Public Kickoff Meeting East River & Long Island Sound Newtown Creek WWTP Visitor Center May 10, 2018 Citywide/Open Waters CSO Long Term Control Plan

Upload: others

Post on 30-Jul-2020

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CSO-LTCP East River Kick Off Meeting FINAL2...4 What is a Combined Sewer Overflow (CSO)? NYC’s sewer system is approximately 60% combined, which means it is used to convey both sanitary

Public Kickoff Meeting East River & Long Island Sound

Newtown Creek WWTP Visitor CenterMay 10, 2018

Citywide/Open WatersCSO Long Term Control Plan

Page 2: CSO-LTCP East River Kick Off Meeting FINAL2...4 What is a Combined Sewer Overflow (CSO)? NYC’s sewer system is approximately 60% combined, which means it is used to convey both sanitary

2

Agenda

Topic Speaker

1 Welcome & Introduction Mikelle Adgate

2 Waterbody & Watershed Characteristics and Water Quality Sampling Keith Mahoney

3 Water Quality Improvement Projects• Grey Infrastructure • Green Infrastructure

Keith MahoneyMelissa Enoch

4 LTCP Modeling & Alternative Development Process Keith Mahoney

5 Next Steps Mikelle Adgate

6 Discussion and Q&A Session All

Page 3: CSO-LTCP East River Kick Off Meeting FINAL2...4 What is a Combined Sewer Overflow (CSO)? NYC’s sewer system is approximately 60% combined, which means it is used to convey both sanitary

3

Welcome & Introduction

Mikelle AdgateSenior Policy Advisor

DEP

Page 4: CSO-LTCP East River Kick Off Meeting FINAL2...4 What is a Combined Sewer Overflow (CSO)? NYC’s sewer system is approximately 60% combined, which means it is used to convey both sanitary

4

What is a Combined Sewer Overflow (CSO)?

NYC’s sewer system is approximately 60% combined, which means it is used to convey both sanitary and storm flows.

When the sewer system is at full capacity, a mixture of rain water and sewage may be released into local waterways. This is called a combined sewer overflow (CSO).

DownSpout

Catch Basin

CombinedSewer Outfall

Sewer Regulator

Dry Weather Conditions

City Sewer Main

Building SewerConnection

DownSpout

Catch Basin

Stormy Weather Conditions

CombinedSewer Outfall

SewerRegulator

City Sewer Main

Building SewerConnection

Page 5: CSO-LTCP East River Kick Off Meeting FINAL2...4 What is a Combined Sewer Overflow (CSO)? NYC’s sewer system is approximately 60% combined, which means it is used to convey both sanitary

5

How does rainfall affect CSOs?

Not every rainfall causes a CSO event: Approximately 33% of the

average rainfall events per year may trigger a CSO at East River and Long Island Sound

Photo Credit: Baptisete Ponshttps://www.flickr.com/photos/bpt/2882285636/

Page 6: CSO-LTCP East River Kick Off Meeting FINAL2...4 What is a Combined Sewer Overflow (CSO)? NYC’s sewer system is approximately 60% combined, which means it is used to convey both sanitary

6

What is a LTCP and CSO Consent Order?

Long Term Control Plan (LTCP)

identifies appropriate CSO controls to achieve applicable water quality standards

consistent with the Federal CSO Policy and Clean Water Act

CSO Consent Order

an agreement between NYC and DEC that settles past legal disputes without prolonged litigation

DEC requires DEP to develop LTCPs and mitigate CSOs

Page 7: CSO-LTCP East River Kick Off Meeting FINAL2...4 What is a Combined Sewer Overflow (CSO)? NYC’s sewer system is approximately 60% combined, which means it is used to convey both sanitary

