2

TBH – THE QUALIFIED PARTNER FOR PLANT CONSTRUCTION

The TECHNICAL OFFICE HAJEK is an innovative Engineering Company situated in

Perchtoldsdorf near Vienna. Our core business activity includes planning,

construction, erection supervision, project development as well as

start up of technical plants in the following field of activities:

Crude Oil and Chemical Industry Plant Construction

Gas and Mineral Oil Engineering

Energy and Heat Engineering

Environmental Engineering

Water Technology

Beverage and Food Industry

Building Services Engineering

Further branches of business are

Personnel Leasing of Engineering Specialists,

Consulting and Preparing Studies (Feasibility Studies)

in these fields and in the field of Mechanical Engineering. Altogether

85 employees are at disposal at TBH and its long-standing partners and sub-contractors.

Page 3: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

3

SAFETY – QUALITY – COSTS – DEAD LINES OUR PRIORITY OBJECTIVES

Our commitment to society and environment and thus particularly to our customers is

reflected in using state-of-the-art technology for plant construction. We meet these highest demands in the course of planning new projects and re-structuring or

retrofitting existing plants. Thereby the choice of the optimized

process methods as well as the spatiotemporal coordination

up to the point of supervision of the final erection

are essential elements.

Based on many years of experience and on a number of various processed projects, both nationally and internationally, TBH can draw now upon a wide range of know-how.

Thus, TBH guarantees the quality of the offered services by planning all activities on a high-level standard before and during project execution.

Our priority objective is to fulfill the customers expectations. Our ambition to closely cooperate with our customers based on a mutual confidence represents

one of the most important elements, which characterizes

TBH as a solid, highly-qualified partner.

TBH has been certified by Certification Body TÜV SÜD according to norm for

Quality Management ISO-9001:2000 and norm for

Safety Management SCC**: 2004.

Page 4: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

4

FROM DESIGN TO START UP – A SERVICE FROM ONE SOURCE

Our Engineering Office provides its customers the entire range of services for planning and

construction of complete plants based on the extensive know-how and

experience of our highly-qualified employees.

Starting with the technical pre-project up to plant design, process engineering, layout and

piping design, construction and steel construction planning, instrumentation

up to site management, process erection planning, start up and technical

supervision on site are the core competences of TBH.

Moreover we offer Studies, Basic Engineering (FEED) and Detail Engineering (EPCM).

Every single step beginning with the planning up to the implementation

is coordinated and controlled based on a high level of

know-how and execution competence.

Page 5: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

5

Feasibility Studies

Project Studies

Feasibility Studies

Cost Effective Analysis

Consulting

Project Management

Project Planning

Project Coordination

Project Requirement Specification

Project Controlling

Risk Management

Process Engineering

Process Engineering

Safety Analysis

Process Design

Detail Process Engineering

Authority Engineering

Basic Engineering

Mass and

Energy Balances

PFDs / PIDs

Risk / Ex-zone Drawings

Plant Layout and Arrangement

Apparatus Specification

Inquiry / Bidding

Detail Engineering

PIDs

Mechanical - Specification

Piping Design 3D

Stress Analysis

Steel Structures and Static

Calculations

Concrete Construction and

Static Calculations

Electrical Engineering /

Instrumentation & Control

Technology

Construction and Erection

Start Up

Site Management /

Expert Site Management

Quality Control / Quality Assurance

Scheduling / Inspection

Progress Controlling / Reporting

Construction Coordination / Safety

Erection Documentation

TBH ENGINEERING SERVICES FOR COMPLETE PLANTS

Page 6: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

6

Koch Austria Transporttechnik

250 /Pipe Conveyer JUNKERS

Cizkovice/Czech Republic

1996

Detail Engineering:

Static calculations, preparing of steel construction and static

calculations

Koch Austria Transporttechnik

500 / Pipe Conveyor

Power Plants, Ptolemais, Greece

1997

Detail Engineering:

