SCOPE OF WORK:
1. Wiring and installation of underground electrical feederline of DPWH Building
2. Excavation of Underground Feederline Wire
3. Certification of Insulation Resistance Test
ITEM
NO.UNIT QTY. UNIT COST TOTAL COST
A GENERAL REQUIREMENTS
Temporary lighting & water facilities days 60 P P
Steel Barricade with Caution tape (rental) each 41
pc 1
Construction Safety and Health
pcs 9
pcs 9
pcs 7
pcs 7
pcs 9
pcs 7
pcs 7
Direct Cost A P
B INSTALLATION OF ELECTRICAL SYSTEM
I
63mm0 Entrance Cap Diecast (US) pcs 2
63mm0x 10' IMC Pipe pc 1
75mm0 x 10' IMC Pipe pcs 20
75mm0 PVC Long Elbow pcs 3
75mm0 PVC Adaptor pcs 4
63mm0Locknut and Bushing pairs 4
75mm0 Malleable Iron Clamp mtrs 12
125mm0 Solderless Connector wl two Bolt pcs 3
5/80 x 1/2"0 x 2 1/2@ Expansion Shield w/ lug screw pairs 12
1/2"0 x 3/8"0 x 2" Expansion Shield w/lug screw pairs 4
12" x 12" x 8" Fabricated Pulibox Ga.18 pc 1
II
mtrs 315
III
set 1
Material Cost P
Labor Cost
Direct Cost B P
PANEL BOARD
Roughing-ins
WIRES & CABLES
125mm2 THHN Wire
Vest
Face Mask
Harness
Goggles
Billboard
Safety Helmet
Safety Shoes
Safety Gloves
PROGRAM OF WORK
Moulded Case Circuit Breaker 250 AT, 2P, 230V Enclosure
Weather Proof Type w/ Ground Terminal in Nema 3R
QC INFRA PROJECT
DETAILED COST ESTIMATE
WORK DESCRIPTION & SCOPE OF WORKS
PROJECT TITLE : PROPOSED INSTALLATION OF ELECTRICAL SYSTEM OF EMILIO
JACINTO NATIONAL HIGH SCHOOL
LOCATION : BARANGAY PASONG TAMO, DISTRICT 6, QUEZON CITY
Page 1 of 3
ITEM
NO.UNIT QTY. UNIT COST TOTAL COST
IV MISCELLANEOUS & CONSUMABLES
roll 1 P P
roll 2
unit 1
C
cum 6
cum 20
cum 6
Direct Cost C P
D CONCRETE WORKS
Concrete Hollow Blocks (CHB) with Leveling Sand sq.m 20
Materials Cost P
Labor Cost
Direct Cost D P
E INSULATION OF RESISTANCE TESTING
Certification of Insulation Resistance Test lot 1
Direct Cost E P
P
P
Duly authorized to sign Bid/Quote for and on behalf of
Pipe/Conduit Supports, Brackets and Other Accessories
SITE WORKS
Excavation
Chipping and Disposal of Concrete
Backfill
Rubber Tape
Electrical Tape
Total Direct Cost
OCM
Profit
VAT
[Signature Over Printer Name] [in the capacity of]
WORK DESCRIPTION & SCOPE OF WORKS
Page 2 of 3
A P
B
C
D
E
P
P
Amount in Words: ________________________________________________________________________________
NAME OF COMPANY: _____________________________________________________________________
ADDRESS: _____________________________________________________________________
_____________________________________________________________________
Duly authorized to sign Bid/Quote for and on behalf of
INSTALLATION OF ELECTRICAL SYSTEM
SITE WORKS
CONCRETING WORKS
INSULATION RESISTANCE TESTING
TOTAL DIRECT COST
Name of Project: PROPOSED INSTALLATION OF ELECTRICAL SYSTEM OF EMILIO
GENERAL REQUIREMENT
SUMMARY
OCM
[Signature Over Printer Name] [in the capacity of]
JACINTO NATIONAL HIGH SCHOOL
Location: BARANGAY PASONG TAMO, DISTRICT 6, QUEZON CITY
ABC: P957,332.46
PROFIT
VAT
TOTAL ESTIMATED COST
Page 3 of 3
Item of Work MATERIALS INDIRECT AGGREGATE
(Description) COST COST COST
A GENERAL REQUIREMENT
B INSTALLATION OF ELECTRICAL SYSTEM
C SITE WORKS
D CONCRETING WORKS
E INSULATION RESISTANCE TESTING
T O T A L
Amount in Words: ______________________________________________________________________________________
NAME OF COMPANY: _______________________________________________________________________
ADDRESS: ______________________________________________________________________________
Duly authorized to sign Bid/Quote for and on behalf of
Name of Project: PROPOSED INSTALLATION OF ELECTRICAL SYSTEM OF EMILIO
BREAKDOWN OF COST
LABOR COST
JACINTO NATIONAL HIGH SCHOOL
Location: BARANGAY PASONG TAMO, DISTRICT 6, QUEZON CITY
ABC: P957,332.46
[Signature Over Printer Name] [in the capacity of]