design of large-sized accelerator tunnel

17
PAC07 PAC07 1 1 Design of Large Design of Large - - sized sized Accelerator Tunnel Accelerator Tunnel Speaker Speaker Takashi Kato, Nikken Sekkei Ltd., Takashi Kato, Nikken Sekkei Ltd., Akinori Akinori Tamura, Nikken Tamura, Nikken Sekkei Sekkei Civil Ltd. Civil Ltd. 2007.6.28

Upload: others

Post on 04-Oct-2021

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Design of Large-sized Accelerator Tunnel

PAC07PAC07 11

Design of LargeDesign of Large--sized sized Accelerator TunnelAccelerator Tunnel

SpeakerSpeaker

Takashi Kato, Nikken Sekkei Ltd.,Takashi Kato, Nikken Sekkei Ltd.,

AkinoriAkinori Tamura, Nikken Tamura, Nikken SekkeiSekkei Civil Ltd.Civil Ltd.

2007.6.28

Page 2: Design of Large-sized Accelerator Tunnel

PAC07PAC07 22

SPring8, XSPring8, X--FELFEL

Page 3: Design of Large-sized Accelerator Tunnel

33

JJ--PARCPARC

Page 4: Design of Large-sized Accelerator Tunnel

PAC07PAC07 44

GHMCGHMC

Page 5: Design of Large-sized Accelerator Tunnel

PAC07PAC07 55

ILCILC

Page 6: Design of Large-sized Accelerator Tunnel

PAC07PAC07 66

IntroductionIntroduction

Accelerator Facilities / Civil EngineeringAccelerator Facilities / Civil EngineeringKKey points ey points for thefor the design of underground design of underground accelerator tunnel accelerator tunnel Overview of the sOverview of the structural analysis tructural analysis concerning with necessity of Expansion Jointsconcerning with necessity of Expansion Joints

Based on the experience in Based on the experience in JJ--PARCPARC

Page 7: Design of Large-sized Accelerator Tunnel

PAC07PAC07 77

2 key2 key--points for the designpoints for the designof undergroundof underground accelerator tunnelsaccelerator tunnels

①① Transformation of the accelerator tunnel Transformation of the accelerator tunnel should be minimalshould be minimal

②② Level of integrity and durability of the tunnel Level of integrity and durability of the tunnel structure should be highstructure should be high

→→ ◆◆stable operation of the acceleratorstable operation of the accelerator

→→ ◆◆very few cracks in the cover concretevery few cracks in the cover concrete

Page 8: Design of Large-sized Accelerator Tunnel

PAC07PAC07 88

①①Transformation of the tunnel Transformation of the tunnel is controlled by following factorsis controlled by following factors

Geological features, Situation of groundwaterGeological features, Situation of groundwaterChange of live load to the tunnelChange of live load to the tunnelTemperature change inside the tunnel, Temperature change inside the tunnel, Influence from earthquakeInfluence from earthquakeStructure of the tunnel itselfStructure of the tunnel itself

(Foundation, (Foundation, Expansion jointExpansion joint,, etc.)etc.)

Page 9: Design of Large-sized Accelerator Tunnel

PAC07PAC07 99

②② Integrity and durability of the tunnel Integrity and durability of the tunnel is controlled by following factorsis controlled by following factors

==To realize very few cracks in tunnel concreteTo realize very few cracks in tunnel concreteTo use watertight mass concreteTo use watertight mass concreteTo place indispensable quantity of reinforcement To place indispensable quantity of reinforcement accurately in positionaccurately in positionTo perform proper waterproofing workTo perform proper waterproofing workTo take appropriate measures against shrinkage To take appropriate measures against shrinkage of concreteof concreteStructure of the tunnel itself Structure of the tunnel itself (Foundation, (Foundation, Expansion jointExpansion joint,, etc.)etc.)

Page 10: Design of Large-sized Accelerator Tunnel

PAC07PAC07 1010

JJ--PARC 50GeVPARC 50GeV synchrotron tunnelsynchrotron tunnel

Bird's-eye view of J-PARC 50GeV

Complicated layer

Cross-section of J-PARC 50GeV tunnel

Page 11: Design of Large-sized Accelerator Tunnel

PAC07PAC07 1111

-300

-200

-100

0

100

200

300

-300 -200 -100 0 100 200 300

Without Expansion joint If provided Expansion Joints

-300

-200

-100

0

100

200

300

-300 -200 -100 0 100 200 300

Analysis model

Expansion JointsExpansion Joints

Expansion joint

Page 12: Design of Large-sized Accelerator Tunnel

PAC07PAC07 1212

Tem perature of concrete(15℃air supply)

0.00

5.00

10.00

15.00

20.00

25.00

30.00

1 58 115 172 229 286 343 400 457 514 571 628 685 742

Passing tim e(hour)

Temperature(℃)

Shut-down (winter)

Condition of structural analysisCondition of structural analysis

(T(Temperature change of tunnel concrete emperature change of tunnel concrete ))

Structural analysis was performed based on the assumption Structural analysis was performed based on the assumption of safe side that the temperature of tunnel concrete change of safe side that the temperature of tunnel concrete change 1212℃℃

12℃

Operation

Page 13: Design of Large-sized Accelerator Tunnel

PAC07PAC07 1313

Axial force diagram in the case of concrete temperature 1℃ rises

Software of structural analysis3-dimensional ground and structure seismic response analysis system DINAS

Page 14: Design of Large-sized Accelerator Tunnel

PAC07PAC07 1414

Bending Moment diagram in the case of concrete temperature 1℃ rises

(12℃ changes)

Page 15: Design of Large-sized Accelerator Tunnel

PAC07PAC07 1515

Maximum displacement to outside direction of the ring tunnel in a curved part is around 4mm

Lap length of the ring tunnel increases around 3mm

Transformation diagram in the case of concrete temperature 1℃ rises

average expansion and contraction rate 1.6×10-7(1/℃)<linear thermal expansion rate of concrete 1.0×10-5(1/℃)

Page 16: Design of Large-sized Accelerator Tunnel

PAC07PAC07 1616

SummarySummary

KKey points ey points for thefor the design of the underground design of the underground accelerator tunnelaccelerator tunnel

→→ Transformation should be minimal and level of integrity Transformation should be minimal and level of integrity and durability of the tunnel structure should be highand durability of the tunnel structure should be high

SStructural analysis concerning with necessity of tructural analysis concerning with necessity of Expansion JointsExpansion Joints

→→ TThere will be no incidence of displacement and cracks here will be no incidence of displacement and cracks in the tunnel concrete without expansion jointsin the tunnel concrete without expansion joints

Page 17: Design of Large-sized Accelerator Tunnel

PAC07PAC07 1717

Thank you very much for your attentionThank you very much for your attention