cv-_dr_s_k_singh -nov. 2016

33
1. NAME : Dr. S.K. Singh 2. DATE OF BIRTH : 14 th December 1960 NATIONALITY: Indian 3. ADDRESS : 390, First Floor, Indira Vihar, Kingsway Camp, Delhi-110009 4. TELEPHONE : +91-11-27651591(R), +919910054240 (M), +919873714240 (M), 5. EMAIL : [email protected] 6. EDUCATION : Doctor of Philosophy (Ph.D.) in Sociology from A.N. Sinha Institute of Social Studies, Patna (under M.U.), as Doctoral Fellow of ICSSR, New Delhi, India, 1992 M.A. (Sociology) with specialization in Demography & Research Methodology from Patna University, 1984 B.A. (Hons.) Sociology from B.N. College, Patna University, 1981 7. MEMBERSHIP OF : Life Member, Indian Society of Labour Economics PROFESSIONAL Life Member, Institute of Urban Transport ASSOCIATIONS 8. RESEARCH AWARDS / SCHOLARSHIPS Recipient of Institutional Doctoral Fellowship of the Indian Council of Social Science Research (I.C.S.S.R.), New Delhi, India 9. PUBLICATIONS : Has published a number of articles related to social issues Some important Publications / Papers Public Consultation in a Development Project : Making a Difference?, published in ‘ICT Newsletter’, Volume 4, Issue 4 November 2001 ‘Facing the challenge of poverty” in Urban India’, in INDIAN DOMINION, June 2002, New Delhi – 110096 ‘Managing risks in fast track projects: An overview’ paper accepted and published in a National Seminar on “Management of fast track projects with special reference to risk management” organized by Scientific Committee, IIBE – DSC and Tandon Consultants Pvt. Ltd., New Delhi, 20-21 Sep. 2002 ‘Managing Solid Waste in urban Environment’ (with Ashish Sinha), the paper is accepted in an International Conference on Ecobalance and Life Cycle Assessment in India, held on 13 th –16 th February 2002 and organized by Indira Gandhi Institute of Development Research (IGIDR), Mumbai and sponsored by Ministry of Environment and Forests, Govt. of India, Asia Productivity Organization, Japan and Industrial Development Bank of India. ‘Environmental Awareness in Kautilya’s Arthasastra’. The present paper has tried to assess Kautilya’s Arthasastra from the perspective of Environmental Awareness, which has been the need of the modern world’s day (unpublished). ‘Rain Water Harvesting: Need of the Day’, ICT Newsletter, Vol.5 Issue-4, August 2002 ‘Social Impact Assessment in Highway Project with special reference to India’ (unpublished) CV of Dr S K Singh

Upload: dr-satish-kumar-singh

Post on 09-Feb-2017

32 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CV-_Dr_S_K_Singh -Nov. 2016

1. NAME : Dr. S.K. Singh2. DATE OF BIRTH : 14th December 1960 NATIONALITY: Indian3. ADDRESS : 390, First Floor, Indira Vihar, Kingsway Camp, Delhi-1100094. TELEPHONE : +91-11-27651591(R), +919910054240 (M), +919873714240 (M), 5. EMAIL : [email protected]. EDUCATION : Doctor of Philosophy (Ph.D.) in Sociology from A.N. Sinha Institute

of Social Studies, Patna (under M.U.), as Doctoral Fellow of ICSSR, New Delhi, India, 1992M.A. (Sociology) with specialization in Demography & Research Methodology from Patna University, 1984

B.A. (Hons.) Sociology from B.N. College, Patna University, 1981

7. MEMBERSHIP OF : Life Member, Indian Society of Labour EconomicsPROFESSIONAL Life Member, Institute of Urban Transport ASSOCIATIONS

8. RESEARCH AWARDS / SCHOLARSHIPSRecipient of Institutional Doctoral Fellowship of the Indian Council of Social Science Research (I.C.S.S.R.), New Delhi, India

9. PUBLICATIONS : Has published a number of articles related to social issues

Some important Publications / Papers

Public Consultation in a Development Project : Making a Difference?, published in ‘ICT Newsletter’, Volume 4, Issue 4 November 2001

‘Facing the challenge of poverty” in Urban India’, in INDIAN DOMINION, June 2002, New Delhi – 110096

‘Managing risks in fast track projects: An overview’ paper accepted and published in a National Seminar on “Management of fast track projects with special reference to risk management” organized by Scientific Committee, IIBE – DSC and Tandon Consultants Pvt. Ltd., New Delhi, 20-21 Sep. 2002

‘Managing Solid Waste in urban Environment’ (with Ashish Sinha), the paper is accepted in an International Conference on Ecobalance and Life Cycle Assessment in India, held on 13th –16th February 2002 and organized by Indira Gandhi Institute of Development Research (IGIDR), Mumbai and sponsored by Ministry of Environment and Forests, Govt. of India, Asia Productivity Organization, Japan and Industrial Development Bank of India.

‘Environmental Awareness in Kautilya’s Arthasastra’. The present paper has tried to assess Kautilya’s Arthasastra from the perspective of Environmental Awareness, which has been the need of the modern world’s day (unpublished).

‘Rain Water Harvesting: Need of the Day’, ICT Newsletter, Vol.5 Issue-4, August 2002 ‘Social Impact Assessment in Highway Project with special reference to India’ (unpublished) ‘Non-conventional Energy for Today and Tomorrow (A Policy Framework and Action Plan)’ presented

paper on 8th annual Convention and National Seminar on “ Urban Infrastructure Development” of Indian Building Congress -June 14-16, 2002, New Delhi held at Vigyan Bhawan, New Delhi

‘Social Infrastructure – A Nutrient For Urban Development’, Vol. 10 No. 1 January- February 2003, SDR (Spatio-Economic Development Record) Journal, New Delhi, 2003

10. COUNTRIES OF WORK EXPERIENCE: Afghanistan, Bangladesh, Cambodia, Ethiopia, India, Kazakhstan,

Mongolia, Tanzania, Myanmar and Vietnam

11. LANGUAGES : Speaking Reading WritingEnglish Excellent Excellent ExcellentHindi Excellent Excellent Excellent

Application of Technical Knowledge and Skills : Packages Known – MS Word, MS Excel, MS Power Point Well acquainted and keep updated with policy guidelines of funding agencies and local institutions and

regulators with regard to Social safeguards, land acquisition and resettlement practice and meticulously use it in the area to relevant tasks

Ability to use knowledge and practical skills independently to perform multifaceted tasks Strenuous planning and good skills to handle multi tasks at a time with deadlines.