Static calculations, preparing of steel construction and static

calculations

Andritz

Paper Machines

1997

Detail Engineering Projects

VA Tech AE&E Environment

DeNox Plant, BASF Ludwigshafen

1997 - 1998

Detail Engineering: arrangement, steel construction, piping

VA Tech AE&E Environment

DeNox Plant, BASF Spain

1997 - 1998

Detail Engineering: arrangement, steel construction/static calculations,

piping

REFERENCES

Page 7: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

7

OMV / LURGI

Refinery Schwechat

1997-1999

EBE/EPCM

4process plants: crude oil distillation RD4, plat former PF3, FCC. HDS

Splitter

EBE:

Arrangement design/grobrouting,

Cost estimation, construction & steel construction, piping, E&MSR

EPCM:

Layout (100 equipments), equipment engineering, construction & steel

construction, piping design (total: approx. 1000 to), steel construction

design, static calculations, E&MSR, construction & arrangement

supervision piping/construction/steel construction/E&MSR

Mannesmann Anlagenbau

OMV/FCC

1998

Detail Engineering: piping drawings

VA Tech AE&E Environment

Heat Plant Harbour Hamburg

1998

Detail Engineering: air/flue gas piping and related steel construction /

static calculations

OMV / KEP-Gasoline Distillation 1998

Detail Engineering: arrangement and piping 2D, EMSR Engineering,

steel construction

REFERENCES

Page 8: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

8

BASF Ludwigshafen / DENOX

Plant

Subcontractor of VA-Tech

2000

Detail Engineering: arrangement, piping and steel construction

OMV / RD-4 Revamp 2000

Detail Engineering: installation of pressure relief valves;

Change of switching mechanism of the exchanger condensation,

Steel constructions

OMV / Claus 3 2001

Detail Engineering: arrangement, steel construction – piping of a

sulphur strainer 3D, site supervision

OMV / Ethylene Plant Schwechat

Subcontractor of TECHNIP

2002-2003

Basic Design 3D – arrangement studies, piping and steel construction

cost calculation construction, steel construction and piping

REFERENCE

S

Page 9: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

9

OMV / UHDE - Edeleanu

HDS-3 Revamp

2003 - 2004

Detail Engineering: in the fields of construction, steel construction, EMSR

engineering, piping, insulation, painting etc., site supervision in these fields,

site coordinator, site manager.

OMV / Bitumen Plant 2005

Revamp Furnaces

OMV 2005 – 2006

Preparing of ex-zone drawings and documentation according to VEXAT for

the entire Refinery Schwechat as well as for the Tank Farms Lobau and St.

Valentin

OMV 2005 – 2006

Biodiesel – Pipeline up to the Manufacturer Biodiesel Vienna Tank Farm

Lobau

Detail Engineering: arrangement/routing, piping, steel construction, static

calculations and site supervision.

OMV / UHDE

HDS-1 Revamp

2006

Basic Engineering EBE: arrangement, piping, construction and steel

construction, static calculations, EMSR

OMV

Power Plant I and II

2006

Removal of sulfur oxides REA, retrofitting of flue gas bypass

Detail Engineering of blanking plate valves 2,5mx3,5m, authority

engineering

OMV Electrical Projects 110kV, 6kV distribution stations

High- and low voltage power network: new planning / replacement, detail

engineering

REFERENCES

Page 10: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

10

OMV / RD4 2006 – 2008

Over- and underground slope separation in 3 sub-projects

Detail Engineering, authority engineering and site supervision

OMV / ENVIRGY

SNOX

2005 - 2008

Desulphurization and denitrification of the power plant

EBE and EPCM Detail Engineering: plant arrangement, reactor, flue

gas ducts, steel construction and static calculations of 4.500 tons steel,

OMV / UHDE

TGU

2007 - 2009

New plant for thermal conversion of residues from

vacuum / atmospheric distillation

EBE / EPCM Detail Engineering

Concrete construction (10.600m³) and concrete pre-fabricated parts

planning (2.200m³) and static calculations, steel construction static

calculations insite/offsite (1.400 tons), steel construction planning offsite

(150 tons), piping design offsite (135 tons), E&MSR design,

underground and duct system, fire protection and fire extinction

planning, site management: piping, steel construction,

scaffolding/painting/insulation

PETROM Romania

Coker 3

2006

Preparation of documentation for complete plant:

Bloc diagram, process flow diagrams, PIDs, arrangement plans,

equipment specifications

UHDE / PETROM Romania

FCC / PTU

2007

EBE: 3D Arrangement, tie-in planning, rough routing, modification fame

plant, steel construction layout and pre-static calculations

REFERENCES

Page 11: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

11

PETROM Romania

FAME

2007 – 2008

EPCM

Detail Engineering:

Fame unloading station for tank wagons

Fame dosing station for blending of diesel with fame

Detail Engineering: concept development / process, layout, authority

engineering, piping design, procurement, E&EMSR, project- and site

management, construction and quality supervision, safety

management

PETROM Romania

TFOP

2007 – 2009

Tank Farm Project

EPCM

Tank new constructions:

Bitumen Tank 5.000m³

Gasoline Tank 10.000m³ (Floating Roof)

Diesel Tank 2 x 13.000m³

Tank Revamps:

13 Tanks from 5.000m³ to 50.000m³

Detail Engineering: concept development / process, layout, authority

engineering, piping design, procurement, E&EMSR, project- and site

management, construction and quality supervision, safety

management

REFERENCES

Page 12: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

12

OMV

Gewinnungsstation Matzen

2010

Steel construction

Static calculations

Expansion and workshop drawings

OMV

Foster Wheeler

2010

Subcontractor EBE

Crude oil distillation RD4

Equipment and piping layout

3D arrangement in Intergraph PDS

3D arrangement pipe bridge static calculations

OMV

Schwechat

2010

AC2 Petrol pipe DN600

AC2 Pump piping

Detail Engineering / piping / steel constructions

Invitation to tender, turn key

Site supervision

Airport Schwechat

Skylink

2010

Steel Construction drawings

Grating drawings for supply system

Site supervision

REFERENCES

Page 13: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

13

OMV

Schwechat

2010/2011

Tank 2112 and Tank 2113 each 50.000 m³

General repair of shell and floating roof

Static calculations

Repair planning

Invitation to tender, turn key for repair

New workshop drawings

PETROM Romania

PALL

2010/2011

Amine gas treating - installation of filter

3D arrangements

Piping of apparatus

Skid construction method

Apparatus expansion and workshop drawings

OMV

Schwechat

2010/2011

Several Electro Projects

Authority documentation

Reconstruction transformer station

500V control plant

USV plants new

Lightning protection and earthing plants

Ex zone drawings

REFERENCES

Page 14: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

14

OMV/CAC Chemnitz

REVAMP FCC – Max Propylene

Subcontractor TBH

2010/2011

Planning offsite , tie-in point planning

Creation PID in Intergraph SPPID

Safety and construction coordinator

Construction supervision, steel construction, piping, equipment

scaffolding

PETROM Romania E&P

Zauner Anlagenbau

ZT-Bausache

Mödling

2010/2011

Piping steam-unit (Skid)

