data bor log, spt dan lab
TRANSCRIPT
DATA HASIL PENYELIDIKAN TANAH DI LAPANGAN DAN DI LABORATORIUM (KEDALAMAN 10 - 20)1 2 3 4 5 6 7 8 9 10 11 12 13 15 16 17 18 19 20 21 22 23 24
DA
TE
DE
PT
H
IN
ME
TE
R
CA
SS
ING
TY
PE
C O R E S
HA
RD
NE
SS
Field Soil Test - SPT WATER TEST HASIL PENGUJIAN LABORATORIUM REMARKS
SC
AL
E
GW
L I
N M
ET
ER
RU
N N
O.
RE
CO
VE
RY
in %
R.Q
.D in
%
RO
CK
UN
IT
RO
CK
S
YM
BO
L
15
cm
pe
rta
ma
10
cm
pe
rta
ma
10
cm
ke
du
a
10
cm
ke
tiga
GRAFIK NILAI N
k in
cm
/se
c
LU
GE
ON
Ka
da
r A
ir
Be
rat
Jen
is
LL
-P
L
An
alis
a
Bu
tira
n
Su
du
t G
ese
r
Ko
nso
lida
si
Kla
sifik
asi
ta
na
h
4-M
ay-1
1
0
1 95ML
2 90
1 1
20.62 2.60 NP G = 12.95 % SMS= 74.84 % Pasir BerkerikilM= 11.76%C= 0.45 %
2 2
3 95
2 2 2 5 9SM
3 323.61 2.57 NP G = 14.21 % SMS= 65.80 % Pasir BerlanauM= 18.89 %C= 1.10 %
4 924 4
5-M
ay-1
1
1 90
8 6 5 5 16 24.5 2.54 NP G = 12.35 % SMS= 74.63 % Pasir BerlanauM= 12.57 %C= 0.46 %
5 5
6 6
2 95
4 4 3 6 13
SP
26.71 2.58 NP G = 2.45 % SPS= 88.76 % Pasir Gradasi BurukM= 7.90 %C= 0.90 %
7 7
3 90
8 89 10 11 10 31
SM
4 95 26.63 2.53 NP G = 1.10 % SPS= 91.67 % Pasir Gradasi BurukM= 7.05 %C= 0.18 %
9 9 PROYEK :
HQ
Æ 8
9 m
m
5 90
SP
LOKASI : KOTA MATARAM - NTB
100
10 104 4 6 5 15
LEGEND : M A T LL= Liquid Limit PL= Plastic Limit IP= Indeks Plastic G = Gravel S= Sand M = Silt C= Clay App.
Sumber : Laboratorium Geoteknik, Jurusan Teknik Sipil, Fakultas Teknik, Universitas Mataram, 2011
CO
RE
BA
RR
EL
&
BIT
T
YP
E
DE
PT
H O
F W
AT
ER
L
OS
S
ME
TH
OD
O
F
SA
MP
LIN
G
JOIN
T I
NT
ER
VA
L
(cm
)
RO
CK
C
LA
SS
IFIC
AT
ION
S.P
.T B
LO
W /
30
cm
SIN
GLE
BA
RR
EL
- N
Q -
Æ 7
3", w
idia
bit
HQ
Æ 8
9 m
mH
Q Æ
89
mm
F= 15.39 O
c = 0.038 kg/cm2
HQ
Æ 8
9 m
m
F= 25.95 O
c = 0.0155 kg/cm2
HQ
Æ 8
9 m
m
F= 28.88 O
c = 0.0045 kg/cm2
HQ
Æ 8
9 m
m
F= 22.21 O
c = 0.01825 kg/cm2
LABORATORIUM GEOTEKNIK DAN GEODESI JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK UNIVERSITAS MATARAM
HQ
Æ 8
9 m
m
BOR LOG PENGEBORAN INTI ISLAMIC CENTERF= 34.87 O
c = 0.0145 kg/cm2
INVESTIGASI GEOLOGI DAN SOIL TEST BANGUNAN MASJID UTAMA DAN MINARET ISLAMIC CENTER
DESCRIPTIONOF
LITHOLOGY
GRAPHOF
R.Q.D
CORING SAMPLING UDSS P T Tlmv Satuan Batuan Gunung api Tua
0 10 20 30 40 50
0
1
2
3
4
5
6
7
8
9
10
0 20 40 60 80 100
0.00 - 1.30 mLanau kepasiran, coklat muda, lembab, plastistas rendah, kepadatan lembek, ML,kelulusan tinggi
1.30 - 6.00 mPasir kelanauan, pasir kasar, lepas, coklat, lembab, SM, terdapat 5 - 7 % gravel, bulat, agak menyudut, berupa butiran batu apung, lunak , putih kecoklatan, diameter 0.5 - 2 cm, kelulusan tinggi
6.00 - 8.00 mPasir , pasir sedang, lepas, hitam abu, basah, SP, terdapat < 3 % gravel, bulat, agak menyudut, berupa butiran batu apung, lunak , putih kecoklatan, diameter 0.5 - 1 cm, kelulusan tinggi
8.00 - 9.00 mPasir kelanauan, basah, pasir sedang, agak padat, coklat muda, SM, terdapat < 3% gravel, bulat, agak menyudut, berupa butiran batu apung, lunak , putih kecoklatan, diameter ,0.5 - 1 cm, kelulusan tinggi
9.00 - 10.00 mPasir , pasir halus - sedang, basah, lepas, hitam abu, SP, gradasi seragam, kelulusan tinggi
Pengujian konsoliasi
tidak dilakukan
karena material
berupa pasir
Pengujian konsoliasi
tidak dilakukan
karena material
berupa pasir
Pengujian konsoliasi
tidak dilakukan
karena material
berupa pasir
Pengujian konsoliasi
tidak dilakukan
karena material
berupa pasir
Pengujian konsoliasi
tidak dilakukan
karena material
berupa pasir
00 Nilai spt0 kedalaman Nilai N0 0 00 2 90 4.5 160 6 130 8 310 10 150000000000 tajuk BH1 BH3 15 10 10 100 2 71 2 15 - - -0 5 9 5 366 8 12 19 200 7 13 7 350 12 16 17 ?0 10 91 10 40 16 15 12 120 300 430000000000000000000000000000000000000000000000000000000000000000000000000000
DATA HASIL PENYELIDIKAN TANAH DI LAPANGAN DAN DI LABORATORIUM (KEDALAMAN 10 - 20)1 2 3 4 5 6 7 8 9 11 12 13 15 16 17 18 19 20 21 22 23 24
DA
TE
DE
PT
H
IN
ME
TE
R
CA
SS
ING
TY
PE
C O R E S
HA
RD
NE
SS
Field Soil Test - SPT WATER TEST HASIL PENGUJIAN LABORATORIUM REMARKSS
CA
LE
GW
L I
N M
ET
ER
RU
N N
O.
RE
CO
VE
RY
in %
R.Q
.D in
%
RO
CK
UN
IT
RO
CK
S
YM
BO
L
15
cm
pe
rta
ma
10
cm
pe
rta
ma
10
cm
ke
du
a
10
cm
ke
tiga
GRAFIK NILAI N
k in
cm
/se
c
LU
GE
ON
Ka
da
r A
ir
Be
rat
Jen
is
LL
-P
L
An
alis
a
Bu
tira
n
Su
du
t G
ese
r
Ko
nso
lida
si
Kla
sifik
asi
ta
na
h
5-M
ay-1
1
10
6 95
4 4 6 5 15
30.03 2.55 NP G = 0.73 % SPS= 90.69 % Pasir Gradasi BurukM= 8.48 %C= 0.100 %
11 11
7 95
12 12
8 95
2 2 3 5 10 31.42 2.59 NP G = 0.60 % SPSP S= 90.16 % Pasir Gradasi Buruk
M= 9.08%C= 0.160 %
13 13
6-M
ay-1
1
1 95
14 143 3 3 5 11 32.70 2.59 NP G = 0.34 % SPS= 92.80 % Pasir Gradasi Buruk
2 95 M= 6.76 %C= 0.10 %
3 90
15 15
SM
MH
16 16
4 95
2 2 1 1 4 30.81 2.6 PL= 34.57 G = 0.11 % SMLL= 43.23 S= 74.80 % Pasir kelanauanIP= 8.66 M= 24.29 %
C= 0.80 %SP
17 17
5 95
18 18
7-M
ay-1
1
1 1 1 1 3 31.96 2.63 PL= 37.89 G = 0.08 % Cv=0.0048 MLLL= 43.72 S= 46.07 % Cc=0.2784 Lanau Kepasiran
1 95 IP= 5.83 M= 52.77% eo=1.3779C= 1.08 % k= 7.09E-0.8
ML
19 19 PROYEK :
2 95 MH LOKASI : KOTA MATARAM - NTB
100
20 201 1 5 3 9
LEGEND : M A T LL= Liquid Limit PL= Plastic Limit IP= Indeks Plastic G = Gravel S= Sand M = Silt C= Clay App.
Sumber : Laboratorium Geoteknik, Jurusan Teknik Sipil, Fakultas Teknik, Universitas Mataram, 2011
811273139
CO
RE
BA
RR
EL
&
BIT
T
YP
E
DE
PT
H O
F W
AT
ER
L
OS
S
ME
TH
OD
O
F
SA
MP
LIN
G
JOIN
T I
NT
ER
VA
L
(cm
)
RO
CK
C
LA
SS
IFIC
AT
ION
S.P
.T B
LO
W /
30
cm
SIN
GLE
BA
RR
EL
- N
Q -
Æ 7
3", w
idia
bit
HQ
Æ 8
9 m
mH
Q Æ
89
mm
F= 24.41 O
c = 0.0335 kg/cm2
HQ
Æ 8
9 m
m
F= 29.25 O
c = 0.083 kg/cm2
HQ
Æ 8
9 m
m
F= 28.41 O
c = 0.003 kg/cm2
HQ
Æ 8
9 m
m
F= 23 O
c = 0.039 kg/cm2
HQ
Æ 8
9 m
m
LABORATORIUM GEOTEKNIK DAN GEODESI JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK UNIVERSITAS MATARAM
HQ
Æ 8
9 m
m
F= 13.57 O
c = 0.108 kg/cm2
BOR LOG PENGEBORAN INTI ISLAMIC CENTER
INVESTIGASI GEOLOGI DAN SOIL TEST BANGUNAN MASJID UTAMA DAN MINARET ISLAMIC CENTER
HQ
Æ 8
9 m
m
DESCRIPTIONOF
LITHOLOGY
GRAPHOF
R.Q.D
CORING SAMPLING UDSS P T Tlmv Satuan Batuan Gunung api Tua
0 10 20 30 40 50
10
11
12
13
14
15
16
17
18
19
20
0 20 40 60 80 100
15.70 - 16.00 mLanau kelempungan, plastisitas tinggi, basah, hitam, kepadatan lembek, MH, kelulusan tinggi
10.00 - 15.00 mPasir , pasir halus - sedang, basah, lepas, hitam ,abu, SP, gradasi seragam, kelulusan tinggi
15.00 - 15.70 mPasir kelanauan, pasir halus ,basah, lepas, ,hitam abu, SM, gradasi seragam, kelulusan tinggi
16.00 - 18.60 mPasir , pasir halus - sedang, lepas, basah, hitam abu, SP, gradasi seragam, kelulusan tinggi
18.60 - 19.00 mLanau kelempungan, plastisitas rendah, coklat, kepadatan lembek, basah, ML, kelulusan tinggi
19.00 - 20.00 mLanau kelempungan, plastisitas tinggi, coklat hitam, kepadatan lembek, basah, MH, kelulusan rendah
GRAPHOF
R.Q.DDESCRIPTION
OFLITHOLOGY
Pengujian konsoliasi
tidak dilakukan
karena material
berupa pasir
Pengujian konsoliasi
tidak dilakukan
karena material
berupa pasir
Pengujian konsoliasi
tidak dilakukan
karena material
berupa pasir
Pengujian konsoliasi
tidak dilakukan
karena material
berupa pasir
00 Nilai spt0 kedalaman Nilai N0 10 150 12 100 14 110 16 40 18 30 20 90000000000 tajuk BH1 BH3 15 10 10 100 2 71 2 15 - - -0 5 9 5 366 8 12 19 200 7 13 7 350 12 16 17 ?0 10 91 10 40 16 15 12 120 300 430000000000000000000000000000000000000000000000000000000000000000000000000000
BORING NO : BH-1
SHEET : 3 of 15 ###
TOTAL DEPTH : 50 m
PROJECT : INVESTIGASI GEOLOGI & SOIL TEST BANGUNAN MASJID UTAMA & MINARET ISLAMIC CENTER NTB COMMENCEMENT DATE : 30-Apr-10
LOCATION : MATARAM - NTB COMPLETION DATE : 30-May-10
GROUND ELEVATION : m DRILLER : Mr. UDIN
COORDINATES : X = 401.147.85 , Y = 9.051.439,65 LOGGED : Mr. MSH
DEPTH OF G.W.L : 3.80 m
DATA HASIL PENYELIDIKAN TANAH DI LAPANGAN DAN DI LABORATORIUM (KEDALAMAN 10 - 20)1 2 3 4 5 6 7 8 9 11 12 13 15 16 17 18 19 20 21 22 23 24
DA
TE
DE
PT
H
IN
ME
TE
R
CA
SS
ING
TY
PE
C O R E S
HA
RD
NE
SS
Field Soil Test - SPT WATER TEST HASIL PENGUJIAN LABORATORIUM REMARKS
SC
AL
E
GW
L I
N M
ET
ER
RU
N N
O.
