Community Efficient Use of District Resources Tradition Fundraising City Infrastructure Expectations Teamwork Sustainability Cooperation Quality of Life Creativity Funding Sources Student Centered Learning Highest & Best Use Communication Memorable Goals Responsibility Safe & Secure Learning Environment NORTHWEST PUBLIC SCHOOLS FACILITY AUDIT & MASTER PLAN STUDY

Upload: others

Post on 24-Dec-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Creativity Efficient Use of District Resources

Community

High Performance Buildings

Efficient Use of District Resources

Tradition

Fundraising

City Infrastructure

Expectations

Teamwork

Sustainability

Cooperation

Quality of Life

Creativity

Funding Sources

Student Centered Learning

Highest & Best Use

Communication

Memorable Goals

High Student Achievement

Responsibility

Safe & Secure Learning Environment

NORTHWEST PUBLIC SCHOOLS FACILITY AUDIT & MASTER PLAN STUDY

Page 2: Creativity Efficient Use of District Resources

Agenda FACILITY AUDIT & MASTER PLAN STUDY

Roles, Goals & Objectives of the Facility Master Planning Process

Overall School District Site Plan

Enrollment & Capacity

Existing Facility Site Plans & Floor Plans

Educational Space Program Summary

Physical Plant Assessment Summary

Key Issues

Potential Solutions Discussion

Future Meeting Dates

Page 3: Creativity Efficient Use of District Resources

Roles, Goals & Objectives FACILITY AUDIT & MASTER PLAN STUDY

ROLES

• DLR Group – Facilitators & Planning Expertise

• District Administration & Staff – Education Leadership & Expertise

• School Board – Strategic & Financial Decision Making Responsibility

• District Patrons & Parents - Stakeholders & Taxpayers

GOALS

• Establish a Long Term Vision for the Northwest School District‘s: • Educational Program Needs

• Facility Improvement Needs

• Be Good Stewards of the School District’s Financial Resources

• Determine Implementation Plan of Master Plan

OBJECTIVES

• Evaluate Current Educational Program offering & space requirements

• Establish an understanding of the condition of the districts’ existing

facilities

• Evaluate Facility Utilization Options

• Evaluate Cost & Tax Impact of Potential Solutions

OUR GUIDING PRINCIPLE:

To Achieve Consensus Through Informed Consent

Page 4: Creativity Efficient Use of District Resources

Overall School District Site Plan FACILITY AUDIT & MASTER PLAN STUDY

Page 5: Creativity Efficient Use of District Resources

Capacity FACILITY AUDIT & MASTER PLAN STUDY

2015-16 Enrollment Current Capacity Available Capacity %

Lockwood Pre-School 38 45 7 84%

Cedar Hollow Elem. / M.S. 346 360 14 96%

Chapman Elem. / M.S. 87 180 93 48%

One-R Elem. / M.S. 170 180 10 94%

St. Libory Elem. / M.S. 87 160 73 54%

Northwest High School 725 800 75 90%

Totals 1453 1725 272 84%

Class size equity is a significant issue when comparing K-8 buildings

Page 6: Creativity Efficient Use of District Resources

Enrollment FACILITY AUDIT & MASTER PLAN STUDY

PreK Enrollment – Historical & Projected

Enr

ollm

ent

School Year

Page 7: Creativity Efficient Use of District Resources

Enrollment FACILITY AUDIT & MASTER PLAN STUDY

K-8 Enrollment – Historical & Projected

Enr

ollm

ent

School Year

Page 8: Creativity Efficient Use of District Resources

Enrollment FACILITY AUDIT & MASTER PLAN STUDY

High School 9-12 Enrollment – Historical & Projected

Enr

ollm

ent

School Year

Page 9: Creativity Efficient Use of District Resources

Enrollment FACILITY AUDIT & MASTER PLAN STUDY

Total Enrollment – Historical & Projected

Tota

l Enr

ollm

ent

School Year

Page 10: Creativity Efficient Use of District Resources

Existing Facility Site Plans & Floor Plans FACILITY AUDIT & MASTER PLAN STUDY

Original Building Constructed in 1960?

