(CV-ANUWAR) Page 1
CURRICULUM VITAE PROJECT ENGINEER
SAA ENGINEERING & MARINE SDN BHD
LOT 19, TINGKAT 1, LOT KEDAI PMINT,
BANDAR BARU SERI KERTEH, 24300
KERTEH, KEMAMAN,
TERENGGANU DARUL IMAN
TEL. NO. : 09-826 1592
FAX NO. : 09-826 1039
BRANCH OFFICE
NO.77-1, JLN SUSUR LARKIN PERDANA 1,
LARKIN PERDANA, 80350 JOHOR BHARU,
JOHOR, MALAYSIA
TEL/FAX NO.: 6-07-3883527/2365672
Personal Information
Name : Mohd Anuwar Hamzah
I/C No. : 820430-11-5355
Date of Birth : 30th
April 1982
Address : 2284, Kampung Sungai Derhaka, 21100 Kuala Terengganu,Terengganu
Contact No. : 019-6222544
Status : Married
Heir : Nurul Fadiah Bt. Abu Zarin
Blood Group : O+
Academic Qualification
2007 Staffordshire University, United Kingdom, England
B. Engineering Mechanical Engineering
2004 International University College of Technology Twintech
Diploma in Mechanical Engineering
2002 Institut Kemahiran Mara
Certificate of Marine
1999 Sekolah Menengah Keb. Tengku Bariah
SPM
(CV-ANUWAR) Page 2
Safety Training / Exposure
27–29th
August 2008 Combined Safety Course ( Offshore ) - TSTC
20th
Oct 2008 Niosh Petronas Safety Passport (NPSP)
10th
March 2010 ISO Awareness Training
27th
to 28th
September 2010 Project Planning & Management (PPM)-Concepts
Competency Course / Training
10th
March, 2010 ISO 9001: 2008 Awareness Training
Key Job Description Engineering:-
1. Prepare parts sketches and write work orders and purchase requests to be furnished by outside
contractors.
2. Draft detail drawing or sketch for drafting technician completion or to request parts fabrication by
machine, sheet or wood shops.
3. Review project instructions and blueprints to ascertain test specifications, procedures, and
objectives and test nature of technical problems such as redesign.
4. Review project instructions and specifications to identify, modify and plan requirements
fabrication, assembly and testing.
5. Devise, fabricate and assemble new or modified mechanical components for products, such as
industrial machinery or equipment and measuring instruments.
6. Discuss changes in design, method of manufacture and assembly and drafting techniques and
procedures with staff and coordinate corrections.
7. Set-up and conduct tests of complete units and components under operational conditions to
investigate proposal for improving equipment performance.
8. Inspect lines and figures for clarity and return erroneous drawings to designer for correction.
9. Analyze test results in relation to design or rated specifications and test objectives and modify or
adjust equipment to meet specifications.
10. Evaluate tool drawing designs by measuring drawing dimensions and comparing with original
specifications for form and function, using engineering skills.
11. Confer with technicians and submit reports of test results to engineering department and
recommend design or material changes.
12. Calculate required capacities for equipment of proposed system to obtain specified performance
and submit data to engineering personnel for approval.
13. Record test procedures and results, numerical and graphical data, and recommendations for
changes in product or test method.
14. Read dials and meters to determine amperage, voltage, electrical output and input at specific
operating temperature to analyze parts performance.
15. Estimate cost factors, including labor and material for purchased and fabricated parts and costs for
assembly, testing and installing.
16. Test equipment, using test devices attached to generator, voltage regulator or other electrical parts,
such as generators or spark plugs.
(CV-ANUWAR) Page 3
Job Activities:-
1. Getting Information
Observing, receiving and otherwise obtaining information from all relevant sources.
2. Interacting With Computers
Using computers and computer systems (including hardware and software) to program, write
software, set up functions, enter data or process information.
3. Communicating with Supervisor, Peers or Subordinates
Providing information to supervisors, co-workers and subordinates by telephone, in written form,
e-mail, or in person.
4. Identifying Objects, Actions and Events
Identifying information by categorizing, estimating, recognizing differences or similarities and
detecting changes in circumstances or events.
5. Evaluating Information to Determine Compliance with Standards
Using relevant information and individual judgment to determine whether events or processes
comply with laws, regulations or standards.
6. Establishing and Maintaining Interpersonal Relationship
Developing constructive and cooperative working relationships with others and maintaining them
over time.