RE
CO
VE
RY
in %
R.Q
.D in
%
RO
CK
UN
IT
RO
CK
S
YM
BO
L
15
cm
pe
rta
ma
10
cm
pe
rta
ma
10
cm
ke
du
a
10
cm
ke
tiga
GRAFIK NILAI N
k in
cm
/se
c
LU
GE
ON
Ka
da
r A
ir
Be
rat
Jen
is
LL
-P
L
An
alis
a
Bu
tira
n
Su
du
t G
ese
r
Ko
nso
lida
si
Kla
sifik
asi
ta
na
h
7-M
ay-1
1
20
HQ
Æ 8
9 m
m
3 95
1 1 5 3 9 33.52 2.55 PL= 29.32 G = 0.11 % SMLL= 44.83 S= 80.39 % Pasir Kelanauan
SM IP= 15.51 M= 19.33 %C= 0.16 %
21 21
4 95
22 22
5 95
4 6 6 9 21 60.14 2.7 PL= 27.56 G = 0.08 % Cv=0.0026 CHCH LL= 63.07 S= 10.60 % Cc=0.3278
IP= 35.51 M= 59.42 % eo=1.6790C= 29.91 % k= 4.28E-0.8
23 23
6 95
24 24
8-M
ay-1
1
1 95
4 7 6 7 20 31.67 2.66 PL= 28.88 G = 1.25 % Cv=0.0046 MLLL= 39.23 S= 45.52 % Cc=0.3156IP= 10.35 M= 52.13 % eo=1.2369
C= 1.10 % k= 1.87E-0.7
ML
25 25
2 95
26 26
3 95
5 3 3 5 11 29.86 2.59 NP G = 4.88 % SMS= 80.33 % Pasir KelanauanM= 14.50 %C= 0.29 %
SM
27 27
4 95
28 28
5 95
15 26 > 30 - > 50 35.8 2.66 PL= 30.15 G = 0.80 % Cv=0.0037 MLLL= 39.41 S= 44.76 % Cc=0.3241IP= 9.26 M= 53.33 % eo=10.9413
C= 1.10 % k= 4.99E-0.8
ML
29 29 PROYEK :
6 95 LOKASI : KOTA MATARAM - NTB
100
30 3013 13 14 20 47
LEGEND : M A T LL= Liquid Limit PL= Plastic Limit IP= Indeks Plastic G = Gravel S= Sand M = Silt C= Clay App.
Sumber : Laboratorium Geoteknik, Jurusan Teknik Sipil, Fakultas Teknik, Universitas Mataram, 2011
S. 8o 34' 48.45" , E. 116o 6' 6.08"
CO
RE
BA
RR
EL
&
BIT
T
YP
E
DE
PT
H O
F W
AT
ER
L
OS
S
ME
TH
OD
O
F
SA
MP
LIN
G
JOIN
T I
NT
ER
VA
L
(cm
)
RO
CK
C
LA
SS
IFIC
AT
ION
S.P
.T B
LO
W /
30
cm
SIN
GLE
BA
RR
EL
- N
Q -
Æ 7
3", w
idia
bit
F= 26.83 O
c = 0.001 kg/cm2
HQ
Æ 8
9 m
m
F= 12.31 O
Lempung Kelanauan Plastisitas Tinggic = 0.466
kg/cm2
HQ
Æ 8
9 m
mH
Q Æ
89
mm
F= 15.54 O
Lanau Berpasir, Plastisitas sedangc = 0.21
kg/cm2
HQ
Æ 8
9 m
m
F= 25.90 O
c = 0.035 kg/cm2
HQ
Æ 8
9 m
m
LABORATORIUM GEOTEKNIK DAN GEODESI JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK UNIVERSITAS MATARAM
F= 17.24 O
Lanau berpasir , Plastisitas rendahc = 0.02935
kg/cm2
BOR LOG PENGEBORAN INTI ISLAMIC CENTER
HQ
Æ 8
9 m
m INVESTIGASI GEOLOGI DAN SOIL TEST BANGUNAN MASJID UTAMA DAN MINARET ISLAMIC CENTER
DESCRIPTIONOF
LITHOLOGY
BORING LOG
GRAPHOF
R.Q.D
CORING SAMPLING UDSS P T Tlmv Satuan Batuan Gunung api Tua
0 10 20 30 40 50
20
21
22
23
24
25
26
27
28
29
30
0 20 40 60 80 100
28.30 - 30.00 mLanau kepasiran, plastisitas rendah, coklat muda, basah, kepadatan sangat padat, ML, kelulusan rendah
GRAPHOF
R.Q.DDESCRIPTION
OFLITHOLOGY
20.00 - 21.60 mPasir kelanauan, pasir halus , lepas, hitam abu, SM, basah, gradasi seragam, kelulusan tinggi
21.60 - 24.00 mLempung kelanauan, plastisitas tinggi, hitam, kepadatan agak padat, basah, CH, kelulusan rendah
24.00 - 25.50 mLanau kerikilan, plastisitas rendah, coklat muda, kepadatan agak padat, basah, ML, setempat kerakal batuapung Ø 6 cm, kaku, kelulusan rendah
25.50 - 28.30 mPasir kelanauan, pasir halus , sangat ,padat, hitam abu, SM, basah, gradasi seragam, kelulusan tinggi
Pengujian konsoliasi
tidak dilakukan
karena material
berupa pasir
Pengujian konsoliasi
tidak dilakukan
karena material
berupa pasir
00 Nilai spt0 kedalaman Nilai N0 20 90 22 210 24 200 26 110 28 500 30 500000000000 tajuk BH1 BH3 15 10 10 100 2 71 2 15 - - -0 5 9 5 366 8 12 19 200 7 13 7 350 12 16 17 ?0 10 91 10 40 16 15 12 120 300 430000000000000000000000000000000000000000000000000000000000000000000000000000
BORING NO : BH-1
SHEET : 4 of 15 ###
TOTAL DEPTH : 50 m
PROJECT : INVESTIGASI GEOLOGI & SOIL TEST BANGUNAN MASJID UTAMA & MINARET ISLAMIC CENTER NTB COMMENCEMENT DATE : 30-Apr-10
LOCATION : MATARAM - NTB COMPLETION DATE : 30-May-10
GROUND ELEVATION : m DRILLER : Mr. UDIN
COORDINATES : X = 401.147.85 , Y = 9.051.439,65 LOGGED : Mr. MSH
DEPTH OF G.W.L : 3.80 m
DATA HASIL PENYELIDIKAN TANAH DI LAPANGAN DAN DI LABORATORIUM (KEDALAMAN 10 - 20)1 2 3 4 5 6 7 8 9 11 12 13 15 16 17 18 19 20 21 22 23 24
DA
TE
DE
PT
H
IN
ME
TE
R
CA
SS
ING
TY
PE
C O R E S
HA
RD
NE
SS
Field Soil Test - SPT WATER TEST HASIL PENGUJIAN LABORATORIUM REMARKS
SC
AL
E
GW
L I
N M
ET
ER
RU
N N
O.
RE
CO
VE
RY
in %
R.Q
.D in
%
RO
CK
UN
IT
RO
CK
S
YM
BO
L
15
cm
pe
rta
ma
10
cm
pe
rta
ma
10
cm
ke
du
a
10
cm
ke
tiga
GRAFIK NILAI N
k in
cm
/se
c
LU
GE
ON
Ka
da
r A
ir
Be
rat
Jen
is
LL
-P
L
An
alis
a
Bu
tira
n
Su
du
t G
ese
r
Ko
nso
lida
si
Kla
sifik
asi
ta
na
h
9-M
ay-1
1
30
1 95
13 13 14 20 47 37.00 2.64 PL= 30.26 G = 0.53 % Cv=0.0051 MLLL= 45.19 S= 43.49 % Cc=0.2202
ML IP= 14.97 M= 54.91 % eo=0.9880C= 1.07 % k= 8.72E-0.8
31 31
2 95 SM
32 32
3 95
3 3 4 3 10 40.01 2.59 PL= 20.33 G = 1.17 % SMLL= 15.99 S= 81.99 % Pasir KelanauanIP= -4.34 M= 16.53 %
NP C= 0.31 %
33 33
4 95
34 34
10-M
ay-1
1
1 95
4 3 3 2 8
40.52 2.56 PL= 18.09 G = 2.41 % SMLL= 19.18 S= 71.63 % Pasir KelanauanIP= 1.08 M= 25.60 %
C= 0.36 %
35 35
2 95
36 36
3 95
5 3 3 3 9
27.83 2.53 NP G = 11.15 % SWS= 78.64 %M= 10.04 %C= 0.182 %
37 37
4 95 SW
38 38
11-M
ay-1
1
1 90
25 35/7 - - >50 26.56 2.53 NP G = 7.75 % SWS= 83.20 %M= 8.79 %C= 0.26 %
39 39 PROYEK :
HQ
Æ 8
9 m
m
2 90 LOKASI : KOTA MATARAM - NTB
100
40 4017 25 27 - >50
LEGEND : M A T LL= Liquid Limit PL= Plastic Limit IP= Indeks Plastic G = Gravel S= Sand M = Silt C= Clay App.
