development presentation (draft)

22
SMART WATER SMART POWER SMART POWER H2.0 Clients: Dr. Ivan Stoianov (Imperial College) Dr. James Kierstead (Imperial College) Mr. Kevin Henderson (Bristol Water) Dr. Sumio Morioka (NEC Europe) Group 3 Members: Ryan McCartney (Project Leader) Julian Phatarfod (Liaison Officer) Ahmad Al Idelbi Mehdi Bedja Divya Bhanderi Clinton Chan Grace Lee Steve Moore Charalambos Spanos

Upload: julianrp

Post on 04-Jul-2015

27 views

Category:

Technology


1 download

TRANSCRIPT

Page 1: Development presentation (draft)

SMART WATERSMART POWERSMART POWER

H2.0Clients:Dr. Ivan Stoianov (Imperial College)Dr. James Kierstead (Imperial College)Mr. Kevin Henderson (Bristol Water)Dr. Sumio Morioka (NEC Europe)

Group 3 Members:Ryan McCartney (Project Leader)Julian Phatarfod (Liaison Officer)Ahmad Al IdelbiMehdi BedjaDivya BhanderiClinton ChanGrace LeeSteve MooreCharalambos Spanos

Page 2: Development presentation (draft)

100%

80%

Page 3: Development presentation (draft)

KEY ISSUES

Demand Pumping

Storage Optimisation

Page 4: Development presentation (draft)

PROJECT MANAGEMENT

Page 5: Development presentation (draft)
Page 6: Development presentation (draft)

Source: APX Group

y = 3E-08x^6 - 1E-05x^5 + 0.0009x^4 - 0.0386x^3 + 0.7608x^2 - 5.5888x + 45.507

17568

Page 7: Development presentation (draft)

MARKETS: REGULATIONS

Source: Environment Agency

Page 8: Development presentation (draft)

ENERGY / CARBON BALANCE

Page 9: Development presentation (draft)

PUMP SCHEDULING

Page 10: Development presentation (draft)

90% OF ALL ENERGY

Page 11: Development presentation (draft)

OPTIMISATIONCost or Carbon?

Page 12: Development presentation (draft)

PUMP SCHEDULING

Source: Metropolitan Industries

Page 13: Development presentation (draft)

OURSOLUTIONSOLUTION

Page 14: Development presentation (draft)

HYDRAULICS

Page 15: Development presentation (draft)

HYDRAULICS

QuickTime™ and aGIF decompressor

are needed to see this picture.

Source: Environmental Protection Agency

Page 16: Development presentation (draft)

HYDRAULICS

Page 17: Development presentation (draft)

PROBLEMS

Page 18: Development presentation (draft)

HYDRAULICSWater Hammer

Page 19: Development presentation (draft)

INCORPORATING RENEWABLESRENEWABLES

Page 20: Development presentation (draft)

UNSTABLE ENERGYStochastic Supply

Source: Power Quality Issues Chapter 4

Page 21: Development presentation (draft)

Week 2 Week 3 Week 4 Week 5 Week 6

Admin

Modelling

Markets

Hydraulics

Critical Session Reports and Presentations

Model Formulation

Market and Regulation Research

Hydraulic Model

Final Report and Presentation

Model Testing

Model Optimisation

Formulate Regulatory Solution

Develop Economic Feasibility

Model Testing

Report Compilation

Report Compilation

Development Presentation

THE NEXT STEPSProject Management

Page 22: Development presentation (draft)

SMART WATERSMART POWERSMART POWER

H2.0Thank you for attending.

Please feel free to ask any questions.

Many thanks to Danny Ball from Bristol Water and the ongoing support from our clients at Imperial College

Visit our website at www.h2point0.org

Folllow us on Twitter: @SmartWaterGDP

#GPDesignPS