cooling tower replacement western guilford high …

8
G-001 18217.0 COOLING TOWER REPLACEMENT WESTERN GUILFORD HIGH SCHOOL GUILFORD COUNTY SCHOOLS 409 FRIENDWAY RD, GREENSBORO, NC 27410 DRAWING DATE DRAWN BY DESIGNED BY PROJECT NUMBER REVIEWED BY SHEET NUMBER 4/25/2018 A B C 4 3 2 1 OWNER'S REPRESENTATIVE: DESIGNER: PROJECT: Mr. Gerald Greeson Executive Director of Maintenance CONSULTING ENGINEERS LICENSE NO. C-0315 SITE PLAN REVISIONS ID DATE COMMENTS MJS MS MS/MJS LIST OF DRAWINGS Sheet Sheet Title G - 001 COVER SHEET M-100 MECHANICAL TITLE SHEET M-101 PARTIAL FIRST FLOOR & ROOF PLANS - MECHANICAL DEMOLITION M-102 PARTIAL FIRST FLOOR PLAN - MECHANICAL CONSTRUCTION M-500 MECHANICAL DETAILS M-600 MECHANICAL SCHEDULES E-001 PARTIAL FIRST FLOOR & ROOF PLANS - ELECTRICAL DEMOLITION E-101 PARTIAL FIRST FLOOR PLAN - ELECTRICAL CONSTRUCTION - GENERAL NOTES WESTERN GUILFORD HIGH SCHOOL 409 FRIENDWAY ROAD GREENSBORO, NC 27410

Upload: others

Post on 07-Feb-2022

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: COOLING TOWER REPLACEMENT WESTERN GUILFORD HIGH …

G-001

18217.0

COOLING TOWER REPLACEMENT

WESTERN GUILFORD HIGH SCHOOL

GUILFORD COUNTY SCHOOLS

409 FRIENDWAY RD, GREENSBORO, NC 27410

DRAWING DATE

DRAWN BY

DESIGNED BY

PROJECT NUMBER

REVIEWED BY

SHEET NUMBER

4/25/2018

A

BC

4 3 2 1

OWNER'S REPRESENTATIVE:

DESIGNER:

PROJECT:

Mr. Gerald Greeson

Executive Director of Maintenance

CONSULTING ENGINEERS

LICENSE NO. C-0315

SITE PLAN

REVISIONS

ID DATE COMMENTS

MJS

MS

MS/MJS

LIST OF DRAWINGS

Sheet Sheet Title

G - 001 COVER SHEET

M-100 MECHANICAL TITLE SHEET

M-101 PARTIAL FIRST FLOOR & ROOF PLANS - MECHANICAL DEMOLITION

M-102 PARTIAL FIRST FLOOR PLAN - MECHANICAL CONSTRUCTION

M-500 MECHANICAL DETAILS

M-600 MECHANICAL SCHEDULES

E-001 PARTIAL FIRST FLOOR & ROOF PLANS - ELECTRICAL DEMOLITION

E-101 PARTIAL FIRST FLOOR PLAN - ELECTRICAL CONSTRUCTION - GENERAL NOTES

WESTERN GUILFORD HIGH SCHOOL

409 FRIENDWAY ROAD

GREENSBORO, NC 27410

AutoCAD SHX Text
G-001 COVER.DWG
AutoCAD SHX Text
4/26/2018 2:07 PM
Page 2: COOLING TOWER REPLACEMENT WESTERN GUILFORD HIGH …

M-100

18217.0

DRAWING DATE

DRAWN BY

DESIGNED BY

PROJECT NUMBER

REVIEWED BY

SHEET NUMBER

CO

NSU

LT

ING

EN

GIN

EE

RS

LIC

EN

SE N

O. C

-031

5

This drawing and the design are the

property of Sud Associates, P.A.,

Consulting Engineers. The reproduction,

copying or other use of this drawing

without their written permission is

prohibited and infringement will be subject

to legal action.

OF

4/25/2018

REVISIONS

ID DATE COMMENTS

MJS

MS

MS/MJS

SUD

ASS

OC

IAT

ES,

P.A

.

CONSULTANT

ME

CH

AN

IC

AL T

IT

LE

S

HE

ET

CO

OLIN

G T

OW

ER

R

EP

LA

CE

ME

NT

GU

ILF

OR

D C

OU

NT

Y, N

OR

TH

C

AR

OLIN

A

GU

ILF

OR

D C

OU

NT

Y S

CH

OO

LS

WE

ST

ER

N G

UILF

OR

D H

IG

H S

CH

OO

L

A/C AIR CONDITIONING

AD ACCESS DOOR

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AHU AIR HANDLING UNIT

BFF BELOW FINISH FLOOR

CD CONDENSATE DRAIN

CFM CUBIC FEET PER MINUTE

CHWR CHILLED WATER RETURN

CHWS CHILLED WATER SUPPLY

CONC CONCRETE

COND CONDUIT

CW COLD WATER SUPPLY

CWR CONDENSER WATER RETURN

CWS CONDENSER WATER SUPPLY

DDC DIRECT DIGITAL CONTROL

DMC DOMESTIC COLD

DN DOWN

DWGS DRAWING

E.C. ELECTRICAL CONTRACTOR

EH ELECTRIC HEATER

ELEC ELECTRICAL

EMCS ENERGY MANAGEMENT CONTROL SYSTEM

EQUIP EQUIPMENT

EXIST EXISTING

FCU FAN COIL UNIT

FD FIRE DAMPER

G GAS

G.C. GENERAL CONTRACTOR

GA GAUGE

GALV GALVANIZED

HP HORSEPOWER

HTWR

HOT WATER RETURN (HEATING)

HTWRR

HOT WATER REVERSE RETURN (HEATING)

HTWS

HOT WATER SUPPLY (HEATING)