Sumber : Laboratorium Geoteknik, Jurusan Teknik Sipil, Fakultas Teknik, Universitas Mataram, 2011
S. 8o 34' 48.45" , E. 116o 6' 6.08"
CO
RE
BA
RR
EL
&
BIT
T
YP
E
DE
PT
H O
F W
AT
ER
L
OS
S
ME
TH
OD
O
F
SA
MP
LIN
G
JOIN
T I
NT
ER
VA
L
(cm
)
RO
CK
C
LA
SS
IFIC
AT
ION
S.P
.T B
LO
W /
30
cm
SIN
GLE
BA
RR
EL
- N
Q -
Æ 7
3", w
idia
bit
HQ
Æ 8
9 m
m
F= 22.61 O
Lanau berpasir, plastisitas rendahc = 0.223
kg/cm2
HQ
Æ 8
9 m
m
F= 28.93 O
c = 0.143 kg/cm2
HQ
Æ 8
9 m
mH
Q Æ
89
mm
F= 25.21 O
c = 0.0995 kg/cm2
HQ
Æ 8
9 m
m
F= 38.21 O
Pasir Berkerikil, Gradasi Baikc = 0.062
kg/cm2
LABORATORIUM GEOTEKNIK DAN GEODESI JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK UNIVERSITAS MATARAM
HQ
Æ 8
9 m
m
F= 34.57 O
Pasir Berkerikil, Gradasi Baikc = 0.01
kg/cm2
BOR LOG PENGEBORAN INTI ISLAMIC CENTER
INVESTIGASI GEOLOGI DAN SOIL TEST BANGUNAN MASJID UTAMA DAN MINARET ISLAMIC CENTER
DESCRIPTIONOF
LITHOLOGY
BORING LOG
GRAPHOF
R.Q.D
CORING SAMPLING UDSS P T Tlmv Satuan Batuan Gunung api Tua
0 10 20 30 40 50
30
31
32
33
34
35
36
37
38
39
40
0 20 40 60 80 100
36.40 - 40.00 mPasir Berkerikil, abu-abu hitam, masa dasar pasir kasar, membulat - membulat Kepadatan sangat padat, terdapat 5 - 8 % gravel, ukuran 0.5 - 3 cm, agak bulat, tidak menyudut, keras, warna abu- abu, kelulusan tinggi
GRAPHOF
R.Q.DDESCRIPTION
OFLITHOLOGY
30.00 - 30.65 mLanau kelempungan/ kepasiran, plastisitas rendah, coklat muda, basah, kepadatan sangat padat, ML, Kelulusan rendah
30.65 - 36.40 mPasir kelanauan, pasir halus , kepadatan lepas, hitam abu, SM, basah, gradasi seragam, kelulusan tinggi
Pengujian konsoliasi
tidak dilakukan
karena material
berupa pasir
Pengujian konsoliasi
tidak dilakukan
karena material
berupa pasir
Pengujian konsoliasi
tidak dilakukan karena
material berupa pasir
berkerikil , spt > 50,
Pengujian konsoliasi
tidak dilakukan karena
material berupa pasir
berkerikil , spt > 50,
00 Nilai spt0 kedalaman Nilai N0 30 500 32 100 34 80 36 90 38 500 40 500000000000 tajuk BH1 BH3 15 10 10 100 2 71 2 15 - - -0 5 9 5 366 8 12 19 200 7 13 7 350 12 16 17 ?0 10 91 10 40 16 15 12 120 300 430000000000000000000000000000000000000000000000000000000000000000000000000000
BORING NO : BH-1
SHEET : 5 of 15 ###
TOTAL DEPTH : 50 m
PROJECT : INVESTIGASI GEOLOGI & SOIL TEST BANGUNAN MASJID UTAMA & MINARET ISLAMIC CENTER NTB COMMENCEMENT DATE : 30-Apr-10
LOCATION : MATARAM - NTB COMPLETION DATE : 30-May-10
GROUND ELEVATION : m DRILLER : Mr. UDIN
COORDINATES : X = 401.147.85 , Y = 9.051.439,65 LOGGED : Mr. MSH
DEPTH OF G.W.L : 3.80 m
DATA HASIL PENYELIDIKAN TANAH DI LAPANGAN DAN DI LABORATORIUM (KEDALAMAN 10 - 20)1 2 3 4 5 6 7 8 9 11 12 13 15 16 17 18 19 20 21 22 23 24
DA
TE
DE
PT
H
IN
ME
TE
R
CA
SS
ING
TY
PE
C O R E S
HA
RD
NE
SS
Field Soil Test - SPT WATER TEST HASIL PENGUJIAN LABORATORIUM REMARKS
SC
AL
E
GW
L I
N M
ET
ER
RU
N N
O.
RE
CO
VE
RY
in %
R.Q
.D in
%
RO
CK
UN
IT
RO
CK
S
YM
BO
L
15
cm
pe
rta
ma
10
cm
pe
rta
ma
10
cm
ke
du
a
10
cm
ke
tiga
GRAFIK NILAI N
k in
cm
/se
c
LU
GE
ON
Ka
da
r A
ir
Be
rat
Jen
is
LL
-P
L
An
alis
a
Bu
tira
n
Su
du
t G
ese
r
Ko
nso
lida
si
Kla
sifik
asi
ta
na
h
11-M
ay-1
1
40
3 90
17 25 27 - >50
SW
14.13 2.57 NP G = 31.60 % SPS= 60.15 %
4 95
M= 8.15 %C= 0.10 %
41 41
10 12 - - > 50
5 95
42 42
6 95
15.64 2.65 NP G = 20.83 % SWS= 71.03 %
7 95 M= 7.93 %C= 0.21 %
43 43
8 95
12-M
ay-1
1
1 95
4 6 5 6 17
ML
44 44
2 90 19.72 2.52 NP G = 31.87 % SMS= 51.42 % Pasir KerikilanM= 15.62 %
SW C= 1.08 %
45 45
3 95
46 46
4 95
50 - - - > 50
47 47
5 95 SM
48 48
6 90
15 18 17 20 55
21.12 2.53 NP G = 39.75 % SMS= 46.74 % Pasir KerikilanM= 13.32 %C= 0.19 %
49 49 PROYEK :
7 90 LOKASI : KOTA MATARAM - NTB
100
50 507 10 10 13 33
LEGEND : M A T LL= Liquid Limit PL= Plastic Limit IP= Indeks Plastic G = Gravel S= Sand M = Silt C= Clay App.
Sumber : Laboratorium Geoteknik, Jurusan Teknik Sipil, Fakultas Teknik, Universitas Mataram, 2011
S. 8o 34' 48.45" , E. 116o 6' 6.08"C
OR
E B
AR
RE
L
&
B
IT
TY
PE
DE
PT
H O
F W
AT
ER
L
OS
S
ME
TH
OD
O
F
SA
MP
LIN
G
JOIN
T I
NT
ER
VA
L
(cm
)
RO
CK
C
LA
SS
IFIC
AT
ION
S.P
.T B
LO
W /
30
cm
SIN
GLE
BA
RR
EL
- N
Q -
Æ 7
3", w
idia
bit
HQ
Æ 8
9 m
mH
Q Æ
89
mm
F= 35.63 O
Passir Berkerikil , Gradsi Burukc = 0.1345
kg/cm2
HQ
Æ 8
9 m
m
F= 32.08 O
Passir Berkerikil , Gradsi Baikc = 0.0335
kg/cm2
HQ
Æ 8
9 m
m
F= 43.00 O
c = 0.1025 kg/cm2
LABORATORIUM GEOTEKNIK DAN GEODESI JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK UNIVERSITAS MATARAM
BOR LOG PENGEBORAN INTI ISLAMIC CENTERF= 38.97 O
c = 0.0275 kg/cm2
INVESTIGASI GEOLOGI DAN SOIL TEST BANGUNAN MASJID UTAMA DAN MINARET ISLAMIC CENTER
DESCRIPTIONOF
LITHOLOGY
BORING LOG
GRAPHOF
R.Q.D
CORING SAMPLING UDSS P T Tlmv Satuan Batuan Gunung api Tua
0 10 20 30 40 50
40
41
42
43
44
45
46
47
48
49
50
0 20 40 60 80 100
47.00 - 50.00 mKePasir kerikilan, abu-abu hitam, masa dasar pasir kasar, membulat - membulat Kepadatan sangat padat, terdapat 5 - 8 % gravel, ukuran 0.5 - 5 cm, agak bulat, tidak menyudut, keras, warna , abu- abu, batuan andesit,
GRAPHOF
R.Q.DDESCRIPTION
OFLITHOLOGY
43.50 - 44.20 mPasir Kelanauan, plastisitas rendah, coklat , muda, basah, kepadatan agak padat, ML, kelulusan tinggi
44.20 - 47.00 mPasir kerikilan, abu-abu hitam, masa dasar pasir kasar, membulat - membulat Kepadatan sangat padat, terdapat 5 - 8 % gravel, ukuran 0.5 - 5 cm, agak bulat, bersudut, keras, warna abu- abu
40.00 - 43.50 mPasir Berkerikil, abu-abu hitam, masa dasar pasir kasar, membulat - membulat Kepadatan sangat padat, terdapat 5 - 8 % gravel, ukuran 0.5 - 3 cm, agak bulat, tidak menyudut, keras, warna abu- abu, kelulusan tinggi
Pengujian konsoliasi
tidak dilakukan karena
material berupa pasir
berkerikil , spt > 50,
Pengujian konsoliasi
tidak dilakukan karena
material berupa pasir
berkerikil , spt > 50,
Pengujian konsoliasi
tidak dilakukan karena
material berupa pasir
berkerikil , spt > 50,
Pengujian konsoliasi
tidak dilakukan karena
material berupa pasir
berkerikil , spt > 50,
00 Nilai spt0 kedalaman Nilai N0 40 500 41.5 500 43.5 170 46 500 48 500 50 330000000000 tajuk BH1 BH3 15 10 10 100 2 71 2 15 - - -0 5 9 5 366 8 12 19 200 7 13 7 350 12 16 17 ?0 10 91 10 40 16 15 12 120 300 430000000000000000000000000000000000000000000000000000000000000000000000000000
BORING NO : BH-2
SHEET : 6 of 15 ###
TOTAL DEPTH : 50 m
PROJECT : INVESTIGASI GEOLOGI & SOIL TEST BANGUNAN MASJID UTAMA & MINARET ISLAMIC CENTER NTB COMMENCEMENT DATE : 15-May-11
LOCATION : KOTA MATARAM - NTB COMPLETION DATE : 30-May-11
GROUND ELEVATION : m DRILLER : Mr. INUL
COORDINATES : X = 401.055.28 , Y = 9.051.428,97 LOGGED : Mr. MSH
DEPTH OF G.W.L : 4.00 m
DATA HASIL PENYELIDIKAN TANAH DI LAPANGAN DAN DI LABORATORIUM (KEDALAMAN 0 - 10)1 2 3 4 5 6 7 8 9 10 11 12 13 15 16 17 18 19 20 21 22 23 24
DA
TE
DE
PT
H
IN
ME
TE
R
CA
SS
ING
TY
PE
C O R E S
HA
RD
NE
SS
Field Soil Test - SPT WATER TEST HASIL PENGUJIAN LABORATORIUM REMARKS
SC
AL
E
GW
L I
N M
ET
ER
RU
N N
O.
RE
CO
VE
RY
in %
R.Q
.D in
%
RO
CK
UN
IT
RO
CK
S
YM
BO
L
15
cm
pe
rta
ma
10
cm
pe
rta
ma
10
cm
ke
du
a
10
cm
ke
tiga
GRAFIK NILAI N
k in
cm
/se
c
LU
GE
ON
Ka
da
r A
ir
Be
rat
Jen
is
LL
-P
L
An
alis
a
Bu
tira
n
Su
du
t G
ese
r
Ko
nso
lida
si
Kla
sifik
asi
ta
na
h
15-M
ay-1
1
0
1 95ML
2 951 SM 1
3 95
3 2 10 13 25
2 235.21 2.58 NP G = 17.73 % SMSM S= 67.26 % pasir Kerikilan
M= 14.44 %C= 0.57 %
3 34 95
5 954 432.54 2.57 NP G = 29.39 % SWS= 62.193 %M+C= 8.42%
6 90
1 2 2 1 5
5 5
7 95
2 1 3 4 8
6 618.04 2.59 NP G = 1.93 % SPS= 88.69 %M+C=9.39%
SP
7 7
8 95
9 95
1 3 3 2 8
8 8
16-M
ay-1
1 1 95
20.78 2.6 NP G = 0.26 % SPS= 95.03 %M+C= 4.71%
9 9 PROYEK :
HQ
Æ 8
9 m
m
9 2 3 3 8 LOKASI : KOTA MATARAM - NTB
2 95
100
10 10
LEGEND : M A T LL= Liquid Limit PL= Plastic Limit IP= Indeks Plastic G = Gravel S= Sand M = Silt C= Clay App.
