Amec Foster Wheeler Environment & Infrastructure 160 Traders Blvd. E., Suite 110 Mississauga, Ontario, L4Z 3K7 Tel: (905) 568-2929 Fax: (905) 568-1686 amecfw.com December 9, 2016 TC150320 Mr. Bertho Caron Greenstone Gold Mines 365 Bay Street, Suite 500 Toronto, Ontario M5H 2V1 Dear Mr. Caron: Re: Hardrock Project – Revised Tailings Management Facility Alignment The tailings management facility (TMF) layout was updated to provide the required 120 m setback from Kenogamisis Lake respecting the surface rights reservation on crown land. Figure 1 shows the revised layout plan. In relation to the layout presented in the final TMF feasibility report, which is included as Appendix K of the final EIS/EA, the northeast corner of the TMF southeast dam has been relocated by moving it north to satisfy the offset guidelines. Table 1 summarizes the impact on the TMF storage at the end of years 2 and 4 of operations, as well as at the end of the project life, for the same tailings discharge elevation. The storage reductions relative to the original design are not considered to be significant and fall within the range of uncertainty associated with estimating the deposited dry density of the tailings. The estimated dry density is used to infer the deposited volume for a given tonnage. Table 1: Change in Storage Capacity due to TMF Dam Alignment Modification Operational Years Deposited Tailings Volume For the Revised Alignment (Million m 3 ) % Incremental Reduction in Storage Capacity End of year 2 11.6 7 End of year 4 26.0 4 End of mine life 105.6 2.2 Figure 2 shows typical tailings deposition snapshots for the second and fourth operational year. As noted above, the revised TMF layout does not significantly impact the tailings storage capacity, with the total reduction of about 3.5 million tonnes reduction at the ultimate configuration. This

Upload: lequynh

Post on 02-Apr-2018

217 views

Category:

Documents


2 download

TRANSCRIPT

Amec Foster Wheeler Environment & Infrastructure 160 Traders Blvd. E., Suite 110 Mississauga, Ontario, L4Z 3K7 Tel: (905) 568-2929 Fax: (905) 568-1686 amecfw.com

December 9, 2016 TC150320 Mr. Bertho Caron Greenstone Gold Mines 365 Bay Street, Suite 500 Toronto, Ontario M5H 2V1 Dear Mr. Caron: Re: Hardrock Project – Revised Tailings Management Facility Alignment The tailings management facility (TMF) layout was updated to provide the required 120 m setback from Kenogamisis Lake respecting the surface rights reservation on crown land. Figure 1 shows the revised layout plan. In relation to the layout presented in the final TMF feasibility report, which is included as Appendix K of the final EIS/EA, the northeast corner of the TMF southeast dam has been relocated by moving it north to satisfy the offset guidelines. Table 1 summarizes the impact on the TMF storage at the end of years 2 and 4 of operations, as well as at the end of the project life, for the same tailings discharge elevation. The storage reductions relative to the original design are not considered to be significant and fall within the range of uncertainty associated with estimating the deposited dry density of the tailings. The estimated dry density is used to infer the deposited volume for a given tonnage.

Table 1: Change in Storage Capacity due to TMF Dam Alignment Modification

Operational Years Deposited Tailings Volume For

the Revised Alignment (Million m3)

% Incremental Reduction in Storage

Capacity

End of year 2 11.6 7 End of year 4 26.0 4 End of mine life 105.6 2.2

Figure 2 shows typical tailings deposition snapshots for the second and fourth operational year. As noted above, the revised TMF layout does not significantly impact the tailings storage capacity, with the total reduction of about 3.5 million tonnes reduction at the ultimate configuration. This

Hardrock Project Revised Tailings Management Facility Alignment December 9, 2016

TC150320 Page 2

deficit in storage will be further evaluated and adjusted in the TMF during detailed engineering of the facility. There are no other impacts due to the change in the TMF layout. Figure 2 also shows the emergency spillway alignments. During the initial first and second year of operations, the emergency spillway will be provided from the south cell to the north cell area, as the north cell is not operational during these years. Starting in year 4 of operations, the emergency spillway will be relocated through the east dam south of the inner dam (Figure 2). The spillway channel downstream of the dam will be directed to the existing drainage area upstream of WC-O. In later part of the mine life the emergency spillway will be moved to its final location on the western side of TMF in preparation for closure. We trust this explanation meets with your current expectations. Please do not hesitate to contact us should you require any further information. Sincerely, Amec Foster Wheeler Environment & Infrastructure a Division of Amec Foster Wheeler Americas Limited Prepared by: Prepared by:

David G Ritchie, M.Eng. P.Eng. Prabhat Habbu, M.Tech.,P.Eng. Principal Geotechnical Engineer Associate Geotechnical Engineer Attachments: Figure 1: TMF Modified Configuration Figure 2: Tailings Deposition Plan snapshot for end of year 2 and 4 P:\2015\Projects\TC150320_Greenstone_HR_Detailed_Design\12_Deliverables\Memos\memo on setback\Final Issue\Letter to GGM\REISSUE 8 Dec\Hardrock TMF realignment (dec.9.2016).docx