7

LTCP Process and Public Involvement

ONGOING PUBLIC/STAKEHOLDER INPUT

Existing Information

Review

Data Collection &

AnalysisModeling

Alternatives Development & Evaluation

PrepareLTCP

Submit to DEC

Kickoff MeetingTODAY

Alternatives Meeting

TBD

Final Plan Review Meeting

TBD

Page 8: CSO-LTCP East River Kick Off Meeting FINAL2...4 What is a Combined Sewer Overflow (CSO)? NYC’s sewer system is approximately 60% combined, which means it is used to convey both sanitary

8

East River & LIS in Phase 2 Sampling

Phase 1 SamplingHudson & Harlem River

Phase 3 SamplingNY Harbor Phase 2 Sampling

East River

HP-011

CSO Outfalls to be MonitoredShorelineOpen Water

LTCP-02 Proposed Sampling Locations

The Citywide/Open Waters Sampling Program was divided into 3 Phases

East River and Long Island Sound (LIS) were covered under Phase 2

HP-021

BB-028BB-005

HP-003

Page 9: CSO-LTCP East River Kick Off Meeting FINAL2...4 What is a Combined Sewer Overflow (CSO)? NYC’s sewer system is approximately 60% combined, which means it is used to convey both sanitary

9

Waterbody & Watershed Characteristics and

Water Quality SamplingKeith Mahoney, PE

Director of Water Quality PlanningDEP

Page 10: CSO-LTCP East River Kick Off Meeting FINAL2...4 What is a Combined Sewer Overflow (CSO)? NYC’s sewer system is approximately 60% combined, which means it is used to convey both sanitary

10

Combined Sewer Drainage Areas to East River/LISWWTP LIS and East River

(acres)

Hunts Point 5,129

Ward’s Island 5,915

Tallman Island 2,271

Bowery Bay 6,352

Newtown Creek 1,247

TOTAL 20,914

Long Island Sound

EastRiver

Page 11: CSO-LTCP East River Kick Off Meeting FINAL2...4 What is a Combined Sewer Overflow (CSO)? NYC’s sewer system is approximately 60% combined, which means it is used to convey both sanitary

11

Land Use for East River/LIS

Long Island Sound

EastRiver

Residential

Mixed Residential

Commercial and Office

Industrial and Manufacturing

Transportation and Utility

Public Facilities and Institutions

Open Space and Outdoor Recreation

Parking Facilities

Vacant Land

East River & LIS

Land Use LIS and East River

Residential 45%

Mixed Residential & Commercial 6%

Commercial 6%

Transportation & Utility 14%

Public Facilities 8%

Park & Open Space 16%

Other 5%

West Fordham Street AssociationMorris Yacht and Beach Club

Pelham Bay Park

Locust Point Yacht ClubSchuler Hill Civic Association

Trinity DanishWhite Cross Fishing Club

American TurnerDanish American Beach Club

Manhem Club

Whitestone Booster Civic Association

Randall’s Island Park

Page 12: CSO-LTCP East River Kick Off Meeting FINAL2...4 What is a Combined Sewer Overflow (CSO)? NYC’s sewer system is approximately 60% combined, which means it is used to convey both sanitary

12

East River & LIS Outfalls

(95 Outfalls)CSO

MS4

Other(1)

(24 Outfalls)

(1) Includes direct drainage and other non-DEP stormwater(2) Preliminary results based on existing conditions

2,046

341

4,115

1

MGY(2)

MGY(2)

MGY(2)

*Preliminary results based on baseline conditions

*

Page 13: CSO-LTCP East River Kick Off Meeting FINAL2...4 What is a Combined Sewer Overflow (CSO)? NYC’s sewer system is approximately 60% combined, which means it is used to convey both sanitary

13

East River & LIS OverviewLegend

CSO OutfallsWater Quality Classifications

Class SBClass I

On March 21, 2018, DEC publicly noticed a revision to the water quality standards and

classifications for certain waterbodies.DEP is in the process of assessing attainment

with the proposed standards and classifications.

