cope tues 3pm ligurian i.pdf

Upload: ndimuzio

Post on 03-Jun-2018

219 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/12/2019 COPE TUES 3PM LIGURIAN I.pdf

    1/30

    TheImpactofWindonRoofsRAACatModelingConference

    Feb1013 2014

    Dr.

    Anne

    Cope

  • 8/12/2019 COPE TUES 3PM LIGURIAN I.pdf

    2/30

  • 8/12/2019 COPE TUES 3PM LIGURIAN I.pdf

    3/30

  • 8/12/2019 COPE TUES 3PM LIGURIAN I.pdf

    4/30

  • 8/12/2019 COPE TUES 3PM LIGURIAN I.pdf

    5/30

  • 8/12/2019 COPE TUES 3PM LIGURIAN I.pdf

    6/30

    n spee s were no a g n s u y areas:

    Gustav - 70 to 80 mph gusts

    Ike - 75 to 90 mph gusts

    HurricaneIke

    (2008)

  • 8/12/2019 COPE TUES 3PM LIGURIAN I.pdf

    7/30

    Failures tended to occur inall areas of roof not just

    o e requremen s or

    rated products or just the

    may be reducing damage

    cant reall tell et. HurricaneIke(2008)

    InsuranceInstituteforBusiness&HomeSafetyInsuranceInstituteforBusiness&HomeSafety

  • 8/12/2019 COPE TUES 3PM LIGURIAN I.pdf

    8/30

    InsuranceInstituteforBusiness&HomeSafety

  • 8/12/2019 COPE TUES 3PM LIGURIAN I.pdf

    9/30

  • 8/12/2019 COPE TUES 3PM LIGURIAN I.pdf

    10/30

  • 8/12/2019 COPE TUES 3PM LIGURIAN I.pdf

    11/30

    omponen es ngo ng es

    ASTMstandardizedtestmethods

    Observeddeflectionofshingles

    Relativeperformance

    comparison

    for

    off

    the

    shelf

    pro ucts

    WholeRoofTesting

    Measurewind

    loads

    for

    6on

    12

    and

    4on

    12

    pitch

    Developtimehistoryinformation

  • 8/12/2019 COPE TUES 3PM LIGURIAN I.pdf

    12/30

    WindUpliftResistance&Agingof

    AsphaltShingles

    PostEvent

    Assessments

    AgingFarm

  • 8/12/2019 COPE TUES 3PM LIGURIAN I.pdf

    13/30

    2013:Establish

    relationship

    withasphaltshingle

    Relativeperformanceof

    3tab

    shin les

    6on12wholerooftesting

    Bu

    aroo

    farmforaging

  • 8/12/2019 COPE TUES 3PM LIGURIAN I.pdf

    14/30

    2014

    Relativeperformance

    of

    architecturalshingles

    on w o eroo test ng

    Compareloadingeffects:realistic

    wind

    loads

    in

    test

    chambervs.standardtests

    Enlargeagingfarm

    sta s

    ns tu

    test ng

    capabilityandconductfieldstudies

  • 8/12/2019 COPE TUES 3PM LIGURIAN I.pdf

    15/30

    2015andbe ond:Establish

    design

    requirementsforshingles

    eve opnews mp e es s

    Statisticalmodelofshingleresistance

    using:

    Resultsfromcomponenttests(COMET)

    Agingfarmresults

    Posteventdamageassessments

  • 8/12/2019 COPE TUES 3PM LIGURIAN I.pdf

    16/30

    Problemsgettingshinglestoseal

    Effectsofhandlingandg

    Difficulttoachieverobust

    Evenat155160F,physicalobstaclesremained

    Whensealedwell,many3tabproductsstayedoninwinds>120mphfor2hours

  • 8/12/2019 COPE TUES 3PM LIGURIAN I.pdf

    17/30

    SealingofShingles

    Observations&

    Takeaways

    InsuranceInstituteforBusiness&HomeSafety

  • 8/12/2019 COPE TUES 3PM LIGURIAN I.pdf

    18/30

    SealingofShingles

    Observations&

    Takeaways

  • 8/12/2019 COPE TUES 3PM LIGURIAN I.pdf

    19/30

    Cohesivefailures

    withintheshingleitself

    InsuranceInstituteforBusiness&HomeSafetyInsuranceInstituteforBusiness&HomeSafety

  • 8/12/2019 COPE TUES 3PM LIGURIAN I.pdf

    20/30

    ResultstoDate:ASTMTestsvs.

    6on

    12

    Whole

    Roof

    Uplift

    Forces

  • 8/12/2019 COPE TUES 3PM LIGURIAN I.pdf

    21/30

    IBHS

  • 8/12/2019 COPE TUES 3PM LIGURIAN I.pdf

    22/30

    IBHS

  • 8/12/2019 COPE TUES 3PM LIGURIAN I.pdf

    23/30

    ResultstoDate:TestProtocol

    Observations&

    Takeaways

    appears o eamoresevere

    testof

    shingles

    than

    ASTM

    D

    7158

    (due

    to

    oa ura on

    ASTM

    D

    3161

    combines

    both

    load

    and

    resistance

    assessmen so s ng es nas ng e es = r.

    durationofsteadywinds

    intotwopartsandresistanceismeasured

  • 8/12/2019 COPE TUES 3PM LIGURIAN I.pdf

    24/30

    ResultstoDate:TestProtocol

    Observations&

    Takeaways

    Hypothesis:Thoughfullscaleshortduration

    loadsmaybehigher,thedurationofloadin

    ASTM3161maycompensate

    InsuranceInstituteforBusiness&HomeSafety

  • 8/12/2019 COPE TUES 3PM LIGURIAN I.pdf

    25/30

    Option1:

    validation

    ofseal

    p on : rea eroofasasystem,

    resilientshingles

    +

    sealedroofdeck

  • 8/12/2019 COPE TUES 3PM LIGURIAN I.pdf

    26/30

  • 8/12/2019 COPE TUES 3PM LIGURIAN I.pdf

    27/30

  • 8/12/2019 COPE TUES 3PM LIGURIAN I.pdf

    28/30

  • 8/12/2019 COPE TUES 3PM LIGURIAN I.pdf

    29/30

    DisasterSafety.org

  • 8/12/2019 COPE TUES 3PM LIGURIAN I.pdf

    30/30