1
1 AD101 0 DEMOLITION PLAN 8'-0" 16'-0" 24'-0" 1/8" = 1'-0" SCOPE OF WORK 18'-9" 6'-6"± 6'-4" 1 1 1 1 1 10 1 2 1 3 3 4 5 6 6 6 7 8 3 9 10'-0" 11 12 13 14 15 S S S S S S S S 16 DEMOLITION GENERAL NOTES 1. ALL DASHED LINES (- - - - - - - - - - -) ARE CONSTRUCTION TO BE REMOVED. BOW-TIES INDICATE CHANGES IN FLOOR MATERIAL TO BE REMOVED. 2. ALL DASHED LINES (_ _ _ _ _ _ _ _) ARE SOFFITS OF CEILING LINES ABOVE TO BE REMOVED. 3. ALL ITEMS NOT SPECIFICALLY CALLED OUT TO BE RETAINED FOR OWNER AND ARE TO BECOME PROPERTY OF THE DEMOLITION CONTRACTOR. 4. ALL ACTIVE FIRE STROBES, FIRE EXTINGUISHERS, MOUNTINGS AND CABINETS ARE TO BE RETAINED AND STOCKPIL LOCATION SELECTED BY OWNER. 5. THE CONSTRUCTION DOCUMENTS ARE COMPLEMENTARY AND THEIR INTENT IS TO INCLUDE ALL ITEMS NECESSAR PROPER EXECUTION AND COMPLETION OF THE WORK. PROVIDE ALL LABOR, MATERIALS, SERVICES AND EQUIPMEN REQUIRED OR REASONABLY IMPLIED BY THESE DOCUMENTS FOR COMPLETION OF THE WORK AMONG THE SUBCONTRACTORS OR IN ESTABLISHING THE EXTENT OF THE WORK PERFORMED BY ANY TRADE. 6. IN CASE OF CONFLICTS OR DISCREPANCIES BETWEEN ANY DOCUMENTS PERTAINING TO THE WORK, THE ARCHITEC DETERMINE WHICH DOCUMENT OR PART TAKES PRECEDENCE. IN GENERAL, BUT NOT WITHOUT EXCEPTION, AT TH DISCRETION OF THE ARCHITECT.THE MORE STRINGENT OR HIGHER COST REQUIREMENT IS REQUIRED. SUBMIT A R FOR INFORMATION (RFI) TO THE ARCHITECT FOR AN INTERPRETATION OF THE REQUIREMENTS PRIOR TO PROCEED ANY WORK ASSOCIATED WITH CONFLICTS OR DISCREPANCIES BETWEEN ANY DOCUMENTS PERTAINING TO THE W 7. DO NOT SCALE DRAWINGS, THE CONTRACTOR IS TO FIELD VERIFY ALL DIMENSIONS. 8. CLARIFICATIONS OR INFORMATION REQUIRED SHALL BE FURNISHED BY THE ARCHITECT IN WRITING. CONTRACTOR SUBMIT REQUESTS FOR SUCH CLARIFICATIONS OR INFORMATION IN WRITING TO THE ARCHITECT. VERBAL INQUIRI RESPONSES ARE NOT BINDING. CONTRACTOR SHALL DISTRIBUTE ARCHITECT'S INFORMATION TO ALL INTERESTED 9. ALL WORK SHALL CONFORM TO APPLICABLE LOCAL BUILDING CODES AND ORDINANCES, AND OTHER REQUIREMEN ENTITIES HAVING JURISDICTION. THE APPLICABLE RULES AND REGULATIONS OF OSHA SHALL BE ADOPTED FOR TH PROJECT. 10. OBTAIN PERMITS AND PAY ALL FEES FOR REQUIRED REGULATORY APPROVALS, CONTROLLED INSPECTIONS AND O AGENCY APPROVALS. COPIES OF ALL TRANSACTIONS SHALL BE PROVIDED TO THE ARCHITECT. COMPLETE DOCUM OF FINAL REGULATORY AGENCY APPROVALS FOR THE PROJECT AND CONTROLLED INSPECTION REPORTS SHALL B SUBMITTED TO THE ARCHITECT PRIOR TO APPLICATION FOR FINAL PAYMENT. 