7. Making Decisions and Solving Problems
Analyzing information and evaluating results to choose the best solution and solve problems.
8. Drafting, Laying Out and Specifying Technical Devices, Parts and Equipment
Providing documentation, detailed instruction, drawings or specifications to tell others about how
devices, parts, equipments or structures are to be fabricated, constructed, assembled, modified,
maintained or used.
9. Documenting/Recording Information
Entering, transcribing, recording, storing or maintaining information in written or
electronic/magnetic form.
10. Estimating the Quantifiable Characteristic of Products, Events or Information
Estimating sizes, distances and quantities or determining time, costs, resources of materials
needed to perform a work activity.
(CV-ANUWAR) Page 4
Working Experiences
Employer : SAA Engineering & Marine Sdn Bhd
Position : Operation Manager
Period/Year : September 2011 to date
Employer : Hamdan Abdullah Sdn Bhd
Position : Project Engineer
Period/Year : August 2008 to September 2011
Project Experience
Client : FPG Oleochemical Sdn.Bhd.
Project : Tank Cleaning During Shutdown 2004
Position : Project Engineer
Date : April 2004
Client : Kerteh Terminal Sdn.Bhd.
Project : : PVRV,PSV and PRV Servicing
Position : Project Engineer
Date : Mei – Jun 2004
Client : Petronas Carigali Sdn.Bhd.
Project : : MISC – FPSO Hose Installation
Position : Project Engineer
Date : Mei – Jun 2004
Client : Petronas Carigali Sdn Bhd
Project : Floating Hose Emergency Repair for FPSO Bunga Kertas
Position : Project Engineer
Date : August 2004 – September 2004
Client : Petronas Carigali Sdn Bhd
Project : Transfer of Marine Cargo Hose from Yard to Warehouse
Position : Project Engineer
Date : September 2004 – October 2004
Client : FPG Oleochemicals Sdn Bhd
Project : Tank Cleaning
Position : Project Engineer
Date : November 2004 - December 2004
Client : Petronas Carigali Sdn Bhd
Project : Offloading Hose Inspection and Testing Warehouse 20, KSB
Position : Project Engineer
Date : November 2004 - December 2004
(CV-ANUWAR) Page 5
Client : Petronas Carigali Sdn Bhd
Project : SCPA Structure Deck Extension Platform
Position : Project Engineer
Date : September 2004 – January 2005
Client : Petronas Carigali Sdn Bhd
Project : Fabrication of Riser Guard
Position : Project Engineer
Date : April 2005 – July 2005 (Completed Installation)
Client : FPG Sdn.Bhd.
Project : Tank Cleaning Of RWST
Position : Project Engineer
Date : June 2005 – July 2005
Client : Petronas Carigali Sdn Bhd
Project : Marine Hose And Ancillaries Repair, Maintenance and Disposal
Position : Project Engineer
Date : June 2005
Client : FPG Oleochemicals Sdn Bhd
Project : Tank Internal Cleaning of Rain Water Surge
Position : Project Engineer
Date : June 2005
Client : Petronas Carigali Sdn Bhd
Project : Service Platform Reinstatement at Bekok-A
Position : Project Engineer
Date : October 2005
Client : Petronas Carigali Sdn Bhd
Project : Floating Hose Stringing, Towing and Installation Work for FPSO
Puteri Dulang
Position : Project Engineer
Date : October 2005
Client : Shell Refining Berhad
Project : Upgrading of Berth No.1 at SRC Jetty, Port Dickson ( Installation of
Fenders )
Position : Project Engineer
Date : November 2005
Client : Felda Bulkers Sdn. Bhd.
Project : Tank Internal Services
Position : Project Engineer
Date : December 2005
Client : MTBE Malaysia Sdn Bhd
(CV-ANUWAR) Page 6
Project : Blasting & Painting Work to ½”, ¾”, 1”, 1 ½”, 2”, 4” and 6” pipe
Position : Project Engineer
Date : January 2006
Client : Felda Bulkers Sdn. Bhd.
Project : Tank Internal Services
Position : Project Engineer
Date : February 2006
Client : Kertih Terminals Sdn. Bhd.
