credit no. 5188ba real estate registration project (p128950)...
TRANSCRIPT
Credit no. 5188BA Real Estate Registration Project (P128950)
Completed Implementation Urgently
Item
:
Act
ivit
y #
Activity Status
Ty
pe
Pro
c. m
eth
od
Pck
s.
Po
st/P
rio
r
Issu
e
Bid
s re
ceiv
ed
Ctr
. S
ign
ed
Ctr
Co
mp
lete
NO
TE
1 A.1 Public awareness, vulnerabilities and social monitoring
2 A.1.1 Studies
3 A.1.1.1 Vulnerability Mapping and Social Monitoring Methodology (6 CM) Completed CS CQ 1 Prior 10-Dec-13 26-Feb-14 7-Apr-14 14-Aug-14 Prism Research, B&H
4 A.1.1.2 Implementation of VM/SM Methodology / Vulnerability Mapping and Social Monitoring Coordinator Implementation CS SS 1 Post 01-Apr-15 15-Apr-15 07-Sep-15 31-Jul-18 Edna Hadžibegić
5 A.1.2 Data Harmonization Public Awareness Campaign
6 A.1.2.1 Printing of promo material (brochures, flayers, posters, and other promo mat.) - Phase 1 Completed TS SH 1 Prior 21-Oct-14 30-Oct-14 21-Nov-14 20-Nov-16 Communis, B&H
7 A.1.2.2 Media Services (Local Radio and TV) - Phase 1 Implementation CS CQ 1 Post 8-Apr-15 29-May-15 3-Aug-15 30-Sep-17Via Media, B&H, Joint procedure with activity C2.2.1.
Total contract amount BAM 151.463,82
8 A.1.2.3 Printing of promo material (brochures, flayers, posters, and other promo mat.) - Phase 2 Implementation TS SH 1 Post 1-Aug-16 22-Aug-16 31-Aug-16 31-Aug-18 SPORTKLUB d.o.o.
9 A.1.2.4 Media Services (Local Radio and TV) - Phase 2 Implementation CS CQ 1 Post 15-May-17 31-May-17 15-Aug-17 30-Jun-18Via Media, B&HJoint procedure with activity C.2.2.2, Total
contract amount BAM 140.650,13
10 A.1.2.5 Media Services (Local Radio and TV) - Phase 3 CS CQ 1 Post 1-May-18 31-May-18 30-Jun-18 1-Jan-20
11 A.1.2.6 Printing of promo material (brochures, flayers, posters, and other promo mat.) - Phase 3 TS SH 1 Post 1-Jul-18 16-Jul-18 1-Aug-18 1-Oct-19
12 A.2 Real estate registration data updating, harmonization and registration
13 A.2.1 Establishing cadastre data for the harmonization with land register data
14 A.2.1.1 Harmonization data on cadastre and land book
15 A.2.1.1.1 Harmonization data on cadastre and land book - Phase 1 (7 CM) Completed TS NCB 3 Prior 26-May-14 24-Jun-14 8-Oct-14 8-Apr-15 Lot 1: Gauss
Completed 26-May-14 24-Jun-14 8-Oct-14 8-Apr-15 Lot 2: Geometrika
Completed 26-May-14 24-Jun-14 8-Oct-14 8-Jun-15 Lot 3: Angermeier
16 A.2.1.1.2 Harmonization data on cadastre and land book - Phase 2 (7 CM) Completed TS NCB 1 Prior 13-Nov-14 15-Dec-14 30-Jan-15 23-Aug-15 JV Geodet d.o.o.&Geometrika d.o.o.
