critical m&e engineering sb - company profile -...

36
________________________________________________________________________ We Strategize Your Critical Services Updated on 28 th Oct 2017 ________________________________________________________________________________________________________________________________________________ C R I T I C AL M&E E NG INEE RING

Upload: others

Post on 26-Mar-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Critical M&E Engineering SB - company profile - …critical-eng.com/wp-content/uploads/2016/11/Critical-ME...We Strategize Your Critical Services Updated on 28th Oct 2017 About Us

________________________________________________________________________

WeStrategizeYourCriticalServices Updatedon28thOct2017________________________________________________________________________________________________________________________________________________

CRITICAL M & E E N G I N E E R I N G

Page 2: Critical M&E Engineering SB - company profile - …critical-eng.com/wp-content/uploads/2016/11/Critical-ME...We Strategize Your Critical Services Updated on 28th Oct 2017 About Us

________________________________________________________________________

WeStrategizeYourCriticalServices Updatedon28thOct2017________________________________________________________________________________________________________________________________________________

Critical M&E Engineering Sdn. Bhd. (946363-W)

CRITICAL M & E E N G I N E E R I N G

Page 3: Critical M&E Engineering SB - company profile - …critical-eng.com/wp-content/uploads/2016/11/Critical-ME...We Strategize Your Critical Services Updated on 28th Oct 2017 About Us

________________________________________________________________________

WeStrategizeYourCriticalServices Updatedon28thOct2017________________________________________________________________________________________________________________________________________________

Introduction

With the ‘shrinking world’ of the global business environment, rapid advancements in technology

within the field, and combined with increasing global connectivity, any downtime or interruption to

such services will have a significant impact to the business continuity.

The increasing demand for ZERO interruption or Fault Tolerance, as well as GREEN has make it

imperative for any forward looking business to ensure that the systems and facilities are

comprehensively designed and supported.

When it comes to critical facilities, there can be no compromise. In a rapidly changing environment,

business can’t afford a ‘trial and error’ approach for selecting and designing their critical systems due

to the high capital expenditure involved and also the consequences.

For this reason, Critical M&E Engineering provides the right people and expertise, to provide the right

advice and solutions.

Page 4: Critical M&E Engineering SB - company profile - …critical-eng.com/wp-content/uploads/2016/11/Critical-ME...We Strategize Your Critical Services Updated on 28th Oct 2017 About Us

________________________________________________________________________

WeStrategizeYourCriticalServices Updatedon28thOct2017________________________________________________________________________________________________________________________________________________

About Us

Critical M&E Engineering Sdn. Bhd. was established in 2011, the objective then was to fulfill the needs

of our growing buildings and manufacturing industries, especially the Multinational Corporation

(MNC). Our core activities are in design, supply, installation, repair, service and maintenance of

Mechanical, Electrical and Process (MEP) utilities works such as Air-Conditioning (AC) System,

Mechanical Ventilation (MV) System, Smoke Spill System, Process Cooling Water System (PCW),

Compressed Dry Air (CDA) System, Clean Room Construction, Ducting Work, Piping Work, Electrical

Work, Service & Maintenance, including preventive and predictive maintenance, and Building

Automation System (BAS). And, we provide consultancy and project management services related to

existing system upgrading.

Today, Critical M&E Engineering is a unique Engineering Services firm that offers unsurpassed critical

facility support. Critical M&E Engineering has extensive experience in consulting, project and

construction management and services for critical facilities environments. This allows us to extend our

expertise and services throughout the region, providing MEP solutions for critical facilities covering

the following areas;

- Manufacturing Plants & Factories

- Data Centers

- Military

- Telecommunication Industries

- Hospitals & Medical Centers

- Laboratories

- Government Buildings & Educational Institutions

- Commercial Building & Complex

Apart from providing critical facilities solutions and supports, Critical M&E Engineering emphasis on

the efficiency of the resources use – to achieve to GREEN, especially through detail study and design in

the HVAC systems, which contributes to the highest electricity power consumption.

Critical M&E Engineering partners each have over 17 years of experience in supporting clients’ critical

facility needs. The company’s staff is comprised of dedicated professionals, encompassing all

engineering disciplines, with specialized knowledge in critical facility requirements.

Page 5: Critical M&E Engineering SB - company profile - …critical-eng.com/wp-content/uploads/2016/11/Critical-ME...We Strategize Your Critical Services Updated on 28th Oct 2017 About Us

________________________________________________________________________

WeStrategizeYourCriticalServices Updatedon28thOct2017________________________________________________________________________________________________________________________________________________

Our experience allows Critical M&E Engineering to understand clients’ needs to optimize and deliver

services to meet our clients’ specific needs, standards and requirements, by providing the highest level

of professionalism and total customer satisfaction.

The Critical M&E Engineering approach to each project is ‘LISTEN, UNDERSTAND, HANDS ON,

DELIVER’, where we tailor our efforts to the specific needs of the client.

Critical M&E Engineering as an engineering firm incorporated in Malaysia, is registered with

Construction Industry Development Board Malaysia (CIDB), as Grade G7, which shall allow the

company to participate to a more sizable project, which is in the company forecasted pipeline.

As a customer satisfaction oriented organization at all time, Critical M&E Engineering as such –

registering to ISO9001: 2008 Quality Management Systems, committing to consistence delivery of

services and solutions, to meet customer’s needs and expectations.

Vision

To be the leader in the critical facility industry.

Mission

A people oriented organization, team-up and share the common values, to provide unsurpassed

solutions and supports, to meet customer needs and expectations, with ZERO compromise to human

safety.

Page 6: Critical M&E Engineering SB - company profile - …critical-eng.com/wp-content/uploads/2016/11/Critical-ME...We Strategize Your Critical Services Updated on 28th Oct 2017 About Us

________________________________________________________________________

WeStrategizeYourCriticalServices Updatedon28thOct2017________________________________________________________________________________________________________________________________________________

Green

‘The challenges our planet faces – particularly climate change and sustainable economic development

– are global in nature and so require global solutions.

The building sector, which consumes as much as 40% of the world’s energy, 12% of its water and

contributes 40% of the waste sent to landfill, is a major part of this global problem. However, the

building sector can be an even bigger part of the solutions.

As we live in one world, we have a collective responsibility to work together to achieve change around

the globe. The World Green Building Council is working within the Asia-Pacific region to promote the

benefits of sustainable building practices, and Malaysia has embraced the potential of green building.

International research confirms that green buildings consume less energy, less water, and generate

less waste, and create a healthy and productive environment for employees.

Green building practices can reduce a building’s operating costs by as much as 9%, increase building

values by 7.5% and realize a 6.6% increase in return on investment. So, green building won't just make

sound ecological and environmental sense – they make sound economic sense too.’

TONY ARNEL

Chairman, World Green Building Council

Why Green Building?

