dated: february plans have been revised to eliminate …gis.dot.nh.gov/plan/14633h.pop.pdf ·...
TRANSCRIPT
REVISION ATER PROPOSAL #1 DATED: FEBRUARY 10, 2017
PLANS HAVE BEEN REVISED TO ELIMINATE AND REPLACE THE WIRELESS COMMUNICATION SYSTEM WITH A FIBER OPTIC BACKBONE SYSTEM. THE FOLLOWING SHEETS HAVE BEEN MODIFIED: 1, 2,47, 49, 50, 52, 53, 312, 365, 368, 445-449, 451 AND 452. THE FOLLOWING SHEETS HAVE BEEN ADDED TO THE PROJECT: 53A, 443A, 443B, AND SHEETS 452A-452D. ALL SHEETS ASSOCIATED WITH THIS REVISION INCLUDE A SUFFIX OF "RAP1" IN THE SHEET NUMBER DESIGNATION.
10
2-
02-
17
1
AD
D
FI
BE
R
OP
TI
C
CO
MM
UNI
CA
TI
ON
S
SY
ST
EM
1 34
13
13
2,641.9
2,650
8.1
From Supplemental Schedule*
* SEE SUPPLEMENTAL ITS DEVICES, FIBER OPTIC BACKBONE, PULL BOX, AND CONDUIT SCHEDULE
47 RAP1
10
2-
02-
17
1
AD
D
FI
BE
R
OP
TI
C
CO
MM
UNI
CA
TI
ON
S
SY
ST
EM
SEE SUPPLEMENTAL QUANTITY TABLE FOR ITS DEVICES, FIBER OPTIC BACKBONE, PULL BOX, AND CONDUITS.
1
49 RAP1
10
2-
02-
17
1A
DD
FI
BE
R
OP
TI
C
CO
MM
UNI
CA
TI
ON
S
SY
ST
EM
SEE SUPPLEMENTAL QUANTITY TABLE FOR ITS DEVICES, FIBER OPTIC BACKBONE, PULL BOX, AND CONDUITS.
1
50 RAP1
10
2-
02-
17
1
AD
D
FI
BE
R
OP
TI
C
CO
MM
UNI
CA
TI
ON
S
SY
ST
EM
SEE SUPPLEMENTAL QUANTITY TABLE FOR ITS DEVICES, FIBER OPTIC BACKBONE, PULL BOX, AND CONDUITS.
1
* * *
11
385
635
635
52 RAP1
10
2-
02-
17
NE
W
SH
EE
T:
AD
D
FI
BE
R
OP
TI
C
CO
MM
UNI
CA
TI
ON
S
SY
ST
EM
SUMMARY OF QUANTITIES1
1
53A RAP1
STATE PROJECT NO. SHEET NO. TOTAL SHEETS
SH
EE
T
CH
EC
KE
D
AS
BUI
LT
DE
TAI
LS
DA
TE
DA
TE
DA
TE
DA
TE
NU
MB
ER
DA
TE
ST
ATI
ON
ST
ATI
ON
DE
SC
RI
PTI
ON
RE
VI
SI
ON
S
AF
TE
R
PR
OP
OS
AL
DGN
STATE OF NEW HAMPSHIRE
NE
W
DE
SI
GN
DEPARTMENT OF TRANSPORTATION BUREAU OF HIGHWAY DESIGN
DATE PLOTTED VHB PROJECT NO.
52525.112/2/2017
SD
R
PR
OC
ES
SE
D
52525.11-QTY.dgn 1343
MD
S
EG
D
CL
D
6/
26/
20
15
1/
9/
20
14
-
14633H
10
2-
02-
17
AD
D
FI
BE
R
OP
TI
C
CO
MM
UNI
CA
TI
ON
S
SY
ST
EM
SEE SUPPLEMENTAL QUANTITY TABLE FOR ITS DEVICES, FIBER OPTIC BACKBONE, PULL BOX, AND CONDUITS.
1
*
1
*
1
53 RAP1
309
10
2-
02-
17
AD
D
FI
BE
R
OP
TI
C
CO
MM
UNI
CA
TI
ON
S
SY
ST
EM
1
SEE SHEET 443B RAP1 FOR NEW EQUIPMENT
312 RAP1
ITS
PB
10
2-
02-
17
AD
D
FI
BE
R
OP
TI
C
CO
MM
UNI
CA
TI
ON
S
SY
ST
EM
1
SEE SHEET 443B RAP1 FOR NEW EQUIPMENT
365 RAP1
ITS
PB
10
2-
02-
17
CONSTRUCTION NOTES:
3.
2.
1.
AD
D
FI
BE
R
OP
TI
C
CO
MM
UNI
CA
TI
ON
S
SY
ST
EM
1
113
ITS DEVICES SHALL BE LIMITED TO NOT MORE THAN FOUR (4) HOURS DOWNTIME.
COMMUNICATIONS TO ITS DEVICES 93-N-X-16.2-CCTV-X-5 AND 93-N-16.2-VSL-D-5 MAY BE INTERRUPTED. DURING THIS WORK, THE EXISTING
PRIOR TO ANY FIBER OPTIC SPLICING, THE CONTRACTOR SHALL NOTIFY THE TMC (603-271-6862) THAT THE EXISTING FIBER OPTIC
COMMUNICATIONS INTERCONNECT PLAN.
THE CONTRACTOR SHALL RE-SPLICE AND RE-CONNECT ALL FIBERS AT THE SPLICE VAULT AS INDICATED IN THE FIBER OPTIC SPLICE TABLES AND
ENCLOSURE SHALL BE SUBSIDIARY TO ITEM 677.53.
THE CONTRACTOR SHALL FURNISH AND INSTALL A NEW SPLICE ENCLOSURE AT THE EXISTING SPLICE VAULT AT STA 3847+48, LT. THE SPLICE
368 RAP1
pb
pb
pb pb
pb
pb
pbpb
pb
pb
its
s vf
mp
cb
cb
cb
cb
cb
cbcb
cb
cb
cb
cb
cb
f&a
cb
f&a
bnd
post
.4"
"14
"grooved shoulders"
caution
motorcycles use
w.w.f.
.4"
"14
beam guardrail
bnd
.4"
"14
"grooved shoulders"
caution
motorcycles use
w.w.f.
10' atv trail
.4"
"14
beam guardrail
PSS
STATE PROJECT NO. SHEET NO. TOTAL SHEETS
SH
EE
T
CH
EC
KE
D
AS
BUI
LT
DE
TAI
LS
DA
TE
DA
TE
DA
TE
DA
TE
NU
MB
ER
DA
TE
ST
ATI
ON
ST
ATI
ON
DE
SC
RI
PTI
ON
RE
VI
SI
ON
S
AF
TE
R
PR
OP
OS
AL
DGN
STATE OF NEW HAMPSHIRE
NE
W
DE
SI
GN
DEPARTMENT OF TRANSPORTATION BUREAU OF HIGHWAY DESIGN
CL
D
EG
D
MD
S
- 1/
9/
20
14
6/
26/
20
15
SCALE IN FEET
0
DATE PLOTTED VHB PROJECT NO.
52525.112/3/2017
SD
R
PR
OC
ES
SE
D
14633H-ITS1.dgn 134314633H
20 20 40
20
1756 1757 1758 1759 1760 1761
3758 3759 3760 3761 3762 3763 3764
GRID
I-93 SOUTHBOUND
I-93 NORTHBOUND
CONSTRUCTION NOTES:
1
10
2-
02-
17
1 93-S-14.4-VSL-D-5
93-S-X-14.4-CCTV-A-5
3.
2.
1.