LAKE

A-322

G

O

L

D

F

I

E

L

D

C

R

E

E

K

LAKE

GFP1

LAKE

GFP2

LAKE

GFP3

LAKE

GFP4

LAKE

A-321

S

O

U

T

H

W

E

S

T

A

R

M

O

F

K

E

N

O

G

A

M

I

S

I

S

L

A

K

E

30.0

1. ALL ELEVATIONS, GRID COORDINATES AND

DIMENSIONS ARE IN METRES. GRID COORDINATES

ARE REFERENCED TO UTM NAD 83 ZONE 16 DATUM.

CONTOUR INTERVAL AT 1.0 M.

2. EXISTING GROUND CONTOURS PRODUCED FROM

LIDAR FLOWN MAY 27 2014, COMPILED BY KBM

RESOURCES GROUP.

3. EXISTING GROUND CONTOURS OUTSIDE OF LIDAR

MAPPING WERE RETRIEVED FROM LAND

INFORMATION OF ONTARIO PROVINCIAL DEM 20M

GRID SIZE, BY THE MNR (ONTARIO MINISTRY OF

NATURAL RESOURCES)

4. THE OPEN PIT, WASTE ROCK AREA AND PLANT SITE

LAYOUTS WERE PROVIDED BY PREMIER (NOVEMBER

2014)

CONTOUR

WATERCOURSE

RAILWAY LINE

WOODED AREA

MINING CLAIM OWNERSHIP BOUNDARY

MUNICIPAL BOUNDARY

COMMUNICATION LINE

TMF DAM CENTRELINE

PROJECTION:

DATUM:

TITLE

PROJECTCLIENT LOGO

FIGURE No.

160 Traders Boulevard East

Mississauga, Ontario, Canada L4Z 3K7

Amec Foster Wheeler Environment & Infrastructure

REV. NO.:

PROJECT NO:

CLIENT:

DWN BY:

CHK'D BY:

DATE:

SCALE:

COMPANY LOGO

GREENSTONE GOLD MINES

HARDROCK FEASIBILITY STUDY

TAILINGS MANAGEMENT FACILITY

ULTIMATE TMF ARRANGEMENT PLAN

NR

PH

UTM NAD 83

ZONE 16

AS SHOWN

MAY2016

TC150320

A

1

AutoCAD SHX Text
TAILINGS MANAGEMENT FACILITY (TMF)
AutoCAD SHX Text
5,500,000 N
AutoCAD SHX Text
5,499,000 N
AutoCAD SHX Text
5,498,000 N
AutoCAD SHX Text
497,000 E
AutoCAD SHX Text
SOUTHWEST DAM
AutoCAD SHX Text
5,500,000 N
AutoCAD SHX Text
5,499,000 N
AutoCAD SHX Text
5,498,000 N
AutoCAD SHX Text
INNER DAM
AutoCAD SHX Text
EAST DAM
AutoCAD SHX Text
LAHTIS ROAD
AutoCAD SHX Text
SOUTH CELL
AutoCAD SHX Text
INNER DAM CREST EL. 341 m
AutoCAD SHX Text
BARGE ENCLOSURE BERM CREST EL. 341 m CREST WIDTH 6 m (TO BE RAISED AS REQUIRED FOR SUBSEQUENT STAGES
AutoCAD SHX Text
SOUTHEAST DAM
AutoCAD SHX Text
REVISED TMF ULTIMATE STAGE DAM TOE
AutoCAD SHX Text
SEEPAGE \ RUNOFF COLLECTION DITCH
AutoCAD SHX Text
TMF CONSTRUCTION ACCESS
AutoCAD SHX Text
ULTIMATE TAILINGS DAM CENTRELINE
AutoCAD SHX Text
GOLDFIELD CREEK DIVERSION DAM
AutoCAD SHX Text
EMERGENCY SPILLWAYS
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text
LEGEND:
AutoCAD SHX Text
DIVERSION CHANNEL
AutoCAD SHX Text
SPILLWAY
AutoCAD SHX Text
0
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
1:7500
AutoCAD SHX Text
200
AutoCAD SHX Text
800m
AutoCAD SHX Text
400
AutoCAD SHX Text
CONSTRUCTION ACCESS ROAD
AutoCAD SHX Text
SEEPAGE \ RUNOFF COLLECTION DITCH

PROJECTION:

DATUM:

TITLE

PROJECTCLIENT LOGO

FIGURE No.

