critical path sample
TRANSCRIPT
-
7/29/2019 Critical Path Sample
1/4
Sheet 1 of 4
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
%
Comp
Actual/
Forecast
Start
Actual/
Forecast
Finish
Total
Float
Planned
Start
Planned
Finish
Milestone
Milestone
MilestoneGeneral Milestone
MM010171 MECHANICAL COMPLETION 0 0 0 26-NOV-12 0 26-NOV-12
MM010178 FIRST COMMERCIAL PRODUCTION 0 0 0 25-JAN-13 0 25-JAN-13
MM010179 PROVISIONAL ACCEPTANCE ACHIEVED 0 0 0 26-MAR-13 0 26-MAR-13
MM010181 Taking Over of Whole Plant 0 0 0 26-MAR-13 0 26-MAR-13
Construction Milestone
MM012200 COMPLETE ERECTION OF REFORMER 0 0 0 30-SEP-12 0 28-APR-12
Precom. / Commissioning
MM010164 STEAM PRODUCTION BY BOILER 0 0 0 15-SEP-12 0 30-JUL-12
MM010174 First Feed to Reformer 0 0 0 27-NOV-12 0 27-NOV-12
MM012401 PROVISIONAL ACCEPTANCE CERTIFICATE 0 0 0 26-MAR-13 0 26-MAR-13
MM015180 COMPLETION OF PERFORMANCE TEST 0 0 0 26-MAR-13 0 26-MAR-13
Construction & Precommissioning
Ammonia
Piping InstallationRack Piping Erection
C1N52022 Ammonia Main Pipe Rack 250 4 94 12-JUL-11A 03-SEP-12 0
Around Equipment Piping Erection
C1N52542 Steam Reforming & Desulphurization Area 245 15 89 16-NOV-11A 14-SEP-12 0
Hydro Test
C1N53001 Hydro Test 172 37 55 15-MAY-11A 13-OCT-12 0 01-OCT-11 30-OCT-12
InsulationPiping
C1N91529 10 Unit - Piping Insulation ( Ammonia Recovery ) 49 49 0 04-SEP-12 30-OCT-12 0 02-JUN-12 15-NOV-12
Pre-commissioningUnit 01: NG Desulphurization & Compression Unit
C1NP0102A S-01-1: Natural Gas Compressor System 92 22 26 11-JUN-12A 21-SEP-12 0
Unit 10 : Ammonia Recovery Unit
C1NP2302A S-10-1: Ammonia Recovery System 84 12 25 15-JUN-12A 15-SEP-12 0
2010 2011 2012 2013
NDJ FMAMJ J ASOND J FMAMJ J AS OND J FMAMJ J ASOND J FMA
MECHANICAL COMPLETIO
FIRST COMMERCIAL PRODUCTIO
PROVISIONAL ACCEPTANCE ACHIEVE
Takin Over of Whole Plan
COMPLETE ERECTION OF REFORME
STEAM PRODUCTION BY BOILE
First Feed to Reforme
PROVISIONAL ACCEPTANCE CERTIFICA
COMPLETION OF PERFORMANCE TES
H dro Test
10 Unit - Pi in Insulation ( Ammonia Recover
CM
Primavera Systems, Inc.
Start Date 27-NOV-09
Finish Date 26-MAR-13
Data Date 31-AUG-12
Actual/Forecast Bar
Planned Bar
Progress Bar
Critical Activity
REVISION BOX
Date Revision Checked Approved
31-AUG-12 Issue for Approval H.C. Kim Y. Kim
13-APR-11 Issue for Approval_Rev.07 H.C.Kim Y. Kim
10-NOV-10 Issue for Approval_Rev.06 H.R.DO Y. Kim
F08D FERTIL-2Ammonia Urea ProjectCritical Path Schedule
-
7/29/2019 Critical Path Sample
2/4
Sheet 2 of 4
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
%
Comp
Actual/
Forecast
Start
Actual/
Forecast
Finish
Total
Float
Planned
Start
Planned
Finish
Urea
Steel Structure
S201 StructureC2N31504 Alignment 42 3 99 04-SEP-11A 02-SEP-12 0
C2N31505 Grating 33 5 99 21-JAN-12A 04-SEP-12 0
C2N31506 Roof Panel 15 15 0 02-SEP-12 16-SEP-12 0
Piping InstallationA/G Piping Shop Fabrication
C2N51501 Shop Fabrication - C.S. line 260 10 99 21-MAY-11A 11-SEP-12 0 02-APR-11 30-OCT-11
C2N51503 Shop Fabrication - S.S. Line 165 10 99 25-JUN-11A 11-SEP-12 0 02-AUG-11 31-DEC-11
Rack Piping ErectionC2N52001 Urea Main Pipe Rack 201 4 98 27-AUG-11A 04-SEP-12 0 28-AUG-11 14-JAN-12
Pre-commissioningUnit 21 : Ammonia Pumping Unit
C2NP0302B S-21-1: Ammonia Pumping System 65 65 0 17-SEP-12 20-NOV-12 0
Unit 22 : Urea Synthesis and Flare Unit
C2NP0402B S-22-1: Urea Synthesis System 71 71 0 17-SEP-12 26-NOV-12 0
Unit 27 : Granulation Unit
C2NP1202 S-27-2: Urea Granulation Auxiliary System 102 50 1 22-MAY-12A 24-OCT-12 0 17-SEP-12 01-NOV-12Unit 28: Desorption and Hydrolysis Unit
C2NP1602 S-28-1: Desorption and Hydrolysis System 110 29 3 22-MAY-12A 15-OCT-12 0 15-SEP-12 15-NOV-12
