1 July '10, IDRO Seminar 0 Best Practice of Use-Ware for Improving Factory Operation Mr. Hajime SUZUKI (Dr. Practice) Professional Engineer authorized by Japanese Government July '10, IDRO Seminar USE-WARE, Practical KAIZEN Prefesional Eng'r, Hajime SUZUKI 1 Guidelines* for Practical KAIZEN *by Dr. Practice

Upload: vudung

Post on 06-Feb-2018

222 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: C:UsersSUZUKI HajimeDesktopAPO Iran MaterialsAPO …irantpm.ir/wp-content/uploads/2011/01/apo_idro_seminar-suzuki.pdf · '3Mu-1' (Muda, Mura, Muri) July '10, IDRO Seminar USE-WARE,

1

July '10, IDRO Seminar 0

Best Practice of

Use-Ware for

Improving Factory Operation

Mr. Hajime SUZUKI (Dr. Practice)Professional Engineer

authorized by Japanese Government

July '10, IDRO Seminar USE-WARE, Practical KAIZEN Prefesional Eng'r, Hajime SUZUKI

1

Guidelines* for

Practical KAIZEN

*by Dr. Practice

Page 2: C:UsersSUZUKI HajimeDesktopAPO Iran MaterialsAPO …irantpm.ir/wp-content/uploads/2011/01/apo_idro_seminar-suzuki.pdf · '3Mu-1' (Muda, Mura, Muri) July '10, IDRO Seminar USE-WARE,

2

July '10, IDRO Seminar USE-WARE, Practical KAIZEN Prefesional Eng'r, Hajime SUZUKI

2

3. Practical Approach

4. Basics of Production Management 1) Effective Problem Finding 2) Effective Problem Solving 5. Integrated Activities

July '10, IDRO Seminar USE-WARE, Practical KAIZEN Prefesional Eng'r, Hajime SUZUKI

3

1) Critical Issue Oriented, not Tool oriented

2) Start from Pilot (Model) Area, not company-wide from the first

3) Practice Basics with Intensive Effort not introducing sophisticated techniques/systems

3. Practical Approach

Page 3: C:UsersSUZUKI HajimeDesktopAPO Iran MaterialsAPO …irantpm.ir/wp-content/uploads/2011/01/apo_idro_seminar-suzuki.pdf · '3Mu-1' (Muda, Mura, Muri) July '10, IDRO Seminar USE-WARE,

3

July '10, IDRO Seminar USE-WARE, Practical KAIZEN Prefesional Eng'r, Hajime SUZUKI

4

(1) Process Analysis (2) Stratification(3) 3 Gen ③find Fact (Genjitsu) ②by closely observing Actual thing (Genbutsu) ①at Site (Genba)

(4) 3 Mu ①Muda (waste) ②Mura (un-even: low and high in defect, etc.) ③Muri (un-natural, such as stacking too high, etc.)

4. Basics1) Effective Problem Finding

July '10, IDRO Seminar USE-WARE, Practical KAIZEN Prefesional Eng'r, Hajime SUZUKI

5

In addition to the aboveS (Safety) andM (Morale) should be examined.

Production (capacity)

Material

Product

Machine

Delivery

Supply

Process

Quality (check and control)

Cost (waste of material & man, etc.)

Delivery (waiting time, etc.)

Order

Planning,Scheduling

(1) Process Analysis

Page 4: C:UsersSUZUKI HajimeDesktopAPO Iran MaterialsAPO …irantpm.ir/wp-content/uploads/2011/01/apo_idro_seminar-suzuki.pdf · '3Mu-1' (Muda, Mura, Muri) July '10, IDRO Seminar USE-WARE,

4

July '10, IDRO Seminar USE-WARE, Practical KAIZEN Prefesional Eng'r, Hajime SUZUKI

6

1) Pareto diagram

2) Cause & effect diagram

3) Histogram

4) Check sheet

5) Scatter diagram

6) Stratification

7) Control chart and Graph

Ordinary 7 QC Tools Practical “8 QC Tools”(in the order of effective use)

1. Stratification2. Check sheet

4. Histogram

5. Pareto diagram

6. Cause & effect diagram

7. Scatter diagram

3. Graphs

8. Control chart

(2) Stratification

July '10, IDRO Seminar USE-WARE, Practical KAIZEN Prefesional Eng'r, Hajime SUZUKI

7

Genba (at Site): 1. Manufacturing Ind. Painting process, Assembly line, Inspection station, Material stockyard, Production floor, Product warehouse, Maintenance store, etc.