Sumber : Laboratorium Geoteknik, Jurusan Teknik Sipil, Fakultas Teknik, Universitas Mataram, 2011
S. 8o 34' 49.19" , E. 116o 6' 3.05"C
OR
E B
AR
RE
L
&
B
IT
TY
PE
DE
PT
H O
F W
AT
ER
L
OS
S
ME
TH
OD
O
F
SA
MP
LIN
G
JOIN
T I
NT
ER
VA
L
(cm
)
RO
CK
C
LA
SS
IFIC
AT
ION
S.P
.T B
LO
W /
30
cm
SIN
GLE
BA
RR
EL
- N
Q -
Æ 7
3", w
idia
bit
HQ
Æ 8
9 m
mH
Q Æ
89
mm
F= 24.57 O
c = 0.1265 kg/cm2
HQ
Æ 8
9 m
m
F= 25.87 O
Pasir Berkerikil, Gradasi Baikc = 0.011
kg/cm2
HQ
Æ 8
9 m
mH
Q Æ
89
mm
F= 28.38 O
Pasir, sedikit mengandung butiran halusc = 0.111
kg/cm2
LABORATORIUM GEOTEKNIK DAN GEODESI JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK UNIVERSITAS MATARAM
HQ
Æ 8
9 m
m
F= 21.95 O
Pasir, sedikit mengandung butiran halusc = 0.0195
kg/cm2
BOR LOG PENGEBORAN INTI ISLAMIC CENTER
INVESTIGASI GEOLOGI DAN SOIL TEST BANGUNAN MASJID UTAMA DAN MINARET ISLAMIC CENTER
DESCRIPTIONOF
LITHOLOGY
BORING LOG
GRAPHOF
R.Q.D
CORING SAMPLING UDSS P T Tlmv Satuan Batuan Gunung api Tua
0 10 20 30 40 50
0
1
2
3
4
5
6
7
8
9
10
0 20 40 60 80 100
0.00 - 0.70 mLanau kepasiran, coklat muda, lembab, kelulusan tinggi, plastistas rendah, kepadatan lembek, ML, kelulusan tinggi
0.70 - 2.00 mPasir kelanauan, pasir sedang, lepas, coklat, lembab, SM, terdapat <5 % gravel, bulat, agak menyudut, berupa butiran batu apung, lunak , putih kecoklatan, diameter 0.5 - 1 cm, kelulusan tinggi
5.00 - 10.00 mPasir , pasir halus, lepas, hitam abu- abu kecoklatan, basah, SP, kelulusan tinggi
2.00 - 5.00 mPasir kelanauan, pasir kasar, lepas, coklat, lembab, SM, terdapat 5 - 8 % gravel, bulat, agak menyudut, berupa butiran batu apung, lunak , putih kecoklatan, diameter 0.5 - 2 cm, kelulusan tinggi
Pengujian konsoliasi
tidak dilakukan
karena material
berupa pasir
Pengujian konsoliasi
tidak dilakukan
karena material
berupa pasir
Pengujian konsoliasi
tidak dilakukan
karena material
berupa pasir
Pengujian konsoliasi
tidak dilakukan
karena material
berupa pasir
00 Nilai spt0 kedalaman Nilai N0 0 00 1.5 250 4.6 50 5.5 80 7.5 80 9.5 80 11.5 11000000000 tajuk BH1 BH3 15 10 10 100 2 71 2 15 - - -0 5 9 5 366 8 12 19 200 7 13 7 350 12 16 17 ?0 10 91 10 40 16 15 12 120 300 4300000000000000000000000000000000000000000000000000000000000000000000000000
21.948823561738 00.0195 0
BORING NO : BH-2
SHEET : 7 of 15 ###
TOTAL DEPTH : 50 m
PROJECT : INVESTIGASI GEOLOGI & SOIL TEST BANGUNAN MASJID UTAMA & MINARET ISLAMIC CENTER NTB COMMENCEMENT DATE : 15-May-11
LOCATION : KOTA MATARAM - NTB COMPLETION DATE : 30-May-11
GROUND ELEVATION : m DRILLER : Mr. INUL
COORDINATES : X = 401.055.28 , Y = 9.051.428,97 LOGGED : Mr. MSH
DEPTH OF G.W.L : 4.00 m
DATA HASIL PENYELIDIKAN TANAH DI LAPANGAN DAN DI LABORATORIUM (KEDALAMAN 10 - 20)1 2 3 4 5 6 7 8 9 11 12 13 15 16 17 18 19 20 21 22 23 24
DA
TE
DE
PT
H
IN
ME
TE
R
CA
SS
ING
TY
PE
C O R E S
HA
RD
NE
SS
Field Soil Test - SPT WATER TEST HASIL PENGUJIAN LABORATORIUM REMARKS
SC
AL
E
GW
L I
N M
ET
ER
RU
N N
O.
RE
CO
VE
RY
in %
R.Q
.D in
%
RO
CK
UN
IT
RO
CK
S
YM
BO
L
15
cm
pe
rta
ma
10
cm
pe
rta
ma
10
cm
ke
du
a
10
cm
ke
tiga
GRAFIK NILAI N
k in
cm
/se
c
LU
GE
ON
Ka
da
r A
ir
Be
rat
Jen
is
LL
-P
L
An
alis
a
Bu
tira
n
Su
du
t G
ese
r
Ko
nso
lida
si
Kla
sifik
asi
ta
na
h
16-M
ay-1
1
10
3 90
SM21.83 2.68 PL= 27.38 G = 1.02 % SM
LL= 33.14 S= 77.95 % Pasir KelanauanIP= 5.76 M= 20.35%
C= 0.69 %
11 11
4 90
5 4 3 4 11
12 1226.06 2.63 NP G = 14.33 % SMSW S= 73.36 % Pasir Berkerikil
M= 12.24 %C= 0.07 %
5 9013 13
SP
6 95
1 1 1 1 3
14 1420.79 2.6 PL= 27.69 G = 11.62 % SMLL= 35.11 S= 65.15 % Pasir Berlanau
SP IP= 7.43 M= 22.32 %C= 0.91 %
15 15
7 90 SP
16 16
8 93
CH 4 3 3 4 10
34.87 2.67 PL= 25.86 G = 0.12 % Cv=0.0054 CHLL= 56.91 S= 11.78 % Cc=0.2580 Lempung Plastisitas tinggiIP= 31.04 M= 61.39 % eo=1.9452
C= 26.81 % k= 1.50E-0.7
17 17
9 95
18 18
17-M
ay-1
1 1 95
2 3 3 5 11
40.22 2.63 PL= 26.42 G = 0.1 % Cv=0.00407 CHLL= 51.95 S= 27.37 % Cc=0.2817 Lempung Plastisitas tinggiIP= 25.53 M= 49.84 % eo=1.3040
C= 22.69 % k= 8.58E-0.8
19 19 PROYEK :
SM 2 3 3 3 9 LOKASI : KOTA MATARAM - NTB
2 90
100
20 20
LEGEND : M A T LL= Liquid Limit PL= Plastic Limit IP= Indeks Plastic G = Gravel S= Sand M = Silt C= Clay App.
Sumber : Laboratorium Geoteknik, Jurusan Teknik Sipil, Fakultas Teknik, Universitas Mataram, 2011
S. 8o 34' 49.19" , E. 116o 6' 3.05"C
OR
E B
AR
RE
L
&
B
IT
TY
PE
DE
PT
H O
F W
AT
ER
L
OS
S
ME
TH
OD
O
F
SA
MP
LIN
G
JOIN
T I
NT
ER
VA
L
(cm
)
RO
CK
C
LA
SS
IFIC
AT
ION
S.P
.T B
LO
W /
30
cm
SIN
GLE
BA
RR
EL
- N
Q -
Æ 7
3", w
idia
bit
HQ
Æ 8
9 m
m
F= 25.66 O
HQ
Æ 8
9 m
m
c = 0.1247 kg/cm2
HQ
Æ 8
9 m
m
F= 31.66 O
c = 0.01 kg/cm2
HQ
Æ 8
9 m
m
F= 26.57 O
c = 0.027 kg/cm2
HQ
Æ 8
9 m
m
F= 11.97 O
HQ
Æ 8
9 m
m
c = 0.424 kg/cm2
LABORATORIUM GEOTEKNIK DAN GEODESI JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK UNIVERSITAS MATARAM
HQ
Æ 8
9 m
m BOR LOG PENGEBORAN INTI ISLAMIC CENTER
F= 8.835 O
c = 0.6085 kg/cm2
INVESTIGASI GEOLOGI DAN SOIL TEST BANGUNAN MASJID UTAMA DAN MINARET ISLAMIC CENTER
HQ
Æ 8
9 m
m
DESCRIPTIONOF
LITHOLOGY
BORING LOG
GRAPHOF
R.Q.D
CORING SAMPLING UDSS P T Tlmv Satuan Batuan Gunung api Tua
0 10 20 30 40 50
10
11
12
13
14
15
16
17
18
19
20
0 20 40 60 80 100
15.00 - 15.70 mPasir , pasir halus ,basah, lepas, hitam abu, SP, gradasi seragam
GRAPHOF
R.Q.DDESCRIPTION
OFLITHOLOGY
10.00 - 12.80 mPasir kelanauan berkerikil, pasir kasar, lepas, hitam abu, basah, SM, terdapat 5 - 7 % gravel, bulat, agak menyudut, berupa butiran batu apung, lunak , putih kecoklatan, diameter 0.5 - 1 cm, kelulusan tinggi
12.80 - 14.00 mPasir , pasir halus , basah, lepas, hitam abu, SP, gradasi seragam
14.00 - 15.00 mPasir , pasir halus , basah, agak padat, hitam abu, SP, gradasi seragam
15,70 - 18.80 mLempung kelanauan, plastisitas tinggi, hitam, kepadatan lembek, basah, CH
18.80 - 20.00 mPasir kelanauan, pasir halus , lepas, coklat tua, SM, basah, gradasi seragam
Pengujian konsoliasi
tidak dilakukan
karena material
berupa pasir
Pengujian konsoliasi
tidak dilakukan
karena material
berupa pasir berkeriki;
Pengujian konsoliasi
tidak dilakukan
karena material
berupa pasir
00 Nilai spt0 kedalaman Nilai N0 9.5 00 11.5 110 13.5 30 16 100 18 110 19.5 90 21.5 27000000000 tajuk BH1 BH3 15 10 10 100 2 71 2 15 - - -0 5 9 5 366 8 12 19 200 7 13 7 350 12 16 17 ?0 10 91 10 40 16 15 12 120 300 430000000000000000000000000000000000000000000000000000000000000000000000000000
BORING NO : BH-2
SHEET : 8 of 15 ###
TOTAL DEPTH : 50 m
PROJECT : INVESTIGASI GEOLOGI & SOIL TEST BANGUNAN MASJID UTAMA & MINARET ISLAMIC CENTER NTB COMMENCEMENT DATE : 15-May-11
LOCATION : KOTA MATARAM - NTB COMPLETION DATE : 30-May-11
GROUND ELEVATION : m DRILLER : Mr. INUL
COORDINATES : X = 401.055.28 , Y = 9.051.428,97 LOGGED : Mr. MSH
DEPTH OF G.W.L : 4.00 m
DATA HASIL PENYELIDIKAN TANAH DI LAPANGAN DAN DI LABORATORIUM (KEDALAMAN 10 - 20)1 2 3 4 5 6 7 8 9 11 12 13 15 16 17 18 19 20 21 22 23 24
DA
TE
DE
PT
H
IN
ME
TE
R
CA
SS
ING
TY
PE
C O R E S
HA
RD
NE
SS
Field Soil Test - SPT WATER TEST HASIL PENGUJIAN LABORATORIUM REMARKS
SC
AL
E
GW
L I
N M
ET
ER
RU
N N
O.
RE
CO
VE
RY
in %
R.Q
.D in
%
RO
CK
UN
IT
RO
CK
S
YM
BO
L
15
cm
pe
rta
ma
10
cm
pe
rta
ma
10
cm
ke
du
a
10
cm
ke
tiga
GRAFIK NILAI N
k in
cm
/se
c
LU
GE
ON
Ka
da
r A
ir
Be
rat
Jen
is
LL
-P
L
An
alis
a
Bu
tira
n
Su
du
t G
ese
r
Ko
nso
lida
si
Kla
sifik
asi
ta
na
h
17-M
ay-1
1
20
HQ
Æ 8
9 m
m 2 90
21.21 2.63 NP G = 0.16 % SMS= 87.35 % Pasir kelanauan
SM M= 12.39 %C= 0.096 %
3 9521 21
7 9 8 10 27
4 90
22 22
18-M
ay-1
1
1 95
24.81 2.56 PL= 32.33 G = 21.51 % Cv=0.00727 SMML LL= 42.62 S= 44.89 % Cc=0.2655
IP= 10.30 M= 32.80 % eo=1.10C= 0.797 % k= 1.2E-0.7
SM
23 23
2 1 1 1 3
2 90 SP
24 24
3 95
26.2 2.56 NP G = 0.58 % SPS= 91.51 %M+C=7.91%
4 95
25 25
20-M
ay-1
1
1 93
26 26
2 95
2 2 2 2 6
26.27 2.60 NP G = 1.11 % SMS= 85.59 % Pasir kelnauanM= 13.00%C= 0.30 %
27 27
3 95
28 28
4 90
5 14 13 14 41
41.49 2.59 PL= 38.85 G = 0.20 % Cv=0.0054 MLLL= 46.41 S= 44.09 % Cc=0.2148 Lanau Kepasiran
ML IP= 7.56 M= 55.07% eo=1.29607C= 0.64 % k= 9.78E-0.8
29 29 PROYEK :
5 90 LOKASI : KOTA MATARAM - NTB
100
30 30
LEGEND : M A T LL= Liquid Limit PL= Plastic Limit IP= Indeks Plastic G = Gravel S= Sand M = Silt C= Clay App.