Whitestone Bridge

East River

Long Island Sound

Page 14: CSO-LTCP East River Kick Off Meeting FINAL2...4 What is a Combined Sewer Overflow (CSO)? NYC’s sewer system is approximately 60% combined, which means it is used to convey both sanitary

14

Location Class Dissolved Oxygen* (mg/L)

Fecal Coliform**(col/100 mL)

Total Coliform**(col/100 mL)

East River and Long Island

Sound(East of Bronx-

Whitestone Bridge)

SB ≥ 4.8 (daily average)≥ 3.0 (acute, never less than)

Monthly Geometric Mean≤ 200

Monthly Median

≤ 2,400and

80% ≤ 5,000East River (West of Bronx-

Whitestone Bridge)I ≥ 4.0 (acute, never less than)

Water Quality Standards and LTCP Goals

CSO LTCP Goals and Targets: Seasonal Bacteria Compliance Annual Dissolved Oxygen Compliance Time to Recovery for Bacteria of ≤ 24 hours Floatables Control

CLASS SBB a t h i n g

The best usage of Class SB water are primary and secondary contact recreation and fishing. These

waters shall be suitable for fish, shellfish and wildlife propagation and survival.

CLASS SBB a t h i n g

The best usage of Class SB water are primary and secondary contact recreation and fishing. These

waters shall be suitable for fish, shellfish and wildlife propagation and survival.

CLASS IB o a t i n g / F i s h i n g

The best usage of Class I water is secondary contact recreation and fishing. These waters shall be suitable for fish, shellfish and wildlife propagation and survival. In addition, the water quality shall be suitable for primary contact recreation,

although other factors may limit the use for this purpose.

CLASS IB o a t i n g / F i s h i n g

The best usage of Class I water is secondary contact recreation and fishing. These waters shall be suitable for fish, shellfish and wildlife propagation and survival. In addition, the water quality shall be suitable for primary contact recreation,

although other factors may limit the use for this purpose.

On March 21, 2018, DEC publicly noticed a revision to the water quality standards and

classifications for certain waterbodies.DEP is in the process of assessing attainment

with the proposed standards and classifications.

*(NYCRR Part 703.3)**(NYCRR Part 703.4)

Page 15: CSO-LTCP East River Kick Off Meeting FINAL2...4 What is a Combined Sewer Overflow (CSO)? NYC’s sewer system is approximately 60% combined, which means it is used to convey both sanitary

15

Ongoing Receiving Water Sampling ProgramsProgram Harbor

Survey Monitoring

Sentinel Monitoring

Riverkeeper Sampling

CitizenSampling

Sampling Frequency

Monthly (Oct – May)

Weekly (Jun – Sept)

Quarterly Monthly(May – Oct)

Weekly(May – Oct)

EAST RIVER & LONG ISLAND SOUND# of Sampling Locations 8 10 2 17

Para

met

ers Fecal

Entero

*YSI

*YSI Parameters: Dissolved Oxygen, Temperature, Conductivity, and Salinity.Data is available here: http://www.nyc.gov/html/dep/html/harborwater/harbor_water_sampling_results.shtmlhttps://www.riverkeeper.org/water-quality/hudson-river/nyc-hudson-bergen/

Page 16: CSO-LTCP East River Kick Off Meeting FINAL2...4 What is a Combined Sewer Overflow (CSO)? NYC’s sewer system is approximately 60% combined, which means it is used to convey both sanitary

16

LTCP Sampling & Monitoring Programs

Flow Monitoring• 3/1/2017 – 7/31/2017• 5 locations in East River & LIS• Continuously monitored• Depth & Velocity measurements

Receiving Water • 12 locations in East River & LIS• Two events• Fecal, Entero, YSI

CSO / MS4 Sampling• 5 CSO, 1 MS4 locations in East

River & LIS• 4 wet weather events• Fecal, Entero, YSI, TSS, CBOD,

Nitrogen

Sampling Period: 4/1/2017 – 7/23/2017

Page 17: CSO-LTCP East River Kick Off Meeting FINAL2...4 What is a Combined Sewer Overflow (CSO)? NYC’s sewer system is approximately 60% combined, which means it is used to convey both sanitary