NE
W
SH
EE
T
1
443A RAP1
ITS DEVICES SHALL BE LIMITED TO NOT MORE THAN FOUR (4) HOURS DOWNTIME.
COMMUNICATIONS TO ITS DEVICES 93-S-X-14.4-CCTV-X-5 AND 93-S-14.4-VSL-D-5 MAY BE INTERRUPTED. DURING THIS WORK, THE EXISTING
PRIOR TO ANY FIBER OPTIC SPLICING, THE CONTRACTOR SHALL NOTIFY THE TMC (603-271-6862) THAT THE EXISTING FIBER OPTIC
OPTIC SPLICE TABLES AND COMMUNICATIONS INTERCONNECT PLAN.
THE CONTRACTOR SHALL RE-SPLICE AND RE-CONNECT ALL FIBERS AT THE PATCH PANEL AND THE SPLICE VAULT AS INDICATED IN THE FIBER
SALEM-MANCHESTER 14633F AND 14633I CONSTRUCTION PLANS AT THIS LOCATION.)
(NOTE: THE LOCATION OF THIS SPLICE VAULT HAS BEEN FIELD ADJUSTED, AND AS SUCH DOES NOT REFLECT THE INFRASTRUCTURE SHOWN ON THE
ENCLOSURE SHALL BE SUBSIDIARY TO ITEM 677.53.
THE CONTRACTOR SHALL FURNISH AND INSTALL A NEW SPLICE ENCLOSURE AT THE EXISTING SPLICE VAULT AT STA 3761+65, LT. THE SPLICE
mh
s
mh
s
pb
mp
pb
Appr
ox.
Exist. L
AROW
HH
pb
pb
pb
pb
CC
pb
pb
pb pb
PB
PB
pbpb
pb
pb
pb
pb
pb
di
cb
pb
pb
mp
vp
pb
di
cb
di
di
cb
cb
cb
cb
cb
cb
cb
cbc
b
cb
cb
cb
cb
cb
cb
bnd
bnd
s vf
mp
20" d.i.
water
413
414
3808
3809
3810
3807
622
623
624
625
ITS
PB
HH
pb
pb
pb
pb
CC
pb
pb
pb pb
PB
PB
pbpb
pb
pb
pb
pb
pb
di
cb
pb
pb
mp
vp
pb
di
cb
di
di
cb
cb
cb
cb
cb
cb
cb
cbc
b
cb
cb
cb
cb
cb
cb
bnd
bnd
s vf
5' c.l.f.
20" d.i.
water
Appr
ox.
Exist. L
AROW
STATE PROJECT NO. SHEET NO. TOTAL SHEETS
SH
EE
T
CH
EC
KE
D
AS
BUI
LT
DE
TAI
LS
DA
TE
DA
TE
DA
TE
DA
TE
NU
MB
ER
DA
TE
ST
ATI
ON
ST
ATI
ON
DE
SC
RI
PTI
ON
RE
VI
SI
ON
S
AF
TE
R
PR
OP
OS
AL
DGN
STATE OF NEW HAMPSHIRE
NE
W
DE
SI
GN
DEPARTMENT OF TRANSPORTATION BUREAU OF HIGHWAY DESIGN
SCALE IN FEET
0
DATE PLOTTED VHB PROJECT NO.
52525.112/2/2017
SD
R
PR
OC
ES
SE
D
14633H-ITS2.dgn 1343
MD
S
EG
D
CL
D
6/
26/
20
15
1/
9/
20
14
-
14633H
20 20 40
25
23
22
24
21
GRID
I-93 SOUTHBOUND
CONSTRUCTION NOTES:
10
2-
02-
17
1
RO
UT
E 28 (
RO
CKI
NG
HA
M
RO
AD)
7.
6.
5.
4.
3.
2.
1.
93-S-X-15.3-CCTV-A-5
NE
W
SH
EE
T
INSTALL 3-CONDUCTOR #8 AWG CABLE FROM THE 40 AMP BREAKER TO THE POWER PANEL AT THE NEW ITS HUB CABINET AT STA 623+90, RT 55'.
THE CONTRACTOR SHALL FURNISH AND INSTALL A NEW 40 AMP BREAKER AT THE EXISTING ITS METER PEDESTAL AT STA 624+05, RT 60'.
OPTIC SPLICE TABLES AND THE COMMUNICATIONS INTERCONNECT PLAN.
THE CONTRACTOR SHALL RE-SPLICE AND RE-CONNECT ALL FIBERS AT THE SPLICE VAULT AND THE PATCH PANELS AS INDICATED IN THE FIBER
SHALL BE CONSIDERED FIBERS #13-#24.
THE CONTRACTOR SHALL INSTALL A PARALLEL 12-STRAND FIBER OPTIC CABLE FROM THE SPLICE VAULT TO THE NEW HUB CABINET. THIS CABLE
SHALL BE CONSIDERED FIBERS #1-#12.
FROM THE CCTV EQUIPMENT CABINET TO THE SPLICE VAULT AND RE-INSTALL FROM THE SPLICE VAULT TO THE NEW HUB CABINET. THIS CABLE
EXISTING ITS EQUIPMENT CABINET AT STA 624+38, RT 72'. THE CONTRACTOR SHALL PULL BACK THE EXISTING 12-STRAND FIBER OPTIC CABLE
THE CONTRACTOR SHALL INTERCEPT THE EXISTING FIBER OPTIC CONDUIT RUN BETWEEN THE EXISTING SPLICE VAULT AT STA 622+56 AND THE
LIMITED TO NOT MORE THAN FOUR (4) HOURS DOWNTIME.
COMMUNICATIONS TO ITS DEVICES 93-S-X-15.3-CCTV-X-5 MAY BE INTERRUPTED. DURING THIS WORK, THE EXISTING ITS DEVICES SHALL BE
PRIOR TO ANY FIBER OPTIC SPLICING, THE CONTRACTOR SHALL NOTIFY THE TMC (603-271-6862) THAT THE EXISTING FIBER OPTIC
SEE FIBER OPTIC SPLICE TABLES AND COMMUNICATIONS INTERCONNECT PLAN FOR SPLICING DETAILS.
THE CONTRACTOR SHALL MODIFY THE SPLICES IN THE EXISTING SPLICE ENCLOSURE AT SPLICE VAULT #21 AT STA 622+56.
1
443B RAP1
Approx. Exist. LAROWbnd
post
cb
cb
.6"
"16
3875 3876 3877 3878 3879 3880
B-10B-10
LAROWLAROW
FOD
ITS
ITS 5453
5251
2
bndpost
cb
cb
15"rcp
15"rcp
.6"
"16
Approx. Exist. LAROW
STATE PROJECT NO. SHEET NO. TOTAL SHEETS
SH
EE
T
CH
EC
KE
D
AS
BUI
LT
DE
TAI
LS
DA
TE
DA
TE
DA
TE
DA
TE
NU
MB
ER
DA
TE
ST
ATI
ON
ST
ATI
ON
DE
SC
RI
PTI
ON
RE
VI
SI
ON
S
AF
TE
R
PR
OP
OS
AL
DGN
STATE OF NEW HAMPSHIRE
NE
W
DE
SI
GN
DEPARTMENT OF TRANSPORTATION BUREAU OF HIGHWAY DESIGN
CL
D
EG
D
MD
S
- 1/
9/
20
14
6/
26/
20
15
SCALE IN FEET
0
DATE PLOTTED VHB PROJECT NO.