160 Traders Boulevard East

Mississauga, Ontario, Canada L4Z 3K7

Amec Foster Wheeler Environment & Infrastructure

REV. NO.:

PROJECT NO:

CLIENT:

DWN BY:

CHK'D BY:

DATE:

SCALE:

COMPANY LOGO

GREENSTONE GOLD MINES

HARDROCK FEASIBILITY STUDY

TAILINGS MANAGEMENT FACILITY

TAILINGS DEPOSITION SNAPSHOTS

NR

PH

UTM NAD 83

ZONE 16

AS SHOWN

NOVEMBER 2016

TC150320

A

2

AutoCAD SHX Text
338
AutoCAD SHX Text
339
AutoCAD SHX Text
340
AutoCAD SHX Text
341
AutoCAD SHX Text
342
AutoCAD SHX Text
343
AutoCAD SHX Text
BARGE ENCLOSURE BERM
AutoCAD SHX Text
BARGE ENCLOSURE BERM
AutoCAD SHX Text
NORTH CELL
AutoCAD SHX Text
SOUTH CELL
AutoCAD SHX Text
337
AutoCAD SHX Text
335
AutoCAD SHX Text
336
AutoCAD SHX Text
337
AutoCAD SHX Text
334
AutoCAD SHX Text
337
AutoCAD SHX Text
335
AutoCAD SHX Text
338
AutoCAD SHX Text
339
AutoCAD SHX Text
340
AutoCAD SHX Text
341
AutoCAD SHX Text
342
AutoCAD SHX Text
343
AutoCAD SHX Text
338
AutoCAD SHX Text
339
AutoCAD SHX Text
340
AutoCAD SHX Text
341
AutoCAD SHX Text
342
AutoCAD SHX Text
341
AutoCAD SHX Text
342
AutoCAD SHX Text
343
AutoCAD SHX Text
344
AutoCAD SHX Text
346
AutoCAD SHX Text
347
AutoCAD SHX Text
342
AutoCAD SHX Text
339
AutoCAD SHX Text
341
AutoCAD SHX Text
338
AutoCAD SHX Text
345
AutoCAD SHX Text
0
AutoCAD SHX Text
400
AutoCAD SHX Text
1000m
AutoCAD SHX Text
200
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
1:10 000
AutoCAD SHX Text
OPERATIONAL YEAR 2
AutoCAD SHX Text
0
AutoCAD SHX Text
400
AutoCAD SHX Text
1000m
AutoCAD SHX Text
200
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
1:10 000
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text
1.ALL ELEVATIONS AND DIMENSIONS ARE IN ALL ELEVATIONS AND DIMENSIONS ARE IN ELEVATIONS AND DIMENSIONS ARE IN ELEVATIONS AND DIMENSIONS ARE IN AND DIMENSIONS ARE IN AND DIMENSIONS ARE IN DIMENSIONS ARE IN DIMENSIONS ARE IN ARE IN ARE IN IN IN METRES. CONTOUR INTERVAL AT 1.0 M. 2.EXISTING GROUND CONTOURS PRODUCED FROM EXISTING GROUND CONTOURS PRODUCED FROM GROUND CONTOURS PRODUCED FROM GROUND CONTOURS PRODUCED FROM CONTOURS PRODUCED FROM CONTOURS PRODUCED FROM PRODUCED FROM PRODUCED FROM FROM FROM LIDAR FLOWN MAY 27 2014, COMPILED BY KBM FLOWN MAY 27 2014, COMPILED BY KBM FLOWN MAY 27 2014, COMPILED BY KBM MAY 27 2014, COMPILED BY KBM MAY 27 2014, COMPILED BY KBM 27 2014, COMPILED BY KBM 27 2014, COMPILED BY KBM 2014, COMPILED BY KBM 2014, COMPILED BY KBM COMPILED BY KBM COMPILED BY KBM BY KBM BY KBM KBM KBM RESOURCES GROUP.
AutoCAD SHX Text
LEGEND:
AutoCAD SHX Text
ACTIVE TAILINGS DEPOSITION
AutoCAD SHX Text
POND
AutoCAD SHX Text
TAILINGS DEPOSITED IN PREVIOUS PERIODS
AutoCAD SHX Text
GROUND ELEVATION CONTOURS
AutoCAD SHX Text
TAILINGS DISCHARGE LOCATION
AutoCAD SHX Text
EMERGENCY SPILLWAY 1 AND 2
AutoCAD SHX Text
OPERATING SPILLWAY DITCH FROM NORTH CELL POND TO SOUTH CELL POND
AutoCAD SHX Text
OPERATIONAL YEAR 4
AutoCAD SHX Text
SOUTH CELL
AutoCAD SHX Text
SOUTH CELL
AutoCAD SHX Text
EMERGENCY SPILLWAY YEAR 4
AutoCAD SHX Text
TO WC-O DRAINAGE AREA
AutoCAD SHX Text
TO WC-O DRAINAGE AREA
AutoCAD SHX Text
SPILLYWAY
AutoCAD SHX Text
ENERGY DISSIPATION TO BE DETERMINED