A Green building focuses on increasing the efficiency of resource use – energy, water, and materials –

while reducing building impact on human health and the environment during the building’s lifecycle,

through better sitting, design, construction, operation, maintenance, and removal.

1 Green buildings are designed to save energy and resources, recycle materials and minimize

the emission of toxic substances throughout its life cycle.

2 Green buildings harmonies with the local climate, traditions, culture and the surrounding

environment.

3 Green buildings are able to sustain and improve the quality of human life whilst maintaining

the capacity of the ecosystem at local and global levels.

4 Green buildings make efficient use of resources, have significant operational savings and

increases workplace productivity.

5 Building green sends the right message about a company or organization – that it is well run,

responsible, and committed to the future.

Page 7: Critical M&E Engineering SB - company profile - …critical-eng.com/wp-content/uploads/2016/11/Critical-ME...We Strategize Your Critical Services Updated on 28th Oct 2017 About Us

________________________________________________________________________

WeStrategizeYourCriticalServices Updatedon28thOct2017________________________________________________________________________________________________________________________________________________

Critical Facility Critical Facility is a term used by the industrial player to describe assets that are essential for the

functioning of business continuity.

Critical Facility Services is Critical M&E Engineering’s primary business. Critical M&E Engineering will

assist to identify all the critical services necessary to ensure customer’s business continuity, by

properly designed and supported, so that the customer can focus on its core business, and to fulfill its

critical objectives.

Critical facilities namely the following areas;

- Manufacturing Plants & Factories

- Data Centers

- Military & Command Center

- Telecommunication Industries

- Hospitals & Medical Centers

- Laboratories

- Government Buildings & Educational Institutions

- Commercial Building & Complex

Which, any interruption to these operations will cause severe losses to the users.

Critical Facility Services and Support includes;

- Advance HVAC systems

o Capacity Elements - Consists of chillers, cooling towers, CRAC units, Air Handlers,

Package DX Systems, Chilled Water Pumps, Condenser Water Pumps, and associated

building control systems

o Distribution/ Path Elements – Consists of refrigerant piping, chilled water piping,

ducting, grills, and associated building control systems

- Clean Room design and construction

- Data Center Architecture Electrical and mechanical system configurations designed for

performance, reliability and maintainability

- Main Electrical Systems Including utility coordination, service entrances and distribution

systems

- Generator system

Page 8: Critical M&E Engineering SB - company profile - …critical-eng.com/wp-content/uploads/2016/11/Critical-ME...We Strategize Your Critical Services Updated on 28th Oct 2017 About Us

________________________________________________________________________

WeStrategizeYourCriticalServices Updatedon28thOct2017________________________________________________________________________________________________________________________________________________

- Electrical transfer systems

- UPS Systems and Distribution

- Builder work includes of raised flooring system

- Fire Detection and Suppression Systems

- Data Center Grounding, Security and Communications Systems

- Commissioning and Failure Mode Testing and Acceptance

- Building Management System

- Services & Maintenance which 24x7x365 support

Page 9: Critical M&E Engineering SB - company profile - …critical-eng.com/wp-content/uploads/2016/11/Critical-ME...We Strategize Your Critical Services Updated on 28th Oct 2017 About Us

________________________________________________________________________

WeStrategizeYourCriticalServices Updatedon28thOct2017________________________________________________________________________________________________________________________________________________

Company Introduction

Name of Company : Critical M&E Engineering Sdn. Bhd.

Company Registration No. : 946363-W

Business Address : Penang

303-4-13 (4th Floor), Kristal Point

Jalan Sultan Azlan Shah

11900 Bayan Lepas, Penang

Telephone No. : 604 – 646 4133

Fax No. : 604 – 644 4133

Business Address : KL

37-2, Block C, Zenith Corporate Park

1, Jalan SS7/26, 47301 Kelana Jaya, Selangor

Telephone No. : 603-7887 8170

Fax No. : 603-7887 8175

Email : [email protected] (Managing Director)

[email protected] (Executive Director)

[email protected] (General)

Date of Registration : 25th May 2011

Authorized Capital : RM1,000,000.00

Paid Up Capital : RM1,000,000.00

Banker : Public Bank Berhad, Jalan Cantonment,

Pulau Tikus Branch, Penang.

Company Secretary : Lim Yong Chiat (MAICSA 7060553)

1772-B, Lorong Tiong,

05200 Alor Setar, Kedah.

Page 10: Critical M&E Engineering SB - company profile - …critical-eng.com/wp-content/uploads/2016/11/Critical-ME...We Strategize Your Critical Services Updated on 28th Oct 2017 About Us

________________________________________________________________________

WeStrategizeYourCriticalServices Updatedon28thOct2017________________________________________________________________________________________________________________________________________________

Company Registration With SSM

Page 11: Critical M&E Engineering SB - company profile - …critical-eng.com/wp-content/uploads/2016/11/Critical-ME...We Strategize Your Critical Services Updated on 28th Oct 2017 About Us

________________________________________________________________________

WeStrategizeYourCriticalServices Updatedon28thOct2017________________________________________________________________________________________________________________________________________________

CIDB Registration Certificate

Page 12: Critical M&E Engineering SB - company profile - …critical-eng.com/wp-content/uploads/2016/11/Critical-ME...We Strategize Your Critical Services Updated on 28th Oct 2017 About Us

________________________________________________________________________

WeStrategizeYourCriticalServices Updatedon28thOct2017________________________________________________________________________________________________________________________________________________

Company Safety & Health Policy Statement

OSHAS/2013/11/01/Ver0 1 Nov 2013

CRITICAL'M& E

E N G I N E E R I N G !!

'Safety'&'Health'Policy'Statement'

!Critical!M&E!Engineering!Sdn!Bhd!is!committed!to!provide!a!safe!and!healthy!working!environment!for!all!the!employees!and!contractors.!!Critical!M&E!Engineering!Sdn!Bhd!understand!that,!all!injuries!are!preventable!and!health!and!safety!is!the!key!to! the! success.! Critical! M&E! Engineering! Sdn! Bhd! is! committed! to! comply! with! all! governmental! agencies,!regulations,!and!industry!best!practices!and!will!use!audits!to!measure!and!improve!safety!and!health!practices.!!Critical! M&E! Engineering! Sdn! Bhd! holds! all! levels! of! management! accountable! to! provide! a! safe! work!environment!and!enforcing!safe!work!procedures!and!practices.! !Management!and!supervisors!will! lead!and!demonstrate!their!commitment!to!health!and!safety!by!example,!and!will!ensure!that!the!peer!that!they!are!responsible!to!have!the!essential!knowledge!to!work!safely.!Supervisors!will!put!safety!and!health!to!the!same!priority!as!productivity.!!They!must!comply!to!occupational!safety!and!health!requirements.!!!Critical!M&E!Engineering!Sdn!Bhd!will!hold!all!employees!and!contractors!responsible!for!following!safe!work!procedures!and!reporting!unsafe!acts!and!safety!incidents.!!!!Workers!have!general!responsibilities!for!their!own!health!and!safety!and!that!of!other!persons.! ! In!addition,!they!have!the!responsibility! to! refuse!unsafe!work.! !Discriminatory!action!will!not!be!taken!against! them!for!refusing!to!do!unsafe!work.!!Employees! from!every!area!of! the! company,! regardless!of!position,!will! be!encouraged! to! contribute! to! the!company! safety! and! health! program.! ! Critical!M&E! Engineering! Sdn! Bhd! encourages! the! involvement! of! all!workers!in!the!development!of!the!program.!!We!will!provide!support!and!promote!the!program!to!ensure!that!safety!has!the!overriding!priority.!!Employee! cooperation! and! compliance!with! the! safety! and!health!program!at! Critical!M&E!Engineering! Sdn!Bhd!is!a!requirement!of!employment.!!!!!!!!!!!