Project : VCM Spheres PSV Instrument Service
Position : Project Engineer
Date : February 2006
Client : Petronas Carigali Sdn Bhd
Project : Tank & Vessel Internal Coating at Pulai A Platform
Position : Project Engineer
Date : May 2006
Client : Felda Bulkers Sdn Bhd
Project : Tank Internal Cleaning
Position : Project Engineer
Date : June 2006
Client : Perwaja Steel Sdn Bhd
Project : Vessel Special Coating
Position : Project Engineer
Date : June 2006
Client : Kertih Terminals Sdn Bhd
Project : Servicing, Overhaul, Repainting of 106 Unit XCV/ERV at KTSB
Position : Project Engineer
Date : July 2006
Client : Petronas Gas Berhad
Project : Fabrication, Installation and Painting Works of Auto Lubrication for
Fin Fan Cooler
Position : Project Engineer
Date : July 2006
Client : Kerteh Terminals Sdn Bhd
Project : Servicing, Overhaul, Repainting of 106 Unit XCV/ERV at KTSB
Position : Project Engineer
Date : July 2006
Client : MTBE Malaysia Sdn Bhd
Project : Supply, Fabrication & Site Installation of Piping System for Spent
Caustic Circulation at PDH
(CV-ANUWAR) Page 7
Position : Project Engineer
Date : August 2006
Client : Felda Bulkers Sdn Bhd
Project : Tank Manual Cleaning
Position : Project Engineer
Date : September 2006
Client : Alam Maritim (M) Sdn Bhd
Project : Assembling Hose for Cendor Project
Position : Project Engineer
Date : September 2006
Client : Alam Hidro (M) Sdn Bhd
Project : Installation Hose at FSO Cendor PM304 Project
Position : Project Engineer
Date : October 2006
Client : Petronas Carigali Sdn Bhd
Project : Marine Hose In-Situ Inspection for SBM-5, Miri MCOT Terminal
Position : Project Engineer
Date : October 2006
Client : Lumut Maritime Terminal Sdn Bhd
Project : Fender Replacement
Position : Project Engineer
Date : November 2006
Client : Petronas Carigali Sdn Bhd
Project : Hose Change Out for FSO Puteri Dulang 2007
Position : Project Engineer
Date : March 2007
Client : MTBE Malaysia Sdn Bhd
Project : Supply, Install & Testing of Piping & ITS Auxilliaries for Spent
Caustic Recirculation System at PDH
Position : Project Engineer
Date : March 2007
Client : FPG Oleochemicals Sdn Bhd
Project : Plant Shutdown – Tank Cleaning
Position : Project Engineer
Date : April 2007
Client : Petronas Carigali Sdn Bhd
Project : Fabrication and Installation of Deck Extension for Temporary
Shelter at Sotong-A (STJT-A) Platform
Position : Project Engineer
(CV-ANUWAR) Page 8
Date : April 2007
Client : Petronas Carigali Sdn Bhd
Project : Hose Change Out for Subsea Hose at SBM 5, Miri (2 strings)
Position : Project Engineer
Date : April 2007
Client : Petronas Gas Berhad
Project : To Perform Rectification Works of Mechanical Small Bore Item
Turnaround GPP2, Phase 1 and 2
Position : Project Engineer
Date : April to May 2007
Client : Swiber Offshore Construction Pte Ltd
Project : Floating Hose and Hawser Installation at FSO Abu Cluster
Position : Project Engineer
Date : May 2007
Client : Petronas Carigali Sdn Bhd – SKO
Project : Mooring Hawser and Chafing Chain Replacement at SBM 1 Bintulu
Position : Project Engineer
Date : June 2007
Client : Miri Crude Oil Terminal (MCOT)
Project : Piping Fabrication
Position : Project Engineer
Date : July 2007
Client : Petronas Carigali Sdn Bhd
Project : Supply of Gasket and Bolt & Nuts for SKO Floating Hose
Position : Project Engineer
Date : July 2007
Client : Petronas Carigali Sdn Bhd
Project : Load Cell Inspection and Sea Chest De-Blinding at FSO Puteri
Dulang
Position : Project Engineer
Date : August 2007
Client : Petronas Carigali Sdn Bhd
Project : Floating Hose for Miri SBM (2 strings)
Position : Project Engineer
Date : August 2007
Client : Shell Malaysia Berhad
Project : Replacement of Jetty Fenders to Outer, Inner and Jetty Head
Position : Project Engineer
Date : September 2007
(CV-ANUWAR) Page 9
Client : Petronas Carigali Sdn Bhd
Project : Floating Hose In-Service Inspection for FSO Puteri Dulang
Position : Project Engineer
Date : October 2007
Client : Petronas Carigali Sdn Bhd
Project : Floating Hose In-Service Inspection for FSO Abu Cluster
Position : Project Engineer
Date : October 2007
Client : Petronas Carigali Sdn Bhd
Project : Floating Hose In-Service Inspection for FPSO Bunga Kertas
