department of the army - globalsecurity.org...less py adv proc plus cy adv proc net proc (p-1)...

167
DEPARTMENT OF THE ARMY Procurement Programs Committee Staff Procurement Backup Book Fiscal Year (FY) 2006/FY 2007 Budget Estimates OTHER PROCUREMENT, ARMY Tactical and Support Vehicles Budget Activity 1 APPROPRIATION February 2005

Upload: others

Post on 03-Aug-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

DEPARTMENT OF THE ARMYProcurement Programs

Committee Staff Procurement Backup BookFiscal Year (FY) 2006/FY 2007 Budget Estimates

OTHER PROCUREMENT, ARMYTactical and Support Vehicles

Budget Activity 1APPROPRIATION

February 2005

Page 2: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)
Page 3: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)
Page 4: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Table of Contents - Other Procurement, Army

BLIN SSN Nomenclature Page 1 DA0100 TACTICAL TRAILERS/DOLLY SETS 1 2 D01001 Semitrailers, Flatbed: 13 3 D02001 Semitrailers, tankers 26 4 D15400 HI MOB MULTI-PURP WHLD VEH (HMMWV) 34 6 D15500 FAMILY OF MEDIUM TACTICAL VEH (FMTV) 48 7 D15800 FIRETRUCKS & ASSOCIATED FIREFIGHTING EQUIPMENT 54 8 DA0500 FAMILY OF HEAVY TACTICAL VEHICLES (FHTV) 63 9 D02800 ARMORED SECURITY VEHICLES (ASV) 88 10 D02903 CASSPIR 93 11 DA0600 TRUCK, TRACTOR, LINE HAUL, M915/M916 94 12 D16000 TRUCK, TRACTOR, YARD TYPE, M878 (C/S) 108 13 DV0021 HVY EXPANDED MOBILE TACTICAL TRUCK EXT SERV PROG 109 14 DV0230 HMMWV RECAPITALIZATION PROGRAM 115 15 DA0924 MODIFICATION OF IN SVC EQUIP 119 16 DL5110 ITEMS LESS THAN $5.0M (TAC VEH) 151 17 D09900 TOWING DEVICE-FIFTH WHEEL 154 18 D22100 HEAVY ARMORED SEDAN 155 19 D23000 PASSENGER CARRYING VEHICLES 156 20 D30000 NonTactical Vehicles, Other 157

i - 1

Page 5: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Alphabetic Listing - Other Procurement, Army

Nomenclature SSN BLIN Page ARMORED SECURITY VEHICLES (ASV) D02800 9 88 CASSPIR D02903 10 93 FAMILY OF HEAVY TACTICAL VEHICLES (FHTV) DA0500 8 63 FAMILY OF MEDIUM TACTICAL VEH (FMTV) D15500 6 48 FIRETRUCKS & ASSOCIATED FIREFIGHTING EQUIPMENT D15800 7 54 HEAVY ARMORED SEDAN D22100 18 155 HI MOB MULTI-PURP WHLD VEH (HMMWV) D15400 4 34 HMMWV RECAPITALIZATION PROGRAM DV0230 14 115 HVY EXPANDED MOBILE TACTICAL TRUCK EXT SERV PROG DV0021 13 109 ITEMS LESS THAN $5.0M (TAC VEH) DL5110 16 151 MODIFICATION OF IN SVC EQUIP DA0924 15 119 NonTactical Vehicles, Other D30000 20 157 PASSENGER CARRYING VEHICLES D23000 19 156 Semitrailers, Flatbed: D01001 2 13 Semitrailers, tankers D02001 3 26 TACTICAL TRAILERS/DOLLY SETS DA0100 1 1 TOWING DEVICE-FIFTH WHEEL D09900 17 154 TRUCK, TRACTOR, LINE HAUL, M915/M916 DA0600 11 94 TRUCK, TRACTOR, YARD TYPE, M878 (C/S) D16000 12 108

i - 1

Page 6: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-1M, Procurement Programs - Modification Summary

System/Modification 2004 & Prior 2005 2006 2007 2008 2009 2010 2011 To CompleteTotal Program

MODIFICATION OF IN SVC EQUIP (DA0924) HMMWV 3-PT Seatbelt 34.0 7.2 2.0 43.2 M939 Tire Improvement 51.1 4.8 55.8 M939 Anti-Lock Brake System (ABS) 59.8 5.6 65.4 HEMTT Wheel Modification 104.3 17.2 121.4 A8020 Fuel Injection Test Stand Upgrade 7.0 7.0 Aluminum Mesh Liner 11.0 11.0 M872 Modification Hardware 14.7 14.7 HEMTT/PLS 4-Point Seatbelt 1.3 1.1 PLS Trailer Wheel Modification 3.5 2.8 HMMWV 3PT Seatbelts-M996 Mini Ambulance 0.1 0.1 HMMWV 3PT Seatbelts-M997 Maxi Ambulance 0.8 0.8 High Mobility Trailer MWOs 3.0 2.2 3.7 HMMWV Maxi-Ambulance A/C Upgrade 1.4 1.4 Fuel Tank Insertion Safety Foam 1.4 1.4 M915 FOV Electrical Upgrade 3.3 2.2 HMMWV Engine Modernization Effort 7.5 2.5 10.7 10.5 38.2 38.4 103.7 211.4 HMMWV Armor Kits 303.1 303.1 Heavy Truck Armor Kits 252.6 252.6 HMMWV Rear Differnetial Oil Cooler 5.5 5.5 Medium Truck Armor Kits 55.0 55.0 Fuel Tanker Armor Kits 4.1 4.1 Total 915.5 25.7 11.7 2.5 10.7 10.5 38.2 38.4 114.1 1163.8

Grand Total 915.5 25.7 11.7 2.5 10.7 10.5 38.2 38.4 114.1 1163.8

P-1M Page 1 Exhibit P-1M, Procurement Programs - Modification Summary

Page 7: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

OTHER PROCUREMENT, ARMYTactical and Support Vehicles

PERFORMANCE METRICS

Performance metrics used in the preparation of this Justification Book may be found in the FY06 Army Performance Budget Justification Book, dated 18 February 2005.

Page 8: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-40, Budget Item Justification Sheet Date: February 2005 Appropriation/Budget Activity/Serial No: Other Procurement, Army /1/Tactical and support vehicles P-1 Item Nomenclature TACTICAL TRAILERS/DOLLY SETS (DA0100) Program Elements for Code B Items: Code: Other Related Program Elements: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 To Complete Total Prog Proc Qty

Gross Cost

Less PY Adv Proc

Plus CY Adv Proc

Net Proc (P-1)

Initial Spares

Total Proc Cost

Flyaway U/C

Wpn Sys Proc U/C

361.6 9.7 17.8 9.6 15.9 7.1 6.5 5.7 2.5 2.5 438.8

361.6 9.7 17.8 9.6 15.9 7.1 6.5 5.7 2.5 2.5 438.8

361.6 9.7 17.8 9.6 15.9 7.1 6.5 5.7 2.5 2.5 438.8

Description: Tactical trailers and dolly sets are used to transport generators, shelters, drinking water, ammunition and general cargo. This budget line funds the Light Tactical Trailer (LTT) and the Heavy Expanded Mobility Ammunition Trailer (HEMAT). The prime movers for these trailers range from the High Mobility Multi-Purpose Wheeled Vehicle (HMMWV) to the 10-Ton M977 Series Heavy Expanded Mobility Tactical Truck (HEMTT). Justification: FY2006/FY2007 procures a total of 1842 LTTs. The Light Tactical Trailer is the companion trailer for the HMMWV.

DA0100 Item No. 1 Page 1 of 12 Exhibit P-40 TACTICAL TRAILERS/DOLLY SETS 1 Budget Item Justification Sheet

Page 9: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-5, Weapon Appropriation/Budget Activity/Serial No. P-1 Line Item Nomenclature: Weapon System Type: Date: Other Procurement, Army / 1 / TACTICAL TRAILERS/DOLLY SETS (DA0100) February 2005 Tactical and support vehicles OPA1 Cost Analysis

OPA1 ID FY 04 FY 05 FY 06 FY 07 Cost Elements CD TotalCost Qty UnitCost TotalCost Qty UnitCost TotalCost Qty UnitCost TotalCost Qty UnitCost

$000 Units $000 $000 Units $000 $000 Units $000 $000 Units $000

HEAVY, EXPANDED MOBILITY (D05700) A 8513 95 LIGHT TACTICAL TRAILER (D06700) 9330 735 9598 901 15867 1354 7079 488

Total 17843 9598 15867 7079

DA0100 Item No. 1 Page 2 of 12 Exhibit P-5 TACTICAL TRAILERS/DOLLY SETS 2 Weapon System Cost Analysis

Page 10: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-40, Budget Item Justification Sheet Date: February 2005 Appropriation/Budget Activity/Serial No: Other Procurement, Army /1/Tactical and support vehicles P-1 Item Nomenclature TRAILER, HEAVY, EXPANDED MOBILITY (D05700) Program Elements for Code B Items: Code: Other Related Program Elements: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 To Complete Total Prog Proc Qty

Gross Cost

Less PY Adv Proc

Plus CY Adv Proc

Net Proc (P-1)

Initial Spares

Total Proc Cost

Flyaway U/C

Wpn Sys Proc U/C

1777 137 95 2009

53.5 9.7 8.5 71.7

53.5 9.7 8.5 71.7

53.5 9.7 8.5 71.7

Description: The Heavy Expanded Mobility Ammunition Trailer (HEMAT) is an 11-Ton, 4-wheel, "wagon-configuration" trailer specifically designed for operation in rough terrain. The HEMAT provides tactical ammunition and fuel resupply for Army combat vehicles (general ammunition pallets), missile systems (Multiple Launch Rocket System), rotary-wing aircraft (Hellfire Missiles) and 500 gallon fuel (bladders). The designated prime mover for HEMAT is the M977 Series Heavy Expanded-Mobility Tactical Truck (HEMTT). The trailer is strategically transportable by C-130 through C-5 airframes, marine and amphibious vessels and rail.

DA0100 (D05700) Item No. 1 Page 3 of 12 Exhibit P-40 TRAILER, HEAVY, EXPANDED MOBILITY 3 Budget Item Justification Sheet

Page 11: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-5, Weapon Appropriation/Budget Activity/Serial No. P-1 Line Item Nomenclature: Weapon System Type: Date: Other Procurement, Army / 1 / TRAILER, HEAVY, EXPANDED MOBILITY (D05700) February 2005 Tactical and support vehicles OPA1 Cost Analysis

OPA1 ID FY 04 FY 05 FY 06 FY 07 Cost Elements CD TotalCost Qty UnitCost TotalCost Qty UnitCost TotalCost Qty UnitCost TotalCost Qty UnitCost

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000

1. HEMAT Trailer Hardware 6146 95 65 2. Federal Retail Excise Tax 738 SubTotal 6884 3. System Fielding Support 150 4. PM Support-Engineering 300 5. PM Support-Government 963 6. PM Support-Contractor 216

Total 8513

DA0100 (D05700) Item No. 1 Page 4 of 12 Exhibit P-5 TRAILER, HEAVY, EXPANDED MOBILITY 4 Weapon System Cost Analysis

Page 12: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Date: Exhibit P-5a, Budget Procurement History and Planning February 2005

Appropriation/Budget Activity/Serial No: Weapon System Type: P-1 Line Item Nomenclature: Other Procurement, Army / 1 / Tactical and support vehicles TRAILER, HEAVY, EXPANDED MOBILITY (D05700)

WBS Cost Elements: Contractor and Location Contract Location of PCO Award Date Date of First QTY Unit Cost Specs Date RFP Issue Method Avail Revsn Date

REMARKS:

and Type Delivery Each $ Now? Avail

1. HEMAT Trailer Hardware FY 2004 Systems & Electronics, Inc. FFP/Opt TACOM, Warren, MI Dec 03 Oct 04 95 65 Yes N/A N/A St. Louis, MO

DA0100 (D05700) Item No. 1 Page 5 of 12 Exhibit P-5a TRAILER, HEAVY, EXPANDED MOBILITY 5 Procurement History and Planning

Page 13: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

P-1 Item Nomenclature: Date: TRAILER, HEAVY, EXPANDED MOBILITY (D05700) February 2005 FY 04 / 05 BUDGET PRODUCTION SCHEDULE Fiscal Year 04 Fiscal Year 05

Calendar Year 04 Calendar Year 05

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P R E T A L

R V 1 OCT 1 OCT F R Each TO AS OF M FY E QTY PRIOR DUE S PROC ACCEP BAL

COST ELEMENTS

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P

M PRODUCTION RATES MFR ADMINLEAD TIME MFR TOTAL REMARKS

F REACHED Number Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct

R NAME/LOCATION MIN. 1-8-5 MAX. D+ INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

1 Systems & Electronics, Inc. , St. Louis, MO 3.00 10.00 15.00 12 1 0 8 10 18

0 3 10 13

1. HEMAT Trailer Hardware 1 FY 04 A 95 0 95 A 4 10 10 10 10 10 10 10 10 10 1 0

Total 95 95 4 10 10 10 10 10 10 10 10 10 1

DA0100 (D05700) Item No. 1 Page 6 of 12 Exhibit P-21 TRAILER, HEAVY, EXPANDED MOBILITY 6 Production Schedule

Page 14: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-40, Budget Item Justification Sheet Date: February 2005 Appropriation/Budget Activity/Serial No: Other Procurement, Army /1/Tactical and support vehicles P-1 Item Nomenclature LIGHT TACTICAL TRAILER (D06700) Program Elements for Code B Items: Code: Other Related Program Elements: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 To Complete Total Prog Proc Qty

Gross Cost

Less PY Adv Proc

Plus CY Adv Proc

Net Proc (P-1)

Initial Spares

Total Proc Cost

Flyaway U/C

Wpn Sys Proc U/C

5212 735 901 1354 488 515 425 233 254 10117

60.2 9.3 9.6 15.9 7.1 6.5 5.7 2.5 2.5 119.2

60.2 9.3 9.6 15.9 7.1 6.5 5.7 2.5 2.5 119.2

60.2 9.3 9.6 15.9 7.1 6.5 5.7 2.5 2.5 119.2

Description: The Light Tactical Trailer (LTT) is the companion trailer for the High Mobility Multipurpose Wheeled Vehicle (HMMWV). The LTT is compatible with both the light and heavy HMMWV. HMMWV variants require a LTT Family of Trailers (light, heavy and heavy chassis) which maximize the HMMWV’s towing capabilities. Current procurements of the LTT will have a steel draw bar and an improved brake actuator. The LTT replaces overage and overmileage M101 series trailers. The LTT has been fielded to the Army’s First Digitized Division, the Stryker Brigade Combat Teams (SBCT)(1-4) and is used by the Special Operations Command. Justification: FY 2006/FY 2007 procures 1842 LTTs as the Army's interim light tactical trailer. The LTT replaces over-aged trailers as the principle LTT to the HMMWV and the platform for numerous Army programs such as the Joint Surveillance Target Attack Radar Systems, Trojan Spirit, Integrated System Control, Explosive Ordnance Disposal, Joint Tactical Unmanned Aerial Vehicle, and Robotic Sensors. The FY 2006 procurement supports fielding to SBCT (5-6) and Data Interchange customers in addition to requirements on the Army approved distribution list that includes an aggressive modularity requirement.

DA0100 (D06700) Item No. 1 Page 7 of 12 Exhibit P-40 LIGHT TACTICAL TRAILER 7 Budget Item Justification Sheet

Page 15: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-5, Weapon Appropriation/Budget Activity/Serial No. P-1 Line Item Nomenclature: Weapon System Type: Date: Other Procurement, Army / 1 / LIGHT TACTICAL TRAILER (D06700) February 2005 Tactical and support vehicles OPA1 Cost Analysis

OPA1 ID FY 04 FY 05 FY 06 FY 07 Cost Elements CD TotalCost Qty UnitCost TotalCost Qty UnitCost TotalCost Qty UnitCost TotalCost Qty UnitCost

$000 Units $000 $000 Units $000 $000 Units $000 $000 Units $000

1. LTT Trailer Hardware 5202 735 8 7000 901 8 10182 1354 8 3719 488 8 2. Engineering Changes 200 200 305 112 3. Government Testing 1368 100 200 150 4. Engineering Support - In-House 1200 1000 2043 850 5. Documentation 100 50 6. Fielding Support 110 148 2213 1700 7. Projec Management Support-Government 400 1000 675 198 8. Project Managemen Support-Contractor 750 100 249 350

Total 9330 9598 15867 7079

DA0100 (D06700) Item No. 1 Page 8 of 12 Exhibit P-5 LIGHT TACTICAL TRAILER 8 Weapon System Cost Analysis

Page 16: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Date: Exhibit P-5a, Budget Procurement History and Planning February 2005

Appropriation/Budget Activity/Serial No: Weapon System Type: P-1 Line Item Nomenclature: Other Procurement, Army / 1 / Tactical and support vehicles LIGHT TACTICAL TRAILER (D06700)

WBS Cost Elements: Contractor and Location Contract Location of PCO Award Date Date of First QTY Unit Cost Specs Date RFP Issue Method Avail Revsn Date

REMARKS:

and Type Delivery Units $ Now? Avail

1. LTT Trailer Hardware FY 2004 Silver Eagle Mfg. Co. C/REQ5(1) TACOM, Warren, MI Mar 04 Sep 04 577 8 Yes Sep 03 Oct 03 Portland, OR FY 2004 Schutt Industries C/REQ2(2) TACOM, Warren, MI Feb 04 Dec 04 104 8 Yes Nov 02 Nov 02 Clintonville, WI FY 2004 Schutt Industries C/REQ2(2) TACOM, Warren, MI Nov 04 May 05 54 8 Yes Nov 02 Nov 02 Clintonville, WI FY 2005 Silver Eagle Mfg. Co. C/REQ5(2) TACOM, Warren, MI Mar 05 Sep 05 901 8 Portland, OR FY 2006 Silver Eagle Mfg. Co. C/REQ5(3) TACOM, Warren, MI Jan 06 Jul 06 1354 8 Portland, OR FY 2007 Silver Eagle Mfg. Co. C/REQ5(4) TACOM, Warren, MI Jan 07 Jul 07 488 8 Portland, OR

DA0100 (D06700) Item No. 1 Page 9 of 12 Exhibit P-5a LIGHT TACTICAL TRAILER 9 Procurement History and Planning

Page 17: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

P-1 Item Nomenclature: Date: LIGHT TACTICAL TRAILER (D06700) February 2005 FY 04 / 05 BUDGET PRODUCTION SCHEDULE Fiscal Year 04 Fiscal Year 05

Calendar Year 04 Calendar Year 05

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P R E T A L

R V 1 OCT 1 OCT F R Units TO AS OF M FY E QTY PRIOR DUE S PROC ACCEP BAL

COST ELEMENTS

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P

M PRODUCTION RATES MFR ADMINLEAD TIME MFR TOTAL REMARKS

F REACHED Number Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct

R NAME/LOCATION MIN. 1-8-5 MAX. D+ INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

1 Silver Eagle Mfg. Co. , Portland, OR 45.00 120.00 180.00 6 1 0 5 6 11

0 4 5 9

2 Schutt Industries , Clintonville, WI 30.00 40.00 100.00 0 2 0 4 10 14

0 4 5 9

1. LTT Trailer Hardware 1 FY 04 A 577 0 577 A 5 10 10 10 25 50 70 75 80 80 80 82 0 2 FY 04 A 104 0 104 A 20 20 20 20 20 4 0 2 FY 04 A 54 0 54 A 16 20 18 0 2 FY 04 OTH 50 0 50 A 50 1 FY 05 A 901 0 901 A 80 821 1 FY 06 A 1354 0 1354 1354 1 FY 07 A 488 0 488 488

Total 3528 3528 5 10 10 30 45 70 90 95 100 100 98 82 80 2713

DA0100 (D06700) Item No. 1 Page 10 of 12 Exhibit P-21 LIGHT TACTICAL TRAILER 10 Production Schedule

Page 18: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

P-1 Item Nomenclature: Date: LIGHT TACTICAL TRAILER (D06700) February 2005 FY 06 / 07 BUDGET PRODUCTION SCHEDULE Fiscal Year 06 Fiscal Year 07

Calendar Year 06 Calendar Year 07

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P R E T A L

R V 1 OCT 1 OCT F R Units TO AS OF M FY E QTY PRIOR DUE S PROC ACCEP BAL

COST ELEMENTS

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P

M PRODUCTION RATES MFR ADMINLEAD TIME MFR TOTAL REMARKS

F REACHED Number Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct

R NAME/LOCATION MIN. 1-8-5 MAX. D+ INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

1 Silver Eagle Mfg. Co. , Portland, OR 45.00 120.00 180.00 6 1 0 5 6 11

0 4 5 9

2 Schutt Industries , Clintonville, WI 30.00 40.00 100.00 0 2 0 4 10 14

0 4 5 9

1. LTT Trailer Hardware 1 FY 04 A 577 577 0 0 2 FY 04 A 104 104 0 0 2 FY 04 A 54 54 0 0 2 FY 04 OTH 50 0 50 20 30 0 1 FY 05 A 901 80 821 70 70 95 95 95 95 100 100 101 0 1 FY 06 A 1354 0 1354 A 112 112 112 112 112 112 112 112 113 115 115 115 0 1 FY 07 A 488 0 488 A 41 41 41 365

Total 3528 815 2713 90 100 95 95 95 95 100 100 101 112 112 112 112 112 112 112 112 113 115 115 115 41 41 41 365

DA0100 (D06700) Item No. 1 Page 11 of 12 Exhibit P-21 LIGHT TACTICAL TRAILER 11 Production Schedule

Page 19: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

P-1 Item Nomenclature: Date: LIGHT TACTICAL TRAILER (D06700) February 2005 FY 08 / 09 BUDGET PRODUCTION SCHEDULE Fiscal Year 08 Fiscal Year 09

Calendar Year 08 Calendar Year 09

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P R E T A L

R V 1 OCT 1 OCT F R Units TO AS OF M FY E QTY PRIOR DUE S PROC ACCEP BAL

COST ELEMENTS

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P

M PRODUCTION RATES MFR ADMINLEAD TIME MFR TOTAL REMARKS

F REACHED Number Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct

R NAME/LOCATION MIN. 1-8-5 MAX. D+ INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

1 Silver Eagle Mfg. Co. , Portland, OR 45.00 120.00 180.00 6 1 0 5 6 11

0 4 5 9

2 Schutt Industries , Clintonville, WI 30.00 40.00 100.00 0 2 0 4 10 14

0 4 5 9

1. LTT Trailer Hardware 1 FY 04 A 577 577 0 0 2 FY 04 A 104 104 0 0 2 FY 04 A 54 54 0 0 2 FY 04 OTH 50 50 0 0 1 FY 05 A 901 901 0 0 1 FY 06 A 1354 1354 0 0 1 FY 07 A 488 123 365 41 41 41 41 41 40 40 40 40 0

Total 3528 3163 365 41 41 41 41 41 40 40 40 40

DA0100 (D06700) Item No. 1 Page 12 of 12 Exhibit P-21 LIGHT TACTICAL TRAILER 12 Production Schedule

Page 20: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-40, Budget Item Justification Sheet Date: February 2005 Appropriation/Budget Activity/Serial No: Other Procurement, Army /1/Tactical and support vehicles P-1 Item Nomenclature Semitrailers, Flatbed: (D01001) Program Elements for Code B Items: Code: Other Related Program Elements: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 To Complete Total Prog Proc Qty

Gross Cost

Less PY Adv Proc

Plus CY Adv Proc

Net Proc (P-1)

Initial Spares

Total Proc Cost

Flyaway U/C

Wpn Sys Proc U/C

18498 701 575 136 99 93 216 346 65 65 20794

332.9 30.2 29.3 9.2 6.0 5.0 10.2 16.9 3.3 3.3 446.5

332.9 30.2 29.3 9.2 6.0 5.0 10.2 16.9 3.3 3.3 446.5

332.9 30.2 29.3 9.2 6.0 5.0 10.2 16.9 3.3 3.3 446.5

Description: 1. The M870A3 semi-trailer lowbed is a 40-ton hydraulic detachable system capable of handling payloads up to 80,000 pounds on primary, secondary, and trail profiles. The semi-trailer is a 45-foot long, 102-inch wide multi-axle state-of-the-art trailer with vehicle front end loading capability, dual 12/24 volt electrical system including light emitting diode (LED) lights and 12-inch extensions to expand the trailer width to 126-inches. The semi-trailer is connected to its prime movers via either a 2 or 3.5-inch king pin assembly. 2. The M871A3 semi-trailer is a 22 1/2-ton drop deck/break bulk (DD/BB) container transporter. It is a tactical, dual purpose, bulk and container transporter. It transports 20 foot International Organization for Standardization (ISO) Containers on line haul missions and are the primary means of distributing containers and bulk cargo. 3. The M872A4 semi-trailer is a 34-ton, dual purpose, break bulk/container transporter. The semi-trailer has a maximum rated payload of 68,000 pounds and is capable of a daily operating range of at least 300 miles at sustained speeds of 50-60 miles per hour. Justification: FY 2006/FY 2007 procures a total of 192 semi-trailers, 165 M871A3s and 27 M872A4s. The M871A3s being procured correct problems of the previous models currently fielded such as load height bridge clearance and mating with the Family of Medium Tactical Vehicles (FMTVs). Procurement of M872A4s support new unit activations, modernizes the fleet and improves the overall operational readiness rate of the M872 series fleet. Funding will support Program Management costs on the M870A3 semi-trailer program.

D01001 Item No. 2 Page 1 of 13 Exhibit P-40 Semitrailers, Flatbed: 13 Budget Item Justification Sheet

Page 21: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-5, Weapon Appropriation/Budget Activity/Serial No. P-1 Line Item Nomenclature: Weapon System Type: Date: Other Procurement, Army / 1 / Semitrailers, Flatbed: (D01001) February 2005 Tactical and support vehicles OPA1 Cost Analysis

OPA1 ID FY 04 FY 05 FY 06 FY 07 Cost Elements CD TotalCost Qty UnitCost TotalCost Qty UnitCost TotalCost Qty UnitCost TotalCost Qty UnitCost

$000 Units $000 $000 Units $000 $000 Units $000 $000 Units $000

Semitrl LB 40T M870A1/A3 (D00700) 1061 1531 11 582 433 Semitrl FB BB 22 1/2T M871A3 (D01500) 19889 575 5931 125 4089 85 3801 80 Semitrl FB BB/Cont 34T M872A4 (D01600) 8360 1744 1378 14 815 13

Total 29310 9206 6049 5049

D01001 Item No. 2 Page 2 of 13 Exhibit P-5 Semitrailers, Flatbed: 14 Weapon System Cost Analysis

Page 22: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-40, Budget Item Justification Sheet Date: February 2005 Appropriation/Budget Activity/Serial No: Other Procurement, Army /1/Tactical and support vehicles P-1 Item Nomenclature SEMITRAILER LB 40T M870A1 (CCE) (D00700) Program Elements for Code B Items: Code: Other Related Program Elements: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 To Complete Total Prog Proc Qty

Gross Cost

Less PY Adv Proc

Plus CY Adv Proc

Net Proc (P-1)

Initial Spares

Total Proc Cost

Flyaway U/C

Wpn Sys Proc U/C

2001 11 2012

45.7 0.9 1.1 1.5 0.6 0.4 50.2

45.7 0.9 1.1 1.5 0.6 0.4 50.2

45.7 0.9 1.1 1.5 0.6 0.4 50.2

Description: The M870A3 semi-trailer lowbed is a 40-ton hydraulic detachable system capable of handling payloads up to 80,000 pounds on primary, secondary, and trail profiles. The semi-trailer is a 45-foot long, 102-inch wide multi-axle state-of-the-art trailer with vehicle front end loading capability, dual 12/24 volt electrical system including light emitting diode (LED) lights, and 12-inch extensions to expand the trailer width to 126-inches. The semi-trailer is connected to its prime movers via either a 2 or 3.5-inch king pin assembly. The M870A3 was type classified and Full Material Release was approved August 2004. Justification: FY 2006/FY 2007 provides funding for Program Management support costs on the M870A3 semi-trailer program.

D01001 (D00700) Item No. 2 Page 3 of 13 Exhibit P-40 SEMITRAILER LB 40T M870A1 (CCE) 15 Budget Item Justification Sheet

Page 23: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-40, Budget Item Justification Sheet Date: February 2005 Appropriation/Budget Activity/Serial No: Other Procurement, Army /1/Tactical and support vehicles P-1 Item Nomenclature SEMITRAILER FB BB/CONT TRANS 22 1/2 T (D01500) Program Elements for Code B Items: Code: Other Related Program Elements: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 To Complete Total Prog Proc Qty

Gross Cost

Less PY Adv Proc

Plus CY Adv Proc

Net Proc (P-1)

Initial Spares

Total Proc Cost

Flyaway U/C

Wpn Sys Proc U/C

6386 440 575 125 85 80 201 207 65 65 8229

117.9 13.9 19.9 5.9 4.1 3.8 9.3 10.2 3.3 3.3 191.7

117.9 13.9 19.9 5.9 4.1 3.8 9.3 10.2 3.3 3.3 191.7

117.9 13.9 19.9 5.9 4.1 3.8 9.3 10.2 3.3 3.3 191.7

0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1

Description: The M871A3 semi-trailer, drop deck/break bulk (DD/BB) container transporter, 22-1/2 ton, is a tactical, dual purpose, bulk and container transporter. The M871A3 model is the authorized worldwide transporter of International Organization for Standardization (ISO) containers within the military logistics system . The M871A3 is also the primary transporter of the 3,000-gallon Reverse Osmosis Water Purification Unit (ROWPU) and the Laundry Advanced System (LADS). The A3 model corrects the problems from the previously fielded models with improved load height bridge clearance and mating with the Family of Medium Tactical Vehicles (FMTV). The prime movers are the 5-Ton truck (M939/809) FMTV and line haul tractors. Justification: FY 2006/FY 2007 procures 165 M871A3 semi-trailers. The M871A3 is used on line-haul missions as the primary transporter of ISO containers, bulk cargo, the ROWPU, and LADS.

D01001 (D01500) Item No. 2 Page 4 of 13 Exhibit P-40 SEMITRAILER FB BB/CONT TRANS 22 1/2 T 16 Budget Item Justification Sheet

Page 24: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-5, Weapon Appropriation/Budget Activity/Serial No. P-1 Line Item Nomenclature: Weapon System Type: Date: Other Procurement, Army / 1 / SEMITRAILER FB BB/CONT TRANS 22 1/2 T (D01500) February 2005 Tactical and support vehicles OPA1 Cost Analysis

OPA1 ID FY 04 FY 05 FY 06 FY 07 Cost Elements CD TotalCost Qty UnitCost TotalCost Qty UnitCost TotalCost Qty UnitCost TotalCost Qty UnitCost

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000

1. Vehicle 16335 575 28 4074 125 33 2813 85 33 2659 80 33 2. Federal Retail Excise Tax 2227 444 307 290 Sub Total 18562 4518 3120 2949 5. Program Management 1095 1143 801 701 6. System Fielding 231 270 168 151

Total 19888 5931 4089 3801

D01001 (D01500) Item No. 2 Page 5 of 13 Exhibit P-5 SEMITRAILER FB BB/CONT TRANS 22 1/2 T 17 Weapon System Cost Analysis

Page 25: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Date: Exhibit P-5a, Budget Procurement History and Planning February 2005

Appropriation/Budget Activity/Serial No: Weapon System Type: P-1 Line Item Nomenclature: Other Procurement, Army / 1 / Tactical and support vehicles SEMITRAILER FB BB/CONT TRANS 22 1/2 T (D01500)

WBS Cost Elements: Contractor and Location Contract Location of PCO Award Date Date of First QTY Unit Cost Specs Date RFP Issue Method Avail Revsn Date

REMARKS:

and Type Delivery Each $ Now? Avail

1. Vehicle FY 2004 Fontaine Trailer Co. C/FP TACOM, Warren, MI Jan 04 Jun 05 179 28 Yes N/A N/A Princeton, Kentucky FY 2004 Fontaine Trailer Co. C/FP TACOM, Warren, MI Nov 04 Jun 05 396 28 Yes N/A N/A Princeton, Kentucky FY 2005 Fontaine Trailer Co. C/FP TACOM, Warren, MI Feb 05 Mar 06 125 33 Yes N/A N/A Princeton, Kentucky FY 2006 TBS TBS TACOM, Warren, MI Dec 05 May 06 85 33 Yes N/A N/A FY 2007 TBS TBS TACOM, Warren, MI Dec 06 May 07 80 33 Yes N/A N/A

D01001 (D01500) Item No. 2 Page 6 of 13 Exhibit P-5a SEMITRAILER FB BB/CONT TRANS 22 1/2 T 18 Procurement History and Planning

Page 26: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

P-1 Item Nomenclature: Date: SEMITRAILER FB BB/CONT TRANS 22 1/2 T (D01500) February 2005 FY 04 / 05 BUDGET PRODUCTION SCHEDULE Fiscal Year 04 Fiscal Year 05

Calendar Year 04 Calendar Year 05

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P R E T A L

R V 1 OCT 1 OCT F R Each TO AS OF M FY E QTY PRIOR DUE S PROC ACCEP BAL

COST ELEMENTS

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P

M PRODUCTION RATES MFR ADMINLEAD TIME MFR TOTAL REMARKS

F REACHED Number Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct

R NAME/LOCATION MIN. 1-8-5 MAX. D+ INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

1 Fontaine Trailer Co. , Princeton, Kentucky 3.00 66.00 112.00 10 1 2 2 3 5

2 2 3 5

2 TBS , 3.00 66.00 112.00 10 2 0 3 5 8

0 2 5 7

1. Vehicle 1 FY 04 A 179 0 179 A 29 35 35 35 45 1 FY 04 A 396 0 396 A 37 31 31 31 266 1 FY 05 A 125 0 125 A 125 2 FY 06 A 85 0 85 85 2 FY 07 A 80 0 80 80 1 FY 05 AR 84 0 84 A 84

Total 949 949 66 66 66 66 685

D01001 (D01500) Item No. 2 Page 7 of 13 Exhibit P-21 SEMITRAILER FB BB/CONT TRANS 22 1/2 T 19 Production Schedule

Page 27: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

P-1 Item Nomenclature: Date: SEMITRAILER FB BB/CONT TRANS 22 1/2 T (D01500) February 2005 FY 06 / 07 BUDGET PRODUCTION SCHEDULE Fiscal Year 06 Fiscal Year 07

Calendar Year 06 Calendar Year 07

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P R E T A L

R V 1 OCT 1 OCT F R Each TO AS OF M FY E QTY PRIOR DUE S PROC ACCEP BAL

COST ELEMENTS

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P

M PRODUCTION RATES MFR ADMINLEAD TIME MFR TOTAL REMARKS

F REACHED Number Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct

R NAME/LOCATION MIN. 1-8-5 MAX. D+ INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

1 Fontaine Trailer Co. , Princeton, Kentucky 3.00 66.00 112.00 10 1 2 2 3 5

2 2 3 5

2 TBS , 3.00 66.00 112.00 10 2 0 3 5 8

0 2 5 7

1. Vehicle 1 FY 04 A 179 134 45 45 0 1 FY 04 A 396 130 266 21 55 55 55 55 25 0 1 FY 05 A 125 0 125 30 56 39 0 2 FY 06 A 85 0 85 A 8 7 7 7 7 7 7 7 7 7 7 7 0 2 FY 07 A 80 0 80 A 17 17 17 17 12 0 1 FY 05 AR 84 0 84 11 11 11 11 11 10 10 9 0

Total 949 264 685 66 66 66 66 66 66 66 57 16 7 7 7 7 7 7 7 7 7 7 17 17 17 17 12

D01001 (D01500) Item No. 2 Page 8 of 13 Exhibit P-21 SEMITRAILER FB BB/CONT TRANS 22 1/2 T 20 Production Schedule

Page 28: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-40, Budget Item Justification Sheet Date: February 2005 Appropriation/Budget Activity/Serial No: Other Procurement, Army /1/Tactical and support vehicles P-1 Item Nomenclature SEMITRAILER FB BB/CONT TR 34T M872 C/S (D01600) Program Elements for Code B Items: Code: Other Related Program Elements: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 To Complete Total Prog Proc Qty

Gross Cost

Less PY Adv Proc

Plus CY Adv Proc

Net Proc (P-1)

Initial Spares

Total Proc Cost

Flyaway U/C

Wpn Sys Proc U/C

10105 289 14 13 15 139 10575

169.4 14.2 8.4 1.7 1.4 0.8 0.9 6.7 203.5

169.4 14.2 8.4 1.7 1.4 0.8 0.9 6.7 203.5

169.4 14.2 8.4 1.7 1.4 0.8 0.9 6.7 203.5

Description: The M872A4 semi-trailer is a dual purpose, break bulk/container transporter, 40-foot with a maximum payload of 68,000 pounds over primary and improved secondary roads. The prime mover is the M915 series 6 x 4 line haul tractor. The M872A4 is a commercially adapted semi-trailer that transports a single 40-foot or two 20-foot International Organization for Standardization (ISO) containers, palletized cargo, light combat and tactical vehicles. Justification: FY 2006/FY 2007 procures 27 M872A4 semi-trailers to support newly formed Army National Guard Medium Transportation Companies.