Chow'Chin'Seang'Managing!Director!

Page 13: Critical M&E Engineering SB - company profile - …critical-eng.com/wp-content/uploads/2016/11/Critical-ME...We Strategize Your Critical Services Updated on 28th Oct 2017 About Us

________________________________________________________________________

WeStrategizeYourCriticalServices Updatedon28thOct2017________________________________________________________________________________________________________________________________________________

Key Personnel Resume

Ir. Chow Chin Seang PEng. MIEM, MASHRAE (Co-Founder)

Managing Director

Ir. Chow is a mechanical engineer by profession, having more than 18 years of experience in

engineering design, project management and company management as an engineer. His technical

expertise includes detailed mechanical system design and field construction management, as well as

all aspects of value engineering, project scheduling and cost containment. He has detailed experience

working on Cleanroom construction, Mechanical Plant Room construction, Process Engineering

construction, other Industrial and utility projects.

His company management experience includes overall management of engineering services,

personnel and production as operation manager, including growing the company into a firm serving

critical facilities clients. He has also led project management group for engineering services.

Education

- Master of Business Administration (MBA), Nottingham Trent University (NTU), 2008

- B. Eng (Hons) Mechanical, Universiti Teknologi Malaysia (UTM), 1999

Registration

- Professional Engineer (PE#13513), Board of Engineers, Malaysia (BEM), 2008

- Member (M#25525), The Institution of Engineers, Malaysia (IEM), 2008

- Member (M#8163424), The American Society of Heating, Refrigerating and Air-

Conditioning Engineer (ASHRAE), 2010

Page 14: Critical M&E Engineering SB - company profile - …critical-eng.com/wp-content/uploads/2016/11/Critical-ME...We Strategize Your Critical Services Updated on 28th Oct 2017 About Us

________________________________________________________________________

WeStrategizeYourCriticalServices Updatedon28thOct2017________________________________________________________________________________________________________________________________________________

Ir. Tan Si Lim PEng. MIEM, ATD (Co-Founder)

Executive Director

Ir. Tan is a mechanical engineer by profession, having 16 years of experience in engineering design,

project management and company management as an engineer. His technical expertise includes

detailed mechanical and electrical system design and field construction management, as well as all

aspects of value engineering, project scheduling and cost containment. He has detailed experience

working on Mission Critical facilities, including Datacenters, Telecommunications, Military Command

Centers, Military Bunkers facilities as well as other Industrial and utility projects.

His company management experience includes overall management of engineering services,

personnel and production as operation manager, including growing the company into a firm serving

critical facilities clients. He has also led the Marketing and Sales group for engineering services.

Education

- Master of Business Administration (MBA), Nottingham Trent University (NTU), 2006

- B. Eng (Hons) Mechanical, Universiti Putra Malaysia (UPM), 2001

Registration

- Accredited Tier Designer (ATD#777), Uptime Institute, 2013

- Certified Data Center Professional (CDCP#60011029064548), EPI, 2009

- Professional Engineer (PE#13229), Board of Engineers, Malaysia (BEM), 2007

- Member (M#24322), The Institution of Engineers, Malaysia (IEM), 2007

Page 15: Critical M&E Engineering SB - company profile - …critical-eng.com/wp-content/uploads/2016/11/Critical-ME...We Strategize Your Critical Services Updated on 28th Oct 2017 About Us

________________________________________________________________________

WeStrategizeYourCriticalServices Updatedon28thOct2017________________________________________________________________________________________________________________________________________________

Ir. Chin Kok You PEng. MIEM, CEng. MIET, ATD

Executive Director

Senior Technical and professional Engineer having more than 18 years of technical and management

experience in engineering design, facilities management & operations within building M&E

consultancy & construction for Data Centre, telecommunication industries. He is currently a Principal

Consultant handling important role in both technical and management activities. Prior to this, he held

key technical & management role in network facilities engineering and operations for one of the

leading telecommunication companies in Malaysia and as a Technical Consultant of Network Facility

for the 3rd telecom operator of Philippines for a total period of 8 years. Prior to this, he was a lead

principal engineer in an M&E consultancy firm involving detailed technical design, tender contract

preparation & management and site construction supervision.

Education

- BEng (Hons) Electrical & Electronics, University Of East London, United Kingdom

- Diploma in Electrical & Telecommunications, Polytechnic Ahmad Aziz Shah, Kuantan, Malaysia

Registration

- Member of The Board of Engineer Malaysia (Registration No: 25686A)

- Professional Engineer Of The Board Of Engineer Malaysia (PEng No: 10838)

- Member of The Institution of Electrical Engineers, UK (Registration No: 36106116)

- Chartered Engineer of The Engineering Council, UK (Registration No: 516830)

- Accredited Tier Designer (ATD) by The Uptime Institute (Foil No: 756)

- Certified Data Centre Professional (CDCP)

- Membership of The Institute of Leadership and Management

Page 16: Critical M&E Engineering SB - company profile - …critical-eng.com/wp-content/uploads/2016/11/Critical-ME...We Strategize Your Critical Services Updated on 28th Oct 2017 About Us

________________________________________________________________________

WeStrategizeYourCriticalServices Updatedon28thOct2017________________________________________________________________________________________________________________________________________________

Terry Chan

Executive Director Terry Chan was a Mechanical Engineer at Tudor Engineering Consultant soon after his graduation. He

was then explored further experience into Engineering Design and Project Management for specialize

requirement such as Data Centre, Telecommunications, Bomb Prove Chamber M&E Design and

Construction, Retrofitting and Modifying Existing Precision Air Cond to become more comprehensive

improved equipment to serve telecommunication sectors when it undergoes the technological

enhancement (from Edge to 3G to 4G etc), as well as enhancing Life System Upgrade for broadcast

industries.

