  • 7/31/2019 Course Presentations 2 1 Project Phases

    1/20

    1

    CONTRACTS&S

    PEC

    IFICATION(ARE459)

    PROJECT PHASES

    ARE 459

    CONTRACTS & SPECIFICATION

    CLASS -2

    ByByZulfikarZulfikarAliyuAliyuAdamuAdamu

    ARE DEPTARE DEPT

  • 7/31/2019 Course Presentations 2 1 Project Phases

    2/20

    2

    CONTRACTS&S

    PEC

    IFICATION(ARE459)

    Presentation OutlinePresentation Outline

    Phases of a construction project

    Planning

    Design

    Construction Procurement

    Construction

    Post construction (Occupancy)

    Notice to Bidders

  • 7/31/2019 Course Presentations 2 1 Project Phases

    3/20

    3

    CONTRACTS&S

    PEC

    IFICATION(ARE459)

    Objectives of Class :Objectives of Class :

    To acquire a working knowledge of the principal project

    phases.

    To identify activities associated with each phase of a

    construction project.

    To provide an understanding of the design and construction

    process and the roles of the different participants, and the typesof documents produced during each phase

  • 7/31/2019 Course Presentations 2 1 Project Phases

    4/20

    4

    CONTRACTS&S

    PEC

    IFICATION(ARE459)

    Major Project PhasesThe major phases in the project cycle that are common to most design and

    construction projects are :

    Project Planning

    Design

    Schematic Design

    Design Development

    Contract Documents

    Construction Procurement (Bidding Phase)

    Construction

    Occupancy

  • 7/31/2019 Course Presentations 2 1 Project Phases

    5/20

    5

    CONTRACTS&S

    PEC

    IFICATION(ARE459)

    Phase 1 :Project Planning

    The planning stage of the project :

    During this phase of the project the owner makes decisions that

    set the tone for the project. All projects begin with an idea or a need

    During this stage the owner :

    selects the project site, and

    establishes a conceptual estimate, schedule.

    The most critical decision that is made during this project

    phase is to make a decision as to whether or not to proceed withthe project (called a go/no go decision).

  • 7/31/2019 Course Presentations 2 1 Project Phases

    6/20

    6

    CONTRACTS&S

    PEC

    IFICATION(ARE459)

    Phase 1: Project Planning

    Phase Activities

    Feasibility studies

    Facility programming Budgeting

    Project delivery system selection

    Scheduling Site selection/acquisition

    Site investigation

    Financing Design services procurement

  • 7/31/2019 Course Presentations 2 1 Project Phases

    7/20

    7

    CONTRACTS&S

    PEC

    IFICATION(ARE459)

    Phase 2 :DESIGN PHASEPhase 2 :DESIGN PHASE

    Design process involves:

    Schematic Design Talk to owner, rough sketches

    Design Development

    Major Systems & component selected

    Contract Documents

    Preliminary Cost estimate

    Develop Preliminary working drawings

    Develop working drawings with Specifications

  • 7/31/2019 Course Presentations 2 1 Project Phases

    8/20

    8

    CONTRACTS&S

    PEC

    IFICATION

    (ARE459)

    Schematic Design

    The A/E reviews and evaluates the owners program and budget

    requirements and discusses with the owner alternative approaches to the

    design and construction

    During schematic design, the A/E prepares conceptual design

    documents. These may include: Preliminary sketches ,Small scaleschematic plans, elevations, sections, diagrams, renderings, and other

    graphic and written documents, General written description of project.

    The completion of the schematic design phase represents approximately30 percent design completion for the project

  • 7/31/2019 Course Presentations 2 1 Project Phases

    9/20

    9

    CONTRACTS&S

    PEC

    IFICATION

    (ARE459)

    The design development phase takes the project from about 30

    percent to approximately 60 percent design.

    It is the time when the design team will be evaluating and

    selecting all the major systems and components of the project.

    During this phase of the project the design team is involved in

    the evaluation and finalization of all the architectural components

    and project systems.

    The project's budget and schedule continue to be monitored and

    adjusted.

    Design Development

  • 7/31/2019 Course Presentations 2 1 Project Phases

    10/20

    10

    CONTRACTS&S

    PEC

    IFICATION

    (ARE459)

    The Architectural Design Process

    - General

    )

  • 7/31/2019 Course Presentations 2 1 Project Phases

    11/20

    11

    CONTRACTS&S

    PEC

    IFICATION

    (ARE459)

    )

  • 7/31/2019 Course Presentations 2 1 Project Phases

    12/20

    12

    CONTRACTS&S

    PEC

    IFICATION

    (ARE459)

    Architectural Fee - Payment Schedule

    WorkingDrawing

    45%

    Construction

    Supervision

    20%

    Conceptual

    Design

    15%

    Design

    Development20%

    )

  • 7/31/2019 Course Presentations 2 1 Project Phases

    13/20

    13

    CONTRACTS&S

    PEC

    IFICATION

    (ARE459)

    Construction Bid Documents

    Construction Bid Documents

    Specifications ArchitecturalDrawings

    StructuralDrawings

    Mechanic& ElectricDrawing

    CAD Drafting

    Software

    ArchitectStructuralEngineer

    MechanicalEngineer

    )

  • 7/31/2019 Course Presentations 2 1 Project Phases

    14/20

    14

    CONTRACTS&S

    PEC

    IFICATION

    (ARE459)

    Phase 3: Construction Procurement

    Contractor qualification/bidder list

    Solicitation

    Proposal preparation Bid/proposal opening

    Bid/proposal evaluation

    Award of contract

    Final negotiation

    Mobilization Subcontracting

    Purchasing

    Permits

    Site preparation Foundations

    Interior finishes and equipment

    Phase 4: Construction

    9)

  • 7/31/2019 Course Presentations 2 1 Project Phases

    15/20

    15

    CONTRACTS&S

    PEC

    IFICATION

    (ARE459

    Phase 5: Occupancy/Post

    constructionStart-up and testing

    LeasingTenant improvements

    Move-in

    Operation

    Correction

    Repairs/maintenance

    Building evaluation

    9)

  • 7/31/2019 Course Presentations 2 1 Project Phases

    16/20

    16

    CONTRA

    CTS&S

    PEC

    IFICATION

    (ARE459

    Development, Design, Construction, and

    Management Process

    Plan &DevelopProject

    Identify& Acquire

    Real Estate

    ArchitecturalEngineering

    Design

    SecureFinancing

    Construction

    Sales,

    Marketing&

    Promotion

    Operation&

    Management

    Architect Architect

    Contractors

    Developers

    Owners

    9)

  • 7/31/2019 Course Presentations 2 1 Project Phases

    17/20

    17

    CONTRA

    CTS&S

    PEC

    IFICATION

    (ARE459

    9)

  • 7/31/2019 Course Presentations 2 1 Project Phases

    18/20

    18

    CONTRA

    CTS&S

    PEC

    IFICATION

    (ARE459

    9)

  • 7/31/2019 Course Presentations 2 1 Project Phases

    19/20

    19

    CONTRA

    CTS&S

    PEC

    IFICATION

    (ARE459

    Cost-Influence Curve

    9)

  • 7/31/2019 Course Presentations 2 1 Project Phases

    20/20

    20

    CONTRA

    CTS&S

    PEC

    IFICATION

    (ARE459

    CONCLUSION

    The major phases in the project cycle are :

    Project Planning

    Design

    Schematic DesignDesign Development

    Contract Documents

    Construction Procurement (Bidding Phase)

    Construction

    Post Construction( Occupancy)