3D arrangement

Piping

Steel construction calculations

2011

Planning roof system steel construction 55 to

On site appraisal

3D arrangement

Steel construction workshop drawings

Site management

Integral

Power Plant MELLACH

2011/2012

Offsite planning

Coolant pipes

Pipe bridges

High pressure steam/condensate system

Pipe planning and stress calculations

REFERENCES

Page 15: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

15

OMV/HDS-1 Ejector Condensate

Water Quench System

2011/2012

Detail Engineering EPCM

OMV/SNOX Plant

2011/2012

Pipe Duct 15/16 droplet separator

Electric trace heating, roofing planned

EPCM

OMV/AC Plant

Analyzer for Process Gas

Furnace

2012

Study with 3D Drawings

OMV/SUNPOR

Distillation of ISO/n Pentane

Storage and Loading

2011/2012

Study with 3D Drawings

OMV/JET Loading 2012

Study with 2D Drawings

OMV/Gasoil-3 Unloading 2012

Study with 2D Drawings

REFERENCES

Page 16: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

16

OMV/TL Schwechat

Adapting Tanks § 34

2012

Study with 2D Drawings

OMV/Raw C4 Additives

Water Quench System

2012

Study with 3D Drawings

EPCM contract with commissioning

OMV/SIRT Product Transfer

Schwechat - Burghausen

2012

SELECT for vapours at loading

DEFINE Tank Farm/ loading Schwechat

DEFINE Tank Farm/ unloading Burghausen

STRABAG AG Environmental

Technology

DeNOx Power Plant Orlen/Poland

2009-2010

Reactor design drawing

Master drawing

Workshop drawing

REFERENCES

Page 17: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

17

KA-München

OMV Matzen – New Construction

of the Extraction Unit

2009 – 2010

Steel construction, pipe brides, platforms, pump stations

Detail engineering

Steel construction master drawings

Steel construction workshop drawings

Static calculations

OMV – Refinery Schwechat

Ethylene Plant

New construction of the fuel pipe

up to AC and new piping of the pumps

2010/2011

EPCM

Concept studies / process

Basic / Detail engineering

E&MSR

Procurement / tender

Project and site management

OMV – Burghausen

Tank Farm Feldkirchen

12/2011

Addition BIO-Quote

SELECT Studies

OMV – Tank Farm Lobau

12/2011

New planning of the street lightning

Detail Engineering

REFERENCES

17

Page 18: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

18

OMV – Refinery Schwechat

HDS-1 Plant

Ejector Condensate

Water Washing

12/2011

Detail Engineering

OMV – Refinery SUNPOR

SELECT and FEED (with CAC)

10/2012

Concept development

Distillation column, offsite

LPC-storage and loading

Authority project

OMV – Refinery

06/2012

SNOx adaption

Flue gas duct 16 and 15.1

Study and detail engineering

OMV – Refinery

08/2012

SELECT Jet-uploading

Crude oil and gas oil downloading

at JET station

OMV – Tank Farm Lobau 07/2012

SELECT fuel oil light

with coloration and end point dosing

REFERENCES

18

Page 19: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

19

OMV – Schwechat and

Burghausen Project SIRT

SELECT and FEED

2012/2013

Loading of HSKL and residue of pyrolysis

in Schwechat, transport and downloading

in Burghausen

Handling of loading steam on-spot

OMV – Ethylene Schwechat

SELECT Study Optimizing

Furnaces

04/2012

Installation of cracked gas analyzer at the process furnaces

OMV – Refinery Schwechat

Revamp FCC Plant with CAC

06/2012

Creation of SPPID-process and process flow diagram

piping drawings, site supervision

SIEMENS – Austria

02/2013

Project PETROM Spinsep and Oprisenesti

Flood water treatment plant,

Detail Engineering, SKID-planning

02 – 09 2013

Project: PETROM Oprisenesti

Process Treatment Water Plant (PTPW)

Basic and Detail Engineering

OMV – Tank Farm Lobau

Transformer Station 3

02/2013

400V-control plant

Authority and site supervision

REFERENCES

19

Page 20: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

20

STRABAG 10/2013

Heat container plant Villach

Detail Engineering

OMV – Burghausen/CAC

BUTAMAX

04/2013

Offsite and tie-in-point planning TP1/2/3

Detail Engineering power house – construction/steel

construction

Several static calculations and steel construction planning

Site supervision TP1/2

OMV – Schwechat

HDS-3 Splitter

Slop System New

06/2013

SELECT and FEED

OMV – Tank Farm Lobau

05/2013

Transformer station 3

Planning and site supervision

OMV – Schwechat

New Construction JET

Up/Downloading station

06/2013

Refining of the JET station suitable for crude and fuel oil

SELECT studies

REFERENCES

20

Page 21: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

21

STRABAG 11/2014

Heat transformer station

Laakirchen

Detail Engineering

OMV – Schwechat 2013/2014

Several studies and concepts for production dosing, tank

rededication, storage automation, etc.