CV of Dr S K Singh

Page 2: CV-_Dr_S_K_Singh -Nov. 2016

Dr. S. K. Singh

Other Training : Successfully attended and completed the three days “ Certificate Course on Environmental Awareness” on

Climate Change and Sustainable Developmet organized by Environmental Planning and Coordination Organization, (EPCO) Institute of Environmental Studies , Bhopal, MP, held on 29th-31st July 2013.

Participated as Social Development and Resettlement Specialist, ADB, TA Consultant, of Policy & Coordination Dept., Ministry of Public Works, Islamic Republic of Afghanistan, Kabul in a Workshop on Environment and Social Management Plan (ESMP) organized by the World Bank in Kabul, Afghanistan , 7-8 August 2007

Risk Management in Infrastructure Projects organized by ICT Pvt. Ltd., 20 Feb. 2004 8th Annual Convention of IBC & National Seminar on "Urban Infrastructure Development", Indian

Building Congress (IBC), 14-16 June, 2002 Awareness Programme on ISO 9001:2000, Consultancy Development Centre, 4th Oct. 2002 In house Training course on preparation of Environmental Assessment Reports (EIA) of Road Projects

conducted by Environment Division of ICT New Delhi, India 2001 In house Training on Social Impact Assessment (SIA) and Resettlement Action Plan (RAP) for highway

projects conducted by Sociology Division of ICT, New Delhi, India 2001 Participated and successfully completed the Training Course on "Training on Geographic Information

System: A Definition of GIS" conducted by IT Division of ICT, New Delhi, India, 2001 Participated and successfully completed the Training Course of Data Processing in Social Sciences,

conducted by Survey Research Training Center (S.R.T.C.), New Delhi, India, 1988 Participated and successfully completed the orientation course in Recent Trends in Sociology and Social

Anthropology conducted at A.N. Sinha Institute of Social Studies, Patna, India, 1988

Training Imparted :

Coordinated and conducted training on "Program of training in Five RCIP states (ADB-TA- 8110 Project), for NRRDA officials of Orissa, West Bengal, Assam, Chhattisgarh and Madhya Pradesh from 15-Sept.2014- 8th September 2015 at different interval of time.

Coordinated and conducted training on Land Acquisition and Resettlement practices as part of road rehabilitation and Capacity Building Cluster, Ministry of Public Works (MPW) Component (TA - 4828 - AFG), Afghanistan in Jun. 2007 – Aug. 2007.

Coordinated and conducted training on "Social Impact Assessment Study and Resettlement and Rehabilitation Plan for Project Affected Persons due to implementation of Infrastructure Project" as a part of Summer training Programme for Mr. Paras Gupta and Mr. Anupam Srivastava, B. Tech student of IIT Kharagpur, June 7 - 12 2004

Coordinated and conducted training on "Social Impact Assessment in Development Project: Examples and Practical demonstration" as a part of summer training Programme for Ms. Jill S. Pike, a student of Massachusetts Institute of Technology (MIT), Boston, USA, June 10, 2004

Coordinated and conducted training on "Social Impact Assessment Study: Methodology and Case Study", as a part of Summer training Programme for Ms. Christina Erickson, a student of Massachusetts Institute of Technology (MIT), Boston, USA, Oct. 6, 2003

Coordinated and conducted training on Relevance of Social Impact Assessment Study in highway projects: In-house Training Programme by ICT, New Delhi, India, Dec. 20, 2001

Coordinated and conducted Training on the proper use of Survey tools in Social Research, in Center for Women Development Studies, Patna, Jun. - Jul. 1995.

Research Awards/Scholarships :

Recipient of Institutional Doctoral Fellowship of the Indian Council of Social Science Research (I.C.S.S.R.), New Delhi, India

Draft Report :

Report on "An Enquiry into the Retarded Economic Development of Schedule Caste Women: A Case Study of Musahar Women of Patna, Vaishali and Jehanabad Districts of Bihar", Welfare Ministry, Govt. of India,

Workshop/Seminars attended :

Participated in a Workshop on Social and Environmental Safeguards Management, organized by the World Bank on 7-8 August, 2007 at Safi Landmark Hotel, Shahr-I- Nau, Kabul, Afghanistan.

Page 3: CV-_Dr_S_K_Singh -Nov. 2016

Participated in a workshop on "Socio-economic and Environmental Studies of Project" organized by CDC and ICT, New Delhi on February 26-27, 2004, held at India Habitat Centre, New Delhi.

Participated in a workshop on "Knowledge Forum: Rural Service Innovation Summit" combined organized by the World Bank and FICCI, New Delhi on June 8, 2004, held at FICCI House, New Delhi

National Seminar on "Integrated Development of Rural and Arterial Network for socio-economic growth organized by Indian Roads Congress at Vigyan Bhavan, New Delhi, 5-6 Dec. 2003

National Seminar on "Management of Fast Track Projects with Special reference to Rock Management" organized by Scientific Committee IIBE-DSC and Tandon Consultants Pvt. Ltd., New Delhi, 20-21 Sep. 2002

8th Annual Convention and National Seminar on "Urban Infrastructure Development, Organized by Indian Buildings Congress at Vigyan Bhavan, New Delhi June 14-16, 2002

International Conference on Ecobalance and Life Cycle Assessment in India, organized by Indira Ghandhi Institute of Development Research (IGIDR), Mumbai, 13-16 Feb., 2002

Labor Migration and its consequences for Social Security Policy, conducted by I.H.D., New Delhi, Aug. 13, 1997

Poverty in India, July 8, 1997 Employment Generation in the Ninth Five Year Plan, Mar. 27, 1997 Strategies for Poverty Alleviation in India: Approach in the Ninth Five Year Plan, Nov. 7-8,

1996, organized by I.H.D. Institute of Applied Manpower Research Building, New Delhi

12. EMPLOYMENT RECORD :RELEVANT TO THE ASSIGNMENT

Period Employing organization and your title/position.

Contact infor for references

Country Summary of activities performed relevant to the Assignment

Mar. 2000 –

To date

Intercontinental Consultants and Technocrats Pvt. Ltd. (ICT), New Delhi,

Sr. Resettlement and Social Development Specialist,

&

Vice-president and

Deputy HOD, Department of Env. & Social

India March 2016 - continued (Intermitent), Resettlement Specialist, Consultancy Service of R & BD centered capacity Development for Second Gujarat State Highway Project (GSHP-II) under IDAP-II, Client:, World Bank & Road and Building Department (R& BD), Govt. of GujratThe main objectives of the consultancy services are R&BD centered capacity building, to strengthen its institutional framework and to enhance capacities to meet increasing demand of infrastructure sector for quality, capacity and connectivity arising through the State’s economic and social development.Responsible for comprehensive review and updating of the R&BD works code and manuals on safeguards issues; strengthen R&BD capacity in environment and social safeguards; enhancement of R&BD capacity in project preparation and implementation;, updating R&BD training policy, planning and delivery for its personnel; etc.