17

1827 35

1737 40

1510

159

40

7

1710 11

138235 264

148218

359

63127

5796

143

50 6342

69

1

10

100

1,000

10,000

Fecal Colifo

rm, cfu/100mL

East River & LIS – Fecal Coliform

Dry Weather DataWet Weather DataDry Weather GeomeanWet Weather Geomean

LTCP2HSMSMCSO

Sampling Period(2017)

# Locations

# Samples

Dry Wet

LTCP Apr 1 – Jun 23 12 4 38

HSM Jan 1 – Dec 31 8 10 14

SM Jan 1 – Oct 31 3 3 1

Sampling Details

200 ------–

17

Page 18: CSO-LTCP East River Kick Off Meeting FINAL2...4 What is a Combined Sewer Overflow (CSO)? NYC’s sewer system is approximately 60% combined, which means it is used to convey both sanitary

18

7 513

85

73 3 3 4

11

43

1

5

3363 66

34 4670

8

22

715 22

9 86

16

1

10

100

1,000

10,000

100,000

Enterococci, cfu/100m

LEast River & LIS – Enterococcus

Sampling Details

35 ----

ER-12/E2/23rd St.

ER-11 ER-10/Hallet’s Cove

ER-9/E4/Hell Gate

ER-8 ER-7/BB WCP

E6 ER-6/E14 E13 ER-5/E7/Mid-channel B

ER-4 ER-3/E8/Throg’s Neck

ER-2 ER-1 E12

135 -----

Sampling Period(2017)

# Locations # SamplesDry Wet

LTCP Apr 1 – Jun 23 12 4 38

HSM Jan 1 – Dec 31 8 15 16

Riverkeeper May 1 – Oct 31 1 2 5

Citizen May 1 – Oct 31 5 7 12

Dry Weather LTCP/HSM Data Wet Weather LTCP/HSM DataDry Weather Third Party DataWet Weather Third Party DataDry Weather GeomeanWet Weather Geomean

LTCPHSMCitizenRiverkeeperCSO

New Enterococci Standards:Monthly GM ≤ 35cfu/100mLMonthly STV ≤ 130cfu/100mL

Page 19: CSO-LTCP East River Kick Off Meeting FINAL2...4 What is a Combined Sewer Overflow (CSO)? NYC’s sewer system is approximately 60% combined, which means it is used to convey both sanitary

19

6.4

4.7 4.3

6.2

4.6 4.5

6.9 6.47.2

6.6

4.6

6.65.9

7.08.38.2

9.2 9.8

8.29.5 9.4

6.77.6

6.1

7.88.8

7.7

9.2 9.6

7.5

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

ER‐12/E2 ER‐11 ER‐10 ER‐9/E4 ER‐8 ER‐7 E6 ER‐6/E14 E13 ER‐5/E7 ER‐4 ER‐3/E8 ER‐2 ER‐1 E12

Dissolved Oxygen, m

g/L

East River & LIS – Dissolved Oxygen

BB6

LTCP2HSMCSO

Class I Class SB

Location Class Dissolved Oxygen (mg/L)

East River and Long Island Sound

(Stations ER-1 – ER-5)SB ≥ 4.8 (daily average)

≥ 3.0 (acute, never less than)

East River (Stations ER-6 – ER-12) I ≥ 4.0 (acute, never less than)

Dry Weather DataWet Weather DataDry Weather AverageWet Weather Average

ER-12/E2 ER-11 ER-10 ER-9/E4 ER-8 ER-7 E6 ER-6/E14 E13 ER-5/E7 ER-4 ER-3/E8 ER-2 ER-1 E12

4.8 –

3.0 –4.0

Sampling Period(2017)