17 A.2.1.1.3 Harmonization data on cadastre and land book - Phase 3 (9 CM) Completed TS NCB 1 Post 2-Apr-15 5-May-15 4-Jun-15 22-Feb-16 Angermeier
18 A.2.1.1.4 Harmonization data on cadastre and land book - Phase 4 (29 CM) Completed TS NCB 3 Post 15-Jul-15 21-Aug-15 23-Nov-15 23-Jul-16 LOT 1: Gauss & Trafficon
Completed 15-Jul-15 21-Aug-15 23-Nov-15 6-Aug-16 LOT 2: Geodet & Geometrika
Completed 15-Jul-15 21-Aug-15 23-Nov-15 23-Jan-17 LOT 3: BNPRO & Geokom
19 A.2.1.1.5 Harmonization data on cadastre and land book - Phase 5 (37 CM) Completed TS NCB 3 Post 17-Mar-16 18-Apr-16 6-Jun-16 6-May-17 LOT 1: Geodet & Angermeier
Completed 17-Mar-16 18-Apr-16 6-Jun-16 6-Jan-17 LOT2:Gauss&Trafficon
Completed 17-Mar-16 18-Apr-16 6-Jun-16 21-Mar-17LOT 3: BNpro & Geometrika (retention in amount 5% is not
paid)
20 A.2.1.1.6 Harmonization data on cadastre and land book - Phase 6 (50 CM) Completed TS NCB 3 Post 24-Nov-16 27-Dec-16 23-Jan-17 22-Aug-17 LOT 1: Gauss & Trafficon
Implementation 24-Nov-16 27-Dec-16 23-Jan-17 21-Dec-17 LOT 2: Geodet & BNPro
Implementation 24-Nov-16 27-Dec-16 23-Jan-17 22-Sep-17 LOT 3: Angermeier & Geometrika
21 A.2.1.1.7 Harmonization data on cadastre and land book - Phase 7 (43 CM) Implementation TS NCB 3 Post 8-Jun-17 6-Jul-17 18-Jul-17 31-Jan-18 LOT 1: Angermeier & Geometrika
Implementation 8-Jun-17 6-Jul-17 18-Jul-17 31-Jan-18 LOT 2: Geodet & BNPro
Implementation 8-Jun-17 6-Jul-17 18-Jul-17 31-Jan-18 LOT 3: Gauss & Trafficon
22 A.2.1.1.8 Harmonization data on cadastre and land book - Phase 8 (28 CM) TS NCB Multi Post 1-Dec-17 31-Dec-17 30-Jan-18 29-Jul-18
23 A.2.1.2Completion of work related to establishment of real estate cadastre commenced in accordance with the Law
on survey and real estate cadastre from 1984.TS
24 A.2.1.2.1 Preparation of real estate cadastre data for handover to land registry - Phase 1 (8 CM) Completed TS NCB 1 Post 1-Dec-16 4-Jan-17 6-Feb-17 6-Aug-17 Geodet d.o.o.
25 A.2.1.2.2 Conversion - Entry of Real Estate Cadastre Data in Land Registry Database - Phase 1 (33 CM) Implementation TS CQ/NCB Multi Post 10-Jun-17 10-Jul-17 21-Jul-17 23-Dec-17 JV Wise Technologies d.o.o. & Geo-Mic d.o.o.
26 A.2.1.3 Establishment of the Real Estate Cadastre (survey completed by 1991) TS NCB Multi Post
27 A.2.2 Land register data harmonization with cadastre data
28 A.2.2.1 Updating (establishment and/or renewal) of land registry
29 A2.2.1.1 Updating (establishment and/or renewal) of land registry - year 2014 (6 courts) Completed CS IC Multi Post 25-Apr-14 5-Jun-14 1-Jul-14 30-Jun-17Implementation Ljubuski, Comleted Bugojno, Čapljina,
Gradačac, Zavidovici, Travnik
30 A2.2.1.2 Updating (establishment and/or renewal) of land registry - year 2015 Implementation CS IC Multi Post 15-Nov-14 15-Jan-15 1-Apr-15 30-Jun-18
Implementation Gračanica, Tešanj, Široki Brijeg, Bugojno,
Mostar, Goražde, Gradačac, Bihać, Cazin, Tomislavgrad, Velika
Kladuša
31 A2.2.1.3 Updating (establishment and/or renewal) of land registry - year 2016-2020 Implementation CS IC Multi Post 12-Jun-16 27-Jul-16 5-Sep-16 31-Jan-20Implementation: Travnik,Velika Kladuša, Orašje, Mostar,