HVAC

HEATING, VENTILATING & AIR CONDITIONING

DHW DOMESTIC HOT WATER

M.C. MECHANICAL CONTRACTOR

MANUF. MANUFACTURER

MAX. MAXIMUM

MECH MECHANICAL

MIN MINIMUM

MUW MAKEUP WATER

O.A. OUTDOOR AIR

P.C. PLUMBING CONTRACTOR

PSI POUNDS PER SQUARE INCH

R.A. RELIEF AIR

R.V. RELIEF VENT

RET. A. RETURN AIR

RM ROOM

S.F. SQUARE FOOR

TYP TYPICAL

U.O.N. UNLESS OTHERWISE NOTED

UL UNDERWRITERS LABORATORIES

W/ WITH

AutoCAD SHX Text
FD
AutoCAD SHX Text
T
AutoCAD SHX Text
H
AutoCAD SHX Text
M
AutoCAD SHX Text
FD
AutoCAD SHX Text
ES
AutoCAD SHX Text
T
AutoCAD SHX Text
*
AutoCAD SHX Text
AI
AutoCAD SHX Text
A0
AutoCAD SHX Text
DI
AutoCAD SHX Text
DO
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
TW
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
SYMBOL
AutoCAD SHX Text
SCHEMATIC
AutoCAD SHX Text
ELEVATION
AutoCAD SHX Text
PLAN
AutoCAD SHX Text
GLOBE VALVE
AutoCAD SHX Text
PRESSURE GAGE
AutoCAD SHX Text
THERMOMETER
AutoCAD SHX Text
CIRCUIT SETTER
AutoCAD SHX Text
BALL VALVE
AutoCAD SHX Text
BUTTERFLY VALVE
AutoCAD SHX Text
CHECK VALVE
AutoCAD SHX Text
TRIPLE DUTY VALVE
AutoCAD SHX Text
RELIEF VALVE
AutoCAD SHX Text
THREE WAY CONTROL VALVE
AutoCAD SHX Text
TWO WAY CONTROL VALVE
AutoCAD SHX Text
STRAINER
AutoCAD SHX Text
IN-LINE PUMP
AutoCAD SHX Text
AD - AREA DRAIN FD - FLOOR DRAIN FS - FLOOR SINK RD - ROOF DRAIN
AutoCAD SHX Text
COCK OR PLUG
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
SYMBOL
AutoCAD SHX Text
NEW PIPING OR EQUIPMENT
AutoCAD SHX Text
EXISTING PIPING OR EQUIPMENT
AutoCAD SHX Text
DEMO PIPING OR EQUIPMENT
AutoCAD SHX Text
TEMPERATURE WELL
AutoCAD SHX Text
ANALOG INPUT TO DDC
AutoCAD SHX Text
ANALOG OUTPUT TO DDC
AutoCAD SHX Text
DIGITAL INPUT TO DDC
AutoCAD SHX Text
DIGITAL OUTPUT TO DDC
AutoCAD SHX Text
SCHEMATIC
AutoCAD SHX Text
ELEVATION
AutoCAD SHX Text
PLAN
AutoCAD SHX Text
*
AutoCAD SHX Text
THERMOSTATIC RADIATOR VALVE
AutoCAD SHX Text
TEMPERATURE SENSOR (EMCS)
AutoCAD SHX Text
MANUAL OVERRIDE (EMCS)
AutoCAD SHX Text
HUMIDISTAT (EMCS)
AutoCAD SHX Text
TEMPERATURE SENSOR (EMCS) * INDICATES ASSOCIATED UNIT
AutoCAD SHX Text
THERMOSTAT * INDICATES UNIT
AutoCAD SHX Text
DUCT STATIC PRESSURE SENSOR
AutoCAD SHX Text
FIRE DAMPER
AutoCAD SHX Text
FD
AutoCAD SHX Text
ONE HOUR FIRE RATED BARRIER
AutoCAD SHX Text
TWO HOUR FIRE RATED BARRIER
AutoCAD SHX Text
VD
AutoCAD SHX Text
BALANCING DAMPER
AutoCAD SHX Text
DUCT SMOKE DETECTOR
AutoCAD SHX Text
GATE VALVE
AutoCAD SHX Text
FM
AutoCAD SHX Text
FLOW METER
AutoCAD SHX Text
HANGER
AutoCAD SHX Text
OR
AutoCAD SHX Text
PSIG
AutoCAD SHX Text
TT
AutoCAD SHX Text
TEMPERATURE TRANSMITTER
AutoCAD SHX Text
MECHANICAL PIPES SEE ABBREVIATION TABLE FOR *
AutoCAD SHX Text
GENERAL MECHANICAL LEGEND
AutoCAD SHX Text
*
AutoCAD SHX Text
POINT OF CONNECTION OF DISCONNECTION
AutoCAD SHX Text
EMERGENCY SHUT-DOWN
AutoCAD SHX Text
M-100 MECHANICAL COVER SHEET.DWG
AutoCAD SHX Text
1813 CHAPEL HILL ROAD DURHAM, NORTH CAROLINA (919) 493-5277
AutoCAD SHX Text
FLAT IRON BUILDING SUITE 706 20 BATTERY PARK AVENUE ASHEVILLE, NORTH CAROLINA (828) 255-4691
AutoCAD SHX Text
4/26/2018 2:07 PM
AutoCAD SHX Text
ABBREVIATIONS
Page 3: COOLING TOWER REPLACEMENT WESTERN GUILFORD HIGH …

142

114A

114

196

196A

113

141

140

143

EXST.

SWITCH

BOARD

(ELEC)

EXST.

BOILER #1

EXST.

BOILER #2

PANEL

'BB'

PANEL

'BA'

EXST. ELECTRICAL GUTTER,

STARTERS AND DISCONNECTS FOR

MECHANICAL EQUIPMENT. REFER TO

ELECTRICAL DRAWINGS FOR DETAILS.

PUMP

P-13

EXST. CHILLED

WATER PUMPS

EXST. EMERGENCY

GENERATOR

TO BE REMOVED

EXST.

CHILLER

EXST. EXH. FAN

TO REMAIN

MECHANICAL ROOM

EXST. CT-2

TO BE

RE-ORIENTED

EXST. P-3

EXST. COND.

WATER PUMP

(P-12)

MECHANICAL

ROOM

EXST. 3"

DRAIN RISER

EXST. 2" VENT PIPE

CWR TO CT

ON ROOF

CWS FROM

CT ON ROOF

PUMP

P-9

PUMP

P-11

MAKE-UP WATER CONNECTION

LOCATED ON WALL.

EXST.

VALVE AND

STRAINER

CWS

CWR

EXST. FENCE

EXST. FUEL OIL

LINES TO BOILERS

TO BE REMOVED

EXST. WALL HUNG

HVAC UNIT

PUMP

P-10

OBSOLETE WATER

TREATMENT DEVICES

TO BE REMOVED

WATER TREATMENT EQPM.