52525.112/2/2017
SD
R
PR
OC
ES
SE
D
14633H-CCTV16.7_S.dgn 1343
MD
S
EG
D
CL
D
6/
26/
20
15
1/
9/
20
14
-
14633H
20 20 40
GRID
I-93 NORTHBOUND
CCTV 93 16.7_S
PROPOSED REMARKS
LEGEND
SOLAR PANEL ARRAY
CONSTRUCTION NOTES:
6.
5.
4.
3.
2.
1.
10
2-
02-
17
RE
MO
VE
WI
RE
LE
SS
CO
MM
UNI
CA
TI
ON
S
AN
TE
NN
A
CONTRACTOR SHALL PROVIDE A GROUND MOUNTED ITS CABINET TO HOUSE BATTERIES AND ALL NECESSARY SOLAR SYSTEM DEVICES.
FOR ALL EQUIPMENT AT THE ITS DEVICE.
CONTRACTOR SHALL PROVIDE A SOLAR PANEL ARRAY AND ASSOCIATED EQUIPMENT SUBSIDIARY TO ITEM 677.4102 TO PROVIDE NECESSARY POWER
SPLICE ENCLOSURE SPLICING DETAILS.
CONCRETE FIBER OPTIC SPLICE VAULT AT STA 3877+89, LT 42' FOR FIBER OPTIC DROP CABLE. SEE COMMUNICATIONS INTERCONNECT PLAN FOR
CONTRACTOR SHALL PROVIDE A 3-INCH PVC CONDUIT FROM THE GROUND MOUNTED ITS EQUIPMENT CABINET TO THE PROPOSED 48"x96"x48"
CONTRACTOR SHALL REFER TO THE COMMUNICATIONS SYSTEM DIAGRAM FOR CABINET EQUIPMENT AND INTERNAL CONNECTIONS BETWEEN EQUIPMENT.
CONTRACTOR SHALL REFER TO THE CCTV DETAILS FOR GROUNDING AND INSTALLATION OF CCTV 93 16.7_S.
CONTRACTOR SHALL REFER TO THE ITS EQUIPMENT CABINET DETAILS FOR THE GROUND MOUNTED ITS EQUIPMENT CABINET DETAILS.
11
1
445 RAP1
Approx. Exist. LAROW
L87
GAZOULIS, RUBY L.
GAZOULIS, EARL G.
Approx. Exist. LAROW
post
bnd
bnd
di
beam guardrail
beam guardrail
double beam guardrail
manchester"
entering
"city line
londonderry"
"town line
3890
3891
3892 3893
3894 3895
1887 1888 1889 1890 1891 1892 1893
B-3ITS
ITS PB
ITS
ITS PB FOD56
57
58
59
post
bnd
bnd
di
6" cmp
6" c
mp
beam guardrail
beam guardrail
s.a.c.
double beam guardrail
6" bcpcmp
6" bcpcmp
12"cmp
6" bcpcmp
6" bcpcmp
manchester"
entering
"city line
outcrop
ledge
ledge
londonderry"
"town line
Approx. Exist. LAROW
L87
GAZOULIS, RUBY L.
GAZOULIS, EARL G.
Approx. Exist. LAROW
PFO
STATE PROJECT NO. SHEET NO. TOTAL SHEETS
SH
EE
T
CH
EC
KE
D
AS
BUI
LT
DE
TAI
LS
DA
TE
DA
TE
DA
TE
DA
TE
NU
MB
ER
DA
TE
ST
ATI
ON
ST
ATI
ON
DE
SC
RI
PTI
ON
RE
VI
SI
ON
S
AF
TE
R
PR
OP
OS
AL
DGN
STATE OF NEW HAMPSHIRE
NE
W
DE
SI
GN
DEPARTMENT OF TRANSPORTATION BUREAU OF HIGHWAY DESIGN
CL
D
EG
D
MD
S
- 1/
9/
20
14
6/
26/
20
15
SCALE IN FEET
0
DATE PLOTTED VHB PROJECT NO.
52525.112/2/2017
SD
R
PR
OC
ES
SE
D
14633H-CCTV17.0_N.dgn 134314633H
20 20 40
CCTV 93 17.0_N
GRID
I-93 SOUTHBOUND
I-93 NORTHBOUND
CONSTRUCTION NOTES:
6.
5.
4.
3.
2.
1.T
OW
N
OF
LO
ND
ON
DE
RR
Y
CI
TY
OF
MA
NC
HE
ST
ER
PROPOSED REMARKS
LEGEND
SOLAR PANEL ARRAY1
1
CONTRACTOR SHALL PROVIDE A GROUND MOUNTED ITS CABINET TO HOUSE BATTERIES AND ALL NECESSARY SOLAR SYSTEM DEVICES.
FOR ALL EQUIPMENT AT THE ITS DEVICE.
CONTRACTOR SHALL PROVIDE A SOLAR PANEL ARRAY AND ASSOCIATED EQUIPMENT SUBSIDIARY TO ITEM 677.4103 TO PROVIDE NECESSARY POWER
COMMUNICATIONS INTERCONNECT PLAN FOR SPLICE ENCLOSURE SPLICING DETAILS.
CONCRETE FIBER OPTIC SPLICE VAULT AT STA 3896+59, LT 42' FOR FIBER OPTIC DROP CABLE (SHARED WITH CCTV CCTV 93 17.2_N). SEE
CONTRACTOR SHALL PROVIDE A 3-INCH PVC CONDUIT FROM THE GROUND MOUNTED ITS EQUIPMENT CABINET TO THE PROPOSED 48"x96"x48"
CONTRACTOR SHALL REFER TO THE COMMUNICATIONS SYSTEM DIAGRAM FOR CABINET EQUIPMENT AND INTERNAL CONNECTIONS BETWEEN EQUIPMENT.
CONTRACTOR SHALL REFER TO THE CCTV DETAILS FOR GROUNDING AND INSTALLATION OF CCTV 93 17.0_N.
CONTRACTOR SHALL REFER TO THE ITS EQUIPMENT CABINET DETAILS FOR THE POLE MOUNTED ITS EQUIPMENT CABINET DETAILS.
1
10
2-
02-
17
RE
MO
VE
WI
RE
LE
SS
CO
MM
UNI
CA
TI
ON
S
AN
TE
NN
A
446 RAP1
Approx. Exist. L.A.R.O.W.
Approx. Exist. LAROW
Approx. Exist. LAROW
post
post
post
cb
cb
beam guardrail
.2""17
1908 1909
1907 1906 1905 1904
1903
PBITSITS
PB
FOD
65
66
67
64
post
post
post
cb
cb
24"rcp
beam guardrail
6" bcpcmp
6" bcpcmp
.2""17
Approx. Exist. LAROW
Approx. Exist. LAROW
STATE PROJECT NO. SHEET NO. TOTAL SHEETS
SH
EE
T
CH
EC
KE
D
AS
BUI
LT
DE
TAI
LS
DA
TE
DA
TE
DA
TE
DA
TE
NU
MB
ER
DA
TE
ST
ATI
ON
ST
ATI
ON
DE
SC
RI
PTI
ON
RE
VI
SI
ON
S
AF
TE
R
PR
OP
OS
AL
DGN
STATE OF NEW HAMPSHIRE
NE
W
DE
SI
GN
DEPARTMENT OF TRANSPORTATION BUREAU OF HIGHWAY DESIGN
CL
D
EG
D
MD
S
- 1/
9/
20
14
6/
26/
20
15
SCALE IN FEET
0
DATE PLOTTED VHB PROJECT NO.
52525.112/2/2017
SD
R
PR
OC
ES
SE
D
14633H-CCTV17.2_N.dgn 134314633H
20 20 40
GRI
D
CCTV 93 17.2_N
I-93 NORTHBOUND
CONSTRUCTION NOTES:
6.
5.
4.