Position : Project Engineer
Date : October 2007
Client : Petronas Carigali Sdn Bhd
Project : Floating Hose In-Service Inspection for FPSO Perintis
Position : Project Engineer
Date : October 2007
Client : Kerteh Terminal Sdn.Bhd
Project : PRV Servicing
Position : Project Engineer
Date : November 2007
Client : Petronas Carigali Sdn Bhd
Project : Fabrication and Installation of Boatlanding at Angsi-E
Position : Project Engineer
Date : November 2007
Client : Petronas Gas Berhad
Project : HDPE Pipeline at GPP4
Position : Project Engineer
Date : March 2008
Client : ENSCO Sdn Bhd
Project : Floating Flare Installation at FSO Abu Field
Position : Project Engineer
Date : March 2008
Client : Petronas Carigali Sdn Bhd
Project : Floating and Subsea Marine Cargo Hose String In-Service
Inspection SBM1, Bintulu
Position : Project Engineer
Date : March 2008
Client : Petronas Carigali Sdn Bhd
(CV-ANUWAR) Page 10
Project : Floating Marine Cargo Hose String Disconnection SBM1, Bintulu
Position : Project Engineer
Date : March 2008
Client : Petronas Carigali Sdn Bhd
Project : Installation of Boat Landing Clamp at Angsi C
Position : Project Engineer
Date : May 2008
Client : Nam Fatt Construction Sdn Bhd
Project : Supply Manpower, Tools, Equipment and Mob-Demob for
Installation Temporary Fender
Position : Project Engineer
Date : June 2008
Client : Petronas Carigali Sdn Bhd
Project : Floating Flare Unit Offshore and Hook-up Commissioning at Abu
Field
Position : Project Engieer
Date : June 2008
Client : Petronas Gas Berhad
Project : Replace 1km Pipe for Potable Water Line
Position : Project Engineer
Date : June 2008
Client : Petronas Penapisan (Terengganu) Sdn Bhd
Project : Hose Change Out 2008
Position : Project Engineer
Date : June 2008
Client : Petronas Carigali Sdn Bhd
Project : Underwater Boat Landing Inspection at DDPC
Position : Project Engineer
Date : July 2008
Client : Petronas Carigali Sdn Bhd
Project : Hose Change Out at TCOT
Position : Project Engineer
Date : July 2008
Client : MISC Berhad
Project : Lifting Work at FPSO Abu Cluster
Position : Project Engineer
Date : September 2008
Client : Petronas Dagangan Berhad
(CV-ANUWAR) Page 11
Project : Maintenance Works on Tank & Intercopter/Replace Check Valve for
The fire & Replace Bundwall Gate Valve at Kertih Aviation Depot
Position : Project Engineer
Date : September 2008
Client : Petronas Carigali Sdn Bhd
Project : Supply of Material, Design, Fabrication, Painting and Installation of
Cold Vent System
Position : Project Engineer
Date : October 2008
Client : Petronas Carigali Sdn Bhd
Project : Provision of Caisson Inspection, Maintenance & Cleaning Services –
Duyong Field
Position : Project Engineer
Date : November 2008
Client : Petronas Gas Berhad
Project : Replace Platform to Grating Type at GPP1
Position : Project Engineer
Date : February 2009
Client : Petronas Carigali Sdn Bhd
Project : Expansion Joint Replacement In-Service Inspection, Subsea/
Floating Hose and Underwater SBM and PLEM, Mooring Hawser
And Chain Replacement at SBM 5 (Miri)
Position : Project Engineer
Date : April 2009
Client : Petronas Carigali Sdn Bhd
Project : Expansion Joint Replacement
Replacement Subsea/Floating Hose Change Out at SBM 1
(Bintulu)
Position : Project Engineer
Date : May 2009
Client : Petronas Carigali Sdn Bhd
Project : Hose Change Out for FSO Puteri Dulang
Position : Project Engineer
Date : July 2009
Client : Petronas Carigali Sdn Bhd
Project : Refit Boatlanding Clamp at Duyong Drilling Platform C (DDPC)
Position : Project Engineer
Date : July 2009
Client : MLNG Sdn Bhd
(CV-ANUWAR) Page 12
Project : Sea Cooling Water Intake Station (SCWIS) Inspection and
Cleaning During Module 1 DOSH Shutdown 2009
Position : Project Engineer
Date : July 2009
Client : Petronas Carigali Sdn Bhd
Project : Expansion Joint Replacement In-Service Inspection, Subsea/
Floating Hose and Underwater SBM and PLEM, Mooring Hawser
And Chain Replacement at SBM 5 (Miri)
Position : Project Engineer
Date : August 2009
Client : Petronas Carigali Sdn Bhd
Project : Fabrication & Installation of Boatlanding Fender System at Malong A
Platform
Position : Project Engineer
Date : August 2009
Client : Petronas Gas Berhad