RACK AND DEVICES

TO BE RETAINED AND REUSED

EXST. FLOOR DRAIN

FD

MECHANICAL

ROOM BELOW

EXST. CT-1

LOCATED ON ROOF

TO BE REMOVED

CWR DOWN THRU ROOF

MAKE-UP WATER PIPE FROM

MECHANICAL ROOM BELOW

ELEC. CONDUIT FROM

MECHANICAL ROOM BELOW

CWS DOWN THRU ROOF

CAMPUS KEY PLAN

M-101

PA

RT

IA

L F

IR

ST

F

LO

OR

&

R

OO

F P

LA

NS

-

ME

CH

AN

IC

AL D

EM

OLIT

IO

N

18217.0

DRAWING DATE

DRAWN BY

DESIGNED BY

PROJECT NUMBER

REVIEWED BY

SHEET NUMBER

CO

NSU

LT

ING

EN

GIN

EE

RS

LIC

EN

SE N

O. C

-031

5

This drawing and the design are the

property of Sud Associates, P.A.,

Consulting Engineers. The reproduction,

copying or other use of this drawing

without their written permission is

prohibited and infringement will be subject

to legal action.

OF

4/25/2018

REVISIONS

ID DATE COMMENTS

MJS

MS

MS/MJS

SUD

ASS

OC

IAT

ES,

P.A

.C

OO

LIN

G T

OW

ER

R

EP

LA

CE

ME

NT

GU

ILF

OR

D C

OU

NT

Y, N

OR

TH

C

AR

OLIN

A

GU

ILF

OR

D C

OU

NT

Y S

CH

OO

LS

WE

ST

ER

N G

UILF

OR

D H

IG

H S

CH

OO

L

CONSULTANT

KEYED NOTES - MECHANICAL:

DEMOLITION

Remove exhaust fan ducting to make room for new condenser water pump. After new pump is installed, duct will be rerouted

and reinstalled.

Remove condenser water pump and condenser supply and return water piping inside mechanical room. All condenser water

piping in room is to be removed from the chiller up to the flange before pipe penetrates roof. The CWS pipe through roof to

remain from flanges on each side of roof. CWR pipe through roof to be removed through aluminum jacket sleeve and the

sleeve capped.

Existing Cooling Tower CT-2 will be moved and reoriented to make room for new Cooling Tower CT-1. Remove condenser

water supply and return water piping indicated. Provide pipe support for existing condenser water supply and return piping to

remain before demolition. Remove pipe insulation and heat trace. Remove tower drain piping and overflow piping from

tower to permanent drain pipe in ground. Set CT-2 down to allow demolition of existing tower supports. Cooling tower shall

not be set directly on gravel, provide substantial blocking at all support points. Remove existing cooling tower concrete

block support and footings. After demolition is complete, begin work immediately to reinstall tower.

Remove existing make up water piping back to isolation valve in mechanical room.

Existing tower water treatment equipment to be reused. Remove stand housing the equipment during demolition. The best

location to reinstall the stand is to be determined after new piping is installed. Blow down solenoid valve to be reused.

Remove all wiring including conduit along floor after review. The obsolete and unused tower treatment equipment that is

mounted on the wall is to be removed.

Existing tower drain piping and vent are to be reused. Remove the vent during construction and replace after work is

complete. Reroute and support vent as necessary.

Alternate M-1: The 3 building chilled water zone pumps (P-9, 10 & 11) are to be removed along with chiller pump (P-13). A

new chiller pump (P-13) will be installed at the same location. The building pump take off with 6” piping to existing pump

P-9 is to be reused for one new building pump (P-9). Cap other take offs. The supply of the new building pump (P-9) will be

routed and tied into the three zone supply pipes. Refer to the Detail 3/M-500 - Alternate M-1 Chilled Water Pump

Replacement Schematic.

Remove existing Cooling Tower CT-1 and condenser supply and return water piping on roof. All condenser piping aboveroof is to be removed from the cooling tower down to the flange before pipe penetrates roof. The CWS pipe throughroof to remain from flanges on each side of roof. CWR pipe through roof to be removed through aluminum jacket sleeveand the sleeve capped.

Existing steel support frame to remain.

Remove make-up water piping from cooling tower down through roof. Cap pipe sleeve after pipe removal.

Remove electrical conduit and conductors from cooling tower back to starter in mechanical room. Conduit through roofcan remain. Cap conduit 1' above roof. Refer to electrical drawings.

1

2

3

4

5

6

7

8

9

10

11

1

2

2

3

3

4

4

5

5

6

7

8

8

9

10

11

GENERAL NOTES:

1. Remove indicated equipment, piping, valves, fittings, wiring, conduit and other associated electrical devices. The Owner shall

be consulted to determine which removed items are to be turned over. All material and equipment which is not to be turned

over to the Owner shall be removed from the job site and disposed of off site by legal means. Contractor shall obtain all

necessary permits to facilitate removal and disposal. Patch and repair surfaces damaged during demolition to match existing.

2. Protect roof with walk boards in work area during construction.

M-101

2

1/8" = 1'-0"

PARTIAL ROOF PLAN - MECHANICAL DEMOLITION

M-101

1

3/16" = 1'-0"

PARTIAL FIRST FLOOR PLAN - MECHANICAL DEMOLITION

AutoCAD SHX Text
M-101 & 102 PARTIAL FIRST FLOOR & ROOF PLANS - MAIN BUILDING.DWG
AutoCAD SHX Text
1813 CHAPEL HILL ROAD DURHAM, NORTH CAROLINA (919) 493-5277
AutoCAD SHX Text
FLAT IRON BUILDING SUITE 706 20 BATTERY PARK AVENUE ASHEVILLE, NORTH CAROLINA (828) 255-4691
AutoCAD SHX Text
4/26/2018 2:07 PM
Page 4: COOLING TOWER REPLACEMENT WESTERN GUILFORD HIGH …

142

114A

114

196

196A

113

141

140

143

EXST.

SWITCH

BOARD

(ELEC)

EXST.

BOILER #1

EXST.

BOILER #2

PANEL

'BB'

PANEL

'BA'

EXST. ELECTRICAL GUTTER,

STARTERS AND DISCONNECTS FOR

MECHANICAL EQUIPMENT. REFER TO

ELECTRICAL DRAWINGS FOR DETAILS.

EXST.

CHILLER

EXST. EXH. FAN

TO REMAIN

MECHANICAL ROOM

EXST. P-3

NEW CT-1

RE-ORIENTED

EXST. CT-2

NEW COND.

WATER PUMP P-12

MECHANICAL

ROOM

3" DRAIN

2" VENT

MAKE-UP WATER CONNECTION

LOCATED ON WALL.

CWS

CWR

NEW CONDENSER WATER PIPING

ROUTED ALONG EXTERIOR WALL. CWS

BELOW CWR. PIPING TO BE SUPPORTED

BY STEEL BRACKETS ON WALL.

CONCRETE PAD FOR

PIPE SUPPORTS

EXST. FENCE

NEW COOLING TOWER

SUPPORTS TYPICAL.