D01001 (D01600) Item No. 2 Page 9 of 13 Exhibit P-40 SEMITRAILER FB BB/CONT TR 34T M872 C/S 21 Budget Item Justification Sheet

Page 29: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-5, Weapon Appropriation/Budget Activity/Serial No. P-1 Line Item Nomenclature: Weapon System Type: Date: Other Procurement, Army / 1 / SEMITRAILER FB BB/CONT TR 34T M872 C/S (D01600) February 2005 Tactical and support vehicles OPA1 Cost Analysis

OPA1 ID FY 04 FY 05 FY 06 FY 07 Cost Elements CD TotalCost Qty UnitCost TotalCost Qty UnitCost TotalCost Qty UnitCost TotalCost Qty UnitCost

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000

1. Vehicle 505 14 37 471 13 36 2. Federal Retail Excise Tax 69 71 Sub Total 574 542 3. Testing 1747 5. Program Management 2221 1050 6. System Fielding 187 694 804 273 7. Engineering Change Proposals (ECPs) 1205 8. Modifications 3000

Total 8360 1744 1378 815

D01001 (D01600) Item No. 2 Page 10 of 13 Exhibit P-5 SEMITRAILER FB BB/CONT TR 34T M872 C/S 22 Weapon System Cost Analysis

Page 30: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Date: Exhibit P-5a, Budget Procurement History and Planning February 2005

Appropriation/Budget Activity/Serial No: Weapon System Type: P-1 Line Item Nomenclature: Other Procurement, Army / 1 / Tactical and support vehicles SEMITRAILER FB BB/CONT TR 34T M872 C/S (D01600)

WBS Cost Elements: Contractor and Location Contract Location of PCO Award Date Date of First QTY Unit Cost Specs Date RFP Issue Method Avail Revsn Date

REMARKS:

and Type Delivery Each $ Now? Avail

1. Vehicle FY 2006 Talbert Manufacturing, Inc. C/FP TACOM, Warren, MI Nov 05 Feb 06 14 37 Yes N/A N/A Rensselaer, Indianna FY 2007 Talbert Manufacturing, Inc. C/FP TACOM, Warren, MI Nov 06 Feb 07 13 36 Yes N/A N/A Rensselaer, Indianna

D01001 (D01600) Item No. 2 Page 11 of 13 Exhibit P-5a SEMITRAILER FB BB/CONT TR 34T M872 C/S 23 Procurement History and Planning

Page 31: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

P-1 Item Nomenclature: Date: SEMITRAILER FB BB/CONT TR 34T M872 C/S (D01600) February 2005 FY 06 / 07 BUDGET PRODUCTION SCHEDULE Fiscal Year 06 Fiscal Year 07

Calendar Year 06 Calendar Year 07

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P R E T A L

R V 1 OCT 1 OCT F R Each TO AS OF M FY E QTY PRIOR DUE S PROC ACCEP BAL

COST ELEMENTS

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P

M PRODUCTION RATES MFR ADMINLEAD TIME MFR TOTAL REMARKS

F REACHED Number Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct

R NAME/LOCATION MIN. 1-8-5 MAX. D+ INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

1 Talbert Manufacturing, Inc. , Rensselaer, Indianna 1.00 65.00 80.00 10 1 1 1 3 4

1 1 3 4

1. Vehicle 1 FY 06 A 14 0 14 A 1 1 1 1 1 1 1 1 1 2 2 1 0 1 FY 07 A 13 0 13 A 2 1 1 1 1 1 1 1 4

Total 27 27 1 1 1 1 1 1 1 1 1 2 2 1 2 1 1 1 1 1 1 1 4

D01001 (D01600) Item No. 2 Page 12 of 13 Exhibit P-21 SEMITRAILER FB BB/CONT TR 34T M872 C/S 24 Production Schedule

Page 32: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

P-1 Item Nomenclature: Date: SEMITRAILER FB BB/CONT TR 34T M872 C/S (D01600) February 2005 FY 08 / 09 BUDGET PRODUCTION SCHEDULE Fiscal Year 08 Fiscal Year 09

Calendar Year 08 Calendar Year 09

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P R E T A L

R V 1 OCT 1 OCT F R Each TO AS OF M FY E QTY PRIOR DUE S PROC ACCEP BAL

COST ELEMENTS

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P

M PRODUCTION RATES MFR ADMINLEAD TIME MFR TOTAL REMARKS

F REACHED Number Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct

R NAME/LOCATION MIN. 1-8-5 MAX. D+ INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

1 Talbert Manufacturing, Inc. , Rensselaer, Indianna 1.00 65.00 80.00 10 1 1 1 3 4

1 1 3 4

1. Vehicle 1 FY 06 A 14 14 0 0 1 FY 07 A 13 9 4 1 1 1 1 0

Total 27 23 4 1 1 1 1

D01001 (D01600) Item No. 2 Page 13 of 13 Exhibit P-21 SEMITRAILER FB BB/CONT TR 34T M872 C/S 25 Production Schedule

Page 33: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-40, Budget Item Justification Sheet Date: February 2005 Appropriation/Budget Activity/Serial No: Other Procurement, Army /1/Tactical and support vehicles P-1 Item Nomenclature Semitrailers, tankers (D02001) Program Elements for Code B Items: Code: Other Related Program Elements: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 To Complete Total Prog Proc Qty

Gross Cost

Less PY Adv Proc

Plus CY Adv Proc

Net Proc (P-1)

Initial Spares

Total Proc Cost

Flyaway U/C

Wpn Sys Proc U/C

4421 72 90 39 59 15 132 4828

325.4 10.5 11.2 0.7 6.3 13.0 2.6 22.8 392.5

325.4 10.5 11.2 0.7 6.3 13.0 2.6 22.8 392.5

325.4 10.5 11.2 0.7 6.3 13.0 2.6 22.8 392.5

0.1 0.2 0.2 0.2 0.2

Description: This budget line procures two different types of 5000-Gallon Semi-Trailers, the M967A2 Bulkhauler and the M969A3 Automotive Refueler. They share the same production line and have common components. Semi-Trailers features include a stainless steel, single compartment tank of 5000-gallon capacity, top and bottom loading capacity, an automatic overflow shutoff device and gravity discharge capability. It is also equipped with a four-cylinder diesel engine and pump assembly, tandem axles, manually operated landing gear, radial tires, a fuel capacity measuring device and a vapor recovery system/kit. When empty, these Semi-Trailers are air transportable and are designed to be towed by a truck tractor equipped with a fifth wheel. The authorized prime movers for the highway and cross-country include the 5-Ton Truck Tractor and the Family of Medium Tactical Vehicles (FMTV) Tractor. Justification: FY2006/FY2007 procures 98 M969A3 Automotive Refuelers. The Semi-trailer tankers are critical to the Global War on Terrorism (GWOT). Fielding plans for both the M967 and M969 have been changed to accomodate the new Army directives that include pure fleeting of Army Preposition Stock (APS), force modularity, as well as meeting the demands of deployments in support of Operation Iraqi Freedom (OIF).

D02001 Item No. 3 Page 1 of 8 Exhibit P-40 Semitrailers, tankers 26 Budget Item Justification Sheet

Page 34: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-5, Weapon Appropriation/Budget Activity/Serial No. P-1 Line Item Nomenclature: Weapon System Type: Date: Other Procurement, Army / 1 / Semitrailers, tankers (D02001) February 2005 Tactical and support vehicles OPA1 Cost Analysis

OPA1 ID FY 04 FY 05 FY 06 FY 07 Cost Elements CD TotalCost Qty UnitCost TotalCost Qty UnitCost TotalCost Qty UnitCost TotalCost Qty UnitCost

$000 Units $000 $000 Units $000 $000 Units $000 $000 Units $000

Semitrl Tank 5000G Automotive (D02306) 11150 90 664 6287 39 13019 59

Total 11150 664 6287 13019

D02001 Item No. 3 Page 2 of 8 Exhibit P-5 Semitrailers, tankers 27 Weapon System Cost Analysis

Page 35: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-40, Budget Item Justification Sheet Date: February 2005 Appropriation/Budget Activity/Serial No: Other Procurement, Army /1/Tactical and support vehicles P-1 Item Nomenclature SEMITRAILER TANK 5000G AUTOMOTIVE (D02306) Program Elements for Code B Items: Code: Other Related Program Elements: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 To Complete Total Prog Proc Qty

Gross Cost

Less PY Adv Proc

Plus CY Adv Proc

Net Proc (P-1)

Initial Spares

Total Proc Cost

Flyaway U/C

Wpn Sys Proc U/C

2263 90 39 59 15 132 2598

173.9 10.5 11.2 0.7 6.3 13.0 2.6 22.8 240.9

173.9 10.5 11.2 0.7 6.3 13.0 2.6 22.8 240.9

173.9 10.5 11.2 0.7 6.3 13.0 2.6 22.8 240.9

Description: The M969A3 5000-Gallon Fuel Tanker Semi-Trailer performs automotive refueling and bulk fuel hauling from Division to Main Supply and Forward Support Battalions. The M969A3 Tanker is found primarily in Transportation Medium Truck Companies, Petroleum, assigned to Quartermasters Battalion. The M969A3 is equipped with a self-priming pump assembly and a filter separator assembly for automotive fuel. This dispensing assembly consists of dual automotive refueling systems that are pressurized to deliver fuel by a diesel engine and centrifugal pump combination. Each refueling system is composed of a meter, electric rewind hose reel, 50-feet of dispensing hose, and a dispensing nozzle. M969A3 features include: electronic overflow prevention, liquid level gauge, anti-lock brakes, vapor recovery and Global Positioning System (GPS) capability. Justification: FY2006/FY2007 procures 98 M969A3s. Automotive refueling/bulk haulers are critical to the Global War on Terrorism (GWOT). Production schedule and fieldings have been accelerated to meet pure fleeting of Army Prepositioned Stock (APS), force modularity, and the deployment requirements for Operation Iraqi Freedom (OIF).

D02001 (D02306) Item No. 3 Page 3 of 8 Exhibit P-40 SEMITRAILER TANK 5000G AUTOMOTIVE 28 Budget Item Justification Sheet

Page 36: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-5, Weapon Appropriation/Budget Activity/Serial No. P-1 Line Item Nomenclature: Weapon System Type: Date: Other Procurement, Army / 1 / SEMITRAILER TANK 5000G AUTOMOTIVE (D02306) February 2005 Tactical and support vehicles OPA1 Cost Analysis

OPA1 ID FY 04 FY 05 FY 06 FY 07 Cost Elements CD TotalCost Qty UnitCost TotalCost Qty UnitCost TotalCost Qty UnitCost TotalCost Qty UnitCost

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000

Vehicle 7262 90 87 4359 39 112 7853 59 133 Federal Retail Excise Tax 1496 520 871 Sub Total 8758 4879 8724 Engineering Change Proposals (ECPs) 200 78 350 Testing 300 Engineering Support 157 100 300 PM Support - Govt 990 825 2000 PM Support - Contractor 156 125 270 Fielding Support 850 664 255 1000 Documentation 39 25 75

Total 11150 664 6287 13019

D02001 (D02306) Item No. 3 Page 4 of 8 Exhibit P-5 SEMITRAILER TANK 5000G AUTOMOTIVE 29 Weapon System Cost Analysis

Page 37: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Date: Exhibit P-5a, Budget Procurement History and Planning February 2005

Appropriation/Budget Activity/Serial No: Weapon System Type: P-1 Line Item Nomenclature: Other Procurement, Army / 1 / Tactical and support vehicles SEMITRAILER TANK 5000G AUTOMOTIVE (D02306)

WBS Cost Elements: Contractor and Location Contract Location of PCO Award Date Date of First QTY Unit Cost Specs Date RFP Issue Method Avail Revsn Date

REMARKS: Heil is concurrently manufacturing the M967A2 5000 Gallon Bulkhaul Tanker, SSN D02304.

and Type Delivery Each $ Now? Avail

Vehicle FY 2004 Heil Trailer International REQ5 (3) TACOM, Warren, MI Dec 03 Nov 05 75 87 Yes Athens, Tennessee FY 2004 Heil Trailer International REQ5 (3) TACOM, Warren, MI Jan 04 Feb 06 15 87 Yes Athens, Tennessee FY 2006 Heil Trailer International REQ5 (5) TACOM, Warren, MI Jan 06 Jun 06 39 112 Yes Athens, Tennessee FY 2007 TBS TBS TACOM, Warren, MI Jan 07 Jun 07 59 133 No Mar-06 Jun-06

D02001 (D02306) Item No. 3 Page 5 of 8 Exhibit P-5a SEMITRAILER TANK 5000G AUTOMOTIVE 30 Procurement History and Planning

Page 38: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

P-1 Item Nomenclature: Date: SEMITRAILER TANK 5000G AUTOMOTIVE (D02306) February 2005 FY 04 / 05 BUDGET PRODUCTION SCHEDULE Fiscal Year 04 Fiscal Year 05

Calendar Year 04 Calendar Year 05

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P R E T A L

R V 1 OCT 1 OCT F R Each TO AS OF M FY E QTY PRIOR DUE S PROC ACCEP BAL

COST ELEMENTS

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P

M PRODUCTION RATES MFR ADMINLEAD TIME MFR TOTAL REMARKS

Heil is also concurrently manufacturing the M967A2, D02304. Delivery schedule reflects current GWOT deployments.

F REACHED Number Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct

R NAME/LOCATION MIN. 1-8-5 MAX. D+ INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

1 Heil Trailer International , Athens, Tennessee 2.00 42.00 84.00 6 1 0 13 36 49

0 3 6 9

2 TBS , 2.00 42.00 84.00 6 2 0 3 6 9

0 3 6 9

Vehicle 1 FY 04 A 75 0 75 A 5 2 5 6 5 5 3 44 1 FY 04 A 15 0 15 A 15 1 FY 06 A 39 0 39 39 2 FY 07 A 59 0 59 59

Total 188 188 5 2 5 6 5 5 3 157

D02001 (D02306) Item No. 3 Page 6 of 8 Exhibit P-21 SEMITRAILER TANK 5000G AUTOMOTIVE 31 Production Schedule

Page 39: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

P-1 Item Nomenclature: Date: SEMITRAILER TANK 5000G AUTOMOTIVE (D02306) February 2005 FY 06 / 07 BUDGET PRODUCTION SCHEDULE Fiscal Year 06 Fiscal Year 07

Calendar Year 06 Calendar Year 07

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P R E T A L

R V 1 OCT 1 OCT F R Each TO AS OF M FY E QTY PRIOR DUE S PROC ACCEP BAL

COST ELEMENTS

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P

M PRODUCTION RATES MFR ADMINLEAD TIME MFR TOTAL REMARKS

Heil is also concurrently manufacturing the M967A2, D02304. Delivery schedule reflects current GWOT deployments.

F REACHED Number Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct

R NAME/LOCATION MIN. 1-8-5 MAX. D+ INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

1 Heil Trailer International , Athens, Tennessee 2.00 42.00 84.00 6 1 0 13 36 49

0 3 6 9

2 TBS , 2.00 42.00 84.00 6 2 0 3 6 9

0 3 6 9

Vehicle 1 FY 04 A 75 31 44 5 3 6 5 2 4 10 9 0 1 FY 04 A 15 0 15 3 12 0 1 FY 06 A 39 0 39 A 4 4 4 3 3 3 3 3 3 3 3 3 0 2 FY 07 A 59 0 59 A 12 12 12 23

Total 188 31 157 5 3 6 5 2 4 10 12 12 4 4 4 3 3 3 3 3 3 3 3 3 12 12 12 23

D02001 (D02306) Item No. 3 Page 7 of 8 Exhibit P-21 SEMITRAILER TANK 5000G AUTOMOTIVE 32 Production Schedule

Page 40: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

P-1 Item Nomenclature: Date: SEMITRAILER TANK 5000G AUTOMOTIVE (D02306) February 2005 FY 08 / 09 BUDGET PRODUCTION SCHEDULE Fiscal Year 08 Fiscal Year 09

Calendar Year 08 Calendar Year 09

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P R E T A L

R V 1 OCT 1 OCT F R Each TO AS OF M FY E QTY PRIOR DUE S PROC ACCEP BAL

COST ELEMENTS

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P

M PRODUCTION RATES MFR ADMINLEAD TIME MFR TOTAL REMARKS

Heil is also concurrently manufacturing the M967A2, D02304. Delivery schedule reflects current GWOT deployments.

F REACHED Number Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct

R NAME/LOCATION MIN. 1-8-5 MAX. D+ INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

1 Heil Trailer International , Athens, Tennessee 2.00 42.00 84.00 6 1 0 13 36 49

0 3 6 9

2 TBS , 2.00 42.00 84.00 6 2 0 3 6 9

0 3 6 9

Vehicle 1 FY 04 A 75 75 0 0 1 FY 04 A 15 15 0 0 1 FY 06 A 39 39 0 0 2 FY 07 A 59 36 23 12 11 0

Total 188 165 23 12 11

D02001 (D02306) Item No. 3 Page 8 of 8 Exhibit P-21 SEMITRAILER TANK 5000G AUTOMOTIVE 33 Production Schedule

Page 41: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-40, Budget Item Justification Sheet Date: February 2005 Appropriation/Budget Activity/Serial No: Other Procurement, Army /1/Tactical and support vehicles P-1 Item Nomenclature HI MOB MULTI-PURP WHLD VEH (HMMWV) (D15400) Program Elements for Code B Items: Code: Other Related Program Elements: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 To Complete Total Prog Proc Qty

Gross Cost

Less PY Adv Proc

Plus CY Adv Proc

Net Proc (P-1)

Initial Spares

Total Proc Cost

Flyaway U/C

Wpn Sys Proc U/C

98991 2785 7800 3254 2065 3242 3260 4539 6720 3175 135831

3534.8 327.1 1338.4 432.9 224.2 331.3 340.9 481.8 724.1 347.2 8082.9

3534.8 327.1 1338.4 432.9 224.2 331.3 340.9 481.8 724.1 347.2 8082.9

3534.8 327.1 1338.4 432.9 224.2 331.3 340.9 481.8 724.1 347.2 8082.9

Description: The High Mobility Multi-Purpose Wheeled Vehicle (HMMWV) is a lightweight, high performance, four-wheel drive, air transportable and air droppable, family of tactical wheeled vehicles. The vehicle has a diesel engine, automatic transmission and payload capacity of a XM1151/XM1152 and 2,300 lbs. (M1114 Up-Armor). The A1 model of the HMMWV began fielding in March 1994. The M1151, which replaces the M1025A2 and the XM1152, will be built on an Expanded Capacity Vehicle (ECV) Chassis which provides additional carrying capacity. The Up-Armored HMMWV (M1114) provides its crew complete ballistic protection against anti-tank and anti-personnel mines, and 360-degree protection against 7.62 NATO armor-piercing munitions. The M1151 and the M1152 are fully capable of accepting an armor kit. Justification: FY06 and FY07 procures 5,307 HMMWV's of which 720 are the M1114 Up-Armored vehicle. The balance of the funding procures 180 XM1151's with armor and 4,407 Armor Ready XM1152's. The Army relies on the U.S. Marine Corps HMMWV requirements to maintain an affordable production rate. The Army XM1151 and XM1152's are required to support the Army's Modularity and Brigade Combat Teams (BCT) units. Also, HMMWV's are required for Data Interchange Programs development and fielding of critical Combat Support and Combat Service Support Systems such as Advanced Field Artillery Tactical Data System (AFATDS), Secure Mobile Anti-Jam Reliable Tactical Terminal (SMART-T) and Tactical Unmanned Aerial Vehicle (TUAV). Some of these HMMWV's will be provided to integrating Project Managers to support meeting critical milestones in standing up the Stryker Brigade Combat Teams. The M1114 Up-Armored HMMWV is part of both the Military Police and Special Operations Forces Light Tactical Vehicle modernization programs as well as Operation Enduring Freedom/Operation Iraqi Freedom. The M1114 provides these high priority units increased crew occupant protection from ballistic, improvised explosive devices, RPG and mine blast threats. The XM1151 is used to support the Rangers, Ground Mobility Systems as well as the Knight program, ARNG Division Redesign Study (ADRS) and other Army Interchange requirements. Vehicles will be placed in high priority units.

D15400 Item No. 4 Page 1 of 14 Exhibit P-40 HI MOB MULTI-PURP WHLD VEH (HMMWV) 34 Budget Item Justification Sheet

Page 42: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-5, Weapon Appropriation/Budget Activity/Serial No. P-1 Line Item Nomenclature: Weapon System Type: Date: Other Procurement, Army / 1 / HI MOB MULTI-PURP WHLD VEH (HMMWV) (D15400) February 2005 Tactical and support vehicles OPA1 Cost Analysis

OPA1 ID FY 04 FY 05 FY 06 FY 07 Cost Elements CD TotalCost Qty UnitCost TotalCost Qty UnitCost TotalCost Qty UnitCost TotalCost Qty UnitCost

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000

Vehicles Up-Armor M1114 387796 6665 58 21202 360 59 21762 360 60 Government Furnished Equipment (Chassis) 535381 6665 80 30062 360 84 30513 360 85 Total Up-Armor M1114 (UAH) 923177 51264 52275 Hvy Var M1097A2 48603 774 63 Truck Utility M1025A2 8354 112 75 ECV M1113 4994 74 67 7022 79 89 XM1151 14941 175 85 133389 1519 88 8112 90 90 8337 90 93 XM1152 126959 1656 77 126137 1615 78 224071 2792 80 Subtotal 76892 267370 134249 232408 Overhead Cost Project Management Support 12151 4583 4606 4675 Government Testing Comparison Test 219 223 226 230 Preproduction Qualification Test 477 309 314 319 XM1151 Aerial Delivery Test 156 XM1151/2 Air Drop Certification 22 Spare Tire Test 480 System Technical Support (STS) 14245 10612 8644 8773 Engineering Support - In-House 4051 1571 1594 1618 Variable Cost Fielding Support 59745 8191 6788 9210 Engineering Changes 14219 6149 4664 7625 Kits (Voice Radio, Singars, GPK) 121338 100756 11873 14174 Blue Force Tracking 111218 HMMWV RECAP 33150

Total 1338390 432914 224222 331307

D15400 Item No. 4 Page 2 of 14 Exhibit P-5 HI MOB MULTI-PURP WHLD VEH (HMMWV) 35 Weapon System Cost Analysis

Page 43: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Date: Exhibit P-5a, Budget Procurement History and Planning February 2005

Appropriation/Budget Activity/Serial No: Weapon System Type: P-1 Line Item Nomenclature: Other Procurement, Army / 1 / Tactical and support vehicles HI MOB MULTI-PURP WHLD VEH (HMMWV) (D15400)

WBS Cost Elements: Contractor and Location Contract Location of PCO Award Date Date of First QTY Unit Cost Specs Date RFP Issue Method Avail Revsn Date

REMARKS: AM General is the FY06 contractor for the XM1151 and XM1152. O'Gara Hess & Eisenhardt (OHE) is the contractor for the M1114 Up-Armor (the chassis is provided by AM General as Government Furnished Equipment (GFE). The chassis for the M1114 (built by AM General) are shown on the P-5 as Government Furnished Equipment to support the OHE contract.

and Type Delivery Each $ Now? Avail

Up-Armor M1114 FY 2004 O'Gara Hess & Eisenhardt SS/Other TACOM, Warren, MI Nov 03 Dec 03 330 71 Yes N/A N/A Fairfield, OH FY 2004 O'Gara Hess & Eisenhardt SS/Other TACOM, Warren, MI Nov 03 Jan 04 170 71 Yes N/A N/A Fairfield, OH FY 2004 O'Gara Hess & Eisenhardt SS/Other TACOM, Warren, MI Dec 03 Jun 04 748 55 Yes N/A N/A Fairfield, OH FY 2004 O'Gara Hess & Eisenhardt SS/Other TACOM, Warren, MI Jan 04 Jun 04 317 55 Yes N/A N/A Fairfield, OH FY 2004 O'Gara Hess & Eisenhardt SS/Other TACOM, Warren, MI Jan 04 Oct 04 258 55 Yes N/A N/A Fairfield, OH FY 2004 O'Gara Hess & Eisenhardt SS/Other TACOM, Warren, MI Apr 04 Jun 04 1471 55 Yes N/A N/A Fairfield, OH FY 2004 O'Gara Hess & Eisenhardt SS/Other TACOM, Warren, MI May 04 Jul 04 189 55 Yes N/A N/A Fairfield, OH FY 2004 O'Gara Hess & Eisenhardt SS/Other TACOM, Warren, MI Sep 04 Oct 04 1774 58 Yes N/A N/A Fairfield, OH FY 2004 O'Gara Hess & Eisenhardt SS/Other TACOM, Warren, MI Sep 04 May 05 1408 58 Yes N/A N/A Fairfield, OH FY 2006 O'Gara Hess & Eisenhardt SS/Other TACOM, Warren, MI Nov 05 Apr 06 360 59 Yes N/A N/A Fairfield, OH FY 2007 O'Gara Hess & Eisenhardt SS/Other TACOM, Warren, MI Oct 06 Mar 07 360 60 Yes N/A N/A Fairfield, OH Hvy Var M1097A2 FY 2004 AM General SS/Other TACOM, Warren, MI Nov 03 Feb 04 596 63 Yes N/A N/A Mishawaka, IN FY 2004 AM General SS/Other TACOM, Warren, MI Jan 04 Jun 04 178 63 Yes N/A N/A Mishawaka, IN

D15400 Item No. 4 Page 3 of 14 Exhibit P-5a HI MOB MULTI-PURP WHLD VEH (HMMWV) 36 Procurement History and Planning

Page 44: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Date: Exhibit P-5a, Budget Procurement History and Planning February 2005

Appropriation/Budget Activity/Serial No: Weapon System Type: P-1 Line Item Nomenclature: Other Procurement, Army / 1 / Tactical and support vehicles HI MOB MULTI-PURP WHLD VEH (HMMWV) (D15400)

WBS Cost Elements: Contractor and Location Contract Location of PCO Award Date Date of First QTY Unit Cost Specs Date RFP Issue Method Avail Revsn Date

REMARKS: AM General is the FY06 contractor for the XM1151 and XM1152. O'Gara Hess & Eisenhardt (OHE) is the contractor for the M1114 Up-Armor (the chassis is provided by AM General as Government Furnished Equipment (GFE). The chassis for the M1114 (built by AM General) are shown on the P-5 as Government Furnished Equipment to support the OHE contract.

and Type Delivery Each $ Now? Avail

Truck Utility M1025A2 FY 2004 AM General SS/Other TACOM, Warren, MI Nov 03 Mar 04 112 75 Yes N/A N/A Mishawaka, IN ECV M1113 FY 2004 AM General SS/Other TACOM, Warren, MI Nov 03 May 04 68 67 Yes N/A N/A Mishawaka, IN FY 2004 AM General SS/Other TACOM, Warren, MI Oct 04 Nov 04 6 67 Yes N/A N/A Mishawaka, IN FY 2005 AM General SS/Other TACOM, Warren, MI Nov 04 May 05 79 89 Yes N/A N/A Mishawaka, IN XM1151 FY 2004 AM General SS/Other TACOM, Warren, MI Nov 03 Aug 04 175 85 Yes N/A N/A Mishawaka, IN FY 2005 AM General SS/Other TACOM, Warren, MI Nov 04 May 05 469 88 Yes N/A N/A Mishawaka, IN FY 2005 AM General SS/Other TACOM, Warren, MI Apr 05 Sep 05 1050 88 Yes N/A N/A Mishawaka, IN FY 2006 AM General SS/Other TACOM, Warren, MI Oct 05 Feb 06 90 90 Yes N/A N/A Mishawaka, IN FY 2007 AM General SS/Other TACOM, Warren, MI Oct 06 Feb 07 90 93 Yes N/A N/A Mishawaka, IN XM1152 FY 2005 AM General SS/Other TACOM, Warren, MI Nov 04 Mar 05 1605 77 Yes N/A N/A Mishawaka, IN FY 2005 AM General SS/Other TACOM, Warren, MI Apr 05 Aug 05 51 77 Yes N/A N/A Mishawaka, IN

D15400 Item No. 4 Page 4 of 14 Exhibit P-5a HI MOB MULTI-PURP WHLD VEH (HMMWV) 37 Procurement History and Planning

Page 45: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Date: Exhibit P-5a, Budget Procurement History and Planning February 2005

Appropriation/Budget Activity/Serial No: Weapon System Type: P-1 Line Item Nomenclature: Other Procurement, Army / 1 / Tactical and support vehicles HI MOB MULTI-PURP WHLD VEH (HMMWV) (D15400)

WBS Cost Elements: Contractor and Location Contract Location of PCO Award Date Date of First QTY Unit Cost Specs Date RFP Issue Method Avail Revsn Date

REMARKS: AM General is the FY06 contractor for the XM1151 and XM1152. O'Gara Hess & Eisenhardt (OHE) is the contractor for the M1114 Up-Armor (the chassis is provided by AM General as Government Furnished Equipment (GFE). The chassis for the M1114 (built by AM General) are shown on the P-5 as Government Furnished Equipment to support the OHE contract.

and Type Delivery Each $ Now? Avail

FY 2006 AM General SS/Other TACOM, Warren, MI Oct 05 Feb 06 1615 78 Yes N/A N/A Mishawaka, IN FY 2007 AM General SS/Other TACOM, Warren, MI Oct 06 Feb 07 2792 80 Yes N/A N/A Mishawaka, IN

D15400 Item No. 4 Page 5 of 14 Exhibit P-5a HI MOB MULTI-PURP WHLD VEH (HMMWV) 38 Procurement History and Planning

Page 46: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

P-1 Item Nomenclature: Date: HI MOB MULTI-PURP WHLD VEH (HMMWV) (D15400) February 2005 FY 04 / 05 BUDGET PRODUCTION SCHEDULE Fiscal Year 04 Fiscal Year 05

Calendar Year 04 Calendar Year 05

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P R E T A L

R V 1 OCT 1 OCT F R Each TO AS OF M FY E QTY PRIOR DUE S PROC ACCEP BAL

COST ELEMENTS

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P

M PRODUCTION RATES MFR ADMINLEAD TIME MFR TOTAL REMARKS

Minimum Production Rate for MFR ID# 1 is 3,760 per year which equals approx 313 per month. Maximum Production Rate for MFR ID# 2 is 500 with a ramp up from 7-12 months depending on rate of production at receipt of order.

F REACHED Number Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct

R NAME/LOCATION MIN. 1-8-5 MAX. D+ INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

1 AM General , Mishawaka, IN 313.00 700.00 1300.00 0 1 0 1 5 6

0 1 4 5

2 O'Gara Hess & Eisenhardt , Fairfield, OH 30.00 80.00 550.00 0 2 0 3 6 9

0 2 5 7

Up-Armor M1114 2 FY 04 A 330 0 330 A 15 20 20 20 156 99 0 2 FY 04 A 170 0 170 A 17 28 53 8 64 0 2 FY 04 A 748 0 748 A 64 220 214 30 30 30 30 30 30 30 30 10 0 2 FY 04 A 317 0 317 A 57 6 175 79 0 2 FY 04 A 258 0 258 A 61 118 79 0 2 FY 04 A 1471 0 1471 A 50 80 80 95 130 133 191 230 220 185 77 0 2 FY 04 A 189 0 189 A 50 50 50 39 0 2 FY 04 A 1774 0 1774 A 48 140 150 190 200 335 443 268 0 2 FY 04 A 1408 0 1408 A 272 318 182 220 110 306 2 FY 04 AF 193 0 193 41 29 19 104 0 2 FY 04 AR 22 0 22 22 0 2 FY 04 FMS 57 0 57 40 3 14 2 FY 04 NA 7 0 7 7 0 2 FY 04 OTH 56 0 56 56 0 2 FY 05 AF 41 0 41 41 0 2 FY 06 A 360 0 360 360 2 FY 07 A 360 0 360 360 XM1151

D15400 Item No. 4 Page 6 of 14 Exhibit P-21 HI MOB MULTI-PURP WHLD VEH (HMMWV) 39 Production Schedule

Page 47: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

P-1 Item Nomenclature: Date: HI MOB MULTI-PURP WHLD VEH (HMMWV) (D15400) February 2005 FY 04 / 05 BUDGET PRODUCTION SCHEDULE Fiscal Year 04 Fiscal Year 05

Calendar Year 04 Calendar Year 05

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P R E T A L

R V 1 OCT 1 OCT F R Each TO AS OF M FY E QTY PRIOR DUE S PROC ACCEP BAL

COST ELEMENTS

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P

M PRODUCTION RATES MFR ADMINLEAD TIME MFR TOTAL REMARKS

Minimum Production Rate for MFR ID# 1 is 3,760 per year which equals approx 313 per month. Maximum Production Rate for MFR ID# 2 is 500 with a ramp up from 7-12 months depending on rate of production at receipt of order.

F REACHED Number Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct

R NAME/LOCATION MIN. 1-8-5 MAX. D+ INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

1 AM General , Mishawaka, IN 313.00 700.00 1300.00 0 1 0 1 5 6

0 1 4 5

2 O'Gara Hess & Eisenhardt , Fairfield, OH 30.00 80.00 550.00 0 2 0 3 6 9

0 2 5 7

1 FY 04 A 175 0 175 A 33 97 45 0 1 FY 05 A 469 0 469 A 51 127 144 147 0 1 FY 05 A 1050 0 1050 A 87 963 1 FY 06 A 90 0 90 90 1 FY 07 A 90 0 90 90 XM1152 1 FY 04 NA 5 0 5 5 0 1 FY 04 OTH 30 0 30 30 0 1 FY 05 A 1605 0 1605 A 11 185 148 183 63 234 356 425 1 FY 05 A 51 0 51 A 10 10 31 1 FY 06 A 1615 0 1615 1615 1 FY 07 A 2792 0 2792 2792 M1097A2, M1025A2, M1113, Chassis 1 FY 04 A 596 0 596 A 67 180 160 155 34 0 1 FY 04 A 178 0 178 A 178 0 1 FY 04 A 330 0 330 A 133 197 0 1 FY 04 A 170 0 170 A 9 161 0 1 FY 04 A 112 0 112 A 13 37 58 4 0 1 FY 04 A 6 0 6 A 6 0 1 FY 04 A 748 0 748 A 67 220 300 161 0

D15400 Item No. 4 Page 7 of 14 Exhibit P-21 HI MOB MULTI-PURP WHLD VEH (HMMWV) 40 Production Schedule

Page 48: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

P-1 Item Nomenclature: Date: HI MOB MULTI-PURP WHLD VEH (HMMWV) (D15400) February 2005 FY 04 / 05 BUDGET PRODUCTION SCHEDULE Fiscal Year 04 Fiscal Year 05

Calendar Year 04 Calendar Year 05

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P R E T A L

R V 1 OCT 1 OCT F R Each TO AS OF M FY E QTY PRIOR DUE S PROC ACCEP BAL

COST ELEMENTS

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P

M PRODUCTION RATES MFR ADMINLEAD TIME MFR TOTAL REMARKS

Minimum Production Rate for MFR ID# 1 is 3,760 per year which equals approx 313 per month. Maximum Production Rate for MFR ID# 2 is 500 with a ramp up from 7-12 months depending on rate of production at receipt of order.