In addition, his experience also includes Sales and Marketing, Mechanical & Electrical Design

Consultation for Specialize requirement, Technical Training, System Improvement Retrofitting and

Upgrade planning and rollout, Project Management, Cost Saving etc. for the upcoming technology

era.

Education - B. Eng (Hons) Mechanical, University of Sunderland, UK, 1997

Registration

- Certified Data Center Professional (CDCP#60011029064548), EPI, 2009

Page 17: Critical M&E Engineering SB - company profile - …critical-eng.com/wp-content/uploads/2016/11/Critical-ME...We Strategize Your Critical Services Updated on 28th Oct 2017 About Us

________________________________________________________________________

WeStrategizeYourCriticalServices Updatedon28thOct2017________________________________________________________________________________________________________________________________________________

Organization Chart

Boards of

Directors

Ir Chow Chin Seang Managing Director

- Administration, Finance & Project Management

(Base Build))

Chin Chin YeeSr. Account & Admin

ExecAdmin & Finance Dept.

Idayu Admin Assistant

Project Dept.

Engineering & Project Management

Yang Chee WanSr. Project Manager

Ng Boon Hong Site Supervisor

Albert Ng Teik HoeSr. Project Manager

(Vacant)Site Supervisor

Project Site Management

Tan Swee Seong Sr. Project Site

Manager

(Vacant) Site Supervisor

Loke Chen WaiProject Manager

Lim Wooi Pin Project Engineer

Ang Kean BooProject Engineer

Tai Kok Won Site Supervisor

Law Sui Chuen Site Supervisor

QS & Drafting

Yeoh Keat Yuen Designer & Drafter

Siti QS & Drafter

Safety Syman

Safety Manager

Ir Tan Si Lim Executive Director- Sales & Business

Development, Service & Project (Retrofit)

Management

Chan Siang Eng Sales Manager

Sales & Marketing Dept.

(Vacant)Sales Coordinator

Project Dept.

Lee Xian Huai Project Engineer

Tan Khai EeProject Engineer

Lim Chin Ming Service Manager

Service Dept.

Foo Soon Weng Service Engineer

Service Sales

Service & Maintenance Foo Soon Weng Service Engineer

Khaw Kheng TeongSr. Technician

Chong Kim Leng Technician

Sam Chai Chin Technician

Boey Boon Liang Technician

Mohd FaizzulTechnician

Mohd SyawanTechnician

Firdaus Assist. Engineer

ZulhilmieSr. Technician

Michael Chong Sr. Technician

Nor Syawan Technician

Service & Maintenance(Pantai Hospital,

Penang)

Mohd RidhaSr. Technician

Kannan Sr. Technician

Zainal Abidin Technician

NasarudeenTechnician

Mohd ShamsuriTechnician

Admad RidhuwanTechnicianIr Tan Si Lim (Acting)

Executive Director - KL Office

Administration & Business Development

Normala Account & Admin ExecAdmin & Finance Dept.

(Vacant)Admin Assist.

Tay Ye Swen System Sales Manager

Sales Dept.

(Vacant)Channel Sales

Executive

Terry Chan Director

- KL OfficeService & Project

Management

Theng Kai YuanProject Engineer

Project Dept.

Jacky Ch’ng Service Manager

Service Dept.

Azma Service Engineer

Nizam Service Engineer

JayaService Engineer

45 staff as of 26th Oct 2017

Page 18: Critical M&E Engineering SB - company profile - …critical-eng.com/wp-content/uploads/2016/11/Critical-ME...We Strategize Your Critical Services Updated on 28th Oct 2017 About Us

________________________________________________________________________

WeStrategizeYourCriticalServices Updatedon28thOct2017________________________________________________________________________________________________________________________________________________

Customer (Direct Registered)

Semiconductor Industry

Dell

Philips Lumileds

Motorola

Agilent Technologies

Keysight Technologies

Osram

Bosch

Western Digital

Inari Technology

VAT Manufacturing

First Solar

Nippon Express Logistics

Entegris

Panasonic Energy

Fuji Electric

Plexus

Jabil Circuits

ASE Electronics

Continental Automotive

Ann Joo Steel

SGK

Pentamaster

CPI

Medical Supplies, F&B Industry

St. Jude Medical

Knowles Electronics

B Braun Medical

Ranbaxy (Sun Pharma)

HACKS

Abbott

Hospital

Adventist Hospital

Island Hospital

Pantai Hospital, Sg. Petani

Gleneagles Medical Centre, Penang

General Electric (GE) Healthcare

Loh Guan Lye Hospital

Seberang Jaya Hospital

Pantai Hospital, Penang

Carl Corrynton Medical

Page 19: Critical M&E Engineering SB - company profile - …critical-eng.com/wp-content/uploads/2016/11/Critical-ME...We Strategize Your Critical Services Updated on 28th Oct 2017 About Us

________________________________________________________________________

WeStrategizeYourCriticalServices Updatedon28thOct2017________________________________________________________________________________________________________________________________________________

Military

TUDM, SOC3, Kuching, Sarawak

TUDM, Kuantan, Pahang

TLDM, Lumut, Perak

TUDM, Butterworth, Penang

TUDM, Sg Besi, Selangor

University

USM

UTP

Telecommunication

Digi

Maxis

U Mobile

Astro

TM

VADS

Main Contractor

BYG Projects Sdn Bhd

Tialoc Malaysia Sdn Bhd

South Island Building Sdn Bhd

Wekajaya Sdn Bhd

Sapura Defense Sdn Bhd

Daya CMT Sdn Bhd

Seriousbiz Sdn Bhd

Johnson Controls

Jones Lang LaSalle (JLL)

TTE Malaysia Sdn Bhd

M+W Group

LB Brothers Sdn Bhd

Kok Construction

Prestige Construction

Page 20: Critical M&E Engineering SB - company profile - …critical-eng.com/wp-content/uploads/2016/11/Critical-ME...We Strategize Your Critical Services Updated on 28th Oct 2017 About Us

________________________________________________________________________

WeStrategizeYourCriticalServices Updatedon28thOct2017________________________________________________________________________________________________________________________________________________

Customer (In-Direct)

Semiconductor Industry

Atotech

Silterra

Star Publication

Intel

AMD

HP

Spansion

Latexx

Fairchild Semiconductor

Hershey

Kaifa Technology

Dyson

Penfabric

KOBE

TS SolarTech

Universities

UUM UiTM, Kepala Batas, Penang

Banking

UOB Bank of China

Commercial

sPICE

Page 21: Critical M&E Engineering SB - company profile - …critical-eng.com/wp-content/uploads/2016/11/Critical-ME...We Strategize Your Critical Services Updated on 28th Oct 2017 About Us

________________________________________________________________________

WeStrategizeYourCriticalServices Updatedon28thOct2017________________________________________________________________________________________________________________________________________________

