    GenSet Preventive Maintenance Process

    Contractor

    SiteTechnician

    Order Contractorto Repair

    Change & Report

    NO

    Does it Have OilLeak?

    NO

    Notify NOCprior to

    access site

    CompleteGenSet

    Status OK?

    Carry outRepair Work

    NotNormal

    YES

    Send RepairReport

    YES

    OrderContractor forRepair Work

    NotifyNOC priorto leavethe site

    CheckGenSetPhysicalCondition

    Does it need OilChange?

    CheckGenSet

    Hours Meter

    CheckGenSet Fuel

    Meter

    Does it need Fuel

    Does it need NewOil Filter?

    Does it need AirFilter?

    Does it makeNoise?

    NO

    YES

    YES

    NO

    FuelConsumption

    Rate?

    Normal

    RecordSparesUsage

    Notify FuellingCompany

    YES

    NO

    YES

    NO

    NO

  • 8/6/2019 Detailed Processes V1.0

    3/12

    Preventive Maintenance Plan Process

    Customer

    PeopleLogic

    To BeAmended

    Approved

    To change

    Issue WOfor any

    SM

    YES

    NotifyNOC priorto leave

    the site

    PM MonthlySchedule

    Carry outCorrective

    Work

    Carry outPM Work

    Complete

    Weekly Report:- Completion to FO- Update ScheduleActual Dates

    NO

    Satisfy CustomerRequirements

    NO

    OK?

    PM Report &Required Actions

    Approve

    PM Plan

    YES

    Monthly PreventiveMaintenance

    Schedule

    YES

    Notify NOCprior to

    access site

    NO

    Preventive MaintenancePlan

    SiteTechnicians

    OMC

    Front

    Office

    Send PM WeeklyReport & Schedule

    Update to OMC

  • 8/6/2019 Detailed Processes V1.0

    4/12

    Corrective Maintenance Process

    S

    iteTechnician

    ZONG

    Telecom Site

    Alarm

    Ask forPermission

    Check withNOC

    every 30 Mins

    OMC

    FrontOffice

    SiteTechnic

    ians

    MTTA MTTR

    Close TT

    Create TT

    AutomaticProcess

    - Close TT (Use standard

    RCA description)- Send RCA Report to ZONG,TL, and FOPS Mgr.

    FOPSManager

    RegionalCTO

    Check if it wasclosed asControllable orUnConctrollable,

    discuss with OMCand if notchanged report toNOC TL

    CountryManager

    NO

    SMS/Email /

    Call toinvolved

    Parties

    ST

    YES

    Acknowledge

    Closing TT

    Fix the

    Problem

    Despatch SiteTech in Parallel

    with Pre-Troubleshooting

    Security

    Guard /Supervisor

    On Duty

    PLC OPSDirector

    SMS to

    involved

    Parties

    - Acknowledge TT- Complete Initialtroubleshooting

    procedure- Check Severity- Assign work

    FOPSManager

    YES

    OPSDirector

    SolvedRoot-Cause

    Report

    Assign to

    SLM /Contractor

    NO

    - Quality related issue (Noise, Block

    TRX, rredundancy for PWR/TRX)- Expansions,- Battery Bank replacement

    YES

    Problem

    Fixed withintime?

    Can be solvedby NOC?

    NO

    Network Management System / Trouble Ticketing System

    Needs SLM orContractor?

  • 8/6/2019 Detailed Processes V1.0

    5/12

    Internal Escalation Process

    FOPS

    RTL

    NOC

    Telecom Site

    Check withNOC

    every 30 Mins

    Despatch SiteTech in Parallel

    with Pre-Troubleshooting

    - Acknowledge TT- Complete Initialtroubleshootingprocedure- Check Severity- Assign work

    Can be solvedby NOC?

    On Duty

    Problem notsolved within

    SLA?

    FirstEscalation:Call and sendSMS to TL

    Check withTL

    every 30 Mins

    Check withRTL

    every 30 Mins

    SecondEscalation:Call and sendSMS to RTL

    Check with

    FOPS Mgrevery 30 Mins

    SecondEscalation:Call and sendSMS to RTL

    FLMT

    ech

    Management

    TL

    First Escalation:TL has to work closelywith Site Tech, if needsto go on site too

    Timeline:- 2 hours for P1- 3 hours for P2- 5 hours for P3

    Timeline:- 2 1/2 hours for P1

    - 4 hours for P2- 6 hours for P3

    Timeline:- 3 hours for P1- 5 hours for P2- 7 hours for P3

    Second Escalation:RTL has to work closelywith TL & Site Tech, ifneeds to go on site too

    Third Escalation:FOPS Mgr has to workclosely with RTL, TL &Site Tech

  • 8/6/2019 Detailed Processes V1.0

    6/12

    Repair and Return Process

    PLC

    ZON

    G

    FoundFaulty

    Hardware

    CreateFault

    Report

    Check forPhysicalDamage

    CompareS/N

    Store IssueRequisition

    SIR

    GoodsReceived Note

    GRN

    Avail in RegionWarehouse?