F REACHED Number Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct

R NAME/LOCATION MIN. 1-8-5 MAX. D+ INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

1 AM General , Mishawaka, IN 313.00 700.00 1300.00 0 1 0 1 5 6

0 1 4 5

2 O'Gara Hess & Eisenhardt , Fairfield, OH 30.00 80.00 550.00 0 2 0 3 6 9

0 2 5 7

1 FY 04 A 68 0 68 A 68 0 1 FY 04 A 317 0 317 A 139 178 0 1 FY 04 A 258 0 258 A 140 118 0 1 FY 04 A 1471 0 1471 A 288 450 300 306 127 0 1 FY 04 A 189 0 189 A 50 50 50 39 0 1 FY 04 A 1774 0 1774 A 337 450 450 450 87 0 1 FY 04 A 1408 0 1408 A 100 100 100 463 550 95 0 1 FY 04 AF 453 0 453 A 17 75 8 82 52 36 20 78 9 76 0 1 FY 04 FMS 361 0 361 2 7 65 10 149 128 0 1 FY 04 MC 1885 0 1885 A 205 453 258 212 75 67 115 108 148 93 151 0 1 FY 04 NA 140 0 140 10 15 26 5 28 18 25 12 1 0 1 FY 04 NG 237 0 237 155 82 0 1 FY 04 OTH 324 0 324 18 102 13 2 50 44 36 59 0 1 FY 05 A 79 0 79 A 79 0 1 FY 05 FMS 336 0 336 5 18 16 169 14 9 105 0 1 FY 05 MC 1763 0 1763 A 220 184 216 150 127 138 140 282 49 119 138 0 1 FY 06 A 360 0 360 360 1 FY 06 MC 1305 0 1305 1305 1 FY 07 A 360 0 360 360 1 FY 07 MC 1415 0 1415 1415 Total 32376 32376 28 324 503 508 684 671 781 993 818 1191 1080 1449 1046 1134 1180 1244 1416 1514 1518 1591 786 730 701 10486

D15400 Item No. 4 Page 8 of 14 Exhibit P-21 HI MOB MULTI-PURP WHLD VEH (HMMWV) 41 Production Schedule

Page 49: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

P-1 Item Nomenclature: Date: HI MOB MULTI-PURP WHLD VEH (HMMWV) (D15400) February 2005 FY 06 / 07 BUDGET PRODUCTION SCHEDULE Fiscal Year 06 Fiscal Year 07

Calendar Year 06 Calendar Year 07

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P R E T A L

R V 1 OCT 1 OCT F R Each TO AS OF M FY E QTY PRIOR DUE S PROC ACCEP BAL

COST ELEMENTS

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P

M PRODUCTION RATES MFR ADMINLEAD TIME MFR TOTAL REMARKS

F REACHED Number Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct

R NAME/LOCATION MIN. 1-8-5 MAX. D+ INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

1 AM General , Mishawaka, IN 313.00 700.00 1300.00 0 1 0 1 5 6

0 1 4 5

2 O'Gara Hess & Eisenhardt , Fairfield, OH 30.00 80.00 550.00 0 2 0 3 6 9

0 2 5 7

Up-Armor M1114 2 FY 04 A 330 330 0 0 2 FY 04 A 170 170 0 0 2 FY 04 A 748 748 0 0 2 FY 04 A 317 317 0 0 2 FY 04 A 258 258 0 0 2 FY 04 A 1471 1471 0 0 2 FY 04 A 189 189 0 0 2 FY 04 A 1774 1774 0 0 2 FY 04 A 1408 1102 306 36 30 30 30 30 30 30 30 30 30 0 2 FY 04 AF 193 193 0 0 2 FY 04 AR 22 22 0 0 2 FY 04 FMS 57 43 14 14 0 2 FY 04 NA 7 7 0 0 2 FY 04 OTH 56 56 0 0 2 FY 05 AF 41 41 0 0 2 FY 06 A 360 0 360 A 30 30 30 30 30 30 30 30 30 30 30 30 0 2 FY 07 A 360 0 360 A 30 30 30 30 30 30 30 150 XM1151

D15400 Item No. 4 Page 9 of 14 Exhibit P-21 HI MOB MULTI-PURP WHLD VEH (HMMWV) 42 Production Schedule

Page 50: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

P-1 Item Nomenclature: Date: HI MOB MULTI-PURP WHLD VEH (HMMWV) (D15400) February 2005 FY 06 / 07 BUDGET PRODUCTION SCHEDULE Fiscal Year 06 Fiscal Year 07

Calendar Year 06 Calendar Year 07

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P R E T A L

R V 1 OCT 1 OCT F R Each TO AS OF M FY E QTY PRIOR DUE S PROC ACCEP BAL

COST ELEMENTS

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P

M PRODUCTION RATES MFR ADMINLEAD TIME MFR TOTAL REMARKS

F REACHED Number Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct

R NAME/LOCATION MIN. 1-8-5 MAX. D+ INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

1 AM General , Mishawaka, IN 313.00 700.00 1300.00 0 1 0 1 5 6

0 1 4 5

2 O'Gara Hess & Eisenhardt , Fairfield, OH 30.00 80.00 550.00 0 2 0 3 6 9

0 2 5 7

1 FY 04 A 175 175 0 0 1 FY 05 A 469 469 0 0 1 FY 05 A 1050 87 963 90 90 90 90 87 86 86 86 86 86 86 0 1 FY 06 A 90 0 90 A 8 8 8 8 8 8 7 7 7 7 7 7 0 1 FY 07 A 90 0 90 A 8 8 8 8 8 8 7 7 28 XM1152 1 FY 04 NA 5 5 0 0 1 FY 04 OTH 30 30 0 0 1 FY 05 A 1605 1180 425 172 130 116 7 0 1 FY 05 A 51 20 31 31 0 1 FY 06 A 1615 0 1615 A 92 92 116 116 85 85 138 171 180 180 180 180 0 1 FY 07 A 2792 0 2792 A 232 232 236 287 182 182 238 238 965 M1097A2, M1025A2, M1113, Chassis 1 FY 04 A 596 596 0 0 1 FY 04 A 178 178 0 0 1 FY 04 A 330 330 0 0 1 FY 04 A 170 170 0 0 1 FY 04 A 112 112 0 0 1 FY 04 A 6 6 0 0 1 FY 04 A 748 748 0 0

D15400 Item No. 4 Page 10 of 14 Exhibit P-21 HI MOB MULTI-PURP WHLD VEH (HMMWV) 43 Production Schedule

Page 51: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

P-1 Item Nomenclature: Date: HI MOB MULTI-PURP WHLD VEH (HMMWV) (D15400) February 2005 FY 06 / 07 BUDGET PRODUCTION SCHEDULE Fiscal Year 06 Fiscal Year 07

Calendar Year 06 Calendar Year 07

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P R E T A L

R V 1 OCT 1 OCT F R Each TO AS OF M FY E QTY PRIOR DUE S PROC ACCEP BAL

COST ELEMENTS

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P

M PRODUCTION RATES MFR ADMINLEAD TIME MFR TOTAL REMARKS

F REACHED Number Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct

R NAME/LOCATION MIN. 1-8-5 MAX. D+ INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

1 AM General , Mishawaka, IN 313.00 700.00 1300.00 0 1 0 1 5 6

0 1 4 5

2 O'Gara Hess & Eisenhardt , Fairfield, OH 30.00 80.00 550.00 0 2 0 3 6 9

0 2 5 7

1 FY 04 A 68 68 0 0 1 FY 04 A 317 317 0 0 1 FY 04 A 258 258 0 0 1 FY 04 A 1471 1471 0 0 1 FY 04 A 189 189 0 0 1 FY 04 A 1774 1774 0 0 1 FY 04 A 1408 1408 0 0 1 FY 04 AF 453 453 0 0 1 FY 04 FMS 361 361 0 0 1 FY 04 MC 1885 1885 0 0 1 FY 04 NA 140 140 0 0 1 FY 04 NG 237 237 0 0 1 FY 04 OTH 324 324 0 0 1 FY 05 FMS 336 336 0 0 1 FY 05 MC 1763 1763 0 0 1 FY 06 A 360 0 360 A 30 30 33 30 30 20 20 32 45 30 30 30 0 1 FY 06 MC 1305 0 1305 A 114 263 143 144 87 90 13 21 109 150 128 43 0 1 FY 07 A 360 0 360 A 30 30 30 30 30 30 30 30 120 1 FY 07 MC 1415 0 1415 A 143 143 100 70 100 100 20 20 150 150 419

Total 32297 21811 10486 343 250 350 390 390 390 390 390 282 280 390 390 390 290 390 390 400 400 404 455 270 270 455 455 1682

D15400 Item No. 4 Page 11 of 14 Exhibit P-21 HI MOB MULTI-PURP WHLD VEH (HMMWV) 44 Production Schedule

Page 52: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

P-1 Item Nomenclature: Date: HI MOB MULTI-PURP WHLD VEH (HMMWV) (D15400) February 2005 FY 08 / 09 BUDGET PRODUCTION SCHEDULE Fiscal Year 08 Fiscal Year 09

Calendar Year 08 Calendar Year 09

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P R E T A L

R V 1 OCT 1 OCT F R Each TO AS OF M FY E QTY PRIOR DUE S PROC ACCEP BAL

COST ELEMENTS

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P

M PRODUCTION RATES MFR ADMINLEAD TIME MFR TOTAL REMARKS

F REACHED Number Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct

R NAME/LOCATION MIN. 1-8-5 MAX. D+ INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

1 AM General , Mishawaka, IN 313.00 700.00 1300.00 0 1 0 1 5 6

0 1 4 5

2 O'Gara Hess & Eisenhardt , Fairfield, OH 30.00 80.00 550.00 0 2 0 3 6 9

0 2 5 7

Up-Armor M1114 2 FY 04 A 330 330 0 0 2 FY 04 A 170 170 0 0 2 FY 04 A 748 748 0 0 2 FY 04 A 317 317 0 0 2 FY 04 A 258 258 0 0 2 FY 04 A 1471 1471 0 0 2 FY 04 A 189 189 0 0 2 FY 04 A 1774 1774 0 0 2 FY 04 A 1408 1408 0 0 2 FY 04 AF 193 193 0 0 2 FY 04 AR 22 22 0 0 2 FY 04 FMS 57 57 0 0 2 FY 04 NA 7 7 0 0 2 FY 04 OTH 56 56 0 0 2 FY 05 AF 41 41 0 0 2 FY 06 A 360 360 0 0 2 FY 07 A 360 210 150 30 30 30 30 30 0 XM1151

D15400 Item No. 4 Page 12 of 14 Exhibit P-21 HI MOB MULTI-PURP WHLD VEH (HMMWV) 45 Production Schedule

Page 53: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

P-1 Item Nomenclature: Date: HI MOB MULTI-PURP WHLD VEH (HMMWV) (D15400) February 2005 FY 08 / 09 BUDGET PRODUCTION SCHEDULE Fiscal Year 08 Fiscal Year 09

Calendar Year 08 Calendar Year 09

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P R E T A L

R V 1 OCT 1 OCT F R Each TO AS OF M FY E QTY PRIOR DUE S PROC ACCEP BAL

COST ELEMENTS

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P

M PRODUCTION RATES MFR ADMINLEAD TIME MFR TOTAL REMARKS

F REACHED Number Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct

R NAME/LOCATION MIN. 1-8-5 MAX. D+ INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

1 AM General , Mishawaka, IN 313.00 700.00 1300.00 0 1 0 1 5 6

0 1 4 5

2 O'Gara Hess & Eisenhardt , Fairfield, OH 30.00 80.00 550.00 0 2 0 3 6 9

0 2 5 7

1 FY 04 A 175 175 0 0 1 FY 05 A 469 469 0 0 1 FY 05 A 1050 1050 0 0 1 FY 06 A 90 90 0 0 1 FY 07 A 90 62 28 7 7 7 7 0 XM1152 1 FY 04 NA 5 5 0 0 1 FY 04 OTH 30 30 0 0 1 FY 05 A 1605 1605 0 0 1 FY 05 A 51 51 0 0 1 FY 06 A 1615 1615 0 0 1 FY 07 A 2792 1827 965 159 30 388 388 0 M1097A2, M1025A2, M1113, Chassis 1 FY 04 A 596 596 0 0 1 FY 04 A 178 178 0 0 1 FY 04 A 330 330 0 0 1 FY 04 A 170 170 0 0 1 FY 04 A 112 112 0 0 1 FY 04 A 6 6 0 0 1 FY 04 A 748 748 0 0

D15400 Item No. 4 Page 13 of 14 Exhibit P-21 HI MOB MULTI-PURP WHLD VEH (HMMWV) 46 Production Schedule

Page 54: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

P-1 Item Nomenclature: Date: HI MOB MULTI-PURP WHLD VEH (HMMWV) (D15400) February 2005 FY 08 / 09 BUDGET PRODUCTION SCHEDULE Fiscal Year 08 Fiscal Year 09

Calendar Year 08 Calendar Year 09

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P R E T A L

R V 1 OCT 1 OCT F R Each TO AS OF M FY E QTY PRIOR DUE S PROC ACCEP BAL

COST ELEMENTS

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P

M PRODUCTION RATES MFR ADMINLEAD TIME MFR TOTAL REMARKS

F REACHED Number Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct

R NAME/LOCATION MIN. 1-8-5 MAX. D+ INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

1 AM General , Mishawaka, IN 313.00 700.00 1300.00 0 1 0 1 5 6

0 1 4 5

2 O'Gara Hess & Eisenhardt , Fairfield, OH 30.00 80.00 550.00 0 2 0 3 6 9

0 2 5 7

1 FY 04 A 68 68 0 0 1 FY 04 A 317 317 0 0 1 FY 04 A 258 258 0 0 1 FY 04 A 1471 1471 0 0 1 FY 04 A 189 189 0 0 1 FY 04 A 1774 1774 0 0 1 FY 04 A 1408 1408 0 0 1 FY 04 AF 453 453 0 0 1 FY 04 FMS 361 361 0 0 1 FY 04 MC 1885 1885 0 0 1 FY 04 NA 140 140 0 0 1 FY 04 NG 237 237 0 0 1 FY 04 OTH 324 324 0 0 1 FY 05 FMS 336 336 0 0 1 FY 05 MC 1763 1763 0 0 1 FY 06 A 360 360 0 0 1 FY 06 MC 1305 1305 0 0 1 FY 07 A 360 240 120 30 30 30 30 0 1 FY 07 MC 1415 996 419 229 190 0

Total 32297 30615 1682 455 287 455 455 30

D15400 Item No. 4 Page 14 of 14 Exhibit P-21 HI MOB MULTI-PURP WHLD VEH (HMMWV) 47 Production Schedule

Page 55: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-40, Budget Item Justification Sheet Date: February 2005 Appropriation/Budget Activity/Serial No: Other Procurement, Army /1/Tactical and support vehicles P-1 Item Nomenclature FAMILY OF MEDIUM TACTICAL VEH (FMTV) (D15500) Program Elements for Code B Items: Code: Other Related Program Elements: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 To Complete Total Prog Proc Qty

Gross Cost

Less PY Adv Proc

Plus CY Adv Proc

Net Proc (P-1)

Initial Spares

Total Proc Cost

Flyaway U/C

Wpn Sys Proc U/C

18893 3255 1534 3623 2074 2769 3043 2728 3332 2575 38721 82547

3192.8 655.8 324.7 593.6 449.6 634.1 624.9 567.5 680.2 553.2 9405.8 17682.3

3192.8 655.8 324.7 593.6 449.6 634.1 624.9 567.5 680.2 553.2 9405.8 17682.3

3192.8 655.8 324.7 593.6 449.6 634.1 624.9 567.5 680.2 553.2 9405.8 17682.3

0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2

Description: The Family of Medium Tactical Vehicles (FMTV) is a complete series of trucks and trailers based on a common chassis and varied by payload and mission. The Light Medium Tactical Vehicle (LMTV) has a 2-1/2-ton capacity consisting of cargo and van models. The Medium Tactical Vehicle (MTV) has a 5-ton capacity, consisting of cargo, tractor, van, wrecker, tanker, dump truck models, the load handling system (LHS), and a higher capacity dump. Sub-variants provide Air Drop (AD) capability for contingency and rapid deployment operations. The commonality between variants significantly reduces operation and maintenance costs. FMTV performs over 55% of the Army's local and line haul, and unit resupply missions in combat, combat support, and combat service support units. The quantities shown above reflect trucks only. Justification: FY 2006/2007 procures 2-1/2-ton and 5-ton trucks via the fourth and last year of the competitive rebuy multiyear contract. The FMTV fills the 2-1/2-ton truck and 5-ton truck requirements, reduces operating and support costs, resolves potential operational deficiencies and operates throughout the theater as a multi-purpose transportation vehicle used by combat, combat support, and combat service support units. The system's design enables rapid deployment worldwide and operation on primary and secondary roads, trails, and cross-country terrain in all climate conditions. Extended applications of the FMTV include support to other Army emerging requirements such as Towed Artillery Digitization (TAD), Theater High Altitude Area Defense (THAAD), Patriot Recapitalization, High Mobility Artillery Rocket System (HIMARS), Medium Extended Air Defense System (MEADS), Non Line of Sight Launching System (NLOS-LS) and the Unit Water Pod System (Camel). SPECIAL NOTICE ON RELEASE OF UNIT PRICE INFORMATION: RELEASE OF UNIT PRICE INFORMATION CONTAINED IN CONTRACT DAAE07-03-C-S023 IS RESTRICTED PURSUANT TO 18 USC 1905, TRADE SECRETS ACT, AND IS EXEMPT FROM DISCLOSURE UNDER FREEDOM OF INFORMATION ACT EXEMPTION 4, 5 USC 552(B)(4). RELEASE FOR OFFICIAL GOVERNMENT USE AND TO STEWART & STEVENSON IS NOT RESTRICTED. WRITTEN PERMISSION FROM STEWART & STEVENSON IS REQUIRED PRIOR TO RELEASE TO ANY OTHER PARTIES.

D15500 Item No. 6 Page 1 of 6 Exhibit P-40 FAMILY OF MEDIUM TACTICAL VEH (FMTV) 48 Budget Item Justification Sheet

Page 56: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-5, Weapon Appropriation/Budget Activity/Serial No. P-1 Line Item Nomenclature: Weapon System Type: Date: Other Procurement, Army / 1 / FAMILY OF MEDIUM TACTICAL VEH (FMTV) (D15500) February 2005 Tactical and support vehicles OPA1 Cost Analysis

OPA1 ID FY 04 FY 05 FY 06 FY 07 Cost Elements CD TotalCost Qty UnitCost TotalCost Qty UnitCost TotalCost Qty UnitCost TotalCost Qty UnitCost

$000 Units $000 $000 Units $000 $000 Units $000 $000 Units $000

1. Vehicles --LMTV Cargo M1078 A 49098 427 115 128566 1225 105 82052 713 116 108427 945 115 --LMTV Cargo w/ winch M1078 15474 123 126 29173 254 115 21532 174 124 14437 117 123 --LMTV Cargo-Air Drop M1081 --LMTV Cargo-Air Drop w/ winch M1081 --LMTV Van M1079 2698 14 193 14005 83 169 4812 25 192 16349 93 176 --LMTV Van w/ winch M1079 --LMTV Chassis M1080 SUBTOTAL LMTV 67270 171744 108396 139213 --MTV Cargo M1083 53050 464 114 173281 1431 121 69098 559 124 44633 345 129 --MTV Cargo w/ winch M1083 17946 135 133 31191 224 139 9419 67 141 8133 58 140 --MTV Cargo-Air Drop M1093 --MTV Cargo-Air Drop w/ winch M1093 --MTV Cargo-Long Wheel Base (LWB) M1085 2017 15 134 5364 40 134 3565 27 132 --MTV Cargo-LWB w/ winch M1085 1451 10 145 --MTV Cargo-LWB- Mat'l Handl Equip M1086 --MTV Cargo MHE M1084 3398 20 170 26725 160 167 8694 45 193 28056 153 183 --MTV Dump M1090 157 5869 31 189 --MTV Dump w/ winch M1090 --MTV Dump-Air Drop M1094 --MTV Tractor M1088 23717 182 130 8067 62 130 34174 262 130 19907 153 130 --MTV Tractor w/ winch M1088 2186 17 129 1526 11 139 1115 9 124 --MTV Wrecker M1089 14859 54 275 868 3 289 10993 38 289 182715 723 253 --MTV Expansible Van M1087 19736 57 346 34499 100 345 62141 180 345 50368 146 345 --MTV Chassis --MTV HIMARs Launcher Chassis XM1140 --MTV LHS XM1148 5639 26 217 --MTV Chassis-LWB SUBTOTAL MTV 142548 287315 196045 338492 LMTV Trailers M1082 14095 672 21 20927 976 21 19912 902 23 20144 911 22 MTV Trailers M1095 8973 294 31 8886 344 26 6742 220 31 9394 308 31 SUBTOTAL TRAILERS 23068 29813 26654 29538 2. Federal Retail Excise Tax 8369 9909 15099 35564 3. Engineering Changes 11966 25178 18916 25978

D15500 Item No. 6 Page 2 of 6 Exhibit P-5 FAMILY OF MEDIUM TACTICAL VEH (FMTV) 49 Weapon System Cost Analysis

Page 57: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-5, Weapon Appropriation/Budget Activity/Serial No. P-1 Line Item Nomenclature: Weapon System Type: Date: Other Procurement, Army / 1 / FAMILY OF MEDIUM TACTICAL VEH (FMTV) (D15500) February 2005 Tactical and support vehicles OPA1 Cost Analysis

OPA1 ID FY 04 FY 05 FY 06 FY 07 Cost Elements CD TotalCost Qty UnitCost TotalCost Qty UnitCost TotalCost Qty UnitCost TotalCost Qty UnitCost

$000 Units $000 $000 Units $000 $000 Units $000 $000 Units $000

4. Testing --Contractor 1125 1260 1026 --Government 8503 3298 2989 2173 5. Contractor Program Support 4955 6632 5180 4849 6. Engineering Support --Government (In-house) 4005 4545 4622 4708 --Contractor 6389 7859 11844 12214 --Competitive Evaluation 12080 9690 7. Quality Assurance Support (In-house) 308 311 316 322 8. HAC S&I A0 Improvements 577 9. Kits 6484 5662 3314 3468 10. Fielding Support 30828 27882 32932 16762 11. Project Mgmt Support 9410 12340 9954 10143

Total 324680 593613 449601 634140

D15500 Item No. 6 Page 3 of 6 Exhibit P-5 FAMILY OF MEDIUM TACTICAL VEH (FMTV) 50 Weapon System Cost Analysis

Page 58: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Date: Exhibit P-5a, Budget Procurement History and Planning February 2005

Appropriation/Budget Activity/Serial No: Weapon System Type: P-1 Line Item Nomenclature: Other Procurement, Army / 1 / Tactical and support vehicles FAMILY OF MEDIUM TACTICAL VEH (FMTV) (D15500)

WBS Cost Elements: Contractor and Location Contract Location of PCO Award Date Date of First QTY Unit Cost Specs Date RFP Issue Method Avail Revsn Date

REMARKS: Quantity above is for trucks only; unit cost is an average of different truck models and can vary due to model mix procured.

and Type Delivery Each $000 Now? Avail

1. Vehicles FY 2004 Stewart & Stevenson (S023) CM-5(2) TACOM, Warren, MI Mar 04 Feb 05 1077 143 Yes N/A N/A Sealy, TX FY 2004 Stewart & Stevenson (S023) Option TACOM, Warren, MI various various 431 128 Yes N/A N/A Sealy, TX FY 2004 Stewart & Stevenson (M005) Option TACOM, Warren, MI Mar 04 Oct 04 26 134 Yes N/A N/A Sealy, TX FY 2005 Stewart & Stevenson (S023) CM-5(3) TACOM, Warren, MI Jan 05 Oct 05 3623 127 Yes N/A N/A Sealy, TX FY 2006 Stewart & Stevenson (S023) CM-5(4) TACOM, Warren, MI Nov 05 Oct 06 2074 147 Yes N/A N/A Sealy, TX FY 2007 Stewart & Stevenson (S023) CM-5(5) TACOM, Warren, MI Nov 06 Oct 07 2769 173 Yes N/A N/A Sealy, TX

D15500 Item No. 6 Page 4 of 6 Exhibit P-5a FAMILY OF MEDIUM TACTICAL VEH (FMTV) 51 Procurement History and Planning

Page 59: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

P-1 Item Nomenclature: Date: FAMILY OF MEDIUM TACTICAL VEH (FMTV) (D15500) February 2005 FY 05 / 06 BUDGET PRODUCTION SCHEDULE Fiscal Year 05 Fiscal Year 06

Calendar Year 05 Calendar Year 06

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P R E T A L

R V 1 OCT 1 OCT F R Each TO AS OF M FY E QTY PRIOR DUE S PROC ACCEP BAL

COST ELEMENTS

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P

M PRODUCTION RATES MFR ADMINLEAD TIME MFR TOTAL REMARKS

P-21 shows Trucks only: FY Truck QTYs Trailer QTYs 03 2360 520 03 319 199 03 576 733 04 1508 966 04 26 0 05 3623 1320 06 2074 1122 07 2769 1219 08 3043 252 09 2728 267 10 3332 301 11 2575 0

F REACHED Number Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct

R NAME/LOCATION MIN. 1-8-5 MAX. D+ INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

1 Stewart & Stevenson (M005) , Sealy, TX 150.00 350.00 700.00 12 1 0 1 11 12

0 2 11 13

2 Stewart & Stevenson (S023) , Sealy, TX 150.00 350.00 700.00 12 2 0 6 9 15

0 1 11 12 3 TBS , TBD 150.00 350.00 700.00 12

3 0 6 11 17

0 1 11 12

1. Vehicles 2 FY 03 A 576 28 548 0 154 209 178 7 0 2 FY 04 A 431 0 431 20 44 28 26 55 32 136 90 0 1 FY 04 A 26 0 26 26 0 2 FY 04 A 1077 0 1077 149 141 148 149 144 149 78 79 14 16 10 0 2 FY 04 OTH 183 0 183 38 0 10 38 24 25 15 14 14 1 4 0 2 FY 05 A 3623 0 3623 A 301 302 302 302 302 302 302 302 302 302 302 302 0 2 FY 06 A 2074 0 2074 A 2074 2 FY 07 A 2769 0 2769 2769

Total 10759 28 10731 26 192 209 188 207 209 201 190 213 202 215 173 315 318 312 302 302 302 302 302 302 302 302 302 4843

D15500 Item No. 6 Page 5 of 6 Exhibit P-21 FAMILY OF MEDIUM TACTICAL VEH (FMTV) 52 Production Schedule

Page 60: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

P-1 Item Nomenclature: Date: FAMILY OF MEDIUM TACTICAL VEH (FMTV) (D15500) February 2005 FY 07 / 08 BUDGET PRODUCTION SCHEDULE Fiscal Year 07 Fiscal Year 08

Calendar Year 07 Calendar Year 08

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P R E T A L

R V 1 OCT 1 OCT F R Each TO AS OF M FY E QTY PRIOR DUE S PROC ACCEP BAL

COST ELEMENTS

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P

M PRODUCTION RATES MFR ADMINLEAD TIME MFR TOTAL REMARKS

P-21 shows Trucks only: FY Truck QTYs Trailer QTYs 03 2360 520 03 319 199 03 576 733 04 1508 966 04 26 0 05 3623 1320 06 2074 1122 07 2769 1219 08 3043 252 09 2728 267 10 3332 301 11 2575 0

F REACHED Number Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct

R NAME/LOCATION MIN. 1-8-5 MAX. D+ INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

1 Stewart & Stevenson (M005) , Sealy, TX 150.00 350.00 700.00 12 1 0 1 11 12

0 2 11 13

2 Stewart & Stevenson (S023) , Sealy, TX 150.00 350.00 700.00 12 2 0 6 9 15

0 1 11 12 3 TBS , TBD 150.00 350.00 700.00 12

3 0 6 11 17

0 1 11 12

1. Vehicles 2 FY 03 A 576 576 0 0 2 FY 04 A 431 431 0 0 1 FY 04 A 26 26 0 0 2 FY 04 A 1077 1077 0 0 2 FY 04 OTH 183 183 0 0 2 FY 05 A 3623 3623 0 0 2 FY 06 A 2074 0 2074 172 172 173 173 173 173 173 173 173 173 173 173 0 2 FY 07 A 2769 0 2769 A 230 231 231 231 231 231 230 231 231 231 231 230 0

Total 10759 5916 4843 172 172 173 173 173 173 173 173 173 173 173 173 230 231 231 231 231 231 230 231 231 231 231 230

D15500 Item No. 6 Page 6 of 6 Exhibit P-21 FAMILY OF MEDIUM TACTICAL VEH (FMTV) 53 Production Schedule

Page 61: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-40, Budget Item Justification Sheet Date: February 2005 Appropriation/Budget Activity/Serial No: Other Procurement, Army /1/Tactical and support vehicles P-1 Item Nomenclature FIRETRUCKS & ASSOCIATED FIREFIGHTING EQUIPMENT (D15800) Program Elements for Code B Items: Code: Other Related Program Elements: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 To Complete Total Prog Proc Qty

Gross Cost

Less PY Adv Proc

Plus CY Adv Proc

Net Proc (P-1)

Initial Spares

Total Proc Cost

Flyaway U/C

Wpn Sys Proc U/C

85 41 31 17 10 33 20 18 2 12 269

39.2 27.2 25.3 13.5 7.5 25.4 16.3 14.7 0.4 4.4 174.0

39.2 27.2 25.3 13.5 7.5 25.4 16.3 14.7 0.4 4.4 174.0

39.2 27.2 25.3 13.5 7.5 25.4 16.3 14.7 0.4 4.4 174.0

Description: This line is a roll-up of various Fire Trucks. These vehicles are used for fighting fires, and as a safety precautions at airfields and ammunition storage areas. In addition, these vehicles respond to forest fires, train & automobile accidents, and hazardous material incidents. These vehicles are essential to all military installations and to many local communities for the preservation of life and property. Justification: FY06/07 procures 43 Tactical and Non-Tactical Fire Fighting Trucks, which will replace unsafe/overaged vehicles currently unable to respond to fire calls as well as vehicles that are uneconomical to repair. Total Army Acquisition Objective (AAO) for all Non-Tactical Fire Trucks is 849 and Tactical Fire Trucks 165.

D15800 Item No. 7 Page 1 of 9 Exhibit P-40 FIRETRUCKS & ASSOCIATED FIREFIGHTING EQUIPMENT 54 Budget Item Justification Sheet

Page 62: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-5, Weapon Appropriation/Budget Activity/Serial No. P-1 Line Item Nomenclature: Weapon System Type: Date: Other Procurement, Army / 1 / FIRETRUCKS & ASSOCIATED FIREFIGHTING February 2005 Tactical and support vehicles EQUIPMENT (D15800) OPA1 Cost Analysis

OPA1 ID FY 04 FY 05 FY 06 FY 07 Cost Elements CD TotalCost Qty UnitCost TotalCost Qty UnitCost TotalCost Qty UnitCost TotalCost Qty UnitCost

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000

1. Firetruck, Non-Tactical (D15801) A 244 1 502 2 410 2 2. Truck, Firefighting, Tactical (D15802 B 25312 31 13301 16 7021 8 25019 31

Total 25312 13545 7523 25429

D15800 Item No. 7 Page 2 of 9 Exhibit P-5 FIRETRUCKS & ASSOCIATED FIREFIGHTING EQUIPMENT 55 Weapon System Cost Analysis

Page 63: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-40, Budget Item Justification Sheet Date: February 2005 Appropriation/Budget Activity/Serial No: Other Procurement, Army /1/Tactical and support vehicles P-1 Item Nomenclature FIRETRUCKS, NON-TACTICAL (D15801) Program Elements for Code B Items: Code: Other Related Program Elements: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 To Complete Total Prog Proc Qty

Gross Cost

Less PY Adv Proc

Plus CY Adv Proc

Net Proc (P-1)

Initial Spares

Total Proc Cost

Flyaway U/C

Wpn Sys Proc U/C

74 9 1 2 2 2 2 2 12 106

26.3 3.3 0.2 0.5 0.4 0.4 0.4 0.4 4.4 36.4

26.3 3.3 0.2 0.5 0.4 0.4 0.4 0.4 4.4 36.4

26.3 3.3 0.2 0.5 0.4 0.4 0.4 0.4 4.4 36.4

Description: These vehicles are of standard commercial design with only slight modifications. Examples include Pumper Trucks, Structural Pumpers, Ladder Trucks, Hazardous Material (HAZMAT)/Rescue Trucks, Brush Tankers, Airfield Crash Trucks, and Multi-Purpose Firetrucks. These trucks are needed by all the Installation Management Agency (IMA) Regions - Northeast, Southeast, Southwest, Northwest, Pacific, Korea, and Europe - as well as other Major Commands. In addition, these trucks are also being used to support operations in South West Asia (e.g. Kuwait). The Army's Fire Fighting Vehicles are essential to all military installations and to many local communities for preservation of life and property. Our Army fire vehicles not only respond to fires on installations and within local communities, but also to forest fires, aircraft, train, and automotive accidents, and hazardous material incidents. Justification: FY06/07 procures four Non-Tactical Firetrucks to replace over-age trucks and fill existing shortages. Many over-age vehicles are unsafe, unable to respond to fire calls, and uneconomical to repair. Total Army Acquisition Objective (AAO) for all Non-Tactical Fire Trucks is 849.

D15800 (D15801) Item No. 7 Page 3 of 9 Exhibit P-40 FIRETRUCKS, NON-TACTICAL 56 Budget Item Justification Sheet

Page 64: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-40, Budget Item Justification Sheet Date: February 2005 Appropriation/Budget Activity/Serial No: Other Procurement, Army /1/Tactical and support vehicles P-1 Item Nomenclature TRUCK, FIREFIGHTING, TACTICAL (D15802) Program Elements for Code B Items: Code: Other Related Program Elements: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 To Complete Total Prog Proc Qty

Gross Cost

Less PY Adv Proc

Plus CY Adv Proc

Net Proc (P-1)

Initial Spares

Total Proc Cost

Flyaway U/C

Wpn Sys Proc U/C

11 32 31 16 8 31 18 16 163

13.0 23.8 25.3 13.3 7.0 25.0 15.9 14.3 137.7

13.0 23.8 25.3 13.3 7.0 25.0 15.9 14.3 137.7

13.0 23.8 25.3 13.3 7.0 25.0 15.9 14.3 137.7

0.7 0.8 0.8 0.9 0.8 0.9 0.9

Description: The multi-purpose Tactical Fire Fighting Truck (TFFT) is issued to Army tactical engineer units and is primarily used to fight aircraft and brush fires and at ammunition storage areas in theater. The new TFFT will be a dramatic improvement over existing firetrucks by having a six-man cab in order to carry an entire fire fighting team, a minimum 1,000-gallon capacity, and all-wheel drive, which is essential for cross-country mobility. The TFFT is part of the Tactical Fire-Fighting Team concept, which consists of the TFFT, two 1,750-gallon Water Distribution Modules, one Heavy Expanded Mobility Tactical Truck (HEMTT)-Load Handling System (LHS), and one Palletized Load System (PLS) trailer. Justification: FY06/FY07 funding procures 39 TFFT for National Guard and Army Reserve Tactical Fire Fighting Teams. The new TFFT replaces old commercial fire trucks, which do not meet tactical or fire fighting standards. The tactical fire-fighting mission requires trucks to have a a significant off-road capability, which is obtained through the use of the combat-proven HEMTT chassis. The fire trucks currently fielded are unreliable and overage or do not meet the National Fire Protection Agency Standards. Army Acquisition Objective is 165.