Sumber : Laboratorium Geoteknik, Jurusan Teknik Sipil, Fakultas Teknik, Universitas Mataram, 2011
S. 8o 34' 49.19" , E. 116o 6' 3.05"C
OR
E B
AR
RE
L
&
B
IT
TY
PE
DE
PT
H O
F W
AT
ER
L
OS
S
ME
TH
OD
O
F
SA
MP
LIN
G
JOIN
T I
NT
ER
VA
L
(cm
)
RO
CK
C
LA
SS
IFIC
AT
ION
S.P
.T B
LO
W /
30
cm
SIN
GLE
BA
RR
EL
- N
Q -
Æ 7
3", w
idia
bit
F= 29.60 O
c = 0.0188 kg/cm2
HQ
Æ 8
9 m
m
F= 24.01 O
Pasir kelanauan, berkerikil, plastisitas
rendah , plastisitas rendahc = 0.1305
kg/cm2
HQ
Æ 8
9 m
mH
Q Æ
89
mm
F= 32.45 O
Pasir , Sedikit mengandung butiran halusc = 0.069
kg/cm2
HQ
Æ 8
9 m
m
F= 32.10 O
c = 0.007 kg/cm2
HQ
Æ 8
9 m
m
LABORATORIUM GEOTEKNIK DAN GEODESI JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK UNIVERSITAS MATARAM
BOR LOG PENGEBORAN INTI ISLAMIC CENTER
HQ
Æ 8
9 m
m
F= 15.48 O
c = 0.1593 kg/cm2
INVESTIGASI GEOLOGI DAN SOIL TEST BANGUNAN MASJID UTAMA DAN MINARET ISLAMIC CENTER
DESCRIPTIONOF
LITHOLOGY
BORING LOG
GRAPHOF
R.Q.D
CORING SAMPLING UDSS P T Tlmv Satuan Batuan Gunung api Tua
0 10 20 30 40 50
20
21
22
23
24
25
26
27
28
29
30
0 20 40 60 80 100
28.50 - 30.00 mLanau kepasiran, plastisitas rendah, coklat muda, basah, kepadatan sangat padat, ML
GRAPHOF
R.Q.DDESCRIPTION
OFLITHOLOGY
20.00 - 21.50 mPasir kelanauan, pasir halus , lepas, hitam abu, SM, basah, gradasi seragam
21.50 - 22.00 mLanau kepasiran, plastisitas rendah, coklat muda, kepadatan padat, basah, ML, terdapat < 5 % % gravel, hitam berbintik putih, kerikil batuan dan karang (karbonat) ukuran 0.5 - 4 cm, agak bulat, tidak menyudut, keras, warna abu- abu
22.00 - 23.50 mPasir kelanauan, pasir halus , padat, hitam abu, SM, basah, gradasi seragam, kelulusan tinggi
23.50 - 28.50 mPasir , pasir halus ,basah, lepas, hitam abu, SP, gradasi seragam, kelulusan tinggi
Pengujian konsoliasi
tidak dilakukan
karena material
berupa pasir
Pengujian konsoliasi
tidak dilakukan
karena material
berupa pasir
Pengujian konsoliasi
tidak dilakukan
karena material
berupa pasir
00 Nilai spt0 kedalaman Nilai N0 19.5 90 21.5 270 23.5 30 26 60 28 410 30.6 420000000000 tajuk BH1 BH3 15 10 10 100 2 71 2 15 - - -0 5 9 5 366 8 12 19 200 7 13 7 350 12 16 17 ?0 10 91 10 40 16 15 12 120 300 430000000000000000000000000000000000000000000000000000000000000000000000000000
BORING NO : BH-1
SHEET : 9 of 15 ###
TOTAL DEPTH : 50 m
PROJECT : INVESTIGASI GEOLOGI & SOIL TEST BANGUNAN MASJID UTAMA & MINARET ISLAMIC CENTER NTB COMMENCEMENT DATE : 15-May-11
LOCATION : KOTA MATARAM - NTB COMPLETION DATE : 30-May-11
GROUND ELEVATION : m DRILLER : Mr. INUL
COORDINATES : X = 401.055.28 , Y = 9.051.428,97 LOGGED : Mr. MSH
DEPTH OF G.W.L : 4.00 m
1 2 3 4 5 6 7 8 9 11 12 13 15 16 17 18 19 20 21 22 23 24
DA
TE
DE
PT
H
IN
ME
TE
R
CA
SS
ING
TY
PE
C O R E S
HA
RD
NE
SS
Field Soil Test - SPT WATER TEST HASIL PENGUJIAN LABORATORIUM REMARKS
SC
AL
E
GW
L I
N M
ET
ER
RU
N N
O.
RE
CO
VE
RY
in %
R.Q
.D in
%
RO
CK
UN
IT
RO
CK
S
YM
BO
L
15
cm
pe
rta
ma
10
cm
pe
rta
ma
10
cm
ke
du
a
10
cm
ke
tiga
GRAFIK NILAI N
k in
cm
/se
c
LU
GE
ON
Ka
da
r A
ir
Be
rat
Jen
is
LL
-P
L
An
alis
a
Bu
tira
n
Su
du
t G
ese
r
Ko
nso
lida
si
Kla
sifik
asi
ta
na
h
21-M
ay-1
1
30
1 95
24.21 2.55 NP G = 0.52 % SMS= 80.12 % Pasir kelanauan
SM M= 19.20%C= 0.16 %
2 90
6 7 7 16 30
31 31
3 95
SM
32 3223.18 2.53 NP G = 1.23 % SMS= 84.52 % Pasir berlanauM= 13.95 %C= 0.30
4 9533 33
5 95
3 2 2 3 7
34 34
ML40.31 2.68 PL= 36.84 G = 0.00 % Cv=0.0060 ML
LL= 48.41 S= 29.82 % Cc=0.19287 Lanau KepasiranIP= 11.57 M= 65.83 % eo=1.33334
C= 4.35 % k= 1.23E-0.7
35 35
22-M
ay-1
0
1 90
36 36
2 95
8 7 9 9 25 40.86 2.67 PL= 39.65 G = 0.04 % Cv=0.00184 MLLL= 46.44 S= 40.09 % Cc=0.4680 Lanau KepasiranIP= 6.79 M= 59.24 % eo=1.3249
C= 0.64 % k= 7.18E-0.8
37 37
3 95 SW
38 38
4 90
25 45 - - >50
18.65 2.54 NP G = 5.05 % SWS= 81.98 %M= 12.78 %C= 0.19 %
39 39 PROYEK :
HQ
Æ 8
9 m
m
5 90 LOKASI : KOTA MATARAM - NTB
100
40 4030 30 25 - >50
LEGEND : M A T LL= Liquid Limit PL= Plastic Limit IP= Indeks Plastic G = Gravel S= Sand M = Silt C= Clay App.
Sumber : Laboratorium Geoteknik, Jurusan Teknik Sipil, Fakultas Teknik, Universitas Mataram, 2011
S. 8o 34' 49.19" , E. 116o 6' 3.05"C
OR
E B
AR
RE
L
&
B
IT
TY
PE
DE
PT
H O
F W
AT
ER
L
OS
S
ME
TH
OD
O
F
SA
MP
LIN
G
JOIN
T I
NT
ER
VA
L
(cm
)
RO
CK
C
LA
SS
IFIC
AT
ION
S.P
.T B
LO
W /
30
cm
SIN
GLE
BA
RR
EL
- N
Q -
Æ 7
3", w
idia
bit
HQ
Æ 8
9 m
m
F= 30.08 O
c = 0.12617 kg/cm2
HQ
Æ 8
9 m
m
F= 34.59 O
c = 0.0897 kg/cm2
HQ
Æ 8
9 m
m
F= 17.21 O
c = 0.3835 kg/cm2
HQ
Æ 8
9 m
mH
Q Æ
89
mm
F= 23.79 O
c = 0.394 kg/cm2
LABORATORIUM GEOTEKNIK DAN GEODESI JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK UNIVERSITAS MATARAM
HQ
Æ 8
9 m
m
F= 40.20 O
Pasir berkerikil, sedikit butira halus BOR LOG PENGEBORAN INTI
ISLAMIC CENTERc = 0.02417
kg/cm2
INVESTIGASI GEOLOGI DAN SOIL TEST BANGUNAN MASJID UTAMA DAN MINARET ISLAMIC CENTER
DESCRIPTIONOF
LITHOLOGY
BORING LOG
GRAPHOF
R.Q.D
CORING SAMPLING UDSS P T Tlmv Satuan Batuan Gunung api Tua
0 10 20 30 40 50
30
31
32
33
34
35
36
37
38
39
40
0 20 40 60 80 100
36.80 - 40.00 mPasir berkerikil/, basah, SW/SM, masa dasar pasir sangat kasar, membulat - membulat tanggung, kelulusan sangat tinggi, sisipan pasir halus tebal 20 cm (kedalaman 38,1 m )Abu- abu hitam, Kepadatan sangat padat, terdapat 5 - 8 % gravel, ukuran 0.5 - 3 cm, agak bulat, tidak menyudut, keras, warna abu- abu
GRAPHOF
R.Q.DDESCRIPTION
OFLITHOLOGY
34.00 - 36.80 mLanau kepasiran, plastisitas rendah, coklat muda, basah, kepadatan padat, ML, kelulusan rendah
30.00 - 34.00 mPasir kelanauan, pasir halus , kepadatan lpadat, coklat, SM, basah, kelulusan tinggi
Pengujian konsoliasi
tidak dilakukan
karena material
berupa pasir
Pengujian konsoliasi
tidak dilakukan
karena material
berupa pasir
Pengujian konsoliasi
tidak dilakukan karena
material berupa pasir
berkerikil , spt > 50,
00 Nilai spt0 kedalaman Nilai N0 28 410 30.6 300 33.6 70 36 250 38 500 40 500000000000 tajuk BH1 BH3 15 10 10 100 2 71 2 15 - - -0 5 9 5 366 8 12 19 200 7 13 7 350 12 16 17 ?0 10 91 10 40 16 15 12 120 300 430000000000000000000000000000000000000000000000000000000000000000000000000000
BORING NO : BH-2
SHEET : 10 of 15 ###
TOTAL DEPTH : 50 m
PROJECT : INVESTIGASI GEOLOGI & SOIL TEST BANGUNAN MASJID UTAMA & MINARET ISLAMIC CENTER NTB COMMENCEMENT DATE : 15-May-11
LOCATION : KOTA MATARAM - NTB COMPLETION DATE : 30-May-11
GROUND ELEVATION : m DRILLER : Mr. INUL
COORDINATES : X = 401.055.28 , Y = 9.051.428,97 LOGGED : Mr. MSH
DEPTH OF G.W.L : 4.00 m
1 2 3 4 5 6 7 8 9 11 12 13 15 16 17 18 19 20 21 22 23 24
DA
TE
DE
PT
H
IN
ME
TE
R
CA
SS
ING
TY
PE
C O R E S
HA
RD
NE
SS
Field Soil Test - SPT WATER TEST HASIL PENGUJIAN LABORATORIUM REMARKS
SC
AL
E
GW
L I
N M
ET
ER
RU
N N
O.