3.
2.
1.
1
PROPOSED REMARKS
LEGEND
SOLAR PANEL ARRAY1
10
2-
02-
17
RE
MO
VE
WI
RE
LE
SS
CO
MM
UNI
CA
TI
ON
S
AN
TE
NN
A
1
CONTRACTOR SHALL PROVIDE A GROUND MOUNTED ITS CABINET TO HOUSE BATTERIES AND ALL NECESSARY SOLAR SYSTEM DEVICES.
FOR ALL EQUIPMENT AT THE ITS DEVICE.
CONTRACTOR SHALL PROVIDE A SOLAR PANEL ARRAY AND ASSOCIATED EQUIPMENT SUBSIDIARY TO ITEM 677.4104 TO PROVIDE NECESSARY POWER
INTERCONNECT PLAN FOR SPLICE ENCLOSURE SPLICING DETAILS.
FIBER OPTIC SPLICE VAULT AT STA 3896+59, LT 42' FOR FIBER OPTIC DROP CABLE (SHARED WITH CCTV 93 17.0_N). SEE COMMUNICATIONS
CONTRACTOR SHALL PROVIDE A 3-INCH PVC CONDUIT FROM THE POLE MOUNTED ITS EQUIPMENT CABINET TO THE PROPOSED 48"x96"x48" CONCRETE
CONTRACTOR SHALL REFER TO THE COMMUNICATIONS SYSTEM DIAGRAM FOR CABINET EQUIPMENT AND INTERNAL CONNECTIONS BETWEEN EQUIPMENT.
CONTRACTOR SHALL REFER TO THE CCTV DETAILS FOR GROUNDING AND INSTALLATION OF CCTV 93 17.2_N.
CONTRACTOR SHALL REFER TO THE ITS EQUIPMENT CABINET DETAILS FOR THE POLE MOUNTED ITS EQUIPMENT CABINET DETAILS.
447 RAP1
$CCTV5$
VSLS 93 17.8_S
CCTV 93 17.8_S
GRI
D
I-93 SOUTHBOUND
CONSTRUCTION NOTES:
6.
5.
4.
3.
2.
1.
I-93 SOUTHBOUND
EASEMENT
UTILITY
1
1
10
2-
02-
17
RE
MO
VE
WI
RE
LE
SS
CO
MM
UNI
CA
TI
ON
S
AN
TE
NN
A
1
PLAN FOR SPLICE ENCLOSURE SPLICING DETAILS.
DROP CABLE. SEE COMMUNICATIONS INTERCONNECT
VAULT AT STA 3936+00, LT 42' FOR FIBER OPTIC
48"x96"x48" CONCRETE FIBER OPTIC SPLICE
EQUIPMENT CABINET TO THE PROPOSED
CONDUIT FROM THE GROUND MOUNTED ITS
CONTRACTOR SHALL PROVIDE A 3-INCH PVC
UNDER ITEM 677.6302.
THE DISCONNECT PEDESTAL SHALL BE PAID FOR
SHALL INCLUDE A 40 AMP SERVICE DISCONNECT.
EQUIPMENT CABINET. THE DISCONNECT PEDESTAL
20 FEET AWAY FROM THE GROUND MOUNTED ITS
PEDESTAL WITH A METER BYPASS NOT MORE THAN
CONTRACTOR SHALL PROVIDE A DISCONNECT
SUBSIDIARY TO ITEM 677.6301.
REQUIRED BY THE UTILITY COMPANY SHALL BE
SERVICE CHARGES, AND ACCESSORY EQUIPMENT
PEDESTAL BRANCH CIRCUIT BREAKERS, UTILITY
SHALL BE SPARE. ALL COSTS FOR THE METER
AMP BRANCH CIRCUIT BREAKERS, ONE OF WHICH
WITH A 100 AMP MAIN DISCONNECT AND TWO 50
CONTRACTOR SHALL PROVIDE A METER PEDESTAL
INTERNAL CONNECTIONS BETWEEN EQUIPMENT.
SYSTEM DIAGRAM FOR CABINET EQUIPMENT AND
CONTRACTOR SHALL REFER TO THE COMMUNICATIONS
DETAIL.
FOR THE BREAKAWAY CABLE DISCONNECT SYSTEM
CONTRACTOR SHALL REFER TO THE VSLS DETAILS
EQUIPMENT CABINET DETAILS.
CABINET DETAILS FOR THE GROUND MOUNTED ITS
CONTRACTOR SHALL REFER TO THE ITS EQUIPMENT
DELETED LEGEND
448 RAP1
42
808
3937 3936 3935
154+00
153+00
30"
RC
P
24" PP
VS FFOD
VS F
FOD
ITS
MP
PB
PB
PB
PB
PB
PB86
85 84 79
80
81 82 83
88
8789
7
8
6" underdrain
15" rcp
6" underdrain
42
808
24.02 Ac.±
7172/1129
STATE PROJECT NO. SHEET NO. TOTAL SHEETS
SH
EE
T
CH
EC
KE
D
AS
BUI
LT
DE
TAI
LS
DA
TE
DA
TE
DA
TE
DA
TE
NU
MB
ER
DA
TE
ST
ATI
ON
ST
ATI
ON
DE
SC
RI
PTI
ON
RE
VI
SI
ON
S
AF
TE
R
PR
OP
OS
AL
DGN
STATE OF NEW HAMPSHIRE
NE
W
DE
SI
GN
DEPARTMENT OF TRANSPORTATION BUREAU OF HIGHWAY DESIGN
CL
D
EG
D
MD
S
- 1/
9/
20
14
6/
26/
20
15
SCALE IN FEET
0
DATE PLOTTED VHB PROJECT NO.
52525.112/2/2017
SD
R
PR
OC
ES
SE
D
14633H-CCTV17.8_S.dgn 134314633H
20 20 40
W 252
EASE.
post
EASE.
EASE.
-1
M4
UNDETERMINED
OWNER
Approx. Exist. LAROW
#
831
post
shoulder"
"groovedq-24
3929 3928 3927
MP
FOD
MPPB
PB
77
76
75
74
post
to
wer
cell
shoulder"
"groovedq-24
EASE.
NOTE:
M5 & M6 NOW p/o M4
FORMER PARCELS
-1
M4
UNDETERMINED
OWNER
Approx. Exist. LAROW
#
831
0.14 Ac.±
#
EASE.
Approx. Exist. L.
A.R.
O.
W.
Exist. L.
A.
R.
O.
W.
Approx.
ip
cb
cb
cb
di
di
cb
w
g
di
cb
mh
mb
di
mh
s
md
mp
pb
an
an
an
mh
s
aband.
aband.
1962-130-07
2000-069-022000-069
2000-069-03
2000-069-04
w
g
its
s
v
f its
FO
D
FO
Dpb
pb
pb
pb
sv31
aband.
aband.
aband.
M23
&
DO
ROT
HY E.
PA
UL F. III
RULE,
DA
VI
D E. Jr.
LA
RO
CHELLE,
ip
md
md
md
md
md
cb
di
di
w
g
mb
cb
cb
di
cb
cb
mh
di
FO
D
FO
Dpb
pb
light
&trans
26/57
psnh
net
&t
57/432/50/
pub ser co.
net
&t
50•
56 432
psnh
432e
304
305
306307 308 309
310
B2
B3
B4
B39-
B02
B39-
B01
B40-B01
B40-B02
FO
D
VS
F
3970
3971
3973
1966
1967
1968
1969
1970
PB
92
11
95
94
103
93
91
12
ip
md
md
md
md
md
cb
di
di
w
g
mb
cb
cb
di
cb
cb
mh
di
maples
1' c.
red oak
.5' c.
cmp12"
cmp12
"
rcp
15"
24"rcp
light
&trans
26/57
psnh
net
&t
57/432/50/
pub ser co.
net
&t
50•
56 432
psnh
432e
pool
a.g.
deck
pool
12"rcp
6'c.l.f.