Visoko, Sarajevo, Široki Brijeg, Gračanica,
32 A.2.2.2 Operational costs for harmonization of data (office supply, publishing costs...)
33 A.2.2.2.1 Office supply - year 2014, 6 courts Completed G SH 1 Post 1-Apr-14 8-Apr-14 14-Apr-14 5-May-14 R&S, B&H
34 A.2.2.2.2 Office supply - year 2015, Phase 1 Completed G SH 1 Post 10-Dec-14 19-Dec-14 14-Jan-15 31-Dec-16 Exclusive, B&H
35 A.2.2.2.2b Office supply - toners for LRO's Completed G SH 1 Post 10-Jul-15 24-Jul-15 6-Aug-15 15-Aug-17 R&S, B&H
36 A.2.2.2.3 Office supply - Phase 2 Completed G SH 1 Post 2-Aug-16 22-Aug-16 29-Aug-16 29-Aug-17 Exclusive, B&H (procurement inculded toners)
37 A.2.2.2.4 Publishing costs - year 2015-2016 Implementation G DC Multi Prior 15-Apr-15 1-May-15 18-May-15 31-Jul-18Sl. Glasnik BiH (BAM 7 500), Sl. List FBiH (BAM 7 500),
Avaz (BAM 30.500), Večernji List (BAM 22.500)
38 A.2.2.2.5 Office supply and toners 2017-Phase 3 Implementation G SH 1 Post 14-Aug-17 28-Aug-17 4-Sep-17 4-Jun-18 Exclusive, B&H
39 A.2.2.2.8 Office supply and toners 2018-Phase 4 G SH 1 Post 1-Apr-18 16-Apr-18 1-May-18 1-May-19
40 A.2.2.2.10 Office supply and toners 2019-Phase 5 G SH 1 Post 1-Jan-19
41 A.2.2.2.9 Office supply and toners -other Phases G SH 1 Post
42 A.2.2.2.7 Delivery cost of Decisions on registrations - year 2017-2018 Implementation G/CS DC/IC Multi Prior/Post 31-Jan-17 15-Feb-17 20-Mar-17 30-Jun-18 Court: Velika Kladuša , Gradačac, Visoko (3 IC)
43 A.3 Vectorization and cadastral database creation
44 A.3.1 Vectorization and cadastral database creation - Phase 1 Completed TS NCB 2 Prior 26-May-14 24-Jun-14 9-Sep-14 26-Jan-15 Lot 1: Geometrika, B&H
Completed 9-Dec-14 Lot 2: Angermeier, B&H
45 A.3.2 Vectorization and cadastral database creation - Phase 2 Completed TS NCB 1 Post 1-Feb-16 1-Mar-16 31-Mar-16 31-Aug-16JV Geometrika & Gauss, B&H(Municipalities co-finance -
17476,90 EUR) (retention in amount 5% is not paid)
46 A.3.3 Vectorization and cadastral database creation - Phase 3 Implementation TS NCB 1 Post 6-Jul-17 4-Aug-17 16-Aug-17 14-Dec-17 JV Angermeier d.o.o. & Geometrika d.o.o.
46 A.3.4 Vectorization and cadastral database creation - Phase 4 TS NCB 1 Post 1-Apr-18 1-May-18 31-May-18 29-Aug-18
47 A.4 Quality Control
48 A.4.1 Quality Control - Project Managers
49 Project Manager Gradačac and Goražde Completed CS IC 2 Post 21-Jan-15 2-Feb-15 15-Feb-15 15-Sep-15 Mirsad Hadžiselimović
Completed Semir Paldum
50A4.1.3/ A4.1.4/
A4.1.5Project managers for Harmonization data on cadastre and land book - Phase 3 and 4 Completed CS IC 11 Post 4-May-15 15-May-15 8-Jun-15 21-Jul-16
Phase 3(Ismar Beganovic, Alan Alicajic, Zdravko Prka), Phase 4
(Darko Raspudić, Edin Hadžiosmanović, Faris Habibović, Rado
Fazlić, Mirsad Hadžiselimović, Vahidin Nurikić, Goran Trogrlić,
Anto Dujaković)
A4.1.1/A4.1.2
FBiH RERP PROCUREMENT PLAN 09.11.2017.
Component A – Real Estate Registration Data Development:
1 of 3
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Credit no. 5188BA Real Estate Registration Project (P128950)
Item
:
Act
ivit
y #
Activity Status
Ty
pe
Pro
c. m
eth
od
Pck
s.