2. Non-Manufacturing Ind. 1) Restaurant: Guest dining room, Kitchen, etc. 2) Shop: Showroom, Sales floor, etc. 3) Transportation: Road, Station, Truck, Warehouse, etc.

'3 Gen'-1 (Genba, Genbutsu, Genjitsu)

Page 5: C:UsersSUZUKI HajimeDesktopAPO Iran MaterialsAPO …irantpm.ir/wp-content/uploads/2011/01/apo_idro_seminar-suzuki.pdf · '3Mu-1' (Muda, Mura, Muri) July '10, IDRO Seminar USE-WARE,

5

July '10, IDRO Seminar USE-WARE, Practical KAIZEN Prefesional Eng'r, Hajime SUZUKI

8

Genbutsu (Actual thing): 1. Manufacturing Ind. - Good Quality product, - Rejected parts, - Work instruction in Foreign language, - Semi-product covered with dust, etc.

2. Non-Manufacturing Ind. 1) Restaurant: - Table wares, - Foods, - Materials, - Cooking utensils, etc. 2) Shop: - Best selling goods (design/color combination), - Showcase, etc.

'3 Gen'-2 (Genba, Genbutsu, Genjitsu)

July '10, IDRO Seminar USE-WARE, Practical KAIZEN Prefesional Eng'r, Hajime SUZUKI

9

Genjitsu (Fact): - Semi-product covered with dust Why with dust? - - staying 3 months Why staying so long? - - order was cancelled after produced Why cancelled after produced? - - this customer often gives uncertain order Why started production without confirming order - - followed general rule 'start as early as possible' Why followed general rule? - - there is no special rule for this kind of non-reliable customer

'3 Gen'-3 (Genba, Genbutsu, Genjitsu)

Link: Pipe Plant

Page 6: C:UsersSUZUKI HajimeDesktopAPO Iran MaterialsAPO …irantpm.ir/wp-content/uploads/2011/01/apo_idro_seminar-suzuki.pdf · '3Mu-1' (Muda, Mura, Muri) July '10, IDRO Seminar USE-WARE,

6

July '10, IDRO Seminar USE-WARE, Practical KAIZEN Prefesional Eng'r, Hajime SUZUKI

10

Muda : Waste 1) Waste of material - Defective products, - Start-up waste, - Design waste, - Dead stock, - Long staying stock. etc.

2) Waste of manpower - Idle time, - Over time, - Reworking, etc.

3) Waste of facility - Broken facility, - Excess facility, etc.

'3Mu-1' (Muda, Mura, Muri)

July '10, IDRO Seminar USE-WARE, Practical KAIZEN Prefesional Eng'r, Hajime SUZUKI

11

Mura : Un-even Data: 1) Daily production very high and very low 2) Defects very low and very high

Operaton: 3) Driving very fast and very slow 4) Materials coming too much and too little 5) Machines stop frequently etc.

'3Mu-2' (Muda, Mura, Muri)

Page 7: C:UsersSUZUKI HajimeDesktopAPO Iran MaterialsAPO …irantpm.ir/wp-content/uploads/2011/01/apo_idro_seminar-suzuki.pdf · '3Mu-1' (Muda, Mura, Muri) July '10, IDRO Seminar USE-WARE,

7

July '10, IDRO Seminar USE-WARE, Practical KAIZEN Prefesional Eng'r, Hajime SUZUKI

12

Muri : Un-natural 1) Working un-easy posture 2) Carrying too heavy thing 3) Trying to reach too high, Working too much overtime 4) Driving too fast 5) Stacking too high etc.

