Corynth, NY The Curtis Palmer hydro facility consists of two run-of-river hydroelectric generating stations located on the Hudson River, in Corynth, NY. In 2014, CHC provided two 2250 mm vertical axial flow Kaplan open flume tur-bines to replace two of the five horizontal units located in the Curtis powerhouse, which were running but in poor mechanical condition. The existing generators were removed, reconfigured as vertical units, and rein-stalled with the new turbines. The turbine replacement was completed in the Spring of 2014 and the two-unit combined capacity has increased from 2.2 to 3.0 MW.
PROJECT FACTS
Two Unit Replacement - Increased Plant Capacity
Two (2) 2250 mm Axial Flow Kaplan Open Flume
Net Head 6.95 m (22.8 ft)
1590 kW per unit
Commissioned 2014
CURTIS HYDRO
REDEVELOPMENT ATLANTIC POWER
16 Main Street W., PO 640, Almonte, ON K0A 1A0 613-256-1983 [email protected] REHABILITATION
CURTIS HYDRO
REDEVELOPMENT ATLANTIC POWER
16 Main Street W., PO 640, Almonte, ON K0A 1A0 613-256-1983 [email protected] REHABILITATION