SEE 3/M102 FOR DETAILS

EXST. WALL HUNG

HVAC UNIT

NEW

PUMP

P-9

1" MUW

1" MUW

REROUTED

EXHAUST DUCT

CWR RISES TO ELEVATION

OF TOWER INLET

ROUTE MUW PIPE

WITH CWS TO

COOLING TOWER

RELOCATED WATER

TREATMENT RACK & EQPM.

NEW

PUMP

P-13

30

x1

6

EXST. FLOOR DRAIN

FD

VSD CT-1 FAN

P-9 VSD

ALT. M-1

VSD P-12

CWR

WALL

CWS

LUBRICATION NOTES

1. AFTER COMPLETION OF THE SYSTEM AND BEFORE START-UP, THE PUMP SHALL BE LUBRICATED IN

STRICT ACCORDANCE WITH MANUFACTURERS INSTRUCTIONS.

2. A METAL INSTRUCTION PLATE SHALL BE ATTACHED TO THE PUMP IN A LOCATION WHERE IT IS

CLEARLY VISIBLE. THESE INSTRUCTIONS SHALL INDICATE THE RECOMMENDED LUBRICANT, THE

POINTS OF, AND FREQUENCY OF LUBRICATION.

PUMP ALIGNMENT

MECHANICAL CONTRACTOR SHALL CHECK, TEST & START BASE MOUNTED PUMP & SHALL HAVE THE

PUMP MANUFACTURER REPRESENTATIVE ALIGN THE PUMP WITH A LASER LEVEL IN ACCORDANCE WITH

PUMP MANUFACTURER'S SPECIFICATIONS. OWNER TO BE PRESENT WHEN CHECKING, TESTING &

STARTING PUMPS.

INSTALLATION NOTES:

1. MOUNT STRAINER WITH BLOWDOWN AT POSITION THAT AVOIDS CHILLED WATER PIPING. EXTEND

1-1/2" BLOW DOWN PIPE AND VALVE TO CONVENIENT LOCATION.

2. DIVERTING BUTTERFLY VALVE TO BE CONTROLLED THROUGH THE DDC SYSTEM.

3. PROVIDE PRESSURE GAUGE TAPS AND SENSORS.

3/4" TAPS FOR

TOWER TREATMENT

6" BELIMO DIVERTING

BUTTERFLY VALVE W/

MODULATING ACTUATOR.

T

CWS FROM

TOWER BASIN

1-1/4" DRAIN

GRADE

PIPE

SUPPORT

STRAINER

5" TO 6"

INCREASING ELBOW

SUCTION DIFFUSER

ROTATE 90°

FLOOR

CWR TO

TOWER

T

TO CHILLER

FROM

CHILLER

ISOLATION VALVE

1-1/4" DRAIN

EXST. FLOOR

DRAIN

P

P

CAMPUS KEY PLAN

M-102

PA

RT

IA

L F

IR

ST

F

LO

OR

P

LA

N - C

ON

ST

RU

CT

IO

N

18217.0

DRAWING DATE

DRAWN BY

DESIGNED BY

PROJECT NUMBER

REVIEWED BY

SHEET NUMBER

CO

NSU

LT

ING

EN

GIN

EE

RS

LIC

EN

SE N

O. C

-031

5

This drawing and the design are the

property of Sud Associates, P.A.,

Consulting Engineers. The reproduction,

copying or other use of this drawing

without their written permission is

prohibited and infringement will be subject

to legal action.

OF

4/25/2018

REVISIONS

ID DATE COMMENTS

MJS

MS

MS/MJS

SUD

ASS

OC

IAT

ES,

P.A

.C

OO

LIN

G T

OW

ER

R

EP

LA

CE

ME

NT

GU

ILF

OR

D C

OU

NT

Y, N

OR

TH

C

AR

OLIN

A

GU

ILF

OR

D C

OU

NT

Y S

CH

OO

LS

WE

ST

ER

N G

UILF

OR

D H

IG

H S

CH

OO

L

CONSULTANT

M-102

13/16" = 1'-0"

PARTIAL FIRST FLOOR - MECHANICAL - NEW WORK

M-102

21/2" = 1'-0"

INSTALLATION DETAIL OF NEW CONDENSER WATER PUMP P-12

KEYED NOTES - MECHANICAL:

CONSTRUCTION

Provide new concrete block support stands for cooling towers (CT-1 & CT-2). Refer to Detail 2/M-103.

Set cooling tower on support stands. Provide condenser water supply and return piping, drain and overflow piping, and

make-up water piping to connect to cooling tower. Provide thermometer well for temperature sensor within 4" of basin

connection. Refer to Detail 1/M-500.

Provide 3" PVC drain piping and connect to each cooling tower. Route drain pipe from CT-1 from tower to building wall and

over then out to hit the existing drain. Maintain even slope. Combine with drain pipe from CT-2.

Make-up water piping shall be routed to both cooling towers. Provide 1" take-off and ball valve for New CT-1 and provide 1"

ball valve on CT-2 make-up water line in Mechanical Room 114. Route new 1" copper piping to each cooling tower.

Support 6" condenser water piping from vertical supports resting on and anchored to concrete base.

Provide new condenser water pump P-12 and diverting valve just inside wall. Refer to Detail 2/M-102. Adjust location to

allow a minimum of 4" of wall between short door and new pipe. Provide 6" condenser water piping to chiller and cooling

tower. Install 3/4" taps and valves for water treatment and thermometer wells for sensors. Sensors will be installed in

separate project. Reinstall chiller flow switch.

Rotate 90° duct radius and extend duct down to 12" above floor at location shown. Install sheet metal down to floor on sides

facing the door and chiller.

Using existing heat trace circuit, wire all piping heat trace through new outdoor thermostat.

Alternate M-1: Replace existing chiller pump (P-13). Provide new constant speed pump chiller pump (P-13). Replace three

existing chilled water pumps (P-9, P-10 and P-11). Provide one new chilled water building pump (P-9) with VSD. Pipe new

pump outlet to all three zone supplies. Refer to Detail 3/M-103.

1

2

3

GENERAL NOTES:

1. Contractor shall route and install all new piping in a manner to ensure clearances and accessibility within the mechanical room

and around equipment is maintained. Contractor shall route piping to provide offsets to avoid interference with structural

elements, equipment, electrical panels and junction boxes, etc. Existing piping shall be modified if necessary to allow the

installation of new systems within the mechanical room.

