2www.vatech-hydro.comR. Faast, 13.06.08
BRIGL & BERGMEISTER
HP STATION II
A REHABILITATION AND UPGRADING
PROJECT AT THE RIVER MURA
R. Faast– ANDRITZ VA TECH HYDRO
E. Walch – ANDRITZ VA TECH HYDRO
A. Warnecke – WARNECKE CONSULT
4www.vatech-hydro.comR. Faast, 13.06.08
• River Mur
• MQ 85.4 m³/s
• HQ5 550 m³/s
• HQ100 950 m³/s
Hydrolocical Data
5www.vatech-hydro.comR. Faast, 13.06.08
Original status 1906
unit 1unit 2unit 3unit 4
trash rackdirection of water flow
flu
sh
ing
ca
na
l
power house ground section
6www.vatech-hydro.comR. Faast, 13.06.08
Original status 1906
Turbine data: 4 Francis- flume type turbines
Supplier: Voith St. Pölten
unit 1 and unit 2 unit 3 and unit 4
generating electricity powering grindig machines
Qr = 10 [m3/s] Qr = 8 [m3/s]
Hr = 4,9 [m] Hr = 4,9 [m]
n = 72 [1/min] n = 77 [1/min]
Pr = 375 [kW] Pr = 300 [kW]
Total installed capacity 1906: 1.350 [kW]
7www.vatech-hydro.comR. Faast, 13.06.08
Power house extension 1924
unit 1unit 2unit 3unit 4
trash rackdirection of water flow
flu
sh
ing
ca
na
l
flu
sh
ing
ca
na
l
unit 6 unit 5
trash rack
flu
sh
ing
ca
na
l
flu
sh
ing
ca
na
l
unit 6 unit 5
8www.vatech-hydro.comR. Faast, 13.06.08
Turbine data: 2 Francis- flume type turbines
Supplier: Voith St. Pölten
unit 5 and unit 6
Qr = 8,9 [m3/s]
Hr = 5,7 [m]
n = 77 [1/min]
Pr = 393 [kW]
unit 5: generating electricity and interchangable powering
a grinding machine
unit 6: directly powering a grinding machine
Total installed capacity 1924: 2.136 [kW]
Power house extension 1924
9www.vatech-hydro.comR. Faast, 13.06.08
First refurbishment and upgrading 1992
Unit No. 2 was replaced by a bevel gear
bulb turbine in 1992, unit No. 1 was put
out of service.
Supplier: ANDRITZ VATECH HYDRO
Qr = 30,1 [m3/s]
Hr = 6,7 [m]
n = 195,9/600 [1/min]
Pr = 1.818 [kW]
A step up gear is installed between the
turbine runner and the generator.
10www.vatech-hydro.comR. Faast, 13.06.08
First refurbishment and upgrading 1992
generator
bevel gear
bulb turbine
11www.vatech-hydro.comR. Faast, 13.06.08
Second refurbishment and upgrading 2006/2007
direction of water flow
trash rack
flu
sh
ing
ca
na
l
unit 6 unit 5
flu
sh
ing
ca
na
l
unit 4 unit 3
How to proceed
Feasibility study
12www.vatech-hydro.comR. Faast, 13.06.08
Second refurbishment and upgrading 2006/2007
Replacement of unit No. 5 and No. 6 by
a Kaplan bulb turbine.
Supplier: ANDRITZ VATECH HYDRO
Commissioning year: 2007
Qr = 31,5 [m3/s]
Hr = 6,53 [m]
n = 187,5 [1/min]
Pr = 1.869 [kW]
The turbine runner with the turbine
shaft is directly coupled to the
generator.
water flow
13www.vatech-hydro.comR. Faast, 13.06.08
trash rack
inlet gate
generator
bulb
Cross section bulb turbine
runner
draft tube
draft tube gate
generator cover
guide vanes
hydraulic governorservo motor
upper access shaft
lower access shaft
14www.vatech-hydro.comR. Faast, 13.06.08
Second refurbishment and upgrading 2006/2007
turbine inlet gate
trash rackbulb turbine
draft tube gate
draft tube
cross section
15www.vatech-hydro.comR. Faast, 13.06.08
Second refurbishment and upgrading 2006/2007
trash rack
sheet pile wall
sheet pile wall
bulb turbine
draft tube
ground section
flushing canal 2
flushing canal 1
16www.vatech-hydro.comR. Faast, 13.06.08
start of construction works
February 2006
Second refurbishment and upgrading 2006/2007
unit No. 6
unit No. 5
17www.vatech-hydro.comR. Faast, 13.06.08
Second refurbishment and upgrading 2006/2007
yellow = remaining structure
red = demolished structure
18www.vatech-hydro.comR. Faast, 13.06.08
Construction pit
upstream
sheet pile wall
sheet pile wall
yellow = remaining structure
grey = new structure
29www.vatech-hydro.comR. Faast, 13.06.08
BRIGL & ERGMEISTER
POWER STATION II
• energy production increase
• 1906: 1.350 kW
• 1924: 2.136 kW
• 1992: 3.204 kW
• 2007: 4.287 kW