7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 1/90 Design and construction of a reinforced soil embankment on soft soil Russell Jones, Golder Associates Gareth Swift, University of Salford

Upload: guillermo-andres-soto-conde

Post on 03-Apr-2018

246 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 1/90

Design and construction of a reinforced

soil embankment on soft soil

Russell Jones, Golder Associates

Gareth Swift, University of Salford

Page 2: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 2/90

Overview

¾ Background

¾ Site details

¾ Design philosophy

¾ Design issues

¾ Construction issues

¾ Conclusions

Page 3: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 3/90

Background

¾ Introduction

¾ Site is located south of Basildon in Essex

¾ Bounded by:

• Wat Tyler country park on western boundary

• Pitsea Marshes (SSSI) along the northern boundary

• East Haven Creek along southern boundary (Thames beyond)

Page 4: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 4/90

Background

Pitsea landfill site located south of Basildonin Essex, and covers an area of approx.284ha (>50ha currently operational)

¾ Introduction

Page 5: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 5/90

Background

¾ Introduction

¾ Paper and presentation deals with design and construction issues

relating to a large leachate lagoon to be constructed on soft,

compressible soils

¾ Design carried out in June 2002

¾Construction between July 2002 and January 2003

¾ Lagoon filled to capacity March 2008

¾ Final Certificate issued by the Panel Engineer July 2008

Page 6: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 6/90

Background

¾ Client brief:

¾ Minimum leachate capacity of 150,000m3

¾ Maximum cost of build £1.3mill

¾ Maximum bund height 8mAOD (planning constraint)

¾ ……needs to be buildable!

Page 7: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 7/90

Background

¾ Additional design constraints:

¾ Ensure stability

¾ Minimise soil imports

¾ Maximise lagoon area (hence, minimise bund height)

¾ Minimise excavation in to existing soils

Page 8: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 8/90

Background

¾ Additionally…

¾ Satisfy requirements of Reservoir Act 1975

¾ the Act applies to Large Raised Reservoirs, defined as:

‘being designed to hold or capable of holding more than25,000m3 of water as such above the natural level of any 

 part of the land adjoining the reservoir (including the bed of 

any stream)’ 

Page 9: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 9/90

Overview

¾ Background

¾ Site details

¾ Design philosophy

¾ Design issues

¾ Construction issues

¾ Conclusions

Page 10: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 10/90

Site Details

¾ Ground conditions

¾ The area is relatively even but groundwater levels close to, or at,

the ground surface

¾ Waste dating from the 1950’s underlies the site in a layer between

1m and 7m thick

¾ Waste comprises ash, clinker, glass, cans in hydraulic continuity

with the surrounding landfill

¾ This overlies a generally soft stratum of alluvial clays and sands

(mv 0.2 – 0.8m2/kN).

Page 11: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 11/90

Site Details

¾ Ground conditions

¾ A similar, but earlier, lagoon encountered significant difficulties

during construction associated with the high groundwater levels

and the trafficability of the waste and the soft alluvial material.

Page 12: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 12/90

Site Details

¾ Ground conditions

Page 13: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 13/90

Overview

¾ Background

¾ Site details

¾ Design philosophy

¾ Design issues

¾ Construction issues

¾ Conclusions

Page 14: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 14/90

Design Philosophy

¾ Original design philosophy

¾ Reducing the existing ground level of approximately 3 m AOD to a

minimum formation level of 1.0 m AOD

¾ Pumping and dewatering required (estimated quantity 20,000 to

75,000m3)

¾ Forming embankment slopes of 1v:4h utilising the excavated

waste

¾ Using a single ethylene inter-polymer alloy geomembrane liner on

both the base and embankment slopes

¾ Liner manufactured to a specific prefabricated size and shape to

suit the design

Page 15: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 15/90

Design Philosophy

¾ Original design philosophy

Page 16: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 16/90

Design Philosophy

¾ Original design philosophy

Page 17: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 17/90

Design Philosophy

¾ Original design philosophy

¾ Ground conditions are poor at best:

• Groundwater/leachate levels at or near to the ground surface; and

• Material to be excavated to produce a formation level comprised

1950’s waste of questionable engineering integrity

¾ Dewatering logistically difficult due to up-gradient landfill (with

leachate)

¾ Single geomembrane liner not the most effective barrier 

¾Tenderers’ comments

Page 18: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 18/90

Design Philosophy

¾ Proposed design

¾ No excavation

• Reinforced basal platform 20 m wide by 700 mm thick constructed atthe existing ground level