D15800 (D15802) Item No. 7 Page 4 of 9 Exhibit P-40 TRUCK, FIREFIGHTING, TACTICAL 57 Budget Item Justification Sheet

Page 65: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-5, Weapon Appropriation/Budget Activity/Serial No. P-1 Line Item Nomenclature: Weapon System Type: Date: Other Procurement, Army / 1 / TRUCK, FIREFIGHTING, TACTICAL (D15802) February 2005 Tactical and support vehicles OPA1 Cost Analysis

OPA1 ID FY 04 FY 05 FY 06 FY 07 Cost Elements CD TotalCost Qty UnitCost TotalCost Qty UnitCost TotalCost Qty UnitCost TotalCost Qty UnitCost

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000

1. Vehicle Tactical Firefighting Truck with FRET 21705 31 700 11360 16 710 5782 8 723 22822 31 736 SubTotal 21705 11360 5782 22822 2. ECPs 460 319 126 450 3. Testing 215 150 80 150 4. System Fielding Support 484 200 168 250 6. Quality Assurance Support 175 117 84 186 7. PM Support 534 272 276 400 8. Engineering Support 233 200 100 200 9. Matrix Support 221 200 205 267 10. Special Tools 185 78 64 86 11. Technical Manuals 600 300 50 100 12. New Equipment Training 500 105 86 108

Total 25312 13301 7021 25019

D15800 (D15802) Item No. 7 Page 5 of 9 Exhibit P-5 TRUCK, FIREFIGHTING, TACTICAL 58 Weapon System Cost Analysis

Page 66: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Date: Exhibit P-5a, Budget Procurement History and Planning February 2005

Appropriation/Budget Activity/Serial No: Weapon System Type: P-1 Line Item Nomenclature: Other Procurement, Army / 1 / Tactical and support vehicles TRUCK, FIREFIGHTING, TACTICAL (D15802)

WBS Cost Elements: Contractor and Location Contract Location of PCO Award Date Date of First QTY Unit Cost Specs Date RFP Issue Method Avail Revsn Date

REMARKS:

and Type Delivery Each $000 Now? Avail

Tactical Firefighting Truck with FRET FY 2004 Pierce Manufacturing Inc. SS/REQ TACOM, Warren, MI Apr 04 Jan 05 31 700 Yes N/A N/A Appleton, WI FY 2005 Pierce Manufacturing Inc. SS/REQ TACOM, Warren, MI Jan 05 Oct 05 16 710 Yes N/A N/A Appleton, WI FY 2006 Pierce Manufacturing Inc. SS/REQ TACOM, Warren, MI Dec 05 Sep 06 8 723 Yes N/A N/|A Appleton, WI FY 2007 Pierce Manufacturing Inc. SS/REQ TACOM, Warren, MI Dec 06 Sep 07 31 736 Yes N/A N/A Appleton, WI

D15800 (D15802) Item No. 7 Page 6 of 9 Exhibit P-5a TRUCK, FIREFIGHTING, TACTICAL 59 Procurement History and Planning

Page 67: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

P-1 Item Nomenclature: Date: TRUCK, FIREFIGHTING, TACTICAL (D15802) February 2005 FY 04 / 05 BUDGET PRODUCTION SCHEDULE Fiscal Year 04 Fiscal Year 05

Calendar Year 04 Calendar Year 05

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P R E T A L

R V 1 OCT 1 OCT F R Each TO AS OF M FY E QTY PRIOR DUE S PROC ACCEP BAL

COST ELEMENTS

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P

M PRODUCTION RATES MFR ADMINLEAD TIME MFR TOTAL REMARKS

F REACHED Number Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct

R NAME/LOCATION MIN. 1-8-5 MAX. D+ INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

1 Pierce Manufacturing Inc. , Appleton, WI 3.00 5.00 10.00 12 1 0 7 9 16

0 3 9 12

Tactical Firefighting Truck with FRET 1 FY 04 A 31 0 31 A 3 3 3 3 3 3 3 3 3 4 1 FY 05 A 16 0 16 A 16 1 FY 06 A 8 0 8 8 1 FY 07 A 31 0 31 31

Total 86 86 3 3 3 3 3 3 3 3 3 59

D15800 (D15802) Item No. 7 Page 7 of 9 Exhibit P-21 TRUCK, FIREFIGHTING, TACTICAL 60 Production Schedule

Page 68: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

P-1 Item Nomenclature: Date: TRUCK, FIREFIGHTING, TACTICAL (D15802) February 2005 FY 06 / 07 BUDGET PRODUCTION SCHEDULE Fiscal Year 06 Fiscal Year 07

Calendar Year 06 Calendar Year 07

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P R E T A L

R V 1 OCT 1 OCT F R Each TO AS OF M FY E QTY PRIOR DUE S PROC ACCEP BAL

COST ELEMENTS

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P

M PRODUCTION RATES MFR ADMINLEAD TIME MFR TOTAL REMARKS

F REACHED Number Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct

R NAME/LOCATION MIN. 1-8-5 MAX. D+ INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

1 Pierce Manufacturing Inc. , Appleton, WI 3.00 5.00 10.00 12 1 0 7 9 16

0 3 9 12

Tactical Firefighting Truck with FRET 1 FY 04 A 31 27 4 4 0 1 FY 05 A 16 0 16 3 3 3 3 4 0 1 FY 06 A 8 0 8 A 4 4 0 1 FY 07 A 31 0 31 A 3 28

Total 86 27 59 7 3 3 3 4 4 4 3 28

D15800 (D15802) Item No. 7 Page 8 of 9 Exhibit P-21 TRUCK, FIREFIGHTING, TACTICAL 61 Production Schedule

Page 69: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

P-1 Item Nomenclature: Date: TRUCK, FIREFIGHTING, TACTICAL (D15802) February 2005 FY 08 / 09 BUDGET PRODUCTION SCHEDULE Fiscal Year 08 Fiscal Year 09

Calendar Year 08 Calendar Year 09

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P R E T A L

R V 1 OCT 1 OCT F R Each TO AS OF M FY E QTY PRIOR DUE S PROC ACCEP BAL

COST ELEMENTS

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P

M PRODUCTION RATES MFR ADMINLEAD TIME MFR TOTAL REMARKS

F REACHED Number Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct

R NAME/LOCATION MIN. 1-8-5 MAX. D+ INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

1 Pierce Manufacturing Inc. , Appleton, WI 3.00 5.00 10.00 12 1 0 7 9 16

0 3 9 12

Tactical Firefighting Truck with FRET 1 FY 04 A 31 31 0 0 1 FY 05 A 16 16 0 0 1 FY 06 A 8 8 0 0 1 FY 07 A 31 3 28 3 3 3 3 3 3 3 3 4 0

Total 86 58 28 3 3 3 3 3 3 3 3 4

D15800 (D15802) Item No. 7 Page 9 of 9 Exhibit P-21 TRUCK, FIREFIGHTING, TACTICAL 62 Production Schedule

Page 70: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-40, Budget Item Justification Sheet Date: February 2005 Appropriation/Budget Activity/Serial No: Other Procurement, Army /1/Tactical and support vehicles P-1 Item Nomenclature FAMILY OF HEAVY TACTICAL VEHICLES (FHTV) (DA0500) Program Elements for Code B Items: Code: Other Related Program Elements: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 To Complete Total Prog Proc Qty

Gross Cost

Less PY Adv Proc

Plus CY Adv Proc

Net Proc (P-1)

Initial Spares

Total Proc Cost

Flyaway U/C

Wpn Sys Proc U/C

4423.5 257.2 218.8 207.6 207.1 292.1 246.5 227.2 152.2 98.2 6330.4

4423.5 257.2 218.8 207.6 207.1 292.1 246.5 227.2 152.2 98.2 6330.4

0.9 0.9

4424.4 257.2 218.8 207.6 207.1 292.1 246.5 227.2 152.2 98.2 6331.3

Description: The Family of Heavy Tactical Wheeled Vehicles are used in line haul, local haul, unit resupply and other missions throughout the tactical environment to support modern and highly mobile combat units. Systems include the Palletized Load System (PLS) and its companion trailers, flat racks (Container Roll-in/Out Platform (CROP)), Container Handling Units (CHU), and the Movement Tracking System (MTS). Other trucks included in this family are: the Heavy Equipment Transporter System (HETS) and the Heavy Expanded Mobility Tactical Truck (HEMTT). The FHTV line also includes the Forward Repair System (FRS), which is a mobile maintenance platform that mounts on a PLS or HEMTT. Justification: FY06-07 funding procures PLS equipment, which includes PLS Trucks and Trailers, CROP, CHU, and MTS; HEMTT Tankers, Wreckers, and Tractors; and FRS. The FY06/07 funding will fill requirements in support of modularity and the Digitized Divisions, Stryker Brigade Combat Team (SBCT), Patriot Units, Combat Engineers, Army Pre-positioned Stocks (APS), 82nd Airborne Division, Korea, and National Guard and Army Reserve Units.

DA0500 Item No. 8 Page 1 of 25 Exhibit P-40 FAMILY OF HEAVY TACTICAL VEHICLES (FHTV) 63 Budget Item Justification Sheet

Page 71: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-5, Weapon Appropriation/Budget Activity/Serial No. P-1 Line Item Nomenclature: Weapon System Type: Date: Other Procurement, Army / 1 / FAMILY OF HEAVY TACTICAL VEHICLES (FHTV) (DA0500) February 2005 Tactical and support vehicles OPA1 Cost Analysis

OPA1 ID FY 04 FY 05 FY 06 FY 07 Cost Elements CD TotalCost Qty UnitCost TotalCost Qty UnitCost TotalCost Qty UnitCost TotalCost Qty UnitCost

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000

Family of Heavy Tactical Vehicles FHTV (DA0500) HEMTT, ALL BODY TYPES (D16204) Tanker, M978A2 A 44854 143 71943 202 48222 138 100950 282 Wrecker, M984A2 A 55768 143 50190 120 38599 91 LHS Cargo, M1120A2 A 13632 51 64213 220 Cargo, M985A2 8675 31 Tractor, M983A2 A 8907 34 Forward Repair System (D16400) Forward Repair System A 17141 32 7121 16 27371 74 24546 65 PALLETIZED LOAD SYSTEM (D16500) PLS Truck A 30994 82 12219 31 26833 63 26156 65 PLS Trailer A 18305 345 3859 64 5692 100 5600 102 Cargo Bed (Flatrack) A 6367 698 2572 154 2439 166 2240 197 Container Handling Unit A 3183 85 1929 36 18702 429 8960 211 Movement Tracking System (MTS) A 19897 1108 43732 2388 27647 1170 76158 3484

Total 218816 207588 207096 292116

DA0500 Item No. 8 Page 2 of 25 Exhibit P-5 FAMILY OF HEAVY TACTICAL VEHICLES (FHTV) 64 Weapon System Cost Analysis

Page 72: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-40, Budget Item Justification Sheet Date: February 2005 Appropriation/Budget Activity/Serial No: Other Procurement, Army /1/Tactical and support vehicles P-1 Item Nomenclature TRUCK, CARGO, 57000 GVW, 8X8 (D16204) Program Elements for Code B Items: Code: Other Related Program Elements: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 To Complete Total Prog Proc Qty

Gross Cost

Less PY Adv Proc

Plus CY Adv Proc

Net Proc (P-1)

Initial Spares

Total Proc Cost

Flyaway U/C

Wpn Sys Proc U/C

2059.0 111.3 122.9 136.2 98.4 148.5 108.4 103.1 54.9 23.5 2966.1

2059.0 111.3 122.9 136.2 98.4 148.5 108.4 103.1 54.9 23.5 2966.1

2059.0 111.3 122.9 136.2 98.4 148.5 108.4 103.1 54.9 23.5 2966.1

Description: The Heavy Expanded Mobility Tactical Truck (HEMTT)is a 10-ton, 8-wheel drive truck in all body styles, including two cargo configurations, a wrecker, tanker and tractor. The HEMTT transports ammunition, petroleum, oils and lubricants and is used as the prime mover for certain missile systems. The HEMTT is C130-transportable and supports Increment 1 of the Unit of Action (UA). The M984A2 Wrecker is the recovery vehicle for other wheeled support and combat vehicle systems and is the only recovery vehicle in the SBCT. The M978A2 Tanker is a 2500-Gallon Fuel Transporter and is a key Combat Service Support (CSS) enabler in the SBCT and Digitized Divisions. The M983A2 LET has a Fifth Wheel Vertical Loading capacity of 20 Tons and a Gross Vehicle Combined Weight (GVCW) of 62.5 Tons Justification: FY06-07 funding procures 665 HEMTTs of multiple variants, including 420 M978A2 HEMTT Tankers and 211 M984A2 HEMTT Wreckers to fill Stryker Brigade Combat Team (SBCT) conversion requirements and to support modularity. FY06/07 funding also procures 34 HEMTT M983A2 Light Equipment Transporter (LET) Tractors for engineer requirements and fills requirements in the National Guard Bureau (NGB) and US Army Reserve and supports the Total Army Analysis (TAA-09) unit activations. Army Acquisition Objective for the HEMTT Fleet is 14,269. The AAO is expected to increase to meet Modularity requirements.

DA0500 (D16204) Item No. 8 Page 3 of 25 Exhibit P-40 TRUCK, CARGO, 57000 GVW, 8X8 65 Budget Item Justification Sheet

Page 73: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-5, Weapon Appropriation/Budget Activity/Serial No. P-1 Line Item Nomenclature: Weapon System Type: Date: Other Procurement, Army / 1 / TRUCK, CARGO, 57000 GVW, 8X8 (D16204) February 2005 Tactical and support vehicles OPA1 Cost Analysis

OPA1 ID FY 04 FY 05 FY 06 FY 07 Cost Elements CD TotalCost Qty UnitCost TotalCost Qty UnitCost TotalCost Qty UnitCost TotalCost Qty UnitCost

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000

1. Hardware - HEMTT All Body Types Tanker M978A2 38294 143 268 56674 202 281 39882 138 289 83923 282 298 Wrecker M984A2 46107 143 322 41314 120 344 32270 91 355 LHS Cargo M1120A2 10890 51 214 49949 220 227 Cargo M985A2 7425 31 240 Tractor M983A2 7442 34 219 Subtotal 102716 106623 81196 123635 2. Federal Retail Excise Tax 12291 12795 9743 14836 3. Engineering Changes 684 3722 2444 3726 4. Government Testing 9 400 500 500 5. Documentation 37 100 560 374 6. Engineering Support Government 1068 500 215 220 7. Quality Assuranc Support - Government 230 500 320 326 8. Special Tools 122 600 350 350 9. System Fielding Support 3444 8732 1719 2763 10. Project Management Support 2328 2184 1365 1726

Total 122929 136156 98412 148456

DA0500 (D16204) Item No. 8 Page 4 of 25 Exhibit P-5 TRUCK, CARGO, 57000 GVW, 8X8 66 Weapon System Cost Analysis

Page 74: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Date: Exhibit P-5a, Budget Procurement History and Planning February 2005

Appropriation/Budget Activity/Serial No: Weapon System Type: P-1 Line Item Nomenclature: Other Procurement, Army / 1 / Tactical and support vehicles TRUCK, CARGO, 57000 GVW, 8X8 (D16204)

WBS Cost Elements: Contractor and Location Contract Location of PCO Award Date Date of First QTY Unit Cost Specs Date RFP Issue Method Avail Revsn Date

REMARKS: Note: Procurement planning underway to extend FHTV Family Contract with Oshkosh Truck Corp. for D16202, D16203, D16204 and D16205 through FY07.

and Type Delivery Each $000 Now? Avail

Tanker M978A2 FY 2004 Oshkosh Truck Corp SS/REQ/PY4 TACOM, Warren, MI Dec 03 Jul 04 143 268 YES N/A N/A Oshkosh, WI FY 2005 Oshkosh Truck Corp SS/REQ/PY5 TACOM, Warren, MI Dec 04 Jul 05 202 281 YES N/A N/A Oshkosh, WI FY 2006 Oshkosh Truck Corp SS/REQ/PY6 TACOM, Warren, MI Dec 05 Jul 06 138 289 YES N/A N/A Oshkosh, WI FY 2007 Oshkosh Truck Corp SS/REQ/PY7 TACOM, Warren, MI Dec 06 Jul 07 282 298 YES N/A N/A Oshkosh, WI Wrecker M984A2 FY 2004 Oshkosh Truck Corp SS/REQ/PY4 TACOM, Warren, MI Dec 03 Jul 04 143 322 YES N/A N/A Oshkosh, WI FY 2006 Oshkosh Truck Corp SS/REQ/PY6 TACOM, Warren, MI Dec 05 Jul 06 120 344 YES N/A N/A Oshkosh, WI FY 2007 Oshkosh Truck Corp SS/REQ/PY7 TACOM, Warren, MI Dec 06 Jul 07 91 355 YES N/A N/A Oshkosh, WI LHS Cargo M1120A2 FY 2004 Oshkosh Truck Corp SS/REQ/PY4 TACOM, Warren, MI Dec 03 Jul 04 51 214 YES N/A N/A Oshkosh, WI FY 2005 Oshkosh Truck Corp SS/REQ/PY TACOM, Warren, MI Dec 04 Jul 05 220 227 YES N/A N/A Oshkosh, WI Cargo M985A2 FY 2004 Oshkosh Truck Corp SS/REQ/PY4 TACOM, Warren, MI Dec 03 Jul 04 31 240 YES N/A N/A Oshkosh, WI Tractor M983A2

DA0500 (D16204) Item No. 8 Page 5 of 25 Exhibit P-5a TRUCK, CARGO, 57000 GVW, 8X8 67 Procurement History and Planning

Page 75: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Date: Exhibit P-5a, Budget Procurement History and Planning February 2005

Appropriation/Budget Activity/Serial No: Weapon System Type: P-1 Line Item Nomenclature: Other Procurement, Army / 1 / Tactical and support vehicles TRUCK, CARGO, 57000 GVW, 8X8 (D16204)

WBS Cost Elements: Contractor and Location Contract Location of PCO Award Date Date of First QTY Unit Cost Specs Date RFP Issue Method Avail Revsn Date

REMARKS: Note: Procurement planning underway to extend FHTV Family Contract with Oshkosh Truck Corp. for D16202, D16203, D16204 and D16205 through FY07.

and Type Delivery Each $000 Now? Avail

FY 2007 Oshkosh Truck Corp SS/REQ/PY7 TACOM, Warren, MI Dec 06 Jul 07 34 219 Yes N/A N/A Oshkosh, WI

DA0500 (D16204) Item No. 8 Page 6 of 25 Exhibit P-5a TRUCK, CARGO, 57000 GVW, 8X8 68 Procurement History and Planning

Page 76: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

P-1 Item Nomenclature: Date: TRUCK, CARGO, 57000 GVW, 8X8 (D16204) February 2005 FY 04 / 05 BUDGET PRODUCTION SCHEDULE Fiscal Year 04 Fiscal Year 05

Calendar Year 04 Calendar Year 05

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P R E T A L

R V 1 OCT 1 OCT F R Each TO AS OF M FY E QTY PRIOR DUE S PROC ACCEP BAL

COST ELEMENTS

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P

M PRODUCTION RATES MFR ADMINLEAD TIME MFR TOTAL REMARKS

Note: Government EOQ 1-8-5 production rate (363/month) accommodates mix of government and commercial production on contractor's integrated production line. Max rate (821/month) reflects contractor capacity using second shift dedicated to government production.

F REACHED Number Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct

R NAME/LOCATION MIN. 1-8-5 MAX. D+ INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

1 Oshkosh Truck Corp , Oshkosh, WI 1.00 363.00 821.00 12 1 0 3 8 11

0 3 7 10

Tanker M978A2 1 FY 04 A 143 0 143 A 11 12 12 12 12 12 12 12 12 12 12 12 0 1 FY 05 A 202 0 202 A 17 17 17 151 1 FY 06 A 138 0 138 138 1 FY 07 A 282 0 282 282 Wrecker M984A2 1 FY 04 A 143 0 143 A 10 10 12 12 12 12 12 12 12 13 13 13 0 1 FY 06 A 120 0 120 120 1 FY 07 A 91 0 91 91 LHS Cargo M1120A2 1 FY 04 A 51 0 51 A 3 3 3 4 4 4 4 4 5 5 6 6 0 1 FY 05 A 220 0 220 A 17 18 18 167 Cargo M985A2 1 FY 04 A 31 0 31 A 3 3 3 3 3 3 3 2 2 2 2 2 0 Tractor M983A2 1 FY 07 A 34 0 34 34

Total 1455 1455 27 28 30 31 31 31 31 30 31 32 33 33 34 35 35 983

DA0500 (D16204) Item No. 8 Page 7 of 25 Exhibit P-21 TRUCK, CARGO, 57000 GVW, 8X8 69 Production Schedule

Page 77: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

P-1 Item Nomenclature: Date: TRUCK, CARGO, 57000 GVW, 8X8 (D16204) February 2005 FY 06 / 07 BUDGET PRODUCTION SCHEDULE Fiscal Year 06 Fiscal Year 07

Calendar Year 06 Calendar Year 07

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P R E T A L

R V 1 OCT 1 OCT F R Each TO AS OF M FY E QTY PRIOR DUE S PROC ACCEP BAL

COST ELEMENTS

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P

M PRODUCTION RATES MFR ADMINLEAD TIME MFR TOTAL REMARKS

F REACHED Number Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct

R NAME/LOCATION MIN. 1-8-5 MAX. D+ INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

1 Oshkosh Truck Corp , Oshkosh, WI 1.00 363.00 821.00 12 1 0 3 8 11

0 3 7 10

Tanker M978A2 1 FY 04 A 143 143 0 0 1 FY 05 A 202 51 151 17 17 17 17 17 17 17 16 16 0 1 FY 06 A 138 0 138 A 10 10 11 11 12 12 12 12 12 12 12 12 0 1 FY 07 A 282 0 282 A 23 23 23 213 Wrecker M984A2 1 FY 04 A 143 143 0 0 1 FY 06 A 120 0 120 A 10 10 10 10 10 10 10 10 10 10 10 10 0 1 FY 07 A 91 0 91 A 8 8 8 67 LHS Cargo M1120A2 1 FY 04 A 51 51 0 0 1 FY 05 A 220 53 167 18 18 18 18 19 19 19 19 19 0 Cargo M985A2 1 FY 04 A 31 31 0 0 Tractor M983A2 1 FY 07 A 34 0 34 A 3 3 3 25

Total 1455 472 983 35 35 35 35 36 36 36 35 35 20 20 21 21 22 22 22 22 22 22 22 22 34 34 34 305

DA0500 (D16204) Item No. 8 Page 8 of 25 Exhibit P-21 TRUCK, CARGO, 57000 GVW, 8X8 70 Production Schedule

Page 78: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

P-1 Item Nomenclature: Date: TRUCK, CARGO, 57000 GVW, 8X8 (D16204) February 2005 FY 08 / 09 BUDGET PRODUCTION SCHEDULE Fiscal Year 08 Fiscal Year 09

Calendar Year 08 Calendar Year 09

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P R E T A L

R V 1 OCT 1 OCT F R Each TO AS OF M FY E QTY PRIOR DUE S PROC ACCEP BAL

COST ELEMENTS

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P

M PRODUCTION RATES MFR ADMINLEAD TIME MFR TOTAL REMARKS

F REACHED Number Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct

R NAME/LOCATION MIN. 1-8-5 MAX. D+ INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

1 Oshkosh Truck Corp , Oshkosh, WI 1.00 363.00 821.00 12 1 0 3 8 11

0 3 7 10

Tanker M978A2 1 FY 04 A 143 143 0 0 1 FY 05 A 202 202 0 0 1 FY 06 A 138 138 0 0 1 FY 07 A 282 69 213 23 23 23 24 24 24 24 24 24 0 Wrecker M984A2 1 FY 04 A 143 143 0 0 1 FY 06 A 120 120 0 0 1 FY 07 A 91 24 67 8 8 8 8 7 7 7 7 7 0 LHS Cargo M1120A2 1 FY 04 A 51 51 0 0 1 FY 05 A 220 220 0 0 Cargo M985A2 1 FY 04 A 31 31 0 0 Tractor M983A2 1 FY 07 A 34 9 25 3 3 3 3 3 3 3 2 2 0

Total 1455 1150 305 34 34 34 35 34 34 34 33 33

DA0500 (D16204) Item No. 8 Page 9 of 25 Exhibit P-21 TRUCK, CARGO, 57000 GVW, 8X8 71 Production Schedule

Page 79: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-40, Budget Item Justification Sheet Date: February 2005 Appropriation/Budget Activity/Serial No: Other Procurement, Army /1/Tactical and support vehicles P-1 Item Nomenclature FORWARD REPAIR SYSTEM (FRS) (D16400) Program Elements for Code B Items: Code: Other Related Program Elements: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 To Complete Total Prog Proc Qty

Gross Cost

Less PY Adv Proc

Plus CY Adv Proc

Net Proc (P-1)

Initial Spares

Total Proc Cost

Flyaway U/C

Wpn Sys Proc U/C

109 74 32 16 74 66 67 65 77 63 643

43.2 40.3 17.1 7.1 27.4 24.5 26.0 26.0 31.8 26.9 270.3

43.2 40.3 17.1 7.1 27.4 24.5 26.0 26.0 31.8 26.9 270.3

43.2 40.3 17.1 7.1 27.4 24.5 26.0 26.0 31.8 26.9 270.3

0.5 0.5 0.2 0.3 0.2 0.2 0.2 0.3 0.2

Description: The Forward Repair System (FRS) is a high-mobility, forward maintenance system that reduces Repair Cycle Time. The FRS places in one package proven tools, test equipment, and heavy lift capability to support forces in the forward battle area. The FRS is the key maintenance system for all repair activities of heavy forces in the forward battle area. Heavy forces include tank, mechanized infantry, cavalry, field artillery, engineers, and supporting units with heavy combat, combat support, and combat service support vehicles. The system consists of overhead lift and mobility nearly equivalent to the supported force Additionally, the FRS has its own air source for air tools and inflatable lifting devices. It has limited spot welding and cutting capabilities, a tailored set of industrial quantity hand and power tools, and its own on board power source. The power source has the capability of providing power sufficient to operate the crane, welding equipment, power tools, and the on board electrical system. The FRS provides storage space for the Soldiers' Portable On-System Repair Tool (SPORT), general Mechanics tool kits (GMTKs), battle damage assessment and repair (BDAR) kits, and combat spares or other supporting equipment. The FRS will free the M88 recovery vehicle from its present captive role as a repair vehicle, which means increased availability of M88 recovery vehicles for recovery missions. The FRS will replace M113 tracked systems currently performing this mission, yielding a 90% reduction in repair parts costs as well as enhanced battlefield capability with demonstrated reductions in Repair Cycle Time (RCT) of 35-50%. The FRS meets the maneuver commander's need for a repair system that is responsive, effective, and reduces the number of systems requiring evacuation. Justification: FY06 program buys 74 FRS modules. The FRS is a must have enabler for both the digitized division and Brigade Combat Teams/Future Combat System (FCS) Complementary System. FY07 program buys 66 FRS modules. The FRS is a must have enabler for both the digitized division and Brigade Combat Teams/FCS Complementary System. Approved Acquisition Objective (AAO): 1197

DA0500 (D16400) Item No. 8 Page 10 of 25 Exhibit P-40 FORWARD REPAIR SYSTEM (FRS) 72 Budget Item Justification Sheet

Page 80: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-5, Weapon Appropriation/Budget Activity/Serial No. P-1 Line Item Nomenclature: Weapon System Type: Date: Other Procurement, Army / 1 / FORWARD REPAIR SYSTEM (FRS) (D16400) February 2005 Tactical and support vehicles OPA1 Cost Analysis

OPA1 ID FY 04 FY 05 FY 06 FY 07 Cost Elements CD TotalCost Qty UnitCost TotalCost Qty UnitCost TotalCost Qty UnitCost TotalCost Qty UnitCost

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000

1. Vehicle Forward Repair System A 8720 32 273 4672 16 292 22718 74 307 20856 66 316 PLS Truck A 6753 20 338 1418 4 355 SubTotal 15473 6090 22718 20856 2. ECPs 196 183 155 160 4. System Fielding Support 671 205 641 527 5. ASL & DS/GS 311 115 455 430 6. Documentation 104 66 370 60 7. Engineering Support 66 122 228 91 8. Quality Assurance Support 100 85 187 182 9. Program Management Support 220 255 2515 1740 10. Transportation (FRS & Flatrack) 102 500

Total 17141 7121 27371 24546

DA0500 (D16400) Item No. 8 Page 11 of 25 Exhibit P-5 FORWARD REPAIR SYSTEM (FRS) 73 Weapon System Cost Analysis

Page 81: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Date: Exhibit P-5a, Budget Procurement History and Planning February 2005

Appropriation/Budget Activity/Serial No: Weapon System Type: P-1 Line Item Nomenclature: Other Procurement, Army / 1 / Tactical and support vehicles FORWARD REPAIR SYSTEM (FRS) (D16400)

WBS Cost Elements: Contractor and Location Contract Location of PCO Award Date Date of First QTY Unit Cost Specs Date RFP Issue Method Avail Revsn Date

REMARKS: IDIQ contract Data Interchange-T40999--Truck, cargo,PLS; ratio 1:1 T96496-HEMTT, LHS, ratio 1:1

and Type Delivery Each $000 Now? Avail

Forward Repair System FY 2004 Rock Island Arsenal FFP TACOM, Warren, MI Nov 03 Nov 04 32 273 Yes N/A N/A Rock Island, IL FY 2005 Rock Island Arsenal FFP PM SKOT, Rock Island, IL Jan 05 Jul 05 16 292 Yes N/A N/A Rock Island, IL FY 2006 Rock Island Arsenal FFP PM SKOT, Rock Island, IL Dec 05 Jun 06 74 307 Yes N/A N/A Rock Island, IL FY 2007 Rock Island Arsenal FFP PM SKOT, Rock Island, IL Dec 06 Jun 07 66 316 Yes N/A N/A Rock Island, IL PLS Truck FY 2004 Oshkosh Truck Corp. SS/REQ/PY4 TACOM, Warren, MI Dec 03 May 04 20 338 Yes N/A N/A Oshkosh, WI FY 2005 Oshkosh Truck Corp. SS/REQ/PY5 TACOM, Warren, MI Jan 05 Aug 05 4 355 Yes N/A N/A Oshkosh, WI

DA0500 (D16400) Item No. 8 Page 12 of 25 Exhibit P-5a FORWARD REPAIR SYSTEM (FRS) 74 Procurement History and Planning

Page 82: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

P-1 Item Nomenclature: Date: FORWARD REPAIR SYSTEM (FRS) (D16400) February 2005 FY 03 / 04 BUDGET PRODUCTION SCHEDULE Fiscal Year 03 Fiscal Year 04

Calendar Year 03 Calendar Year 04

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P R E T A L

R V 1 OCT 1 OCT F R Each TO AS OF M FY E QTY PRIOR DUE S PROC ACCEP BAL

COST ELEMENTS

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P

M PRODUCTION RATES MFR ADMINLEAD TIME MFR TOTAL REMARKS

Production Rates are monthly. F REACHED Number Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct

R NAME/LOCATION MIN. 1-8-5 MAX. D+ INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

1 Rock Island Arsenal , Rock Island, IL 1.00 20.00 35.00 12 1 0 3 6 9

0 3 6 9

2 Oshkosh Truck Corp. , Oshkosh, WI 1.00 25.00 45.00 12 2 0 3 5 8

0 0 0 0

Forward Repair System 1 FY 04 A 32 0 32 A 32 1 FY 05 A 16 0 16 16 1 FY 06 A 74 0 74 74 1 FY 07 A 66 0 66 66 PLS Truck 2 FY 04 A 20 0 20 A 2 2 2 2 2 10 2 FY 05 A 4 0 4 4

Total 212 212 2 2 2 2 2 202

DA0500 (D16400) Item No. 8 Page 13 of 25 Exhibit P-21 FORWARD REPAIR SYSTEM (FRS) 75 Production Schedule

Page 83: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

P-1 Item Nomenclature: Date: FORWARD REPAIR SYSTEM (FRS) (D16400) February 2005 FY 05 / 06 BUDGET PRODUCTION SCHEDULE Fiscal Year 05 Fiscal Year 06

Calendar Year 05 Calendar Year 06

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P R E T A L

R V 1 OCT 1 OCT F R Each TO AS OF M FY E QTY PRIOR DUE S PROC ACCEP BAL

COST ELEMENTS

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P

M PRODUCTION RATES MFR ADMINLEAD TIME MFR TOTAL REMARKS

Production Rates are monthly. F REACHED Number Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct

R NAME/LOCATION MIN. 1-8-5 MAX. D+ INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

1 Rock Island Arsenal , Rock Island, IL 1.00 20.00 35.00 12 1 0 3 6 9

0 3 6 9

2 Oshkosh Truck Corp. , Oshkosh, WI 1.00 25.00 45.00 12 2 0 3 5 8

0 0 0 0

Forward Repair System 1 FY 04 A 32 0 32 4 4 4 4 4 4 4 4 0 1 FY 05 A 16 0 16 A 4 4 4 4 0 1 FY 06 A 74 0 74 A 7 7 7 7 46 1 FY 07 A 66 0 66 66 PLS Truck 2 FY 04 A 20 10 10 2 2 2 1 1 1 1 0 2 FY 05 A 4 0 4 A 1 1 1 1 0

Total 212 10 202 2 6 6 5 5 5 5 4 4 4 5 5 5 1 7 7 7 7 112

DA0500 (D16400) Item No. 8 Page 14 of 25 Exhibit P-21 FORWARD REPAIR SYSTEM (FRS) 76 Production Schedule

Page 84: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

P-1 Item Nomenclature: Date: FORWARD REPAIR SYSTEM (FRS) (D16400) February 2005 FY 07 / 08 BUDGET PRODUCTION SCHEDULE Fiscal Year 07 Fiscal Year 08

Calendar Year 07 Calendar Year 08

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P R E T A L

R V 1 OCT 1 OCT F R Each TO AS OF M FY E QTY PRIOR DUE S PROC ACCEP BAL

COST ELEMENTS

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P

M PRODUCTION RATES MFR ADMINLEAD TIME MFR TOTAL REMARKS

Production Rates are monthly. F REACHED Number Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct

R NAME/LOCATION MIN. 1-8-5 MAX. D+ INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

1 Rock Island Arsenal , Rock Island, IL 1.00 20.00 35.00 12 1 0 3 6 9

0 3 6 9

2 Oshkosh Truck Corp. , Oshkosh, WI 1.00 25.00 45.00 12 2 0 3 5 8

0 0 0 0

Forward Repair System 1 FY 04 A 32 32 0 0 1 FY 05 A 16 16 0 0 1 FY 06 A 74 28 46 7 7 7 7 7 7 4 0 1 FY 07 A 66 0 66 A 6 6 6 6 6 6 6 6 6 6 6 0 PLS Truck 2 FY 04 A 20 20 0 0 2 FY 05 A 4 4 0 0

Total 212 100 112 7 7 7 7 7 7 4 6 6 6 6 6 6 6 6 6 6 6

DA0500 (D16400) Item No. 8 Page 15 of 25 Exhibit P-21 FORWARD REPAIR SYSTEM (FRS) 77 Production Schedule

Page 85: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-40, Budget Item Justification Sheet Date: February 2005 Appropriation/Budget Activity/Serial No: Other Procurement, Army /1/Tactical and support vehicles P-1 Item Nomenclature TRUCK, PALLETIZED LOAD SYSTEM (PLS), 10X10 (D16500) Program Elements for Code B Items: Code: Other Related Program Elements: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 To Complete Total Prog Proc Qty

Gross Cost

Less PY Adv Proc

Plus CY Adv Proc

Net Proc (P-1)

Initial Spares

Total Proc Cost

Flyaway U/C

Wpn Sys Proc U/C

1037.4 105.1 78.7 64.3 81.3 119.1 112.1 98.1 65.5 47.8 1809.6

1037.4 105.1 78.7 64.3 81.3 119.1 112.1 98.1 65.5 47.8 1809.6

1037.4 105.1 78.7 64.3 81.3 119.1 112.1 98.1 65.5 47.8 1809.6

Description: The Palletized Load System (PLS) is the primary component of the Modular Ammunition Company Concept and is interoperable with the comparable British, German and French systems, through the use of a common flatrack. The PLS consists of a 16.5-ton payload prime mover (10x10) with an integral load-handling system, which provides self-loading and unloading capability; a 16.5- ton payload trailer; and demountable cargo beds, or flatracks. The Container Handling Unit (CHU) is being fielded to transportation and ammunition units and to forward support battalions, providing the capability to pick up and transport 20-foot International Standards Organization (ISO) containers without the use of a flatrack. The Movement Tracking System (MTS) program provides a multitude of tactical wheeled vehicles (PLS, Heavy Expanded Mobility Tactical Truck, Family of Medium Tactical Vehicles, etc.) with Global Positioning System (GPS) capability and two-way digital messaging. The PLS Truck performs line haul, local haul, unit resupply and other missions in the tactical environment to support modern and highly mobile combat units and is equipped with a Central Tire Inflation System (CTIS) which significantly improves off-road mobility. Current flatrack funding buys the Container Roll-in/out Platform (CROP), an A-frame type flatrack, which fits inside a 20-foot ISO inter-modal container. The PLS Trailer, CROP, CHU, and MTS are key enablers for both the Stryker Brigade Combat Team (SBCT) and Digitized Divisions. Army Acquisition Objectives (AAO) for PLS equipment are as follows: PLS Truck - 4,222, PLS Trailer - 4,094, Flatracks - 59,962, CHU - 2,204, and MTS - 35,702. Justification: FY06-07 procures 128 PLS trucks, 202 PLS Trailers, 363 CROP, and 640 CHU to support Modularity and Engineering Mission Module (EMM) fieldings, SBCT activations, National Guard (NG), Army Reserve (AR), and Army Pre-position Stocks (APS) requirements. MTS procurements of 4654 mobile units support the Counterattack Corps (CATK), SBCT, Korea, 82nd ABN Division, and NG and Army Reserve units.