Po
st/P
rio
r
Issu
e
Bid
s re
ceiv
ed
Ctr
. S
ign
ed
Ctr
Co
mp
lete
NO
TE
Component A – Real Estate Registration Data Development:
51 A4.1.7 Project managers for Harmonization data on cadastre and land book - Phase 5 Completed CS IC 9 Post 15-Mar-16 21-Apr-16 15-May-16 22-Jan-17
Phase 5:Darko Raspudić, Edin Hadžiosmanović, Rado Fazlić,
Mirsad Hadžiselimović, Vahidin Nurikić, Hajrudin Kaljun,
Smiljan Novak, Lejla Baščaušević-Krđalić, Zdravko Prka
52 A4.1.8 Project managers for Harmonization data on cadastre and land book - Phase 6 Completed CS IC 11 Post 9-Nov-16 9-Dec-16 17-Jan-17 16-Aug-17
Phase 6:Darko Bradara, Edin Hadžiosmanović, Rado Fazlić,
Mirsad Hadžiselimović, Vahidin Nurikić, Hajrudin Kaljun, Lejla
Baščaušević-Krđalić, Zdravko Prka, Anto Dujaković, Ismar
Beganović, Almir Imširović
53 A4.1.9 Project managers for Harmonization data on cadastre and land book - Phase 7 Implementation CS IC 12 Post 29-May-17 19-Jun-17 20-Jul-17 23-Feb-18
Phase 7:Adnan Abaza, Darko Bradara, Edin Hadžiosmanović,
Rado Fazlić, Mirsad Hadžiselimović, Vahidin Nurikić, Hajrudin
Kaljun, Lejla Baščaušević-Krđalić, Zdravko Prka, Anto
Dujaković, Almir Imširović, Mario Krmek
54 A4.1.10 Project managers for Harmonization data on cadastre and land book - Phase 8 CS IC Multi Post 15-Dec-17 30-Dec-17 14-Jan-18 12-Aug-18
55 A.4.2 Quality Control - other Phases CS IC Multi Post
56 B.1 Working conditions improvement
57 B.1.1 Office purchase and modernization
58 B.1.1.1 Architect required for civil works Completed CS IC 1 Prior 1-Jul-14 15-Jul-14 21-Jul-14 31-Jul-15 Zoran Mićević
59 B.1.1.1a Architect required for civil works Implementation CS IC 1 Post 1-Apr-16 19-Apr-16 12-May-16 30-Nov-17 Mirzana Bijedić
60 B.1.1.2a Design for renovation od CO's/LRO's Completed CS CQ 1 Post 24-Dec-14 25-Mar-15 28-Apr-15 31-May-16 I.D.E..A. , B&H
61 B.1.1.2b Supervision of renovation works of CO's/LRO's Completed CS CQ 1 Post 24-Dec-14 25-Mar-15 28-Apr-15 30-May-17 I.D.E..A., B&H
62 B.1.1.3 Renovation of LR offices (4), cadastre offices (15) and FGA office
63 B.1.1.3.1 Renovation of LR office Gračanica Completed W NCB 1 Prior 5-Jan-15 23-Jan-15 3-Mar-15 15-Apr-15 Džena , B&H
64 B.1.1.3.2 Renovation of CO's/LRO's - Phase 1 Completed W NCB 1 Post 16-Dec-15 21-Jan-16 10-Mar-16 10-Sep-16 Ćosićpromex, B&H
65 B.1.1.3.3 Renovation of CO's/LRO's - Phase 2 Completed W NCB 1 Post 3-Aug-16 9-Sep-16 26-Sep-16 20-May-17JV Džekos d.o.o. & Neimari d.o.o. (retention in amount 5% is
not paid)
66 B.1.1.3.4 Renovation FGA office (Technikal Protection)- Phase 3 Completed G SH 1 Post 12-May-17 26-May-17 1-Jun-17 1-Jul-17 DSC d.o.o., Sarajevo
