CONFIRMATION OF CONCRETE SLUMP DESIGN

Project: CT2 High-rise Condominium, The Exchange city - Tu Liem - Hanoi

Item: Basement

STT MEMBERS REMARKS Final slump

1 Big Pile caps (mass concrete pouring) B40 (M500)

2 Pile-caps with piles underneath B40 (M500)

3 Pile-caps with single pile underneath B30 (M400)

4 Basement Wall B27.5 (M350) B10 grade of water proofing / Bê tông chống thấm cấp B10

5 Slabs, Beams of B1 and Ground Floor B35 (M450) A1, A2, A3

6 Slabs, Beams of B1 and Ground Floor B30 (M400) B4, B5, B6, Club House

7 Slabs, Beams of B2 B30 (M400)

8 Columns and Walls (up to level -0.05 m) B40 (M500) A1, A2, A3

9 Columns and Walls (up to level -0.05 m) B35 (M450) B4, B5, B6, Club House

10 Stair, lintel, ramp and other B22.5 (M300)

11 Lean Concrete B7.5 (M100)

GRADE OF CONCRETE

100 ± 20 mm 100 ± 20 mm

140 ±20 mm

120 ±20 mm

140 ±20 mm

120 ±20 mm

120 ±20 mm

120 ±20 mm

140 ±20 mm

140 ±20 mm

120 ±20 mm

120 ±20 mm

HOA BINH CORPORATION 235 Voõ Thò Saùu Q3 Tp.HCM