    Avail in Other RegionWarehouse?

    Avail in Other Site?

    - Obtain FOPSManager Approval

    - Replace faulty HW

    StartEscalation

    PROC

    SIR

    GRN

    FaultReport

    PROC?

    NO

    YES

    NO

    YES

    NO

    YES

    ProvideSpares

    Network Management System / Trouble Ticketing System

    Alarm

    - Acknowledge TT- Check Severity

    - Assign work

    Despatch Site

    Tech

    SMS toinvolved

    Parties

    Create TT

    Send dispatch

    request (Call)

  • 8/6/2019 Detailed Processes V1.0

    7/12

    Consumables Process

    PeopleLogic

    Zon

    g

    QualityManager

    Coordinator

    SiteTech

    Procurement

    Document all

    Materials inDatabase

    Meet QARequirements?

    Archive

    Update

    Materials inDatabase List

    Site Needs:- Oil Change- Oil Filter- Air FilterEtc ...

    ReplacementReport

    HandoverLimitedQuantity

    Check:- Serial No- Replaced Item

    - Site Requirement

    Deliver Reportalong withreplacedmaterials

    Inspect Sites

    Weekly ReplacedMaterial Report

    Accurate

    DetailedReplacement

    Report

    Ask forMore Details

    Accept?

    UpdateReplacementMaterial List

    MaterialOrder

    Deliver Used& Order Monthly

    Replacement

    Anti-ThievingProcedure

    Yes

    NoYes

    No Yes

    No

  • 8/6/2019 Detailed Processes V1.0

    8/12

    Call Quality Test CQT Process

    P

    LC

    ZONG

    C

    OPS&RAN

    OMC

    FOPS

    Create List of

    Sites to Check

    Initiate aRequest for

    CQT

    Create CQT

    Schedule

    OK?

    Deploy CQTMake a Callfor 45 Sec.

    Wait 15 Sec.Repeat lasttwo steps 10

    times

    Record- RX & CID- Fill in theCQT Form

    Rx

  • 8/6/2019 Detailed Processes V1.0

    9/12

    Site Handover Process

    PLC

    ZONG

  • 8/6/2019 Detailed Processes V1.0

    10/12

    GenSet Refuelling Process

    ZONG

    Contractor

    Contractor withthe lorry in GasStation to fill uphis Lorry beforeset-off to sites

    Driver

    PLC

    B

    ackOffice

    QA

    Define InitialConsumption Plan

    and RequiredQuantity per Site,Considering Due

    Dates

    Daily Path withSite Attendance

    Approx Time

    Is ThereExceptional

    Site

    ProvideSpecialCases

    ReviseFuelling

    Plan

    Fill GenSet Tank

    DeployFuelling

    Plan

    - Call Back Office- Report Qty / Time

    Check & Record:

    - Tank Indicator- Time Counter- Take Sample Fuel& Label it

    Call BO & Report:- Tank Status- Time Counter- Keep Sample Fuelin Special Store

    G

    enSetTech

    DispatchGenSet Techor Logistics

    Coord.- Insert data in DB- Report to ZONG- Reconciliation Report

    Update FuellingInformation

    Logistics Techin Gas Stationwith Contractor

    to swipe thePSO Card

    Take Sample ofthe Fuel

    ZONGhelpdesk on

    call

  • 8/6/2019 Detailed Processes V1.0

    11/12

    Operations Reporting System

    PLC

    Shift HOReport

    WOReport

    RCAReport

    HourlyReport

    NOCEngineer

    Legend

    Internal Report

    Customer Report

    DailyReport

    WeeklyReport

    MonthlyReport

    Emergen

    cyReport

    NOC TL

    WeeklyReport

    MonthlyReport

    QC

    Daily

    Report

    PM

    Schedule

    Monthly

    ReportRTL

    WeeklyReport

    Emergency

    Report

    TL

    CustomerInspection

    Report

    Emergency

    Report

    ADM-PWR

    WeeklyInventory

    Report

    VehicleMangmtReport

    ElectricBill

    Report

    ConsumablesReport

    CustomerManagement

    FOPSManagement

    FLM MonthlyReport