# Locations

# Samples

Dry Wet

LTCP Apr 1 – Jun 23 12 4 38

HSM Jan 1 – Dec 31 8 20 30

Sampling Details

19

Page 20: CSO-LTCP East River Kick Off Meeting FINAL2...4 What is a Combined Sewer Overflow (CSO)? NYC’s sewer system is approximately 60% combined, which means it is used to convey both sanitary

20

813

85 5 6

10

17

31

1013

10

1

10

100

ER‐12

23rd St

ER‐10

Hallet's Cove

ER‐9

Hell Gate Bridge

ER‐7

BB W

PCP

ER‐5

Mid‐chann

el B

ER‐3

Throngs N

eck

Enterococci, cfu/100m

LLTCP2/Riverkeeper/Citizen Comparison – EnterococcusLTCP2 Sampling Period: April 1 – June 31, 2017

LTCP2: ~4 Dry and 38 Wet Weather Samples per locationRiverkeeper: ~1 Dry and 2 Wet Weather Samples per locationCitizen : ~3 Dry and 1 Wet Weather Samples per location

Dry Weather Wet Weather

LTCPCitizenRiverkeeperCSO

55 58 60 6625

10

95

532

2010

8532

1

10

100

1,000

10,000

100,000

ER‐12

23rd St

ER‐10

Hallet's Cove

ER‐9

Hell Gate Bridge

ER‐7

BB W

PCP

ER‐5

Mid‐chann

el B

ER‐3

Throngs N

eck

Enterococci, cfu/100m

L35

35

20

Page 21: CSO-LTCP East River Kick Off Meeting FINAL2...4 What is a Combined Sewer Overflow (CSO)? NYC’s sewer system is approximately 60% combined, which means it is used to convey both sanitary

21

East River & LIS Projected % Attainment

Station

Baseline Fecal Coliform Baseline Enterococcus

AnnualMonthly GM

≤ 200cfu/100mL

Recreational Season Monthly GM

≤ 200cfu/100mL

Recreational Season Monthly GM

< 30cfu/100mL

Recreational Season Monthly STV

< 110cfu/100mL

ER-1

ER-2

ER-3

ER-4

ER-5

ER-6 86%

ER-7 81%

ER-8 80%

ER-9 80%

ER-10 80%

ER-11 80%

ER-12 80%

≥ 95% Attainment

Upper East River and Lower Long Island Sound have a total of 95 CSO outfalls; 42% of the annual CSO volume occurs in 3 outfalls

Sampling has shown a wet weather impact on bacteria concentrations Models predict attainment of existing WQS criteria

Notes: Preliminary Existing Conditions Gap Analysis; Attainment based on modeled 10-year averages. On March 21, 2019, DEC publicly noticed a revision to the WQS and Classifications for certain waterbodies. DEP is in the process of modeling attainment with the proposed standard and classifications.

Page 22: CSO-LTCP East River Kick Off Meeting FINAL2...4 What is a Combined Sewer Overflow (CSO)? NYC’s sewer system is approximately 60% combined, which means it is used to convey both sanitary

22

Water Quality Improvement ProjectsGrey Infrastructure

Keith Mahoney, PEDirector of Water Quality Planning

DEP

Page 23: CSO-LTCP East River Kick Off Meeting FINAL2...4 What is a Combined Sewer Overflow (CSO)? NYC’s sewer system is approximately 60% combined, which means it is used to convey both sanitary

23

Existing Grey Infrastructure Projects

Wards Island WWTP Headworks

Bowery Bay WWTP Headworks

Hunts Point WWTP Headworks

Tallman Island WWTP Conveyance

Wards Island WWTP

Bowery Bay WWTP

Hunts Point WWTPTallman Island WWTP

Page 24: CSO-LTCP East River Kick Off Meeting FINAL2...4 What is a Combined Sewer Overflow (CSO)? NYC’s sewer system is approximately 60% combined, which means it is used to convey both sanitary