15"rcp
cmp 12"
6" und.
6" und.
18"rcp
18"rcp
6" und.
M23
&
DO
ROT
HY E.
PA
UL F. III
RULE,
DA
VI
D E. Jr.
LA
RO
CHELLE,
STATE PROJECT NO. SHEET NO. TOTAL SHEETS
SH
EE
T
CH
EC
KE
D
AS
BUI
LT
DE
TAI
LS
DA
TE
DA
TE
DA
TE
DA
TE
NU
MB
ER
DA
TE
ST
ATI
ON
ST
ATI
ON
DE
SC
RI
PTI
ON
RE
VI
SI
ON
S
AF
TE
R
PR
OP
OS
AL
DGN
STATE OF NEW HAMPSHIRE
NE
W
DE
SI
GN
DEPARTMENT OF TRANSPORTATION BUREAU OF HIGHWAY DESIGN
CL
D
EG
D
MD
S
- 1/
9/
20
14
6/
26/
20
15
SCALE IN FEET
0
DATE PLOTTED VHB PROJECT NO.
52525.112/16/2017
SD
R
PR
OC
ES
SE
D
14633H-CCTV18.4_M.dgn 134314633H
20 20 40
92
11
95
94
103
93
91
12
AND FIBER OPTIC HUB CABINET.
CONNECTIONS FOR THE CCTV
PULL BOX AND RE-ROUTE POWER
NEW CONDUIT TO EXISTING
CONTRACTOR SHALL INSTALL
INSTALL NEW PULL BOX.
EXISTING POWER CONDUIT AND
CONTRACTOR SHALL INTERCEPT
GRI
D
I-93 S
OUT
HB
OU
ND
CCTV 93 18.4_M
CONSTRUCTION NOTES:
BODWELL ROAD
I-93
NORT
HB
OU
ND
02-
02-
17
1R
EM
OV
E
WI
RE
LE
SS
CO
MM
UNI
CA
TI
ON
S
AN
TE
NN
A
1
1
1
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
DELETED LEGEND
449 RAP1
EQUIPMENT SHALL BE LIMITED TO NOT MORE THAN FOUR (4) HOURS DOWNTIME.
COMMINICATIONS TO (CCTV 93 18.4_M AND CCTV 293 1.4_S) MAY BE INTERRUPTED. UPON RECEIVING APPROVAL FROM THE TMC, THE EXISTING
PRIOR TO ANY FIBER OPTIC SPLICING, THE CONTRACTOR SHALL NOTIFY THE TMC (603-271-6862) THAT THE EXISTING FIBER OPTIC
ETHERNET SWITCH AND PATCH PANEL AS SHOWN IN THE FIBER OPTIC SPLICE TABLES AND COMMUNICATIONS INTERCONNECT PLAN.
THE CONTRACTOR SHALL SUPPLY ADDITIONAL PATCH CORDS AS REQUIRED AT THE EXISTING EQUIPMENT CABINET TO MAKE CONNECTIONS BETWEEN
STATE.
FIBER OPTIC CABLE SHALL BE DISTURBED OR DAMAGED. ANY DAMAGE SHALL BE REPLACED/REPAIRED BY THE CONTRACTOR AT NO COST TO THE
ONLY THE STRANDS OF THE EXISTING FIBER OPTIC CABLE IDENTIFIED IN THIS PLAN SHALL BE SPLICED. NO OTHER STRANDS OF THE EXISTING
NUMBER OF SPLICES AS SHOWN IN THE CONTRACT PLANS.
THE CONTRACTOR SHALL REPLACE/UPGRADE THE EXISTING SPLICE ENCLOSURE WITH ADDITIONAL SPLICE TRAYS AS REQUIRED TO HANDLE THE
SEE FIBER OPTIC SPLICE TABLES AND COMMUNICATIONS INTERCONNECT PLAN FOR SPLICE DETAILS.
SPLICE ENCLOSURE SHALL BE SUBSIDIARY TO ITEM 677.53.
THE CONTRACTOR SHALL FURNISH AND INSTALL A NEW SPLICE ENCLOSURE AT THE EXISTING SPLICE VAULT 12 AT STA 1968+13, LT. THE
93 18.4_M. POWER SHALL NOT BE DISCONNECTED FOR MORE THAN EIGHT (8) HOURS.
CONTRACTOR SHALL CONTACT TMC ONE (1) HOUR PRIOR TO DISCONNECTING POWER TO EXISTING FIBER OPTIC HUB CABINET AND EXISTING CCTV
POWER CABLES TO RECONNECT THE CCTV AND FIBER OPTIC HUB CABINET TO POWER.
AFTER NEW POWER CABLES HAVE BEEN INSTALLED, CONTRACTOR SHALL DISCONNECT EXISTING POWER CABLES AT METER PEDESTAL AND ATTACH NEW
CONDUIT INSTALLED UNDER SLOPE PROTECTION SHALL BE A MINIMUM OF 30 INCHES BELOW SLOPE PROTECTION SURFACE.
TO THE EXISTING ITS DEVICES.
PULL BOX FOR POLE MOUNTED CCTV CABINET FOR ITS POWER RECONNECTION PRIOR TO BRIDGE AND WIDENING WORK THAT WOULD INTERRUPT POWER
CONTRACTOR SHALL PROVIDE PVC CONDUIT AND 18 INCH PULL BOX SYSTEM FROM THE GROUND MOUNTED FIBER OPTIC HUB CABINET AND ELECTRIC
CONTRACTOR SHALL REFER TO THE COMMUNICATIONS SYSTEM DIAGRAM FOR CABINET EQUIPMENT AND INTERNAL CONNECTIONS BETWEEN EQUIPMENT.
GROUND
NOT TO SCALE
BREAKERS
CIRCUIT
CABINET
UPS
SWITCH
ETHERNET
FIBER
TVSS
INJECTOR
POWER
TVSS
POE
POLE
CCTV
GROUND
BREAKERS
CIRCUIT
CABINET
SWITCH
ETHERNET
FIBER
TVSS
INJECTOR
POWER
PANEL
PATCH
TVSS
POE
POLE
CCTV
NOT TO SCALE
CABINET
STORAGE
BATTERY
FOR CCTV 93 17.0_N
EQUIPMENT CABINET DIAGRAM
POLE MOUNTED ITS
NOT TO SCALE
FOR CCTV 93 17.2_N
EQUIPMENT CABINET DIAGRAM
POLE MOUNTED ITS
GROUND
BREAKERS
CIRCUIT
CABINET
SWITCH
ETHERNET
FIBER
TVSS
INJECTOR
POWER
PANEL
PATCH
TVSS
POE
POLE
CCTV
CABINET
STORAGE
BATTERY
PANEL
PATCH
LEGEND:
FOR CCTV 93 16.7_S
EQUIPMENT CABINET DIAGRAM
GROUND MOUNTED ITS
(1 OF 2)
SYSTEM DIAGRAM
COMMUNICATIONS
CABINET
STORAGE
BATTERY
GROUND
NOT TO SCALE
BREAKERS
CIRCUIT
CABINET
UPS
SWITCH
ETHERNET
FIBER
TVSS
INJECTOR
POWER
PANEL
PATCH
TVSS
POE
(BOTTOM)
VSLS MEDIAN
(TOP)
VSLS MEDIAN
(BOTTOM)
VSLS RIGHT
(TOP)
VSLS RIGHT
BOX
PULL
POLE
CCTV
FOR CCTV 93 16.2_N
EQUIPMENT CABINET DIAGRAM
GROUND MOUNTED ITS
CABLE
FIBER OPTIC
SINGLE MODE
12 STRAND
TRANSFORMER
W/ STEPDOWN
PEDESTAL
DISCONNECT
FOR VSLS
POWER SERVICE
120 / 240 VAC
10
2-
02-
17
1
1
1
1
1 1
1
AD
D
FI
BE
R
OP
TI
C
CO
MM
UNI
CA
TI
ON
S
SY
ST
EM
STA 3878+00
CABLE TO SV2 @
FIBER OPTIC
@ STA 1894+25
CABLE TO SV60
FIBER OPTIC
- 4.9GHz MICROWAVE ANTENNA
- TRANSIENT VOLTAGE AND SURGE SUPPRESSORTVSS
- POWER OVER ETHERNETPOE
- RADIO UNITRU
- UNINTERRUPTIBLE POWER SUPPLYUPS
- MEGABITS PER SECONDMBPS
- GIGABITS PER SECONDGBPS
- ETHERNET CABLEETH.