RE
CO
VE
RY
in %
R.Q
.D in
%
RO
CK
UN
IT
RO
CK
S
YM
BO
L
15
cm
pe
rta
ma
10
cm
pe
rta
ma
10
cm
ke
du
a
10
cm
ke
tiga
GRAFIK NILAI N
k in
cm
/se
c
LU
GE
ON
Ka
da
r A
ir
Be
rat
Jen
is
LL
-P
L
An
alis
a
Bu
tira
n
Su
du
t G
ese
r
Ko
nso
lida
si
Kla
sifik
asi
ta
na
h
24-M
ay-1
1
40
1 90
30 30 25 - >50
SM
41 41
2 95
20.58 2.65 NP G = 21.36 % SWS= 70.10 %M= 8.42 %C= 0.12 %
42 42
3 95
45 47 - - > 50
43 43
4 95
22.52 2.55 NP G = 34.01 % SMS= 51.67 % Pasir kerikilan berlanauM= 13.91 %C= 0.41 %
44 44
5 90
20 21 23 25 69
45 45
6 90
46 46
25-M
ay-1
1
1 90
45 - - - > 50 23.04 2.52 NP G = 48.99 % SPS= 39.02 % Pasir berkerikilM= 11.67 %C= 0.33 %
47 47
2 95
48 48
3 95
19 25 37 - > 50 23.8 2.52 NP G = 36.39 % SPS= 52.62 % Pasir berkerikilM= 10.80 %C= 0.19
49 49 PROYEK :
4 95 LOKASI : KOTA MATARAM - NTBC= 0.17 %
Pasir berkerikilM= 8.07 %
100
S= 46.26 %
50 24.16 2.57 NP G = 45.50 % SP 5025 31 35 - > 50
LEGEND : M A T LL= Liquid Limit PL= Plastic Limit IP= Indeks Plastic G = Gravel S= Sand M = Silt C= Clay App.
Sumber : Laboratorium Geoteknik, Jurusan Teknik Sipil, Fakultas Teknik, Universitas Mataram, 2011
S. 8o 34' 49.19" , E. 116o 6' 3.05"C
OR
E B
AR
RE
L
&
B
IT
TY
PE
DE
PT
H O
F W
AT
ER
L
OS
S
ME
TH
OD
O
F
SA
MP
LIN
G
JOIN
T I
NT
ER
VA
L
(cm
)
RO
CK
C
LA
SS
IFIC
AT
ION
S.P
.T B
LO
W /
30
cm
SIN
GLE
BA
RR
EL
- N
Q -
Æ 7
3", w
idia
bit
HQ
Æ 8
9 m
mH
Q Æ
89
mm
F= 42.27 O
Pasir berkerikil, sedikit butira halusc = 0.0559
kg/cm2
HQ
Æ 8
9 m
m
F= 37.04 O
c = 0.0535 kg/cm2
HQ
Æ 8
9 m
m
F= 37.67 O
c = 0.0005 kg/cm2
LABORATORIUM GEOTEKNIK DAN GEODESI JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK UNIVERSITAS MATARAM
F= 36.68 O
c = 0.0075 kg/cm2
BOR LOG PENGEBORAN INTI ISLAMIC CENTER
INVESTIGASI GEOLOGI DAN SOIL TEST BANGUNAN MASJID UTAMA DAN MINARET ISLAMIC CENTER
c = 0.052 kg/cm2
F= 42.39 O
DESCRIPTIONOF
LITHOLOGY
BORING LOG
GRAPHOF
R.Q.D
CORING SAMPLING UDSS P T Tlmv Satuan Batuan Gunung api Tua
0 10 20 30 40 50
40
41
42
43
44
45
46
47
48
49
50
0 20 40 60 80 100
GRAPHOF
R.Q.DDESCRIPTION
OFLITHOLOGY
40.00 - 50.00 mPasir kelanauan berkerikil, basah, SM,Pasir kasar, Abu- abu hitam, Kepadatan sangat padat, terdapat 5 - 8 % gravel, ukuran 0.5 - 5 cm, agak bulat, agak menyudut, keras, warna , abu- abu, batuan andesit,
Pengujian konsoliasi
tidak dilakukan karena
material berupa pasir
berkerikil , spt > 50,
Pengujian konsoliasi
tidak dilakukan karena
material berupa pasir
berkerikil , spt > 50,
Pengujian konsoliasi
tidak dilakukan karena
material berupa pasir
berkerikil , spt > 50,
Pengujian konsoliasi
tidak dilakukan karena
material berupa pasir
berkerikil , spt > 50,
Pengujian konsoliasi
tidak dilakukan karena
material Pasir
00 Nilai spt0 kedalaman Nilai N0 40 500 42 500 44 500 46 500 48 500 50 500000000000 tajuk BH1 BH3 15 10 10 100 2 71 2 15 - - -0 5 9 5 366 8 12 19 200 7 13 7 350 12 16 17 ?0 10 91 10 40 16 15 12 120 300 430000000000000000000000000000000000000000000000000000000000000000000000000000
BORING NO : BH-3
SHEET : 11 of 15 ###
TOTAL DEPTH : 50 m
PROJECT : INVESTIGASI GEOLOGI & SOIL TEST BANGUNAN MASJID UTAMA & MINARET ISLAMIC CENTER NTB COMMENCEMENT DATE : 1-May-11
LOCATION : KOTA MATARAM - NTB COMPLETION DATE : 30-May-11
GROUND ELEVATION : m DRILLER : Mr. INUL
COORDINATES : X = 401.029,67 , Y = 9.051.503,44 LOGGED : Mr. MSH
DEPTH OF G.W.L : 3.95 m
DATA HASIL PENYELIDIKAN TANAH DI LAPANGAN DAN DI LABORATORIUM (KEDALAMAN 10 - 20)1 2 3 4 5 6 7 8 9 10 11 12 13 15 16 17 18 19 20 21 22 23 24
DA
TE
DE
PT
H
IN
ME
TE
R
CA
SS
ING
TY
PE
C O R E S
HA
RD
NE
SS
Field Soil Test - SPT WATER TEST HASIL PENGUJIAN LABORATORIUM REMARKS
SC
AL
E
GW
L I
N M
ET
ER
RU
N N
O.
RE
CO
VE
RY
in %
R.Q
.D in
%
RO
CK
UN
IT
RO
CK
S
YM
BO
L
15
cm
pe
rta
ma
10
cm
pe
rta
ma
10
cm
ke
du
a
10
cm
ke
tiga
GRAFIK NILAI N
k in
cm
/se
c
LU
GE
ON
Ka
da
r A
ir
Be
rat
Jen
is
LL
-P
L
An
alis
a
Bu
tira
n
Su
du
t G
ese
r
Ko
nso
lida
si
Kla
sifik
asi
ta
na
h
1-M
ay-1
1
0
1 95ML
2 90
1 1
7.24 2.57 NP G = 11.30 % SMS= 74.35 % Pasir kelanauanM= 13.72 %C= 0.63 %
2 2
3 95
1 1 1 1 3SM
3 3
4 92
18.66 2.52 PL= 26.45 G = 6.50 % Cv=0.0040 SMLL= 27.82 S= 61.30 % Cc=0.2507 Pasir Berlanau
4 SM IP= 1.37 M= 29.85 % eo=1.35728 4
5 90
2 2 2 1 5 C= 2.35 % k= 2.24E-0.7
5 51 1 3 4 8
SP6 90
6 6
7 95
19.49 2.54 NP G = 2.77 % SPS= 89.05 % Pasir, sedikit butiran halusM+C=8.18 %
7 7
2-M
ay-1
1
3 2 3 4 9
1 90 MH
8 821.23 2.60 NP G = 1.75 % SWS= 88.55 % Pasir, Gradasi Baik
SP M+C=9.70 %
2 90
9 9 PROYEK :
HQ
Æ 8
9 m
m
3 90
1 1 1 1 3
SM
LOKASI : KOTA MATARAM - NTB
100
10 10
LEGEND : M A T LL= Liquid Limit PL= Plastic Limit IP= Indeks Plastic G = Gravel S= Sand M = Silt C= Clay App.
Sumber : Laboratorium Geoteknik, Jurusan Teknik Sipil, Fakultas Teknik, Universitas Mataram, 2011
S. 8o 34' 46.76" , E. 116o 6' 2.22"C
OR
E B
AR
RE
L
&
B
IT
TY
PE
DE
PT
H O
F W
AT
ER
L
OS
S
ME
TH
OD
O
F
SA
MP
LIN
G
JOIN
T I
NT
ER
VA
L
(cm
)
RO
CK
C
LA
SS
IFIC
AT
ION
S.P
.T B
LO
W /
30
cm
SIN
GLE
BA
RR
EL
- N
Q -
Æ 7
3", w
idia
bit
HQ
Æ 8
9 m
mH
Q Æ
89
mm
F= 32.59 O
c = 0.0055 kg/cm2
HQ
Æ 8
9 m
m
F= 21.05 O
c = 0.0015 kg/cm2
HQ
Æ 8
9 m
mH
Q Æ
89
mm
F= 31.61 O
c = 0.0195 kg/cm2
LABORATORIUM GEOTEKNIK DAN GEODESI JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK UNIVERSITAS MATARAM
HQ
Æ 8
9 m
m
F= 32.10 O
c = 0.018 kg/cm2
BOR LOG PENGEBORAN INTI ISLAMIC CENTER
INVESTIGASI GEOLOGI DAN SOIL TEST BANGUNAN MASJID UTAMA DAN MINARET ISLAMIC CENTER
DESCRIPTIONOF
LITHOLOGY
BORING LOG
GRAPHOF
R.Q.D
CORING SAMPLING UDSS P T Tlmv Satuan Batuan Gunung api Tua
0 10 20 30 40 50
0
1
2
3
4
5
6
7
8
9
10
0 20 40 60 80 100
0.00 - 1.60 mLanau kepasiran, coklat muda, lembab, plastistas rendah, kepadatan lembek, ML, terdapat < 5% gravel, bulat, tidak menyudut, berupa butiran batu apung, lunak , putih kecoklatan, diameter 0.5 - 1.5 cm
1.60 - 3.60 mPasir kelanauan, pasir sedang, lepas, coklat muda, lembab, SM, terdapat 5 - 7 % gravel, bulat, tidak menyudut, berupa butiran batu apung, lunak , putih kecoklatan, diameter 0.5 - 2 cm
5.00 - 8.00 mPasir , pasir halus - sedang, lepas, hitam abu, basah, SP, terdapat 5 - 7 % gravel, bulat, tidak menyudut, berupa butiran batu apung, lunak , putih kecoklatan, diameter 0.5 - 2 cm
3.60 - 5.00 mPasir kelanauan, pasir halus -sedang, lepas, coklat muda, lembab & basah, berupa butiran batu apung, SM, terdapat 5 - 7 % gravel, bulat, tidak menyudut, berupa butiran batu apung, lunak , putih kecoklatan, diameter 0.5 - 2 cm
8.00 - 9.40 mPasir , pasir halus , lepas, basah, , abu abu , SP, gradasi seragam,Kelulusan Tinggi
9.40 - 10.00 mPasir kelanauan, pasir halus -sedang, lepas, coklat muda, basah, SM, sedikit kerikil batuapung warna putih, padat, kelulusan sedang
Pengujian konsoliasi
tidak dilakukan
karena material
berupa pasir
Pengujian konsoliasi
tidak dilakukan
karena material
berupa pasir
Pengujian konsoliasi
tidak dilakukan
karena material
berupa pasir
00 Nilai spt0 kedalaman Nilai N0 0 00 2 30 4 50 5 80 7 90 9 30 12 5000000000 tajuk BH1 BH3 15 10 10 100 2 71 2 15 - - -0 5 9 5 366 8 12 19 200 7 13 7 350 12 16 17 ?0 10 91 10 40 16 15 12 120 300 430000000000000000000000000000000000000000000000000000000000000000000000000000
BORING NO : BH-3
SHEET : 12 of 15 ###
TOTAL DEPTH : 50 m
PROJECT : INVESTIGASI GEOLOGI & SOIL TEST BANGUNAN MASJID UTAMA & MINARET ISLAMIC CENTER NTB COMMENCEMENT DATE : 1-May-11
LOCATION : KOTA MATARAM - NTB COMPLETION DATE : 30-May-11
GROUND ELEVATION : m DRILLER : Mr. INUL
COORDINATES : X = 401.029,67 , Y = 9.051.503,44 LOGGED : Mr. MSH
DEPTH OF G.W.L : 3.95 m
DATA HASIL PENYELIDIKAN TANAH DI LAPANGAN DAN DI LABORATORIUM (KEDALAMAN 10 - 20)1 2 3 4 5 6 7 8 9 11 12 13 15 16 17 18 19 20 21 22 23 24
DA
TE
DE
PT
H
IN
ME
TE
R
CA
SS
ING
TY
PE
C O R E S
HA
RD
NE
SS
Field Soil Test - SPT WATER TEST HASIL PENGUJIAN LABORATORIUM REMARKS
SC
AL
E
GW
L I
N M
ET
ER
RU
N N
O.