24

Water Quality Improvement ProjectsGreen Infrastructure

Melissa EnochProgram Manager, Private Incentives

DEP

Page 25: CSO-LTCP East River Kick Off Meeting FINAL2...4 What is a Combined Sewer Overflow (CSO)? NYC’s sewer system is approximately 60% combined, which means it is used to convey both sanitary

25

East River/Open Waters Contract Areas

GI is being implemented in combined sewer areas tributary to: - Gravesend Bay (OH-015)- Wallabout Creek (NCB-014/-

013)- BB-005 – Bowery Bay- HP-002 – Barretto Cove- TI-023 – Little Bay- TI-003 – Powells Cove

Green Infrastructure Assets: Constructed – 103 In Construction – 14 In Design – 929

Page 26: CSO-LTCP East River Kick Off Meeting FINAL2...4 What is a Combined Sewer Overflow (CSO)? NYC’s sewer system is approximately 60% combined, which means it is used to convey both sanitary

26

Public Property Retrofits in East River/Open Waters

Before

Project StatusParks/

PlaygroundsPublic

Schoolyards TotalPreliminary 1 7 8In Design 7 4 11

In Construction 14 0 14Constructed 9 3 12

Total 31 14 45

After

P.S. 15 Roberto Clemente333 East 4th Street, Manhattan

Page 27: CSO-LTCP East River Kick Off Meeting FINAL2...4 What is a Combined Sewer Overflow (CSO)? NYC’s sewer system is approximately 60% combined, which means it is used to convey both sanitary

27

Private Property GI ProgramsGreen Infrastructure Grant Program

• More than $14.5 million committed to date to 35 private property owners

• 26 grants awarded in EROW

NYC Housing and Preservation Department Partnership• Establishing on-going funding source for GI as part of HPD new

affordable housing development• 1 project in FY18, up to 5 projects in FY19 as initial investment

Ballet Tech The New School

Page 28: CSO-LTCP East River Kick Off Meeting FINAL2...4 What is a Combined Sewer Overflow (CSO)? NYC’s sewer system is approximately 60% combined, which means it is used to convey both sanitary

28

Private Property GI ProgramsNew Private Property Retrofit Program

• Phase One Goal: retrofit 200 Greened Acres* in Tier 1 and Tier 2 sites

• RFP to select Program Administrator anticipated release date: Q2 2018

• DEP will jumpstart outreach to Tier 1 and Tier 2 property owners and community organizations in 2018

*a Greened Acre is defined as 1” of rainfall on one acre of impervious surfaces or 1.5” on 0.67 acre of impervious surfaces, etc.

Privately Owned Sites in Combined Sewer AreaTier 1 – Over 100,000 sf 693

Tier 2 – 50,000-99,999 sf 896

Page 29: CSO-LTCP East River Kick Off Meeting FINAL2...4 What is a Combined Sewer Overflow (CSO)? NYC’s sewer system is approximately 60% combined, which means it is used to convey both sanitary

29

Other Private Property GI Opportunities

Green Roof Tax Abatement:The City provides a one-year property tax abatement for private properties that install green roofs. The abatement value is $5.23 per square foot (up to the lesser of $200,000 or the building’s tax liability) and is available through March 15, 2018.

2012 Stormwater Rule:In 2012, DEP amended the allowable flow rate of stormwater to the City’s combined sewer system for new and existing development. Site Connection Proposals may include green infrastructure technologies to meet the new allowable rate.