11. MAKE ALL ARRANGEMENTS, MAINTAIN AND PAY ALL COSTS FOR TEMPORARY TELECOMMUNICATIONS, WATER, PLU POWER, LIGHTING, HEATING, VENTILATION AND CLEAN-UP OPERATIONS AS NECESSARY TO PROPERLY CONDUCT T ALL HOSTING CHARGES OR SPECIAL EQUIPMENT, IF ANY, SHALL BE INCLUDED IN THE WORK. BUILDING 12. REMOVALS OR ABANDONMENT OF DUCTS, PIPES, CONDUITS, AND THE LIKE, SHALL OCCUR BELOW OR BEHIND FINIS SURFACES AND BE APPROPRIATELY CAPPED AND COVERED TO MATCH ADJACENT CONSTRUCTION AND FINISHES. MEP FOR MORE INFORMATION. 13. REMOVE ALL CEILING AND FLOOR FINISHES. PATCH ALL HOLES AND DEFECTS IN FLOORING SUBSTRATES TO MEET MANUFACTURERS REQUIREMENTS FOR NEW FLOORING MATERIALS. PROVIDE APPROPRIATE LEVELING MATERIAL COMPOUND OR GROUT TO RENDER SUBSTRATE SUITABLE FOR FUTURE FLOORING COVER. 14. AT DEMOLITION SITES ABUTTING NEW CONSTRUCTION, AND AREAS OF IN-FILL OR PATCH WORK, MATCH ADJACENT CONSTRUCTION UNLESS CALLED FOR OR SHOWN OTHERWISE IN THE DRAWINGS. 15. REMOVE, REPAIR AND PAINT WALLS AND/OR CEILING IN FINISHED AREAS AS NECESSARY FOR MEP DEMOLITION. 16. REMOVE ALL EXISTING MEP ITEMS AS SHOWN ON MEP DEMOLITION PLANS. 17. EXTERIOR BRICK AND STUD WALLS SUPPORTING CONSTRUCTION TO REMAIN. 18. CONTRACTOR SHALL IMPLEMENT CONSTRUCTION DUST / DEBRIS CONTROL MEASURES THROUGHOUT THE DURATI CONSTRUCTION. PLAN KEY NOTES 1. REMOVE WALL. 2. REMOVE DOOR AND FRAME ASSEMBLY. 3. SALVAGE ALL TRACK AND TRACK LIGHT HEADS, RETURN TO OWNER. 4. EXISTING DOWN LIGHTS TO REMAIN. 5. DEMO SUSPENDED CEILING. RE-HANG LIGHTS AND MECHANICAL IN EXISTING SPACE 6. GRIND AND FILL DECORATIVE FLOOR INLAY IN PREPARATION FOR NEW FLOOR COVERING. 7. REMOVE GYP. BOARD. 8. REMOVE EXISTING CARPET. 9. EXISTING CARPET TO REMAIN. 10. REMOVE PLEXI GLASS RAIL. 11. EXISTING PIPING IN WALL TO REMAIN. 12. REMOVE TRIM. 13. EXISTING UNISTRUT TO REMAIN. 14. ALL EXIT SIGNS TO BE UN-INSTALLED AND SAVED FOR FUTURE USE. 15. REMOVE ALL SPEAKERS AND RETURN TO OWNER. 16. SECURITY CAMERAS TO REMAIN IN PLACE. AD101 DEMOLITION PLAN 29 April 2016 Michael Bennett AIA, TBAE # 12795 These documents are incomplete and may not be used for regulatory approval, permit, or construction. Project No: Issue Date: Plot: Apr 29, 2016 - 11:05am pyoung Last Save: Apr 28, 2016 - 11:11am File: E:\no15108.00 Cattle Raisers Museum\07 CADD\07-02 ACAD\Cattle Raisers Museum\Sheets\AD101 DEMOLITION PLAN.dwg 1 2 3 4 5 6 7 8 9 A B C D E F G 6 7 8 9 A B C D E F G 1 2 3 4 5 Rev. Description Date 500 West Seventh Street Suite 1400 Fort Worth, Texas .1861 www.bbptx.com Tel 817 .335.4991 .877 817 Fax 76102 DESIGN DEVELOPMENT Cattle Raisers Museum Renovation 1600 Gendy Street Fort Worth, TX 76107 15108.00 SUMMIT CONSULTANTS 1300 SUMMIT AVE. SUITE 500 FORT WORTH, TX 76102 (817) 878-4242 DATUM ENGINEERS 6516 FOREST PARK ROAD DALLAS, TX 75235 (214) 358-0174 PR O JE C T I L E S 8, Passage Brûlon - 75012 Paris Bât A, 1er étage [email protected] 29 April 2016