Key Project References Industry - Facility Maintenance

Owner Year Completion Location Contract Amount Type of Project Scope Compliance

First Solar Yearly Contract Kulim Hi-Tech Park, Kedah >RM500,000.00 to date Maintenance Maintenance Involving 16 nos 300kVA UPS service, maintenance & troubleshooting FM Global Approved

Owner Year Completion Location Contract Amount Type of Project Scope

Pantai Hospital Yearly Contract Penang >RM500,000.00 to date Maintenance Maintenance Involving entire hospital ACMV service, maintenance & troubleshooting

Owner Year Completion Location Contract Amount Type of Project Scope

VADS Yearly Contract Nationwide RM1,200,000.00 Maintenance Maintenance Involving entire VADs Data Center M&E service, maintenance & troubleshooting, namely UPS, CRAC, STS, FM200, VESDA, GENSET, EMS, BMS, etc

Page 22: Critical M&E Engineering SB - company profile - …critical-eng.com/wp-content/uploads/2016/11/Critical-ME...We Strategize Your Critical Services Updated on 28th Oct 2017 About Us

________________________________________________________________________

WeStrategizeYourCriticalServices Updatedon28thOct2017________________________________________________________________________________________________________________________________________________

Industry - Solar

Owner Year Completion Location Contract Amount Type of Project Scope Compliance

First Solar Apr 2016 Kulim Hi-Tech Park, Kedah RM1,035,000.00 Retrofit Project Involving New Acid Scrubber System Installation FM Global Approved

Owner Year Completion Location Contract Amount Type of Project Scope

TS Solartech Jun 2016 Penang Science Park RM3,300,000.00 New Installation Project involving supply, install, testing & commissioning UPS/FC system, having capacity up to 5.5MW (3x800kVA, 1x600kVA, 2x500kVA, 1x250kVA, 3x200kVA, 6x20kVA, 4x10kVA)

Owner Year Completion Location Contract Amount Type of Project Scope Compliance

First Solar Dec 2016 Kulim Hi-Tech Park, Kedah RM1,700,000.00 Retrofit Project Involving KLM 1&2 T&R New ACMV Installation FM Global Approved

Page 23: Critical M&E Engineering SB - company profile - …critical-eng.com/wp-content/uploads/2016/11/Critical-ME...We Strategize Your Critical Services Updated on 28th Oct 2017 About Us

________________________________________________________________________

WeStrategizeYourCriticalServices Updatedon28thOct2017________________________________________________________________________________________________________________________________________________

Industry - Telco

Owner Year Completion Location Contract Amount Type of Project Scope

U Mobile Nov 2015 Subang Hi-Tech, Selangor RM1,490,000.00 Retrofit Project involving new TELCO ACMV upgrading, 7 nos CRAC, 2 nos 240kW Modular UPS, 3 sets CAC, and associated services

Owner Year Completion Location Contract Amount Type of Project Scope

Maxis Nov 2016 Subang Hi-Tech, Selangor RM450,000.00 Retrofit Project involving new TELCO ACMV’s CRAC unit outdoor condenser total change-out

Owner Year Completion Location Contract Amount Type of Project Scope

Maxis Jan 2018 (Targeted) Nationwide RM6,200,000.00 Retrofit Project involving new 900 nos TELCO outdoor free-cooling total change-out

Page 24: Critical M&E Engineering SB - company profile - …critical-eng.com/wp-content/uploads/2016/11/Critical-ME...We Strategize Your Critical Services Updated on 28th Oct 2017 About Us

________________________________________________________________________

WeStrategizeYourCriticalServices Updatedon28thOct2017________________________________________________________________________________________________________________________________________________

Industry - Data Center/ Call Center

Owner Year Completion Location Contract Amount Type of Project Scope

Motorola Aug 2015 Penang RM620,000.00 Retrofit Project involving 2 new Data Center installation, 5 nos CRAC, 2 sets Perm-Alert WDS, 2 nos VESDA, 2 Lots Raised Flooring system, EMS and associated services

Owner Main Con Year Completion Location Contract Amount Type of Project Scope Compliance

Western Digital Tialoc Sdn Bhd Dec 2015 Penang RM570,000.00 Retrofit Project involving new Data Center installation, 3 nos CRAC, 1 set Perm-Alert WDS, 1 nos VESDA, 1 Lots Raised Flooring system, 1 Lot FM200, EMS and associated services FM Global Approved

Owner Year Completion Location Contract Amount Type of Project Scope Compliance

Dell Feb 2014 APCC1 DC1 Penang RM340,000.00 Retrofit Project involving Data Center ACMV Upgrading FM Global Approved

Owner Year Completion Location Contract Amount Type of Project Scope Compliance

First Solar Jun 2015 Kulim Hi-Tech Park, Kedah RM775,000.00 Retrofit Project Involving New Data Center CRAC Upgrading (4 Data Centers) FM Global Approved

Owner Year Completion Location Contract Amount Type of Project Scope Compliance

Dell Sep 2016 APCC2 DC1 Bukit Minyak Penang RM800,000.00 New Installation Project involving Data Center Battery Monitoring System (BMS) Installation FM Global Approved

Page 25: Critical M&E Engineering SB - company profile - …critical-eng.com/wp-content/uploads/2016/11/Critical-ME...We Strategize Your Critical Services Updated on 28th Oct 2017 About Us

________________________________________________________________________

WeStrategizeYourCriticalServices Updatedon28thOct2017________________________________________________________________________________________________________________________________________________

Owner Year Completion Location Contract Amount Type of Project Scope Compliance

Dell Jun 2017 APCC1 DC3 Penang RM1,800,000.00 New Installation Project involving new Tier III Data Center Installation, consisting of UPS, CRAC, Raised Flooring, FM200, VESDA, BMS, Racking, and associates M&E Services FM Global Approved

Owner Main Con Year Completion Location Contract Amount Type of Project Scope

Jabatab Pengaliran & Saluran (JPS) ETE Sdn Bhd Sep 2017 Ampang, Selangor RM720,000.00 Retrofit New TIER III Data Center set up involving 3 nos DX Row Cooling, COdl Aisle Containment, VESDA, EMS, 2 lots IG55, Water Detection System

Page 26: Critical M&E Engineering SB - company profile - …critical-eng.com/wp-content/uploads/2016/11/Critical-ME...We Strategize Your Critical Services Updated on 28th Oct 2017 About Us

________________________________________________________________________

WeStrategizeYourCriticalServices Updatedon28thOct2017________________________________________________________________________________________________________________________________________________

Industry - Medical/ Food

Owner Main Con Year Completion Location Contract Amount Type of Project Scope Compliance

Rembina Sdn Bhd South Island Sdn Bhd Jan 2016 Penang RM1,750,000.00 Base Build Project involving ACMV, CDA ISO8 Cleanroom, Smoke Spill System, BMS system GMP Certified