SIEMENS – Austria

03/2014

Basic design and Detail Engineering

Flood water treatment plant VIDELE/Romania

11/2013 – 08/2014

Project PETROM Videle

Basic and Detail Engineering

(Arrangement, 3D model, piping,

Construction/steel construction, statics)

SIEMENS - Austria

08 – 10/2013

Project: INA Zutica

Detail Engineering Walnut Shell Filter (WSF)

Detail Engineering

(arrangement, 3D model, piping,

construction/steel construction, statics)

SIEMENS - Austria 09 – 12/2013

Project: intelligent PID

Project development PID

REFERENCES

21

Page 22: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

22

SIEMENS - Austria

12/2013 – 01/2014

Project PETROM Tazlau

Basic Engineering/PID

REFERENCES

22

Page 23: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

23

Client / Country TECHNIP Benelux

OMV Refinery Schwechat

Period 2002 / 2003

Type of Contract EBE

Project Description Increase in Capacity of the

Ethylene Plant AC2 from

320.000 tons/y to 500.000 tons/y

TBH Scope of Services Arrangement Studies / Plant Layout

Piping Studies and Pipe Routing

in the hot, cold part and

High-Pressure Steam System

New Foundation and

Static Calculations

Static Load Test and

Static Calculations for

Steel and Concrete Construction

Cost Estimate for Construction,

Steel Construction, Piping

PROJECT - AC2 Revamp

Page 24: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

24

Client / Country UHDE Edeleanu

OMV Refinery Schwechat

Period 2003 / 2004

Type of Contract EBE / EPCM

Project Description Revamp of the HDS Splitter - Plant

and Enlargement with a

Post Treating Unit (PTU)

TBH Scope of Services Piping Design 420 Pipes /190 Inlets

Steel Construction Planning + Static

Calculations (120 tons)

Constructional Engineering + Static

Calculations (820m³)

Authority Engineering

E & EMSR Design

Planning of Fire Protection,

Fire Extinguishing System

Site Management:

Special Site Management Construction,

Pipe work, Scaffolding,

Painting/Insulation, Construction

Coordination, E&MSR

Start Up/Training

PROJECT - HDS3 Revamp

Page 25: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

25

Client / Country UHDE Edeleanu

OMV Refinery Schwechat

Period 2005/2006

Type of Contract EBE

Project Description Revamp of the existing

HDS1/HDS2 Plant

for Production of Low-Sulfur Kerosene

(HELSA) and for the Increase of

Capacity

TBH Scope of Services Arrangement Planning / Plant Layout

Pipe work: Rough Routing,

Tie-In Point Design, Offsite Design,

Dismounting Planning

Constructional Engineering:

Pre-Static Analyses,

Evaluation Underground

E&MSR-Design

Authority Engineering

Cost Estimates:

Construction, Steel Construction,

Pipe work, E&MSR

PROJECT - HDS1 Revamp

Page 26: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

26

PROJECT - SNOX

Client / Country ENVIRGY

OMV Refinery Schwechat

Period 2006 / 2008

Type of Contract EBE / EPCM

Project Description New Building of a Flue Gas Purification

Plant for Reduction of SO2 and NOx

TBH Scope of Services Arrangement Planning

Caustic Tank

Provisional Arrangement

Steel Construction Planning + Static

Calculations (4.700 tons):

Reactor 700 tons (16Mo3)

Static Calculations + Design

Flue Gas Ducts 1.900 tons (S235JRG2)

Static Calculations and Design

Scaffoldings 2.100 tons (S235JRG2 &

S355J0)

Static Calculations and Design

Page 27: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

27

PROJECT - TGU Thermal Gasoil Unit

Client / Country UHDE Edeleanu Refining Technologies

OMV Refinery Schwechat

Period 2006 / 2008

Type of Contract EBE / EPCM

Project Description New Plant for Thermal

Conversion of Residues from

Vacuum and Atmospheric Distillation

TBH Scope of Services Authority Engineering Construction

Construction/Steel Construction –

Civil Engineering

Planning Precast Concrete

Scaffoldings

Pipe work Offsite – 135 tons (75 Tie-Ins)

Pipe Racks Offsite – 150 tons

Underground Planning ISBL

Fire Extinction Planning ISBL

E+MSR Engineering

Site Management:

Special Site Management Construction,

Pipe work, Scaffolding,

Painting/Insulation, Construction

Coordination, E&MSR

Page 28: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

28

Client / Country UHDE Edeleanu

PETROM - OMV Refinery Ploiesti

Period 2006/2007

Type of Contract EBE

Project Description New Building of FCC-Gasoline

Desulphurization Plant and

Revamp of the existing

TAME Plant

TBH Scope of Services Arrangement Plans / Plant Layout

Pipe work: Rough Routing,

Tie-In Point Planning, Offsite

Planning, Dismounting Planning

Constructional Engineering:

Pre-Static Analyses,

Evaluation Underground

E&MSR-Planning

Authority Engineering

Cost Estimates:

Construction, Steel Construction, Pipe

work, E&MSR

PROJECT - FCC PT

Page 29: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

29

Client / Country PETROM - OMV, Romania

Period 2007 to 2008

Type of Contract EPCM

Project Description Fame Unloading Station

Unloading of Tank Wagons

50 - 100m³/h

Fame Dosing Station

Production of Biodiesel

100 - 200m³/h

TBH Scope of Services Concept Development / Process

Basic / Detail Engineering

E&EMSR

Authority Engineering

Procurement

Project Management

Site Management

Construction Management

Quality Management

Safety Management

PROJECT - FAME

Page 30: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

30

Client / Country PETROM - OMV Romania

Refineries Ploiesti / Arpechim

Period 2007 to 2009

Type of Contract EBE/EPCM

Project Description Tank New Constructions

Bitumen Tank 5.000m³

Gasoline Tank 10.000m³

Diesel Tanks 2 x 13.000m³

Tank Revamps

13 Tanks 5.000m³ to 50.000m³

TBH Scope of Services Concept Development / Process

Basic / Detail Engineering

E&MSR

Authority Engineering

Procurement

Project Management

Site Management

Construction Management

Quality Management

Safety Management

PROJECT - TANK CONSTRUCTION – TANK REVAMP

Page 31: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

31

PROJECT – AC – Fuel Pipe and New Piping of Pumps

Client / Country OMV - Refinery

Schwechat

Period 2010/2011

Type of Contract EPCM

Project Description Replanning of 800m

AC-fuel pipe NW 400

New Pipe work of

5 Pumps including

Measurement and Control Technology

TBH Scope of Services Conceptual Development / Process

Basic / Detail Engineering

E&MSR

Procurement

Project and Site Management

Page 32: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

32

Client / Country OMV / HEAT

Extraction Unit Matzen

Period 2010

Type of Contract EPCM

Project Description Package – Unit

Gas – Drying

TBH Scope of Services Container Construction

Detail Engineering

3D – Plant Layouts

Piping Drawings

Isometrics

PROJECT – Refrigerant Dryer Plant Matzen

Page 33: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

33

Client / Country PETROM - Romania

Refinery Ploiesti

PALL Filter

Period 2010/2011

Type of Contract EPCM

Project Description Package – Unit

For AMIN – Filter

TBH Scope of Services Conceptual Development / Process

Basic / Detail Engineering

E&MSR

Workshop Drawings Apparatus

Workshop Drawings Steel Construction

Foundation Drawings

3D- Piping

Isometrics

PROJECT – Amine Filtration Package

Page 34: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

34

Client / Country OMV - Refinery

Schwechat

Subcontractor for EBE

Foster Wheeler/Italy

Period 2010

Type of Contract EBE

Project Description Capacity Expansion

of the Crude Oil Distillation 4

TBH Scope of Services Conceptual Development on basis of Rul

Basic Engineering - Subcontractor

Layout Planning 3D – Intergraph

Piping Drawings

Steel Construction Statics and Planning

EMSR – Planning

Cost Estimate for

Scope of Design TBH

Disassembling Planning

PROJECT – RD4 – UZR Revamp

Page 35: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

35

PROJECT – RD4 – UZR Revamp

Client / Country OMV - Refinery

Schwechat

Subcontractor for EBE

Foster Wheeler/Italy

Period 2010

Type of Contract EBE

Project Description Capacity Expansion

of the Crude Oil Distillation 4

TBH Scope of Services Conceptual Development on basis of

Rul Basic Engineering -

Subcontractor

Layout Planning 3D – Intergraph

Piping Drawings

Steel Construction Statics and Planning

EMSR – Planning