- DYNAMIC MESSAGE SIGNDMS
- CLOSED CIRCUIT TELEVISIONCCTV
- 12 STRAND SINGLE MODE FIBER OPTIC CABLE12F
1
1 DELETED LEGEND
451 RAP1
STATE PROJECT NO. SHEET NO. TOTAL SHEETS
SH
EE
T
CH
EC
KE
D
AS
BUI
LT
DE
TAI
LS
DA
TE
DA
TE
DA
TE
DA
TE
NU
MB
ER
DA
TE
ST
ATI
ON
ST
ATI
ON
DE
SC
RI
PTI
ON
RE
VI
SI
ON
S
AF
TE
R
PR
OP
OS
AL
DGN
STATE OF NEW HAMPSHIRE
NE
W
DE
SI
GN
DEPARTMENT OF TRANSPORTATION BUREAU OF HIGHWAY DESIGN
CL
D
EG
D
MD
S
- 1/
9/
20
14
6/
26/
20
15
DATE PLOTTED VHB PROJECT NO.
52525.112/2/2017
SD
R
PR
OC
ES
SE
D
14633H-ITSCOMM1.dgn 1343
MD
S
EG
D
CL
D
6/
26/
20
15
1/
9/
20
14
-
14633H
SYSTEM DIAGRAM
FIBER OPTIC
10
2-
02-
17
- VARIABLE SPEED LIMIT SIGNVSLS
- TRANSPORTATION MANAGEMENT CENTERTMC
- SPLICE VAULTSV
- PATCH PANELPP
- MILE MARKERMM
- MEDIA CONVERTER (FIBER-TO-ETHERNET)MC
- MEGABIT PER SECONDMBPS
- INTELLIGENT TRANSPORTATION SYSTEMITS
- GIGABIT PER SECONDGBPS
- CATEGORY 6 ETHERNET CABLEETH.
- ETHERNET SWITCHES
- DYNAMIC MESSAGE SIGNDMS
- CLOSED CIRCUIT TELEVISIONCCTV
- 192 STRAND SINGLE MODE FIBER OPTIC CABLE192F
- 24 STRAND SINGLE MODE FIBER OPTIC CABLE24F
- 12 STRAND SINGLE MODE FIBER OPTIC CABLE12F
- 2 STRANDS OF SINGLE MODE FIBER OPTIC CABLE2F
(BODWELL ROAD)
STA 1968+25, LT 67'
HUB CABINET 5 @
(ROUTE 3A)
TO HUB CABINET 3 @ MM 25.8(TO BE BUILT UNDER 14633I)
TO HUB CABINET @ MM 13.6
- PROPOSED ITEMS
- EXISTING ITEMS
- SPLICE
- PP CONNECTOR POSITION
NOTES: LEGEND:
1 GBPS
FIBER ES
ETH.
100 MBPS
FIBER ES
100 MBPS
FIBER ES 2F
2F
100 MBPS
FIBER ES
1 GBPS
FIBER ES
ETH.
100 MBPS
FIBER ES
100 MBPS
FIBER ES
100 MBPS
FIBER ES
100 MBPS
FIBER ES
100 MBPS
FIBER ES
100 MBPS
FIBER ES
100 MBPS
FIBER ES
ETH.
1 GBPS
FIBER ES
100 MBPS
FIBER ES
ETH.
1 GBPS
FIBER ES
2F
2F 2F 2F 2F 2F 2F
2F
2F
CCTV 93 16.7_S
LT 59'
STA 3877+89,
ITS CABINET @
CCTV 93 17.0_N
STA 1890+15, RT 48'
ITS CABINET @
CCTV 93 17.2_N
STA 1906+00, RT 48'
ITS CABINET @
100 MBPS
FIBER ES
100 MBPS
FIBER ES2F 2F
2F
2F2F
14633D)
(TO BE BUILT UNDER
HUB CABINET
93-S-X-11.5-CCTV-X-5
EXISTING VSL 415/416
CCTV 93 16.2_N
1848+99, LT 52'
ITS CABINET @ STA
FIBER OPTIC INTERCONNECT PLAN
93 17.8_S
CCTV 93 17.8_S/VSLS
3936+02, LT 62'
ITS CABINET @ STA
CCTV 93 19.5_M
RT 32'
STA 14605+75,
ITS CABINET @
(CANDIA ROAD)
MM 20.6
HUB CABINET 4 @
VSL 93 19.6
MM 19.8
ITS CABINET @
NE
W
SH
EE
T:
AD
D
FI
BE
R
OP
TI
C
CO
MM
UNI
CA
TI
ON
S
SY
ST
EM
NORTH OF STONEHENGE ROAD
93-S-14.4-VSL-D-5
93-S-X-14.4-CCTV-A-5
3761+46, LT 63'
ITS CABINET @ STA
(ROCKINGHAM ROAD)
55'
STA 623+90, RT
NEW HUB CABINET @
(FORMERLY CCTV 8)
93-S-X-15.3-CCTV-A-5
3806+68, LT 77'
ITS CABINET @ STA
PANEL POSITIONS AND MAKE PROPOSED CONNECTIONS AS SHOWN IN THIS PLAN.
3. AT EXISTING CABINETS, RE-ARRANGE THE EXISTING ETHERNET PATCH CORD CONNECTIONS TO PATCH
ALL THE UNUSED PATCH PANEL CONNECTOR POSITIONS SHALL BE PIGTAIL CONNECTED FOR FUTURE USE.2
SEE COMMUNICATIONS INTERCONNECT PLAN AND FIBER OPTIC SPLICE TABLES FOR ADDITIONAL DETAILS.1.
1
452A RAP1
STATE PROJECT NO. SHEET NO. TOTAL SHEETS
SH
EE
T
CH
EC
KE
D
AS
BUI
LT
DE
TAI
LS
DA
TE
DA
TE
DA
TE
DA
TE
NU
MB
ER
DA
TE
ST
ATI
ON
ST
ATI
ON
DE
SC
RI
PTI
ON
RE
VI
SI
ON
S
AF
TE
R
PR
OP
OS
AL
DGN
STATE OF NEW HAMPSHIRE
NE
W
DE
SI
GN
DEPARTMENT OF TRANSPORTATION BUREAU OF HIGHWAY DESIGN
DATE PLOTTED VHB PROJECT NO.