67 B.1.1.3.5 Cutting down and hauling away of a tree Completed TS DC 1 Post 10-Jun-17 28-Jun-17 24-Jul-17 14-Aug-17 PARK d.o.o., Sarajevo BIH
68 B.1.1.3.6 Relocating the equipment and arranging in office of new building FGA Completed TS SH 1 Post 24-Jul-17 31-Jul-17 2-Aug-17 17-Aug-17 LIV elektronik d.o.o., Sarajevo BIH
69 B.1.1.4 Furniture for offices
70 B.1.1.4.1 Furniture for FGA Completed G SH 1 Prior 12-Mar-14 26-Mar-14 7-Apr-14 1-May-14 Boma, B&H
71 B.1.1.4.2 Furniture for LR offices Gračanica and Tešanj Completed G SH 1 Prior 22-Jan-15 5-Feb-15 31-Mar-15 30-Apr-15 Boma, B&H
72 B.1.1.4.3 Furniture for offices - Phase 1 LRO - Velika Kladuša i Bihać Completed G SH 1 Post 15-Oct-15 1-Nov-15 15-Nov-15 1-Jan-16 Kraning, B&H
73 B1.1.4.4 Archive racks for the FGU Completed G SH 1 Prior 29-Oct-14 5-Nov-14 24-Nov-14 23-Jan-15 Kabas, B&H
74 B.1.1.4.5 Furniture for offices - Phase 2 Completed G SH 1 Post 19-Apr-16 28-Apr-16 5-May-16 5-Aug-16 Boma, B&H
75 B.1.1.4.6 Furniture for offices - Phase 3 Completed G SH 1 Post 10-May-16 26-May-16 6-Jun-16 6-Aug-16 Kraning, B&H
76 B.1.1.4.7 Furniture for offices - Phase 4 Completed G SH 1 Post 2-Dec-16 12-Dec-16 19-Dec-16 19-Jan-17 Kraning, B&H
77 B.1.1.4.8 Furniture for offices - Phase 5 Publishing G SH 1 Post 7-Nov-17 17-Nov-17 2-Dec-17 1-Jan-18
78 B.1.1.4.9 Furniture for offices - Phase 6 G SH 1 Post 1-Jan-19 Procurement will be done in 2018. if necessary.
79 B.1.2 Vehicles Prior
80 B.1.2.1 Vehicles - Phase 1 Completed G SH 1 Prior 10-Mar-14 24-Mar-14 14-Apr-14 14-Jun-14 Bunjo, B&H
81 B.1.2.2 Vehicles - Phase 2 Completed G SH 1 Prior 29-Dec-14 14-Jan-15 23-Jan-15 23-Mar-15 ABC 1968, B&H
82 B.1.2.3 Vehicles - Phase 3 G SH 1 Post 1-Jan-19
83 B.1.3 Surveying technology equipment
Completed 15-May-14 26-Jun-14 25-Sep-14 27-Oct-14 Lot 1: Geokom
Completed Lot 2: Geowild
Completed G NCB Post 1-Nov-15 15-Dec-15 15-Jan-16 15-Apr-16 Lot 1: Geokom
Completed G Lot 2: Geowild
Copleted G Post 3-Oct-16 3-Nov-16 22-Nov-16 22-Jan-17 Lot 1: Geokom
Completed G Post 3-Oct-16 3-Nov-16 22-Nov-16 22-Jan-17 Lot 2: GeoWILD
87 B.1.3.4 Surveying technology equipment - year 2017 Preparation G NCB Multi Post 10-Nov-17 10-Dec-17 9-Jan-18 9-May-18
88 B.1.3.5 Surveying technology equipment - year 2018 G NCB Multi Post 1-Jul-18 31-Jul-18 30-Aug-18 28-Dec-18
89 B.2 IT-strategy implementation
90 B.2.1 ICT technical sustainability
91 B.2.1.1 Technical Assistance for QA/QC, ICT Strategy update, others
92 B.2.1.1.1 Technical Assistance for QA/QC - Phase 1 Implementation CS IC 1 Post 15-Jul-14 15-Jul-14 1-Aug-14 31-Jul-18 Marko Puljić
93 B.2.1.1.2 Technical Assistance for QA/QC - Phase 2 CS CQ/IC Multi Post 1-Jan-19 Procurement will be done in 2018. if necessary.