2. All exterior piping to be insulated, heat traced, and aluminum jacketed.

4

5

6

7

8

9

1

1

2

2

3

3

4

4

4

5

6

7

8

9

AutoCAD SHX Text
M-101 & 102 PARTIAL FIRST FLOOR & ROOF PLANS - MAIN BUILDING.DWG
AutoCAD SHX Text
1813 CHAPEL HILL ROAD DURHAM, NORTH CAROLINA (919) 493-5277
AutoCAD SHX Text
FLAT IRON BUILDING SUITE 706 20 BATTERY PARK AVENUE ASHEVILLE, NORTH CAROLINA (828) 255-4691
AutoCAD SHX Text
4/26/2018 2:07 PM
Page 5: COOLING TOWER REPLACEMENT WESTERN GUILFORD HIGH …

BUILDING WALL

STEEL PIPE SUPPORT

WALL BRACKETS

PIPE STAND PIPE

SUPPORT ANCHOR BASE

TO CONCRETE PAD

DROP CT-1 CWS

DOWN TO ELEVATION

OF PUMP SUCTION

T

CWR

CT-1

CWS

GRADE

W8x24

1-1/2" NON-SHRINK

GROUT TYPICAL

3/4" DIA.x12"

GALVANIZED

ANCHOR BOLTS

4#5 CONT

END VIEW

FRONT VIEW

12" CONCRETE

BLOCK

#4 U BARS

CENTER IN

BLOCK CORES

LAP 1'-8"

#4 CENTER

IN BLOCK

CORE

#4@12"

W8x24

#4 U BARS

CENTER IN

BLOCK CORES

LAP 1'-8"

#4 CENTER

IN BLOCK

CORE

M-500

ME

CH

AN

IC

AL D

ET

AILS

18217.0

DRAWING DATE

DRAWN BY

DESIGNED BY

PROJECT NUMBER

REVIEWED BY

SHEET NUMBER

CO

NSU

LT

ING

EN

GIN

EE

RS

LIC

EN

SE N

O. C

-031

5

This drawing and the design are the

property of Sud Associates, P.A.,

Consulting Engineers. The reproduction,

copying or other use of this drawing

without their written permission is

prohibited and infringement will be subject

to legal action.

OF

4/25/2018

REVISIONS

ID DATE COMMENTS

MJS

MS

MS/MJS

SUD

ASS

OC

IAT

ES,

P.A

.C

OO

LIN

G T

OW

ER

R

EP

LA

CE

ME

NT

GU

ILF

OR

D C

OU

NT

Y, N

OR

TH

C

AR

OLIN

A

GU

ILF

OR

D C

OU

NT

Y S

CH

OO

LS

WE

ST

ER

N G

UILF

OR

D H

IG

H S

CH

OO

L

CONSULTANT

M-500

3

NO SCALE

ALTERNATE M-1 - CHILLED WATER PUMP REPLACEMENT SCHEMATIC

M-500

2

3/4" = 1'-0"

COOLING TOWER SUPPORT DETAIL

M-500

1

3/8" = 1'-0"

ELEVATION VIEW OF NEW COOLING TOWER CT-1 (CT-2 SIMILAR)

EXISTING HOUSEKEEPING PAD

TO BE REMOVED

EXST. AIR

SEPARATOR

EXST. AIR

SEPARATOR

DEMOLITION VIEW CONSTRUCTION VIEW

EXST. P-10

TO BE

REMOVED

EXST. P-13

TO BE REMOVED

EXST. P-9

TO BE REMOVED

EXST. P-11

TO BE REMOVED

NEW P-13NEW P-9

CHWR TO

CHILLER

CHWS FROM

CHILLER

NEW HOUSEKEEPING PAD

CHWS TO BLDG.

CHWS TO BLDG.

CHWS

TO BLDG.

CHWR

FROM BLDG.

CHWS TO BLDG.

CHWS TO BLDG.

CHWS

TO BLDG.

CHWR TO

CHILLER

CHWS FROM

CHILLER

CHWR

FROM BLDG.

PROVIDE

BLIND

FLANGE

NOTES:

1. PROVIDE NEW ISOLATION VALVES.

2. PROVIDE LINE SIZE FLEX CONNECTORS.

3. TRIPLE DUTY VALVE AND SUCTION DIFFUSER

ARE NOT REQUIRED.

AutoCAD SHX Text
M-101 & 102 PARTIAL FIRST FLOOR & ROOF PLANS - MAIN BUILDING.DWG
AutoCAD SHX Text
1813 CHAPEL HILL ROAD DURHAM, NORTH CAROLINA (919) 493-5277
AutoCAD SHX Text
FLAT IRON BUILDING SUITE 706 20 BATTERY PARK AVENUE ASHEVILLE, NORTH CAROLINA (828) 255-4691
AutoCAD SHX Text
4/26/2018 2:07 PM
Page 6: COOLING TOWER REPLACEMENT WESTERN GUILFORD HIGH …

M-600

ME

CH

AN

IC

AL S

CH

ED

ULE

S

18217.0

DRAWING DATE

DRAWN BY

DESIGNED BY

PROJECT NUMBER

REVIEWED BY

SHEET NUMBER

CO

NSU

LT

ING

EN

GIN

EE

RS

LIC

EN

SE N

O. C

-031

5

This drawing and the design are the

property of Sud Associates, P.A.,

Consulting Engineers. The reproduction,

copying or other use of this drawing

without their written permission is

prohibited and infringement will be subject

to legal action.

OF

4/25/2018

REVISIONS

ID DATE COMMENTS

MJS

MS

MS/MJS

SUD

ASS

OC

IAT

ES,

P.A

.C

OO

LIN

G T

OW

ER

R

EP

LA

CE

ME

NT

GU

ILF

OR

D C

OU

NT

Y, N

OR

TH

C

AR

OLIN

A

GU

ILF

OR

D C

OU

NT

Y S

CH

OO

LS

WE

ST

ER

N G

UILF

OR

D H

IG

H S

CH

OO

L

CONSULTANT

PUMP SCHEDULE

UNIT DESIGNATION

Alt M-1 Pump -13 Alt M-1 Pump -9

NEW P-12

SERVICE CHILLER EVAPORATOR PUMP CHILLED WATER BUILDING PUMP CHILLER CONDENSER WATER

TYPE END SUCTION END SUCTION END SUCTION

MANUFACTURER B&G B&G TACO

MODEL DESIGNATION SERIES 4BD 5GB FI SERIES

WEIGHT (LBS)

NA NA 711

PUMP SIZE DESIGNATION 1510 1510 5095

SUCTION DIFFUSER SIZE NA NA 8

OUTLET SIZE 4 4 6

CAPACITY (GPM)

780 1000 800

TOTAL DYNAMIC HEAD (FT)

35 60 40

RPM 1760 1760 1760

PUMP EFFICIENCY (Percent)