DA0500 (D16500) Item No. 8 Page 16 of 25 Exhibit P-40 TRUCK, PALLETIZED LOAD SYSTEM (PLS), 10X10 78 Budget Item Justification Sheet

Page 86: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-5, Weapon Appropriation/Budget Activity/Serial No. P-1 Line Item Nomenclature: Weapon System Type: Date: Other Procurement, Army / 1 / TRUCK, PALLETIZED LOAD SYSTEM (PLS), February 2005 Tactical and support vehicles 10X10 (D16500) OPA1 Cost Analysis

OPA1 ID FY 04 FY 05 FY 06 FY 07 Cost Elements CD TotalCost Qty UnitCost TotalCost Qty UnitCost TotalCost Qty UnitCost TotalCost Qty UnitCost

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000

1. Hardware PLS Truck 27691 82 338 10989 31 354 23008 63 365 24440 65 376 PLS Trailer 16491 345 48 3136 64 49 5050 100 51 5304 102 52 Cargo Bed, Demountable 5375 698 8 1463 154 10 1610 166 10 1812 197 9 PLS Container Handling Unit 3009 85 35 1321 36 37 16002 429 37 8018 211 38 Movement Tracking System 17944 1108 16 40006 2388 17 23400 1170 20 71492 3484 21 Subtotal 70510 56915 69070 111066 2. Engineering Changes 1595 2116 1370 951 3. Government Testing - ATC/YPG 457 500 2000 500 4. Documentation 90 72 2000 500 5. Engineering Support - Government 292 243 219 230 6. Quality Assurance Supt- Government 435 500 456 464 7. Special Tools 467 500 350 379 8. System Fielding Support 3219 2665 3447 2511 9. PM Support 1681 800 2401 2513

Total 78746 64311 81313 119114

DA0500 (D16500) Item No. 8 Page 17 of 25 Exhibit P-5 TRUCK, PALLETIZED LOAD SYSTEM (PLS), 10X10 79 Weapon System Cost Analysis

Page 87: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Date: Exhibit P-5a, Budget Procurement History and Planning February 2005

Appropriation/Budget Activity/Serial No: Weapon System Type: P-1 Line Item Nomenclature: Other Procurement, Army / 1 / Tactical and support vehicles TRUCK, PALLETIZED LOAD SYSTEM (PLS), 10X10 (D16500)

WBS Cost Elements: Contractor and Location Contract Location of PCO Award Date Date of First QTY Unit Cost Specs Date RFP Issue Method Avail Revsn Date

REMARKS: Note: Procurement planning underway to extend FHTV FY01-05 Family Contract with Oshkosh Truck Corp. for D16500, D08900, and D16101 through FY07.

and Type Delivery Each $000 Now? Avail

PLS Truck FY 2004 Oshkosh Truck Corp (PLS) SS/REQ/PY4 TACOM, Warren, MI Dec 03 Jul 04 82 338 Yes N/A N/A Oshkosh, WI FY 2005 Oshkosh Truck Corp (PLS) SS/REQ/PY5 TACOM, Warren, MI Dec 04 Jul 05 31 354 Yes N/A N/A Oshkosh, WI FY 2006 Oshkosh Truck Corp (PLS) SS/REQ/PY6 TACOM, Warren, MI Dec 06 Jul 06 63 365 Yes N/A N/A Oshkosh, WI FY 2007 Oshkosh Truck Corp (PLS) SS/REQ/PY7 TACOM, Warren, MI Dec 07 Jul 07 65 376 Yes N/A N/A Oshkosh, WI PLS Trailer FY 2004 Oshkosh Truck Corp (PLS) SS/REQ/PY4 TACOM, Warren, MI Dec 03 Jul 04 345 48 Yes N/A N/A Oshkosh, WI FY 2005 Oshkosh Truck Corp (PLS) SS/REQ/PY5 TACOM, Warren, MI Dec 04 Jul 05 64 49 Yes N/A N/A Oshkosh, WI FY 2006 Oshkosh Truck Corp (PLS) SS/REQ/PY6 TACOM, Warren, MI Dec 06 Jul 06 100 51 Yes N/A N/A Oshkosh, WI FY 2007 Oshkosh Truck Corp (PLS) SS/REQ/PY7 TACOM, Warren, MI Dec 07 Jul 07 102 52 Yes N/A N/A Oshkosh, WI Cargo Bed, Demountable FY 2004 Summa Technology Inc. C/REQ/PY3 TACOM, Warren, MI Dec 03 Jul 04 698 8 Yes N/A N/A Huntsville, AL FY 2005 Summa Technology Inc. C/REQ/PY4 TACOM, Warren, MI Dec 04 Jul 05 154 10 Yes N/A N/A Huntsville, AL FY 2006 Summa Technology Inc. C/REQ/PY5 TACOM, Warren, MI Dec 06 Jul 06 166 10 Yes N/A N/A Huntsville, AL FY 2007 Summa Technology Inc. C/REQ/PY6 TACOM, Warren, MI Dec 07 Jul 07 197 9 Yes N/A N/A Huntsville, AL

DA0500 (D16500) Item No. 8 Page 18 of 25 Exhibit P-5a TRUCK, PALLETIZED LOAD SYSTEM (PLS), 10X10 80 Procurement History and Planning

Page 88: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Date: Exhibit P-5a, Budget Procurement History and Planning February 2005

Appropriation/Budget Activity/Serial No: Weapon System Type: P-1 Line Item Nomenclature: Other Procurement, Army / 1 / Tactical and support vehicles TRUCK, PALLETIZED LOAD SYSTEM (PLS), 10X10 (D16500)

WBS Cost Elements: Contractor and Location Contract Location of PCO Award Date Date of First QTY Unit Cost Specs Date RFP Issue Method Avail Revsn Date

REMARKS: Note: Procurement planning underway to extend FHTV FY01-05 Family Contract with Oshkosh Truck Corp. for D16500, D08900, and D16101 through FY07.

and Type Delivery Each $000 Now? Avail

PLS Container Handling Unit FY 2004 OTC Kewaunee Fabrication SS/REQ/PY4 TACOM, Warren, MI Dec 03 Jul 04 85 35 Yes N/A N/A Kewaunee, WI FY 2005 OTC Kewaunee Fabrication SS/REQ/PY5 TACOM, Warren, MI Dec 04 Jul 05 36 37 Yes N/A N/A Kewaunee, WI FY 2006 OTC Kewaunee Fabrication SS/REQ/PY6 TACOM, Warren, MI Dec 06 Jul 06 429 37 Yes N/A N/A Kewaunee, WI FY 2007 OTC Kewaunee Fabrication SS/REQ/PY7 TACOM, Warren, MI Dec 07 Jul 07 211 38 Yes N/A N/A Kewaunee, WI Movement Tracking System FY 2004 Comtech Mobile Datacom C/REQ/PY6 CECOM, Washington, DC Dec 03 May 04 571 16 Yes N/A N/A Germantown, MD FY 2004 Comtech Mobile Datacom C/REQ/PY6 CECOM, Washington, DC Mar 04 Dec 04 537 16 Yes N/A N/A Germantown, MD FY 2005 Comtech Mobile Datacom C/REQ/PY7 CECOM, Washington, DC Dec 04 May 05 2388 17 Yes N/A N/A Germantown, MD FY 2006 TBS - MTS C/REQ/PY1 CECOM, Washington, DC Dec 05 May 06 1170 20 Yes N/A Jun 05 FY 2007 TBS - MTS C/REQ/PY2 CECOM, Washington, DC Dec 06 May 07 3484 21 Yes N/A N/A

DA0500 (D16500) Item No. 8 Page 19 of 25 Exhibit P-5a TRUCK, PALLETIZED LOAD SYSTEM (PLS), 10X10 81 Procurement History and Planning

Page 89: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

P-1 Item Nomenclature: Date: TRUCK, PALLETIZED LOAD SYSTEM (PLS), 10X10 (D16500) February 2005 FY 04 / 05 BUDGET PRODUCTION SCHEDULE Fiscal Year 04 Fiscal Year 05

Calendar Year 04 Calendar Year 05

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P R E T A L

R V 1 OCT 1 OCT F R Each TO AS OF M FY E QTY PRIOR DUE S PROC ACCEP BAL

COST ELEMENTS

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P

M PRODUCTION RATES MFR ADMINLEAD TIME MFR TOTAL REMARKS

Note: Government EOQ 1-8-5 production rate (363/month) accommodates mix of government and commercial production on contractor's integrated production line. Max rate (821/month) reflects contractor capacity using second shift dedicated to government production.

F REACHED Number Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct

R NAME/LOCATION MIN. 1-8-5 MAX. D+ INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

1 Oshkosh Truck Corp (PLS) , Oshkosh, WI 1.00 363.00 821.00 12 1 0 3 8 11

0 4 7 11

2 Comtech Mobile Datacom , Germantown, MD 10.00 150.00 330.00 12 2 0 3 5 8

0 3 7 10 3 OTC Kewaunee Fabrication , Kewaunee, WI 1.00 15.00 40.00 12

3 0 3 8 11

0 4 7 11

4 Summa Technology Inc. , Huntsville, AL 5.00 160.00 350.00 12

4 0 3 7 10

0 3 7 10

5 Oshkosh Truck Corp (PLST) , Oshkosh, WI 1.00 20.00 40.00 12

5 0 3 8 11

0 3 7 10

6 TBS - MTS , 10.00 150.00 330.00 12

6 0 3 5 8

0 3 5 8

PLS Truck 1 FY 04 A 82 0 82 A 2 2 3 12 10 8 8 8 8 7 7 7 0 1 FY 05 A 31 0 31 A 3 3 3 22 1 FY 06 A 63 0 63 63 1 FY 07 A 65 0 65 65 PLS Trailer 5 FY 04 A 345 0 345 A 24 30 30 30 30 30 30 31 30 30 25 25 0 5 FY 05 A 64 0 64 A 5 5 5 49 5 FY 06 A 100 0 100 100 5 FY 07 A 102 0 102 102 Cargo Bed, Demountable 4 FY 04 A 698 0 698 A 4 63 63 63 63 63 63 63 63 63 63 64 0 4 FY 05 A 154 0 154 A 13 13 13 115 4 FY 06 A 166 0 166 166 4 FY 07 A 197 0 197 197 PLS Container Handling Unit 3 FY 04 A 85 0 85 A 7 7 7 7 7 7 7 6 6 6 6 6 6 0 3 FY 05 A 36 0 36 A 2 2 2 30 3 FY 06 A 429 0 429 429

DA0500 Item No. 8 Page 20 of 25 Exhibit P-21 TRUCK, PALLETIZED LOAD SYSTEM (PLS), 10X10 82 Production Schedule

Page 90: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

P-1 Item Nomenclature: Date: TRUCK, PALLETIZED LOAD SYSTEM (PLS), 10X10 (D16500) February 2005 FY 04 / 05 BUDGET PRODUCTION SCHEDULE Fiscal Year 04 Fiscal Year 05

Calendar Year 04 Calendar Year 05

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P R E T A L

R V 1 OCT 1 OCT F R Each TO AS OF M FY E QTY PRIOR DUE S PROC ACCEP BAL

COST ELEMENTS

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P

M PRODUCTION RATES MFR ADMINLEAD TIME MFR TOTAL REMARKS

Note: Government EOQ 1-8-5 production rate (363/month) accommodates mix of government and commercial production on contractor's integrated production line. Max rate (821/month) reflects contractor capacity using second shift dedicated to government production.

F REACHED Number Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct

R NAME/LOCATION MIN. 1-8-5 MAX. D+ INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

1 Oshkosh Truck Corp (PLS) , Oshkosh, WI 1.00 363.00 821.00 12 1 0 3 8 11

0 4 7 11

2 Comtech Mobile Datacom , Germantown, MD 10.00 150.00 330.00 12 2 0 3 5 8

0 3 7 10 3 OTC Kewaunee Fabrication , Kewaunee, WI 1.00 15.00 40.00 12

3 0 3 8 11

0 4 7 11

4 Summa Technology Inc. , Huntsville, AL 5.00 160.00 350.00 12

4 0 3 7 10

0 3 7 10

5 Oshkosh Truck Corp (PLST) , Oshkosh, WI 1.00 20.00 40.00 12

5 0 3 8 11

0 3 7 10

6 TBS - MTS , 10.00 150.00 330.00 12

6 0 3 5 8

0 3 5 8

3 FY 07 A 211 0 211 211 Movement Tracking System 2 FY 04 A 571 0 571 A 81 82 82 82 82 81 81 0 2 FY 04 A 537 0 537 A 83 83 83 83 84 81 40 0 2 FY 05 A 2388 0 2388 A 199 199 199 199 199 1393 6 FY 06 A 1170 0 1170 1170 6 FY 07 A 3484 0 3484 3484

Total 10978 10978 81 82 119 184 185 193 191 191 191 191 190 190 381 341 228 222 222 7596

DA0500 (D16500) Item No. 8 Page 21 of 25 Exhibit P-21 TRUCK, PALLETIZED LOAD SYSTEM (PLS), 10X10 83 Production Schedule

Page 91: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

P-1 Item Nomenclature: Date: TRUCK, PALLETIZED LOAD SYSTEM (PLS), 10X10 (D16500) February 2005 FY 06 / 07 BUDGET PRODUCTION SCHEDULE Fiscal Year 06 Fiscal Year 07

Calendar Year 06 Calendar Year 07

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P R E T A L

R V 1 OCT 1 OCT F R Each TO AS OF M FY E QTY PRIOR DUE S PROC ACCEP BAL

COST ELEMENTS

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P

M PRODUCTION RATES MFR ADMINLEAD TIME MFR TOTAL REMARKS

F REACHED Number Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct

R NAME/LOCATION MIN. 1-8-5 MAX. D+ INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

1 Oshkosh Truck Corp (PLS) , Oshkosh, WI 1.00 363.00 821.00 12 1 0 3 8 11

0 4 7 11

2 Comtech Mobile Datacom , Germantown, MD 10.00 150.00 330.00 12 2 0 3 5 8

0 3 7 10 3 OTC Kewaunee Fabrication , Kewaunee, WI 1.00 15.00 40.00 12

3 0 3 8 11

0 4 7 11

4 Summa Technology Inc. , Huntsville, AL 5.00 160.00 350.00 12

4 0 3 7 10

0 3 7 10

5 Oshkosh Truck Corp (PLST) , Oshkosh, WI 1.00 20.00 40.00 12

5 0 3 8 11

0 3 7 10

6 TBS - MTS , 10.00 150.00 330.00 12

6 0 3 5 8

0 3 5 8

PLS Truck 1 FY 04 A 82 82 0 0 1 FY 05 A 31 9 22 3 3 3 3 2 2 2 2 2 0 1 FY 06 A 63 0 63 A 4 4 5 5 5 5 5 6 6 6 6 6 0 1 FY 07 A 65 0 65 A 5 5 5 50 PLS Trailer 5 FY 04 A 345 345 0 0 5 FY 05 A 64 15 49 6 6 6 6 5 5 5 5 5 0 5 FY 06 A 100 0 100 A 8 9 9 9 9 8 8 8 8 8 8 8 0 5 FY 07 A 102 0 102 A 9 9 9 75 Cargo Bed, Demountable 4 FY 04 A 698 698 0 0 4 FY 05 A 154 39 115 13 13 13 13 13 13 13 12 12 0 4 FY 06 A 166 0 166 A 14 14 14 14 14 14 14 14 14 14 14 12 0 4 FY 07 A 197 0 197 A 14 14 14 155 PLS Container Handling Unit 3 FY 04 A 85 85 0 0 3 FY 05 A 36 6 30 4 4 4 3 3 3 3 3 3 0 3 FY 06 A 429 0 429 A 24 25 30 30 40 40 40 40 40 40 40 40 0

DA0500 Item No. 8 Page 22 of 25 Exhibit P-21 TRUCK, PALLETIZED LOAD SYSTEM (PLS), 10X10 84 Production Schedule

Page 92: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

P-1 Item Nomenclature: Date: TRUCK, PALLETIZED LOAD SYSTEM (PLS), 10X10 (D16500) February 2005 FY 06 / 07 BUDGET PRODUCTION SCHEDULE Fiscal Year 06 Fiscal Year 07

Calendar Year 06 Calendar Year 07

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P R E T A L

R V 1 OCT 1 OCT F R Each TO AS OF M FY E QTY PRIOR DUE S PROC ACCEP BAL

COST ELEMENTS

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P

M PRODUCTION RATES MFR ADMINLEAD TIME MFR TOTAL REMARKS

F REACHED Number Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct

R NAME/LOCATION MIN. 1-8-5 MAX. D+ INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

1 Oshkosh Truck Corp (PLS) , Oshkosh, WI 1.00 363.00 821.00 12 1 0 3 8 11

0 4 7 11

2 Comtech Mobile Datacom , Germantown, MD 10.00 150.00 330.00 12 2 0 3 5 8

0 3 7 10 3 OTC Kewaunee Fabrication , Kewaunee, WI 1.00 15.00 40.00 12

3 0 3 8 11

0 4 7 11

4 Summa Technology Inc. , Huntsville, AL 5.00 160.00 350.00 12

4 0 3 7 10

0 3 7 10

5 Oshkosh Truck Corp (PLST) , Oshkosh, WI 1.00 20.00 40.00 12

5 0 3 8 11

0 3 7 10

6 TBS - MTS , 10.00 150.00 330.00 12

6 0 3 5 8

0 3 5 8

3 FY 07 A 211 0 211 A 17 17 17 160 Movement Tracking System 2 FY 04 A 571 571 0 0 2 FY 04 A 537 537 0 0 2 FY 05 A 2388 995 1393 199 199 199 199 199 199 199 0 6 FY 06 A 1170 0 1170 A 98 98 98 98 98 98 97 97 97 97 97 97 0 6 FY 07 A 3484 0 3484 A 290 290 290 290 290 2034

Total 10978 3382 7596 225 225 225 224 222 222 222 120 120 148 150 156 156 165 164 164 165 165 165 358 356 335 335 335 2474

DA0500 (D16500) Item No. 8 Page 23 of 25 Exhibit P-21 TRUCK, PALLETIZED LOAD SYSTEM (PLS), 10X10 85 Production Schedule

Page 93: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

P-1 Item Nomenclature: Date: TRUCK, PALLETIZED LOAD SYSTEM (PLS), 10X10 (D16500) February 2005 FY 08 / 09 BUDGET PRODUCTION SCHEDULE Fiscal Year 08 Fiscal Year 09

Calendar Year 08 Calendar Year 09

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P R E T A L

R V 1 OCT 1 OCT F R Each TO AS OF M FY E QTY PRIOR DUE S PROC ACCEP BAL

COST ELEMENTS

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P

M PRODUCTION RATES MFR ADMINLEAD TIME MFR TOTAL REMARKS

F REACHED Number Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct

R NAME/LOCATION MIN. 1-8-5 MAX. D+ INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

1 Oshkosh Truck Corp (PLS) , Oshkosh, WI 1.00 363.00 821.00 12 1 0 3 8 11

0 4 7 11

2 Comtech Mobile Datacom , Germantown, MD 10.00 150.00 330.00 12 2 0 3 5 8

0 3 7 10 3 OTC Kewaunee Fabrication , Kewaunee, WI 1.00 15.00 40.00 12

3 0 3 8 11

0 4 7 11

4 Summa Technology Inc. , Huntsville, AL 5.00 160.00 350.00 12

4 0 3 7 10

0 3 7 10

5 Oshkosh Truck Corp (PLST) , Oshkosh, WI 1.00 20.00 40.00 12

5 0 3 8 11

0 3 7 10

6 TBS - MTS , 10.00 150.00 330.00 12

6 0 3 5 8

0 3 5 8

PLS Truck 1 FY 04 A 82 82 0 0 1 FY 05 A 31 31 0 0 1 FY 06 A 63 63 0 0 1 FY 07 A 65 15 50 5 5 5 5 6 6 6 6 6 0 PLS Trailer 5 FY 04 A 345 345 0 0 5 FY 05 A 64 64 0 0 5 FY 06 A 100 100 0 0 5 FY 07 A 102 27 75 10 10 9 9 9 9 8 6 5 0 Cargo Bed, Demountable 4 FY 04 A 698 698 0 0 4 FY 05 A 154 154 0 0 4 FY 06 A 166 166 0 0 4 FY 07 A 197 42 155 18 18 17 17 17 17 17 17 17 0 PLS Container Handling Unit 3 FY 04 A 85 85 0 0 3 FY 05 A 36 36 0 0 3 FY 06 A 429 429 0 0

DA0500 Item No. 8 Page 24 of 25 Exhibit P-21 TRUCK, PALLETIZED LOAD SYSTEM (PLS), 10X10 86 Production Schedule

Page 94: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

P-1 Item Nomenclature: Date: TRUCK, PALLETIZED LOAD SYSTEM (PLS), 10X10 (D16500) February 2005 FY 08 / 09 BUDGET PRODUCTION SCHEDULE Fiscal Year 08 Fiscal Year 09

Calendar Year 08 Calendar Year 09

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P R E T A L

R V 1 OCT 1 OCT F R Each TO AS OF M FY E QTY PRIOR DUE S PROC ACCEP BAL

COST ELEMENTS

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P

M PRODUCTION RATES MFR ADMINLEAD TIME MFR TOTAL REMARKS

F REACHED Number Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct

R NAME/LOCATION MIN. 1-8-5 MAX. D+ INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

1 Oshkosh Truck Corp (PLS) , Oshkosh, WI 1.00 363.00 821.00 12 1 0 3 8 11

0 4 7 11

2 Comtech Mobile Datacom , Germantown, MD 10.00 150.00 330.00 12 2 0 3 5 8

0 3 7 10 3 OTC Kewaunee Fabrication , Kewaunee, WI 1.00 15.00 40.00 12

3 0 3 8 11

0 4 7 11

4 Summa Technology Inc. , Huntsville, AL 5.00 160.00 350.00 12

4 0 3 7 10

0 3 7 10

5 Oshkosh Truck Corp (PLST) , Oshkosh, WI 1.00 20.00 40.00 12

5 0 3 8 11

0 3 7 10

6 TBS - MTS , 10.00 150.00 330.00 12

6 0 3 5 8

0 3 5 8

3 FY 07 A 211 51 160 18 18 18 18 18 18 18 17 17 0 Movement Tracking System 2 FY 04 A 571 571 0 0 2 FY 04 A 537 537 0 0 2 FY 05 A 2388 2388 0 0 6 FY 06 A 1170 1170 0 0 6 FY 07 A 3484 1450 2034 291 291 291 291 290 290 290 0

Total 10978 8504 2474 342 342 340 340 340 340 339 46 45

DA0500 (D16500) Item No. 8 Page 25 of 25 Exhibit P-21 TRUCK, PALLETIZED LOAD SYSTEM (PLS), 10X10 87 Production Schedule

Page 95: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-40, Budget Item Justification Sheet Date: February 2005 Appropriation/Budget Activity/Serial No: Other Procurement, Army /1/Tactical and support vehicles P-1 Item Nomenclature ARMORED SECURITY VEHICLES (ASV) (D02800) Program Elements for Code B Items: Code: Other Related Program Elements: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 To Complete Total Prog Proc Qty

Gross Cost

Less PY Adv Proc

Plus CY Adv Proc

Net Proc (P-1)

Initial Spares

Total Proc Cost

Flyaway U/C

Wpn Sys Proc U/C

79 23 53 5 160

59.5 17.0 41.5 4.8 122.9

59.5 17.0 41.5 4.8 122.9

59.5 17.0 41.5 4.8 122.9

0.9 1.1

Description: The Armored Security Vehicle (ASV) is an all-wheel drive armored vehicle that provides ballistic protection, overhead protection and protection against landmines. The ASV accepts the MK-19 Grenade Machine Gun, the M-2 .50 caliber machine gun and the M249 5.56 mm Squad Automatic Weapon (SAW) machine gun. The ASV is transportable by C-130 and larger aircraft, rail, and marine transport modes, and is capable of carrying a crew of four. The vehicle has a diesel engine, automatic transmission, central tire inflation system, and a payload of 3,360 lbs. Additional survivability enhancements include: gas particulate ventilated face pieces, a multi-salvo smoke grenade launcher, a crew/engine compartment fire suppression system, an intercom system with radio interface, seamless armor and blackout capability. Justification: The FY06/07 ASV program is not funded. The ASV is used by the Military Police (MP) to perform missions of security, battlefield circulation and law and order across the entire operational continuum. The MPs conduct force protection and stabilization operations in a war environment. The revised Army Acquisition Objective (AAO) is 1,940.

D02800 Item No. 9 Page 1 of 5 Exhibit P-40 ARMORED SECURITY VEHICLES (ASV) 88 Budget Item Justification Sheet

Page 96: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-5, Weapon Appropriation/Budget Activity/Serial No. P-1 Line Item Nomenclature: Weapon System Type: Date: Other Procurement, Army / 1 / ARMORED SECURITY VEHICLES (ASV) (D02800) February 2005 Tactical and support vehicles OPA1 Cost Analysis

OPA1 ID FY 04 FY 05 FY 06 FY 07 Cost Elements CD TotalCost Qty UnitCost TotalCost Qty UnitCost TotalCost Qty UnitCost TotalCost Qty UnitCost

$000 Units $000 $000 Units $000 $000 Units $000 $000 Units $000

Vehicle A 33374 53 630 3150 5 630 Engineering Changes 114 50 Non-Recurring Cost Testing - Govt 200 91 Documentation 25 10 System Technical Support (STS) 1213 346 Engineering Spt (In-House) 220 113 Kits 1921 50 Fielding Support 297 335 Facilitization of Contract 3900 Project Management Support 266 636

Total 41530 4781

D02800 Item No. 9 Page 2 of 5 Exhibit P-5 ARMORED SECURITY VEHICLES (ASV) 89 Weapon System Cost Analysis

Page 97: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Date: Exhibit P-5a, Budget Procurement History and Planning February 2005

Appropriation/Budget Activity/Serial No: Weapon System Type: P-1 Line Item Nomenclature: Other Procurement, Army / 1 / Tactical and support vehicles ARMORED SECURITY VEHICLES (ASV) (D02800)

WBS Cost Elements: Contractor and Location Contract Location of PCO Award Date Date of First QTY Unit Cost Specs Date RFP Issue Method Avail Revsn Date

REMARKS:

and Type Delivery Each $ Now? Avail

Vehicle FY 2004 Textron Marine & Land Systems SS/Option TACOM, Warren, MI Nov 03 Jan 05 5 572 Yes N/A N/A New Orleans, LA FY 2004 Textron Marine & Land Systems SS/Option TACOM, Warren, MI Jun 04 Apr 05 25 563 Yes N/A N/A New Orleans, LA FY 2004 Textron Marine & Land Systems SS/Option TACOM, Warren, MI Sep 04 Jun 05 23 715 Yes N/A N/A New Orleans, LA FY 2005 Textron Marine & Land Systems SS/Option TACOM, Warren, MI Nov 04 Aug 05 5 630 Yes N/A N/A New Orleans, LA

D02800 Item No. 9 Page 3 of 5 Exhibit P-5a ARMORED SECURITY VEHICLES (ASV) 90 Procurement History and Planning

Page 98: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

P-1 Item Nomenclature: Date: ARMORED SECURITY VEHICLES (ASV) (D02800) February 2005 FY 03 / 04 BUDGET PRODUCTION SCHEDULE Fiscal Year 03 Fiscal Year 04

Calendar Year 03 Calendar Year 04

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P R E T A L

R V 1 OCT 1 OCT F R Units TO AS OF M FY E QTY PRIOR DUE S PROC ACCEP BAL

COST ELEMENTS

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P

M PRODUCTION RATES MFR ADMINLEAD TIME MFR TOTAL REMARKS

F REACHED Number Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct

R NAME/LOCATION MIN. 1-8-5 MAX. D+ INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

1 Textron Marine & Land Systems , New Orleans, LA 1.00 8.00 36.00 0 1 0 3 20 23

0 2 9 11

Vehicle 1 FY 04 A 5 0 5 A 5 1 FY 04 A 25 0 25 A 25 1 FY 04 A 23 0 23 A 23 1 FY 05 A 5 0 5 5

Total 58 58 58

D02800 Item No. 9 Page 4 of 5 Exhibit P-21 ARMORED SECURITY VEHICLES (ASV) 91 Production Schedule

Page 99: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

P-1 Item Nomenclature: Date: ARMORED SECURITY VEHICLES (ASV) (D02800) February 2005 FY 05 / 06 BUDGET PRODUCTION SCHEDULE Fiscal Year 05 Fiscal Year 06

Calendar Year 05 Calendar Year 06

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P R E T A L

R V 1 OCT 1 OCT F R Units TO AS OF M FY E QTY PRIOR DUE S PROC ACCEP BAL

COST ELEMENTS

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P

M PRODUCTION RATES MFR ADMINLEAD TIME MFR TOTAL REMARKS

F REACHED Number Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct

R NAME/LOCATION MIN. 1-8-5 MAX. D+ INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

1 Textron Marine & Land Systems , New Orleans, LA 1.00 8.00 36.00 0 1 0 3 20 23

0 2 9 11

Vehicle 1 FY 04 A 5 0 5 1 2 2 0 1 FY 04 A 25 0 25 11 11 3 0 1 FY 04 A 23 0 23 8 5 5 5 0 1 FY 05 A 5 0 5 A 3 2 0

Total 58 58 1 2 2 11 11 11 5 8 7

D02800 Item No. 9 Page 5 of 5 Exhibit P-21 ARMORED SECURITY VEHICLES (ASV) 92 Production Schedule

Page 100: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-40, Budget Item Justification Sheet Date: February 2005 Appropriation/Budget Activity/Serial No: Other Procurement, Army /1/Tactical and support vehicles P-1 Item Nomenclature CASSPIR (D02903) Program Elements for Code B Items: Code: Other Related Program Elements: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 To Complete Total Prog Proc Qty

Gross Cost

Less PY Adv Proc

Plus CY Adv Proc

Net Proc (P-1)

Initial Spares

Total Proc Cost

Flyaway U/C

Wpn Sys Proc U/C

1.7 1.7

1.7 1.7

1.7 1.7

Description: This budget line was used to procure foreign vehicles for use in the Global War On Terrorism (GWOT). The Buffalo Mine Protected Clearance Vehicle is a six wheeled armor vehicle with a remote hydraulic boom arm for detecting and clearing mines and Improvised Explosive Devices (IEDs). The Alvis RG-31 Medium Mine Protected Vehicle is used for command and control of route and area clearance missions and for VIP operations. The vehicles provide mine protection to vehicle occupants. The mine proof vehicle consists of a mine protected hull/body. It provides a high degree of safety in respect to collision or vehicle roll over.

D02903 Item No. 10 Page 1 of 1 Exhibit P-40 CASSPIR 93 Budget Item Justification Sheet

Page 101: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-40, Budget Item Justification Sheet Date: February 2005 Appropriation/Budget Activity/Serial No: Other Procurement, Army /1/Tactical and support vehicles P-1 Item Nomenclature TRUCK, TRACTOR, LINE HAUL, M915/M916 (DA0600) Program Elements for Code B Items: Code: Other Related Program Elements: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 To Complete Total Prog Proc Qty

Gross Cost

Less PY Adv Proc

Plus CY Adv Proc

Net Proc (P-1)

Initial Spares

Total Proc Cost

Flyaway U/C

Wpn Sys Proc U/C

358 249 165 80 50 33 34 45 1014

551.5 46.4 41.1 30.2 17.1 11.6 8.4 8.6 11.7 726.7

551.5 46.4 41.1 30.2 17.1 11.6 8.4 8.6 11.7 726.7

0.5 0.5

552.0 46.4 41.1 30.2 17.1 11.6 8.4 8.6 11.7 727.2

0.1 0.2 0.2 0.2 0.2 0.3 0.3 0.3

Description: This is the roll-up BLIN for D15900, Truck, Tractor Line Haul (M915A3) and D19601, Truck, Tractor, Light Equipment Transporter (LET)(M916A3). These two tractors share common components, such as the cab, engine, and transmission, to form a family of vehicles. Justification: The FY06/07 M915/916 funding will procure 130 new trucks to modernize the current Army fleet and support activation of new National Guard and Army Reserve units. These new petroleum companies will add necessary fuel handling capability to support the modern battlefield. Without these new trucks, the petroleum units will be activated with Tanker Trailers and no trucks to haul them, thus causing a severe deficiency in supplying fuel to support transport. The current trucks are currently experiencing mission capable rates below the assigned Army goal and are difficult and expensive to support due to their age. The new M915A3/M916A3 Truck Tractors will significantly improve readiness because several new commercial truck technologies have been or will be incorporated in these tractors. Some examples are Collision Warning System, Lube-Free Drive Shaft, Low-Lube Fifth Wheel,and Electronic Transmission. The Approved Acquisition Objective for the M915 is 6,026; the Approved Acquisition Objective for the M916 is 2,358.

DA0600 Item No. 11 Page 1 of 14 Exhibit P-40 TRUCK, TRACTOR, LINE HAUL, M915/M916 94 Budget Item Justification Sheet

Page 102: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-5, Weapon Appropriation/Budget Activity/Serial No. P-1 Line Item Nomenclature: Weapon System Type: Date: Other Procurement, Army / 1 / TRUCK, TRACTOR, LINE HAUL, M915/M916 (DA0600) February 2005 Tactical and support vehicles OPA1 Cost Analysis

OPA1 ID FY 04 FY 05 FY 06 FY 07 Cost Elements CD TotalCost Qty UnitCost TotalCost Qty UnitCost TotalCost Qty UnitCost TotalCost Qty UnitCost

$000 Units $000 $000 Units $000 $000 Units $000 $000 Units $000

Trk, Tractor, Line Haul, M915A3 (D15900) 24670 167 17845 115 6192 31 4460 20 Truck, Tractor, LET, M916A3 (D19601) 16396 82 12352 50 10871 49 7164 30

Total 41066 30197 17063 11624

DA0600 Item No. 11 Page 2 of 14 Exhibit P-5 TRUCK, TRACTOR, LINE HAUL, M915/M916 95 Weapon System Cost Analysis

Page 103: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-40, Budget Item Justification Sheet Date: February 2005 Appropriation/Budget Activity/Serial No: Other Procurement, Army /1/Tactical and support vehicles P-1 Item Nomenclature TRUCK, TRACTOR, LINE HAUL, M915A2 (D15900) Program Elements for Code B Items: Code: Other Related Program Elements: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 To Complete Total Prog Proc Qty

Gross Cost

Less PY Adv Proc

Plus CY Adv Proc

Net Proc (P-1)

Initial Spares

Total Proc Cost

Flyaway U/C

Wpn Sys Proc U/C

6929 320 167 115 31 20 4 7586

495.4 38.9 24.7 17.8 6.2 4.5 1.2 588.6

495.4 38.9 24.7 17.8 6.2 4.5 1.2 588.6

0.2 0.2

495.6 38.9 24.7 17.8 6.2 4.5 1.2 588.8

0.2 0.1 0.0 0.2 0.2 0.3

Description: The M915A3 Line Haul Tractor is a Non-Developmental Item (NDI) found primarily in medium transportation companies. It is a prime mover used to transport breakbulk, containers, water and petroleum over primary and secondary roads. It is a 6x4 tractor with a 2-inch kingpin and 105,000 Gross Combination Vehicle Weight (GCVW) capacity. The M915A3 is transportable by highway, rail, marine, and air modes worldwide. Justification: FY06/07 funding procures 51 M915A3 Line Haul Tractors that will provide prime-mover capability to newly activated Petroleum Transportation Companies which were organized as a result of a Desert Storm deficiency (inability of companies to transport large volumes of petroleum). This funding also provides vehicles to fill requirements in selected National Guard and Army Reserve units to replace overage M915A0's and M915A1's. Without these new trucks, the Army will have a severe deficiency in supplying fuel to support transport. Because the M915 Truck Tractor is experiencing operational readiness rates below the assigned Army goal and is difficult and expensive to support due to its age, the new M915A3 Truck Tractor will significantly improve readiness. Several new commercial truck technologies have been or will be incorporated in the M915A3. Some examples are Collision Warning System, Lube-Free Drive Shaft, Low-Lube Fifth Wheel, and Electronic Transmission.