RE
CO
VE
RY
in %
R.Q
.D in
%
RO
CK
UN
IT
RO
CK
S
YM
BO
L
15
cm
pe
rta
ma
10
cm
pe
rta
ma
10
cm
ke
du
a
10
cm
ke
tiga
GRAFIK NILAI N
k in
cm
/se
c
LU
GE
ON
Ka
da
r A
ir
Be
rat
Jen
is
LL
-P
L
An
alis
a
Bu
tira
n
Su
du
t G
ese
r
Ko
nso
lida
si
Kla
sifik
asi
ta
na
h
3-M
ay-1
1
10
4 95 SM22.80 2.54 NP G = 0.40 % SM
S= 81.72 % Pasir BerlanauM= 17.41 %C= 0.47 %
11 11
5 95
SP
12 12
6 95
1 1 2 2 5
SP22.64 2.53 NP G = 0.50 % SP
S= 89.60 % Pasir, sedikit butiran halusM= 9.84 %C= 0.06 %
13 13
7 95
14 1423.15 2.55 NP G = 0.15 % SPS= 95.35 % Pasir, sedikit butiran halusM+C=4.50%
8 90
1 1 1 1 1
15 15
4-M
ay-1
1
1 95
16 16
2 95
23.34 2.55 NP G = 0.01 % SPS= 89.85 % Pasir, sedikit butiran halusM+C=10.14%
17 17
3 95
1 1 1 2 4
18 18
4 95
1 1 2 2 5 20.55 2.58 PL= 25.24 G = 0.01 % Cv=0.00188 SMLL= 33.24 S= 78.33 % Cc=0.3878 Pasir kelanauan
ML IP= 7.71 M= 21.51% eo=1.0659C= 0.15 % k= 1.32E-0.7
MH
19 19 PROYEK :
SM 1 1 1 1 3 LOKASI : KOTA MATARAM - NTB
5 95
100
20 20
LEGEND : M A T LL= Liquid Limit PL= Plastic Limit IP= Indeks Plastic G = Gravel S= Sand M = Silt C= Clay App.
Sumber : Laboratorium Geoteknik, Jurusan Teknik Sipil, Fakultas Teknik, Universitas Mataram, 2011
S. 8o 34' 46.76" , E. 116o 6' 2.22"C
OR
E B
AR
RE
L
&
B
IT
TY
PE
DE
PT
H O
F W
AT
ER
L
OS
S
ME
TH
OD
O
F
SA
MP
LIN
G
JOIN
T I
NT
ER
VA
L
(cm
)
RO
CK
C
LA
SS
IFIC
AT
ION
S.P
.T B
LO
W /
30
cm
SIN
GLE
BA
RR
EL
- N
Q -
Æ 7
3", w
idia
bit
HQ
Æ 8
9 m
mH
Q Æ
89
mm
F= 27.63 O
c = 0.012 kg/cm2
HQ
Æ 8
9 m
m
F= 25.05 O
c = 0.0055 kg/cm2
HQ
Æ 8
9 m
m
F= 29.08 O
c = 0.008 kg/cm2
HQ
Æ 8
9 m
m
F= 26.63 O
c = 0.005 kg/cm2
HQ
Æ 8
9 m
m
LABORATORIUM GEOTEKNIK DAN GEODESI JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK UNIVERSITAS MATARAM
HQ
Æ 8
9 m
m
F= 23.82 O
c = 0.032 kg/cm2
BOR LOG PENGEBORAN INTI ISLAMIC CENTER
INVESTIGASI GEOLOGI DAN SOIL TEST BANGUNAN MASJID UTAMA DAN MINARET ISLAMIC CENTER
HQ
Æ 8
9 m
m
DESCRIPTIONOF
LITHOLOGY
BORING LOG
GRAPHOF
R.Q.D
CORING SAMPLING UDSS P T Tlmv Satuan Batuan Gunung api Tua
0 10 20 30 40 50
10
11
12
13
14
15
16
17
18
19
20
0 20 40 60 80 100
19.50- 20.00 mPasir kelanauan, pasir halus -, lepas, abu hitam, basah, SM, kelulusan tinggi
19.20 - 19.50 mLanau kelempungan, plastisitas tinggi, coklat hitam abu, kepadatan lembek, basah, MH, kelulusan rendah
GRAPHOF
R.Q.DDESCRIPTION
OFLITHOLOGY
10.70 - 12.00 mPasir , pasir sedang, lepas, abu kecoklatan, basah, SP, terdapat < 5% gravel, bulat, tidak menyudut, berupa butiran batu apung, lunak , putih kecoklatan, diameter 0.5 - 1 cm, kelulusan tinggi
12.00 - 18.00 mPasir , pasir halus , lepas, basah, hitam abu, SP, gradasi seragam
18.00 - 19.20 mPasir kelanauan, pasir halus -, lepas, abu kecoklatan, basah, SM, kelulusan tinggi
10.00 - 10.70 mPasir kelanauan, pasir halus -sedang, lepas, coklat muda, basah, SM, sedikit kerikil batuapung warna putih, padat, kelulusan sedang Pengujian
konsoliasi tidak
dilakukan karena
material berupa pasir
Pengujian konsoliasi
tidak dilakukan
karena material
berupa pasir
Pengujian konsoliasi
tidak dilakukan
karena material
berupa pasir
Pengujian konsoliasi
tidak dilakukan
karena material
berupa pasir
00 Nilai spt0 kedalaman Nilai N0 9 30 12 50 14.5 10 17 40 18 50 19.5 30 22 5000000000 tajuk BH1 BH3 15 10 10 100 2 71 2 15 - - -0 5 9 5 366 8 12 19 200 7 13 7 350 12 16 17 ?0 10 91 10 40 16 15 12 120 300 430000000000000000000000000000000000000000000000000000000000000000000000000000
BORING NO : BH-3
SHEET : 13 of 15 ###
TOTAL DEPTH : 50 m
PROJECT : INVESTIGASI GEOLOGI & SOIL TEST BANGUNAN MASJID UTAMA & MINARET ISLAMIC CENTER NTB COMMENCEMENT DATE : 1-May-11
LOCATION : KOTA MATARAM - NTB COMPLETION DATE : 30-May-11
GROUND ELEVATION : m DRILLER : Mr. INUL
COORDINATES : X = 401.029,67 , Y = 9.051.503,44 LOGGED : Mr. MSH
DEPTH OF G.W.L : 3.95 m
DATA HASIL PENYELIDIKAN TANAH DI LAPANGAN DAN DI LABORATORIUM (KEDALAMAN 10 - 20)1 2 3 4 5 6 7 8 9 11 12 13 15 16 17 18 19 20 21 22 23 24
DA
TE
DE
PT
H
IN
ME
TE
R
CA
SS
ING
TY
PE
C O R E S
HA
RD
NE
SS
Field Soil Test - SPT WATER TEST HASIL PENGUJIAN LABORATORIUM REMARKS
SC
AL
E
GW
L I
N M
ET
ER
RU
N N
O.
RE
CO
VE
RY
in %
R.Q
.D in
%
RO
CK
UN
IT
RO
CK
S
YM
BO
L
15
cm
pe
rta
ma
10
cm
pe
rta
ma
10
cm
ke
du
a
10
cm
ke
tiga
GRAFIK NILAI N
k in
cm
/se
c
LU
GE
ON
Ka
da
r A
ir
Be
rat
Jen
is
LL
-P
L
An
alis
a
Bu
tira
n
Su
du
t G
ese
r
Ko
nso
lida
si
Kla
sifik
asi
ta
na
h
5-M
ay-1
1
20
HQ
Æ 8
9 m
m
1 95
21.59 2.55 PL= 26.24 G = 0.08 % Cv=0.0027 SMLL= 27.83 S= 73.41 % Cc=0.3443 Pasir kelanauan
SM IP= 1.59 M= 26.35 % eo=0.9348C= 0.16 % k= 8.93E-0.8
21 21
2 95 SP
23.72 2.60 NP G = 0.00 % SPS= 92.81 %
22 M= 7.13 % 22
3 95
1 1 2 2 5 C= 0.06 %
23 23
4 95
24 24
6-M
ay-1
1
1 95
10 4 4 16 24 31.77 2.63 PL= 26.61 G = 1.88 % Cv=0.00413 MLLL= 37.18 S= 47.18 % Cc=0.1965IP= 10.57 M= 49.37 % eo=0.96156
C= 1.57 % k= 1.05E-0.7
ML
25 25
2 95 ML
26 26
3 95
17 21 23 26 70
23.53 2.59 NP G = 11.06 % SMS= 73.33 % Pasir kelanauanM= 15.34 %
SM C= 0.26 %
27 27
4 95
ML
SM 23.40 2.6 PL= 25.90 G = 0.42 % SMLL= 31.16 S= 73.84 % Pasir kelanauan
28 IP= 5.26 M= 25.42 % 28
5 95
5 5 5 7 17 C= 0.32 %
29 ML 29 PROYEK :
6 95 31.44 2.67 PL= 35.44 G = 6.54 % Cv=0.0053 ML LOKASI : KOTA MATARAM - NTBLL= 46.81 S= 40.95 % Cc=0.3383IP= 11.37 M= 51.72 % eo=1.1579
100
C= 0.80 % k= 2.47E-0.7
30 305 7 6 7 20
LEGEND : M A T LL= Liquid Limit PL= Plastic Limit IP= Indeks Plastic G = Gravel S= Sand M = Silt C= Clay App.
Sumber : Laboratorium Geoteknik, Jurusan Teknik Sipil, Fakultas Teknik, Universitas Mataram, 2011
S. 8o 34' 46.76" , E. 116o 6' 2.22"C
OR
E B
AR
RE
L
&
B
IT
TY
PE
DE
PT
H O
F W
AT
ER
L
OS
S
ME
TH
OD
O
F
SA
MP
LIN
G
JOIN
T I
NT
ER
VA
L
(cm
)
RO
CK
C
LA
SS
IFIC
AT
ION
S.P
.T B
LO
W /
30
cm
SIN
GLE
BA
RR
EL
- N
Q -
Æ 7
3", w
idia
bit
F= 21.33 O
c = 0.049 kg/cm2
HQ
Æ 8
9 m
m
F= 24.46 O
Pasir , Sedikit butiran halusc = 0.034
kg/cm2
HQ
Æ 8
9 m
mH
Q Æ
89
mm
F= 13.75 O
Lanau berpasir, plastisitas rendahc = 0.1185
kg/cm2
HQ
Æ 8
9 m
m
F= 30.76 O
c = 0.0595 kg/cm2
HQ
Æ 8
9 m
m
LABORATORIUM GEOTEKNIK DAN GEODESI JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK UNIVERSITAS MATARAMF= 29.11 O
c = 0.0675 kg/cm2
BOR LOG PENGEBORAN INTI ISLAMIC CENTER
HQ
Æ 8
9 m
m INVESTIGASI GEOLOGI DAN SOIL TEST BANGUNAN MASJID UTAMA DAN MINARET ISLAMIC CENTER
F= 19.05 O
Lanau berpasir, plastisitas rendahc = 0.041
kg/cm2
DESCRIPTIONOF
LITHOLOGY
BORING LOG
GRAPHOF
R.Q.D
CORING SAMPLING UDSS P T Tlmv Satuan Batuan Gunung api Tua
0 10 20 30 40 50
20
21
22
23
24
25
26
27
28
29
30
0 20 40 60 80 100
28.65 - 30.00 mLanau kelempungan/ kepasiran, plastisitas rendah, coklat muda, basah, kepadatan agak padat, ML
GRAPHOF
R.Q.DDESCRIPTION
OFLITHOLOGY
20.00 - 21.00 mPasir kelanauan, pasir halus , lepas, coklat, SM, basah, gradasi seragam, kelulusan tinggi
24.00 - 24.80 mLanau kelempungan, plastisitas rendah, coklat tua, kepadatan agak padat, basah, ML, kelulusan sedang
26.40 - 27.00 mPasir kelanauan, pasir halus , sangat padat, abu kecoklatan, SM, basah,
21.00 - 24.00 mPasir , pasir halus , lepas, basah, hitam abu, SP, gradasi seragam, kelulusan tinggi
24.80 - 25.00 mLanau kepasiran, cooklat tua hitam, lbasah, plastistas rendah, kepadatan lagak padat, ML, 25.00 - 26.40 mLanau kepasiran, cooklat tua hitam, lbasah, plastistas rendah, kepadatan padat, ML,
27.00 - 27.45 mLanau kepasiran, cooklat muda, lbasah, plastistas rendah, kepadatan padat, ML, 27.45 - 28.65 mPasir kelanauan, pasir halus , agak padat, abu hitam, SM, basah,
Pengujian konsoliasi
tidak dilakukan
karena material
berupa pasir
Pengujian konsoliasi
tidak dilakukan
karena material
berupa pasir
Pengujian konsoliasi
tidak dilakukan
karena material
berupa pasir
00 Nilai spt0 kedalaman Nilai N0 19.5 30 22 50 24 240 26 500 28 170 30 200000000000 tajuk BH1 BH3 15 10 10 100 2 71 2 15 - - -0 5 9 5 366 8 12 19 200 7 13 7 350 12 16 17 ?0 10 91 10 40 16 15 12 120 300 430000000000000000000000000000000000000000000000000000000000000000000000000000
DATA HASIL PENYELIDIKAN TANAH DI LAPANGAN DAN DI LABORATORIUM (KEDALAMAN 30 - 40)1 2 3 4 5 6 7 8 9 11 12 13 15 16 17 18 19 20 21 22 23 24
DA
TE
DE
PT
H
IN
ME
TE
R
CA
SS
ING
TY
PE
C O R E S
HA
RD
NE
SS
Field Soil Test - SPT WATER TEST HASIL PENGUJIAN LABORATORIUM REMARKS
SC
AL
E
GW
L I
N M
ET
ER
RU
N N
O.