76 80 80.3

MOTOR HORSEPOWER 10 20 15

MOTOR TYPE / FRAME TEFC / 254T TEFC / 254T TEFC / 254T

VOLTS/PHASE 460/3 460/3 460/3

NOTES: Premium Effic motorPremium Effic motor, Inverter rated Premium Effic motor, Inverter rated

Manufacturer:TACO or equals by ITT B&G, ARMSTRONG, or WEINMAN

COOLING TOWER

IDENTIFICATION NEW CT-1

MANUFACTURER MARLEY

MODEL NUMBER NC8402PAN

DESCRIPTIONCROSSFLOW, INDUCED DRAFT, HORIZONTAL DISCHARGE

OPERATING WEIGHT (LBS) 10,080

SIZE: LENGTH X WIDTH X HEIGHT (FT)

8'-4 3/4" X 14'-2" X 10'-3"

CONNECTIONS: INLET/OUTLET 6" / 6"

CHILLER COOLING LOAD (TONS)

250

PERFORMANCE (NOTES 2, 3, 5, &

6)

GPM 750

EWT 95

LWT 85

AMBIENT WET BULB (DESIGN)

78 F

STATIC LIFT 10.571'

FAN(S)

HP

(1) 15

CFM84,340

ELECTRIC IMMERSION BASIN

HEATER

AMBIENT TEMPERATURE DEGREES F 3

KW 8

ELECTRICAL

VOLTS 460

PHASE 3

SOUND

SOUND PRESSURE AT 50' AIR INLET FACE / CASED FACE / FAN DISCHARGE FACE

MAXIMUM dB A WEIGHTED SOUND

PRESSURE LEVEL (NOTE 4)

61 / 60 / 67

NOTES:

1. MANUFACTURER: MARLEY OR EQUAL BY BAC OR EVAPCO.

2. PROVIDE ADJUSTABLE SPEED DRIVE AND PREMIUM EFFICIENCY INVERTER DUTY MOTOR FOR FAN.

3. PROVIDE STAINLESS STEEL BASIN CONTRUCTION.

4. MAXIMUM "A" RATED SOUND PRESSURE LEVEL 20' FROM THE AIR INLET FACE/CASED FACE/FAN DISCHARGE FACE/TOP DECK OF THE

COOLING TOWER.

5. PROVIDE FLOAT TYPE AUTOMATIC MAKE-UP WATER FILL ASSEMBLY.

6. PROVIDE ANTI-VORTEXING DEVICE AND A SCREEN STRAINER AT COOLING TOWER OUTLET.

7. PROVIDE STAINLESS STEEL WIRE MESH AIR INLET SCREENS.

8. PROVIDE ELECTRIC IMMERSION BASIN HEATER WITH ITS CONTROLLER IN A NEMA 4 STAINLESS STEEL ENCLOSURE. PROVIDE A NEMA 4

THERMOSTAT AND A LOW WATER CUT OFF SWITCH.

9. FAN MOTOR START/STOP SHALL BE CONTROLLED BY THE DDC SYSTEM THROUGH THE NEW ADJUSTABLE SPEED DRIVE.

AutoCAD SHX Text
M-101 & 102 PARTIAL FIRST FLOOR & ROOF PLANS - MAIN BUILDING.DWG
AutoCAD SHX Text
1813 CHAPEL HILL ROAD DURHAM, NORTH CAROLINA (919) 493-5277
AutoCAD SHX Text
FLAT IRON BUILDING SUITE 706 20 BATTERY PARK AVENUE ASHEVILLE, NORTH CAROLINA (828) 255-4691
AutoCAD SHX Text
4/26/2018 2:07 PM
Page 7: COOLING TOWER REPLACEMENT WESTERN GUILFORD HIGH …

CAMPUS KEY PLAN

EXST.

BOILER #1

EXST.

BOILER #2

MECHANICAL

ROOM

EXST. CT-2

DISC. SW.

EXST. ELECTRICAL GUTTER,

STARTERS AND DISCONNECTS FOR

MECHANICAL EQUIPMENT. SEE

SCHEMATIC DETAIL THIS SHEET.

'BB'

208/120

'BA'

277/480

EXST.

P-12

EXST. P-3

EXST.

P-13

EXST.

P-9EXST.

P-11

EXST.

P-10

EXST.

CHILLER

EXST.

SWITCH

BOARD

(ELEC)

EXST.

CT-2

EXST. CT-2 ELEC.

GUTTER, STARTER

AND DISCONNECTS

142

114B

114A

114

196

196A

196B

113

145

141

140

143

3

2

J

4

5

4

JB JB

PANEL

'BB'

PANEL

'BA'

EXST. CT-1

BASIN HTR.

DISC. SW.

P-8

P-5

P-3

CT-1

FAN

P-4 P-6 P-7

P-10

P-8 P-9 P-11 P-12 CT-1

JB

2

1

3 444

MECHANICAL

ROOM BELOW

EXST. CT-1

LOCATED ON ROOF

TO BE REMOVED

ELEC. CONDUIT FROM

MECHANICAL ROOM BELOW

1

E-001

18217.0

DRAWING DATE

DRAWN BY

DESIGNED BY

PROJECT NUMBER

REVIEWED BY

SHEET NUMBER

CO

NSU

LT

ING

EN

GIN

EE

RS

LIC

EN

SE N

O. C

-031

5

This drawing and the design are the

property of Sud Associates, P.A.,

Consulting Engineers. The reproduction,

copying or other use of this drawing

without their written permission is

prohibited and infringement will be subject

to legal action.

04/25/2018

REVISIONS

ID DATE COMMENTS

PSD

JCH

DLB

SUD

ASS

OC

IAT

ES,

P.A

.

CONSULTANT

KEYED NOTES

1 TURN OFF AND REMOVE ALL ELECTRICAL BACK TO PANEL. MARK BREAKERS AS SPARE.

2 TURN OFF AND DISCONNECT ELECTRICAL TO TOWER, DISCONNECT TO BE REUSED. REMOVE FEEDER CIRCUIT

TO TOWER.

