department of energy
DESCRIPTION
DEPARTMENT OF ENERGY. Select Committee on Appropriations on the Division of Revenue Bill 2011/12 EDSM and INEP Grants Dr Wolsey Barnard and Mr Mohau Nketsi 6 April 2011. BACKGROUND. Electricity Demand Side Management Grant (EDSM Grant). - PowerPoint PPT PresentationTRANSCRIPT
Click to edit Master subtitle style
4/8/11
DEPARTMENT OF ENERGY
Select Committee on Appropriations on the Division of Revenue Bill 2011/12
EDSM and INEP Grants
Dr Wolsey Barnard and Mr Mohau Nketsi
6 April 2011
4/8/11 22
• Electricity Demand Side Management Grant (EDSM Grant).
• Integrated National Electrification Programme Grant (INEP Grant).
• Both are direct grants and grants-in-kind.
• Since the tabling of the 2011 DoR Bill, incorrect allocations have been reflected for different municipalities.
• All are due to ‘line slipping’.
BACKGROUND
4/8/11 33
Long term planning been put in place, but the period 2011 to 2016 is critical regarding the generation of electricity.
Medium Term Mitigation Plan for Electricity in South Africa.
Focus in medium term on non-Eskom generation and Energy Efficiency projects.
DoRA allocation for electricity savings from retrofitting of public lighting and installations of solar water heaters.
Contracts signed with Municipalities and Eskom in 2010. R245 m has been transferred to date, from R328.9 m at
March 2011.
PROGRESS REGARDING EDSM
4/8/11
EDSM Grant
Re-allocation of EDSM Grant from Mutale Local Municipality to Musina Local Municipality are proposed.
44
ANNEXURE W6ALLOCATIONS-IN-KIND TO MUNICIPALITIES (SCHEDULE 7) 2 OF 3
National Financial Year Municipal Financial Year National Financial Year Municipal Financial Year
B LIM341 Musina
B LIM342 Mutale 17 021 7 104 12 063 17 021 7 104 12 063 54 400 54 400
B LIM343 Thulamela 14 157 42 163 28 160 14 157 42 163 28 160
B LIM344 Makhado 6 227 58 766 32 496 6 227 58 766 32 496
C DC34 Vhembe District Municipality
Total: Vhembe Municipalities 37 405 108 033 72 719 37 405 108 033 72 719 54 400 54 400
2013/14 (R'000)
Integrated National Electrification Programme (Eskom) Grant Electricity Demand Side Management (Eskom) Grant
Category Municipality 2011/12 (R'000)
2012/13 (R'000)
2013/14 (R'000)
2011/12 (R'000)
2012/13 (R'000)
2013/14 (R'000)
2011/12 (R'000)
2012/13 (R'000)
2013/14 (R'000)
2011/12 (R'000)
2012/13 (R'000)
ANNEXURE W6ALLOCATIONS-IN-KIND TO MUNICIPALITIES (SCHEDULE 7) 2 OF 3
Allocaton Schedule proposed for Gazette interms of section 14 of the Bill/Act
National Financial Year Municipal Financial Year National Financial Year Municipal Financial Year
B LIM341 Musina 54 400 54 400
B LIM342 Mutale 17 021 7 104 12 063 17 021 7 104 12 063
B LIM343 Thulamela 14 157 42 163 28 160 14 157 42 163 28 160
B LIM344 Makhado 6 227 58 766 32 496 6 227 58 766 32 496
C DC34 Vhembe District Municipality
Total: Vhembe Municipalities 37 405 108 033 72 719 37 405 108 033 72 719 54 400 54 400
2013/14 (R'000)
Integrated National Electrification Programme (Eskom) Grant Electricity Demand Side Management (Eskom) Grant
Category Municipality 2011/12 (R'000)
2012/13 (R'000)
2013/14 (R'000)
2011/12 (R'000)
2012/13 (R'000)
2013/14 (R'000)
2011/12 (R'000)
2012/13 (R'000)
2013/14 (R'000)
2011/12 (R'000)
2012/13 (R'000)
4/8/11
EDSM Grant (cont..)
Re-allocation of EDSM Grant from Sedibeng District Municipality to Emfuleni Local Municipality are proposed.