Major Remodeling in 2014

Page 11: Creativity Efficient Use of District Resources

Existing Facility Site Plans & Floor Plans FACILITY AUDIT & MASTER PLAN STUDY

Page 12: Creativity Efficient Use of District Resources

Existing Facility Site Plans & Floor Plans FACILITY AUDIT & MASTER PLAN STUDY

Original Building Constructed in 1980?

Additions in 1990, 1992 & 1996

Page 13: Creativity Efficient Use of District Resources

Existing Facility Site Plans & Floor Plans FACILITY AUDIT & MASTER PLAN STUDY

Original Building Constructed in 1917

Additions in 1970? & 1996 (Major Remodeling)

Page 14: Creativity Efficient Use of District Resources

Existing Facility Site Plans & Floor Plans FACILITY AUDIT & MASTER PLAN STUDY

Original Building Constructed in 1973

Additions in 1992 & 2005

Page 15: Creativity Efficient Use of District Resources

Existing Facility Site Plans & Floor Plans FACILITY AUDIT & MASTER PLAN STUDY

Original Building Constructed in 1964

Addition in 1980

Page 16: Creativity Efficient Use of District Resources

Existing Facility Site Plans & Floor Plans FACILITY AUDIT & MASTER PLAN STUDY

Page 17: Creativity Efficient Use of District Resources

Existing Facility Site Plans & Floor Plans FACILITY AUDIT & MASTER PLAN STUDY

Original Building Constructed in 1963

Additions in 1977, 2000, 2002 & 2010

Page 18: Creativity Efficient Use of District Resources

Existing Facility Site Plans & Floor Plans FACILITY AUDIT & MASTER PLAN STUDY

Page 19: Creativity Efficient Use of District Resources

Educational Space Program Summary FACILITY AUDIT & MASTER PLAN STUDY

Lockwood Pre-School • Room for expansion of program if needed

• Lack of administration / storage / conference

• Toilet facilities – potential updates per code

Common Elementary / Middle School Issues for

Cedar Hollow, Chapman, One-R and St. Libory • Program equity: Cedar Hollow is a 2-unit facility,

while the other schools are 1-unit facilities

• Program equity: Class sizes at Cedar Hollow are

larger than any of the other schools

• Lack of Middle School exploratory program

• No art program

• Lack of meeting / conference / storage / workroom spaces

• Lack of SPED support spaces

• Toilet facilities – potential updates per code

Cedar Hollow Elementary / Middle School • Gymnasium used for multiple functions – hard to schedule

• Lack of kitchen support spaces

• Media center could be bigger and needs more support spaces

• Classroom wing design helps to segregate grade levels

Chapman Elementary / Middle School • Music room lacks support spaces

• Cafeteria is small

• Lack of science support spaces

• Lack of media center support spaces

• Multiple floors helps to segregate grade levels

• Gymnasium the best compared to the other Elem/MS buildings

One-R Elementary / Middle School • Music room lacks support spaces

• Gymnasium used for multiple functions – hard to schedule

• Lack of media center support spaces

St. Libory Elementary / Middle School • No music classroom or support spaces

• Gymnasium used for multiple functions – hard to schedule

• Needs more lounge / storage / workroom areas

• Media center could be bigger and lack of support spaces

• Lack of science support spaces

• Lack of kitchen support spaces

• Classroom square footage is above average

Northwest High School • Need more lecture space for science

• Need more SPED spaces

• Music rooms need more support spaces

• Lack of meeting / conference spaces

• District office spaces are not together

• More P.E. storage is needed

• FCS space is limited

• Above average amount of vocational spaces

• Toilet facilities – potential updates per code

Page 20: Creativity Efficient Use of District Resources

Educational Space Program Example – Cedar Hollow Elem. / M.S. FACILITY AUDIT & MASTER PLAN STUDY

Page 21: Creativity Efficient Use of District Resources

Educational Space Program Example – Cedar Hollow Elem. / M.S. FACILITY AUDIT & MASTER PLAN STUDY

