1 CS-413 Project Management Components (Part 5) Bilgisayar Mühendisliği Bölümü – Bilkent Üniversitesi – Fall 2009 Dr.Çağatay ÜNDEĞER Instructor Bilkent University, Computer Engineering Middle East Technical University, Game Technologies & General Manager SimBT Inc. e-mail : [email protected]

Upload: karin-barton

Post on 03-Jan-2016

227 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: CS-413 1 Project Management Components (Part 5) Bilgisayar Mühendisliği Bölümü – Bilkent Üniversitesi – Fall 2009 Dr.Çağatay ÜNDEĞER Instructor Bilkent

1CS-413

Project Management Components

(Part 5)

Bilgisayar Mühendisliği Bölümü – Bilkent Üniversitesi – Fall 2009

Dr.Çağatay ÜNDEĞER

InstructorBilkent University, Computer Engineering

Middle East Technical University, Game Technologies

&

General ManagerSimBT Inc.

e-mail : [email protected]

Page 2: CS-413 1 Project Management Components (Part 5) Bilgisayar Mühendisliği Bölümü – Bilkent Üniversitesi – Fall 2009 Dr.Çağatay ÜNDEĞER Instructor Bilkent

2CS-413

Project Management Components

• Knowledge areas:– Project Integration Management– Project Scope Management– Project Time Management– Project Cost Management– Project Human Resource Management– Project Communication Management– Project Quality Management– Project Risk Management– Project Procurement Management

Page 3: CS-413 1 Project Management Components (Part 5) Bilgisayar Mühendisliği Bölümü – Bilkent Üniversitesi – Fall 2009 Dr.Çağatay ÜNDEĞER Instructor Bilkent

3CS-413

Integration Management

• Includes the process required to ensure that– Elements of project are properly

coordinated.• Major management processes:

– Project Plan Development– Project Plan Execution– Integrated Change Control

Page 4: CS-413 1 Project Management Components (Part 5) Bilgisayar Mühendisliği Bölümü – Bilkent Üniversitesi – Fall 2009 Dr.Çağatay ÜNDEĞER Instructor Bilkent

4CS-413

Scope Management

• Includes the process required to ensure that– Project includes all the work required,

and only the work required, to complete project successfully.

• Major management processes:– Initiation– Scope Planning– Scope Definition– Scope Verification– Scope Change Control

Page 5: CS-413 1 Project Management Components (Part 5) Bilgisayar Mühendisliği Bölümü – Bilkent Üniversitesi – Fall 2009 Dr.Çağatay ÜNDEĞER Instructor Bilkent

5CS-413

Time Management

• Includes the process required to ensure– Timely completion of project.

• Major management processes:– Activity Definition– Activity Sequencing– Activity Duration Estimating– Schedule Development– Schedule Control

Page 6: CS-413 1 Project Management Components (Part 5) Bilgisayar Mühendisliği Bölümü – Bilkent Üniversitesi – Fall 2009 Dr.Çağatay ÜNDEĞER Instructor Bilkent

6CS-413

Cost Management

• Includes the process required to ensure that– Project is completed within the approved

budget.• Major management processes:

– Resource Planning– Cost Estimation– Cost Budgeting– Cost Control

Page 7: CS-413 1 Project Management Components (Part 5) Bilgisayar Mühendisliği Bölümü – Bilkent Üniversitesi – Fall 2009 Dr.Çağatay ÜNDEĞER Instructor Bilkent

7CS-413

Quality Management

• Includes the process required to ensure that– Project will satisfy the needs for which it

was undertaken.• Major management processes:

– Quality Planning– Quality Assurance– Quality Control

Page 8: CS-413 1 Project Management Components (Part 5) Bilgisayar Mühendisliği Bölümü – Bilkent Üniversitesi – Fall 2009 Dr.Çağatay ÜNDEĞER Instructor Bilkent

8CS-413

Human Resource Management

• Includes the process required to make– Most effective use of people involved in

project.• Major management processes:

– Organizational Planning– Staff Acquisition– Team Development

Page 9: CS-413 1 Project Management Components (Part 5) Bilgisayar Mühendisliği Bölümü – Bilkent Üniversitesi – Fall 2009 Dr.Çağatay ÜNDEĞER Instructor Bilkent

9CS-413

Communications Management

• Includes the process required to ensure– Timely and appropriate generation,

collection, dissemination, storage, and organization of project information.

• Major management processes:– Communications Planning– Information Distribution– Performance Reporting– Administrative Closure

Page 10: CS-413 1 Project Management Components (Part 5) Bilgisayar Mühendisliği Bölümü – Bilkent Üniversitesi – Fall 2009 Dr.Çağatay ÜNDEĞER Instructor Bilkent

10CS-413

Risk Management

• Systematic process of– Identifying, analysing, and responding to

project risks.• Major management processes:

– Risk Management Planning– Risk Identification– Qualitative Risk Analysis– Quantitative Risk Analysis– Risk Response Planning– Risk Monitoring and Control

Page 11: CS-413 1 Project Management Components (Part 5) Bilgisayar Mühendisliği Bölümü – Bilkent Üniversitesi – Fall 2009 Dr.Çağatay ÜNDEĞER Instructor Bilkent

11CS-413

Procurement Management

• Includes the process required to – Acquire goods and services from outside

performing organization, to attain project scope.

• Major management processes:– Procurement Planning– Solicitation Planning– Solicitation– Source Selection– Contract Administration– Contract Closeout