55
ANNEXURE W6ALLOCATIONS-IN-KIND TO MUNICIPALITIES (SCHEDULE 7) 2 OF 3
Integrated National Electrification Programme (Eskom) GrantNational Financial Year Municipal Financial Year National Financial Year Municipal Financial Year
B GT421 Emfuleni 5 137 5 137 5 137 5 137 5 137 5 137B GT422 MidvaalB GT423 LesediC DC42 Sedibeng District Municipality 54 400 54 400Total: Sedibeng Municipalities 5 137 5 137 5 137 5 137 5 137 5 137 54 400 54 400
2012/13 (R'000)
2013/14 (R'000)
2011/12 (R'000)
2012/13 (R'000)
2013/14 (R'000)
Electricity Demand Side Management (Eskom) Grant
Category Municipality 2011/12 (R'000)
2012/13 (R'000)
2013/14 (R'000)
2011/12 (R'000)
2012/13 (R'000)
2013/14 (R'000)
2011/12 (R'000)
ANNEXURE W6ALLOCATIONS-IN-KIND TO MUNICIPALITIES (SCHEDULE 7) 2 OF 3
Allocaton Schedule Proposed for Gazette interms of Section 14 of the Bill/ActIntegrated National Electrification Programme (Eskom) Grant
National Financial Year Municipal Financial Year National Financial Year Municipal Financial Year
B GT421 Emfuleni 5 137 5 137 5 137 5 137 5 137 5 137 54 400 54 400
B GT422 Midvaal
B GT423 Lesedi
C DC42 Sedibeng District Municipality
Total: Sedibeng Municipalities 5 137 5 137 5 137 5 137 5 137 5 137 54 400 54 400
2012/13 (R'000)
2013/14 (R'000)
2012/13 (R'000)
2013/14 (R'000)
2011/12 (R'000)
2012/13 (R'000)
2013/14 (R'000)
2011/12 (R'000)
Category Municipality 2011/12 (R'000)
2012/13 (R'000)
2013/14 (R'000)
2011/12 (R'000)
Electricity Demand Side Management (Eskom) Grant
4/8/11
Integrated National Electrification Programme Grant (INEP Grant)
• Re-allocation of INEP Grant from Mookgopong Local Municipality to Modimolle Local Municipality
• The INEP Grant consists of both a direct grant and a grant-in-kind component. Since tabling of the 2011 Division of Revenue Bill it has been ascertained that a direct grant allocation has been incorrectly reflected to Mookgopong Local Municipality (LIM364) instead of Modimolle Local Municipality (LIM365), an adjacent municipality.
• Allocation Schedule in 2011 Bill Amendments:
66
4/8/11
DoRA current
77
ANNEXURE W5INFRASTRUCTURE GRANT ALLOCATIONS TO MUNICIPALITIES (SCHEDULE 6) 3 OF 4
National Financial Year Municipal Financial Year National Financial Year Municipal Financial Year
B LIM361 Thabazimbi 1 600 3 000 5 000 1 600 3 000 5 000B LIM362 LephalaleB LIM364 Mookgopong 2 000 5 000 2 000 5 000 B LIM365 ModimolleB LIM366 Bela BelaB LIM367 Mogalakwena 6 000 6 000C DC36 Waterberg District MunicipalityTotal: Waterberg Municipalities 9 600 8 000 5 000 9 600 8 000 5 000
2013/14 (R'000)
Integrated National Electrification Programme (Municipal) Grant Electricity Demand Side Management (Municipal) Grant
Category Municipality 2011/12 (R'000)
2012/13 (R'000)
2013/14 (R'000)
2011/12 (R'000)
2012/13 (R'000)
2013/14 (R'000)
2011/12 (R'000)
2012/13 (R'000)
2013/14 (R'000)
2011/12 (R'000)
2012/13 (R'000)
4/8/11
DoRA Proposed
88
ANNEXURE W5INFRASTRUCTURE GRANT ALLOCATIONS TO MUNICIPALITIES (SCHEDULE 6) 3 OF 4
Allocaton Schedule Proposed for Gazette interms of Section 14 of the Bill/Act
National Financial Year Municipal Financial Year National Financial Year Municipal Financial Year
B LIM361 Thabazimbi 1 600 3 000 5 000 1 600 3 000 5 000
B LIM362 Lephalale
B LIM364 Mookgopong 5 000 5 000
B LIM365 Modimolle 2 000 2 000
B LIM366 Bela Bela
B LIM367 Mogalakwena 6 000 6 000
C DC36 Waterberg District Municipality
Total: Waterberg Municipalities 9 600 8 000 5 000 9 600 8 000 5 000
2013/14 (R'000)