Owner Year Completion Location Contract Amount Type of Project Scope Compliance

Sun Phama Mar 2017 Sg Petani, Kedah RM320,000.00 Retrofit Water cooled chiller replacement GMP certified

Owner Main Con Year Completion Location Contract Amount Type of Project Scope Compliance

Hacks Estagold Sdn Bhd Oct 2017 Penang RM5,800,000.00 Base Build New factory involving ACMV set up, production having 20degC 35%RH environment GMP certified

Page 27: Critical M&E Engineering SB - company profile - …critical-eng.com/wp-content/uploads/2016/11/Critical-ME...We Strategize Your Critical Services Updated on 28th Oct 2017 About Us

________________________________________________________________________

WeStrategizeYourCriticalServices Updatedon28thOct2017________________________________________________________________________________________________________________________________________________

Industry - Healthcare

Owner Year Completion Location Contract Amount Type of Project Scope Compliance

Pantai Hospital Sep 2015 Sg Petani, Kedah RM720,000.00 Retrofit Project involving 2 nos 300RT water cooled chiller replacement @ level 3 Sustainable Energy Development Authority Malaysia (SEDA)

Owner Year Completion Location Contract Amount Type of Project Scope

Pantai Hospital Oct 2017 Penang RM1,800,000.00 Retrofit Project involving chiller plant room upgrading, 3 nos 300RT water cooled chiller, 2 nos 500Rt cooling tower, 2000Amp MCC panel, and associated work @ Level 6 roof top

Page 28: Critical M&E Engineering SB - company profile - …critical-eng.com/wp-content/uploads/2016/11/Critical-ME...We Strategize Your Critical Services Updated on 28th Oct 2017 About Us

________________________________________________________________________

WeStrategizeYourCriticalServices Updatedon28thOct2017________________________________________________________________________________________________________________________________________________

Industry – Government/ Military

Owner Year Completion Main Con Location Contract Amount Type of Project Scope

TUDM (Air Force) Malaysia Jan 2015 Sapura Defence Sdn Bhd Butterworth, Penang RM930,000.00 Retrofit Project involving supply, install, testing & commissioning ACMV, 2*150RT air cooled chiller, CRAC, and BMS

Owner Year Completion Main Con Location Contract Amount Type of Project Scope

TUDM (Air Force) Malaysia Dec 2015 Wekajaya Sdn Bhd Kota Samarahan, Kuching, Sarawak, Malaysia RM2,900,000.00 Base Build Project involving supply, install, testing & commissioning ACMV, 2*300RT water cooled chiller, Smoke Spill System, and BMS

Owner Main Con Year Completion Location Contract Amount Type of Project Scope

Thai Consulate Prestige Construction Oct 2017 Penang RM700,000.00 Base Build New consulate building completed with full VRV system, and associated services

Owner Year Completion Location Contract Amount Type of Project Scope

Putrajaya Holding Oct 2017 Putrajaya, Selangor RM1,050,000.00 New Installation Project involving supply, install, testing & commissioning UPS system, having capacity up to 1.2MW (4 nos 300kVA)

Page 29: Critical M&E Engineering SB - company profile - …critical-eng.com/wp-content/uploads/2016/11/Critical-ME...We Strategize Your Critical Services Updated on 28th Oct 2017 About Us

________________________________________________________________________

WeStrategizeYourCriticalServices Updatedon28thOct2017________________________________________________________________________________________________________________________________________________

Industry - Oil & Gas

Owner Year Completion Main Con Location Contract Amount Type of Project Scope Compliance

Schlumberger Jun 2015 Tialoc Malaysia Sdn Bhd Port Klang Free Zone (PKFZ), Klang, Selangor, Malaysia RM3,700,000.00 Base Build Project involving supply, install, testing & commissioning ACMV, CDA, Desiccant Wheel System, Smoke Spill System, Process Utility & BMS LEED Certified by U.S Green Building Council FM Global Approved

Page 30: Critical M&E Engineering SB - company profile - …critical-eng.com/wp-content/uploads/2016/11/Critical-ME...We Strategize Your Critical Services Updated on 28th Oct 2017 About Us

________________________________________________________________________

WeStrategizeYourCriticalServices Updatedon28thOct2017________________________________________________________________________________________________________________________________________________

Industry - Semiconductor

Owner Year Completion Location Contract Amount Type of Project Scope Compliance

Entegris Nov 2015 Kulim Hi-Tech Park, Kedah RM950,000.00 Retrofit Project involving ACMV Upgrading, 3 nos air cooled chiller, associated mechanical work FM Global Approved

Owner Main Con Year Completion Location Contract Amount Type of Project Scope

Classified (Top Tier Semincon Player) Johnson Control Dec 2015 Penang RM180,000.00 Retrofit Project involving chiller plant room upgrading, 1 nos 800RT water cooled chiller replacement

Owner Year Completion Location Contract Amount Type of Project Scope Compliance

Latexx (Semperit) Dec 2015 Taiping, Perak RM4,700,000.00 Base Build Project involving Process Utility pipe work, Boiler pipe work, Natural Gas pipe work, & mechanical Ventilation system FM Global Approved

Page 31: Critical M&E Engineering SB - company profile - …critical-eng.com/wp-content/uploads/2016/11/Critical-ME...We Strategize Your Critical Services Updated on 28th Oct 2017 About Us

________________________________________________________________________

WeStrategizeYourCriticalServices Updatedon28thOct2017________________________________________________________________________________________________________________________________________________

Owner Main Con Year Completion Location Contract Amount Type of Project Scope

VAT BYG Projects Sdn Bhd Mar 2016 Penang RM380,000.00 Retrofit Project involving new ISO6 & ISO8 cleanroom set up

Owner Year Completion Location Contract Amount Type of Project Scope

Osram Jan 2017 Penang RM950,000.00 Retrofit New Oil Free Compressed Air System in Wafer Plant

Owner Year Completion Location Contract Amount Type of Project Scope

Osram Aug 2017 Penang RM800,000.00 Retrofit New PEN5 ISO8 Cleanroom set up

Owner Year Completion Location Contract Amount Type of Project Scope

CPI Oct 2017 Penang RM1,800,,000.00 Retrofit New ISO8 cleanroom set up, having total area of 32,000ft2. PU ducting instead of GI ducting deployed, to achieve to a better workmanship

Page 32: Critical M&E Engineering SB - company profile - …critical-eng.com/wp-content/uploads/2016/11/Critical-ME...We Strategize Your Critical Services Updated on 28th Oct 2017 About Us

________________________________________________________________________

WeStrategizeYourCriticalServices Updatedon28thOct2017________________________________________________________________________________________________________________________________________________

Owner Main Con Year Completion Location Contract Amount Type of Project Scope

TF-AMD Tialoc Sdn Bhd Oct 2017 Penang RM4,000,000.00 Base Build New factory set up involving total CHW, CW, CDA, Process Piping Work