'3Mu-3' (Muda, Mura, Muri)

July '10, IDRO Seminar USE-WARE, Practical KAIZEN Prefesional Eng'r, Hajime SUZUKI

13

(1) Best Conditions (2) Flow Production(3) Visual Control ① for right Management (report with high-lighting) ② for right Operation at shop-floor (in-line visual control) ③for promoting shop-floor activities

(4) PDCA ① for Daily Operation and management ② for improvement activities

Effective Problem Solving2) Effective Problem Solving

Page 8: C:UsersSUZUKI HajimeDesktopAPO Iran MaterialsAPO …irantpm.ir/wp-content/uploads/2011/01/apo_idro_seminar-suzuki.pdf · '3Mu-1' (Muda, Mura, Muri) July '10, IDRO Seminar USE-WARE,

8

July '10, IDRO Seminar USE-WARE, Practical KAIZEN Prefesional Eng'r, Hajime SUZUKI

14

If 4Ms are good (normal), No defect will come out.

Good Methods

Good Machines and

Conditions

Good Men (Operators)

Good Materials

No Defect

(1) Best Conditions

Do your Best !

July '10, IDRO Seminar USE-WARE, Practical KAIZEN Prefesional Eng'r, Hajime SUZUKI

15

Delivery : Delivery in Time

Finished Product : No Long Staying/Dead stock

Production

Material : No Long Staying/Dead stock

     :Well controlled WIP                Final process

 ・ ・

1st process

(2) Flow Production

Page 9: C:UsersSUZUKI HajimeDesktopAPO Iran MaterialsAPO …irantpm.ir/wp-content/uploads/2011/01/apo_idro_seminar-suzuki.pdf · '3Mu-1' (Muda, Mura, Muri) July '10, IDRO Seminar USE-WARE,

9

July '10, IDRO Seminar USE-WARE, Practical KAIZEN Prefesional Eng'r, Hajime SUZUKI

16

(3) Visual Control① For Management “Visual Report” for managers to easily see important

points by highlighting with red color, etc. ② For Shop-floor Control “In-process (or in-line) Visual Control” for operators to easily follow work standard ③ For Shop-floor Motivation Visual Control posted on boards at shop-floor

Link: Case Machine (Visual Control-1)

Link: Visual Control 2

Link: Visual Control 3

July '10, IDRO Seminar USE-WARE, Practical KAIZEN Prefesional Eng'r, Hajime SUZUKI

17

Plan, action Plan

2nd Target

Plan, action Plan*1

1st Target

(4) PDCA-2 (for Achieving Target)

Action*2

Check

Action=Helping to achieve target *2: and Appreciation

Plan=Target for improvement *1: and Preparation

Do=Improvement activitiesIn Do step, we have small (p)(d)(c)(a)

Check=Progress of improvement

Check

Do (a) (c)

(p) (d)

Do (a) (c)

(p) (d)

Action*2

Page 10: C:UsersSUZUKI HajimeDesktopAPO Iran MaterialsAPO …irantpm.ir/wp-content/uploads/2011/01/apo_idro_seminar-suzuki.pdf · '3Mu-1' (Muda, Mura, Muri) July '10, IDRO Seminar USE-WARE,

10

July '10, IDRO Seminar USE-WARE, Practical KAIZEN Prefesional Eng'r, Hajime SUZUKI

18

PlanExisting level

(4) PDCA-1 (for Daily Operation)

Do=Daily operation

PlanBetter level

ActionDo

Check

Higher level

Plan=Existing system & method

Check=Result such as customer claim, reject, late delivery, etc. Action=Improve system & method

Action

ActionDo

Check

Action

Link: Case ISO Aplication.