Page 22: Creativity Efficient Use of District Resources

Educational Space Program Example – Cedar Hollow Elem. / M.S. FACILITY AUDIT & MASTER PLAN STUDY

Page 23: Creativity Efficient Use of District Resources

Educational Space Program Example – Cedar Hollow Elem. / M.S. FACILITY AUDIT & MASTER PLAN STUDY

Page 24: Creativity Efficient Use of District Resources

Educational Space Program Example – Cedar Hollow Elem. / M.S. FACILITY AUDIT & MASTER PLAN STUDY

Page 25: Creativity Efficient Use of District Resources

Educational Space Program Example – Cedar Hollow Elem. / M.S. FACILITY AUDIT & MASTER PLAN STUDY

Page 26: Creativity Efficient Use of District Resources

Educational Space Program Summary FACILITY AUDIT & MASTER PLAN STUDY

Proposed Square Footage Existing Square Footage Deficiency

Lockwood Pre-School 3,466 sf 2,570 sf 896 sf

Cedar Hollow Elem. / M.S. 65,410 sf 48,815 sf 16,595 sf

Chapman Elem. / M.S. 52,796 sf 33,615 sf 19,181 sf

One-R Elem. / M.S. 46,799 sf 24,360 sf 22,439 sf

St. Libory Elem. / M.S. 47,048 sf 22,885 sf 24,163 sf

Northwest High School 201,303 sf 196,265 sf 5,038 sf

Totals 416,822 sf 328,510 sf 88,312 sf

Page 27: Creativity Efficient Use of District Resources

Educational Space Program SF / Student FACILITY AUDIT & MASTER PLAN STUDY

Enrollment Existing Square Footage SF / Student Target SF / Student

Lockwood Pre-School 38 2,570 sf 68 sf / student 100 - 110 sf / student

Cedar Hollow Elem. / M.S. 346 48,815 sf 141 sf / student 160 - 190 sf / student

Chapman Elem. / M.S. 87 33,615 sf 386 sf / student 160 – 190 sf / student

One-R Elem. / M.S. 170 24,360 sf 143 sf / student 160 - 190 sf / student

St. Libory Elem. / M.S. 87 22,885 sf 263 sf / student 160 - 190 sf / student

Northwest High School 725 196,265 sf 270 sf / student 230 - 260 sf / student

Totals 1,453 328,510 sf 226 sf / student 190 - 215 sf / student

Page 28: Creativity Efficient Use of District Resources

Physical Plant Assessment Summary Scope of the Physical Plant Assessment

• The physical plant assessment has been determined through on-site surveys of the existing buildings by our architecture & engineering

team in consultation with school district maintenance staff.

• Physical plant improvement work can be extensive and is meant to provide for improvements to the building infrastructure to make them

comparable, as much as possible to a new facility. They include:

• Site access & parking

• Building envelope (roofs, windows, doors, insulation, etc…)

• Heating, ventilation and air conditioning systems

• Plumbing and sanitary sewer systems

• Lighting & power distribution systems

• Data and communication systems

• Room finishes (carpet, tile, paint, ceilings, etc…)

• Equipment (casework, lockers, gym equipment, food service equipment)

Page 29: Creativity Efficient Use of District Resources

Physical Plant Assessment Summary

Lockwood Pre-School

Civil • No splash blocks under roof overflows

• Minimal slope across pavements and grasses

• Entrance and exit is all gravel

Architecture • Toilet facilities will need to be updated per code

• There is no range hood in the kitchen area

Mechanical • No fire sprinkler system

• Drinking water for the school is provided by bottled water

Electrical • Video surveillance could be replaced to match other potential new surveillance systems at other buildings