India Sept. 2015 – To date (Intermittent), R & R- cum- Social Development Specialist, Consultancy Services for Road Construction Supervision of Rehabilitation and Up gradation of Group C Roads chhattisgarh (Contract Package 16 to 19). Client: Chhattisgarh PWD. Duties included carry out a social assessment, including an assessment of the potential social impacts of large structures, intersection and road improvements; Monitoring and reporting on the implementation of the Resettlement plan in accordance with the ADB's

CV of Dr S K Singh

Page 4: CV-_Dr_S_K_Singh -Nov. 2016

Dr. S. K. Singh

Period Employing organization and your title/position.

Contact infor for references

Country Summary of activities performed relevant to the Assignment

Policy on Involuntary Resettlement; Recommend social mitigating measures and monitoring the implementation of the social mitigating measures. Supervision of the contractor's compliance of HIV / AIDS mitigating measures;

India March 2015- to continued (Internitent), Resettlement Specialist, Consultancy Services for feasibility studies for Diamond quadrilateral network of High speed rail corridors ( HSRC), In 3 (three) packages for Package-3 (New Delhi – Kolkata) Client:, Ministry of Railways, High Speed Rail Corporation of India Limited (HSRC) The main objective of the study under the resettlement aspects essentially require mapping of Project affected households and persons, whether economically affected or requiring relocation/resettlement; identification of means of livelihood of such persons, their income data and requisite R &R strategies; estimation of likely cost of such R & R efforts and time line and listing of barriers and services, the relocation strategy, cost involved in relocation of residents, relocation destinations etc. Responsible for qualitative and quantitative assessment of resettlement and rehabilitation requirement in project affected area, suggesting methods and options. Risks and their mitigation, financial implication and economic impact.

Vietnam March 2015- to date, Resettlement Specialist, Consultancy Services for Construction Supervision for the BEN LUC LONG THANH Expressway project, Vietnam(GMS Ben Luc - Long Thanh Expressway Project Loan No.: 2730-VIE), Project Supervision Consultant (PSC). The starting point of the project expressway is an interchange with the existing HCMC — Trung Luong expressway, the ending point is an interchange with the planned Bien Hoa — Vung Tau expressway and will be operated by VEC. The expressway will be constructed under the Project to be 4 lanes and the Government will expand the width to 8 lanes when the traffic demand exceeds 4 lanes capacity. The 6 interchanges (EC) are planned under the Project, i.e., (i) IC1 with HCMC-Trung Luong expressway; (ii) IC2 with National Road 1A; (iii) IC3 with National Road No.50; (iv) IC4 with Nguyen Van Tao road; (v) IC6 with Phuoc An; (vi) IC7 with National Road No.51. ICS with HCMC . The project is divided into a western section (KmO - Km21,744), a middle section (Km21,744-Km3 2,45 0), and eastern section (Km32,450 - Km57,700). Client: Vietnam Expressway Corporation (VEC) under the Ministry of Transport (MOT), Socialist Republic of Vietnam, JICA and ADB.

Page 5: CV-_Dr_S_K_Singh -Nov. 2016

Period Employing organization and your title/position.

Contact infor for references

Country Summary of activities performed relevant to the Assignment

Responsible for assisting VEC in updating and implementation of the agreed Resettlement Plan and gender strategy; prepare quarterly social and resettlement monitoring reports until the livelihood development and income restoration program is completed, and prepare corrective action plans as required. Will also be responsible for assisting VEC in the design and implementation of an HIV/AIDS and Human Trafficking Prevention Program and prepare quarterly monitoring reports. Under the BLLT Expressway Loan, the works to be completed are: (i) update resettlement plans, (ii) prepare an income restoration program, and (iii) implement the resettlement plan sufficient to allow the commencement of construction activities. The activities related to the implementation of the resettlement plan will continue during the construction phase of the project

Myanmar Nov 2014- till date (Intermittent) Resettlement Specialist, Consultancy Services for DPR for construction of road from Rih to Tedim with two lane carriageway width, Myanmar. Ministry of External Affairs, Client:, Govt. of India and Ministry of Construction (MOC), Govt. of the Republic of Myanmar, Was responsible for preparation of the Social Impact Assessment Report, which identified people affected, beneficially or adversely the key social aspects (such as involuntary resettlement, indigenous people, minorities, gender issues) that need to be addressed under the project. Was also responsible for preparation of detailed Resettlement and Rehabilitation (R&R) Plan conforming to relevant statutory requirements / guidelines of the Government of Myanmar etc.

Kazakhstan Aug. 2013 – 2014, External Monitoring Specialist, Consultancy Services for Project Management Consultant (PMC) , ‘Loan Number 2503 – ADB- Western Europe - Westen China International Transportcorridor Tranche-1 - Taraz - Korda Y Section In Zhambyl Oblast, from Km 214 - Km 260 and from Km 404 - Km 483 & Loan 2562-KAZ: CAREC 1 International Transit Corridor (Western Europe–Western China) Investment Program—Tranche 2 Km 310.5–Km 389.4 (Zhambyl Oblast Section). Client: Ministry of Transport and Communication (MOTC), Republic of Kazaakhstan and ADB.

Responsible for preparation of external monitoring report, which could deliver the up to date and objective reporting on imlementation of the LARPs in compliance with ADB’s Safeguard Policy Statement-2009 (SPS). The job of External Monitoring Specilaist includes the task related to review and verification of internal monitoring reports prepared by the Implementing Agency (include field verification);

CV of Dr S K Singh

Page 6: CV-_Dr_S_K_Singh -Nov. 2016

Dr. S. K. Singh

Period Employing organization and your title/position.

Contact infor for references

Country Summary of activities performed relevant to the Assignment

socio-economic baseline census information of pre-displaced persons and its updating; identification and selection of impact indicators as per available Secondary data supported by Primary Data; assessment of project impact on population after project implementation through sample surveys with affected persons; consultation with APs, government officials, community leaders for preparing review report; and Institutional capacity and responsiveness of the EA, IA and supervision consultants to the TORs; The task also includes the assessment of resettlement efficiency, effectiveness, impact, and sustainability to draw lessons for preparation and implementation of future resettlement planning documents.

