cv swp

9

Click here to load reader

Upload: calin-campianu

Post on 23-Jan-2018

394 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: cv swp

CALIN CAMPIANU 28 Rose Street,Swindon,Wiltshire, 28 Rose St, Swindon SN2 2HH

0750 715 4378

[email protected]

Position applied for:

LAND SURVEYOR/SETTING OUT ENGINEER

Summary

I'm an experienced Land Surveyor/Setting Out Engineer (BTEC Level 4/SQA Higher National Certificate

standard issued by NARIC) and carried out civil engineering surveys, measured building surveys and

setting out motorways, highways, sewage systems, airport expansion and tramway lines. I have many

years of experience dealing with Land Surveying and I am looking to utilize these skills in a public or

private sector operation. As a Land Surveyor I was an operational team-leader on the field and

construction sites (4-7 people).

Skills

Construction Skills Certificate Scheme (CSCS) -white card (Health, Safety and Environment for Managers

and Professionals)

Knowledge of working with theodolites, optical andand electronic level machines;

Very good knowledge of working in AutoCAD Civil, TopoLT

Advance knowledge of working with total stations (Leica TS 06/TCRP 1205,TS16 ,Trimble, Nikon, Sokkia);

Work History

Setting Out Engineer

Swindon,Highworth 31Oct2016-present

Setting out Wastewater Treatement Plant

Page 2: cv swp

Thames Water is building the first-full scale Nereda plant in the UK at its Highworth Wastewater

Treatment Works in Highworth, Swindon. The new plant serves a population of approximately 9,000

customers and will replace the existing life-expired plant.

Setting Out Engineer

Bath,UK 31 May2016-21 Oct 2016

Britannia Construction Ltd.(Freelancer)

http://www.mulberryparkbath.co.uk/

Bentchmarks,Earthworks,Drainage,Services,Roads&Kerbs,Materials supply calculation,As Builds

Autocad,Leica Robotic 12,level machines

Setting Out Engineer

John Reddington Ltd

Newbury, UK Nov 2015 - Apr 2016

(Newbury Racecourse 78m Project, construction of 10 concrete framed apartment blocks overlooking

the racecourse)

Setting out RC Frames for foundation, pile caps, pre-casts, walls, slabs, drainage, concrete level control,

excavation, as-builds using blue prints, AutoCAD, Leica TS06 and 16 total station, level machines

Setting Out Engineer Mar 2013 - Feb 2015

Mr. Bede Zoltan Francisc

Cluj-Napoca, Romania

Collaboration Agreement with Mr. Bede Zoltan Francisc, authorised expert surveyor for cadastral

measurements.

Performing legal boundary surveys

Page 3: cv swp

Producing and maintaining the land tenure records: the survey field notes and plats

Topographical Land Surveyor Nov 2011 - Mar 2013

Swietelsky & Indyss Cluj-Napoca, Romania

Project for tramway lines rehabilitation in the Cluj-city.

Main duties:

AutoCAD

benchmark network;

checking project drawings checking;

digging level control;

gravel and sand level control before and after compacting;

stake out protection walls;

poured concrete level;

stake-out tramway lines axis;

setting tramway lines in place and levelling level;

asphalt level control;

stake-out electric network;

stake-out tramway stations;

volume calculation;

drainage stake-out and pipes ‘control on level.

Topographical Land Surveyor Aug 2010 - Nov 2011

Astaldi Spa Hunedoara, Romania

Main duties:

Page 4: cv swp

property limits, retaining walls, earthworks, road axis, asphalt elevation, storm manhole s and sewage

pipes, quantities,calculation, junior staff training

Topographical Land Surveyor May 2010 - Jul 2010

SC TIM SA Cluj-Napoca, Romania

Modernization of water/wastewater infrastructure agglomerations of Cluj county.

Main duties:

benchmark network, earthworks, topographical surveying, manholes and pipes setting and levelling

Topographical Land Surveyor Nov 2007 - Mar 2010

Astaldi Spa Cluj-Napoca, Romania

Cluj city Airport expansion: Terminal ‘'Arrivals’’, Terminal ‘'Departures’’, Linking Building, parking,

handling road, sewage system, platforms between terminals and ‘'taxi'' road.

Duties:

AutoCAD

local benchmark network

buildings' axis

excavation level checking

ground concrete level

metal structure setting out and levels(metal pilots basement and boullons in the R-bar structure, metal

pilots vertical

control, metal slabs)

flours and ceiling level control

setting out all inside compartments, rooms, desks, check-in points, luggage transportation bands,

windows, stairs ,lifts

building external walls control ("Alucobond" sheets)

Page 5: cv swp

sewage system setting-out and levelling (manholes, pipes)

outer platforms and handling road-setting out and levelling parking setting –out and asphalt level

control)

Topographical Land Surveyor Apr 2005 - Aug 2007

Bechtel International Inc. Cluj-Napoca, Romania

"Autostrada Transilvania''(‘'Romanian Motorway''), The four-lane Autostrada Transylvania will be the

largest motorway in

Europe. It will extend 258 miles from Brasov in central Romania to Oradea on the country's border with

Hungary. The whole

project will cost about $2.2bn (estimation in 2004).