52525.112/2/2017
SD
R
PR
OC
ES
SE
D
52525.11-COMINT.dgn 1343
MD
S
EG
D
CL
D
6/
26/
20
15
1/
9/
20
14
-
14633H
INTERCONNECT PLAN
COMMUNICATIONS
10
2-
02-
17
288F
CUT & CAP
1-4, 9-12
100 MBPS
FIBER ES
1 GBPS
FIBER ES
18 17 16 15 14 132021222324 19 5 4101112 7 3 2 1689
18 17 16 15 14 132021222324 19 6 5 4 3 289101112 7 1
7-85-6
288F
CUT & CAP
1-4, 9-12
CUT & CAP
3-4, 15-16CUT & CAP
1-4, 9-12
1-4,7-288
CUT & CAP
1-4, 9-12
CUT & CAP
1-4, 9-12
1-4,7-288
100 MBPS
FIBER ES 100 MBPS
FIBER ES
100 MBPS
FIBER ES
100 MBPS
FIBER ES
100 MBPS
FIBER ES
100 MBPS
FIBER ES
100 MBPS
FIBER ES
(BODWELL ROAD)
HUB CABINET 5 @ STA 1968+25, LT 67'
NE
W
SH
EE
T:
AD
D
FI
BE
R
OP
TI
C
CO
MM
UNI
CA
TI
ON
S
SY
ST
EM
COMMUNICATIONS INTERCONNECT PLAN
PP
1 GBPS
FIBER ES
18 17 16 15 14 132021222324 19 6 5 4 3 289101112 7
24F
1
100 MBPS
FIBER ES
ETH.
18 17 16 15 14 132021222324 19 6 5 4 3 289101112 7 1
(CCTV 93 18.4 M - BUILT UNDER 10418Z)
EXISTING ITS CABINET @ MM 18.4
12F
5-6 5-6
PP
1 2 3 4 5 6 987
1 2 3 4 5 6 1110987 12
UNTERMINATED
9-12 (TYP.)
PIGTAILS
288F288F288F
288F
PP
1 2 3 4 5 6 987
1 2 3 4 5 6 1110987 12
UNTERMINATED
9-12 (TYP.)
PIGTAILS
12F
PP
1 2 3 4 5 6 987
1 2 3 4 5 6 1110987 12
UNTERMINATED
9-12 (TYP.)
PIGTAILS
12F
PP
1 2 3 4 5 6 987
1 2 3 4 5 6 1110987 12
UNTERMINATED
9-12 (TYP.)
PIGTAILS
12F
7-8
7-8
7-8 5-6
12F
PP
1 2 3 4 5 6 987
1 2 3 4 5 6 1110987 12
(TYP.)
PIGTAILS
12F
PP
1 2 4 5 6 987
1 2 3 4 5 6 1110987 12
UNTERMINATED
9-12
12F
12F
PP
1 2 3 4 5 6 987
1 2 3 4 5 6 1110987 12
UNTERMINATED
9-12 (TYP.)
PIGTAILS
12F
PP
1 2 3 4 5 6 987
1 2 3 4 5 6 1110987 12
12F
7-8
5-6
5-6
5-6 5-6
5-6
3UNTERMINATED
3-6, 9-12
5-6
5-6
5-6
12F
5-6
7-8
7-8
5-6
5-6
5-6
7-8
24F
5-6
5-6
CAP
&
CUT
9-12
1-4,
CAP
&
CUT
9-12
1-4,
1-4, 7-12 1-4, 7-2881-4, 7-12
PP
UNTERMINATED
13-24
5-67-8
5-6
1-4
9-12
1-2, 9-10
11-12
3-8,
5-6
1-2, 7-8
3-4
3-4
100 MBPS
FIBER ES
5-12
1-2,
5-12
1-2,
5-12
1-2,17-24
13-14,
13-288
3-4,
13-288
3-4,
7-8
15-20,
288F
288F
CUT & CAP
5-12
CUT & CAP
21-24
1-2, 9-14,
CUT & CAP
9-12
CUT & CAP
1-4, 9-12CUT & CAP
1-4, 9-12
CUT & CAP
13-288
EXISTING VSL 415/416
CCTV 93 16.2_N
ITS CABINET @ STA 1848+99, LT 52'
CCTV 93 16.7_S
ITS CABINET @ STA 3877+89, LT 59'
CCTV 93 17.8_S/VSLS 93 17.8_S
ITS CABINET @ STA 3936+02, LT 62'
CCTV 93 17.0_N
ITS CABINET @ STA 1890+15, RT 48'
CCTV 93 17.2_N
ITS CABINET @ STA 1906+00, RT 48'
UNTERMINATED
9-12
CCTV 93 19.5_M
32', ISLAND POND RD
ITS CABINET @ STA 14605+75, RT
(EXIT 5)
ROCKINGHAM ROAD
SV 21 @ STA 622+56
SV 20 @ STA 3761+65
SV 13 @ STA 3847+48 SV 2 @ STA 3878+00
(FORMERLY CCTV 8)
93-S-X-15.3-CCTV-A-5
ITS CABINET @ STA 3806+68, LT 77'
(ROCKINGHAM ROAD)
NEW HUB CABINET @ STA 623+90, RT 55'
NORTH OF STONEHENGE ROAD
93-S-14.4-VSL-D-5
93-S-X-14.4-CCTV-A-5
ITS CABINET @ STA 3761+46, LT 63'
CUT & CAP
1-8
(14633I)
TO BE SPLICED BY OTHER
SV 4 @ STA 3896+61
7-288
1-4,
7-288
1-4,
SV 60 @ STA 1894+25
SV 7 @ STA 3936+00 SV 12 @ STA 1968+13 SV 102 @ STA 14607+76
SV @ HUB 6
100 MBPS
FIBER ES
1
452B RAP1
STATE PROJECT NO. SHEET NO. TOTAL SHEETS
SH
EE
T
CH
EC
KE
D
AS
BUI
LT
DE
TAI
LS
DA
TE
DA
TE
DA
TE
DA
TE
NU
MB
ER
DA
TE
ST
ATI
ON
ST
ATI
ON
DE
SC
RI
PTI
ON
RE
VI
SI
ON
S
AF
TE
R
PR
OP
OS
AL
DGN
STATE OF NEW HAMPSHIRE
NE
W
DE
SI
GN
DEPARTMENT OF TRANSPORTATION BUREAU OF HIGHWAY DESIGN
CL
D
EG
D
MD
S
- 1/
9/
20
14
6/
26/
20
15
DATE PLOTTED VHB PROJECT NO.
52525.112/2/2017
SD
R
PR
OC
ES
SE
D
52525.11-FIBER.dgn 1343
MD
S
EG
D
CL
D
6/
26/
20
15
1/
9/
20
14
-
14633H
FIBER OPTIC CABLE SPLICE TABLES
10
2-
02-
17
(1 OF 2)
SPLICE TABLES
FIBER OPTIC
NE
W
SH
EE
T:
AD
D
FI
BE
R
OP
TI
C
CO
MM
UNI
CA
TI
ON
S
SY
ST
EM
OF THE PROPOSED WORK.
PRIOR TO WORKING AT ANY LOCATION WITH LIT FIBER OPTIC CABLE, THE CONTRACTOR SHALL NOTIFY THE TMC AT LEAST 48 HOURS IN ADVANCE
REPLACED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE STATE.
INDICATED AS THROUGH SHALL PASS THROUGH THE SPLICE ENCLOSURE WITHOUT CUTTING. ANY DAMAGE TO THE FIBER OPTIC CABLES SHALL BE
ONLY THE STRANDS OF THE EXISTING AND PROPOSED FIBER OPTIC CABLE IDENTIFIED IN THIS PLAN SHALL BE SPLICED. ALL FIBER STRANDS
NOTES:
2.