Integrated National Electrification Programme (Municipal) Grant Electricity Demand Side Management (Municipal) Grant
Category Municipality 2011/12 (R'000)
2012/13 (R'000)
2013/14 (R'000)
2011/12 (R'000)
2012/13 (R'000)
2013/14 (R'000)
2011/12 (R'000)
2012/13 (R'000)
2013/14 (R'000)
2011/12 (R'000)
2012/13 (R'000)
Eskom changesB KZN431 Ingwe 894
B KZN432 Kwa Sani 7 364 7 261 10 757
B KZN433 Greater Kokstad 329 57 42
B KZN434 Ubuhlebezwe 72 403 79 927 112 837
B KZN435 Umzimkhulu 24 725 63 012 67 797
C DC43 Sisonke District Municipality 8 910 8 910 13 200
Total: Sisonke Municipalities 114 624 159 167 204 633
KZN431 Ingwe 894 13 200KZN432 Kwa Sani 7 364 7 261 10 757KZN433 Greater Kokstad 9 239 8 967 42KZN434 Ubuhlebezwe 72 403 79 927 112 837KZN435 Umzimkhulu 24 725 63 012 67 797
DC43 Sisonke District Municipality 114 624 159 167 204 633
Kwazulu Natal (Sisonke District) Current
Kwazulu Natal (Sisonke District) Proposed
4/8/11 1010
MP311 Victor Khanye 205 103
MP312 Emalahleni
MP313 Steve Tshwete 4 161 3 010 3 585
MP314 Emakhazeni
MP315 Thembisile 5 586 6 384 5 985
MP316 Dr JS Moroka 1 789 1 269 1 529
DC31 Nkangala District Municipality 1 508 1 550 1 529
13 248 12 213 12 730
Mpumalanga (Nkangala District) Current
Mpumalanga (Nkangala District) Revised
MP311 Victor Khanye 205 103
MP312 Emalahleni
MP313 Steve Tshwete 4 161 3 010 3 585
MP314 Emakhazeni
MP315 Thembisile 5 586 6 384 5 985
MP316 Dr JS Moroka 3 297 2819 3058
DC31 Nkangala District Municipality
13 249 12 213 12 730
4/8/11
LIM351 Blouberg 9 168 6 924 8 046
LIM352 Aganang 5 154 2 577
LIM353 Molemole
LIM354 Polokwane 27 953 19 896 23 924
LIM355 Lepele-Nkumpi 1 270 10 810 6 040
DC35 Capricorn District Municipality 684 2 736 1 710
39 075 45 519 42 297
LIM351 Blouberg 9 168 6 924 8 046
LIM352 Aganang 684 7 890 4 287
LIM353 Molemole
LIM354 Polokwane 27 953 19 896 23 924
LIM355 Lepele-Nkumpi 1 270 10 810 6 040
DC35 Capricorn District Municipality
39 075 45 519 42 297
Limpopo (Capricon District) Current
Limpopo (Capricon District) Revised
4/8/11
LIM361 Thabazimbi
LIM362 Lephalale 4 195 6 047 5 121
LIM364 Mookgopong
LIM365 Modimolle
LIM366 Bela-Bela 171 86
LIM367 Mogalakwena 13 556 9 378 11 467
DC36 Waterberg District Municipality 513 912 713
18 436 16 337 17 386
LIM361 Thabazimbi
LIM362 Lephalale 4 195 6 047 5 121
LIM364 Mookgopong
LIM365 Modimolle
LIM366 Bela-Bela 171 86
LIM367 Mogalakwena 14 069 10 290 12 180
DC36 Waterberg District Municipality
18 435 16 337 17 386
Limpopo (Waterberg District) Current
Limpopo (Capricon District) Current
4/8/11
NC451 Moshaweng 7 403 7 403 7 403
NC452 Ga-Segonyana 8 053 8 053 8 053
NC453 Gamagara
DC45 John Taolo Gaetsewe District Municipality 1 524 5 645 3 585
16 981 21 102 19 041
NC451 Moshaweng 7 403 7 403 7 403
NC452 Ga-Segonyana 9 577 13 698 11 638
NC453 Gamagara
DC45 John Taolo Gaetsewe District Municipality
16 980 21 101 19 041
Nothern Cape (John Taolo District) Current
Nothern Cape (John Taolo District) Revised
PROVINCIAL BREAKDOWN - BACKLOGS
PROVINCE BACKLOG % BACKLOG INFORMAL BACKLOG FORMAL BACKLOG
Eastern Cape 673,694 19.88% 67,369 606,325
Free State 200,633 5.92% 70,222 130,411
Gauteng 715,195 21.11% 572,156 143,039
Kwazulu-Natal 813,315 24.00% 162,663 650,652
Limpopo 340,064 10.04% 51,010 289,054
Mpumalanga 222,755 6.57% 44,551 178,204
North West 192,774 5.69% 48,194 144,581
Northern Cape 49,375 1.46% 17,281 32,094
Western Cape 180,351 5.32% 126,246 54,105
Total 3,388,156 100.00% 1,159,691 2,228,465