3 MAINTAIN HEAT TRACE CIRCUIT, TO BE REUSED.

ALTERNATE 1:

4 TURN OFF AND REMOVE ELECTRICAL FROM PUMPS P-9, P-10, & P-11 BACK TO PANEL BA.

5 TURN OFF AND DISCONNECT ELECTRICAL FROM PUMP P-13, MAINTAIN CIRCUIT AND BREAKER.

E-101

11/8" = 1'-0"

PARTIAL FIRST FLOOR - ELECTRICAL- DEMOLITION

E-001

3

NTS

PARTAIL POWER RISER - DEMOLITION

KEYED NOTES

1 REMOVE BASIN HEATER DISCONNECT, (SAVE FOR REINSTALLATION), CIRCUIT FROM PANEL BA AND FEEDER TO COOLING TOWER ON ROOF.

2 REMOVE COOLING TOWER (ROOF) FAN STARTER AND DISCONNECT, CIRCUIT FROM PANEL BA AND FEEDER TO COOLING TOWER.

3 REMOVE PUMP P-12 STARTER, CIRCUIT FROM PANEL BA AND FEEDER TO PUMP.

ALTERNATE 1:

4 REMOVE PUMPS P-9, P-10, & P-11 STARTERS, CIRCUITS FROM PANEL BA, AND FEEDERS TO PUMPS.

PA

RT

IA

L F

IR

ST

F

LO

OR

P

LA

N -

ELE

CT

RIC

AL D

EM

OLIT

IO

N

CO

OLIN

G T

OW

ER

R

EP

LA

CE

ME

NT

GU

ILF

OR

D C

OU

NT

Y, N

OR

TH

C

AR

OLIN

A

GU

ILF

OR

D C

OU

NT

Y S

CH

OO

LS

WE

ST

ER

N G

UILF

OR

D H

IG

H S

CH

OO

L

E-101

21/8" = 1'-0"

PARTIAL ROOF - ELECTRICAL- DEMOLITION

AutoCAD SHX Text
EXST. CT-1 BASIN HTR. DISC. SW. BELOW ELEC. PANEL BA
AutoCAD SHX Text
EXST. EMERGENCY GENERATOR TO BE REMOVED
AutoCAD SHX Text
EXST. EXH. FAN
AutoCAD SHX Text
1813 CHAPEL HILL ROAD DURHAM, NORTH CAROLINA (919) 493-5277
AutoCAD SHX Text
FLAT IRON BUILDING SUITE 706 20 BATTERY PARK AVENUE ASHEVILLE, NORTH CAROLINA (828) 255-4691
Page 8: COOLING TOWER REPLACEMENT WESTERN GUILFORD HIGH …

EXST.

BOILER #1

EXST.

BOILER #2

NEW CT-1

RE-ORIENTED

EXST. CT-2

MECHANICAL

ROOM

EXST. CT-2

DISC. SW.

EXST. ELECTRICAL GUTTER,

STARTERS AND DISCONNECTS FOR

MECHANICAL EQUIPMENT. SEE

SCHEMATIC DETAIL SHEET E001.

EXST. P-3

EXST.

CHILLER

EXST.

SWITCH

BOARD

(ELEC)

NEW

PUMP

P-9

NEW

PUMP

P-13

142

114B

114A

114

196

196A

196B

113

145

141

140

143

C

'BB'

208/120

'BA'

277/480

J

A

B

1

2

4

2

6

35

8

7

J

CIRCUIT TO

FAN AND

HEATER

8

9

CAMPUS KEY PLAN

GENERAL ELECTRICAL LEGEND

SYMBOL DESCRIPTION

DISCONNECT SWITCH - AMP RATING/NO. OF POLES/FUSE SIZE INDICATED

100

603P

NON-FUSIBLE DISCONNECT SWITCH, 60 AMP RATED, HP RATED FOR

MOTORS NEMA ENCLOSURE RATING(3R) AS SHOWN. 3R: RAIN TIGHT.

60

3R

ELECTRICAL POWER SUPPLY CONNECTION TO EQUIPMENT - EQUIPMENT

TAG OR DESIGNATION INDICATED. COORDINATE LOCATION AND

CONNECTION DETAILS WITH EQUIPMENT PROVIDER.

e

GFCI DUPLEX RECEPTACLEG

S MOTOR STARTER TOGGLE SWITCH, #POLE TO MATCH # CIRCUITS

M

S NEMA 4 WET RATED MOTOR STARTER TOGGLE SWITCH

MW

J

JUNCTION BOX

SWITCHED CIRCUIT

UNSWITCHED CIRCUIT

HOMERUN CIRCUIT TO PANEL - CIRCUIT INDICATED

EXISTING EQUIPMENT

NEW EQUIPMENT

WEATHER TIGHT DUPLEX RECEPTACLEW

E-101

PA

RT

IA

L F

IR

ST

F

LO

OR

P

LA

N -

ELE

CT

RIC

AL C

ON

ST

RU

CT

IO

N

DRAWING DATE

DRAWN BY

DESIGNED BY

PROJECT NUMBER

REVIEWED BY

SHEET NUMBER

CO

NSU

LT

ING

EN

GIN

EE

RS

LIC

EN

SE N

O. C

-031

5

This drawing and the design are the

property of Sud Associates, P.A.,

Consulting Engineers. The reproduction,

copying or other use of this drawing

without their written permission is

prohibited and infringement will be subject

to legal action.

REVISIONS

ID DATE COMMENTS

SUD

ASS

OC

IAT

ES,

P.A

.C

OO

LIN

G T

OW

ER

R

EP

LA

CE

ME

NT

GU

ILF

OR

D C

OU

NT

Y, N

OR

TH

C

AR

OLIN

A

GU

ILF

OR

D C

OU

NT

Y S

CH

OO

LS

WE

ST

ER

N G

UILF

OR

D H

IG

H S

CH

OO

L

CONSULTANT

E-101

21/8" = 1'-0"

PARTIAL FIRST FLOOR - ELECTRICAL- NEW WORK

18217.0

04/25/2018

PSD

JCH

DLB

GENERAL NOTE:

ALTERNATE M-1: REPLACE EXISTING CHILLER PUMP (P-13). PROVIDE NEW CONSTANT SPEED PUMP CHILLER PUMP (P-13).

REPLACE THREE EXISTING CHILLED WATER PUMPS (P-9, P-10 AND P-11). PROVIDE ONE NEW CHILLED WATER BUILDING PUMP

(P-9) WITH VSD. PIPE NEW PUMP OUTLET TO ALL THREE ZONE SUPPLIES. REFER TO DETAIL 3/M-103.

KEYED NOTES

1 INSTALL VFD, FURNISHED BY MC FOR NEW PUMP P-12. PROVIDE CIRCUIT TO ORIGINAL BREAKER IN PANEL BA FOR P-12. PROVIDE 3/4" C, (3) #12, #12 G. PROVIDE 2-3' OF FMC AT MOTOR.

2 PROVIDE CIRCUIT FROM PANEL BA TO COOLING TOWER #1 FAN VFD AND BASIN HEATER FUSED DISCONNECT. REUSE EXISTING BREAKER, PROVIDE 1" C, (3) #8, + #10 G.