¾ Steeper face angles

• Reinforced soil perimeter embankment, 5.5 m high

• External side slopes 1v:2h

• Internal side slopes 1v:1v

Page 19: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 19/90

Design Philosophy

¾ Original design philosophy

Page 20: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 20/90

Design Philosophy

¾ Proposed design

Page 21: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 21/90

Design Philosophy

¾ Proposed design

Page 22: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 22/90

Design Philosophy

¾ Proposed design

¾ Base area of approximately 32,000 m2 lined with a composite

lining system

• 2 mm thick Linear Low Density Polyethylene (LLDPE) sheet

• Geosynthetic clay liner (GCL)

¾

Underdrainage geocomposite drainage layer to limit hydraulicpressures from the leachate and gas

¾ Lining of the perimeter embankment with

• 2 mm thick LLDPE geomembrane

• Geocomposite drainage layer connected to a piped drainage system

Page 23: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 23/90

Page 24: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 24/90

Overview

¾ Background

¾ Site details

¾ Design philosophy

¾ Design issues

¾ Construction issues

¾ Conclusions

Page 25: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 25/90

Design Issues

¾ Proposed design

¾ Since material was limited to on-site sources, the quality would be

variable

¾ Side slopes would be steep in order to achieve capacity

• Geosynthetic reinforcement, geotextile rather than geogrid to aid

dissipation of pore pressures

• Primary geotextile reinforcement

• Secondary geogrid reinforcement

¾ Granular material used for foundation layer 

¾ Cohesive material used for most of embankment but granular 

material used for upper section

Page 26: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 26/90

Design Issues

¾ Proposed design

Page 27: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 27/90

Design Issues

¾ Proposed design

Page 28: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 28/90

Design Issues

¾ Reinforcement details

4Fornit 20/20

3Stabilenka 100/50Class 6I, 6J, 7B, 7C or 7D

material

Embankment

1Tensar 120RECrushed concrete finesBasal layer 2

1Tensar 160RE75 mm crushed concrete (min

50 kN 10 % fines)

Basal layer 1

No. of 

Layers

ReinforcementMaterialLayer 

Page 29: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 29/90

Design Issues

¾ Settlement

¾ Final top of embankment = 7.5m AOD

¾Constructed to = 8m AOD due to anticipated settlement

Page 30: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 30/90

Design Issues

mv = 0.2m2/MN

k = 1 x 10-8m/s

0.2 to

0.8

25019 Alluvium

Beneath northern

embankment

0.325016Old waste

Beneath main

slope

0.525016Old waste

-0.130018Foundationlayer 

-0.124020Embankment

fill

 Additional

information

r u

φ′

(deg)

c′

(kPa)

γb

(kN/m3)

Material

¾ Material parameters

Page 31: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 31/90

Design Issues

¾ Value Engineering

¾ Time constraints

¾Design optimisation during construction

¾ Supported by field trials where possible

¾ ECC form of contract

Page 32: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 32/90

Design Issues

¾ Value Engineering

¾ NEC/Engineering and Construction Contract

¾Six Main Options• Option A - Priced with Activity Schedule

• Option B - Priced with BQ

• Option C - Target with Activity Schedule

• Option D - Target with BQ

• Option E - Cost Reimbursement

• Option F - Management Contract

Page 33: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 33/90

Design Issues

¾ Contract

¾ NEC/Engineering and Construction Contract

¾Six Main Options• Option A - Priced with Activity Schedule

• Option B - Priced with BQ

• Option C - Target with Activity Schedule

• Option D - Target with BQ

• Option E - Cost Reimbursement

• Option F - Management Contract

Page 34: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 34/90

Design Issues

¾ Stability

¾ A key factor in the design of the perimeter embankments is their 

stability

• Internal – Inside face and outside face

• External – Global failure and siding

¾ Major issue is the development of pore water pressure in the sub-

grade due to embankment construction

• Slope/w and Seep/w used to examine the effects of pore water 

pressure on stability

• Results indicate that the rate of build up and dissipation was critical to

stability

Page 35: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 35/90

Design Issues

¾ Stability

¾ Piezometers used on site to monitor pore water pressures

¾Construction of toe berms would improve short term stability• Factor of safety >1.3 if r u <0.7

• Toe berms allow increase in r u to 0.8

Page 36: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 36/90

Design Issues

¾ Stability

Page 37: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 37/90

Design Issues

¾ Stability

700mm thick reinforced foundation layer:

•300mm drainage layer

•400mm stability layer

Page 38: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 38/90

Design Issues

¾ Stability

¾ Typical output:

1.509

Top Layer of Fornit 20/20

3 Layers of Stablenka

Top Layer of 120RELower Layer of 160RE

10 kPa

Page 39: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 39/90

Design Issues

¾ Groundwater 

¾ Geotextile reinforcement allows dissipation of pore pressures in

embankment fill

¾ Geocomposite allows dissipation of pore pressures beneath the

lagoon

¾ 75mm crushed concrete layer allows dissipation of pore

pressures beneath the embankment

D i I

Page 40: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 40/90

Design Issues

¾ Environmental considerations

¾ Leachate containment

• 2mm LLDPE geomembrane

• GCL

• UV protection geotextile

¾Underdrainage• Complete system required to remove gases beneath lining system

• 12mm geocomposite

O i

Page 41: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 41/90

Overview

¾ Background

¾ Site details

¾ Design philosophy

¾ Design issues

¾ Construction issues

¾ Conclusions

C t ti I

Page 42: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 42/90

Construction Issues

¾ Construction works

¾ Groundwater monitoring

¾ Settlement monitoring

C t ti I

Page 43: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 43/90

Construction Issues

¾ Construction works

Poor ground conditions

Constr ction Iss es

Page 44: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 44/90

Construction Issues

¾ Construction works

Generally, a flat

lying area in a

floodplain

Construction Issues

Page 45: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 45/90

Construction Issues

¾ Construction works

Construction Issues

Page 46: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 46/90

Construction Issues

¾ Construction works

¾ Relatively flat formation level (3.0mAOD) required:

• Removal of bushes/trees

• Re-profiling of hummocky areas

• Elevated ground in NE was excavated

• Low area in south backfilled

¾ Existing leachate trench backfilled

¾ Dewatering, where required

¾ Installation of piezometers

¾ Construction of cut-off trench

Construction Issues

Page 47: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 47/90

Construction Issues

¾ Construction works

Construction Issues

Page 48: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 48/90

Construction Issues

¾ Construction works

¾ Basal layer 

• Separator geotextile on existing ground

• 9 mm Drainage geocomposite

• 300 mm thick drainage layer 

• Separator geotextile on drainage layer 

• 400 mm thick stability layer including two layers of geogrid

reinforcement

Construction Issues

Page 49: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 49/90

Construction Issues

¾ Construction works

Foundation layer, first layer of geogrid

Construction Issues

Page 50: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 50/90

Construction Issues

¾ Construction works

Foundation layer, second layer of geogrid

Construction Issues

Page 51: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 51/90

Construction Issues

¾ Construction works

Foundation layer 

Construction Issues

Page 52: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 52/90

Construction Issues

¾ Construction works

¾ Reinforced embankment

• Compacted general fill material (Class 6I, 6J, 7B, 7C or 7D)

