CONFIRMATION OF CONCRETE SLUMP DESIGN
Project: CT2 High-rise Condominium, The Exchange city - Tu Liem - Hanoi
Item: Basement
STT MEMBERS REMARKS Final slump
1 Big Pile caps (mass concrete pouring) B40 (M500)
2 Pile-caps with piles underneath B40 (M500)
3 Pile-caps with single pile underneath B30 (M400)
4 Basement Wall B27.5 (M350) B10 grade of water proofing / Bê tông chống thấm cấp B10
5 Slabs, Beams of B1 and Ground Floor B35 (M450) A1, A2, A3
6 Slabs, Beams of B1 and Ground Floor B30 (M400) B4, B5, B6, Club House
7 Slabs, Beams of B2 B30 (M400)
8 Columns and Walls (up to level -0.05 m) B40 (M500) A1, A2, A3
9 Columns and Walls (up to level -0.05 m) B35 (M450) B4, B5, B6, Club House
10 Stair, lintel, ramp and other B22.5 (M300)
11 Lean Concrete B7.5 (M100)
GRADE OF CONCRETE
100 ± 20 mm 100 ± 20 mm
140 ±20 mm
120 ±20 mm
140 ±20 mm
120 ±20 mm
120 ±20 mm
120 ±20 mm
140 ±20 mm
140 ±20 mm
120 ±20 mm
120 ±20 mm
HOA BINH CORPORATION 235 Voõ Thò Saùu Q3 Tp.HCM
B10 grade of water proofing / Bê tông chống thấm cấp B10