1.
1
452C RAP1
STATE PROJECT NO. SHEET NO. TOTAL SHEETS
SH
EE
T
CH
EC
KE
D
AS
BUI
LT
DE
TAI
LS
DA
TE
DA
TE
DA
TE
DA
TE
NU
MB
ER
DA
TE
ST
ATI
ON
ST
ATI
ON
DE
SC
RI
PTI
ON
RE
VI
SI
ON
S
AF
TE
R
PR
OP
OS
AL
DGN
STATE OF NEW HAMPSHIRE
NE
W
DE
SI
GN
DEPARTMENT OF TRANSPORTATION BUREAU OF HIGHWAY DESIGN
CL
D
EG
D
MD
S
- 1/
9/
20
14
6/
26/
20
15
DATE PLOTTED VHB PROJECT NO.
52525.112/2/2017
SD
R
PR
OC
ES
SE
D
52525.11-SPLICE1.dgn 1343
MD
S
EG
D
CL
D
6/
26/
20
15
1/
9/
20
14
-
14633H
FIBER OPTIC CABLE SPLICE TABLES
10
2-
02-
17
(2 OF 2)
SPLICE TABLES
FIBER OPTIC
NE
W
SH
EE
T:
AD
D
FI
BE
R
OP
TI
C
CO
MM
UNI
CA
TI
ON
S
SY
ST
EM
OF THE PROPOSED WORK.
PRIOR TO WORKING AT ANY LOCATION WITH LIT FIBER OPTIC CABLE, THE CONTRACTOR SHALL NOTIFY THE TMC AT LEAST 48 HOURS IN ADVANCE
REPLACED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE STATE.
INDICATED AS THROUGH SHALL PASS THROUGH THE SPLICE ENCLOSURE WITHOUT CUTTING. ANY DAMAGE TO THE FIBER OPTIC CABLES SHALL BE
ONLY THE STRANDS OF THE EXISTING AND PROPOSED FIBER OPTIC CABLE IDENTIFIED IN THIS PLAN SHALL BE SPLICED. ALL FIBER STRANDS
NOTES:
2.
1.
1
452D RAP1
STATE PROJECT NO. SHEET NO. TOTAL SHEETS
SH
EE
T
CH
EC
KE
D
AS
BUI
LT
DE
TAI
LS
DA
TE
DA
TE
DA
TE
DA
TE
NU
MB
ER
DA
TE
ST
ATI
ON
ST
ATI
ON
DE
SC
RI
PTI
ON
RE
VI
SI
ON
S
AF
TE
R
PR
OP
OS
AL
DGN
STATE OF NEW HAMPSHIRE
NE
W
DE
SI
GN
DEPARTMENT OF TRANSPORTATION BUREAU OF HIGHWAY DESIGN
CL
D
EG
D
MD
S
- 1/
9/
20
14
6/
26/
20
15
DATE PLOTTED VHB PROJECT NO.
52525.112/2/2017
SD
R
PR
OC
ES
SE
D
52525.11-SPLICE2.dgn 1343
MD
S
EG
D
CL
D
6/
26/
20
15
1/
9/
20
14
-
14633H
GROUND
NOT TO SCALE
VSLS 93 17.8_S
FOR CCTV 93 17.8_S &
EQUIPMENT CABINET DIAGRAM
GROUND MOUNTED ITS
BREAKERS
CIRCUIT
CABINET
UPS
SWITCH
ETHERNET
FIBER
TVSS
INJECTOR
POWER
PANEL
PATCH
TVSS
POE
(BOTTOM)
VSLS MEDIAN
(TOP)
VSLS MEDIAN
(BOTTOM)
VSLS RIGHT
(TOP)
VSLS RIGHT
BOX
PULL
POLE
CCTV
PEDESTAL
DISCONNECT
GROUND
BREAKERS
CIRCUIT
CABINET
SWITCH
ETHERNET
FIBER
TVSS
INJECTOR
POWER
PANEL
PATCH
TVSS
POE
POLE
CCTV
NOT TO SCALE
CABINET
STORAGE
BATTERY
(2 OF 2)
SYSTEM DIAGRAM
COMMUNICATIONS
BREAKERS
CIRCUIT
CABINET
TVSS
INJECTOR
POWER
PANEL
PATCH
TVSS
POE
POLE
CCTV
NOT TO SCALE
BACKBONE CABLE
CABLE FROM I-93
MODE FIBER OPTIC
12-STRAND SINGLE
PULLBOX
ELECTRIC
RURU
400' TOWER
TO
4.9GHZ
FOR CCTV 93 18.4_M
EQUIPMENT CABINET DIAGRAM
EXISTING POLE MOUNTED ITS
FOR CCTV 93 19.5_M
EQUIPMENT CABINET DIAGRAM
POLE MOUNTED ITS
GROUND
UPS
GPS
POWER
SWITCH
ETHERNET
POE
CMM4
CCTV 293 1.4_S
FROM
4.9GHZ
ANTENNA
GPS
10
2-
02-
17
BREAKERS
CIRCUIT
CABINET
TVSS
INJECTOR
POWER
PANEL
PATCH
TVSS
POE
POLE
CCTV
NOT TO SCALE
BACKBONE CABLE
CABLE FROM I-93
MODE FIBER OPTIC
12-STRAND SINGLE
RURU
400' TOWER
TO
4.9GHZ
GROUND
UPS
GPS
POWER
SWITCH
ETHERNET
POE
CMM4
CCTV 293 1.4_S
FROM
4.9GHZ
ANTENNA
GPS
GROUND
BREAKERS
CIRCUIT
CABINET
TVSSPANEL
PATCH
NOT TO SCALE
FOR NEW HUB CABINET AT ROCKINGHAM RD (EXIT 5)
EQUIPMENT CABINET DIAGRAM
GROUND MOUNTED ITS
UPS
1 GBPS
SWITCH
ETHERNET
FIBER
ETH.
POWER SOURCE
120 VAC
DISCONNECT
SERVICE
WITH NEW
PEDETAL
DISCONNECT
EXISTING
1 1
11
1
AD
D
FI
BE
R
OP
TI
C
CO
MM
UNI
CA
TI
ON
S
SY
ST
EM
STA 3936+00
CABLE TO SV7 @
FIBER OPTIC
SINGLE MODE
12-STRAND
14607+76
TO SV102 @ STA
BACKBONE CABLE
CABLE FROM I-93
MODE FIBER OPTIC
12-STRAND SINGLE
ETH.
100 MBPS
SWITCH
ETHERNET
FIBER
EQUIPMENT CABINET FOR ...
EXISTING POLE MOUNTED ITS
452 RAP1
STATE PROJECT NO. SHEET NO. TOTAL SHEETS
SH
EE
T
CH
EC
KE
D
AS
BUI
LT
DE
TAI
LS
DA
TE
DA
TE
DA
TE
DA
TE
NU
MB
ER
DA
TE
ST
ATI
ON
ST
ATI
ON
DE
SC
RI
PTI
ON
RE
VI
SI
ON
S
AF
TE
R
PR
OP
OS
AL
DGN
STATE OF NEW HAMPSHIRE
NE
W
DE
SI
GN
DEPARTMENT OF TRANSPORTATION BUREAU OF HIGHWAY DESIGN
CL
D
EG
D
MD
S
- 1/
9/
20
14
6/
26/
20
15
DATE PLOTTED VHB PROJECT NO.
52525.112/2/2017
SD
R
PR
OC
ES
SE
D
14633H-ITSCOMM2.dgn 1343
MD
S
EG
D
CL
D
6/
26/
20
15
1/
9/
20
14
-
14633H