Project : Small and Big Bores Piping Inspection Program at Plant Operation
Division, PGB for a Period of Two (2) years with an option to extend
For another two (2) years on annually basis
Position : Project Engineer
Date : December 2008 – December 2010
Client : Petronas Carigali Sdn Bhd
Project : Provision of Grating Replacement at ANDR-A and ANDP-B
Position : Project Engineer
Date : October 2009
Client : Kertih Port Sdn Bhd
Project : Provision for Fender Replacement at Berth 4 & 5, KPSB Jetty
Position : Project Engineer
Date : October 2009
Client : Petronas Penapisan (Terengganu) Sdn Bhd
Project : Provision of SBM Underwater Barnacle Cleaning, Kerteh
Position : Project Engineer
Date : November 2009
Client : Petronas Carigali Sdn Bhd
Project : Mooring Hawser, Chafing Chain, Support Buoy Chain and Picking-
up Rope Replacement for SBM 1 (Bintulu)
Position : Project Engineer
Date : November 2009
Client : Petronas Penapisan (Terengganu) Sdn Bhd
(CV-ANUWAR) Page 13
Project : Provision for Emergency Floating Hose Replacement For SBM
Kerteh
Position : Project Engineer
Date : November 2009
Client : Petronas Carigali Sdn Bhd
Project : Provision Underwater Welding and Rectification SBM Kerteh
Position : Project Engineer
Date : December 2009 - January 2010
Client : Petronas Carigali Sdn Bhd
Project : Mooring Hawser Replacement for SBM 2, Bintulu
Position : Project Engineer
Date : January, 2010
Client : Petronas Carigali Sdn Bhd
Project : SBM 5 Mooring Hawser, Chafing Chain and Support Chain
Replacement and Spool Installation
Position : Project Engineer
Date : February, 2010
Client : Petronas Carigali Sdn Bhd
Project : Provision of Grating Replacement at ANDR – A and ANDP-B
Position : Project Engineer
Date : October 2009 – February, 2010
Client : Petronas Carigali Sdn Bhd
Project : SBM 5 Mooring Hawser, Chafing Chain and Support Chain
Replacement and Spool Installation, Miri
Position : Project Engineer
Date : March, 2010
Client : Petronas Carigali Sdn Bhd
Project : Fabrication & Installation of Boatlanding Fender System at Malong A
Platform
Position : Project Engineer
Date : September, 2009 - March, 2010
Client : Kertih Port Sdn Bhd
Project : Provision of Fender Replacement at Berth 4 & 5, KPSB Jetty
Position : Project Engineer
Date : October 2009 - April, 2010
Client : Petronas Penapisan (Terengganu) Sdn Bhd
Project : Provision of Manpower, Equipment, Tools, Material & etc for SBM
Shutdown
Position : Project Engineer
Date : April, 2010
(CV-ANUWAR) Page 14
Client : FPSO Venture Sdn Bhd
Project : Recovering of Starboard and Port Mooring Chain and Reinstatement of
Port and Starboard Mooring Buoy Offshore Location at FSO South
Angsi
Position : Project Engineer
Date : April, 2010
Client : Kertih Port Sdn Bhd
Project : Fabrication Fender Frontal Frame
Position : Project Engineer
Date : April, 2010
Client : Kertih Port Sdn Bhd
Project : Provision of Scaffolding
Position : Project Engineer
Date : April, 2010
Client : Malaysia Marine and Heavy Engineering Sdn Bhd (MMHE)
Project : Provision to Fabricate and Install of Fuel Gas Line for Gas Engine
Generator & Remaining Work at FSO Abu Offshore
Position : Project Engineer
Date : September, 2010
Client : FPSO Ventures Sdn Bhd
Project : Supply, Fabricate and Install of Emergency Repair Crude Oil
Washing Line at FSO Abu (Fieldweld)
Position : Project Engineer
Date : October, 2010
Client : FPSO Ventures Sdn Bhd
Project : Additional for Supply, Fabricate and Install of Emergency Repair
Crude Oil Washing Line at FSO Abu (Fieldweld)
Position : Project Engineer
Date : October, 2010
Client : Petronas Penapisan Melaka Sdn Bhd
Project : Repair and Maintenance Work (SPM F123 & F028)
Position : Project Engineer
Date : October, 2010
Client : Petronas Penapisan (Terengganu) Sdn Bhd
Project : Provision for SBM Underwater Barnacle Cleaning
Position : Project Engineer
Date : November, 2010
Client : FPSO Ventures Sdn Bhd
(CV-ANUWAR) Page 15
Project : Provide Manpower, Tools and Equipment for Hydrostatic Test for
1 String Hose at FSO Angsi
Position : Project Engineer
Date : October 2010
Client : FPSO Ventures Sdn Bhd
Project : Provision of Manpower, Material, Equipments, Tools and Consumables