Utility
InstrumentLoop Test
C3N76002 Loop Test 105 51 60 02-MAY-12A 29-OCT-12 0 01-JUL-12 17-NOV-12
Pre-commissioningUnit 83: Auxiliary Boiler and Steam System
C3NP0604 S-83-3: Auxiliary Boiler System 48 16 53 30-APR-12A 09-OCT-12 0
Unit 86: Inert Gas Unit
C3NP1002 S-86-1: Nitrogen Import and Distribution 43 15 46 02-MAY-12A 17-SEP-12 0 18-MAR-12 29-APR-12
Offsite
Steel StructureTransfer Tower
CON32515 T/T8 (Transfer Tower Str ) 17 9 88 14-APR-12A 10-SEP-12 0 01-NOV-11 31-DEC-11CON32516 T/T9 (Transfer Tower Str ) 30 22 84 14-APR-12A 25-SEP-12 0
Pre-commissioningUrea Product from TT-7 to TT-9
CONP2100 Urea Product from TT-7 to TT-9 8 8 0 30-OCT-12 07-NOV-12 0
2010 2011 2012 2013
NDJ FMAMJ J ASOND J FMAMJ J AS OND J FMAMJ J ASOND J FMA
Sho Fabrication - C.S. lin
Sho Fabrication - S.S. Lin
Urea Main Pi e Rac
S-27-2: Urea Granulation Auxiliar S ste
S-28-1: Desorption and Hydrolysis Syste
Loo Tes
S-86-1: Nitro en Im ort and Distributio
T/T8 Transfer Tower Str
-
7/29/2019 Critical Path Sample
3/4
Sheet 3 of 4
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
%
Comp
Actual/
Forecast
Start
Actual/
Forecast
Finish
Total
Float
Planned
Start
Planned
Finish
New Jetty Conveyor and Ship loader System
CONP2102 New Jetty Conveyor and Ship loader System 9 9 0 17-NOV-12 26-NOV-12 0 01-SEP-12 31-OCT-12
Commissioning & Start-UpAmmoniaCommissioning - Ammonia
Unit 02 : Process Air Compression Unit
CX1P01034 S-02-1: Process Air Compression Unit 36 36 0 28-NOV-12 02-JAN-13 0
Unit 03 Steam Reforming &Waste Heat Recov'y Unit
CX1P01042 S-03-3: Combustion Air and Flue Gas Fan System 50 49 0 07-DEC-12 24-JAN-13 0
Unit 04 : CO Conversion Unit
CX1P01044 S-04-1: Conversion Gas System 120 120 0 27-SEP-12 24-JAN-13 0
Unit 07 : Ammonia Synthesis Gas Compression Unit
CX1P01056 S-07-2: Synthesis Gas Compressor System 74 49 12 09-AUG-12A 24-JAN-13 0
Unit 09 : Ammonia Refrigeration Unit
CX1P01064 S-09-2: Ammonia Refrigeration System 49 49 0 07-DEC-12 24-JAN-13 0
Unit 10 : Ammonia Recovery Unit
CX1P01066 S-10-1: Ammonia Recovery System 158 158 0 16-SEP-12 20-FEB-13 0
Utility Systems of Ammonia Plant
CX1P01072 S-82-2: Ammonia Plant Boiler Feed Water System 25 25 0 07-DEC-12 31-DEC-12 0
Urea
Commissioning - UreaUnit 20 : CO2 Compression Unit
CXP3424 S-20-2: CO2 Compressor System 42 42 0 08-DEC-12 24-JAN-13 0
Unit 21 : Ammonia Pumping Unit
CXP3426 S-21-1: Ammonia Pumping System 56 56 0 21-NOV-12 24-JAN-13 0
Unit 27 : Granulation Unit
CXP3440 S-27-2: Urea Granulation Auxiliary System 79 79 0 25-OCT-12 24-JAN-13 0
Unit 28: Desorption and Hydrolysis Unit
CXP3444 S-28-1: Desorption and Hydrolysis System 87 87 0 16-OCT-12 24-JAN-13 0
Utility
Commissioning _Utility/ Off SiteUnit 83: Auxiliary Boiler and Steam System
CXP4014 S-83-3: Auxiliary Boiler System 19 19 0 10-OCT-12 31-OCT-12 0
CXP4020 S-83-6: MP Steam Distribution System 31 31 0 01-NOV-12 06-DEC-12 0
Unit 86: Inert Gas Unit
CXP4026 S-86-1: Nitrogen Import and Distribution 30 7 29 19-JUN-12A 26-SEP-12 0
2010 2011 2012 2013
NDJ FMAMJ J ASOND J FMAMJ J AS OND J FMAMJ J ASOND J FMA
New Jett Conve or and Shi loader S ste
-
7/29/2019 Critical Path Sample
4/4
Sheet 4 of 4
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
%
Comp
Actual/
Forecast
Start
Actual/
Forecast
Finish
Total
Float
Planned
Start
Planned
Finish
Performance Test
Performance Test
Performance TestCX4P0801 Performance Test of Ammonia & Urea plants 28 28 0 21-FEB-13 20-MAR-13 0 14-MAR-13 26-MAR-13
2010 2011 2012 2013
NDJ FMAMJ J ASOND J FMAMJ J AS OND J FMAMJ J ASOND J FMA
Performance Test of Ammonia & Urea lan