Page 30: CSO-LTCP East River Kick Off Meeting FINAL2...4 What is a Combined Sewer Overflow (CSO)? NYC’s sewer system is approximately 60% combined, which means it is used to convey both sanitary

30

LTCP Modeling and Alternatives Development Process

Keith Mahoney, PEDirector of Water Quality Planning

DEP

Page 31: CSO-LTCP East River Kick Off Meeting FINAL2...4 What is a Combined Sewer Overflow (CSO)? NYC’s sewer system is approximately 60% combined, which means it is used to convey both sanitary

31

Model Inputs and Assumptions Landside Model calibrated based on flow monitoring data, gauge adjusted

radar rainfall data, and satellite flyover impervious data

Water Quality Model calibrated with Harbor Survey and LTCP sampling data

Calibrated modeling inputs and assumptions include:• Committed CSO and BNR projects• 2040 sanitary flows and loads• JFK 2008 “Typical Year Rainfall” for Alternative Analysis• JFK 10-yr data (2001 to 2011) for baseline and selected alternatives

5-YearMoving Average

Standard for WWFP(JFK 1988 – 40.7 inches)

LTCP Typical Year Rainfall(JFK 2008 – 46.3 inches)

2002-201110-Year

Water Quality Period for

Selected Plan

Page 32: CSO-LTCP East River Kick Off Meeting FINAL2...4 What is a Combined Sewer Overflow (CSO)? NYC’s sewer system is approximately 60% combined, which means it is used to convey both sanitary

32

CSO Control Evaluation Process

1. Bacteria Source Component Analysis CSO, stormwater and direct drainage

2. Gap Analysis for Water Quality Standard (WQS) Attainment Calculate bacteria and dissolved oxygen for: Baseline Conditions 100% CSO Control Conditions

3. Assess Levels of CSO Control Necessary to Achieve WQS

4. Identify Technologies to Cost-Effectively Achieve the Required Level of CSO Control

Increasing CSO

Reduction Potential

Storage

Treatment

System Optimization

Source Control

Sample Technologies:

Page 33: CSO-LTCP East River Kick Off Meeting FINAL2...4 What is a Combined Sewer Overflow (CSO)? NYC’s sewer system is approximately 60% combined, which means it is used to convey both sanitary

33

Source Control Green Infrastructure Storm Sewers

System Optimization Fixed Weir

ParallelInterceptor /

Sewer

Bending WeirsControl Gates

Pump Station

Optimization

Pump Station

Expansion

CSO Relocation

Gravity Flow Tipping to Other Watersheds

Pumping Station Modification

Flow Tipping withConduit/Tunnel and Pumping

Water Quality /Ecological

Enhancement

FloatablesControl

Environmental Dredging

Wetland Restoration & Daylighting

Treatment Satellite:

Centralized:

OutfallDisinfection

Retention Treatment Basin (RTB)High Rate

Clarification (HRC)

WWTP Expansion

Storage In-System Shaft Tank Tunnel

CSO Mitigation Toolbox

Page 34: CSO-LTCP East River Kick Off Meeting FINAL2...4 What is a Combined Sewer Overflow (CSO)? NYC’s sewer system is approximately 60% combined, which means it is used to convey both sanitary

34

Next StepsMikelle Adgate

Senior Policy AdvisorDEP

Page 35: CSO-LTCP East River Kick Off Meeting FINAL2...4 What is a Combined Sewer Overflow (CSO)? NYC’s sewer system is approximately 60% combined, which means it is used to convey both sanitary

35

Next Steps

Alternatives and LTCP Recommendation Meetings, TBD

Public opportunity to review and comment on DEP’s selected alternative before the LTCP is submitted to DEC

Comments can be submitted to:• New York City DEP at: [email protected]

Page 36: CSO-LTCP East River Kick Off Meeting FINAL2...4 What is a Combined Sewer Overflow (CSO)? NYC’s sewer system is approximately 60% combined, which means it is used to convey both sanitary

36

Additional Information & Resources

Visit the informational tables tonight for handouts and poster boards with detailed information

Go to www.nyc.gov/dep/ltcp to access:• LTCP Public Participation Plan• Presentation, handouts and poster boards from this meeting• Links to Waterbody/Watershed Facility Plans• CSO Order including LTCP Goal Statement• NYC’s Green Infrastructure Plan • Green Infrastructure Pilots 2011 and 2012 Monitoring Results• NYC Waterbody Advisory Program• Upcoming meeting announcements• Other LTCP updates