To Perform Survey, Replace and Repair Aft Ballast Tanks Ladder and
Securing Arrangement
Position : Project Engineer
Date : November 2010
Client : FPSO Ventures Sdn Bhd
Project : Supply, Fabricate and install of Emergency Repair Crude Oil Washing
Line at FSO Abu (Fieldweld)
Position : Project Engineer
Date : November 2010
Client : FPSO Ventures Sdn Bhd
Project : Supply, Fabricate and install of Emergency Repair Crude Oil Washing
Line at FSO Abu (Fieldweld)
Position : Project Engineer
Date : November 2010
Client : FPSO Ventures Sdn Bhd
Project : Sea Cooling Water Intake Station (SCWIS) Inspection and Cleaning
During Module 2 Dosh TA 2010
Position : Project Engineer
Date : November 2010
Client : Petronas Carigali Sdn Bhd
Project : Term contract for Maintenance & Repair of Offshore Facilities
(Upgrading of Boat Landing Fender at Penara)
Position : Project Engineer
Date : November 2010 – June 2011
Client : Petronas Carigali Sdn Bhd
Project : Term contract for Maintenance & Repair of Offshore Facilities
(Upgrading of Boat Landing Fender at North Lukut)
Position : Project Engineer
Date : November 2010 – June 2011
Client : FPSO Ventures Sdn Bhd
Project : Provision to Supply Manpower, Material (Belzona), Tool and
Consumable to Repair of Barbell Marine Cargo Floating Hose
Position : Project Engineer
Date : December 2010
(CV-ANUWAR) Page 16
Client : Petronas Gas Berhad
Project : Recertification of Lifting & Rigging Equipment
Position : Project Engineer
Date : December 2010
Client : FPSO Ventures Sdn. Bhd
Project : Provision of Manpower, Materials, Equipment, Tools and Consumables
For Replacement of Corroded Piping in Engine Room onboard FPSO
Bunga Kertas
Position : Project Engineer
Date : December 2010
Client : FPG Oleochemicals Sdn Bhd
Project : Tank Cleaning for S901 & 902
Position : Project Engineer
Date : January 2011
Client : FPSO Ventures Sdn Bhd
Project : Provision of Manpower, Equipment, Tools and Consumables to
Fabricate, Dismantle and Install of Steam Turbine Generator (STG)
Lube Oil (LO) Cooler Sea Water Pipeline onboard FSO Abu
Position : Project Engineer
Date : January 2011
Client : FPSO Ventures Sdn Bhd
Project : Provision of Manpower, Materials, Equipments, Tools and
Consumables to Perform Repair, Inspect and Load Test for Provision
Crane onboard FPSO Bunga Kertas
Position : Project Engineer
Date : January 2011
Client : FPG Oleochemicals Sdn Bhd
Project : Major Tank Cleaning 2011
Position : Project Engineer
Date : January 2011
Client : Petronas Gas Bhd
Project : Maintenance of Plug Valve and Grease Nip at GPPB
Position : Project Engineer
Date : January 2011
Client : Petronas Gas Bhd
Project : Provision of Manpower, Supervision, Tools, Materials and
Consumables to Perform Fabrication of IETS Aeractor Structure,
GPPA
Position : Project Engineer
Date : February 2011
(CV-ANUWAR) Page 17
Client : FPG Oleochemicals Sdn Bhd
Project : Tank Cleaning S-804
Position : Project Engineer
Date : March 2011
Client : FPSO Ventures Sdn Bhd
Project : Provision of Manpower, Equipment, Tools and Consumables for the
Renewal of Lifeboat Davit Structure onboard FSO Cendor
Position : Project Engineer
Date : April 2011
Client : FPSO Ventures Sdn Bhd
Project : Provision of Manpower, Equipment, Tools and Consumables to Survey
And Service Pump Room Stripping Pump onboard FSO Abu
Position : Project Engineer
Date : April 2011
Client : Petronas Carigali Sdn Bhd
Project : Provision of Manpower, Supervision, Tools, Materials and
Consumables for Hose Change Out FPSO Bunga Kertas
Position : Project Engineer
Date : April 2011
Client : Petronas Carigali Sdn Bhd
Project : Mooring Hawser Change Out for FPSO Bunga Kertas
Position : Project Engineer
Date : April 2011
Client : Petronas Carigali Sdn Bhd
Project : Provision of Manpower, Supervision, Tools, Materials and
Consumables for Hose Change Out Abu Cluster
Position : Project Engineer
Date : April 2011
Client : FPSO Ventures Sdn Bhd
Project : Provision of Manpower, Equipment, Tools and Consumables for
Retrievel, Transportation, Cleaning, Repair and Storage of A Mid
Water Arch (MWA) Buoy for FSO Abu
Position : Project Engineer
Date : April 2011
Client : Newfield Peninsula Malaysia Inc.