• Geotextile primary reinforcement

• Geogrid secondary reinforcement

Construction Issues

Page 53: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 53/90

Construction Issues

¾ Construction works

¾ Lining system

• Drainage geocomposite

• Geomembrane

• Perforated pipe

• Soil retention geocomposite

Construction Issues

Page 54: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 54/90

Construction Issues

¾ Construction works

Construction Issues

Page 55: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 55/90

Construction Issues

¾ Construction works

Installation of perforated pipe at toe of inside slope

Construction Issues

Page 56: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 56/90

Construction Issues

¾ Construction works

Embankment starting to be constructed

Construction Issues

Page 57: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 57/90

¾ Construction works

Embankment works continuing

Construction Issues

Page 58: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 58/90

¾ Construction works

Embankment works continuing, inside face

Construction Issues

Page 59: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 59/90

¾ Construction works

Embankment works continuing, outside face

Construction Issues

Page 60: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 60/90

¾ Construction works

Embankment works, becoming difficult with cohesive fill

Construction Issues

Page 61: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 61/90

¾ Construction works

Trafficability concerns…

Construction Issues

Page 62: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 62/90

¾ Construction works

Embankment works, revised fill

Construction Issues

Page 63: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 63/90

¾ Construction works

Embankment works, revised fill, impact on geotextile reinforcement

Construction Issues

Page 64: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 64/90

¾ Construction works

Embankment works, revised fill, impact on geogrid reinforcement

Construction Issues

Page 65: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 65/90

¾ Construction works

Embankment works, working in the winter 

Construction Issues

Page 66: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 66/90

¾ Construction works

Embankment works, geocomposite and geomembrane deployment

Construction Issues

Page 67: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 67/90

¾ Construction works

Embankment works, uv protection geotextile and tyre wave wall

Construction Issues

Page 68: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 68/90

¾ Construction works

Embankment works, soil retention geocomposite

Construction Issues

Page 69: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 69/90

¾ Construction works

Basal works, prior to geocomposite deployment

Construction Issues

Page 70: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 70/90

¾ Construction works

Basal works, deployment of geocomposite, GCL and geomembrane

Construction Issues

Page 71: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 71/90

¾ Construction works

Basal works, deployment of geocomposite

Construction Issues

Page 72: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 72/90

¾ Construction works

Basal works, deployed GCL

Construction Issues

Page 73: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 73/90

¾ Construction works

Basal works, deployment of geomembrane

Construction Issues

Page 74: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 74/90

¾ Construction works

Basal works, hydraulic bund

Construction Issues

Page 75: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 75/90

¾ Construction works

Perimeter leachate trench

Construction Issues

Page 76: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 76/90

¾ Construction works

Tested to capacity for Reservoir Act sign off, 2008

Construction Issues

Page 77: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 77/90

¾ Construction works

Completed lagoon, 2008

Construction Issues

Page 78: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 78/90

¾ Groundwater monitoring

¾ piezometers installed at a number of locations to monitor PWP

Construction Issues

Page 79: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 79/90

¾ Groundwater monitoring

leachate level in lagoon

Construction Issues

Page 80: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 80/90

¾ Groundwater monitoring

ru typically between 0.2 and 0.3

Construction Issues

Page 81: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 81/90

¾ Settlement monitoring

¾ Temporary vertical and horizontal stations at toe of embankment

¾ Permanent stations at top of embankment

Construction Issues

Page 82: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 82/90

¾ Settlement monitoring

Construction Issues

Page 83: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 83/90

¾ Settlement monitoring

3

4

5

6

7

8

9

1-Jan-03 1-Apr-03 1-Jul-03 1-Oct -03 1-Jan-04 1-Apr-04 1-Jul-04 1-Oct-04 1-Jan-05

   L  e  v  e   l   (  m   a

   O   D   )

Leachate level in lagoon

 Approximate elevation of top of bund –between 7.6m and 8.0mAOD

Elevation of foundation layer

Construction Issues

Page 84: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 84/90

¾ CQA

¾ Quality assurance and conformance testing of all materials:

• Separator geotextiles

• Reinforcing elements

• Lining elements

• All soils

¾ In accordance with the approved CQA Plan

Construction Issues

Page 85: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 85/90

Overview

Page 86: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 86/90

¾ Background

¾ Site details

¾Design philosophy

¾ Design issues

¾ Construction issues

¾ Conclusions

Conclusions

¾ R i f th d i i l ti t th t ti f

Page 87: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 87/90

¾ Review of the design issues relating to the construction of aleachate storage lagoon has been presented

¾ Geotechnical and geoenvironmental applications of 

geosynthetics have been used to ensure the short and long termstability of the perimeter embankment of the lagoon and to

maximize containment capacity

¾ Design revised during construction as part of a ValueEngineering approach

¾ Lagoon now tested by filling to capacity

Conclusions

¾ A f th ti d i th j t

Page 88: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 88/90

Soil retentionGeocomposite

Secondary component of composite liner Geosynthetic Clay Liner 

Primary component of composite liner Geomembrane

DrainageGeopipes

ReinforcementGeogrid

DrainageGeocomposite

UV protectionGeotextile

Reinforcement and DrainageGeotextile

FunctionGeosynthetic Material

¾  A range of geosynthetics was used in the project

¾ This project could not have been constructed without the use of 

these materials

Acknowledgements

¾ V li E i t l S i (f l Cl )

Page 89: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 89/90

¾ Veolia Environmental Services (formerly Cleanaway)

¾ Steve Smith (now Golder Associates)

¾ John Bowers

¾ Nick Sinclair 

¾ Panel Engineers

¾ Michael Kennard (retired)

¾ George Hallowes (deceased)

¾ Chris Hoskins

Page 90: Design and Construction of a Reinforced Soil Embankment on Soft Soil

7/28/2019 Design and Construction of a Reinforced Soil Embankment on Soft Soil

http://slidepdf.com/reader/full/design-and-construction-of-a-reinforced-soil-embankment-on-soft-soil 90/90

Conclusion slide

Thank you for your attention