Owner Main Con Year Completion Location Contract Amount Type of Project Scope

VAT BYG Projects Sdn Bhd Jun 2018 (Targeted) Penang RM7,000,000.00 Base Build New factory expansion involving 170,000ft2 area ACMV set up, including of 55,000ft2 cleanroom (ISO6 & ISO8), OFA, smoke spill system, DCC, 3 nos chiller, and other associated services

Owner Main Con Year Completion Location Contract Amount Type of Project Scope

Qdos Flexcircuits SdnBhd Kok Construction Mar 2018 (Targeted) Penang RM7,000,000.00 Base Build New ACMV, CDA, Cleanroom, Scrubber System, and other associated mechanical services for the new factory set up

Page 33: Critical M&E Engineering SB - company profile - …critical-eng.com/wp-content/uploads/2016/11/Critical-ME...We Strategize Your Critical Services Updated on 28th Oct 2017 About Us

________________________________________________________________________

WeStrategizeYourCriticalServices Updatedon28thOct2017________________________________________________________________________________________________________________________________________________

Project References – 2016

Customer Description/ Scope Status Amount (RM)

FIRST SOLAR KLM1-2 Server Room Int Flood Detection Job Done 40,000.00

GADING KASTURI ACMV & Electrical Installation Job Done 40,000.00

FIRST SOLAR Install volume control damper to existing project Job Done 43,000.00

ROBERT BOSCH (M) Refer PO for the details Job Done 43,682.50

ASTRO UPS Installation at AGSS Mines Office Job Done 45,000.00

FIRST SOLAR M62A UPS Repairing & Part Replacement Job Done 47,082.00

FIRST SOLAR Coater UPS M5.1B Repair & Service Job Done 47,082.00

FIRST SOLAR KLM Maint Equipment & Repairs Job Done 47,082.00

ASTRO UPS 4 Capacitor Bank Replacement at AABC, Bukit Jalil Job Done 47,500.00

JKR To supply & deliver to ground level - DB Aire PAC Job Done 48,000.00

FIRST SOLAR APM16 M56 Supply PCW Filter Job Done 50,260.00

ASTRO Service Maintenance for GE UPS and Renovo PAC at AABC, Bukit Jalil

Job Done 51,984.00

YORK To supply and install Steril-Aire UVC Job Done 52,000.00

FIRST SOLAR M4 Replace CHWS Pipe Insulation Prod U2 Job Done 53,500.00

OSRAM To supply and install LEGRAND inform true on-line double conversion UPS Model

Job Done 56,300.00

PEJABAT TANAH Pejabat Tanah Timur Laut Komtar LV 50 - PAC Job Done 57,664.00

MAXIS, SUBANG HI-TECH

Refer PO for the details Job Done 58,800.00

OSRAM Silicone Extension (New Coater Room)_TENDER Job Done 63,900.00

FIRST SOLAR KLM2 Server Room Ducting Modification Job Done 65,500.00

ES MATRIX DB Aire Precision Air Conditioning System Job Done 66,000.00

FIRST SOLAR KLM 4CHW Insulation Replacement Job Done 68,000.00

BAYVIEW Installation of new air-cond and fan coil Job Done 68,900.00

ENTEGRIS Gypsum board and aluminium frame Job Done 70,500.00

LUMILEDS Refer PO for the details Job Done 72,000.00

OSRAM Refer PO for the details Job Done 75,000.00

OSRAM To supply PAC for Control Room_TENDER Job Done 78,000.00

FIRST SOLAR EATON UPS Repairing & Part Replacement Job Done 79,881.00

PEJABAT TANAH Pejabat Tanah Seberang Perai Selatan - PAC Job Done 85,000.00

PARADIGM Install CFM Air Cooler Job Done 88,000.00

CELESTICA Precision Air- Cond (PAC) System Job Done 90,200.00

MCAT BOX OFFICE To supply deliver to ground level only (LEGRAND UPS KEOR T Series)

Job Done 93,000.00

ASTRO AC Cabling and installation of Switchboard for HPA building at ACBC, Cyberjaya

Job Done 95,500.00

DYNACRAFT To supply labour, tools and materials to install new 10HP FCU_TENDER

Job Done 105,000.00

ASTRO CYBERJAYA Refer PO for the details Job Done 139,175.00

DYSON, JOHOR TAG: DB-AIRE II Job Done 142,800.00

Page 34: Critical M&E Engineering SB - company profile - …critical-eng.com/wp-content/uploads/2016/11/Critical-ME...We Strategize Your Critical Services Updated on 28th Oct 2017 About Us

________________________________________________________________________

WeStrategizeYourCriticalServices Updatedon28thOct2017________________________________________________________________________________________________________________________________________________

Customer Description/ Scope Status Amount (RM)

TUDM KUANTAN Refer PO for the details_TENDER In progress 144,000.00

ENTEGRIS Refer PO for the details_TENDER Job Done 150,000.00

ENTEGRIS Refer PO for the details_TENDER Job Done 190,200.00

YORK Mechanical Work Intel PG8_TENDER Job Done 191,000.00

MAXIS, PLAZA SENTRAL

Refer PO for the details Job Done 208,000.00

ASTRO Supply and install outdoor load bank at ACBC, Cyberjaya Job Done 218,000.00

ASTRO Replacement of 4P ACB 3200A at AABC, Bukit Jalil Job Done 219,000.00

TM, Cyberjaya Renovation_TENDER Job Done 234,600.00

VAT Cleanroom Extension At Batu Kawan_TENDER Job Done 278,650.00

MNG Project Optics Balzers - Ventilation Ducting Works Job Done 340,000.00

FLEX Mechanical Work Omega Project_TENDER Job Done 459,000.00

FLEX To supply Legrands UPS KEOR HP Series UPS System_TENDER Job Done 500,000.00

JPS AMPANG Menaiktaraf Bilik Server Hidrologi Dan Pusat Ramalan Banjir_TENDER

Job Done 511,846.00

VAT Cleanroom Extension At Batu Kawan_TENDER Job Done 517,410.00

OSRAM STS Silicone Extension Renovation_TENDER In progress 578,000.00

DELL To supply labour material & tools to install battery monitoring system for UPS critical equipment_TENDER

Job Done 635,000.00

MNG Project Optics Balzers - Chilled Water, Water Condenser & Process Utility Piping Works

Job Done 635,000.00

OSRAM Conversion Of Dry Pack Area To SMT Test_TENDER In progress 738,000.00

U-MOBILE To supply, deliver, install and commission UPS At U-Mobile, Kepong_TENDER

Job Done 835,000.00

OSRAM Install Air- Compressor_TENDER Job Done 940,000.00

FIRST SOLAR KLM 1.5 TetraSun Scrubber Blower Redundan_TENDER Job Done 1,035,000.00