Project : Provision of Conversation, Supply, Fabrication, Installation &
Commissioning of Floating Flare Unit
Position : Project Engineer
Date : April 2011
Client : Petronas Gas Bhd
(CV-ANUWAR) Page 18
Project : Provision for Scaffolding, Insulation and Painting Services for Small
And Big Bores Piping Inspection Program at GPPA, GPPB, Export
Terminal and Kertih Shared Marine Facility, Plant Operation Division,
For A period of Two (2) years with an option to extend for another one
(1) Year (2 + 1)
Position : Project Engineer
Date : April – December 2011
Client : FPSO Ventures Sdn Bhd
Project : Provision of Manpower, Equipment, Tools and Consumables to Repair
Underwater Sea Chest Suction Grating Cleaning onboard FSO Abu
Position : Project Engineer
Date : April 2011
Client : Kertih Port Sdn Bhd
Project : Provision of Manpower, Supervision, Tools, Materials and
Consumable to Replace Fender 4 units at Jetty KPSB Berth 1 by
Workboat
Position : Project Engineer
Date : May 2011
Client : Kertih Terminals Sdn Bhd
Project : Supply of Manpower, Equipment, Tools and Consumables and
Transportation for Hose Hydrotest
Position : Project Engineer
Date : June 2011
Client : Petronas Maritime (M) Sdn Bhd
Project : Mooring Hawser Replacement Works at SUPSB
Position : Project Engineer
Date : June 2011
Client : Petronas Maritime (M) Sdn Bhd
Project : Manhole Opening, Cleaning and Drying Inside Compartment and
Closing back at SUPSB
Position : Project Engineer
Date : June 2011
Client : Petronas Maritime (M) Sdn Bhd
Project : Flushing of Greaser and Re-grease to SPM at SUPSB
Position : Project Engineer
Date : June 2011
Client : Kertih Terminals Sdn Bhd
Project : Painting Works at Ammonia Loading Arm and Associated Area at
Jetty B5 and B6
Position : Project Engineer
Date : May - July 2011
(CV-ANUWAR) Page 19
Client : Petronas Carigali Sdn Bhd
Project : Provision for Manpower, Equipment, Tools, Materials and
Consumables Supply for Tie-in Works for TCOT Zero Flaring Project
Position : Project Engineer
Date : July 2011
Client : Petronas Gas Berhad
Project : Provision of Manpower, Supervision, Tools, Materials and
Consumable to Perform NSR Rectification during GPP1 Turnaround,
Gas Processing Plant Complex A
Position : Project Engineer
Date : May - July 2011
Client : FPSO Ventures Sdn Bhd
Project : Provision of Repair and Life Extension (RLE) Work Phase 1 onboard
FSO Cendor
Position : Project Engineer
Date : July 2011
Client : FPSO Ventures Sdn Bhd
Project : Provision of Manpower, Equipment, Tools and Consumables to
Replace The Sea Chest Valves in Engine Room onboard FSO Cendor
Position : Project Engineer
Date : July 2011
Client : FPSO Ventures Sdn Bhd
Project : To Crop and Replace Boundry Plate Between Sea Chest No.3 and
No.4 for FSO Puteri Dulang
Position : Project Engineer
Date : July 2011
Client : FPSO Ventures Sdn Bhd
Project : Provision of Manpower, Equipment, Tools and Consumables to Dismantle
Fabricate and Replace Marine Gas Oil (MGO) 6” Main Pipe Line in engine
Room onboard FSO Abu
Position : Project Engineer
Date : July 2011
Client : Petronas Carigali Sdn Bhd
Project : Provision for Supply Manpower, Material, Consumables and Equipment
for Maintenance Painting at Tiong B
Position : Project Engineer
Date : July to November 2011
Client : FPSO Ventures Sdn Bhd