Upload: others

Post on 12-Feb-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DEMOLITION GENERAL NOTES PLAN KEY NOTES...DEMOLITION PLAN 29 April 2016 Michael Bennett AIA, TBAE # 12795 These documents are incomplete and may not be used for regulatory approval,

1

AD1010

DEMOLITION PLAN

8'-0" 16'-0" 24'-0"1/8" = 1'-0"

SCOPE OF WORK

18'-9"

6'-6"± 6'-4"

1

1

1

1

1

10

1

2

1

3

3

4

5

6

6

6

7

8

3

9

10'-0"

11

12

13

14 15

S

S

S

S

S

S

S

S

16

DEMOLITION GENERAL NOTES1. ALL DASHED LINES (- - - - - - - - - - -) ARE CONSTRUCTION TO BE REMOVED. BOW-TIES INDICATE CHANGES IN FLOORING

MATERIAL TO BE REMOVED.

2. ALL DASHED LINES (_ _ _ _ _ _ _ _) ARE SOFFITS OF CEILING LINES ABOVE TO BE REMOVED.

3. ALL ITEMS NOT SPECIFICALLY CALLED OUT TO BE RETAINED FOR OWNER AND ARE TO BECOME PROPERTY OF THE

DEMOLITION CONTRACTOR.

4. ALL ACTIVE FIRE STROBES, FIRE EXTINGUISHERS, MOUNTINGS AND CABINETS ARE TO BE RETAINED AND STOCKPILED AT

LOCATION SELECTED BY OWNER.

5. THE CONSTRUCTION DOCUMENTS ARE COMPLEMENTARY AND THEIR INTENT IS TO INCLUDE ALL ITEMS NECESSARY FOR THE

PROPER EXECUTION AND COMPLETION OF THE WORK. PROVIDE ALL LABOR, MATERIALS, SERVICES AND EQUIPMENT

REQUIRED OR REASONABLY IMPLIED BY THESE DOCUMENTS FOR COMPLETION OF THE WORK AMONG THE

SUBCONTRACTORS OR IN ESTABLISHING THE EXTENT OF THE WORK PERFORMED BY ANY TRADE.

6. IN CASE OF CONFLICTS OR DISCREPANCIES BETWEEN ANY DOCUMENTS PERTAINING TO THE WORK, THE ARCHITECT WILL

DETERMINE WHICH DOCUMENT OR PART TAKES PRECEDENCE. IN GENERAL, BUT NOT WITHOUT EXCEPTION, AT THE SOLE

DISCRETION OF THE ARCHITECT.THE MORE STRINGENT OR HIGHER COST REQUIREMENT IS REQUIRED. SUBMIT A REQUEST

FOR INFORMATION (RFI) TO THE ARCHITECT FOR AN INTERPRETATION OF THE REQUIREMENTS PRIOR TO PROCEEDING WITH

ANY WORK ASSOCIATED WITH CONFLICTS OR DISCREPANCIES BETWEEN ANY DOCUMENTS PERTAINING TO THE WORK.

7. DO NOT SCALE DRAWINGS, THE CONTRACTOR IS TO FIELD VERIFY ALL DIMENSIONS.

8. CLARIFICATIONS OR INFORMATION REQUIRED SHALL BE FURNISHED BY THE ARCHITECT IN WRITING. CONTRACTOR SHALL

SUBMIT REQUESTS FOR SUCH CLARIFICATIONS OR INFORMATION IN WRITING TO THE ARCHITECT. VERBAL INQUIRIES AND

RESPONSES ARE NOT BINDING. CONTRACTOR SHALL DISTRIBUTE ARCHITECT'S INFORMATION TO ALL INTERESTED PARTIES.

9. ALL WORK SHALL CONFORM TO APPLICABLE LOCAL BUILDING CODES AND ORDINANCES, AND OTHER REQUIREMENTS OF THE

ENTITIES HAVING JURISDICTION. THE APPLICABLE RULES AND REGULATIONS OF OSHA SHALL BE ADOPTED FOR THIS

PROJECT.

10. OBTAIN PERMITS AND PAY ALL FEES FOR REQUIRED REGULATORY APPROVALS, CONTROLLED INSPECTIONS AND OTHER

AGENCY APPROVALS. COPIES OF ALL TRANSACTIONS SHALL BE PROVIDED TO THE ARCHITECT. COMPLETE DOCUMENTATION

OF FINAL REGULATORY AGENCY APPROVALS FOR THE PROJECT AND CONTROLLED INSPECTION REPORTS SHALL BE

SUBMITTED TO THE ARCHITECT PRIOR TO APPLICATION FOR FINAL PAYMENT.

11. MAKE ALL ARRANGEMENTS, MAINTAIN AND PAY ALL COSTS FOR TEMPORARY TELECOMMUNICATIONS, WATER, PLUMBING,

POWER, LIGHTING, HEATING, VENTILATION AND CLEAN-UP OPERATIONS AS NECESSARY TO PROPERLY CONDUCT THE WORK.

ALL HOSTING CHARGES OR SPECIAL EQUIPMENT, IF ANY, SHALL BE INCLUDED IN THE WORK.