India Aug. 2012 – 2014, Resettlement & Rehabilitation Specialist, Consultancy Services for Preparation of Detailed Project Report for Upgradation of Phalodi – Jaisalmer Section of NH-15 in the State of Rajasthan (Length 144 km, 2/4 lane). Client: National Highways Authority of India. Responsible for carrying out Social Impact Screening for the project; Social Impact Assessment including Resettlement and Rehabilitation (R&R) framework; Public Consultation including Consultation with Communities, NGOs, other Stakeholders and Relevant Government Agencies; Preparation of Resettlement Action Plan (RAP); Preparation of Land Acquisition Report; Assist Team Leader in preparation of various reports; and Assist Team Leader in obtaining various clearances from State and Central Government for Land Acquisition and Rehabilitation.

India Dec. 2011 – Apr. 2012, Resettlement & Rehabilitation Specialist, Consultancy Services for Preparation of Detailed Project Report of 2-laning of 300 km of Ladnu (NH-65) – Khaatu – Degana – Merta City –Lambia – Jaitaranraipur – Bheem (NH-8) –Parasoli – Gulabpura (NH-79) [newly declared national highway] in the state of Rajasthan. Client: National Highways Authority of India. Responsible for Social Impact Screening for the project; Social Impact Assessment including Resettlement and Rehabilitation (R&R) framework; Public Consultation including Consultation with Communities, NGOs, other Stake-holders and Relevant Government Agencies; Preparation of Resettlement Action Plan (RAP); Preparation of Land Acquisition Report; and Assist in obtaining various clearances from State and Central Government for Land Acquisition and Rehabilitation.

India Sep. 2011 – To date, R&R-cum-Social Development Expert / External Monitoring Specialist, Construction supervision for Civil works under Bihar State Highways Project-II, Bihar (ADB Project No. IND 41629) Loan No, 2663 IND

Page 7: CV-_Dr_S_K_Singh -Nov. 2016

Period Employing organization and your title/position.

Contact infor for references

Country Summary of activities performed relevant to the Assignment

in the State of Bihar. Client: Bihar State Road Development Corporation Ltd & ADB. The Project basically comprises upgradation and construction of 3 State Highway having a total length of 253.21 km, 2 lane i.e. (i) Sakkadi – Nasariganj, SH-81 (86.80 km); (ii) Mohammadpur – Chhapra, SH-90 (64.71 km); and (iii) Birpur – Udaikishanganj (SH-91) (101.70 km). Responsible for Supervise the contractor's compliance of HIV / AIDS mitigating measures; Carry out a social assessment, including an assessment of the potential social impacts of large structures, intersection and road improvements; Monitoring and reporting on the implementation of the Resettlement plan in accordance with the ADB's Policy on Involuntary Resettlement; Recommend social mitigating measures and monitoring the implementation of the social mitigating measures. Cost of the Project: US $ 170 million.

India Jun. 2011 – to date, Social Development (Gender) Specialist-cum-Internal Monitoring Specilaist, Consultancy Services for supervision of Civil Works for Madhya Pradesh State Road Project - III (MPSRP-III), Package -1, BHOPAL (ADB funded). Client: M.P. Road Development Corporation Ltd. The Project basically comprises upgradation and construction of 9 State Highway Roads in 7 packages having a total length of 675.87 km. The package - wise details are: (i) Bhind-Ater-Porsa (60.85 Km); (ii) Mihona-Lahar-Daboh-Bhander-Chirgaon (85.70 Km); (iii) Pichhore-Chanderi-Mungawali- Onder-Kurwai (SH-19) (146.50 Km); (iv) Manwar-Mangod (Bandheri) (49.63 Km); (v) Sardarpur-Rajgarh-Bagh (50.43 Km); (vi) Agar-Barod-Alot-Jawra (108.70 Km); (vii) Pachor-Chhapikheda-Jirapur-Machalpur-Soyat (86.70 Km); (viii) Badi-Baktara-Dobi-Shahganj-Budhni (58.78 Km) and (ix) Silwani-Udayapura (28.58 Km).; Activities performed: Carry out a reconnaissance survey along with other team members and help with identifying appropriate roadside amenities; Assist the TL in preparation of Design Review Report; Assist in preparation of Quality Assurance and Construction Supervision Manual; Responsible to Supervise the contractor’s compliance of HIV / AIDS mitigating measures and other safeguard compliance, preparation of Project performance Monitoring Report on the basis of collected data from the field, compliance of project requirements and prepare baseline data for future monitoring project implementation. Besides, preparing the baseline survey report also collected relevant information from several Experts from different domains in finalizing the PPMS Report. The following technical information related with actual Physical and Financial progress of the project as against the planned one was collected, to assess

CV of Dr S K Singh

Page 8: CV-_Dr_S_K_Singh -Nov. 2016

Dr. S. K. Singh

Period Employing organization and your title/position.

Contact infor for references

Country Summary of activities performed relevant to the Assignment

the performance of the project. Project Cost: US$ 166.6 million

Mongolia 2011 – 2012, Project Performance Monitoring Specialist (PPMS), Consultancy Services for Supervision of Civil Works for the Construction of Choir – Sainshand – Zamiin Uud Section (467.615 km). Client: ADB & Department of Road (Govt. of Mongolia). Responsible for preparation of Project performance Monitoring Report on the basis of collected data from the field, compliance of project requirements and prepare baseline data for future monitoring project implementation. Besides, preparing the baseline survey report also collected relevant information from several Experts from different domains in finalizing the PPMS Report. The following technical information related with actual Physical and Financial progress of the project as against the planned one was collected, to assess the performance of the project.

The following information/data was collected and compiled in the process to prepare the PPMS report;

Baseline socio-economic, traffic and road safety data from the project road and of the project influence Area

Project cost and financial sources- Original and updated cost.

Projected and Actual Disbursement as against progress of the work

Implementation arrangement of the project- Contractors/ Supervision Consultant/ DOR/ Project Steering Committee constituted by the client etc.

Status on Environmental and Social Monitoring Performance Report, submitted by the Contractor

Technical Assistance to the concerned officials, associated with implementation of the project, it includes the in-house/ on site and overseas training details etc.

Any other information, which was beneficial to show the performance of the project

Cambodia 2010 - 2011, Socio-economic Expert, Consulting Services for the Feasibility Study of the Stung Sen River Basin Multi-Purpose Water Resources Development Project in Cambodia, Client: The Royal Government of Cambodia and & Kuwait Fund for Arab Economic Development (KFAED) The Royal Government of Cambodia, Was responsible for preparation of the Social Impact Assessment Report, which identified people affected, beneficially or adversely the key social aspects (such as involuntary resettlement, indigenous people, minorities, gender issues) that

Page 9: CV-_Dr_S_K_Singh -Nov. 2016

Period Employing organization and your title/position.