July '10, IDRO Seminar USE-WARE, Practical KAIZEN Prefesional Eng'r, Hajime SUZUKI

19

Case Study 1Best Practice

after

3-day Course and

Small-scale Consultation

Page 11: C:UsersSUZUKI HajimeDesktopAPO Iran MaterialsAPO …irantpm.ir/wp-content/uploads/2011/01/apo_idro_seminar-suzuki.pdf · '3Mu-1' (Muda, Mura, Muri) July '10, IDRO Seminar USE-WARE,

11

July '10, IDRO Seminar USE-WARE, Practical KAIZEN Prefesional Eng'r, Hajime SUZUKI

20

Best Participant In Suzuki's 'Practical IE' Course

Large variety of cushions for outdoor furniture exported to many European countries.

Link: Case Co. B

Top Mgt of Co. B attendedSuzuki’s IE course, thenSuzuki visited Co. B and gave guidelines on how toapply (Use-Ware).

She digested all what Suzuki gave, then applied them practically (developed her own Use-Ware).The case is prepared separately.

July '10, IDRO Seminar USE-WARE, Practical KAIZEN Prefesional Eng'r, Hajime SUZUKI

21

Practical 5S 5S with Kaizen

developed through Suzuki’s 20 years experiences

Page 12: C:UsersSUZUKI HajimeDesktopAPO Iran MaterialsAPO …irantpm.ir/wp-content/uploads/2011/01/apo_idro_seminar-suzuki.pdf · '3Mu-1' (Muda, Mura, Muri) July '10, IDRO Seminar USE-WARE,

12

July '10, IDRO Seminar USE-WARE, Practical KAIZEN Prefesional Eng'r, Hajime SUZUKI

22

In Japan, ・ 5S has been practiced for many years as common sense as Seiri  Seiton「整頓整理」 for Safety, Quality, Efficiency then Environment. ・ In 1986, 1st book on 5S was published, since then 5S rapidly became popular. ・ In good companies, it has been continuously practiced and keeping high level.

History of 5S

In many countries, ・ 5S was successful during the initial period, however after a while, it easily become superficial, cosmetic and non-useful due to wrong application.  

In Iran, - How is the situation?  

July '10, IDRO Seminar USE-WARE, Practical KAIZEN Prefesional Eng'r, Hajime SUZUKI

23

Ordinary 5S

Good for initial stage, but needs some modification for Practical use.

Seiri(整理): Sort out necessary items and un-necessary items, then discard un-necessary items.

Seiton(整頓): Arrange necessary items in good order so that they           can be easily picked up for use.

Seiketsu(清潔): Maintain high standard of Seiri, Seiton, Seiso and             workplace organization at all times.

Shituke(躾): Train people to follow good housekeeping discipline    autonomously.

Seiso (清掃): Clean the workplace completely so that there is no dust on floor, machines or equipment.

Page 13: C:UsersSUZUKI HajimeDesktopAPO Iran MaterialsAPO …irantpm.ir/wp-content/uploads/2011/01/apo_idro_seminar-suzuki.pdf · '3Mu-1' (Muda, Mura, Muri) July '10, IDRO Seminar USE-WARE,

13

July '10, IDRO Seminar USE-WARE, Practical KAIZEN Prefesional Eng'r, Hajime SUZUKI

24

Objective Effective Problem Solving

•Best Conditions

•Flow Production

•Visual Control

•PDCA

PQCDSM

•Production capacity

•Quality

•Cost

•Delivery

•Safety

•Morale

•Customer Satisfaction

•Internal Effectiveness and Safety

•Profit •Happy Life

5S •Seiri

•Seiton

•Seiso

•Seiketsu

•Shitsuke

5S with Kaizen: always think Objectives

July '10, IDRO Seminar USE-WARE, Practical KAIZEN Prefesional Eng'r, Hajime SUZUKI

25

1. 1st stage: Ordinary 5S

Key point of Practical 5S

2. 2nd stage: Practical 5S Practice by thinking ”the objective of 5S at each work place” for Effective Problem Solving, namely, 1) Best Conditions  2) Flow Production 3) Visual Control 4) PDCA 

Page 14: C:UsersSUZUKI HajimeDesktopAPO Iran MaterialsAPO …irantpm.ir/wp-content/uploads/2011/01/apo_idro_seminar-suzuki.pdf · '3Mu-1' (Muda, Mura, Muri) July '10, IDRO Seminar USE-WARE,

14

July '10, IDRO Seminar USE-WARE, Practical KAIZEN Prefesional Eng'r, Hajime SUZUKI

26

Practical Seiri: Sort out and remove un-necessary items and from the workplace.