Page 30: Creativity Efficient Use of District Resources

Physical Plant Assessment Summary

Cedar Hollow Elementary / Middle School

Civil • Drop off / pick up area should be redesigned

• Improvements needed on parking

• Minimal slope across pavements and grasses

• No splash blocks under roof overflows

• Some settlement around a few structural stoops

• Need for new paint striping in parking lot

• Need to add bollards around light pole

• Need for sealing of joints on sidewalks

Architecture • Toilet facilities will need to be updated per code

• Some deteriorated sealant at grade

• Repair on flashing or sealant on at least 5 windows

• Some masonry tuck pointing needed

• Some downspout repair needed

• Carpet in need of replacement in at least 24 rooms

• Damaged tile flooring in at least 4 rooms

• Roof repair required

• Damaged ceiling tiles in at least 11 rooms

• ADA updates needed on at least 27 doors

• Dated casework in at least 18 rooms

• Some new marker boards needed

• New drinking fountain needed

Mechanical • No fire sprinkler system

• Gymnasium is not air conditioned

• Temperature control valve on air handling unit is leaking

• No hood over dishwasher in kitchen

• Should repair hail damage on coil fins on rooftop units

• Add coil hail guards to rooftop units where needed

• Many of the air conditioner units are nearing the end of their life

• As units are replaced, they should replace them with non-

ozone depleting HFC refrigerants

• Consideration should be given to upgrade HVAC system to a

new energy efficient technology, such as a variable refrigerant

flow (VRF) system.

Electrical • Video surveillance should be replaced

• There is no access control system

• Should consider replacing interior fixtures and controls

• Exit signs need to be replaced

• Need to replace all wall mounted HID fixtures on exterior

• Need to replace all parking lot HID flood lights

• Potential grounding issue during lightning storms

• Need to replace panels that were existing prior to 1996

• Long range plan should include upgrades to CAT 6A cabling

• The fire alarm system should be replaced with any new project

Page 31: Creativity Efficient Use of District Resources

Physical Plant Assessment Summary

Chapman Elementary / Middle School

Civil • Need to seal crack in concrete paving

• Need to fill gravel lot to eliminate pot holes

• Sidewalk on the south side needs to be resealed

• Need to remove leaves and debris from trench drains

• Remove gravel from valley gutter

Architecture • Toilet facilities will need to be updated per code

• Some deteriorated sealant at grade

• Some downspout repair needed

• New windows needed in at least 6 locations

• Exterior masonry structural repair needed in at least 1 location

• Exterior painting needed in select locations

• Need new spandrel window panels at 2 locations

• New carpet needed in at least 19 rooms

• Damaged tile flooring in at least 2 rooms

• Damaged ceiling tiles in at least 4 rooms

• ADA updates needed on at least 3 doors

• Partition wall showing wear

• Dated casework in at least 2 locations

• Some repair on casework needed

• All toilet partitions should be replaced

• Sinks should be replaced in at least 1 room

Mechanical • No fire sprinkler system

• Many of the HVAC units are nearing the end of their life

• As units are replaced, they should replace them with non-

ozone depleting HFC refrigerants

Electrical • Video surveillance should be replaced

• There is only one location of access control

• Should consider replacing interior fixtures and controls

• Need to replace the gymnasium lights

• Replace all exit signs

• If area lighting is a concern, replace with new fixtures

• Long range plan should include upgrades to CAT 6A cabling

• Should replace the intercom head end system

• The fire alarm system should be replaced with any new project

• Should consider providing smart boards

Page 32: Creativity Efficient Use of District Resources

Physical Plant Assessment Summary

One-R Elementary / Middle School

Civil • Drop off / pick up area should be redesigned

• Improvements needed on parking

• No curb and gutter at the site

• Reseal concrete joints where cracking

• Need for a joint to be cut on the north concrete area

• Sidewalks around stoop are settling

• They have power surges at this location

• Mill and overlay of existing asphalt needed soon

• Barrier separation needed between country road and parking

Architecture • Toilet facilities will need to be updated per code

• Exterior door replacement needed in at least 4 locations

• Exterior soffit work needed

• Some rooms need new carpet

• Damaged tile floor in at least 2 rooms

• New ceilings needed in at least 3 locations

• Damaged gypsum ceiling in at least 1 location

• ADA updates needed on at least 33 doors

• New casework needed at 1 location

• New countertop needed at 1 location

• Need 2 new drinking fountains

• Sink repair needed in at least 1 location

Mechanical • The building has a humidity issue. Need to explore the source

of the issue and make repairs.