Contact infor for references

Country Summary of activities performed relevant to the Assignment

need to be addressed under the project. Was also responsible for preparation of detailed social management plan (SMP) including Resettlement and Rehabilitation (R&R) Plan conforming to relevant statutory requirements / guidelines of the Government of Cambodia etc.

Tanzania 2010 – 2012, Team Leader-cum- Socio-economic Expert, Consultancy for completing the Resettlement Action Plan (RAP), and Preparation of Tender Documents for Pemba Rural Roads (35 KM) to Bitumen Standard in Tanzania (MCC funded). Client: Government of United Republic of Tanzania (GoT). Besides others, was responsible for preparation and implementation of Resettlement Action Plan. Monitoring of implementation of Resettlement Plan as per implementation schedule. It has been done in close consultation with the client, The MCC (Funding Agency) and in accordance with the existing laws and guidelines

Ethiopia Jun. 2009 – Sep. 2010, Environmental / Social Specialist, Detailed Engineering Design Review of Yalo-Abala Road Construction Project, Contract 1, Yalo Nehile, Phase-1, Ethiopia (IDA funded). Client: Ethiopian Roads Authority, Addis Ababa, Ethiopia. He is responsible for carrying out a reconnaissance survey along with other team members; Collection and review of relevant documents and policies for resettlement action plan; Collection of social field data; Review social impact assessment and mitigation and monitoring plan; Review land Acquisition problems; Finalization and land acquisition requirements. Review and get familiar with Environmental Polices and Procedure manual of Government and EIA Reports and ensure proper implementation of the Project; Obtain and submit Contractors Environmental Protection Plans to ERA; Monitor all necessary environmental protection requirements during implementation; Review ERA’s HIV/AIDS Policy and Strategy and assist Resident Engineer in monitoring Contractor’s alleviation programme for site staff and labour in respect of Sexually Transmitted Diseases (STD) including HIV/AIDS; Review Resettlement Framework paper and Resettlement Action Plan, Government policies/regulations/laws of resettlement and assist Resident Engineer in ensuring their implementation; Preparation of checklist for items to be monitored for environmental and social impacts by Resident Engineer and Assistant Resident Engineer.

India Feb. 2009 – Dec. 2010, Social Development and Gender Specialist, Construction supervision for four Laning of Jhansi – Lakhnadon Section from km 255 to km 405.7 (150.70 km) of NH-26 in the

CV of Dr S K Singh

Page 10: CV-_Dr_S_K_Singh -Nov. 2016

Dr. S. K. Singh

Period Employing organization and your title/position.

Contact infor for references

Country Summary of activities performed relevant to the Assignment

state of Madhya Pradesh - National Highway Sector-II Project-North South Corridor - Civil Works Package Nos. (ADB-II/C-7, ADB-II/C-8, ADB-II/C-9). Client: National Highways Authority of India & ADB. Rehabilitation and upgrading of existing 2-lane carriageway to 4-lane carriageway with provision of bridges, service roads, bypasses, grade separator, intersections, ROBs, underpasses, protective works, drainage, safety features, toll plazas and maintenance works. The consultant will act as the “Engineer” for the construction contracts. Responsible for Assist the TL in preparation of Design Review Report; Assist in preparation of Quality Assurance and Construction Supervision Manual; Review all documents, data and policies concerning resettlement; Identify Stakeholders; Organization and facilitation of multi-stakeholder participatory processes; Assess data / information requirements; Identify data / information gaps; Advise on preparation of formats for preparation monitoring and evaluation; Identification of current economic and social management issues; Provide training to enumerators and other field staff concerned for carrying out surveys for collection of data; Study in existing cottage industries and measures to create employment, increase production and marketing facilities; Develop the output indicators to monitor the progress in implementation ; Prepare monitoring indicators for change in percentage of BPL families; Prepare monitoring indicators for average rural household income; Prepare monitoring indicators for employment generations; Undertaken data collection and correlation on PPMS based upon environmental and social impact indicators and socio economic indicators, social and poverty reduction impact indicators; Monitoring implementation of R&R Plan as per ADB guidelines; Monitor alleviation measures on HIV / AIDS as per schedule; Assist in preparation of various reports. Cost of the project: US$ 131.54 million.

India Feb. 2009 – Apr. 2011, Social Development (Gender) Specialist, Supervision of Civil Works for Madhya Pradesh State Road Sector Project-II (Package-1, Bhopal) (ADB funded). Client: Madhya Pradesh Road Development Corporation Limited. To provide proper management of civil works contracts as ‘Engineer’ in terms of civil works contracts; (ii) to carry out construction supervision of the Project as per the requirement of the ToR. Responsible for Assist the TL in preparation of Design Review Report; Assist in preparation of Quality Assurance and Construction Supervision Manual; Identification of current economic and social management issues; Organization and facilitation of multi-stakeholder

Page 11: CV-_Dr_S_K_Singh -Nov. 2016

Period Employing organization and your title/position.

Contact infor for references

Country Summary of activities performed relevant to the Assignment

participatory processes; Implementation of R&R Plan as per ADB guidelines and carrying out Socio-economic Monitoring and Evaluation (SEM&E) and field testing of operational methodology designed for the project; Socio-economic monitoring of the project benefits, carrying out base line survey at the initial stage of the project, before the implementation of the project; Undertaken data collection and correlation on PPMS based upon environmental and social impact indicators and socio economic indicators, social and poverty reduction impact indicators; Implementation of plan to improve connectivity of the project which provide better access to health facilities, and better access to pre-natal and post-natal health care of women; Supervision of implementation of HIV /AIDS awareness Plan as a part of components of the project which is implemented by Executing Agency with the help of NGOs; Supervsion of implemation of preventive measures during construction so that HIV / AIDS among truckers and in turn in the community and labour force is not allowed to spread, especially near construction camps as there may be a risk of HIV/ AIDS and other communicable diseases; Monitoring of construction activities at different locations and ensure that Child labour is not involved in construction activities. Estimated cost of the project: US$ 198.5 million

Afghanistan Jan 2009 - 2010, Socio-economic Monitoriing Expert (SEME), Consulting Services for the Initial Implementation Phase of Northern Economic Infrastructure Development Programme (KfW funded), Client: Ministry of Public Works (MoPW), Afghanistan, Was responsible for carrying out Socio-economic Monitoring and Evaluation (SEM&E) and field testing of operational methodology, especially designed for socio-economic monitoring and evaluation of the project. As the first step of the socio-economic monitoring of the development programme, base line survey at the initial stage of the programme was carried out, before the implementation of the project, which in turn is used as a reference (at a given point of time) against which the effects of a programme on completion could be compared for its impact assessment. It is designed to cover the goals and objectives of the programme, the impact of which is to be assessed.