Cost Estimate for

Scope of Design TBH

Disassembling Planning

Page 36: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

36

PROJECT – RD4 – UZR Revamp

Client / Country OMV - Refinery

Schwechat

Subcontractor for EBE

Foster Wheeler/Italy

Period 2010

Type of Contract EBE

Project Description Capacity Expansion

of the Crude Oil Distillation 4

TBH Scope of Services

Conceptual Development on basis of

Rul Basic Engineering -

Subcontractor

Layout Planning 3D – Intergraph

Piping Drawings

Steel Construction Statics and Planning

EMSR – Planning

Cost Estimate for

Scope of Design TBH

Disassembling Planning

Page 37: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

37

Client / Country PETROM - OMV Romania

Oil Field Station – Suplac

Zauner/Wallern

Period 2010

Type of Contract EBE/EPCM

Project Description Assembling of

2 Steam Generators

TBH Scope of Services Conceptual Development

Arrangement / Layout Planning

in ACAD 3D

Piping Studies

Isometrics

Steel Construction

PROJECT – Steam Unit 1 + 2 Suplac de Barcau

Page 38: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

38

Client / Country OMV - Refinery

Ethylene Plant

Period 2010

Type of Contract EBE/EPCM

Project Description New Construction of

SV – Station AC

TBH Scope of Services Conceptual Development on

basis of RuI

3D – Planning Intergraph

Isometrics

Material Lists

PROJECT – Safety Valve Station

Page 39: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

39

Client / Country OMV – Schwechat

Contractor Kremsmüller

Period 2010/2011

Type of Contract EPCM

Project Description Revamp of Tank and

Modernization

Content = 50.000 m³

Diameter = 57,0 m

Height = 20,0 m

TBH Scope of Services Tender Documents

General Contractor

Detail Engineering

Static Calculations

Workshop Drawings for

Reconstruction and New

Tank Drawings for Modernization

PROJECT – Revamp Tank T2113

Page 40: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

40

PROJECT – Revamp Tank T2112

Client / Country OMV – Schwechat

Contractor Kremsmüller

Period 2010/2011

Type of Contract EPCM

Project Description Revamp of Tank and

Modernization

Content = 50.000 m³

Diameter = 57,0 m

Height = 20,0 m

TBH Scope of Services Tender Documents

General Contractor

Detail Engineering

Static Calculations

Workshop Drawings for

Reconstruction and New

Tank Drawings for Modernization

Page 41: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

41

PROJECT – Revamp Tank T2112

Client / Country OMV – Schwechat

Contractor Kremsmüller

Period 2010/2011

Type of Contract EPCM

Project Description Revamp of Tank and

Modernization

Content = 50.000 m³

Diameter = 57,0 m

Height = 20,0 m

TBH Scope of Services Tender Documents

General Contractor

Detail Engineering

Static Calculations

Workshop Drawings for

Reconstruction and New

Tank Drawings for Modernization

Page 42: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

42

Client / Country Power Plant

Poland

Period 2010

Type of Contract EBE/EPCM

Project Description Erection of a

DENOX – Plant

TBH Scope of Services Reactor Planning

Static Calculation and Master Drawing

Detail and Workshop Drawings

Assembly Instructions and

Assembly Planning

PROJECT - DeNOx

Page 43: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

43

Client / Country Corus Energy

IRAN

Period 2010

Type of Contract EBE

Project Description Analysis of

3 Tank Farms on its Usability

TBH Scope of Services Conceptual Development for

Bitumen Tank Farm

Analysis

Inspection Works

Cost Estimate for

Tank Farm Adaptation

Cost Estimate for

Bitumen Tank Farm Reconstruction

PROJECT – Tank Inspection - IRAN

Page 44: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

44

Client / Country EVN / Austria

Integral - Montage

Period 2009/2010/2011

Type of Contract Engineering Services

Project Description Erection Power Plant

Mellach / Austria

TBH Scope of Services Offsite Pipeline System

Planning and Procurement

Stress Calculation for

High Pressure Steam and

Condensate Systems

PROJECT – Power Plant MELLACH

Page 45: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

45

PROJECT – OMV Matzen – New Construction of Extraction Station

Client / Country KA-München