• Not all areas of the building get filtered water from the well

• Many of the HVAC units are nearing the end of their life

• As units are replaced, they should replace them with non-

ozone depleting HFC refrigerants

• Consideration should be given to upgrade HVAC system to a

new energy efficient technology, such as a variable refrigerant

flow (VRF) system.

Electrical • No video surveillance

• No access control

• Underground electrical has created issues

• Should consider replacing interior fixtures and controls

• Need to add emergency lighting throughout the building

• Gymnasium lights should be replaced

• Replace all exit signs

• Need to replace all wall mounted HID fixtures on exterior

• Need to replace all parking lot HID flood lights

• Consider adding more light poles

• Panels installed in 1972 should be replaced

• Panels installed in 1992 should be replaced in 5-10 years

• Long range plan should include upgrades to CAT 6A cabling

• Intercom system should be replaced

• The fire alarm system should be replaced with any new project

• Should consider providing smart boards

Page 33: Creativity Efficient Use of District Resources

Physical Plant Assessment Summary

St. Libory Elementary / Middle School

Civil • Drainage issue on north side of building

• Mill and overlay needed at asphalt lot

• No curb and gutter on site

• No ADA stalls, striping or signage on site

• Minimal slop across pavements and grasses

• No splash blocks under roof overflows

• Sidewalks at front entrance are cracked

• Some settlement around structural stoops

Architecture • Toilet facilities will need to be updated per code

• All exterior soffits need to be replaced

• Some damaged exterior fascia and metal panels

• Miscellaneous caulking required

• Some downspout repair needed

• Brick spalling on exterior gymnasium walls

• Structural stoops need to be repaired in at least 3 locations

• Interior slab issues in at least 2 locations

• Gymnasium flooring in need of replacement

• Damaged ceiling tiles in at least 7 rooms

• ADA updates needed on at least 16 doors

• Damaged casework in at least 1 room

• New marker boards needed in at least 7 rooms

• Kindergarten pit is not ADA accessible

• Bleachers are not ADA compliant

Mechanical • The two multi-zone air handling units are operating beyond

their useful life. They should be replaced with a new VAV

reheat system.