India Dec. 2008 – Jun. 2012, Resettlement and Rehabilitation-cum-Social Development Expert/ External Monitoring Specilaist, Supervision of Civil Works for Bihar State Highway Project (Package-1 - North Bihar) (ADB Funded). Client: Road Construction Department. The Project basically comprises widening the existing carriageway to two lane carriageway width with

CV of Dr S K Singh

Page 12: CV-_Dr_S_K_Singh -Nov. 2016

Dr. S. K. Singh

Period Employing organization and your title/position.

Contact infor for references

Country Summary of activities performed relevant to the Assignment

earthen shoulders on either side, strengthening / reconstruction of the existing pavement, rehabilitation and widening of the existing bridges, construction of new bridges, rehabilitation of the existing culverts and construction of new culverts, construction of bus stops, truck parking areas, improvement of road junctions, etc. of 5 State Highway Roads in 5 Packages i.e. : (i) Siwan-Shitalpur (ii) Hajipur-Areraj (iii) Darbhanga-Madhwapur (iv) Araria-Bhaptiyahi; and (v) Kursela-Farbesgunj having a total length of 446 km. Responsible for Assist the TL in preparation of Design Review Report; Assist in preparation of Quality Assurance and Construction Supervision Manual; Identification of current economic and social management issues; Implementation of R&R Plan as per ADB guidelines and carrying out Socio-economic Monitoring and Evaluation (SEM&E) and field testing of operational methodology designed for the project; Socio-economic monitoring of the project benefits, carrying out base line survey at the initial stage of the project, before the implementation of the project; Undertaken data collection and correlation on PPMS based upon environmental and social impact indicators and socio economic indicators, social and poverty reduction impact indicators; Implementation of plan to improve connectivity of the project which provide better access to health facilities, and better access to pre-natal and post-natal health care of women; Supervision of implementation of HIV /AIDS awareness Plan as a part of components of the project which is implemented by Executing Agency with the help of NGOs; Supervsion of implemation of preventive measures during construction so that HIV / AIDS among truckers and in turn in the community and labour force is not allowed to spread, especially near construction camps as there may be a risk of HIV/ AIDS and other communicable diseases; Monitoring of construction activities at different locations and ensure that Child labour is not involved in construction activities. Cost of the project: US$ 236.98 million.

India Sep. 2007 – Jun. 2009, Environmental / Social Specialist, Responsible for carrying out Environmental Studies / Social Impact Screening for the project; Environment / Social Impact Assessment including Resettlement and Rehabilitation (R&R) framework, Gender Assessment ; Public Consultation including Consultation with Communities, NGOs, other Stake-holders and Relevant Government Agencies; Preparation of Environmental Management Plan / Resettlement Action Plan (RAP); Develop HIV / AIDS Awareness and Prevention Programme, Preparation of Land Acquisition Report; Assist

Page 13: CV-_Dr_S_K_Singh -Nov. 2016

Period Employing organization and your title/position.

Contact infor for references

Country Summary of activities performed relevant to the Assignment

Team Leader in preparation of various reports; and Assist Team Leader in obtaining various clearances from State and Central Government for Land Acquisition and Rehabilitation

Preparation of Feasibility-cum-Preliminary Design for 4 / 6 Laning of Patna - Gaya - Dobhi section of NH-83 (Length 127.130 km) in Bihar to be executed as BOT (Toll) Project on DBFO Pattern. Client: National Highways Authority of India. Project Cost: US $ 238.46 million

Preparation of Feasibility-cum-Preliminary Design Report for Rehabilitation and Upgrading of existing 2-lane road to 4/6 laning of Beawar - Pali - Pindwara Section of NH-14 (length 246 km) to be executed on Design, Built, Finance and Operate (DBFO) Pattern in the State of Rajasthan. Client: National Highways Authority of India. India. Estimated cost of the project: US $ 657.52 million

Afghanistan Jun. 2007 – Aug. 2007, Land Acquisition and Resettlement Specialist, Preparing the road rehabilitation and Capacity Building Cluster, Ministry of Public Works (MPW) Component (TA - 4828 - AFG), Afghanistan. Client: Asian Development Bank. Responsible for reviewing the existing skills in MPW for social and resettlement; Develop a handbook on land acquisition and resettlement for road sector projects in compliance with ADB's policy; Review constitutional provisions, the existing national legal framework, and Government orders to identify the gaps between the ADB and Government policy and recommend measures to bridge them; Review ongoing road projects to understand probable socioeconomic impacts on affected people, displacement and gender impacts, from land acquisition and resettlement, define the impact categories, eligibility, and recommended mitigation measures; Develop HIV / AIDS Awareness and Prevention Programme, Review the country's land acquisition process, land records system, fund-flow system, and implementation constraints and suggest methodology for resettlement planning and its implementation; Prepare sample questionnaires for the census and socioeconomic survey, consultation checklists, and recording formats for different stakeholders and resettlement monitoring and evaluation formats; Conduct classroom and field-based training workshops for MPW, the Ministry of Land Assets and Agriculture, and other relevant departments; Prepare a plan for local training for social & resettlement; Prepare training Modules; Provide training to officials who will be involved in project implementation.

CV of Dr S K Singh

Page 14: CV-_Dr_S_K_Singh -Nov. 2016

Dr. S. K. Singh

Period Employing organization and your title/position.

Contact infor for references

Country Summary of activities performed relevant to the Assignment

Afghanistan May 2007 – Jun. 2007, Social Expert, Preliminary Design, Detailed Engineering Design, Tender Assistance and Construction Supervision for Improvement and Construction of the Major Roads of Kabul City, (Total length 80 km), Afghanistan. Client: Kabul Municipality and Abu Dhabi Fund. Was responsible for conducting socio-economic surveys of the project influence area, carrying out Social Impact Assessment (SIA) and preparation of Social Impact Assessment report for 7 identified Kabul city Roads project, which was part of the Kabul Master Plan-1978. Estimates cost of the project: US $ 66 million

Mongolia Aug. 2006 – Feb. 2011( Intermitent), Environmental / Social Specialist, Design review, Construction Supervision of the Choir-Sainshand-Zamiin-Uud Road lying in Govisumber and Dornogovi aimags, Mongolia, Client : Ts. BAT-ENKH, State Secretary, Ministry of Roads, Transport & Tourism, Govt. Building, Mongolia, & ADB funded. Responsible for carrying out a reconnaissance survey along with other team members; Collection and review of relevant documents and policies for resettlement action plan; Collection of social field data; Review social impact assessment and mitigation and monitoring plan; Review and get familiar with Environmental Polices and Procedure manual of Government and EIA Reports and ensure proper implementation of the Project; Obtain and submit Contractors Environmental Protection Plans; Monitor all necessary environmental protection requirements during implementation; Review HIV/AIDS Policy and Strategy, Review Resettlement Framework paper and Resettlement Action Plan, Government policies/ regulations /laws of resettlement and assist Team Leader / Deputy Team Leader in ensuring their implementation.