Project : Provision of Manpower, Materials, Equipment, Tools and Consumables to
Remove and Install New Gas Extractor (GE) Collecting Tank at 4” GE
(CV-ANUWAR) Page 20
Piping in AFT Pump Room
Position : Project Engineer
Date : July to September 2011
Client : FPSO Ventures Sdn Bhd
Project : Provision of Manpower, Equipment, Tools and Consumables to Replace
Worn Seat Rings for Cargo Valve COT 2C, 3C, 5C and one by pass Valve
Onboard FSO Puteri Dulang
Position : Project Engineer
Date : July to September 2011
Client : Sungai Udang Port Sdn Bhd
Project : Sand Removal at SPM Plem
Position : Project Engineer
Date : July 2011
Client : FPSO Venture Sdn Bhd
Project : Hydrotest Hose Location at FSO South Angsi, Talisman
Position : Project Engineer
Date : July 2011
Client : PMSSB, Kerteh Port (TCOT-Descaling)
Project : Effluent Water Discharge Line Terengganu Crude Oil Terminal
Connect and Disconnection of Hose for Scale Recovery
Position : Project Engineer
Date : August 2011
Client : PMSSB, Kerteh Port (TCOT)
Project : Provision of Manpower, Equipment, Material, Tools and
Consumables for CBM SALM 1 & SALM 2
Position : Project Engineer
Date : August-October 2011
Client : Kertih Terminal Sdn Bhd
Project : Provision of Manpower, Tools, Materials, Consumables, Equipment
And Mob Demob for Piping Work at Jetty B5
Position : Project Engineer
Date : August 2011
Client : PMSSB, Kerteh Port (TCOT)
Project : Cleaning and Gauge Pig Retrieval from SALM 1 Pig Receive
Module for SALM 1, TCOT, Kerteh
Position : Project Engineer
Date : September 2011
(CV-ANUWAR) Page 21
Client : Sungai Udang Port Sdn Bhd
Project : Rectification Work to SPM Melaka Sub Sea Floaters & Spreader Bar
Position : Project Engineer
Date : September 2011
Client : Sungai Udang Port Sdn Bhd
Project : Underwater Inspection and Maintenance Services Surface and Underwater
Inspection SPM Melaka (Quartely Inspection)
Position : Project Engineer
Date : October 2011
Client : Petronas Carigali Sdn Bhd
Project : Manpower Supply for GEG Commissioning Work at FSO Abu Cluster
Position : Project Engineer
Date : November 2011
Client : Petronas Carigali Sdn Bhd
Project : To Supply Manpower, Tools, Equipment to Repair 3 unit Ball Valve
Position : Project Engineer
Date : December 2011
Client : Iskandar Malaysia, Johor Darul Takzim
Project : Jointing & Launching of Marine Outfall for Medini Development
Position : Project Engineer
Date : March 2012 – June 2012
Client : Ardent Sea Tramp Sdn Bhd
Project : ROV Sea Fastening Ondeck MV Setia Nurani
Position : Project Engineer
Date : May 2012
Client : FPSO Ventures Sdn Bhd
Project : Repair and Life Extension (RLE) Work Phase IV (A) onboard FSO Cendor
Position : Project Engineer
Date : June 2012
Client : MISC Berhad
Project : Rehabilitation of Existing Forward Deck Tensioning Winch
Position : Project Engineer
Date : June 2012
Client : Petronas Carigali Sdn Bhd
Project : Flexible Piping System at Bekok-C MOPU
Position : Project Engineer
Date : June 2012
(CV-ANUWAR) Page 22
Client : Petronas Carigali Sdn Bhd
Project : Well Desander Installation at Duyung Platform
Position : Project Engineer
Date : June 2012
Client : Petronas Carigali Sdn Bhd
Project : Inspection and Testing of Export Hose for FSO Cendor
Position : Project Engineer
Date : June 2012