Presentation OutlinePresentation Outline
Phases of a construction project
Planning
Design
Construction Procurement
Construction
Post construction (Occupancy)
Notice to Bidders
-
7/31/2019 Course Presentations 2 1 Project Phases
3/20
3
CONTRACTS&S
PEC
IFICATION(ARE459)
Objectives of Class :Objectives of Class :
To acquire a working knowledge of the principal project
phases.
To identify activities associated with each phase of a
construction project.
To provide an understanding of the design and construction
process and the roles of the different participants, and the typesof documents produced during each phase
-
7/31/2019 Course Presentations 2 1 Project Phases
4/20
4
CONTRACTS&S
PEC
IFICATION(ARE459)
Major Project PhasesThe major phases in the project cycle that are common to most design and
construction projects are :
Project Planning
Design
Schematic Design
Design Development
Contract Documents
Construction Procurement (Bidding Phase)
Construction
Occupancy
-
7/31/2019 Course Presentations 2 1 Project Phases
5/20
5
CONTRACTS&S
PEC
IFICATION(ARE459)
Phase 1 :Project Planning
The planning stage of the project :
During this phase of the project the owner makes decisions that
set the tone for the project. All projects begin with an idea or a need
During this stage the owner :
selects the project site, and
establishes a conceptual estimate, schedule.
The most critical decision that is made during this project
phase is to make a decision as to whether or not to proceed withthe project (called a go/no go decision).
-
7/31/2019 Course Presentations 2 1 Project Phases
6/20
6
CONTRACTS&S
PEC
IFICATION(ARE459)
Phase 1: Project Planning
Phase Activities
Feasibility studies
Facility programming Budgeting
Project delivery system selection
Scheduling Site selection/acquisition
Site investigation
Financing Design services procurement
-
7/31/2019 Course Presentations 2 1 Project Phases
7/20
7
CONTRACTS&S
PEC
IFICATION(ARE459)
Phase 2 :DESIGN PHASEPhase 2 :DESIGN PHASE
Design process involves:
Schematic Design Talk to owner, rough sketches
Design Development
Major Systems & component selected
Contract Documents
Preliminary Cost estimate
Develop Preliminary working drawings
Develop working drawings with Specifications
-
7/31/2019 Course Presentations 2 1 Project Phases
8/20
8
CONTRACTS&S
PEC
IFICATION
(ARE459)
Schematic Design
The A/E reviews and evaluates the owners program and budget
requirements and discusses with the owner alternative approaches to the
design and construction
During schematic design, the A/E prepares conceptual design
documents. These may include: Preliminary sketches ,Small scaleschematic plans, elevations, sections, diagrams, renderings, and other
graphic and written documents, General written description of project.
The completion of the schematic design phase represents approximately30 percent design completion for the project
-
7/31/2019 Course Presentations 2 1 Project Phases
9/20
9
CONTRACTS&S
PEC
IFICATION
(ARE459)
The design development phase takes the project from about 30
percent to approximately 60 percent design.
It is the time when the design team will be evaluating and
selecting all the major systems and components of the project.
During this phase of the project the design team is involved in
the evaluation and finalization of all the architectural components
and project systems.
The project's budget and schedule continue to be monitored and
adjusted.
Design Development
-
7/31/2019 Course Presentations 2 1 Project Phases
10/20
10
CONTRACTS&S
PEC
IFICATION
(ARE459)
The Architectural Design Process
- General
)
-
7/31/2019 Course Presentations 2 1 Project Phases
11/20
11
CONTRACTS&S
PEC
IFICATION
(ARE459)
)
-
7/31/2019 Course Presentations 2 1 Project Phases
12/20
12
CONTRACTS&S
PEC
IFICATION
(ARE459)
Architectural Fee - Payment Schedule
WorkingDrawing
45%
Construction
Supervision
20%
Conceptual
Design
15%
Design
Development20%
)
-
7/31/2019 Course Presentations 2 1 Project Phases
13/20
13
CONTRACTS&S
PEC
IFICATION
(ARE459)
Construction Bid Documents
Construction Bid Documents
Specifications ArchitecturalDrawings
StructuralDrawings
Mechanic& ElectricDrawing
CAD Drafting
Software
ArchitectStructuralEngineer
MechanicalEngineer
)
-
7/31/2019 Course Presentations 2 1 Project Phases
14/20
14
CONTRACTS&S
PEC
IFICATION
(ARE459)
Phase 3: Construction Procurement
Contractor qualification/bidder list
Solicitation
Proposal preparation Bid/proposal opening
Bid/proposal evaluation
Award of contract
Final negotiation
Mobilization Subcontracting
Purchasing
Permits
Site preparation Foundations
Interior finishes and equipment
Phase 4: Construction
9)
-
7/31/2019 Course Presentations 2 1 Project Phases
15/20
15
CONTRACTS&S
PEC
IFICATION
(ARE459
Phase 5: Occupancy/Post
constructionStart-up and testing
LeasingTenant improvements
Move-in
Operation
Correction
Repairs/maintenance
Building evaluation
9)
-
7/31/2019 Course Presentations 2 1 Project Phases
16/20
16
CONTRA
CTS&S
PEC
IFICATION
(ARE459
Development, Design, Construction, and
Management Process
Plan &DevelopProject
Identify& Acquire
Real Estate
ArchitecturalEngineering
Design
SecureFinancing
Construction
Sales,
Marketing&
Promotion
Operation&
Management
Architect Architect
Contractors
Developers
Owners
9)
-
7/31/2019 Course Presentations 2 1 Project Phases
17/20
17
CONTRA
CTS&S
PEC
IFICATION
(ARE459
9)
-
7/31/2019 Course Presentations 2 1 Project Phases
18/20
18
CONTRA
CTS&S
PEC
IFICATION
(ARE459
9)
-
7/31/2019 Course Presentations 2 1 Project Phases
19/20
19
CONTRA
CTS&S
PEC
IFICATION
(ARE459
Cost-Influence Curve
9)
-
7/31/2019 Course Presentations 2 1 Project Phases
20/20
20
CONTRA
CTS&S
PEC
IFICATION
(ARE459
CONCLUSION
The major phases in the project cycle are :
Project Planning
Design
Schematic DesignDesign Development
Contract Documents
Construction Procurement (Bidding Phase)
Construction
Post Construction( Occupancy)