94 B.2.1.2 Suplly of equipment for the ICT system
95 B.2.1.2.1 Suplly of equipment for the ICT system (land registry offices Jajce, Široki Brijeg, Tešanj and Gračanica) Completed G SH 1 Prior 29-Dec-14 15-Jan-15 10-Feb-15 25-Mar-15 CT Retail, B&H
96 B.2.1.2.2 Suplly of equipment for the ICT system (for cadastre and land registry) Phase 1 Completed G ICB 1 Prior 16-Jan-15 3-Mar-15 15-Apr-15 15-Jul-15 Kamer Commerce, B&H
97 B.2.1.2.3 Suplly of equipment for the ICT system - Phase 2 Completed G NCB/SH 1 Post 10-May-16 17-May-16 24-May-16 17-Aug-16 Net d.o.o., B&H
98 B.2.1.2.7 Suplly of equipment for the ICT system - Phase 3 Preparation G NCB/SH 1 Post 10-Nov-17 25-Nov-17 10-Dec-17 9-Jan-18
99 B.2.1.2.8 Suplly of equipment for the ICT system - Phase 4 G NCB/SH 1 Post 1-Jan-19
100 B.2.1.2.4 Replaceable HW components required for HW maintenance - Phase 1 Implementation G SH 1 Post 6-Jun-16 16-Jun-16 27-Jun-16 27-Jun-18 Kamer Commerce, B&H
101 B.2.1.2.6 Replaceable HW components required for HW maintenance - Phase 2 G SH 1 Post 1-Jan-19
102 B.2.1.2.5 Server for cadastre Office in Olovo Completed G SH 1 Prior 29-May-14 30-May-14 30-May-14 6-Jun-14 Terabajt, B&H
103 B.2.1.3 Supply of ORACLE licenses for the REC system
104 B.2.1.3.1 Supply of ORACLE licenses for the REC system - Phase 1 Completed G SH 1 Prior 15-Dec-14 24-Dec-14 10-Feb-15 5-Mar-15 Gauss, B&H
105 B.2.1.3.2 Supply of ORACLE licenses for the REC system (Software Update License & Support) - Phase 2 Implementation TS DC 1 Prior 15-Jan-16 30-Jan-16 18-Feb-16 18-Feb-18 Oracle BH d.o.o.
106 B.2.1.3.3Supply of ORACLE licenses for the REC system (New Licenses and Software Update License & Support) -
Phase 3G SH 1 Post
107 B.2.1.3.5 Supply of antivirus licenses for the FGU and LR system (140 New licenses) Completed G DC 1 Post 23-Jun-17 10-Jul-17 16-Aug-17 15-Sep-17 MIBO komunikacije d.o.o.
108 B.2.1.4 Communication infrastructure improvement
109 B.2.1.4.1 Communication infrastructure improvement (LAN/MAN/WAN) - Phase 1 G SH Multi Post 1-Jan-19
110 B.2.1.4.2 Communication infrastructure improvement (LAN/MAN/WAN) - Phase 2 G SH Multi Post
111 B.2.1.4.3 Costs of links for LR System Implementation TS DC 1 Prior 15-Nov-14 15-Dec-14 1-Feb-15 15-May-18 BH Telecom d.o.o.
112 B.2.1.4.4 Costs of links for LR System - Phase 2 TS DC 1 Prior 25-Apr-18 30-Apr-18 15-May-18 15-May-19
113 B.2.1.5 Maintenance costs of e-grunt software and hardware (included instalation of new licences)
2
Total Component A – Real Estate Registration Data Development:
B.1.3.1 Surveying technology equipment - Phase 1 G84
Surveying technology equipment - year 2015B.1.3.285
Prior
Component B – Real estate registration infrastructure development:
ICB
86 B.1.3.3 Surveying technology equipment - year 2016 2
2
NCB
2 of 3
Credit no. 5188BA Real Estate Registration Project (P128950)
Item
:
Act
ivit
y #
Activity Status
Ty
pe
Pro
c. m
eth
od
Pck
s.
Po
st/P
rio
r
Issu
e
Bid
s re
ceiv
ed
Ctr
. S
ign
ed
Ctr
Co
mp
lete
NO
TE
Component A – Real Estate Registration Data Development:114 B.2.1.5.1 Maintenance costs of e-grunt software and hardware (included instalation of new licences) - Phase 1 Implementation TS NCB 1 Post 1-Jul-14 25-Jul-14 1-Sep-14 1-Sep-17
Wise Technologies, B&H (Amendment 3-Ministry of Justice will
co-finance BAM 100.000,00)
115 B.2.1.5.2 Maintenance costs of e-grunt software and hardware (included instalation of new licences) - Phase 2 TS DC 1 Prior 9-Nov-17 10-Nov-17 10-Nov-17 30-Apr-18
115 B2.1.5.3 Installation of e-grunt software in courts Banovici, Lukavac, Jajce Completed TS DC 1 Prior 19-Mar-14 26-Mar-14 9-Apr-14 30-Apr-14 Wise Technologies, B&H
116 B.2.2 ICT further development and e-service
117 B.2.2.1 REC system further development, incl. e-services
118 B.2.2.1.1 IT strategy for land registry and cadastre (2018-2028) CQ IC Multi Post 1-Jan-18 16-Jan-18 31-Jan-18 31-May-18
119 B.2.2.1.2 Upgrade systema katastar.ba TS NCB 1 Post 1-Jun-18 1-Jul-18 31-Jul-18 29-Oct-18
120 B.2.2.1.3 Upgrade systema e-grunt TS NCB 1 Post 1-Jun-18 1-Jul-18 31-Jul-18 29-Oct-18
121 B.2.2.2 Personal IDs and Company's IDs data import to the database and data verification CS CQ 1 Post 1-Jan-19 Procurement will be done in 2018. if necessary.