DA0600 (D15900) Item No. 11 Page 3 of 14 Exhibit P-40 TRUCK, TRACTOR, LINE HAUL, M915A2 96 Budget Item Justification Sheet

Page 104: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-5, Weapon Appropriation/Budget Activity/Serial No. P-1 Line Item Nomenclature: Weapon System Type: Date: Other Procurement, Army / 1 / TRUCK, TRACTOR, LINE HAUL, M915A2 (D15900) February 2005 Tactical and support vehicles OPA1 Cost Analysis

OPA1 ID FY 04 FY 05 FY 06 FY 07 Cost Elements CD TotalCost Qty UnitCost TotalCost Qty UnitCost TotalCost Qty UnitCost TotalCost Qty UnitCost

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000

Hardware - M915A3 with FRET 7910 70 113 13455 115 117 3751 31 121 2500 20 125 Hardware - M915A3 without FRET 10961 97 113 Federal Excise Tax 1175 1615 470 315 Documentation 475 150 100 100 Logistics Support 100 100 100 50 Engineering Support 400 400 200 200 Quality Support 375 275 200 200 Program Management Support 850 475 450 400 Engineering Change Proposals 499 375 276 195 System Fielding Support 775 325 200 200 Special Tools 700 375 275 150 FSR Support 450 300 170 150

Total 24670 17845 6192 4460

DA0600 (D15900) Item No. 11 Page 4 of 14 Exhibit P-5 TRUCK, TRACTOR, LINE HAUL, M915A2 97 Weapon System Cost Analysis

Page 105: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Date: Exhibit P-5a, Budget Procurement History and Planning February 2005

Appropriation/Budget Activity/Serial No: Weapon System Type: P-1 Line Item Nomenclature: Other Procurement, Army / 1 / Tactical and support vehicles TRUCK, TRACTOR, LINE HAUL, M915A2 (D15900)

WBS Cost Elements: Contractor and Location Contract Location of PCO Award Date Date of First QTY Unit Cost Specs Date RFP Issue Method Avail Revsn Date

REMARKS:

and Type Delivery Each $ Now? Avail

Hardware - M915A3 with FRET FY 2004 Freightliner Corporation CFP RQ7 4 TACOM, Warren, MI Nov 03 May 04 55 113 YES N/A N/A Portland, OR FY 2004 Freightliner Corporation CFP RQ7 4 TACOM, Warren, MI May 04 Nov 04 9 113 YES N/A N/A Portland, OR FY 2004 Freightliner Corporation CFP RQ7 4 TACOM, Warren, MI Mar 04 Sep 04 6 113 YES N/A N/A Portland, OR FY 2005 Freightliner Corporation CFP RQ7 5 TACOM, Warren, MI Jan 05 Jul 05 105 117 YES N/A N/A Portland, OR FY 2005 Freightliner Corporation CFP RQ7 5 TACOM, Warren, MI Apr 05 Sep 05 10 117 YES N/A N/A Portland, OR FY 2006 Freightliner Corporation CFP RQ7 6 TACOM, Warren, MI Dec 05 Jun 06 31 121 YES N/A N/A Portland, OR FY 2007 Freightliner Corporation CFP RQ7 7 TACOM, Warren, MI Dec 06 Jun 07 20 125 YES N/A N/A Portland, OR Hardware - M915A3 without FRET FY 2004 Freightliner Corporation CFP RQ7 4 TACOM, Warren, MI Nov 03 May 04 78 113 YES N/A N/A Portland, OR FY 2004 Freightliner Corporation CFP RQ7 4 TACOM, Warren, MI Dec 03 Jun 04 13 113 YES N/A N/A Portland, OR FY 2004 Freightliner Corporation CFP RQ7 4 TACOM, Warren, MI Feb 04 Aug 04 6 113 YES N/A N/A Portland, OR

DA0600 (D15900) Item No. 11 Page 5 of 14 Exhibit P-5a TRUCK, TRACTOR, LINE HAUL, M915A2 98 Procurement History and Planning

Page 106: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

P-1 Item Nomenclature: Date: TRUCK, TRACTOR, LINE HAUL, M915A2 (D15900) February 2005 FY 04 / 05 BUDGET PRODUCTION SCHEDULE Fiscal Year 04 Fiscal Year 05

Calendar Year 04 Calendar Year 05

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P R E T A L

R V 1 OCT 1 OCT F R Each TO AS OF M FY E QTY PRIOR DUE S PROC ACCEP BAL

COST ELEMENTS

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P

M PRODUCTION RATES MFR ADMINLEAD TIME MFR TOTAL REMARKS

The production schedule shown above is for one of two body styles in the M915 Family of Vehicles. The M915 Family Of Vehicles are produced together with the commercial production which runs at an average of 40 per day or more.

F REACHED Number Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct

R NAME/LOCATION MIN. 1-8-5 MAX. D+ INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

1 Freightliner Corporation , Portland, OR 8.00 88.00 90.00 3 1 0 2 6 8

0 2 6 8

Hardware - M915A3 with FRET 1 FY 04 A 55 0 55 A 10 10 10 10 15 0 1 FY 04 A 9 0 9 A 9 0 1 FY 04 A 6 0 6 A 6 0 1 FY 05 A 105 0 105 A 20 20 20 45 1 FY 05 A 10 0 10 A 10 0 1 FY 06 A 31 0 31 31 1 FY 07 A 20 0 20 20 1 FY 04 AR 48 0 48 A 28 20 0 1 FY 04 AR 3 0 3 A 3 0 Hardware - M915A3 without FRET 1 FY 04 A 78 0 78 A 20 20 20 18 0 1 FY 04 A 13 0 13 A 13 0 1 FY 04 A 6 0 6 A 6 0 1 FY 04 AR 71 0 71 A 15 15 15 15 11 0 1 FY 05 AR 19 0 19 A 19 0 1 FY 05 FMS 50 0 50 A 25 25 1 FY 04 NA 20 0 20 A 20 0 1 FY 04 NA 6 0 6 A 6 0

DA0600 Item No. 11 Page 6 of 14 Exhibit P-21 TRUCK, TRACTOR, LINE HAUL, M915A2 99 Production Schedule

Page 107: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

P-1 Item Nomenclature: Date: TRUCK, TRACTOR, LINE HAUL, M915A2 (D15900) February 2005 FY 04 / 05 BUDGET PRODUCTION SCHEDULE Fiscal Year 04 Fiscal Year 05

Calendar Year 04 Calendar Year 05

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P R E T A L

R V 1 OCT 1 OCT F R Each TO AS OF M FY E QTY PRIOR DUE S PROC ACCEP BAL

COST ELEMENTS

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P

M PRODUCTION RATES MFR ADMINLEAD TIME MFR TOTAL REMARKS

The production schedule shown above is for one of two body styles in the M915 Family of Vehicles. The M915 Family Of Vehicles are produced together with the commercial production which runs at an average of 40 per day or more.

F REACHED Number Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct

R NAME/LOCATION MIN. 1-8-5 MAX. D+ INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

1 Freightliner Corporation , Portland, OR 8.00 88.00 90.00 3 1 0 2 6 8

0 2 6 8

1 FY 04 NA 10 0 10 A 10 0

Total 560 560 30 63 36 34 21 43 47 15 15 21 39 20 55 121

DA0600 (D15900) Item No. 11 Page 7 of 14 Exhibit P-21 TRUCK, TRACTOR, LINE HAUL, M915A2 100 Production Schedule

Page 108: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

P-1 Item Nomenclature: Date: TRUCK, TRACTOR, LINE HAUL, M915A2 (D15900) February 2005 FY 06 / 07 BUDGET PRODUCTION SCHEDULE Fiscal Year 06 Fiscal Year 07

Calendar Year 06 Calendar Year 07

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P R E T A L

R V 1 OCT 1 OCT F R Each TO AS OF M FY E QTY PRIOR DUE S PROC ACCEP BAL

COST ELEMENTS

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P

M PRODUCTION RATES MFR ADMINLEAD TIME MFR TOTAL REMARKS

The production schedule shown above is for one of two body styles in the M915 Family of Vehicles. The M915 Family Vehicles are produced together with the commercial production which runs at an average of 40 per day or more.

F REACHED Number Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct

R NAME/LOCATION MIN. 1-8-5 MAX. D+ INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

1 Freightliner Corporation , Portland, OR 8.00 88.00 90.00 3 1 0 2 6 8

0 2 6 8

Hardware - M915A3 with FRET 1 FY 04 A 55 55 0 0 1 FY 04 A 9 9 0 0 1 FY 04 A 6 6 0 0 1 FY 05 A 105 60 45 20 25 0 1 FY 05 A 10 10 0 0 1 FY 06 A 31 0 31 A 31 0 1 FY 07 A 20 0 20 A 20 0 1 FY 04 AR 48 48 0 0 1 FY 04 AR 3 3 0 0 Hardware - M915A3 without FRET 1 FY 04 A 78 78 0 0 1 FY 04 A 13 13 0 0 1 FY 04 A 6 6 0 0 1 FY 04 AR 71 71 0 0 1 FY 05 AR 19 19 0 0 1 FY 05 FMS 50 25 25 25 0 1 FY 04 NA 20 20 0 0 1 FY 04 NA 6 6 0 0

DA0600 Item No. 11 Page 8 of 14 Exhibit P-21 TRUCK, TRACTOR, LINE HAUL, M915A2 101 Production Schedule

Page 109: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

P-1 Item Nomenclature: Date: TRUCK, TRACTOR, LINE HAUL, M915A2 (D15900) February 2005 FY 06 / 07 BUDGET PRODUCTION SCHEDULE Fiscal Year 06 Fiscal Year 07

Calendar Year 06 Calendar Year 07

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P R E T A L

R V 1 OCT 1 OCT F R Each TO AS OF M FY E QTY PRIOR DUE S PROC ACCEP BAL

COST ELEMENTS

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P

M PRODUCTION RATES MFR ADMINLEAD TIME MFR TOTAL REMARKS

The production schedule shown above is for one of two body styles in the M915 Family of Vehicles. The M915 Family Vehicles are produced together with the commercial production which runs at an average of 40 per day or more.

F REACHED Number Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct

R NAME/LOCATION MIN. 1-8-5 MAX. D+ INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

1 Freightliner Corporation , Portland, OR 8.00 88.00 90.00 3 1 0 2 6 8

0 2 6 8

1 FY 04 NA 10 10 0 0

Total 560 439 121 45 25 31 20

DA0600 (D15900) Item No. 11 Page 9 of 14 Exhibit P-21 TRUCK, TRACTOR, LINE HAUL, M915A2 102 Production Schedule

Page 110: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-40, Budget Item Justification Sheet Date: February 2005 Appropriation/Budget Activity/Serial No: Other Procurement, Army /1/Tactical and support vehicles P-1 Item Nomenclature TRUCK, TRAC, LT EQ TRANS, 6 X 6, M916A1 (D19601) Program Elements for Code B Items: Code: Other Related Program Elements: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 To Complete Total Prog Proc Qty

Gross Cost

Less PY Adv Proc

Plus CY Adv Proc

Net Proc (P-1)

Initial Spares

Total Proc Cost

Flyaway U/C

Wpn Sys Proc U/C

789 38 82 50 49 30 29 34 45 1146

56.1 7.6 16.4 12.4 10.9 7.2 7.2 8.6 11.7 138.0

56.1 7.6 16.4 12.4 10.9 7.2 7.2 8.6 11.7 138.0

0.3 0.3

56.4 7.6 16.4 12.4 10.9 7.2 7.2 8.6 11.7 138.3

0.2 0.2 0.2 0.2 0.2 0.2 0.3 0.3

Description: The M916A3 Light Equipment Transporter (LET) is a 68,000 Gross Vehicle Weight (GVW) tractor with a 3-1/2-inch, 40,000-pound capacity Compensator Fifth Wheel. It has an electronic diesel engine, automatic electronic transmission, anti-lock brakes, air conditioning, and is capable of operating at speeds up to 55-mph. The M916A3 Truck Tractor LET is used primarily in engineering units to tow the 40-ton M870/M870A1 lowbed semi-trailer resulting in a Gross Combination Vehicle Weight (GCVW) rating of 130,000-pounds. The M916A3 transports engineer construction equipment in the local, line haul, and maintenance evacuation missions over a 50% primary, 45% secondary, and 5% off-road mission profile. Justification: FY06/07 funding procures 79 M916A3 Truck Tractors that will replace 18-20 year old M916 Truck Tractors in the War Reserves, newly activated Petroleum, Oil, and Lubricant (POL) Supply Companies, Fire Truck Companies, and Engineer Battalions. The Approved Acquisition Objective is 2,358.

DA0600 (D19601) Item No. 11 Page 10 of 14 Exhibit P-40 TRUCK, TRAC, LT EQ TRANS, 6 X 6, M916A1 103 Budget Item Justification Sheet

Page 111: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-5, Weapon Appropriation/Budget Activity/Serial No. P-1 Line Item Nomenclature: Weapon System Type: Date: Other Procurement, Army / 1 / TRUCK, TRAC, LT EQ TRANS, 6 X 6, M916A1 (D19601) February 2005 Tactical and support vehicles OPA1 Cost Analysis

OPA1 ID FY 04 FY 05 FY 06 FY 07 Cost Elements CD TotalCost Qty UnitCost TotalCost Qty UnitCost TotalCost Qty UnitCost TotalCost Qty UnitCost

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000

Hardware - M916A3 w/o FRET 5940 36 165 Hardware - M916A3 w/FRET 7590 46 165 8650 50 173 8771 49 179 5550 30 185 Federal Excise Tax 915 1038 1050 666 Program Management Support 400 400 250 250 Engineering Change Proposals 351 414 100 98 System Fielding Support 250 375 125 75 Quality Support 200 200 125 100 Documentation 100 100 100 75 Engineering Support 175 325 100 100 Logistics Support 125 250 100 75 Special Tools 225 325 100 100 FSR Support 125 275 50 75

Total 16396 12352 10871 7164

DA0600 (D19601) Item No. 11 Page 11 of 14 Exhibit P-5 TRUCK, TRAC, LT EQ TRANS, 6 X 6, M916A1 104 Weapon System Cost Analysis

Page 112: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Date: Exhibit P-5a, Budget Procurement History and Planning February 2005

Appropriation/Budget Activity/Serial No: Weapon System Type: P-1 Line Item Nomenclature: Other Procurement, Army / 1 / Tactical and support vehicles TRUCK, TRAC, LT EQ TRANS, 6 X 6, M916A1 (D19601)

WBS Cost Elements: Contractor and Location Contract Location of PCO Award Date Date of First QTY Unit Cost Specs Date RFP Issue Method Avail Revsn Date

REMARKS:

and Type Delivery Each $ Now? Avail

Hardware - M916A3 w/o FRET FY 2004 Freightliner Corporation CFPRQ7 4 TACOM, Warren, MI Nov 03 May 04 36 165 YES N/A N/A Portland, OR Hardware - M916A3 w/FRET FY 2004 Freightliner Corporation CFPRQ7 4 TACOM, Warren, MI Nov 03 May 04 46 165 YES N/A N/A Portland, OR FY 2005 Freightliner Corporation CFP RQ7 5 TACOM, Warren, MI Jan 05 Jul 05 42 173 YES N/A N/A Portland, OR FY 2005 Freightliner Corporation CFP RQ7 5 TACOM, Warren, MI Apr 05 Sep 05 8 173 YES N/A N/A Portland, OR FY 2006 Freightliner Corporation CFPRQ7 6 TACOM, Warren, MI Dec 05 Jun 06 49 179 YES N/A N/A Portland, OR FY 2007 Freightliner Corporation CFPRQ7 7 TACOM, Warren, MI Dec 06 Jun 07 30 185 YES N/A N/A Portland, OR

DA0600 (D19601) Item No. 11 Page 12 of 14 Exhibit P-5a TRUCK, TRAC, LT EQ TRANS, 6 X 6, M916A1 105 Procurement History and Planning

Page 113: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

P-1 Item Nomenclature: Date: TRUCK, TRAC, LT EQ TRANS, 6 X 6, M916A1 (D19601) February 2005 FY 04 / 05 BUDGET PRODUCTION SCHEDULE Fiscal Year 04 Fiscal Year 05

Calendar Year 04 Calendar Year 05

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P R E T A L

R V 1 OCT 1 OCT F R Each TO AS OF M FY E QTY PRIOR DUE S PROC ACCEP BAL

COST ELEMENTS

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P

M PRODUCTION RATES MFR ADMINLEAD TIME MFR TOTAL REMARKS

The production schedule shown above is for one of two body styles in the M915 Family of Vehicles. The M915 Family of Vehicles are produced together with the commercial production which runs at an average of 40 per day or more.

F REACHED Number Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct

R NAME/LOCATION MIN. 1-8-5 MAX. D+ INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

1 Freightliner Corporation , Portland, OR 8.00 88.00 90.00 3 1 0 2 6 8

0 2 6 8

Hardware - M916A3 w/o FRET 1 FY 04 A 36 0 36 A 18 18 0 Hardware - M916A3 w/FRET 1 FY 04 A 46 0 46 A 23 23 0 1 FY 05 A 8 0 8 A 8 0 1 FY 05 A 42 0 42 A 20 22 0 1 FY 06 A 49 0 49 49 1 FY 07 A 30 0 30 30 1 FY 04 FMS 20 0 20 A 20 0

Total 231 231 41 41 20 20 22 8 79

DA0600 (D19601) Item No. 11 Page 13 of 14 Exhibit P-21 TRUCK, TRAC, LT EQ TRANS, 6 X 6, M916A1 106 Production Schedule

Page 114: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

P-1 Item Nomenclature: Date: TRUCK, TRAC, LT EQ TRANS, 6 X 6, M916A1 (D19601) February 2005 FY 06 / 07 BUDGET PRODUCTION SCHEDULE Fiscal Year 06 Fiscal Year 07

Calendar Year 06 Calendar Year 07

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P R E T A L

R V 1 OCT 1 OCT F R Each TO AS OF M FY E QTY PRIOR DUE S PROC ACCEP BAL

COST ELEMENTS

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P

M PRODUCTION RATES MFR ADMINLEAD TIME MFR TOTAL REMARKS

The production schedule shown above is for one of two body styles in the M915 Family of Vehicles. The M915 Family of Vehicles are produced together with the commercial production which runs at an average of 40 per day or more.

F REACHED Number Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct

R NAME/LOCATION MIN. 1-8-5 MAX. D+ INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

1 Freightliner Corporation , Portland, OR 8.00 88.00 90.00 3 1 0 2 6 8

0 2 6 8

Hardware - M916A3 w/o FRET 1 FY 04 A 36 36 0 0 Hardware - M916A3 w/FRET 1 FY 04 A 46 46 0 0 1 FY 05 A 8 8 0 0 1 FY 05 A 42 42 0 0 1 FY 06 A 49 0 49 A 15 15 19 0 1 FY 07 A 30 0 30 A 15 15 0 1 FY 04 FMS 20 20 0 0

Total 231 152 79 15 15 19 15 15

DA0600 (D19601) Item No. 11 Page 14 of 14 Exhibit P-21 TRUCK, TRAC, LT EQ TRANS, 6 X 6, M916A1 107 Production Schedule

Page 115: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-40, Budget Item Justification Sheet Date: February 2005 Appropriation/Budget Activity/Serial No: Other Procurement, Army /1/Tactical and support vehicles P-1 Item Nomenclature TRUCK, TRACTOR, YARD TYPE, M878 (C/S) (D16000) Program Elements for Code B Items: Code: Other Related Program Elements: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 To Complete Total Prog Proc Qty

Gross Cost

Less PY Adv Proc

Plus CY Adv Proc

Net Proc (P-1)

Initial Spares

Total Proc Cost

Flyaway U/C

Wpn Sys Proc U/C

298 28 27 353

20.4 4.7 4.4 29.6

20.4 4.7 4.4 29.6

20.4 4.7 4.4 29.6

0.2 0.2

Description: The Truck Tractor, Yard Type, M878A2 is primarily used to transport semi-trailers loaded with containers of break bulk cargo within fixed ports, on prepared beaches during Logistics-Over-The-Shore (LOTS) operations, and in trailer transfer areas (ports, beaches, forward supply areas, railhead operations, cargo handling areas and in/near air terminal fields). These trucks are also required to transport containerized cargo from port facilities to transfer points for line haul operations. The vehicle is a highly maneuverable commercial tractor with an automatic locking, hydraulic-lock fifth wheel, which facilitates semi-trailer coupling and disengagement and allows movement of the semi-trailers/chassis without retracting the landing legs. It is capable of moving loads weighing up to 88,000 pounds. Justification: FY04 is the last year of funding for the M878A2 Yard Tractor.

D16000 Item No. 12 Page 1 of 1 Exhibit P-40 TRUCK, TRACTOR, YARD TYPE, M878 (C/S) 108 Budget Item Justification Sheet

Page 116: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-40, Budget Item Justification Sheet Date: February 2005 Appropriation/Budget Activity/Serial No: Other Procurement, Army /1/Tactical and support vehicles P-1 Item Nomenclature HVY EXPANDED MOBILE TACTICAL TRUCK EXT SERV PROG (DV0021) Program Elements for Code B Items: Code: Other Related Program Elements: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 To Complete Total Prog Proc Qty

Gross Cost

Less PY Adv Proc

Plus CY Adv Proc

Net Proc (P-1)

Initial Spares

Total Proc Cost

Flyaway U/C

Wpn Sys Proc U/C

403 632 129 92 189 591 794 822 834 708 5194

67.5 119.3 24.7 19.1 40.7 136.9 184.8 201.7 213.8 189.2 1197.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

67.5 119.3 24.7 19.1 40.7 136.9 184.8 201.7 213.8 189.2 1197.6

67.5 119.3 24.7 19.1 40.7 136.9 184.8 201.7 213.8 189.2 1197.6

0.2 0.2 0.1 0.4 0.2 0.2 0.2 0.3 0.3

Description: The Heavy Expanded Mobility Tactical Truck Extended Service Program (HEMTT-ESP) is a Vice Chief of Staff of The Army (VCSA) approved RECAP program and is critical to the effort to increase HEMTT fleet readiness, reduce O&S costs, and modernize the fleet. HEMTT ESP supports modularity by remanufacturing and upgrading existing HEMTT vehicles with insertion of new technologies to reduce the logistics burden and reduce life cycle costs. HEMTT ESP is critical because it is the primary source of M1120A2R1 HEMTT Load Handling System (LHS) variants, which reduce the logistics footprint on the battlefield and is critical to the Army's evolving transportation-based, just-in-time supply system. HEMTT LHS is a "must have" Combat Service Support (CSS) enabler in both the Stryker Bridgade Combat Team (SBCT) and the Modular Brigades, providing C130 transportability and modular delivery of fuel, ammunition and other classes of supply in forward areas. The ESP program reduces emissions, improves fuel economy, increases reliability, and improves safety and performance. These upgrades include a new electronically-controlled engine and transmission, bolt-together wheels, increased corrosion prevention, and 4-point seatbelts. This program produces a "like-new" vehicle with a full new vehicle warranty. Justification: FY06/07 procure upgrades for 780 HEMTT variants, including 87 M984A2R1 Wreckers, 185 M1120A2R1 LHSs, 377 M978A2R1 Tankers, 90 M983A2R1 Tractors, and 41 M977/M985 Cargo variants. This completes the upgrade of two PATRIOT Battalions, fills SBCT #5 and 6; supports upgrades to modular brigades, as well as interchange requirements for M1120A2R1 HEMTT LHS.

DV0021 Item No. 13 Page 1 of 6 Exhibit P-40 HVY EXPANDED MOBILE TACTICAL TRUCK EXT SERV PROG 109 Budget Item Justification Sheet

Page 117: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-5, Weapon Appropriation/Budget Activity/Serial No. P-1 Line Item Nomenclature: Weapon System Type: Date: Other Procurement, Army / 1 / HVY EXPANDED MOBILE TACTICAL TRUCK EXT SERV February 2005 Tactical and support vehicles PROG (DV0021) OPA1 Cost Analysis

OPA1 ID FY 04 FY 05 FY 06 FY 07 Cost Elements CD TotalCost Qty UnitCost TotalCost Qty UnitCost TotalCost Qty UnitCost TotalCost Qty UnitCost

$000 Each $000 $000 Each $000 $000 Each $000 $000 Each $000

1. Hardware HEMTT ESP M984A2R1 Wrecker 1597 7 228 2541 11 231 18240 76 240 HEMTT ESP M978A2R1 Tanker 8416 38 221 77334 339 228 HEMTT ESP M1022A2R1 LHS 10450 62 169 5965 33 181 14674 80 183 19838 105 189 HEMTT ESP M983A2R1 Tractor 6599 44 150 5959 37 162 7461 45 166 7685 45 171 HEMTT M977 EPP 987 7 141 764 5 153 786 5 157 810 5 162 HEMTT M977 LRPT 817 5 163 882 5 176 908 5 182 HEMTT M977A2R1 Cargo 972 6 162 850 5 170 1982 11 180 HEMTT ESP M985E1 GMT 1093 5 219 1167 5 233 1202 5 240 1237 5 247 Subtotal 20918 16302 35962 128034 2. Engineering Changes 866 483 985 2500 3. Government Testing 150 75 215 220 4. Documentation 50 175 350 250 5. Engineering Support - Government 179 180 182 285 6. Quality Assurance Supt - Government 200 250 138 200 7. Special Tools 61 45 195 475 8. System Fielding Support 1455 1120 1825 4060 9. PM Support 775 500 858 894

Total 24654 19130 40710 136918

DV0021 Item No. 13 Page 2 of 6 Exhibit P-5 HVY EXPANDED MOBILE TACTICAL TRUCK EXT SERV PROG 110 Weapon System Cost Analysis

Page 118: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Date: Exhibit P-5a, Budget Procurement History and Planning February 2005

Appropriation/Budget Activity/Serial No: Weapon System Type: P-1 Line Item Nomenclature: Other Procurement, Army / 1 / Tactical and support vehicles HVY EXPANDED MOBILE TACTICAL TRUCK EXT SERV PROG (DV0021)

WBS Cost Elements: Contractor and Location Contract Location of PCO Award Date Date of First QTY Unit Cost Specs Date RFP Issue Method Avail Revsn Date

REMARKS: Procurement planning underway to extend FHTV Family Contract with OTC through FY07. Unit costs are average of model mix for each year.

and Type Delivery Each $000 Now? Avail

1. Hardware FY 2004 Oshkosh Truck Corp. (OTC) SS/REQ/PY4 TACOM, Warren, MI Dec 03 Jul 04 111 161 Yes N/A N/A Oshkosh, WI FY 2004 Oshkosh Truck Corp. (OTC) SS/REQ/PY4 TACOM, Warren, MI Mar 04 Oct 04 18 175 Yes N/A N/A Oshkosh, WI FY 2005 Oshkosh Truck Corp. (OTC) SS/REQ/PY5 TACOM, Warren, MI Dec 04 Jul 05 92 177 Yes N/A N/A Oshkosh, WI FY 2006 Oshkosh Truck Corp. (OTC) SS/REQ/PY6 TACOM, Warren, MI Dec 05 Jul 06 189 190 Yes N/A N/A Oshkosh, WI FY 2007 Oshkosh Truck Corp. (OTC) SS/REQ/PY7 TACOM, Warren, MI Dec 06 Jul 07 591 216 Yes N/A N/A Oshkosh, WI

DV0021 Item No. 13 Page 3 of 6 Exhibit P-5a HVY EXPANDED MOBILE TACTICAL TRUCK EXT SERV PROG 111 Procurement History and Planning

Page 119: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

P-1 Item Nomenclature: Date: HVY EXPANDED MOBILE TACTICAL TRUCK EXT SERV PROG (DV0021) February 2005 FY 04 / 05 BUDGET PRODUCTION SCHEDULE Fiscal Year 04 Fiscal Year 05

Calendar Year 04 Calendar Year 05

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P R E T A L

R V 1 OCT 1 OCT F R Each TO AS OF M FY E QTY PRIOR DUE S PROC ACCEP BAL

COST ELEMENTS

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P

M PRODUCTION RATES MFR ADMINLEAD TIME MFR TOTAL REMARKS

Note: Government EOQ 1-8-5 production rate (363/month) accommodates mix of government and commercial production on contractor's integrated production line. Max rate (821/month) reflects contractor capacity using second shift dedicated to government production.

F REACHED Number Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct

R NAME/LOCATION MIN. 1-8-5 MAX. D+ INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

1 Oshkosh Truck Corp. (OTC) , Oshkosh, WI 1.00 363.00 821.00 12 1 0 3 8 11

0 3 7 10

HEMTT ESP Vehicles 1 FY 04 A 111 0 111 A 10 10 10 10 10 9 9 9 9 9 8 8 0 1 FY 04 A 18 0 18 A 3 3 3 3 2 2 2 0 1 FY 05 A 92 0 92 A 4 8 8 72 1 FY 06 A 189 0 189 189 1 FY 07 A 591 0 591 591

Total 1001 1001 10 10 10 13 13 12 12 11 11 11 8 8 4 8 8 852

DV0021 Item No. 13 Page 4 of 6 Exhibit P-21 HVY EXPANDED MOBILE TACTICAL TRUCK EXT SERV PROG 112 Production Schedule

Page 120: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

P-1 Item Nomenclature: Date: HVY EXPANDED MOBILE TACTICAL TRUCK EXT SERV PROG (DV0021) February 2005 FY 06 / 07 BUDGET PRODUCTION SCHEDULE Fiscal Year 06 Fiscal Year 07

Calendar Year 06 Calendar Year 07

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P R E T A L

R V 1 OCT 1 OCT F R Each TO AS OF M FY E QTY PRIOR DUE S PROC ACCEP BAL

COST ELEMENTS

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P

M PRODUCTION RATES MFR ADMINLEAD TIME MFR TOTAL REMARKS

F REACHED Number Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct

R NAME/LOCATION MIN. 1-8-5 MAX. D+ INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

1 Oshkosh Truck Corp. (OTC) , Oshkosh, WI 1.00 363.00 821.00 12 1 0 3 8 11

0 3 7 10

HEMTT ESP Vehicles 1 FY 04 A 111 111 0 0 1 FY 04 A 18 18 0 0 1 FY 05 A 92 20 72 8 8 8 8 8 8 8 8 8 0 1 FY 06 A 189 0 189 A 15 15 15 16 16 16 16 16 16 16 16 16 0 1 FY 07 A 591 0 591 A 49 49 49 444

Total 1001 149 852 8 8 8 8 8 8 8 8 8 15 15 15 16 16 16 16 16 16 16 16 16 49 49 49 444

DV0021 Item No. 13 Page 5 of 6 Exhibit P-21 HVY EXPANDED MOBILE TACTICAL TRUCK EXT SERV PROG 113 Production Schedule

Page 121: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

P-1 Item Nomenclature: Date: HVY EXPANDED MOBILE TACTICAL TRUCK EXT SERV PROG (DV0021) February 2005 FY 08 / 09 BUDGET PRODUCTION SCHEDULE Fiscal Year 08 Fiscal Year 09

Calendar Year 08 Calendar Year 09

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P R E T A L

R V 1 OCT 1 OCT F R Each TO AS OF M FY E QTY PRIOR DUE S PROC ACCEP BAL

COST ELEMENTS

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P

M PRODUCTION RATES MFR ADMINLEAD TIME MFR TOTAL REMARKS

F REACHED Number Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct

R NAME/LOCATION MIN. 1-8-5 MAX. D+ INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

1 Oshkosh Truck Corp. (OTC) , Oshkosh, WI 1.00 363.00 821.00 12 1 0 3 8 11

0 3 7 10

HEMTT ESP Vehicles 1 FY 04 A 111 111 0 0 1 FY 04 A 18 18 0 0 1 FY 05 A 92 92 0 0 1 FY 06 A 189 189 0 0 1 FY 07 A 591 147 444 49 49 49 49 49 49 50 50 50 0

Total 1001 557 444 49 49 49 49 49 49 50 50 50

DV0021 Item No. 13 Page 6 of 6 Exhibit P-21 HVY EXPANDED MOBILE TACTICAL TRUCK EXT SERV PROG 114 Production Schedule

Page 122: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-40, Budget Item Justification Sheet Date: February 2005 Appropriation/Budget Activity/Serial No: Other Procurement, Army /1/Tactical and support vehicles P-1 Item Nomenclature HMMWV RECAPITALIZATION PROGRAM (DV0230) Program Elements for Code B Items: Code: Other Related Program Elements: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 To Complete Total Prog Proc Qty

Gross Cost

Less PY Adv Proc

Plus CY Adv Proc

Net Proc (P-1)

Initial Spares

Total Proc Cost

Flyaway U/C

Wpn Sys Proc U/C

676 692 2629 2631 869 870 8367

32.8 34.3 131.3 134.0 45.6 46.6 424.6

32.8 34.3 131.3 134.0 45.6 46.6 424.6

32.8 34.3 131.3 134.0 45.6 46.6 424.6

Description: The HMMWV recapitalization (Recap) program will recapitalize 676 vehicles in FY06 and 692 in FY07, and convert them from M998/M1037/M1038 to M1097R1 to permit heavier payloads. The result of this recapitalization effort is a vehicle with an extended service life that is compliant with the requirement to be armor kit ready. Justification: FY06/07 procures 1368 M1097R1 recapitalized vehicles. The HMMWV Recapitalization program maintains the Army's investment in the Light Tactical Vehicle Fleet. Reconfiguration of the M998/M1037/M1038 vehicles to the M1097R1 configuration results in a more capable vehicle with improved reliability and maintainability. This configuration upgrades the vehicles to better meet the needs of today's war fighter by allowing the addition of Add-on-Armor without significant mission degradation caused by overloading the suspension and/or reducing the capabilities of the vehicles. Vehicles will be fielded to active units to replace the M998, M1038 and M1037 models that will then enter the Recap program and be converted to the new M1097R1 configuration. This effectively removes the oldest, lower payload vehicles from the Army's inventory, replacing them with a more capable vehicle. As part of the Recap program, a Repower initiative is also being pursued. This will result in increased cabilities and fuel efficiency with significant improvements to maintainability and reliability. FY05 funding in the amount of $33.2M reflected in HMMWV SSN D15400.