Bangladesh 2006 - 2008, Poverty Impact Specialist, Consultancy Sewrvices for feasibility study and conceptual Design for an independent 4-Laned Access Controlled Highway parallel to the existing Highway with maximum utilization of the ROW of the existing Dhaka- Chittagong Highway ([ADB Loan No. 1789-BAN (SF)], Client: Road and Highway Department (RHD), Govt. of Bangladesh and ADB. Was responsible for Poverty impact study for this project, which was a part of separately financed ADB TA. As Poverty Impact Specialist, on behalf of the consultant, liaised and worked in close coordination with these TAs for the safeguard compliance and incorporate their recommendations in the Feasibility Study Report of the Project. Estimated cost of the project : US $ 160.200 million

Tanzania Aug. 2005 – Jun. 2006, Environmental / Social Specialist, Consultancy Services for Social and

Page 15: CV-_Dr_S_K_Singh -Nov. 2016

Period Employing organization and your title/position.

Contact infor for references

Country Summary of activities performed relevant to the Assignment

Environmental Impact Assessment, Detailed Engineering Design and Preparation of Tender Documents for Bwanga - Biharamulo Upgrading Project (length 69 km), Tanzania. Client: Tanzania National Roads Agency (TANROADS). His responsibilities include collection and review of documents and policies for Environment / Social Studies; Carry out environmental screening and scoping, Determination of potential impacts on environment; Public Consultations; Assistance to inter-agency coordination and Public / NGO participation; Carry out a Environment / Social Impact Assessment; Develop HIV / AIDS Awareness and Prevention Programme; Preparation of Detailed Mitigation Measures / Plans and cost estimates; Preparation of Environmental Management Plan and Detailed Resettlement Action Plan (RAP); Develop Measures to Prevent Road Reserves Encroachment. Estimated cost of the Project : US $ 59 million

India Apr. 2004 – Jun. 2005, Environmental / Social Specialist, Responsible for carrying out Environmental Studies / Social Impact Screening for the Project; Environment / Social Impact Assessment including Resettlement and Rehabilitation (R&R) framework; Public Consultation including Consultation with Communities, NGOs, other Stakeholders and Relevant Government Agencies; Preparation of Environmental Management Plan / Resettlement Action Plan (RAP); Develop HIV / AIDS Awareness and Prevention Programme, Preparation of Land Acquisition Report; Assist Team Leader in preparation of various reports; and Assist Team Leader in obtaining various clearances from State and Central Government for Land Acquisition and Rehabilitation.

Feasibility study and Detailed Project Report including detailed engineering report for 4/6 laning of NH-12 from Jabalpur-Jn of NH-12 & NH-26 (Non-NHDP) to Rajmarg crossing of NH-12 (length 102 km) in the State of Madhya Pradesh. Client: National Highways Authority of India. Cost of the Project: 5178.63 million

Feasibility study and detailed project preparation including detailed engineering report for 4 laning of Dholpur - Morena Section including Chambal Bridge from km 51 to km 61 of NS corridor on NH-3 in the states of Rajasthan and Madhya Pradesh. Client: National Highways Authority of India. Estimated cost of the Project: US $ 113.82 million.

CV of Dr S K Singh

Page 16: CV-_Dr_S_K_Singh -Nov. 2016

Dr. S. K. Singh

Period Employing organization and your title/position.

Contact infor for references

Country Summary of activities performed relevant to the Assignment

Tanzania May 2004 –Dec. 2007, Environmental / Social Specialist, Design review and supervision of construction works for upgrading of Kagoma – Lusahunga Road (African Development Bank Funded). Tanzania. Client : The United Republic of Tanzania, Tanzania National Roads Agency (TANROADS). His duties included review of Policies, Legal and administrative frame work and relevant environmental details of the Report of the project road; Collection and review of relevant documents and policies for resettlement action plan; Carryout a reconnaissance survey along with other team members and collection of social field data; Collection and confirmation of environmental field data; Review environmental impact assessment, mitigation measures and adequacy of Environmental Management Plan (EMP);Review social impact assessment and adequacy HIV/AIDS mitigation measures; Review and finalize land Acquisition requirements and Resettlement Plan. Cost of the Project : US $ 59 million

India& Malaysia

Jun. 2003 – Jul. 2003, Environmental Health & Safety Assessor, Proposal for Environment, Health and Safety (EHS) Due Diligence Assessment-Hindustan Petroleum Corporation Limited (HPCL) in India. As in association with the EHS Experts from Malaysia, was responsible for assessment of organizational structure and responsibilities regarding EHS issues, EHS studies and audits done for the assets, labour accident statistics, Employee health care monitoring, degree of conformity with the recommendations of local authorities/ legislation, safety programme and safety performance figures/ metrics etc. for the Project. Client: HPCL, India and ENSR Environmental International, Malaysia.

India Jun. 2002 – Mar. 2004, Environmental / Social Expert, Responsible for Environment / Social Impact Assessment Study and Resettlement Action Plan for the Project. Assessment of impacts due to migration; development of appropriate plan for their rehabilitation; awareness generation regarding their rights and AIDS related issues; developing strategies for intervention through institutional development; preparation of draft report; final report with recommendations for Govt. Agencies; recommendations for awareness training and alternative employment arrangement, etc.

Feasibility study and DPR for rehabilitation and upgrading to 4/6 lane divided carriageway configuration of Chittorgarh to Kota Section (km 222 to km 397) of NH-76 in Rajasthan (ADB funded). Client:National Highways Authority of India. Estimated cost of the Project: US $ 260.25

Page 17: CV-_Dr_S_K_Singh -Nov. 2016

Period Employing organization and your title/position.

