Agenda 1. Quantities 2. Estimate 3. Contract Awarding 4. ConclusionTRANSCRIPT
![Page 1: Cost Estimation Strategies for Keeping Track of the Vastness Presented by: David Lake, P.E. Roadway Designer Nevada Department of Transportation](https://reader036.vdocuments.net/reader036/viewer/2022062905/5a4d1aee7f8b9ab05997cc30/html5/thumbnails/1.jpg)
Cost EstimationStrategies for Keeping Track of
the Vastness
Presented by:David Lake, P.E.Roadway DesignerNevada Department of TransportationEmail: [email protected]
![Page 2: Cost Estimation Strategies for Keeping Track of the Vastness Presented by: David Lake, P.E. Roadway Designer Nevada Department of Transportation](https://reader036.vdocuments.net/reader036/viewer/2022062905/5a4d1aee7f8b9ab05997cc30/html5/thumbnails/2.jpg)
Introduction1. How many bid items do you think
were used on US95 2A?2. How many sources/divisions
contribute to the estimate?3. What are some good strategies to
keep track of bid items?
![Page 3: Cost Estimation Strategies for Keeping Track of the Vastness Presented by: David Lake, P.E. Roadway Designer Nevada Department of Transportation](https://reader036.vdocuments.net/reader036/viewer/2022062905/5a4d1aee7f8b9ab05997cc30/html5/thumbnails/3.jpg)
Agenda
1. Quantities2. Estimate3. Contract
Awarding 4. Conclusion
![Page 4: Cost Estimation Strategies for Keeping Track of the Vastness Presented by: David Lake, P.E. Roadway Designer Nevada Department of Transportation](https://reader036.vdocuments.net/reader036/viewer/2022062905/5a4d1aee7f8b9ab05997cc30/html5/thumbnails/4.jpg)
Roadway Quantity Breakout & Calculations
Master Quantities Roadway Breakout
Structure List
Barrier Rail Length of Need
ADA (driveways) Areas/ Cross Sec
ADA (Sidewalk) Areas/ Cross Sec
3 sheets
Earthwork Cross Sections
Structure Sections Station/ Offset
Geotextile Locations/ Areas
Traffic Control
Sign Matrix TC phasing
Device Matrix TC phasing
Detour Cross Sections
Striping Excel Calcs Areas
Compiled Estimate Breakouts Sub-Breakouts Excel Calculators CADD Calculations
![Page 5: Cost Estimation Strategies for Keeping Track of the Vastness Presented by: David Lake, P.E. Roadway Designer Nevada Department of Transportation](https://reader036.vdocuments.net/reader036/viewer/2022062905/5a4d1aee7f8b9ab05997cc30/html5/thumbnails/5.jpg)
Other Division’s Breakouts and Calculations
Master Quantities
Hydraulics
Ditch & Channels Excel Calcs DGN
Culverts Pipe matrix CS/ Lengths
ITS CMS CMS matrix Conduit
Signs Cantilever Sign Matrix CS
Lighting High Mast Lighting Matrix Area
L&A Decorative Rock Area Designations Areas
Structures
MSE walls
Wall Matrix Profiles/ Volumes
Excavation CS
Bridge Resurfacing Deck Inventory Areas
Sound Walls SW List ProfilesCCRFC
Compiled Estimate Breakouts Sub-Breakouts Excel Calculators CADD Calculations
![Page 6: Cost Estimation Strategies for Keeping Track of the Vastness Presented by: David Lake, P.E. Roadway Designer Nevada Department of Transportation](https://reader036.vdocuments.net/reader036/viewer/2022062905/5a4d1aee7f8b9ab05997cc30/html5/thumbnails/6.jpg)
CADD file• Removal of
Composite surface
Excel Calculator
s• Driveway Calculator
Sub Breakout
• Structure List
Roadway Breakout
• Master Quantities
~Look at Actual Quantity
Calculators~
![Page 7: Cost Estimation Strategies for Keeping Track of the Vastness Presented by: David Lake, P.E. Roadway Designer Nevada Department of Transportation](https://reader036.vdocuments.net/reader036/viewer/2022062905/5a4d1aee7f8b9ab05997cc30/html5/thumbnails/7.jpg)
State’s Estimate Program• Integrated Project Development (iPD)
Estimator Specialist
• Ensure Correct Coding
• Handles Permit funding
• Oversees Estimate Status
Roadway Designer
• Creates Estimate
• Inputs Quantities
• Creates Breakouts
• Obligates Funding
Manager
• Unit Price Checker
Special Provisions Writer
• Approve Bid items
Finical Management
• Oversees preliminary costs
• Reserves money sources
![Page 8: Cost Estimation Strategies for Keeping Track of the Vastness Presented by: David Lake, P.E. Roadway Designer Nevada Department of Transportation](https://reader036.vdocuments.net/reader036/viewer/2022062905/5a4d1aee7f8b9ab05997cc30/html5/thumbnails/8.jpg)
Analyzing Different Types of Estimate
Engineers Final Estimate
Estimate Breakout Items
Has bid item descriptors
Contract Work Item Price Report
Shows compiled Breakouts
List all bid items and prices~Look at Actual Estimates~
![Page 9: Cost Estimation Strategies for Keeping Track of the Vastness Presented by: David Lake, P.E. Roadway Designer Nevada Department of Transportation](https://reader036.vdocuments.net/reader036/viewer/2022062905/5a4d1aee7f8b9ab05997cc30/html5/thumbnails/9.jpg)
Contract Awarding• Low bidder gets the job
• Various Types of Submittals:
• change order?
• What is a supplemental?
• What is a revision?
~Look at Actual Bid Tab~
![Page 10: Cost Estimation Strategies for Keeping Track of the Vastness Presented by: David Lake, P.E. Roadway Designer Nevada Department of Transportation](https://reader036.vdocuments.net/reader036/viewer/2022062905/5a4d1aee7f8b9ab05997cc30/html5/thumbnails/10.jpg)
Conclusion• Tips to keep track of quantities
• Structure that builds in expectancy
• Ability to update a quantity conveniently
• Linked quantities
• Estimates have transparency to all divisions, common language
• Contract Awarding
• Low Bidder gets the job
• Contractor’s are looking to make the must money, it’s a business.
![Page 11: Cost Estimation Strategies for Keeping Track of the Vastness Presented by: David Lake, P.E. Roadway Designer Nevada Department of Transportation](https://reader036.vdocuments.net/reader036/viewer/2022062905/5a4d1aee7f8b9ab05997cc30/html5/thumbnails/11.jpg)