DV0230 Item No. 14 Page 1 of 4 Exhibit P-40 HMMWV RECAPITALIZATION PROGRAM 115 Budget Item Justification Sheet

Page 123: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-5, Weapon Appropriation/Budget Activity/Serial No. P-1 Line Item Nomenclature: Weapon System Type: Date: Other Procurement, Army / 1 / HMMWV RECAPITALIZATION PROGRAM (DV0230) February 2005 Tactical and support vehicles OPA1 Cost Analysis

OPA1 ID FY 04 FY 05 FY 06 FY 07 Cost Elements CD TotalCost Qty UnitCost TotalCost Qty UnitCost TotalCost Qty UnitCost TotalCost Qty UnitCost

$000 Units $000 $000 Units $000 $000 Units $000 $000 Units $000

Vehicles 31772 676 47 33216 692 48 Engineering Support - In-House 40 41 Quality Assurance Support - In-House 40 41 Fielding Support 473 484 Project Management Support 475 509

Total 32800 34291

DV0230 Item No. 14 Page 2 of 4 Exhibit P-5 HMMWV RECAPITALIZATION PROGRAM 116 Weapon System Cost Analysis

Page 124: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Date: Exhibit P-5a, Budget Procurement History and Planning February 2005

Appropriation/Budget Activity/Serial No: Weapon System Type: P-1 Line Item Nomenclature: Other Procurement, Army / 1 / Tactical and support vehicles HMMWV RECAPITALIZATION PROGRAM (DV0230)

WBS Cost Elements: Contractor and Location Contract Location of PCO Award Date Date of First QTY Unit Cost Specs Date RFP Issue Method Avail Revsn Date

REMARKS:

and Type Delivery Units $ Now? Avail

Vehicles FY 2006 Red River Army Depot MIPR TACOM, Warren, MI Nov 05 Jan 06 338 47 Y NA NA Texarkana, TX FY 2006 Letterkenny Army Depot MIPR TACOM, Warren, MI Nov 05 Jan 06 338 47 Y NA NA Chambersburg, PA FY 2007 Red River Army Depot MIPR TACOM, Warren, MI Nov 06 Jan 07 346 48 Y NA NA Texarkana, TX FY 2007 Letterkenny Army Depot MIPR TACOM, Warren, MI Nov 06 Jan 07 346 48 Y NA NA Chambersburg, PA

DV0230 Item No. 14 Page 3 of 4 Exhibit P-5a HMMWV RECAPITALIZATION PROGRAM 117 Procurement History and Planning

Page 125: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

P-1 Item Nomenclature: Date: HMMWV RECAPITALIZATION PROGRAM (DV0230) February 2005 FY 06 / 07 BUDGET PRODUCTION SCHEDULE Fiscal Year 06 Fiscal Year 07

Calendar Year 06 Calendar Year 07

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P R E T A L

R V 1 OCT 1 OCT F R Units TO AS OF M FY E QTY PRIOR DUE S PROC ACCEP BAL

COST ELEMENTS

O N D J F M A M J J A S O N D J F M A M J J A S C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P

M PRODUCTION RATES MFR ADMINLEAD TIME MFR TOTAL REMARKS

F REACHED Number Prior 1 Oct After 1 Oct After 1 Oct After 1 Oct

R NAME/LOCATION MIN. 1-8-5 MAX. D+ INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

INITIAL

REORDER

1 Red River Army Depot , Texarkana, TX 50.00 225.00 360.00 0 1 0 1 2 3

0 1 2 3

2 Letterkenny Army Depot , Chambersburg, PA 50.00 105.00 210.00 0 2 0 1 2 3

0 1 2 3

Vehicles 1 FY 06 A 338 0 338 A 50 50 50 50 50 50 38 0 2 FY 06 A 338 0 338 A 50 50 50 50 50 50 38 0 1 FY 07 A 346 0 346 A 50 50 50 50 50 50 46 0 2 FY 07 A 346 0 346 A 50 50 50 50 50 50 46 0

Total 1368 1368 100 100 100 100 100 100 76 100 100 100 100 100 100 92

DV0230 Item No. 14 Page 4 of 4 Exhibit P-21 HMMWV RECAPITALIZATION PROGRAM 118 Production Schedule

Page 126: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-40, Budget Item Justification Sheet Date: February 2005 Appropriation/Budget Activity/Serial No: Other Procurement, Army /1/Tactical and support vehicles P-1 Item Nomenclature MODIFICATION OF IN SVC EQUIP (DA0924) Program Elements for Code B Items: Code: Other Related Program Elements: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 To Complete Total Prog Proc Qty

Gross Cost

Less PY Adv Proc

Plus CY Adv Proc

Net Proc (P-1)

Initial Spares

Total Proc Cost

Flyaway U/C

Wpn Sys Proc U/C

260.7 77.5 820.4 25.7 11.7 2.5 10.7 10.5 38.2 38.4 1296.4

260.7 77.5 820.4 25.7 11.7 2.5 10.7 10.5 38.2 38.4 1296.4

260.7 77.5 820.4 25.7 11.7 2.5 10.7 10.5 38.2 38.4 1296.4

Description: Supports the hardware and application of High Mobility Multi-purpose Wheeled Vehicle (HMMWV) 3-Point Seatbelt Modifications, HMMWV M997 3-Point Seatbelts, HMMWV M996 3-Point Seatbelts, HMMWV M997 Maxi-Ambulance Air Conditioning Upgrade, HMMWV Rear Differential Oil Cooler, modernization of the fielded HMMWV vehicles to include on- board diagnostics of the powertrain, Heavy Expanded Mobility Tactical Truck (HEMTT) Wheel Modification, Palletized Load System (PLS) Trailer Wheel Modification, and PLS/HEMTT 4-Point Seatbelt Modification. Safety related modifications increase survivability of soldiers in the field and improve vehicle readiness. The 3-Point Seatbelt modification provides three point seatbelts to all HMMWV variants. This is a safety modification that should be completed as soon as possible to avoid injury to the soldier. The Air Conditioning modification is an environmental and supportability issue. The ozone-depleting refrigerant currently in M997 HMMWV ambulances will not be available until after FY05. Ambulances will be unable to operate their air conditioning units, which is a medical requirement. The HMMWV differential can exceed optimal operating temperature resulting in premature component failure. This modification is especially critical considering high ambient temperatures and vehicle loads in current war support efforts. The HEMTT Wheel Modification program retrofits fielded vehicles that have a split-ring design with a two-piece bolt together design that is safer. Over the past few years, 59 soldier-injury split rim unique accidents have occurred for the 220 Tank Automotive & Armaments Command (TACOM) managed systems that use split rim design wheels. Of those accidents, 30 were specifically attributed to the HEMTT fleet, which also accounted for two fatalities during 1999-2000. The PLS Trailer Wheel Modification also retrofits fielded trailers with a safer two-piece bolt together wheel design. The HEMTT/PLS 4-Point Seatbelt modification enhances crew safety in selected trucks that have extensive cab-mounted Command, Control, Communications and Computer Systems (C4) equipment. Justification: FY06 procures modification for the HMMWV 3-Point Seatbelts on all basic armor/non-armor vehicles. The HMMWV 3-point seatbelt safety enhancement modification provides 3-point seatbelts to the front and rear seats on all basic HMMWV models. The change from 2-point to the 3-point seatbelt will reduce injury associated with accidents by reducing the severity of injuries and fatalities. Also, funds an urgent requirement to modernize the HMMWV powertrain for fielded vehicles. The initiative will include pit stop maintenance of the powertrain to minimize time to remove/replace. The repower effort will be done in conjunction with the HMMWV Recap initiative. This change will take advantage of technology to introduce on-board diagnostics of the engine and transmission as well as move toward EPA compliance.

DA0924 Item No. 15 Page 1 of 32 Exhibit P-40 MODIFICATION OF IN SVC EQUIP 119 Budget Item Justification Sheet

Page 127: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Date: Exhibit P-40M, Budget Item Justification Sheet February 2005

Appropriation/Budget Activity/Serial No: Other Procurement, Army /1/Tactical and support vehicles P-1 Item Nomenclature MODIFICATION OF IN SVC EQUIP (DA0924)

Program Elements for Code B Items: Code: Other Related Program Elements: A

Description Fiscal Years OSIP NO. Classification 2004 & PR FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 TC Total

HMMWV 3-PT Seatbelt

1-92-06-4401 Safety 34.0 7.2 2.0 0.0 0.0 0.0 0.0 0.0 0.0 43.2

M939 Tire Improvement

1-97-06-4532 Safety 51.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.8 55.8

M939 Anti-Lock Brake System (ABS)

1-97-06-4533 Safety 59.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5.6 65.3

HEMTT Wheel Modification

1-00-06-0003 Urgent 104.2 17.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 121.4

A8020 Fuel Injection Test Stand Upgrade

0-00-00-0000 7.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 7.0

Aluminum Mesh Liner

0-00-00-0000 11.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 11.0

M872 Modification Hardware

1-01-06-0007 Special Purpose Mod 14.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 14.8

HEMTT/PLS 4-Point Seatbelt

0-00-00-0000 Safety 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.3

PLS Trailer Wheel Modification

2-02-06-0001 Safety 3.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.5

HMMWV 3PT Seatbelts-M996 Mini Ambulance

1-01-06-0004 Safety 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2

DA0924 Item No. 15 Page 2 of 32 Exhibit P-40M MODIFICATION OF IN SVC EQUIP 120 Budget Item Justification Sheet

Page 128: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Date: Exhibit P-40M, Budget Item Justification Sheet February 2005

Appropriation/Budget Activity/Serial No: Other Procurement, Army /1/Tactical and support vehicles P-1 Item Nomenclature MODIFICATION OF IN SVC EQUIP (DA0924)

Program Elements for Code B Items: Code: Other Related Program Elements: A

Description Fiscal Years OSIP NO. Classification 2004 & PR FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 TC Total

HMMWV 3PT Seatbelts-M997 Maxi Ambulance

1-01-06-0005 Safety 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8

High Mobility Trailer MWOs

0-00-00-0000 Urgent 3.0 0.0 2.2 0.0 0.0 0.0 0.0 0.0 0.0 5.2

HMMWV Maxi-Ambulance A/C Upgrade

1-02-06-0001 Urgent 0.0 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.4

Fuel Tank Insertion Safety Foam

0-00-00-0000 Safety 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.4

M915 FOV Electrical Upgrade

0-00-00-0000 Safety 3.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.3

HMMWV Engine Modernization Effort

0-00-00-0000 Urgent 0.0 0.0 7.5 2.5 10.7 10.5 38.1 38.4 103.7 211.4

HMMWV Armor Kits

0-00-00-0000 Urgent 303.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 303.1

Heavy Truck Armor Kits

0-00-00-0000 Urgent 252.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 252.5

HMMWV Rear Differnetial Oil Cooler

1-01-06-0008 Safety 5.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5.6

Medium Truck Armor Kits

0-00-00-0000 Urgent 55.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 55.0

DA0924 Item No. 15 Page 3 of 32 Exhibit P-40M MODIFICATION OF IN SVC EQUIP 121 Budget Item Justification Sheet

Page 129: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Date: Exhibit P-40M, Budget Item Justification Sheet February 2005

Appropriation/Budget Activity/Serial No: Other Procurement, Army /1/Tactical and support vehicles P-1 Item Nomenclature MODIFICATION OF IN SVC EQUIP (DA0924)

Program Elements for Code B Items: Code: Other Related Program Elements: A

Description Fiscal Years OSIP NO. Classification 2004 & PR FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 TC Total

Fuel Tanker Armor Kits

0-00-00-0000 Urgent 4.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.1

Totals 915.5 25.8 11.7 2.5 10.7 10.5 38.1 38.4 114.1 1167.3

DA0924 Item No. 15 Page 4 of 32 Exhibit P-40M MODIFICATION OF IN SVC EQUIP 122 Budget Item Justification Sheet

Page 130: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

INDIVIDUAL MODIFICATION Date: February 2005

MODIFICATION TITLE:

MODELS OF SYSTEM AFFECTED:

DESCRIPTION/JUSTIFICATION:

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:

Installation Schedule:

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 89795 65553 4766 4766 4765 4765 1295 1295 1295 1295

89795 89795

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

Pr Yr Totals

To Totals Complete

Inputs Outputs

Inputs Outputs

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: PRODUCTION LEADTIME:

FY 2005 FY 2006 FY 2007 FY 2008 FY 2009

FY 2010 FY 2011 FY 2012 FY 2013

Contract Dates: FY 2006 FY 2007 FY 2008

Delivery Date: FY 2006 FY 2007 FY 2008

HMMWV 3-PT Seatbelt [MOD 1] 1-92-06-4401

All HMMWV Models (Except M996 and M997)

The three-point seatbelt safety modification will be applied to the front and rear seats on all basic armor and non-armor High Mobility Multi-purpose Wheeled Vehicle (HMMWV) models. This three-point seatbelt is a safer and more effective restraint system than the two-point seatbelt will reduce the severity of injuries and fatalities and is a significant safety enhancement. Total requirement is for 88,477 front and rear seatbelts plus 1,318 template kits.

The three point seatbelts were added to the High Mobility Multi-purpose Wheeled Vehicles (HMMWV) in response to increased safety regulations. The three point seatbelt system was put into all vehicle models beginning with the 100,000th vehicle produced. Retrofit kits for vehicles produced prior to that point were developed and modeled after the production version. This material change will be applied using one of the three hardware kits and template kits developed to cover the different vehicle configurations.

Depot Team 0 Months 0 Months

DA0924 Item No. 15 Page 5 of 32 Exhibit P-3a MODIFICATION OF IN SVC EQUIP 123 Individual Modification

Page 131: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

INDIVIDUAL MODIFICATION Date: February 2005

MODIFICATION TITLE (Cont): HMMWV 3-PT Seatbelt [MOD 1] 1-92-06-4401

FINANCIAL PLAN: ($ in Millions)

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $

FY 2004 and Prior FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 TC TOTAL

Total Installment Total Procurement Cost

RDT&E 0 Procurement 0 Kit Quantity 0 Installation Kits 89795 13.9 89795 13.9 Installation Kits, Nonrecurring 0 Equipment 0 Equipment, Nonrecurring 0 Engineering Change Orders 0 Data 0 Training Equipment 0 Support Equipment 0 Other 0 Interim Contractor Support 0 Installation of Hardware 0 FY2002 & Prior Equip -- Kits 65553 20.1 65553 20.1 FY2003 Equip -- Kits FY2004 Equip -- Kits 0 FY2005 Equip -- Kits 0 19062 7.2 19062 7.2 FY2006 Equip -- Kits 0 5180 2.0 5180 2.0 FY2007 Equip -- Kits 0 FY2008 Equip -- Kits 0 FY2009 Equip -- Kits 0 TC Equip- Kits 0

65553 20.1 19062 7.2 5180 2.0 0.0 0.0 0.0 0.0 0.0 0.0 89795 29.3 34.0 7.2 2.0 0.0 0.0 0.0 0.0 0.0 0.0 43.2

DA0924 Item No. 15 Page 6 of 32 Exhibit P-3a MODIFICATION OF IN SVC EQUIP 124 Individual Modification

Page 132: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

INDIVIDUAL MODIFICATION Date: February 2005

MODIFICATION TITLE:

MODELS OF SYSTEM AFFECTED:

DESCRIPTION/JUSTIFICATION:

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:

Installation Schedule:

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 10816 10816

884 11700 884 11700

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

Pr Yr Totals

To Totals Complete

Inputs Outputs

Inputs Outputs

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: PRODUCTION LEADTIME:

FY 2005 FY 2006 FY 2007 FY 2008 FY 2009

FY 2010 FY 2011 FY 2012 FY 2013

Contract Dates: FY 2006 FY 2007 FY 2008

Delivery Date: FY 2006 FY 2007 FY 2008

M939 Tire Improvement [MOD 2] 1-97-06-4532

M939 Family of Vehicles

The Non-Directional Cross Country (NDCC) tire was engineered for cross-country applications prior to WWII and is neither compatible nor safe for highway driving. For the past six years, the M939 Series Trucks have been operating under Safety of Use Message (SOUM) 98-07 limiting the highway speed to 40-mph in an attempt to limit accidents, injuries, and fatalities occurring under this scenario. Changes in vehicle speeds, road construction, mission requirements, as well as advances in tire technology have made this tire obsolete. This modification will change the tires from the current bias ply NDCC to a radial tire designed for on/off highway usage. Recent improvements in radial tire design will provide better traction and mobility, which will enhance system safety. The 11,700 basic M939 series trucks are having their NDCC or other type bias tires upgraded to radial tires. Operating and support will also be significantly reduced. Economic Analysis Report 03-84-01 shows that the annual cost for bias tires is $1,069; radial tires is $737. This is a $332 annual savings per truck, or $3.9M per year (11700 x $332). The accident scenario for M939 basic trucks with NDCC tires occurs during panic stop situations and is worsened on wet pavement. In panic stop situations on wet pavement the front wheels lock up. The NDCC stopping distance is increased by 245-320-feet over trucks with radial tires. Once the NDCC tires are replaced with radial tires in conjunction with application of the ABS, the 40-mph speed limit restriction can be lifted, allowing the vehicles to be safely operated up to their required operational capability and mission requirements.

Hardware Procurement (Tires and Tubes): May 99 - May 04

Depot/Contractor Team 0 Months 0 Months

DA0924 Item No. 15 Page 7 of 32 Exhibit P-3a MODIFICATION OF IN SVC EQUIP 125 Individual Modification

Page 133: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

INDIVIDUAL MODIFICATION Date: February 2005

MODIFICATION TITLE (Cont): M939 Tire Improvement [MOD 2] 1-97-06-4532

FINANCIAL PLAN: ($ in Millions)

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $

FY 2004 and Prior FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 TC TOTAL

Total Installment Total Procurement Cost

RDT&E 0 Procurement 0 Kit Quantity 0 Installation Kits 10816 34.0 884 3.5 11700 37.5 Installation Kits, Nonrecurring 0 Equipment 0 Equipment, Nonrecurring 0 Engineering Change Orders 0 Data 0 Training Equipment 0 Support Equipment 0 Other (Testing, PM/Eng Spt) 0 4.6 0.6 5.2 Interim Contractor Support 0 Installation of Hardware 0 FY2002 & Prior Equip -- Kits 8894 11.0 8894 11.0 FY2003 Equip -- Kits 1106 1.0 1106 1.0 FY2004 Equip -- Kits 816 0.4 816 0.4 FY2005 Equip -- Kits 0 FY2006 Equip -- Kits 0 FY2007 Equip -- Kits 0 FY2008 Equip -- Kits 0 FY2009 Equip -- Kits 0 TC Equip- Kits 0 884 0.7 884 0.7

10816 12.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 884 0.7 11700 13.1 51.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.8 55.8

DA0924 Item No. 15 Page 8 of 32 Exhibit P-3a MODIFICATION OF IN SVC EQUIP 126 Individual Modification

Page 134: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

INDIVIDUAL MODIFICATION Date: February 2005

MODIFICATION TITLE:

MODELS OF SYSTEM AFFECTED:

DESCRIPTION/JUSTIFICATION:

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:

Installation Schedule:

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 29580 29580

2420 32000 2420 32000

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

Pr Yr Totals

To Totals Complete

Inputs Outputs

Inputs Outputs

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: PRODUCTION LEADTIME:

FY 2005 FY 2006 FY 2007 FY 2008 FY 2009

FY 2010 FY 2011 FY 2012 FY 2013

Contract Dates: FY 2006 FY 2007 FY 2008

Delivery Date: FY 2006 FY 2007 FY 2008

M939 Anti-Lock Brake System (ABS) [MOD 3] 1-97-06-4533

M939 Family of Vehicles

The current design for the M939 brake system is inadequate and accident-prone. In the FY90-FY95 timeframe there were 194 serious accidents resulting in injury costs of $8.1M, $2.9M in property damage, 163 serious injuries, and 46 fatalities. In 1999, GAO report GAO/NSIAD-99-82 analysis indicated that from Jan 1987 thru Jun 1998 accident data showed that, while M939s made up an average of 9% of the Army Motor vehicle fleet, the M939 accounted for 34% of the fleet's accidents resulting in fatalities. Comparison of U.S. Department of Transportation accident statistics and M939 accident statistics showed that over a 10-year period, the fatality rate of occupants of the M939 averaged about 30 times higher than the fatality rate for occupants of comparably sized commercial trucks. For the past six years the M939 Series Trucks have been operating under Safety of Use Message (SOUM) 98-07 limiting the highway speed to 40-mph in an attempt to limit accidents, injuries, and fatalities occurring under this highway operational scenario. The accident scenario for M939 trucks occurs during panic stop situations and is worsened on wet pavement. In panic stop situations the truck's wheels lock up causing engine stall. This causes loss of power steering resulting in uncontrolled skidding creating accident and roll-over situations. Extensive testing of ABS for this truck has shown that ABS will eliminate 100% of the engine stalls and wheel lock-up regardless of the skill level of the drivers. Once the ABS is installed on trucks with radial tires, the 40-mph speed limit restriction can be lifted, allowing the vehicles to be safely operated to their required operational capability and mission requirements.

Products Specification Available - Oct 98 Hardware Application : Jan 00 - Sep 04

Depot/Contractor Team 0 Months 0 Months

DA0924 Item No. 15 Page 9 of 32 Exhibit P-3a MODIFICATION OF IN SVC EQUIP 127 Individual Modification

Page 135: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

INDIVIDUAL MODIFICATION Date: February 2005

MODIFICATION TITLE (Cont): M939 Anti-Lock Brake System (ABS) [MOD 3] 1-97-06-4533

FINANCIAL PLAN: ($ in Millions)

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $

FY 2004 and Prior FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 TC TOTAL

Total Installment Total Procurement Cost

RDT&E 0 Procurement 0 Kit Quantity 29580 36.8 2420 3.9 32000 40.7 Installation Kits 0 Installation Kits, Nonrecurring 0 Equipment 0 Equipment, Nonrecurring 0 Engineering Change Orders 0 Data 0 Training Equipment 0 Support Equipment 0 Other (Testing, PM/Eng Supt) 0 5.0 0.6 5.6 Interim Contractor Support 0 Installation of Hardware 0 FY2002 & Prior Equip -- Kits 29580 15.7 29580 15.7 FY2003 Equip -- Kits 3024 1.4 3024 1.4 FY2004 Equip -- Kits 2232 0.8 2232 0.8 FY2005 Equip -- Kits 0 FY2006 Equip -- Kits 0 FY2007 Equip -- Kits 0 FY2008 Equip -- Kits 0 FY2009 Equip -- Kits 0 TC Equip- Kits 0 2420 1.1 2420 1.1

34836 17.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2420 1.1 37256 19.0 59.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5.6 65.3

DA0924 Item No. 15 Page 10 of 32 Exhibit P-3a MODIFICATION OF IN SVC EQUIP 128 Individual Modification

Page 136: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

INDIVIDUAL MODIFICATION Date: February 2005

MODIFICATION TITLE:

MODELS OF SYSTEM AFFECTED:

DESCRIPTION/JUSTIFICATION:

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:

Installation Schedule:

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 7960 1208 920 920 920 893 6297 1206 1208 920 920 920 893

12821 12821

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

Pr Yr Totals

To Totals Complete

Inputs Outputs

Inputs Outputs

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: PRODUCTION LEADTIME:

FY 2005 FY 2006 FY 2007 FY 2008 FY 2009

FY 2010 FY 2011 FY 2012 FY 2013

Contract Dates: FY 2006 FY 2007 FY 2008

Delivery Date: FY 2006 FY 2007 FY 2008

HEMTT Wheel Modification [MOD 4] 1-00-06-0003

All HEMTTs fielded prior to CY2000

In 2001, the PM HTV implemented an expedited change to the HEMTT production vehicle configuration to include a safer, bolt-together wheel design and tubeless tire. This MWO rapidly retrofits the remainder of the fielded fleet with the safer, bolt-together wheel design and tubeless tire per Chief of Staff, United States Army (CSA) direction, and implements Maintenance Work Order (MWO) No. 9-2320-279-20-9. Prior to initiation of this retrofit program, 59 soldier-injury split-ring unique accidents occurred for the 220 TACOM managed systems that use split-ring design wheels. Of those accidents, 30 were specifically attributed to the HEMTT fleet, which also accounted for the two fatalities during 1999-2000 and an additional two fatalities in 2003.

Modification configuration is fully tested and has been applied to the production line as well as overhaul/Extended Service Program (ESP) vehicles. Delivery of retrofit kits and start of kit installation began in May 02. Kit's procurement continues FY05; kits installation continues FY06. The program is being executed by Red River Army Depot (RRAD).

Depot/Contractor Team 0 Months 0 Months

DA0924 Item No. 15 Page 11 of 32 Exhibit P-3a MODIFICATION OF IN SVC EQUIP 129 Individual Modification

Page 137: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

INDIVIDUAL MODIFICATION Date: February 2005

MODIFICATION TITLE (Cont): HEMTT Wheel Modification [MOD 4] 1-00-06-0003

FINANCIAL PLAN: ($ in Millions)

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $

FY 2004 and Prior FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 TC TOTAL

Total Installment Total Procurement Cost

RDT&E 0 Procurement 0 Kit Quantity 0 Installation Kits 10990 94.6 1831 16.0 12821 110.6 Installation Kits, Nonrecurring 0 Equipment 0 Equipment, Nonrecurring 0 Engineering Change Orders 0 Data 0 Training Equipment 0 Support Equipment 0 Other (PM Supt) 0 -- 0 Installation of Hardware 0 FY2002 & Prior Equip -- Kits 1357 0.2 1357 0.2 FY2003 Equip -- Kits 5530 4.8 5530 4.8 FY2004 Equip -- Kits 4103 4.6 4103 4.6 FY2005 Equip -- Kits 0 1831 1.2 1831 1.2 FY2006 Equip -- Kits 0 FY2007 Equip -- Kits 0 FY2008 Equip -- Kits 0 FY2009 Equip -- Kits 0 TC Equip- Kits 0

10990 9.6 1831 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 12821 10.8 104.2 17.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 121.4

DA0924 Item No. 15 Page 12 of 32 Exhibit P-3a MODIFICATION OF IN SVC EQUIP 130 Individual Modification

Page 138: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

INDIVIDUAL MODIFICATION Date: February 2005

MODIFICATION TITLE:

MODELS OF SYSTEM AFFECTED:

DESCRIPTION/JUSTIFICATION:

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:

Installation Schedule:

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 5050 5050

5050 5050

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

Pr Yr Totals

To Totals Complete

Inputs Outputs

Inputs Outputs

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: PRODUCTION LEADTIME:

FY 2005 FY 2006 FY 2007 FY 2008 FY 2009

FY 2010 FY 2011 FY 2012 FY 2013

Contract Dates: FY 2006 FY 2007 FY 2008

Delivery Date: FY 2006 FY 2007 FY 2008

M872 Modification Hardware [MOD 7] 1-01-06-0007

M872 Basics, A1s and A2s

A significant portion of the M872 fleet was deadlined as a result of Safety of Use Memorandum (SOUM) #01-008, dated Feb 2001 and updated in Jun 01. The trailer's kingpin mounting structure has deteriorated over the fleet's 20 plus year service life because of age, rust and corrosion. Funds are allocated to buy the 5,050 kits needed to repair all M872 basics, A1s and A2s and to support associated labor costs. Installation of repair kits began 2nd Qtr FY03 and was completed in FY04. The kits will restore the fleet to fully mission capacity (FMC) status and effectively extend the trailer's service life an additional 10 to 15 years.

Hardware Procurement - Oct 02 Hardware Application - Jan 03 - Sep 04

Depot field team 0 Months 0 Months

DA0924 Item No. 15 Page 13 of 32 Exhibit P-3a MODIFICATION OF IN SVC EQUIP 131 Individual Modification

Page 139: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

INDIVIDUAL MODIFICATION Date: February 2005

MODIFICATION TITLE (Cont): M872 Modification Hardware [MOD 7] 1-01-06-0007

FINANCIAL PLAN: ($ in Millions)

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $

FY 2004 and Prior FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 TC TOTAL

Total Installment Total Procurement Cost

RDT&E 0 Procurement 0 Kit Quantity 5050 6.1 5050 6.1 Installation Kits 0 Installation Kits, Nonrecurring 0 Equipment 0 Equipment, Nonrecurring 0 Engineering Change Orders 0 Data 0 Training Equipment 0 Support Equipment 0 Other 0 Interim Contractor Support 0 Installation of Hardware 0 FY2002 & Prior Equip -- Kits FY2003 Equip -- Kits 2828 5.1 2828 5.1 FY2004 Equip -- Kits 2222 3.6 2222 3.6 FY2005 Equip -- Kits 0 FY2006 Equip -- Kits 0 FY2007 Equip -- Kits 0 FY2008 Equip -- Kits 0 FY2009 Equip -- Kits 0 TC Equip- Kits 0

5050 8.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5050 8.7 14.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 14.8

DA0924 Item No. 15 Page 14 of 32 Exhibit P-3a MODIFICATION OF IN SVC EQUIP 132 Individual Modification

Page 140: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

INDIVIDUAL MODIFICATION Date: February 2005

MODIFICATION TITLE:

MODELS OF SYSTEM AFFECTED:

DESCRIPTION/JUSTIFICATION:

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:

Installation Schedule:

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 326 326

326 326

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

Pr Yr Totals

To Totals Complete

Inputs Outputs

Inputs Outputs

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: PRODUCTION LEADTIME:

FY 2005 FY 2006 FY 2007 FY 2008 FY 2009

FY 2010 FY 2011 FY 2012 FY 2013

Contract Dates: FY 2006 FY 2007 FY 2008

Delivery Date: FY 2006 FY 2007 FY 2008

HMMWV 3PT Seatbelts-M996 Mini Ambulance [MOD 10] 1-01-06-0004

HMMWV M996 Mini-Ambulances

The M996 High Mobility Multi-purpose Wheeled Vehicle (HMMWV) 3-point seatbelt modification, Modification Work Order (MWO) 9-2320-280-35-6, provides front three-point seatbelts to mini-ambulances. The current HMMWV lap belt is significantly less effective in preventing injuries than the 3-point seatbelt. The change to the 3 point seatbelt will reduce injury associated with accidents by reducing the severity of injuries and fatalities, and is a significant safety enhancement.

The 3 point seatbelts were added to the High Mobility Multi-purpose Wheeled Vehicles (HMMWV) in response to increased safety regulations. The 3Pt system was cut into production for all vehicle models beginning with vehicle number 100,000. Retrofit kits for pre 100,000 serial vehicle number vehicles were developed and modeled after the production version. This material change was applied using one of the three hardware kits developed to cover the different vehicle configurations.

Depot Team 0 Months 0 Months

DA0924 Item No. 15 Page 15 of 32 Exhibit P-3a MODIFICATION OF IN SVC EQUIP 133 Individual Modification

Page 141: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

INDIVIDUAL MODIFICATION Date: February 2005

MODIFICATION TITLE (Cont): HMMWV 3PT Seatbelts-M996 Mini Ambulance [MOD 10] 1-01-06-0004

FINANCIAL PLAN: ($ in Millions)

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $

FY 2004 and Prior FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 TC TOTAL

Total Installment Total Procurement Cost

RDT&E 0 Procurement 0 Kit Quantity 326 0.1 326 0.1 Installation Kits 0 Installation Kits, Nonrecurring 0 Equipment 0 Equipment, Nonrecurring 0 Engineering Change Orders 0 Data 0 Training Equipment 0 Support Equipment 0 Other 0 Interim Contractor Support 0 Installation of Hardware 0 FY2002 & Prior Equip -- Kits FY2003 Equip -- Kits 326 0.1 326 0.1 FY2004 Equip -- Kits 0 FY2005 Equip -- Kits 0 FY2006 Equip -- Kits 0 FY2007 Equip -- Kits 0 FY2008 Equip -- Kits 0 FY2009 Equip -- Kits 0 TC Equip- Kits 0

326 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 326 0.1 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2

DA0924 Item No. 15 Page 16 of 32 Exhibit P-3a MODIFICATION OF IN SVC EQUIP 134 Individual Modification

Page 142: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

INDIVIDUAL MODIFICATION Date: February 2005

MODIFICATION TITLE:

MODELS OF SYSTEM AFFECTED:

DESCRIPTION/JUSTIFICATION:

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:

Installation Schedule:

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 3115 3115

3115 3115

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

Pr Yr Totals

To Totals Complete

Inputs Outputs

Inputs Outputs

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: PRODUCTION LEADTIME:

FY 2005 FY 2006 FY 2007 FY 2008 FY 2009

FY 2010 FY 2011 FY 2012 FY 2013

Contract Dates: FY 2006 FY 2007 FY 2008

Delivery Date: FY 2006 FY 2007 FY 2008

HMMWV 3PT Seatbelts-M997 Maxi Ambulance [MOD 11] 1-01-06-0005

HMMWV M997 Maxi-Ambulances

The M997 High Mobility Multi-purpose Wheeled Vehicle (HMMWV) 3-point seatbelt modification, Modification Work Order (MWO) 9-2320-280-35-4, provides front three-point seatbelts to maxi-ambulances. The current HMMWV lap belt is significantly less effective in preventing injuries than the 3-point seatbelt. The change to the 3-point seatbelt will reduce injury associated with accidents by reducing the severity of injuries and fatalities, and is a significant safety enhancement.

The 3-point seatbelts were added to the High Mobility Multi-purpose Wheeled Vehicles (HMMWV) in response to increased safety regulations. The 3-point seatbelt system was cut into production for all vehicle models beginning with vehicle number 100,000. Retrofit kits for pre 100,000 serial number vehicles were developed and modeled after the production version. This material change was applied using one of the three hardware kits and template kits developed to cover the different vehicle configurations.

0 Months 0 Months

DA0924 Item No. 15 Page 17 of 32 Exhibit P-3a MODIFICATION OF IN SVC EQUIP 135 Individual Modification

Page 143: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

INDIVIDUAL MODIFICATION Date: February 2005

MODIFICATION TITLE (Cont): HMMWV 3PT Seatbelts-M997 Maxi Ambulance [MOD 11] 1-01-06-0005

FINANCIAL PLAN: ($ in Millions)

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $

FY 2004 and Prior FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 TC TOTAL

Total Installment Total Procurement Cost

RDT&E 0 Procurement 0 Kit Quantity 3115 0.6 3115 0.6 Installation Kits 0 Installation Kits, Nonrecurring 0 Equipment 0 Equipment, Nonrecurring 0 Engineering Change Orders 0 Data 0 Training Equipment 0 Support Equipment 0 Other 0 Interim Contractor Support 0 Installation of Hardware 0 FY2002 & Prior Equip -- Kits FY2003 Equip -- Kits 3115 0.2 3115 0.2 FY2004 Equip -- Kits 0 FY2005 Equip -- Kits 0 FY2006 Equip -- Kits 0 FY2007 Equip -- Kits 0 FY2008 Equip -- Kits 0 FY2009 Equip -- Kits 0 TC Equip- Kits 0

3115 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3115 0.2 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8

DA0924 Item No. 15 Page 18 of 32 Exhibit P-3a MODIFICATION OF IN SVC EQUIP 136 Individual Modification

Page 144: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

INDIVIDUAL MODIFICATION Date: February 2005

MODIFICATION TITLE:

MODELS OF SYSTEM AFFECTED:

DESCRIPTION/JUSTIFICATION:

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:

Installation Schedule:

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1562 0 521 521 520

1562 1562

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

Pr Yr Totals

To Totals Complete

Inputs Outputs

Inputs Outputs

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: PRODUCTION LEADTIME:

FY 2005 FY 2006 FY 2007 FY 2008 FY 2009

FY 2010 FY 2011 FY 2012 FY 2013

Contract Dates: FY 2006 FY 2007 FY 2008

Delivery Date: FY 2006 FY 2007 FY 2008

HMMWV Maxi-Ambulance A/C Upgrade [MOD 13] 1-02-06-0001

M997

The current refrigerant used has an adverse environmental impact. Army policy directed the discontinuation of ozone depleting chemicals in Army vehicles in FY05. The current supply of M997 refrigerant will be depleted by FY05. This effort will modify R-134a refrigerant, which complies with Federal Regulations and international agreements regarding the use of ozone depleting chlorofluorocarbon (CFC) gases.