-Involved in an operational team of 7 people, as land surveying team-leader in expropriations,

earthworks, structures, drainage

and paving for section 2B, a four-lane motorway, €330.4m, inaugurated in December 2009.

PROJECT LIMITS AND GEOMETRY

setting-out boundaries and expropriation limits using GPS and total stations Leica and Trimble;

setting out road axis and offsets;

setting out local benchmark network using total stations, optical and electronic level machines;

relocation of the local roads.

EARTHWORK

AutoCAD

control the mass excavations and filling areas;

topographical-surveying the waste areas an borrowing areas;

setting-out and levelling big slopes.

STRUCTURES

Page 6: cv swp

setting-out and level control the execution of small structures (culverts);

setting out the big structures, especially bridges axis ;

level control of the structural excavation;

setting-out the pilots and control the drilling levels;

R-bars control on level for the cast-in–place pilots;

setting-out and level control of all elevation elements of the bridges (pile head breaking, foundation

works, abutment walls,

pier elevation, pier head and deck slab).

DRAINAGE & SEWEGE

setting out alignments and manholes;

excavation level control;

level control of concrete for drainage;

control level of pipes for sewage;

setting out detention ponds.

PAVING

level control of the base-ground, gravel and sand layers;

setting-out the level for bitumen and asphalt layers;

checking the final asphalt level;

OTHER ACTIVITIES

junior staff training;

setting out elements of the asphalt plant.

Topographical Land Surveyor Feb 1984 - May 1990

I.C.S.H - Civil and Industrial ConstructionHunedoara, Romania

Page 7: cv swp

Mayorship projects (blocks of flats, streets, sewage systems) and Industrial Constructions for the C.S.H

(Hunedoara Steel

Plant).

Main duties:

earthworks, road axis ,civil and industrial topographical surveying using classical i nstruments

(theodolites, level

machines), projects drawings.

working with classical Theodolites

perform manual mathematical and topographical calculation upon orientation in gradients(centesimal

grades),distances,

using analytical coordinates, geometrical elements calculation for curves and setting stations by

intersection, using algorithms(Pothenot)

Education

Higher National Certificate: Topographer - Constructions 2008

“Anghel Saligny” Technical College - Cluj-Napoca, Romania

References(contact data available upon request)

1)"Calin Cimpianu has been employed under my supervision for the past 6 months. During that time he

has shown to be extremely

courteous and pleasant to work with. His time keeping was very good, rarely missing any time unless he

had notified us well in

advance. He formed part of a 2 engineer team which had total control over the groundworks on my site.

He was involved in all

aspects of substructure work and had dealings with superstructure elements as well. His main roles

included setting out of

foundation and drainage positions, setting of invert levels and setting of dig levels throughout the site.

All of these roles he

performed well in." - Ross McQuade, Senior Engineer, JRL Group

Page 8: cv swp

2)Dear Sir/Madam,

‘’I can reference for Calin Cimpianu that he has been working as a Civil Engineer for Britannia

Construction on our Mulberry Park new development site in Bath.

Although we have employed him through Carmichael for the past 6 months, he has been solely working

on the same site for us.

The second phase of works, Approx £2m is programmed to begin in October, which will lead well into

next summer. We our pleased with Calin's work, so will be continuing his employment and there is every

possibility that once phase 2 is complete, Calin can also move onto the next project with us.’’

Peter Hodgson-Senior Engineer at

Britannia Construction Ltd

Britannia House

Staverton Technology Park

Cheltenham

Gloucestershire

GL51 6TQ

Company Number : 1164013 Registered in England & Wales

3) Dear Sir,

I worked with Calin Campianu in Cluj-Napoca Romania in the highway project(‘’Transilvania Motorway’’).

I was survey superindentent in the structure group, Calin was responsible

survey engineer of big structures and piling works in that project. We worked together two years.

Piling and structure works were continuous two shifts. Calin worked in the both of shifts. Calin

was always an engineer we trust. Because he knew his responsibilities. In that

project had been successful as a group. You can certainly trust to Calin in the

Page 9: cv swp

similar jobs. I would recommend it. You can always communicate with me.

Best Regards,

Metin Cagatay

Senior Survey Chief - Structure

Bechtel Corporation

June 2006 – June 2008 (2 years 1 month)Cluj / Romania