BUILDING

12. REMOVALS OR ABANDONMENT OF DUCTS, PIPES, CONDUITS, AND THE LIKE, SHALL OCCUR BELOW OR BEHIND FINISHED

SURFACES AND BE APPROPRIATELY CAPPED AND COVERED TO MATCH ADJACENT CONSTRUCTION AND FINISHES. REFER TO

MEP FOR MORE INFORMATION.

13. REMOVE ALL CEILING AND FLOOR FINISHES. PATCH ALL HOLES AND DEFECTS IN FLOORING SUBSTRATES TO MEET

MANUFACTURERS REQUIREMENTS FOR NEW FLOORING MATERIALS. PROVIDE APPROPRIATE LEVELING MATERIAL /

COMPOUND OR GROUT TO RENDER SUBSTRATE SUITABLE FOR FUTURE FLOORING COVER.

14. AT DEMOLITION SITES ABUTTING NEW CONSTRUCTION, AND AREAS OF IN-FILL OR PATCH WORK, MATCH ADJACENT

CONSTRUCTION UNLESS CALLED FOR OR SHOWN OTHERWISE IN THE DRAWINGS.

15. REMOVE, REPAIR AND PAINT WALLS AND/OR CEILING IN FINISHED AREAS AS NECESSARY FOR MEP DEMOLITION.

16. REMOVE ALL EXISTING MEP ITEMS AS SHOWN ON MEP DEMOLITION PLANS.

17. EXTERIOR BRICK AND STUD WALLS SUPPORTING CONSTRUCTION TO REMAIN.

18. CONTRACTOR SHALL IMPLEMENT CONSTRUCTION DUST / DEBRIS CONTROL MEASURES THROUGHOUT THE DURATION OF

CONSTRUCTION.

PLAN KEY NOTES1. REMOVE WALL.

2. REMOVE DOOR AND FRAME ASSEMBLY.

3. SALVAGE ALL TRACK AND TRACK LIGHT HEADS, RETURN TO OWNER.

4. EXISTING DOWN LIGHTS TO REMAIN.

5. DEMO SUSPENDED CEILING. RE-HANG LIGHTS AND MECHANICAL IN EXISTING SPACE

6. GRIND AND FILL DECORATIVE FLOOR INLAY IN PREPARATION FOR NEW FLOOR COVERING.

7. REMOVE GYP. BOARD.

8. REMOVE EXISTING CARPET.

9. EXISTING CARPET TO REMAIN.

10. REMOVE PLEXI GLASS RAIL.

11. EXISTING PIPING IN WALL TO REMAIN.

12. REMOVE TRIM.

13. EXISTING UNISTRUT TO REMAIN.

14. ALL EXIT SIGNS TO BE UN-INSTALLED AND SAVED FOR FUTURE USE.

15. REMOVE ALL SPEAKERS AND RETURN TO OWNER.

16. SECURITY CAMERAS TO REMAIN IN PLACE.

AD101

DEMOLITION PLAN

29

A

pril 2

01

6

Mich

ae

l B

en

ne

tt A

IA

, T

BA

E #

1

27

95

Th

ese d

ocu

me

nts a

re

in

co

mple

te

an

d m

ay n

ot be

u

se

d fo

r re

gu

la

tory

ap

pro

va

l, p

erm

it, o

r co

nstru

ctio

n.

Project No:Issue Date:

Plo

t: A

pr 2

9, 2

016

- 11:

05am

pyo

ung

Las

t Sav

e: A

pr 2

8, 2

016

- 11:

11am

File

: E:

\no1

5108

.00

Cattl

e Ra

iser

s M

useu

m\0

7 CA

DD\0

7-02

ACA

D\Ca

ttle

Rais

ers

Mus

eum

\She

ets\

AD10

1 DE

MOL

ITIO

N PL

AN.d

wg

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

G

6 7 8 9

A

B

C

D

E

F

G

1 2 3 4 5

Rev. Description Date

500

Wes

t Sev

enth

Stre

et

Suite

140

0Fo

rt W

orth

, Tex

as.1

861

www.

bbpt

x.com

Tel8

17.3

35.4

991

.877

817

Fax

7610

2

DESIGN DEVELOPMENT

Catt

le R

aise

rs M

useu

mR

enov

atio

n16

00 G

endy

Stre

etFo

rt W

orth

, TX

761

07

15108.00

SUM

MIT

CON

SULT

ANTS

1300

SUM

MIT

AVE

. SUI

TE 5

00FO

RT W

ORTH

, TX

7610

2(8

17) 8

78-4

242

DATU

M E

NGIN

EERS

6516

FOR

EST

PARK

ROA

DDA

LLAS

, TX

7523

5(2

14) 3

58-0

174

PR O

   JE

  C  T

I L 

E  S

8, P

assa

ge B

rûlo

n - 7

5012

Par

isBâ

t A, 1

er é

tage

atel

ier@

proj

ectil

es.n

et

29 April 2016