• When the gymnasium rooftop units need to be replaced, they

should be replaced with non-ozone depleting HFC refrigerants

• No fire sprinkler system

Electrical • No video surveillance

• No access control

• Should consider replacing interior fixtures and controls

• Add emergency lighting throughout the building

• Replace all exit signs

• Need to replace all wall mounted HID fixtures on exterior

• Adding parking lot lighting is recommended

• Panels will need to be replaced within 5-10 years

• Need to add boiler shutdown stations

• Long range plan should include upgrades to CAT 6A cabling

• Intercom system should be replaced

• Fire alarm system should be replaced

Page 34: Creativity Efficient Use of District Resources

Physical Plant Assessment Summary

Northwest High School

Civil • Desire for a softball field

• Desire for more event parking

• Need for restriping of all parking lots

• Some cracking in the utility yard concrete

• Mill and overlay needed at asphalt parking lots

• ADA ramp needed at 1 ADA parking stall

• Crack in 1 of the retaining walls

• North parking lot has minimal slope

• Need to install drains by the northwest corner of the building

• Drainage in the utility yard is poor

• Dirt near concessions is not sloped to drain

• Trench drains on south side of track are not working

• Some of the concrete valley gutters are not draining

• Need for some roof drain extensions

• Some cracking at sidewalks

• Some sidewalks around structural stoops have settled

• At least one section of sidewalk should be replaced

Architecture • Toilet facilities will need to be updated per code

• Sinks needed in one science room

• Gutter and downspout repair needed in at least 6 locations

• Some masonry tuck pointing required

• Some peeling stucco paint

• Broken glass in at least 1 window

• Fascia repair needed in at least 2 locations

Architecture (continued) • Some deteriorated sealant at grade

• Splash blocks needed in some locations

• Damaged floor tiles in at least 13 rooms

• Carpet needs replacing in at least 4 rooms

• Roof is in need of repair as it is causing leaks

• Damaged ceiling tiles in at least 54 rooms

• Warped ceiling grind in at least 2 rooms

• Interior painting is needed

• ADA updates needed on at least 89 doors

• Rubber base needs to be fixed in at least 2 locations

• Some drywall patching needed

• Cracks in structural CMU wall in at least 2 locations

• Dated casework in at least 23 rooms

• Damaged casework in at least 3 rooms

• Academic lockers showing wear

• Some new marker boards needed

• New sinks needed in at least 5 rooms

• New drinking fountain needed

• Vocal and band rooms are not ADA accessible

• Upper levels of shop areas are not ADA accessible

• Upper level wrestling area is not ADA accessible

• ADA kitchen needed in FCS classroom

• Upper classrooms by auxiliary gym are not ADA accessible

Page 35: Creativity Efficient Use of District Resources

Physical Plant Assessment Summary

Northwest High School

Mechanical • Many of the HVAC units are nearing the end of their life

• As units are replaced, they should replace them with non-

ozone depleting HFC refrigerants

• Broken condensate drains on some of the rooftop units

• Quite a bit of hail damage on some of the condensing units

and rooftop units

• Repair coil fins and add coil hail guards

• There are a lot of bird droppings in the vicinity of intakes of the

rooftop units

Electrical • Should replace video surveillance system

• No access control

• No intrusion detection system

• Replace theatrical lighting system

• Auditorium house lights should be replaced

• Replace fixtures mainly concentrated in the shop areas

• Should consider replacing all interior fixtures and controls

• Need to replace all wall mounted HID fixtures on exterior

• Plan for sports lighting should included new poles and fixtures

• Panels installed prior to 1977 should be replaced

• Long range plan should include upgrades to CAT 6A cabling

• Should consider replacing intercom system

• The fire alarm system should be replaced with any new project

Page 36: Creativity Efficient Use of District Resources

Key Issues FACILITY AUDIT & MASTER PLAN STUDY

Facility Locations • Are there too many buildings for this school district?

• Too much duplication of program space

• Shared / Traveling staff

• Too much space in the wrong places

• Is there room for growth at any of the sites?

Demographics • Open enrollment students

• District is currently losing students at the Middle School level

• What size of a school does GINW want to be going forward?

Educational Program • Program Inequity: 1-Unit schools vs 2-Unit schools – Minimal Collaboration

• Program Inequity: # students per classroom • 5 vs 21 - Smallest to Largest Class Size

• 10 vs 19 – Average Class Size

• Music program

• Art program

• Middle School exploratory program • Industrial Tech program

• FCS program

• Foreign language program

• Drama program

Financial Impact • Overall District Levy

• Impact of Open Enrollment

• Operational Costs

• Staff Inefficiencies

• Energy inefficiencies

• Capital Costs

Page 37: Creativity Efficient Use of District Resources

Potential Solutions Discussion FACILITY AUDIT & MASTER PLAN STUDY

Option A: • Fix what you have and maintain all six buildings

Option B: • Convert one of the buildings (Cedar Hollow?) into a Middle School and

consolidate the other Elementary Schools

Option C: • Construct a new free standing Middle School on the High School site

Other Options?

Page 38: Creativity Efficient Use of District Resources

Future Meeting Dates FACILITY AUDIT & MASTER PLAN STUDY

Tentative Planning Meeting Overview

Meeting # 1 – September 28th – Cedar Hollow

Master Plan Process Overview & General Discussion of Issues

Meeting # 2 - October 11th – Chapman School

Review Educational Program & Physical Plant Needs

Develop & Discuss Solution Options

Meeting # 3 - October 20th – 1-R School

District Financial Overview

Solution Cost Options

Meeting # 4 – October 27th – St. Libory School

Discussion & Consensus Building

Meeting #5 – TBD if Needed

Additional / Future meetings as required TBD