DELL To supply and install 1 unit of 500TR YORK Chiller at Dell Bayan Lepas_TENDER

Job Done 1,052,410.00

FIRST SOLAR KLM1-6 Transformer Room Aircond Job Done 1,230,000.00

GUNUNG NGILI, SARAWAK

Infrastructure Project at Gunung Ngili (SOC3)_TENDER Job Done 1,357,850.00

FIRST SOLAR KLM1-2 Air Conditioning System Installation In progress 1,460,000.00

U-MOBILE To supply, deliver, install and commission HPAC At U-Mobile, Kepong_TENDER

Job Done 2,183,000.00

TS SOLAR Refer PO for the details_TENDER In progress 3,137,522.32

HACKS To supply, delivery, installation, testing & comissioning & maintenance for Mechanical Ventilation_TENDER

In progress 4,600,000.00

Page 35: Critical M&E Engineering SB - company profile - …critical-eng.com/wp-content/uploads/2016/11/Critical-ME...We Strategize Your Critical Services Updated on 28th Oct 2017 About Us

________________________________________________________________________

WeStrategizeYourCriticalServices Updatedon28thOct2017________________________________________________________________________________________________________________________________________________

Project References – 2017

Customer Description/ Scope Status Amount (RM)

PANTAI HOSPITAL (SG PETANI)

To supply labour, tools & material to replace the current L2 AHU Job Done 30,000.00

ROBERT BOSCH (M) M102-CM Lab Chamber Hook-Up Job Done 32,000.00

MAL To supply and deliver DB Aire PAC Job Done 34,000.00

MOLEX Tender For Molex Project In progress 35,400.00

KNOWLES PENANG Public Holiday Maintenance Service For UPS - Refer PO for the details

In progress 37,200.00

WD Bi-Monthly Comprehensive Maintenance For Environmental Monitoring System (EMS)

In progress 39,520.00

FIRST SOLAR To install fan at Acid Etch Area KLM 1-4 Job Done 44,000.00

PANTAI HOSPITAL (SG PETANI)

Building - Ventilation System For Path Room Job Done 44,320.00

ROBERT BOSCH (M) B101 GM C4B Mechanical Utilities Hook-Up In progress 45,000.00

INFIRMARY TAI TU LONG

To supply delivery to ground level only - UPS LEGRAND Job Done 45,000.00

NIPPON Supply & install 1 unit 15 HP Acson outdoor unit In progress 48,000.00

OSRAM Oil-Free Compressor Rental Job Done 48,000.00

FIRST SOLAR KLM1 & KLM2 Additional Duct Work Job Done 52,000.00

ROBERT BOSCH PGP2

To supply and deliver to ground level only DB Aire PAC Job Done 55,000.00

FIRST SOLAR KLM34 Dryer Geex Replacement Job Done 55,000.00

FIRST SOLAR KLM 1-4 PAC Unit Bi-Monthly Service Job Done 57,600.00

MAXIS Monthly Inspection & Electrical Installation In progress 58,800.00

HACKS KEOR T10 kvA/9kW @ 10 mins full load 0.8pf Job Done 60,420.00

FIRST SOLAR KLM4 Office CHW Pipe Replace Insulation Job Done 65,000.00

ASTRO Rectification work for 160kVA GE UPS at aabc, Bukit Jalil Job Done 79,000.00

MEASAT Cable Termination Work For AMF Board Job Done 85,100.00

NIPPON Remove existing drain pump & replace with new HVAC draim pump

Job Done 85,100.00

ASTRO Modification works at CMA and SWQ CAR1, AABC, Bukit Jalil In progress 92,000.00

SANDISKS To supply & deliver DB-Aire PAC (Precision Air-Cond) In progress 95,000.00

TUDM, BUTTERWORTH

To supply & install new capacitor Control Panel For Series Surge Compressor (SSS)

Job Done 96,500.00

U-MOBILE Comprehensive Maintenance For UPS Located at LT28 & Prai TOC

In progress 98,000.00

FIRST SOLAR KLM3 Open Office Insulation Replacement Job Done 115,000.00

DELL IT Lab Air Cond Replacement In progress 122,040.00

PANTAI HOSPITAL (PENANG)

Supply & delivery of HVAC Maintenance Service In progress 189,600.00

SIRIM Mechanical Installations at Sirim QAS International Sdn Bhd_TENDER

In progress 194,285.00

YORK To carry out AHU unloading, hoisting, positioning and sections joining at site c/w safety officer

Job Done 200,000.00

YORK Refer quotation REF#Q/CCS/2016/158R1_TENDER Job Done 200,000.00

YORK Chiller Replacement - Refer PO for the details Job Done 250,000.00

Page 36: Critical M&E Engineering SB - company profile - …critical-eng.com/wp-content/uploads/2016/11/Critical-ME...We Strategize Your Critical Services Updated on 28th Oct 2017 About Us

________________________________________________________________________

WeStrategizeYourCriticalServices Updatedon28thOct2017________________________________________________________________________________________________________________________________________________

Customer Description/ Scope Status Amount (RM)

HOTEL BAJET Cadangan Mendirikan Sebuah Hotel Bajet 10 Tingkat (49 Bilik) In progress 259,000.00

U-MOBILE To supply, deliver, install, test and comissioning HPAC at U-Mobile, Subang_TENDER

Job Done 317,500.00

YORK RCU Work - Refer PO for the details Job Done 338,000.00

LATEXX MANUFACTURING

ACMV package & process utilities piping package_Tender Job Done 367,888.02

ASTRO UPS Relocation for Astro at AABC, Bukit Jalil Job Done 399,250.00

QDOS FLEXCIRXUITS Refer to LA for the details (Additional cost for Mechanical Work) In progress 579,000.00

ROYAL THAI Supply & Installation Of Air-Conditioning Work In progress 660,000.00

BENCHMARK Refer PO for the details_Tender In progress 713,471.95

BUDDHIST TEMPLE, SEPANG

Refer PO/LA for the details In progress 886,793.00

YORK Mechanical & Electrical WorksFor Chillers, Pumps & Cooling Towers Installation Works At Carsem (M) Site

In progress 950,000.00

DELL Dell APCC 1 - Client Lab Renovation_TENDER In progress 1,520,000.00

GLENEAGLES To supply and delivery Chiller_Tender In progress 1,740,000.00

CPI (PENANG) SDN BHD

ACMV Works For Factory at CPI, Bayan Lepas_TENDER In progress 1,800,000.00

TF-AMD To supply, deliver, install and Testing & Commissioning of the ACMV Pipe Works

In progress 3,305,000.00

QDOS FLEXCIRXUITS Refer to LA for the details. In progress 6,100,000.00

VAT ACMV & Mechanical Installation In progress 6,656,103.40