What is the key point here ?

⇒Clear ‘Criterion’ and ‘Instruction’

Practical 5S: Modified by SUZUKI -1

“quantity (of necessary items)”

July '10, IDRO Seminar USE-WARE, Practical KAIZEN Prefesional Eng'r, Hajime SUZUKI

27

Practical Seiton:Arrange - - for easy use (Location, Arrangement, Indication)

also must be in

“good conditions” (ready for use) in “fail safe ” (no chance of misuse, preventing any accident)

Practical 5S: Modified by SUZUKI -2

Page 15: C:UsersSUZUKI HajimeDesktopAPO Iran MaterialsAPO …irantpm.ir/wp-content/uploads/2011/01/apo_idro_seminar-suzuki.pdf · '3Mu-1' (Muda, Mura, Muri) July '10, IDRO Seminar USE-WARE,

15

July '10, IDRO Seminar USE-WARE, Practical KAIZEN Prefesional Eng'r, Hajime SUZUKI

28

Practical Seiso:Clean - - or equipment. Do it by considering the objective,

1) “collect dust without scattering” for clean workplace, 2) “remove dust without damaging product” for sensitive product,

3) “check and correct abnormal conditions” for machines and equipment.

Practical 5S: Modified by SUZUKI -3

July '10, IDRO Seminar USE-WARE, Practical KAIZEN Prefesional Eng'r, Hajime SUZUKI

29

Practical Shitsuke:No modification, but for newly established factory, Rules, Regulations and Work Standards come first).

Practical Seiketsu:“Prevent from becoming dirty” and keep high level cleanliness“Maintain good hygiene”

Practical 5S: Modified by SUZUKI -4

Page 16: C:UsersSUZUKI HajimeDesktopAPO Iran MaterialsAPO …irantpm.ir/wp-content/uploads/2011/01/apo_idro_seminar-suzuki.pdf · '3Mu-1' (Muda, Mura, Muri) July '10, IDRO Seminar USE-WARE,

16

July '10, IDRO Seminar USE-WARE, Practical KAIZEN Prefesional Eng'r, Hajime SUZUKI

30

Case Study 2Best Practice

after

3-day Course x 2 timesand

6 times Consultation

July '10, IDRO Seminar USE-WARE, Practical KAIZEN Prefesional Eng'r, Hajime SUZUKI

31

Best Participant In Suzuki's ‘Practical 5S' Course

When I showed this picture.Mr. A said ‘we are much higher level, I don’t need this’ and left the class with nothing.

On the other hand Mr. D, owner of apparel company, attended 2 times in the same course. He worked with Suzuki as model company and achieved good result. He went to Japan as an excellent participants. He cooperated in sharing his experiences in Practical 5S Course.

He was expecting what looks like this.

Link: Case Appael 2Link: Case Appael 1

Page 17: C:UsersSUZUKI HajimeDesktopAPO Iran MaterialsAPO …irantpm.ir/wp-content/uploads/2011/01/apo_idro_seminar-suzuki.pdf · '3Mu-1' (Muda, Mura, Muri) July '10, IDRO Seminar USE-WARE,

17

July '10, IDRO Seminar USE-WARE, Practical KAIZEN Prefesional Eng'r, Hajime SUZUKI

32

Positive Mind

With your Positive Mind,Your dream will

come true !

Please surprise me with your

practice !

July '10, IDRO Seminar USE-WARE, Practical KAIZEN Prefesional Eng'r, Hajime SUZUKI