OMV Matzen

Period 2009-2010

Type of Contract Subcontract

Project Description New Construction of the Extraction

Station Matzen

TBH Scope of Services Steel Construction, Pipe Bridges,

Platforms, Pump Stations

Detail Engineering

Steel Construction Master Drawings

Steel Construction Workshop

Drawings

Static Calculations

45

Page 46: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

46

PROJECT– Process Water Treatment Plant – Walnut Filter

Client / Country SIEMENS Austria

Period 2011

Type of Contract Subcontract

Project Description Flood Water Treatment Plant

in SKID-planning + hall

TBH Scope of Services Detail Engineering and

Workshop Drawings

46

Page 47: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

47

PROJECT – Ejector Condensate / Water Washing

Client / Country OMV

Refinery Schwechat

HDS-1 Plant

Period 2011

Type of Contract EPCM

Project Description Process Water Inhibition

to protect corrosion in the heat

exchanger

TBH Scope of Services Detail Engineering

Site Management

47

Page 48: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

48

PROJECT – SUNPOR

Client / Country OMV

Refinery Schwechat

Period 2012

Type of Contract SELECT and FEED

Project Description Distillation of ISO und

n-pentane, Storage

and Loading

TBH Scope of Services Concept development

Distillation column

Offsite

LPC-storage and loading

Authority Project

48

Page 49: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

49

PROJECT – Ethylene Plant

Client / Country OMV

Refinery Schwechat

Period 2010/2011

Type of Contract EPCM

Project Description Concept studies / Process

TBH Scope of Services Basic / Detail Engineering

E&MSR

Procurement/Tender

Project and Site Management

49

Page 50: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

50

PROJECT – SIRT – SELECT and FEED

Client / Country OMV

Refinery Schwechat and Burghausen

Period 2012/2013

Type of Contract Engineering

Project Description Loading of HSKL and Residue of

Pyrolysis in Schwechat

Transport and Downloading

in Burghausen

Handling of Steam on-spot

TBH Scope of Services SELECT-Study and

FEED-Engineering

50

Page 51: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

51

PROJECT – PETROM Spinsep and Oprisenesti

Client / Country OMV R&M

HDS1 Water Washing

Period 2011/12

Type of Contract EPCM

Project Description Flood Water Processing

TBH Scope of Services Detail Engineering

SKID-planning

51

Page 52: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

52

PROJECT – BUTAMAX

Client / Country OMV

Refinery Burghausen

Period 2013

Type of Contract Subcontract

with CAC Chemnitz

Project Description Offsite and Tie-in-point planning

TP1/2/3 and piping planning

New power supply with

MD-steam generator 50 t/h

TBH Scope of Services Detail Engineering Power House –

Construction/steel construction

Several static calculation and steel

construction planning Site

ManagmentTP1/2

52

Page 53: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

53

PROJECT – PETROM Videle

Client / Country SIEMENS

Austria

Period 11/2013 – 08/2014

Type of Contract Subcontract

Project Description

Process Water Treatment

VIDELE/Romania

TBH Scope of Services Basic and Detail Engineering

Arrangement, 3D model, Piping,

Construction/steel construction, static

calculations

53

Page 54: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

54

PROJECT – HDS-3 Splitter – Slop System New

Client / Country OMV

Refinery Schwechat

Period 2013

Type of Contract SELECT Study and

FEED

Project Description Dismantling and Refitting

Slop System HDS-3 Splitter

TBH Scope of Services Piping

Construction/Steel construction

engineering

Static calculations and

Cost estimation

54

Page 55: TBH · piping design, construction and steel construction planning, instrumentation up to site management, ... OMV / UHDE - Edeleanu HDS-3 Revamp 2003 - 2004

55

TBH Office Center Perchtoldsdorf

Alfred Feierfeilstraße 3

A-2380 Perchtoldsdorf near Vienna

Tel.: +43-1-699 25 47 – 0

Fax.: +43-699 25 47 – 9

Email: [email protected]

Internet: www.tbhajek.at

Management of TBH / Project Management

Herbert Grabner

CEO / Plant Design

Oliver Grabner

Process Engineering / Engineering

Andreas Grabner