Hardware Procurement: Mar 03, and Jun 03 Hardware Application: May 03 - Jul 05

Depot/Contract Team 0 Months 0 Months

DA0924 Item No. 15 Page 19 of 32 Exhibit P-3a MODIFICATION OF IN SVC EQUIP 137 Individual Modification

Page 145: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

INDIVIDUAL MODIFICATION Date: February 2005

MODIFICATION TITLE (Cont): HMMWV Maxi-Ambulance A/C Upgrade [MOD 13] 1-02-06-0001

FINANCIAL PLAN: ($ in Millions)

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $

FY 2004 and Prior FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 TC TOTAL

Total Installment Total Procurement Cost

RDT&E 0 Procurement 0 Kit Quantity 0 Installation Kits 0 Installation Kits, Nonrecurring 0 Equipment 0 Equipment, Nonrecurring 0 Engineering Change Orders 0 Data 0 Training Equipment 0 Support Equipment 0 Other 0 Interim Contractor Support 0 Installation of Hardware 0 FY2002 & Prior Equip -- Kits 0 FY2003 Equip -- Kits 0 FY2004 Equip -- Kits 0 FY2005 Equip -- Kits 0 1562 1.4 1562 1.4 FY2006 Equip -- Kits 0 FY2007 Equip -- Kits 0 FY2008 Equip -- Kits 0 FY2009 Equip -- Kits 0 TC Equip- Kits 0

0 0.0 1562 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1562 1.4 0.0 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.4

DA0924 Item No. 15 Page 20 of 32 Exhibit P-3a MODIFICATION OF IN SVC EQUIP 138 Individual Modification

Page 146: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

INDIVIDUAL MODIFICATION Date: February 2005

MODIFICATION TITLE:

MODELS OF SYSTEM AFFECTED:

DESCRIPTION/JUSTIFICATION:

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:

Installation Schedule:

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 187 187 187 187 63 63 63 62 267 266 266 266 261 261 187 187 187 187 63 63 63 62 267 266 266 266 261 261

260 260 947 947 947 946 950 950 950 949 10220 20912 260 260 947 947 947 946 950 950 950 949 10220 20912

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

Pr Yr Totals

To Totals Complete

Inputs Outputs

Inputs Outputs

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: PRODUCTION LEADTIME:

FY 2005 FY 2006 FY 2007 FY 2008 FY 2009

FY 2010 FY 2011 FY 2012 FY 2013

Contract Dates: FY 2006 FY 2007 FY 2008

Delivery Date: FY 2006 FY 2007 FY 2008

HMMWV Engine Modernization Effort [MOD 16] 0-00-00-0000

M998/M1037/M1038

The requirement to modernize the HMMWV powertrain for fielded vehicles. The initiative will include pit stop maintenance of the powertrain to minimize time to remove/replace. The repower effort will be done in conjuction with the HMMWV Recap initiative. This change will take advantage of technology to introduce on-board diagnostics of the engine and transmission as well as move toward EPA compliance.

Engineering effort - Jan 05 thru Jun 05 (Prototype) Testing - Aug 05 thru Dec 05 TDP/Log Support - Jan 06 thru Apr 06

Jan 06 Jan 07 Jan 08

Jun 06 Jun 07 Jun 08

Contract 3 Months 5 Months

DA0924 Item No. 15 Page 21 of 32 Exhibit P-3a MODIFICATION OF IN SVC EQUIP 139 Individual Modification

Page 147: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

INDIVIDUAL MODIFICATION Date: February 2005

MODIFICATION TITLE (Cont): HMMWV Engine Modernization Effort [MOD 16] 0-00-00-0000

FINANCIAL PLAN: ($ in Millions)

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $

FY 2004 and Prior FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 TC TOTAL

Total Installment Total Procurement Cost

RDT&E Procurement Kit Quantity 748 5.6 251 1.9 1065 8.0 1042 7.9 3787 28.6 3799 28.8 10220 77.8 20912 158.6 Installation Kits Installation Kits, Nonrecurring Equipment Equipment, Nonrecurring Engineering Change Orders Data Training Equipment Support Equipment Other Interim Contractor Support Installation of Hardware FY 2004 & Prior Equip -- Kits FY 2005 -- Kits FY 2006 Equip -- Kits 748 1.9 748 1.9 FY 2007 Equip -- Kits 251 0.6 251 0.6 FY 2008 Equip -- Kits 1065 2.7 1065 2.7 FY 2009 Equip -- Kits 1042 2.6 1042 2.6 FY 2010 Equip -- Kits 3787 9.5 3787 9.5 FY 2011 Equip -- Kits 3799 9.6 3799 9.6 TC Equip- Kits 10220 25.9 10220 25.9

0.0 0.0 748 1.9 251 0.6 1065 2.7 1042 2.6 3787 9.5 3799 9.6 10220 25.9 20912 52.8 0.0 0.0 7.5 2.5 10.7 10.5 38.1 38.4 103.7 211.4

DA0924 Item No. 15 Page 22 of 32 Exhibit P-3a MODIFICATION OF IN SVC EQUIP 140 Individual Modification

Page 148: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

INDIVIDUAL MODIFICATION Date: February 2005

MODIFICATION TITLE:

MODELS OF SYSTEM AFFECTED:

DESCRIPTION/JUSTIFICATION:

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:

Installation Schedule:

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 11372 1250 1250 11372 1250 1250

13872 13872

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

Pr Yr Totals

To Totals Complete

Inputs Outputs

Inputs Outputs

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: PRODUCTION LEADTIME:

FY 2005 FY 2006 FY 2007 FY 2008 FY 2009

FY 2010 FY 2011 FY 2012 FY 2013

Contract Dates: FY 2006 FY 2007 FY 2008

Delivery Date: FY 2006 FY 2007 FY 2008

HMMWV Armor Kits [MOD 17] 0-00-00-0000

All HMMWVs except M1114s

An urgent and validated requirement exists for 13,872 HMMWV add-on-armor kits in Southwest Asia (SWA) in support of Operation Iraqi Freedom (OIF) and Operation Enduring Freedom (OEF). These kits include armored doors with ballistic windows, windshields and air conditioning. Total requirement to date has been fully funded.

Nov 03 - Responding to urgent need from SWA, Army Research Lab designed HMMWV armor kit. Dec 03- GSIE (Ground Systems Industrial Enterprise) receives requirement for 3670 kits. Dec 03 - present, over 10,000 kits produced and shipped to SWA.

Contractor 0 Months 0 Months

DA0924 Item No. 15 Page 23 of 32 Exhibit P-3a MODIFICATION OF IN SVC EQUIP 141 Individual Modification

Page 149: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

INDIVIDUAL MODIFICATION Date: February 2005

MODIFICATION TITLE (Cont): HMMWV Armor Kits [MOD 17] 0-00-00-0000

FINANCIAL PLAN: ($ in Millions)

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $

FY 2004 and Prior FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 TC TOTAL

Total Installment Total Procurement Cost

RDT&E Procurement 13872 197.0 13872 197.0 Kit Quantity Installation Kits Installation Kits, Nonrecurring Equipment Equipment, Nonrecurring Engineering Change Orders Data Training Equipment Support Equipment Other Interim Contractor Support Installation of Hardware FY 2004 & Prior Equip -- Kits 13872 106.1 13872 106.1 FY 2005 -- Kits FY 2006 Equip -- Kits FY 2007 Equip -- Kits FY 2008 Equip -- Kits FY 2009 Equip -- Kits FY 2010 Equip -- Kits FY 2011 Equip -- Kits TC Equip- Kits

13872 106.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 13872 106.1 303.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 303.1

DA0924 Item No. 15 Page 24 of 32 Exhibit P-3a MODIFICATION OF IN SVC EQUIP 142 Individual Modification

Page 150: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

INDIVIDUAL MODIFICATION Date: February 2005

MODIFICATION TITLE:

MODELS OF SYSTEM AFFECTED:

DESCRIPTION/JUSTIFICATION:

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:

Installation Schedule:

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 2241 1135 1135 2241 1135 1135

4511 4511

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

Pr Yr Totals

To Totals Complete

Inputs Outputs

Inputs Outputs

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: PRODUCTION LEADTIME:

FY 2005 FY 2006 FY 2007 FY 2008 FY 2009

FY 2010 FY 2011 FY 2012 FY 2013

Contract Dates: FY 2006 FY 2007 FY 2008

Delivery Date: FY 2006 FY 2007 FY 2008

Heavy Truck Armor Kits [MOD 18] 0-00-00-0000

HEMTTs, PLS, HET, M915, and M969 Trailer

An urgent and validated requirement exists for 4511 add on armor kits for Heavy Tactical Trucks (HEMTT, PLS, HET, M915 and M969 Trailer) in SWA in support of Operation Iraqi Freedom (OIF) and Operation Enduring Freedom (OEF). Total requirement to date has been fully funded.

Nov 03 - Responding to urgent need from SWA, contractor (Oshkosh Truck Corp (OTC)) reviewed previously developed armor kits. Dec 03 OTC received requirement for 4511 kits. Dec 03 to present - Has developed and produced over 2200 kits and shipped to SWA.

0 Months 0 Months

DA0924 Item No. 15 Page 25 of 32 Exhibit P-3a MODIFICATION OF IN SVC EQUIP 143 Individual Modification

Page 151: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

INDIVIDUAL MODIFICATION Date: February 2005

MODIFICATION TITLE (Cont): Heavy Truck Armor Kits [MOD 18] 0-00-00-0000

FINANCIAL PLAN: ($ in Millions)

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $

FY 2004 and Prior FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 TC TOTAL

Total Installment Total Procurement Cost

RDT&E Procurement 4511 189.4 4511 189.4 Kit Quantity Installation Kits Installation Kits, Nonrecurring Equipment Equipment, Nonrecurring Engineering Change Orders Data Training Equipment Support Equipment Other Interim Contractor Support Installation of Hardware FY 2004 & Prior Equip -- Kits 4511 63.1 4511 63.1 FY 2005 -- Kits FY 2006 Equip -- Kits FY 2007 Equip -- Kits FY 2008 Equip -- Kits FY 2009 Equip -- Kits FY 2010 Equip -- Kits FY 2011 Equip -- Kits TC Equip- Kits

4511 63.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4511 63.1 252.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 252.5

DA0924 Item No. 15 Page 26 of 32 Exhibit P-3a MODIFICATION OF IN SVC EQUIP 144 Individual Modification

Page 152: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

INDIVIDUAL MODIFICATION Date: February 2005

MODIFICATION TITLE:

MODELS OF SYSTEM AFFECTED:

DESCRIPTION/JUSTIFICATION:

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:

Installation Schedule:

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 4216 4216

4216 4216

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

Pr Yr Totals

To Totals Complete

Inputs Outputs

Inputs Outputs

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: PRODUCTION LEADTIME:

FY 2005 FY 2006 FY 2007 FY 2008 FY 2009

FY 2010 FY 2011 FY 2012 FY 2013

Contract Dates: FY 2006 FY 2007 FY 2008

Delivery Date: FY 2006 FY 2007 FY 2008

HMMWV Rear Differnetial Oil Cooler [MOD 19] 1-01-06-0008

M1113 Expanded Capacity Vehicles and M1114 Up-Armored HMMWV

The High Mobility Multi-purpose Wheeled Vehicle (HMMWV) Rear Differertial Oil Cooler is an "oil to oil" cooler using some excess heat capacity in the power steering cooler to cool the rear differential in conditions of high temperatures and high loading which may lead to oil break down and differential overheating and failure. In order to reduce cost of frequent replacement, a periodic oil change is being added to field maintenance actions. This represents an unacceptable burden on the user. The differential temperature issue is considered an optional deficiency so critical by the Army User community that they will only accept, under conditional material release, a limited number of the vehicles without a modification plan to install a differential cooler. Cost of the differenetial cooler will be partially offset by savings in logistics burden of oil changes including transport of Petroleum Oil and Lubricants (POL) in the froward area.

Level II Drawings Available - 4Q98 Production Award - 2Q02 Hardware Application - 4Q02 - 4Q04

0 Months 0 Months

DA0924 Item No. 15 Page 27 of 32 Exhibit P-3a MODIFICATION OF IN SVC EQUIP 145 Individual Modification

Page 153: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

INDIVIDUAL MODIFICATION Date: February 2005

MODIFICATION TITLE (Cont): HMMWV Rear Differnetial Oil Cooler [MOD 19] 1-01-06-0008

FINANCIAL PLAN: ($ in Millions)

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $

FY 2004 and Prior FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 TC TOTAL

Total Installment Total Procurement Cost

RDT&E Procurement Kit Quantity 4216 4.7 4216 4.7 Installation Kits Installation Kits, Nonrecurring Equipment Equipment, Nonrecurring Engineering Change Orders Data Training Equipment Support Equipment Other Interim Contractor Support Installation of Hardware FY 2004 & Prior Equip -- Kits 4216 0.9 4216 0.9 FY 2005 -- Kits FY 2006 Equip -- Kits FY 2007 Equip -- Kits FY 2008 Equip -- Kits FY 2009 Equip -- Kits FY 2010 Equip -- Kits FY 2011 Equip -- Kits TC Equip- Kits

4216 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4216 0.9 5.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5.6

DA0924 Item No. 15 Page 28 of 32 Exhibit P-3a MODIFICATION OF IN SVC EQUIP 146 Individual Modification

Page 154: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

INDIVIDUAL MODIFICATION Date: February 2005

MODIFICATION TITLE:

MODELS OF SYSTEM AFFECTED:

DESCRIPTION/JUSTIFICATION:

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:

Installation Schedule:

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 2993 264 264 2993 264 264

3521 3521

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

Pr Yr Totals

To Totals Complete

Inputs Outputs

Inputs Outputs

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: PRODUCTION LEADTIME:

FY 2005 FY 2006 FY 2007 FY 2008 FY 2009

FY 2010 FY 2011 FY 2012 FY 2013

Contract Dates: FY 2006 FY 2007 FY 2008

Delivery Date: FY 2006 FY 2007 FY 2008

Medium Truck Armor Kits [MOD 20] 0-00-00-0000

An urgent and validated requirement exists for 1191 FMTV Armor Kits and 2330 M939 5-Ton trucks add-on-armor (AOA) kits in SWA in support of Operation Iraqi Freedom and Operation Enduring Freedom (OEF). These kits include 806 AOA Crew Protection Kits (CPKs), 385 Low Signature Armored Cabs, armored doors with ballistic windows, windshields and air conditioning.

Initial design on the CPKs started in Dec 03, final design completed in Jun 04. The CPKs were tested and obtained safety confirmation in Mar 04. Production started Jun 04 with the first kit installed in country Jul 04. Initial design of the LSAC started Jun 04, final design complete Oct 04. Testing was completed Oct 04 when safety confirmation was obtained. Production commenced Nov 04 and first cab installed Jan 05. The M939 preliminary design began Mar 04, final design complete Nov 04. Safety confirmation obtained Aug 04. Production started Jan 05.

0 Months 0 Months

DA0924 Item No. 15 Page 29 of 32 Exhibit P-3a MODIFICATION OF IN SVC EQUIP 147 Individual Modification

Page 155: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

INDIVIDUAL MODIFICATION Date: February 2005

MODIFICATION TITLE (Cont): Medium Truck Armor Kits [MOD 20] 0-00-00-0000

FINANCIAL PLAN: ($ in Millions)

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $

FY 2004 and Prior FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 TC TOTAL

Total Installment Total Procurement Cost

RDT&E Procurement Kit Quantity 3521 15.7 3521 15.7 Installation Kits Installation Kits, Nonrecurring Equipment Equipment, Nonrecurring Engineering Change Orders Data Training Equipment Support Equipment Other Interim Contractor Support Installation of Hardware FY 2004 & Prior Equip -- Kits 3521 39.3 3521 39.3 FY 2005 -- Kits FY 2006 Equip -- Kits FY 2007 Equip -- Kits FY 2008 Equip -- Kits FY 2009 Equip -- Kits FY 2010 Equip -- Kits FY 2011 Equip -- Kits TC Equip- Kits

3521 39.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3521 39.3 55.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 55.0

DA0924 Item No. 15 Page 30 of 32 Exhibit P-3a MODIFICATION OF IN SVC EQUIP 148 Individual Modification

Page 156: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

INDIVIDUAL MODIFICATION Date: February 2005

MODIFICATION TITLE:

MODELS OF SYSTEM AFFECTED:

DESCRIPTION/JUSTIFICATION:

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:

Installation Schedule:

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

0

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

Pr Yr Totals

To Totals Complete

Inputs Outputs

Inputs Outputs

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: PRODUCTION LEADTIME:

FY 2005 FY 2006 FY 2007 FY 2008 FY 2009

FY 2010 FY 2011 FY 2012 FY 2013

Contract Dates: FY 2006 FY 2007 FY 2008

Delivery Date: FY 2006 FY 2007 FY 2008

Fuel Tanker Armor Kits [MOD 21] 0-00-00-0000

M969 5000 Gallon and M1062 7500 Gallon Fuel Tankers

Urgent requriements to test and install ballistic protection Fuel Tank Self-sealing System (FTSS) and add-on-armor panels for M969 5000 gallon fuel tankers and M1062 7500 gallon fuel tankers to prevent fuel leakage when hit by small arms fire in Iraq and Kuwait.

Protection for M969 fuel tankers was tested at ATC Oct 04. Protection for M1062 fuel tankers begins at ATC 20 Jan 05. Partial funding for effort to apply ballistic protection to M969 fuel tankers in Iraq and Kuwait beginning Jan 05. Tankers scheduled for installation of protection beginning in Kuwait the week of 15 Jan 05.

0 Months 0 Months

DA0924 Item No. 15 Page 31 of 32 Exhibit P-3a MODIFICATION OF IN SVC EQUIP 149 Individual Modification

Page 157: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

INDIVIDUAL MODIFICATION Date: February 2005

MODIFICATION TITLE (Cont): Fuel Tanker Armor Kits [MOD 21] 0-00-00-0000

FINANCIAL PLAN: ($ in Millions)

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $

FY 2004 and Prior FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 TC TOTAL

Total Installment Total Procurement Cost

RDT&E Procurement Kit Quantity 3.5 3.5 Installation Kits Installation Kits, Nonrecurring Equipment Equipment, Nonrecurring Engineering Change Orders Data Training Equipment Support Equipment Other 0.6 0.6 Interim Contractor Support Installation of Hardware FY 2004 & Prior Equip -- Kits FY 2005 -- Kits FY 2006 Equip -- Kits FY 2007 Equip -- Kits FY 2008 Equip -- Kits FY 2009 Equip -- Kits FY 2010 Equip -- Kits FY 2011 Equip -- Kits TC Equip- Kits

0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.1

DA0924 Item No. 15 Page 32 of 32 Exhibit P-3a MODIFICATION OF IN SVC EQUIP 150 Individual Modification

Page 158: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-40, Budget Item Justification Sheet Date: February 2005 Appropriation/Budget Activity/Serial No: Other Procurement, Army /1/Tactical and support vehicles P-1 Item Nomenclature ITEMS LESS THAN $5.0M (TAC VEH) (DL5110) Program Elements for Code B Items: Code: Other Related Program Elements: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 To Complete Total Prog Proc Qty

Gross Cost

Less PY Adv Proc

Plus CY Adv Proc

Net Proc (P-1)

Initial Spares

Total Proc Cost

Flyaway U/C

Wpn Sys Proc U/C

71.6 2.8 0.2 0.2 0.4 0.3 0.3 0.5 0.3 0.3 77.0

71.6 2.8 0.2 0.2 0.4 0.3 0.3 0.5 0.3 0.3 77.0

71.6 2.8 0.2 0.2 0.4 0.3 0.3 0.5 0.3 0.3 77.0

Description: This equipment consists of various tools and shop sets essential to the maintenance of the Army's Worldwide Tactical Wheeled Vehicle Fleet. These sets include components as small as a screwdriver to as large as an International Standard Organizational (ISO) Shelter. The maintenance equipment and tools have multi-application to the maintenance organization tasked with maintaining tactical and support vehicles. Justification: FY06/07 funds tool maintenance for the Fuel and Electric Repair Shop Set and the Automotive Field Maintenance Supplement #2 Tool Set requirements. These Sets, Kits and Outfits (SKO's) are on every readiness review and are required for units to properly maintain mandatory operations. Funding also allows for continuation of modernization, revisions, and upgrading of these systems.

DL5110 Item No. 16 Page 1 of 3 Exhibit P-40 ITEMS LESS THAN $5.0M (TAC VEH) 151 Budget Item Justification Sheet

Page 159: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-5, Weapon Appropriation/Budget Activity/Serial No. P-1 Line Item Nomenclature: Weapon System Type: Date: Other Procurement, Army / 1 / ITEMS LESS THAN $5.0M (TAC VEH) (DL5110) February 2005 Tactical and support vehicles OPA1 Cost Analysis

OPA1 ID FY 04 FY 05 FY 06 FY 07 Cost Elements CD TotalCost Qty UnitCost TotalCost Qty UnitCost TotalCost Qty UnitCost TotalCost Qty UnitCost

$000 Units $000 $000 Units $000 $000 Units $000 $000 Units $000

1. Shop Equip, Fuel & Elec Sys Eng, FM 138 7 20 144 6 24 241 5 48 192 4 48 4940-00-754-0714 2. Shop Equip Auto Repair FM Suppl #2 70 1 70 75 1 75 90 5 18 54 4 14 4910-00-754-0707 3. Program Support 35 35 27 28 47 34

Total 243 246 378 280

DL5110 Item No. 16 Page 2 of 3 Exhibit P-5 ITEMS LESS THAN $5.0M (TAC VEH) 152 Weapon System Cost Analysis

Page 160: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Date: Exhibit P-5a, Budget Procurement History and Planning February 2005

Appropriation/Budget Activity/Serial No: Weapon System Type: P-1 Line Item Nomenclature: Other Procurement, Army / 1 / Tactical and support vehicles ITEMS LESS THAN $5.0M (TAC VEH) (DL5110)

WBS Cost Elements: Contractor and Location Contract Location of PCO Award Date Date of First QTY Unit Cost Specs Date RFP Issue Method Avail Revsn Date

REMARKS:

and Type Delivery Units $ Now? Avail

1. Shop Equip, Fuel & Elec Sys Eng, FM FY 2004 RIA Rock Island, Ilinois REQN/FP TACOM, Rock Island, IL Nov 03 Nov 04 7 20 Y N FY 2005 RIA Rock Island, Ilinois REQN/FP TACOM, Rock Island, IL Feb 05 Feb 06 6 24 Y N FY 2006 RIA Rock Island, Ilinois REQN/FP TACOM, Rock Island, IL Dec 05 Dec 06 5 48 Y N FY 2007 RIA Rock Island, Ilinois REQN/FP TACOM, Rock Island, IL Dec 06 Dec 07 4 48 Y N 4940-00-754-0714 2. Shop Equip Auto Repair FM Suppl #2 FY 2004 RIA Rock Island, Ilinois REQN/FP TACOM, Rock Island, IL Nov 03 Nov 04 1 70 Y N FY 2005 RIA Rock Island, Ilinois REQN/FP TACOM, Rock Island, IL Feb 05 Feb 06 1 75 Y N FY 2006 RIA Rock Island, Ilinois REQN/FP TACOM, Rock Island, IL Dec 05 Dec 06 5 18 Y N FY 2007 RIA Rock Island, Ilinois REQN/FP TACOM, Rock Island IL Dec 06 Dec 07 4 14 Y N 4910-00-754-0707

DL5110 Item No. 16 Page 3 of 3 Exhibit P-5a ITEMS LESS THAN $5.0M (TAC VEH) 153 Procurement History and Planning

Page 161: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-40, Budget Item Justification Sheet Date: February 2005 Appropriation/Budget Activity/Serial No: Other Procurement, Army /1/Tactical and support vehicles P-1 Item Nomenclature TOWING DEVICE-FIFTH WHEEL (D09900) Program Elements for Code B Items: Code: Other Related Program Elements: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 To Complete Total Prog Proc Qty

Gross Cost

Less PY Adv Proc

Plus CY Adv Proc

Net Proc (P-1)

Initial Spares

Total Proc Cost

Flyaway U/C

Wpn Sys Proc U/C

33 31 32 33 15 144

1.9 1.9 2.0 2.0 1.1 8.9

1.9 1.9 2.0 2.0 1.1 8.9

1.9 1.9 2.0 2.0 1.1 8.9

Description: The Fifth Wheel Towing Device (FWTD) is a system that attaches to a tractor's fifth wheel converting it into a towing/recovery vehicle. The device transforms a Truck Tractor into an evacuation vehicle capable of recovery, lift-towing or flat-towing another disabled truck. It is capable of lifting up to 30,000 pounds and towing up to 120,000 pounds. When the FWTD is not in use, it can be dismounted and the tractor can perform its normal trailer-towing mission. Justification: FY2006/FY2007 procures 65 FWTDs which are used to perform forward recovery missions in the Ordnance, Transportation and Engineer Units and is a critical supplement to organic evacuation and towing assets. It also provides a unit the capability to recover vehicles without the use of a wrecker, especially in Line Haul missions. It provides worldwide service to evacuate, tow, deliver as well as limited recovery capability. The FY2006/FY2007 procurements support fieldings to the US Army Reserve Engineering Units and Transportation Companies. Program was previously funded under Towing Device, 5th Wheel (D15901), and Items Less than $5.0 million (DL5110) budget lines.

D09900 Item No. 17 Page 1 of 1 Exhibit P-40 TOWING DEVICE-FIFTH WHEEL 154 Budget Item Justification Sheet

Page 162: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-40, Budget Item Justification Sheet Date: February 2005 Appropriation/Budget Activity/Serial No: Other Procurement, Army /1/Tactical and support vehicles P-1 Item Nomenclature HEAVY ARMORED SEDAN (D22100) Program Elements for Code B Items: Code: Other Related Program Elements: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 To Complete Total Prog Proc Qty

Gross Cost

Less PY Adv Proc

Plus CY Adv Proc

Net Proc (P-1)

Initial Spares

Total Proc Cost

Flyaway U/C

Wpn Sys Proc U/C

66 6 4 1 14 3 3 3 4 4 108

7.0 0.6 0.5 0.2 2.9 0.6 0.6 0.6 0.8 0.8 14.6

7.0 0.6 0.5 0.2 2.9 0.6 0.6 0.6 0.8 0.8 14.6

7.0 0.6 0.5 0.2 2.9 0.6 0.6 0.6 0.8 0.8 14.6

Description: These physical security vehicles are specialized commercial design vehicles that are armored to meet specific threat conditions within the guidelines/requirements established by the Office of the Secretary of Defense, Special Operations and Low Intensity Conflict (SOLIC) for Heavy Armored Vehicles (HAV). These vehicles provide inconspicuous protection and transportation for U.S. personnel and cargo in high threat areas, such as Europe, Korea, and Southwest Asia. The level of armor is in accordance with the nature and type of threat in the area of use. These vehicles are heavy duty passenger vehicles and are utilized by General Officers, dignitaries, embassy personnel, and other servicemen requiring protection. These vehicles are essential for protecting lives. Justification: FY06/07 procures 17 Heavy Armored Commercial Vehicles to fill urgent requirements for the protection of personnel performing support missions within areas of threat. These vehicles are being utilized to support operations in Southwest Asia (e.g. Kuwait, Saudi Arabia, Qatar, Afghanistan, and Iraq). Requirements are expected to increase in Afghanistan and Iraq.

D22100 Item No. 18 Page 1 of 1 Exhibit P-40 HEAVY ARMORED SEDAN 155 Budget Item Justification Sheet

Page 163: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-40, Budget Item Justification Sheet Date: February 2005 Appropriation/Budget Activity/Serial No: Other Procurement, Army /1/Tactical and support vehicles P-1 Item Nomenclature PASSENGER CARRYING VEHICLES (D23000) Program Elements for Code B Items: Code: Other Related Program Elements: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 To Complete Total Prog Proc Qty

Gross Cost

Less PY Adv Proc

Plus CY Adv Proc

Net Proc (P-1)

Initial Spares

Total Proc Cost

Flyaway U/C

Wpn Sys Proc U/C

67530 4 3 5 7 9 9 8 8 8 67591

261.5 0.3 0.3 0.2 0.3 0.3 0.3 0.3 0.3 0.3 264.0

261.5 0.3 0.3 0.2 0.3 0.3 0.3 0.3 0.3 0.3 264.0

261.5 0.3 0.3 0.2 0.3 0.3 0.3 0.3 0.3 0.3 264.0

Description: Vehicles are of commercial design, intended to provide transportation for Army personnel and family members. Passenger Carrying Vehicles are procurable from commercial vendors, Original Equipment Manufacturers (OEM), and after-market sources. Examples include sedans, ambulances, buses, station wagons, and hearses. Passenger Carrying vehicles sedans are used for investigation, field intelligence, and security. Ambulances are essential and life saving vehicles. LAVs are specialized commercial vehicles which include sedans, sport utility vehicles, vans, and cargo trucks. LAVs are used to provide inconspicuous protection for high level personnel who might be seen as terrorist targets. Justification: FY06/07 procures 16 Passenger Carrying Vehicles. These vehicles are needed to fill shortages and replace over-age vehicles located at Outside Continental United States (OCONUS) activities, including covert activities. The General Services Administration (GSA) does not lease vehicles to many OCONUS locations. Light Armored vehicles (LAV) are being used to support operations in Southwest Asia (e.g. Kuwait, Saudi Arabia, Qatar, Afghanistan, and Iraq). LAVs are also used in South America and Korea. There is a continuous need and increasing demand for LAVs to support ongoing operations in Southwest Asia.

D23000 Item No. 19 Page 1 of 1 Exhibit P-40 PASSENGER CARRYING VEHICLES 156 Budget Item Justification Sheet

Page 164: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-40, Budget Item Justification Sheet Date: February 2005 Appropriation/Budget Activity/Serial No: Other Procurement, Army /1/Tactical and support vehicles P-1 Item Nomenclature NonTactical Vehicles, Other (D30000) Program Elements for Code B Items: Code: Other Related Program Elements: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 To Complete Total Prog Proc Qty

Gross Cost

Less PY Adv Proc

Plus CY Adv Proc

Net Proc (P-1)

Initial Spares

Total Proc Cost

Flyaway U/C

Wpn Sys Proc U/C

64079 47 21 4 3 2 2 2 1 1 64162

678.6 5.7 0.7 0.2 0.4 0.4 0.4 0.4 0.2 0.2 687.1

678.6 5.7 0.7 0.2 0.4 0.4 0.4 0.4 0.2 0.2 687.1

678.6 5.7 0.7 0.2 0.4 0.4 0.4 0.4 0.2 0.2 687.1

Description: This line is a roll-up of Special Purpose Vehicles, General Purpose Vehicles, and the Personnel Carrying Semi-Trailer Vans. Special and General Purpose vehicles are used in the direct support of facility engineering, maintenance activities, and used for general administrative use in transporting personnel and cargo. Personnel Carrying Semi-Trailer Vans are used for transporting U.S. Military personnel and their equipment to training sites. All vehicles are procurable from commercial sources. Justification: FY06/07 procures five Non-Tactical Vehicles to fill shortages and replace vehicles that are unsafe, overaged and over mileage, as well as uneconomical to repair.

D30000 Item No. 20 Page 1 of 4 Exhibit P-40 NonTactical Vehicles, Other 157 Budget Item Justification Sheet

Page 165: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-40, Budget Item Justification Sheet Date: February 2005 Appropriation/Budget Activity/Serial No: Other Procurement, Army /1/Tactical and support vehicles P-1 Item Nomenclature SEMITRAILER VAN PERS 80 PASS 7T 2WHL (D31500) Program Elements for Code B Items: Code: Other Related Program Elements: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 To Complete Total Prog Proc Qty

Gross Cost

Less PY Adv Proc

Plus CY Adv Proc

Net Proc (P-1)

Initial Spares

Total Proc Cost

Flyaway U/C

Wpn Sys Proc U/C

10 1 1 1 1 14

2.8 0.1 0.0 0.3 0.3 0.3 0.3 0.1 0.1 4.4

2.8 0.1 0.0 0.3 0.3 0.3 0.3 0.1 0.1 4.4

2.8 0.1 0.0 0.3 0.3 0.3 0.3 0.1 0.1 4.4

Description: This Semi-Trailer is a specially engineered / configured, commercial design vehicle that is pulled by a Tractor Truck. It is intended for the transportation of military personnel and their equipment to and from installation training sites. The Personnel Carrying Semi-Trailer Van is procured from a commercial vendor under a requirements contract. Justification: FY06/07 procures two Personnel Carrying Semi-Trailer Vans. These vehicles are needed to replace overage, unsafe, and extremely poor condition Semi-Trailers currently being used to transport military recruits and their equipment to training sites. Many of the existing vehicles are over 30 years old and extremely unsafe. Total Army Acquisition Objective (AAO) is 86.

D30000 (D31500) Item No. 20 Page 2 of 4 Exhibit P-40 SEMITRAILER VAN PERS 80 PASS 7T 2WHL 158 Budget Item Justification Sheet

Page 166: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-40, Budget Item Justification Sheet Date: February 2005 Appropriation/Budget Activity/Serial No: Other Procurement, Army /1/Tactical and support vehicles P-1 Item Nomenclature GENERAL PURPOSE VEHICLES (DV0013) Program Elements for Code B Items: Code: Other Related Program Elements: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 To Complete Total Prog Proc Qty

Gross Cost

Less PY Adv Proc

Plus CY Adv Proc

Net Proc (P-1)

Initial Spares

Total Proc Cost

Flyaway U/C

Wpn Sys Proc U/C

48506 36 21 3 1 48567

379.0 4.1 0.7 0.1 0.0 383.9

379.0 4.1 0.7 0.1 0.0 383.9

379.0 4.1 0.7 0.1 0.0 383.9

Description: Vehicles are of commercial design, intended primarily for general administrative use in transporting personnel and cargo. Most vehicles are procurable from commercial production lines and include light to heavy trucks, such as carryalls, panel trucks, stake trucks, cargo trucks, trailers, semi trailers, utility trucks, fuel servicing tankers, truck tractors and flatbeds. Additional examples of General Purpose Vehicles include; a mobile air sampling lab van, which is being used to support operations in Iraq; command center vehicles; blood mobile vehicle, which is used for collecting blood; and expandable semi-trailers used for recruiting purposes. These types of vehicles are procured from specialized vendors. Justification: FY06/07 procures one General Purpose Vehicle to replace an over-aged vehicle or fill a shortage. The FY06 cost is $30,000. Carryalls, utility trucks, and cargo trucks are needed at Outside the Continental United States (OCONUS) locations where General Services Administration (GSA) leasing is not available (e.g. Japan and Korea). Carryalls are also needed for covert OCONUS activities.

D30000 (DV0013) Item No. 20 Page 3 of 4 Exhibit P-40 GENERAL PURPOSE VEHICLES 159 Budget Item Justification Sheet

Page 167: DEPARTMENT OF THE ARMY - GlobalSecurity.org...Less PY Adv Proc Plus CY Adv Proc Net Proc (P-1) Initial Spares ... C-5 airframes, marine and amphibious vessels and rail. DA0100 (D05700)

Exhibit P-40, Budget Item Justification Sheet Date: February 2005 Appropriation/Budget Activity/Serial No: Other Procurement, Army /1/Tactical and support vehicles P-1 Item Nomenclature SPECIAL PURPOSE VEHICLES (DV0014) Program Elements for Code B Items: Code: Other Related Program Elements: Prior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 To Complete Total Prog Proc Qty

Gross Cost

Less PY Adv Proc

Plus CY Adv Proc

Net Proc (P-1)

Initial Spares

Total Proc Cost

Flyaway U/C

Wpn Sys Proc U/C

15563 11 1 1 1 1 1 1 1 15581

296.7 1.4 0.0 0.1 0.1 0.1 0.1 0.1 0.1 298.7

296.7 1.4 0.0 0.1 0.1 0.1 0.1 0.1 0.1 298.7

296.7 1.4 0.0 0.1 0.1 0.1 0.1 0.1 0.1 298.7

Description: Vehicles are commercially designed for specialized use in direct support of facility engineering, maintenance and similar activities within an organization. Examples of these vehicles include maintenance trucks, servicing platform trucks, refuse trucks, and other vehicles with mounted equipment. Line construction maintenance trucks, otherwise known as Pole trucks, are being used to support operations in Iraq. Justification: FY06/07 procures two Special Purpose Vehicles to replace overage, poor condition vehicles and to fill shortages. Most Special Purpose Vehicles are not available from General Services Administration (GSA) lease; therefore support to the servicing, sanitation, and welfare missions of the field must be provided by procurement. Service platform trucks, line construction trucks, maintenance trucks, and refuse trucks are required to continue the engineering support mission necessary to the operation of posts, camps, and stations worldwide.

D30000 (DV0014) Item No. 20 Page 4 of 4 Exhibit P-40 SPECIAL PURPOSE VEHICLES 160 Budget Item Justification Sheet