122 B.3 Cadastral and land book scanning and indexing for digital archives TS
123 B.3.1 Land book scanning and indexing for digital archives Preparation TS NCB Multi Post 1-Dec-17 31-Dec-17 30-Jan-18 30-May-18
124 B.3.2 Cadastral scanning and indexing for digital archives TS NCB 1 Post 1-Jan-19
125 B.3.3 Digitalization of land registry folios
126 B.3.3.1 Digitalization of land registry folios (Lukavac) Completed CS IC 13 Post 25-Apr-14 15-May-14 1-Jul-14 31-Oct-14 IC (13 temporary assistance)
127 B.3.3.2 Digitalization of land registry folios (Jajce, Tuzla i Čapljina) Completed CS IC 24 Post 20-Dec-14 5-Jan-15 1-Feb-15 31-Dec-15 IC (24 temporary assistants)
128 B.3.3.3 Digitalization of Book of deposit contract- year 2017 Implementation CS IC 3 Post 1-Feb-17 15-Feb-17 17-Apr-17 17-Apr-18 IC (3 temporary assistants)
129 C.1 Policy support
130 C.1.1 Studies and legislation CS IC Multi Post 1-Jan-19
131 C.1.2 Technical assistance CS IC/CQ Multi Post 1-Jan-19
132 C.2 Institutional development
133 C.2.1 Sustainability and governance CS/OC
134 C.2.1.1 Updating and developing Business plans CS CQ/IC 1 Prior It will be implemented through CILAP Project
135 C.2.1.2 Implementing costs OC SOE Various Post 1-Jan-19
136 C.2.2 Marketing and public perception (note: Comp A will also provide media) CS
137 C.2.2.1 Project Public Awareness Campaigne, Phase 1 Implementation CS CQ 1 Post 8-Apr-15 29-May-15 3-Aug-15 30-Sep-17Via Media, B&H, Joint procedure with activity A.1.2.2.
Total contract amount BAM 151.463,82
138 C.2.2.2 Project Public Awareness Campaigne, Phase 2 - Implementation CS CQ 1 Post 15-May-17 31-May-17 15-Aug-17 30-Jun-18Via Media, B&HJoint procedure with activity A.1.2.4, Total
contract amount BAM 140.650,13
139 C.2.3 Capacity building and training TR
140 C.2.3.1 Real estate registration institutions/Land Registry,Cadastre offices, Spatial planning TR SOE
141 C.2.3.1.1 Real estate registration institutions/Land Registry,Cadastre offices, Spatial planning for 2014 TR SOE
142 C.2.3.1.2 Real estate registration institutions/Land Registry,Cadastre offices, Spatial planning for 2015 Completed TR SOE
143 C.2.3.1.3 Real estate registration institutions/Land Registry,Cadastre offices, Spatial planning for 2016 Completed CS CQ/IC 1 Post 1-Feb-16 1-Mar-16 8-Aug-16 8-May-17 MH Consulting LTD
144 C.2.3.1.3a Real estate registration institutions/Land Registry,Cadastre offices, Spatial planning for 2016 Completed TR SOE
145 C.2.3.1.4 Real estate registration institutions/Land Registry,Cadastre offices, Spatial planning for 2017-2018 Preparation CS CQ/IC 1 Post 10-Nov-17 25-Nov-17 10-Dec-17 1-Dec-18
146 C.2.3.1.4a Real estate registration institutions/Land Registry,Cadastre offices, Spatial planning for 2017-2018 Implementation TR SOE
147 C.2.3.1.5 Real estate registration institutions/Land Registry,Cadastre offices, Spatial planning for 2019-2020 CS CQ/IC 1 Post 1-Jan-19