RE
CO
VE
RY
in %
R.Q
.D in
%
RO
CK
UN
IT
RO
CK
S
YM
BO
L
15
cm
pe
rta
ma
10
cm
pe
rta
ma
10
cm
ke
du
a
10
cm
ke
tiga
GRAFIK NILAI N
k in
cm
/se
c
LU
GE
ON
Ka
da
r A
ir
Be
rat
Jen
is
LL
-P
L
An
alis
a
Bu
tira
n
Su
du
t G
ese
r
Ko
nso
lida
si
Kla
sifik
asi
ta
na
h
8-M
ay-1
1
30
1 93
5 7 6 7 20
ML
31 31
2 93 SM
21.92 2.56 NP G = 1.13 SMS= 79.62 % Pasir Kelanauan
32 M= 19.09 % 32
3 95
3 2 4 5 11 C= 0.16 %
33 33
4 95
34 34
9-M
ay-1
1
1 95
24.21 2.55 PL= 26.76 G = 13.84 % SMLL= 35.45 S= 47.03 % Pasir KelanauanIP= 8.69 M= 38.59 %
C= 0.55 %
32 43 - - >502 96
35 35
3 95
24.59 2.56 PL= 28.35 G = 3.39 % SM
36 LL= 31.76 S= 61.54 % Pasir Kelanauan 36
4 95
15 20 18 21 59 IP= 3.41 M= 34.65 %C= 0.41 %
SM
37 37
5 95
38 38
10-M
ay-1
1
1 95
SM 25 25 20 29 74
19.87 2.54 NP G = 53.66 % GPS= 40.37 %M+C=5.97 %
39 39
HQ
Æ 8
9 m
m
2 95
100
40 4015 18 20 21 59
LEGEND : M A T LL= Liquid Limit PL= Plastic Limit IP= Indeks Plastic G = Gravel S= Sand M = Silt C= Clay App.
Sumber : Laboratorium Geoteknik, Jurusan Teknik Sipil, Fakultas Teknik, Universitas Mataram, 2011
CO
RE
BA
RR
EL
&
BIT
T
YP
E
DE
PT
H O
F W
AT
ER
L
OS
S
ME
TH
OD
O
F
SA
MP
LIN
G
JOIN
T I
NT
ER
VA
L
(cm
)
RO
CK
C
LA
SS
IFIC
AT
ION
S.P
.T B
LO
W /
30
cm
SIN
GLE
BA
RR
EL
- N
Q -
Æ 7
3", w
idia
bit
HQ
Æ 8
9 m
mH
Q Æ
89
mm
F= 27.29 O
c = 0.014 kg/cm2
HQ
Æ 8
9 m
m
F= 33.18 O
c = 0.02 kg/cm2
HQ
Æ 8
9 m
m
F= 31.28 O
HQ
Æ 8
9 m
m
c = 0.001 kg/cm2
HQ
Æ 8
9 m
m
F= 38.35 O
Kerikil Gradasi buruk, campuran pasir kerikil c = 0.0015
kg/cm2
DESCRIPTIONOF
LITHOLOGY
GRAPHOF
R.Q.D
CORING SAMPLING UDSS P T Tlmv Satuan Batuan Gunung api Tua
0 10 20 30 40 50
30
31
32
33
34
35
36
37
38
39
40
0 20 40 60 80 100
36.00 - 37.00 mPasir kelanauan, basah, SM,Pasir kasar, coklat tua, Kepadatan padat, terdapat < 5% gravel, ukuran 0.5 - 2 cm, agak bulat, tidak menyudut, keras, warna abu- abu
GRAPHOF
R.Q.DDESCRIPTION
OFLITHOLOGY
31.00 - 36.00 mPasir kelanauan, pasir halus , kepadatan agak , padat, hitam abu- abu
30.00 - 31.00 mLanau kelempungan/ kepasiran, plastisitas rendah, coklat muda, basah, kepadatan agak padat, ML
37.00 - 40.00 mPasir kelanauan berkerikil, basah, SM,Pasir kasar, abu- abu kecoklatan , Kepadatan sangat padat, terdapat 5 - 8 % gravel, ukuran 0.5 - 6 cm, agak bulat, agak menyudut, keras, warna abu- abu
Pengujian konsoliasi
tidak dilakukan
karena material
berupa pasir
Pengujian konsoliasi
tidak dilakukan
karena material
berupa pasir
Pengujian konsoliasi
tidak dilakukan
karena material
berupa pasir
Pengujian konsoliasi
tidak dilakukan karena
material berupa kerikil berpasir, spt
> 50,
DATA HASIL PENYELIDIKAN TANAH DI LAPANGAN DAN DI LABORATORIUM (KEDALAMAN 40 - 50)1 2 3 4 5 6 7 8 9 11 12 13 15 16 17 18 19 20 21 22 23 24
DA
TE
DE
PT
H
IN
ME
TE
R
CA
SS
ING
TY
PE
C O R E S
HA
RD
NE
SS
Field Soil Test - SPT WATER TEST HASIL PENGUJIAN LABORATORIUM REMARKS
SC
AL
E
GW
L I
N M
ET
ER
RU
N N
O.
RE
CO
VE
RY
in %
R.Q
.D in
%
RO
CK
UN
IT
RO
CK
S
YM
BO
L
15
cm
pe
rta
ma
10
cm
pe
rta
ma
10
cm
ke
du
a
10
cm
ke
tiga
GRAFIK NILAI N
k in
cm
/se
c
LU
GE
ON
Ka
da
r A
ir
Be
rat
Jen
is
LL
-P
L
An
alis
a
Bu
tira
n
Su
du
t G
ese
r
Ko
nso
lida
si
Kla
sifik
asi
ta
na
h
10-M
ay-1
1
40
3 90
15 18 20 21 59
SM20.49 2.57 NP G = 56.09 % GP
S= 40.28 %M+C=3.63%
4 9541 41
5 95
42 42
6 95
27 20 25 28 73
21.00 2.57 NP G = 15.93 % SMS= 70.25 %
7 95
M= 13.17 %C= 0.65 %
43 43
13-M
ay-1
1
1 95
44 44
2 90
25 25 30 - > 50
30.62 2.68 PL= 28.72 G = 2.26 % Cv=0.0032 CHLL= 55.44 S= 26.21 % Cc=0.3300IP= 26.72 M= 50.34 % eo=1.3293
CH C= 21.19 % k= 6.22E-0.8
45 45
3 95
SM
46 46
4 95
5 5 4 6 15 22.61 2.56 PL= 24.85 G = 18.0 % SMLL= 26.77 S= 61.00 % Pasir kelanauanIP= 1.92 M= 18.05 %
C= 2.95 %
47 47
5 95
48 48
6 95
26.38 2.60 PL= 25.00 G = 2.41 % Cv=0.0055 MLML LL= 26.69 S= 45.12 % Cc=0.2389
IP= 1.69 M= 50.45 % eo=0.8918C= 2.02 % k= 2.77E-0.7
4 3 5 6 147 95
49 49
8 95
SM
100
50 505 10 17 16 43
LEGEND : M A T LL= Liquid Limit PL= Plastic Limit IP= Indeks Plastic G = Gravel S= Sand M = Silt C= Clay App.
Sumber : Laboratorium Geoteknik, Jurusan Teknik Sipil, Fakultas Teknik, Universitas Mataram, 2011
CO
RE
BA
RR
EL
&
BIT
T
YP
E
DE
PT
H O
F W
AT
ER
L
OS
S
ME
TH
OD
O
F
SA
MP
LIN
G
JOIN
T I
NT
ER
VA
L
(cm
)
RO
CK
C
LA
SS
IFIC
AT
ION
S.P
.T B
LO
W /
30
cm
SIN
GLE
BA
RR
EL
- N
Q -
Æ 7
3", w
idia
bit
HQ
Æ 8
9 m
m
F= 38.73 O
Kerikil Gradasi buruk, campuran pasir kerikil
HQ
Æ 8
9 m
m
c = 0.0055 kg/cm2
HQ
Æ 8
9 m
m
F= 34.96 O
Pasir berlanau mengandung kerikillc = 0.0235
kg/cm2
HQ
Æ 8
9 m
m
F= 11.35 O
lempung , Plastisitas tinggic = 0.3722
kg/cm2
HQ
Æ 8
9 m
m
F= 34.79 O
c = 0.0975 kg/cm2
F= 22.70 O
Lanau berpasir, plastisitas rendahc = 0.1615
kg/cm2
DESCRIPTIONOF
LITHOLOGY
GRAPHOF
R.Q.D
CORING SAMPLING UDSS P T Tlmv Satuan Batuan Gunung api Tua
0 10 20 30 40 50
40
41
42
43
44
45
46
47
48
49
50
0 20 40 60 80 100
45.30 - 47.55 mPasir kelanauan berkerikil, basah, SM,Pasir kasar, coklat tua, Kepadatan padat, terdapat < 5 % gravel, ukuran 0.5 - 3 cm, agak bulat, agak menyudut, keras, warna , abu- abu, batuan andesit,
GRAPHOF
R.Q.DDESCRIPTION
OFLITHOLOGY
44.50 - 45.30 mLempung kelanauan, Plastisitas tinggi,coklat tua hitam, basah, kepadatan lembek, CH
40.00 - 44.50 mPasir kelanauan berkerikil , basah, SM,Pasir kasar, abu- abu kecoklatan , Kepadatan sangat padat, terdapat 5 - 8 % gravel, ukuran 0.5 - 6 cm, agak bulat, agak menyudut, keras, warna abu- abu
47.55 - 49.10 mLanau kepasiran, plastisitas rendah, coklat muda, basah, kepadatan agak padat, ML
49.10 - 50.00 mPasir kelanauan berkerikil , basah, SM,Pasir kasar, hitam abu- abu, Kepadatan sangat padat,terdapat 5 - 8 % gravel, ukuran 0.5 - 3 cm, agak bulat, agak menyudut, keras, warna , abu- abu, batuan andesit,
Pengujian konsoliasi
tidak dilakukan karena
material berupa kerikil berpasir, spt
> 50,
Pengujian konsoliasi
tidak dilakukan karena
material berupa Pasir
kelanauan berkerikil,
spt > 50,
Pengujian konsoliasi
tidak dilakukan
karena material
berupa pasir