HIDROENERGIA 2008

BLED

SLOVENIA

2www.vatech-hydro.comR. Faast, 13.06.08

BRIGL & BERGMEISTER

HP STATION II

A REHABILITATION AND UPGRADING

PROJECT AT THE RIVER MURA

R. Faast– ANDRITZ VA TECH HYDRO

E. Walch – ANDRITZ VA TECH HYDRO

A. Warnecke – WARNECKE CONSULT

3www.vatech-hydro.comR. Faast, 13.06.08

Location of the power station

Brigl II

4www.vatech-hydro.comR. Faast, 13.06.08

• River Mur

• MQ 85.4 m³/s

• HQ5 550 m³/s

• HQ100 950 m³/s

Hydrolocical Data

5www.vatech-hydro.comR. Faast, 13.06.08

Original status 1906

unit 1unit 2unit 3unit 4

trash rackdirection of water flow

flu

sh

ing

ca

na

l

power house ground section

6www.vatech-hydro.comR. Faast, 13.06.08

Original status 1906

Turbine data: 4 Francis- flume type turbines

Supplier: Voith St. Pölten

unit 1 and unit 2 unit 3 and unit 4

generating electricity powering grindig machines

Qr = 10 [m3/s] Qr = 8 [m3/s]

Hr = 4,9 [m] Hr = 4,9 [m]

n = 72 [1/min] n = 77 [1/min]

Pr = 375 [kW] Pr = 300 [kW]

Total installed capacity 1906: 1.350 [kW]

7www.vatech-hydro.comR. Faast, 13.06.08

Power house extension 1924

unit 1unit 2unit 3unit 4

trash rackdirection of water flow

flu

sh

ing

ca

na

l

flu

sh

ing

ca

na

l

unit 6 unit 5

trash rack

flu

sh

ing

ca

na

l

flu

sh

ing

ca

na

l

unit 6 unit 5

8www.vatech-hydro.comR. Faast, 13.06.08

Turbine data: 2 Francis- flume type turbines

Supplier: Voith St. Pölten

unit 5 and unit 6

Qr = 8,9 [m3/s]

Hr = 5,7 [m]

n = 77 [1/min]

Pr = 393 [kW]

unit 5: generating electricity and interchangable powering

a grinding machine

unit 6: directly powering a grinding machine

Total installed capacity 1924: 2.136 [kW]

Power house extension 1924

9www.vatech-hydro.comR. Faast, 13.06.08

First refurbishment and upgrading 1992

Unit No. 2 was replaced by a bevel gear

bulb turbine in 1992, unit No. 1 was put

out of service.

Supplier: ANDRITZ VATECH HYDRO

Qr = 30,1 [m3/s]

Hr = 6,7 [m]

n = 195,9/600 [1/min]

Pr = 1.818 [kW]

A step up gear is installed between the

turbine runner and the generator.

10www.vatech-hydro.comR. Faast, 13.06.08

First refurbishment and upgrading 1992

generator

bevel gear

bulb turbine

11www.vatech-hydro.comR. Faast, 13.06.08

Second refurbishment and upgrading 2006/2007

direction of water flow

trash rack

flu

sh

ing

ca

na

l

unit 6 unit 5

flu

sh

ing

ca

na

l

unit 4 unit 3

How to proceed

Feasibility study

12www.vatech-hydro.comR. Faast, 13.06.08

Second refurbishment and upgrading 2006/2007

Replacement of unit No. 5 and No. 6 by

a Kaplan bulb turbine.

Supplier: ANDRITZ VATECH HYDRO

Commissioning year: 2007

Qr = 31,5 [m3/s]

Hr = 6,53 [m]

n = 187,5 [1/min]

Pr = 1.869 [kW]

The turbine runner with the turbine

shaft is directly coupled to the

generator.

water flow

13www.vatech-hydro.comR. Faast, 13.06.08

trash rack

inlet gate

generator

bulb

Cross section bulb turbine

runner

draft tube

draft tube gate

generator cover

guide vanes

hydraulic governorservo motor

upper access shaft

lower access shaft

14www.vatech-hydro.comR. Faast, 13.06.08

Second refurbishment and upgrading 2006/2007

turbine inlet gate

trash rackbulb turbine

draft tube gate

draft tube

cross section

15www.vatech-hydro.comR. Faast, 13.06.08

Second refurbishment and upgrading 2006/2007

trash rack

sheet pile wall

sheet pile wall

bulb turbine

draft tube

ground section

flushing canal 2

flushing canal 1

16www.vatech-hydro.comR. Faast, 13.06.08

start of construction works

February 2006

Second refurbishment and upgrading 2006/2007

unit No. 6

unit No. 5

17www.vatech-hydro.comR. Faast, 13.06.08

Second refurbishment and upgrading 2006/2007

yellow = remaining structure

red = demolished structure

18www.vatech-hydro.comR. Faast, 13.06.08

Construction pit

upstream

sheet pile wall

sheet pile wall

yellow = remaining structure

grey = new structure

19www.vatech-hydro.comR. Faast, 13.06.08

Draft tube section

20www.vatech-hydro.comR. Faast, 13.06.08

Draft tube section

21www.vatech-hydro.comR. Faast, 13.06.08

Turbine inlet section

22www.vatech-hydro.comR. Faast, 13.06.08

Construction pit

23www.vatech-hydro.comR. Faast, 13.06.08

Turbine installation

24www.vatech-hydro.comR. Faast, 13.06.08

Turbine installation

25www.vatech-hydro.comR. Faast, 13.06.08

Turbine installation

26www.vatech-hydro.comR. Faast, 13.06.08

Turbine installation

27www.vatech-hydro.comR. Faast, 13.06.08

Generator installation

28www.vatech-hydro.comR. Faast, 13.06.08

Commissioning work

start of commissioning

February 2007

29www.vatech-hydro.comR. Faast, 13.06.08

BRIGL & ERGMEISTER

POWER STATION II

• energy production increase

• 1906: 1.350 kW

• 1924: 2.136 kW

• 1992: 3.204 kW

• 2007: 4.287 kW

TO BE CONTINUED