148 C.2.3.1.5a Real estate registration institutions/Land Registry,Cadastre offices, Spatial planning for 2019-2020 TR SOE
147 C.2.3.2 Management for GA and MOJ TR SOE
148 C.2.3.3 Study tours and workshop TR SOE
149 C.3 Operational support
150 C.3.1 Customer satisfaction studies
151 C3.1.1 Customer satisfaction study 1 Completed CS CQ 1 Prior 6-Nov-14 12-Jan-15 1-Apr-15 31-Aug-15 Prime Communications, B&H
152 C3.1.2 Customer satisfaction studies 2 CS CQ/IC 1 Post 1-Jan-19
153 C.3.2 Impact evaluation
154 C.3.2.1 Impact evaluation - Phase 1 Completed CS CQ 1 Prior 30-Dec-13 12-Feb-14 7-May-14 28-Feb-15 Promente, B&H
155 C.3.2.2 Impact evaluation - Phase 2 CS CQ 1 Post 1-Jan-19 Financing from other funds
156 C.3.3 Project management
157 C.3.3.1 PIU staff Implementation CS IC Multi Post 1-Sep-13 15-Sep-13 21-Oct-13 31-Jan-20 During the Project Implementation
158 C.3.3.2 PIU expenses G/OC SOE Various 21-Oct-13 30-Jun-18 During the Project Implementation
159 C.3.3.2.1 Procurement of computer equipment for PIU Completed G SH 1 Prior 26-Nov-13 10-Dec-13 9-Jan-14 23-Jan-14 CT Retail, B&H
160 C.3.3.2.2 Procurement of licence for PIU finance management software Completed G DC 1 Prior 14-Nov-13 21-Nov-13 6-Dec-13 13-Dec-13 E-Line, B&H
161 C.3.3.2.3 Office supply - Phase 1 (year 2014) Completed G SH 1 Post 23-Apr-14 30-Apr-14 10-May-14 31-Dec-14
162 C.3.3.2.4 Office supply - Phase 2 (year 2015) Completed G SH 1 Post 20-Feb-15 19-Mar-15 2-Apr-15 15-Oct-15 Exclusive, B&H
163 C.3.3.2.5 Office supply - Phase 3(year 2016) Completed G SH 1 Post 1-Feb-16 1-Mar-16 1-Apr-16 1-Apr-17 Exclusive, B&H
164 C.3.3.2.7 Office supply - Phase 4 (year 2017) Implementation G SH 1 Post 11-Jan-17 23-Jan-17 27-Jan-17 27-Jan-18 Norin d.o.o., B&H
165 C.3.3.2.9 Office supply - Phase 5(year 2018) G SH 1 Post 10-Jan-18 25-Jan-18 9-Feb-18 8-Feb-19
166 C.3.3.2.10 Office supply - Phase 6(year 2019) G SH 1 Post 1-Jan-19
167 C.3.3.2.8 Other equipment G SH Multi Post
168 C.3.3.2.6 Project operating costs Implementation OC SOE Various Post 1-Oct-13 31-Jan-20 During the Project Implementation
169 C.3.3.3 Interpreter CS
170 C.3.3.3.1 Interpreter - Phase 1 Completed CS IC 1 Prior 15-Jan-14 29-Jan-14 14-Feb-14 1-Mar-16 Sanja Onescuk-Tahirovic
171 C.3.3.3.2 Interpreter - Phase 2 Implementation CS IC 1 Post 15-Jan-16 1-Feb-16 15-Feb-16 30-Jun-18 Irena Protić
Implementation CS IC 1 Aida Spahić
172 C.3.3.4 Renting of premisses for the PIU - option OC SOE 1 Prior 1-Jan-18
TOTAL FBiH RERP PROJECT COSTS in Euro
Annual Training Plans
Total Component C – Policy and Institutional Development, and Project Management
Annual Training Plans
Annual Training Plans
Annual Training Plans
Annual Training Plans
Annual Training Plans
Annual Training Plans
Annual Training Plans
Component C – Policy and Institutional Development, and Project Management:
Total Component B – Modernization of Working Conditions
3 of 3