3 PROVIDE CIRCUIT FROM TOWER MOUNTED DISCONNECT TO VFD. PROVIDE 3/4" C (3) #10, #12 G.

4 REINSTALL DISCONNECT FOR BASIN HEATER.

5 PROVIDE FEED TO BASIN HEATER, 3/4" C, (3) #12, #12 G. PROVIDE A JUNCTION BOX AS NEEDED. MOUNT DISCONNECT AT TOWER.

6 PROVIDE (2) 3/4" C AND EXTEND CIRCUITS, AT 24" BFG, TO NEW COOLING TOWER.

7 RECONNECT EXISTING CIRCUIT TO RELOCATED COOLING TOWER #2. PROVIDE AT 24" BFG.

8 RECONNECT HEAT TRACING CIRCUIT TO NEW TOWER #1. PROVIDE EXTENSION AND RECONNECT HEAT TRACING ON REORIENTED COOLING TOWER #2.

9 EC TO DETERMINE PANEL SOURCE FOR CT 2 CIRCUIT.

ALTERNATE M 1:

A REMOVE CIRCUITS FOR PUMPS P-9, P-10, P-11, INSTALL VFD FURNISHED BY MC. PROVIDE FEED TO NEW PUMP P-9, 3/4" C, (3) #8, + #10 G.

B PROVIDE CIRCUIT TO PANEL BA, 3/4" C, (3) #8, + #10G. PROVIDE 60 AMP, 3 POLE BREAKER, MATCH EXISTING BREAKERS.

C INSTALL NEW STARTER, FURNISHED BY MC, FOR NEW PUMP P-13. RECONNECT EXISTING CIRCUIT TO NEW PUMP P-13. PROVIDE 2 - 3' OFFMC AT PUMP.

SCOPE OF WORK

PROVIDE TEMPORARY CONSTRUCTION PHASE POWER AND LIGHTING FOR ALL TRADES AS NEEDED.

PROVIDE SUBMITTALS ON ALL POWER, LIGHTING, AND CONTROLS EQUIPMENT.

PROVIDE ALL ELECTRICAL SHOWN ON DRAWINGS AND SPECIFICATIONS AND AS NEEDED TO PROVIDE A COMPLETE FUNCTIONAL INSTALLATION

IN COMPLIANCE WITH STATE AND LOCAL CODES.

PROVIDE ALL LOW VOLTAGE, DATA WIRING AND OUTLETS.

PROVIDE FIELD COORDINATION WITH OTHER TRADES AND PROVIDE RED-LINE MARKED UP DRAWINGS TO OWNER OF ALL FIELD CHANGES.

TEST ALL MOTORS FOR CORRECT ROTATION.

ASSIST OTHER TRADES IN TESTING OF HVAC EQUIPMENT.

PROVIDE ALL REQUIRED ELECTRICALLY RELATED PERMITS AND INSPECTIONS.

PROVIDE ONE YEAR WARRANTY ON ALL PARTS AND LABOR FROM DATE OF PROJECT ACCEPTANCE

ABBREVIATIONS

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AHU AIR HANDING UNIT

AL ALUMINUM

BFG BELOW FINISHED GRADE

C CONDUIT

CT COOLING TOWER

CU COPPER

DS DISCONNECT SWITCH

EF EXHAUST FAN

G GROUND

MC MECHANICAL CONTRACTOR

MCB MAIN CIRCUIT BREAKER

MDS MAIN DISCONNECT SWITCH

N NEUTRAL

NIC NOT IN CONTRACT

PC PHOTOCELL

PNL PANELBOARD

RSC RIGID STEEL CONDUIT

UNV UNIVERSAL

UON UNLESS OTHERWISE NOTED

W WET LOCATION RATED

WIR WIRE (SIZE/RATING)

GENERAL NOTES (ALL ELECTRICAL SHEETS)

1 THIS DRAWING IS DIAGRAMMATIC AND INDICATES THE APPROXIMATE LOCATION OF DEVICES AND EQUIPMENT. THE CONTRACTOR

SHALL FIELD VERIFY ALL EXISTING CONDITIONS ON SITE. MINOR ADJUSTMENTS AND OFFSETS SHALL BE PROVIDED WHERE

REQUIRED AT NO ADDITIONAL COST TO THE OWNER.

2 PROVIDE ALL WORK IN COMPLIANCE WITH ALL STATE AND LOCAL CODES AND IN AN INDUSTRY STANDARD WORKMANLIKE MANNER.

3 NMC (ROMEX AND SE CABLE FOR FEEDERS) IS NOT ACCEPTABLE. AC/MC CABLE IS NOT ACCEPTABLE. EMT CONDUITS WITH CRIMP

COUPLINGS AND CONDUCTORS SHALL BE USED IN ALL LOCATIONS.

4 RACEWAYS SHALL NOT BE RUN ON THE EXTERIOR OF BUILDING OR EXPOSED IN FINISHED USER/PUBLIC AREAS.

5 ALL WALLS AND PENETRATIONS SHALL BE REPAIRED AND SEALED, SEE ARCHITECTURAL FOR WALL CONSTRUCTION.

6 ALL WIRE SIZES SHOWN ARE FOR COPPER, UNLESS OTHERWISE NOTED. WIRES #10 OR LESS SHALL BE SOLID.

7 RECEPTACLE AND SWITCH COVER PLATES SHALL BE STAINLESS STEEL, DEVICES SHALL BE WHITE.

8 ALL SPARE BREAKERS SHALL BE TURNED OFF AND LABELED "SPARE" ON DIRECTORY CARD.

9 PROVIDE ALL CONDUIT AND WIRE TERMINATIONS TO EQUIPMENT.

10 THE ENGINEER HAS ATTEMPTED TO PROVIDE A COMPLETE DESIGN, COMPLIANT WITH ALL CODES. THE CONTRACTOR IS STILL

RESPONSIBLE FOR MAKING MINOR ADJUSTMENTS TO MEET CODES AND THE DESIGN INTENT.

AutoCAD SHX Text
EXST. EXH. FAN
AutoCAD SHX Text
NEW P-13 COMB. STARTER/DISC. SW.
AutoCAD SHX Text
NEW P-9 VSD
AutoCAD SHX Text
NEW PUMP P-12
AutoCAD SHX Text
NEW CT-1 VFD
AutoCAD SHX Text
RELOCATED CT-1 BASIN HTR. DISC. SW.
AutoCAD SHX Text
NEW P-12 VFD.
AutoCAD SHX Text
ALT M-1
AutoCAD SHX Text
1813 CHAPEL HILL ROAD DURHAM, NORTH CAROLINA (919) 493-5277
AutoCAD SHX Text
FLAT IRON BUILDING SUITE 706 20 BATTERY PARK AVENUE ASHEVILLE, NORTH CAROLINA (828) 255-4691