Contact infor for references

Country Summary of activities performed relevant to the Assignment

million

Feasibility study and detailed project report including detailed engineering report for four laning and strengthening of West Bengal Border to Gairkatta Section (km 145 to km 255) of NH-31C in West Bengal. Client: National Highways Authority of India. Cost of the Project: US $ 157.89 million

Feasibility study and preparation of detailed project report including detailed engineering report for improvement, rehabilitation, strengthening and widening of Gobindpur - Jamtara - Dumka - Barhat - Sahebganj Ghat Road (330 km) in Jharkhand. Client: PWD, Govt. of Jharkhand. Estimated Cost of Project: US $ 90.52 million

India Oct. 2000 - Feb. 2002, Environmental / Social Expert, Development of adequate road connectivity to Cochin Port in Kerala for the detailed project preparation including detailed engineering report for widening to four lane of NH-47 in km 348.382 to km 358.300 and strengthening of the existing pavement of NH-47; NH-47 A from km 0.00 to km 5.90 and a four lane 15.3 km new road. Client: National Highways Authority of India. His responsibilities included Coordination of reconnaissance level environmental and social impact surveys; Design and coordination of baseline environment, socio-economic survey and census survey of the project affected persons through participatory rural appraisal techniques; Analysis of survey data, environmental and social impact screenings; Developing strip maps, land plans and land schedules for the acquisition of privately owned lands; Organizing consultations and workshops with the stakeholders; carrying out Environmental and Social Impact Assessment, Preparation of resettlement and rehabilitation policy framework and Environment Management Plan and Resettlement Action Plan (RAP); Organized training programmes; Deliverable reports included Environmental and Social Impact Assessment (SIA) reports, Resettlement and Rehabilitation Policy Framework, Resettlement Action Plan (RAP), which gave special attention to the poverty analysis and employment opportunities to the project affected persons. Cost of the Project: US $ 77 million

India Mar. 2000 – Jun. 2001 , Sociologist, Carried out socio-economic analysis, Social Impact Studies and preparation of Rehabilitation and Resettlement Plan.

Preparation of detailed project report including detailed engineering report for 4

CV of Dr S K Singh

Page 18: CV-_Dr_S_K_Singh -Nov. 2016

Dr. S. K. Singh

Period Employing organization and your title/position.

Contact infor for references

Country Summary of activities performed relevant to the Assignment

laning of Chingelpet - Tindivanam Section of NH-45 in Tamil Nadu on BOT basis and preparation of technical schedules”. Client: National Highways Authority of India. Estimated cost of the Project: US $ 90 million

Preparation of Detailed Project Report along with Cost Estimates and Bidding Documents for Four laning & Strengthening of the Existing 2 lane of Jalandhar-Amritsar Section of NH-1 from km 387.100 to km 456.100 (69 km) (package I) –Second National Highway Project (World Bank funded). Client: Ministry of Road Transport and Highways (Roads Wing). Cost of the Project: US $ 104 million

Jan. 1998 -

Feb. 2000

Institute for Human Development, NIDM Building, IIPA CampusNew Delhi Consultant (Social)Tel: + 91 11 2335 8166/ 2332 1610Fax No.: +91 11 2376 5410E-mail: [email protected]; [email protected]

India Jan. 1998 - Feb. 2000, Consultant (Social), Promoted research in the area of labour, employment, poverty, health including AIDS related issues & adequacy HIV/AIDS mitigation measures, infrastructure, community development, people's participation and other aspect of human development, which was largely an evaluation study in nature. Dynamic of Poverty and Employment in Rural Bihar (a project by Action Aid). Studying the existing problems of poverty and employment in rural Bihar. The status of women in job market, discrimination in wages, sexual exploitation of women worker, the contribution of women in economic market etc. Developed an action plan for reduction of poverty and employment generation particularly for women folk etc. Assessment of impacts due to migration; development of appropriate plan for their rehabilitation; awareness generation regarding their rights and AIDS related issues including adequacy HIV/AIDS mitigation measures; developing strategies for intervention through institutional development.

Nov. 1996 -

Dec. 1997

B.T.C. (Pvt.) Ltd., New Delhi.

Manager (Research and Development)

India Nov. 1996 - Dec. 1997, Manager (Research and Development), Carried out MIS activities, co-ordination and training of survey team for development of the company.

Feb. 1993 -

Oct. 1996

Center for Women Development Studies, Patna.

Social Science Research Expert / Training Instructor

India Feb. 1993 - Oct. 1996, Social Science Research Expert / Training Instructor, The important project undertaken include an Enquiry into the Retarded Economic Development of Schedule Caste Women: A Case Study of Musahar Women of Patna, Vaishali and Jehanabad Districts of Bihar”.

May 1985 -

Feb . 1993

A.N. Sinha Institute of Social Studies, Patna, India. Research Investigator and Senior Research

India May 1985 - Feb . 1993, Research Investigator and Senior Research Officer, (i) Bihar Rural Roads Project (World Bank funded), (ii) Tradition, beliefs and work practices of rural affecting qualities of their Environment in Bihar State, (iii)

Page 19: CV-_Dr_S_K_Singh -Nov. 2016

Period Employing organization and your title/position.

Contact infor for references

Country Summary of activities performed relevant to the Assignment

Officer/ Doctoral FellowContact Information : Tel: +91-612-221395, 223320, 665482Fax No.: +91-612-226226Web:www.ansiss.res.in

Development perspective of Tribals – Study of Tribal Beneficiaries under Family Oriented Programmes in Bihar, (iv) ‘Research Project on New Communication Technologies’ - A Sociological Study in Bihar and Uttar Pradesh, and (v) Evaluation of Non-Formal Education in Bihar – A project of Directorate, AE & NFE, Government of Bihar.

Jan. 1985 -

Feb. 1985

Transport and Road Research Laboratory Department of Environment, Department of Transport, Old Wokingham Road Crowthrone, Berkshire, UK and Transportation Engineering Section, Dept. of Civil Engineering, B.C.E., Patna.

Survey Assistant / Research Investigator Tel: +91-612-2371715FaxNo.: +91-612-2670631Web: www.nitp.ac.in

UK and India

Jan. 1985 - Feb. 1985, Survey Assistant / Research Investigator, transport and Road Research Laboratory Department of Environment, Department of Transport, Old Wokingham Road Crowthrone, Berkshire, UK and Transportation Engineering Section, Dept. of Civil Engineering, B.C.E., Patna.

CERTIFICATION :

I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes myself, my qualifications, and my experience, and I am available to undertake the assignment in case of an award. I understand that any misstatement or misrepresentation described herein may lead to my disqualification or dismissal by the Client, and/or sanctions by the Bank.

Dr S K Singh

CV of Dr S K Singh