DEWA* awards the largest frame con- tract for IEC 61850-based Substation Automation Systems to ABB The Dubai Electricity and Water Authority (DEWA*) relies on ABB’s IEC 61850-compliant SA solutions: Optimal life cycle management and low life cycle cost through future-proof SA systems based on key features of IEC 61850 Use of established equipment with verified new communication interface Maximum operational safety with tried and tested automation functions Proven system integration capabilities and close cooperation with main contractors ensures primary and secondary equipment are well integrated This is the second frame contract for substation auto- mation systems that DEWA has awarded to ABB. It marks the customers’ great satisfaction with the profes- sional solutions and services already provided under the previous project, which was extended from originally 20 to 24 SA systems. In close cooperation, ABB Switzer- land and ABB Dubai will combine global experience with local presence to offer DEWA future-proof systems and competent support to ensure on-time energization of the 132/11kV GIS sub- stations. Customer satisfaction: Project Reference 5-3 Substation Automation Protection, Substation Automation & Network Control

Upload: lamthuy

Post on 31-Jan-2018

224 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DEWA* awards the largest frame con- tract for IEC 61850 ... · PDF fileDEWA* awards the largest frame con-tract for IEC 61850-based Substation Automation Systems to ABB The Dubai Electricity

DEWA* awards the largest frame con-tract for IEC 61850-based Substation Automation Systems to ABB

The Dubai Electricity and Water Authority (DEWA*) relies on ABB’s IEC 61850-compliant SA solutions: Optimal life cycle management and low life cycle cost through future-proof SA systems based on key features of IEC 61850 Use of established equipment with verified new communication interface Maximum operational safety with tried and tested automation functions Proven system integration capabilities and close cooperation with main contractors ensures primary and secondary equipment are well integrated

This is the second frame contract for substation auto-mation systems that DEWA has awarded to ABB. It marks the customers’ great satisfaction with the profes-sional solutions and services already provided under theprevious project, which was extended from originally 20 to 24 SA systems. In closecooperation, ABB Switzer-land and ABB Dubai will combine global experience with local presence to offer DEWA future-proof systems and competent support to ensure on-time energization of the 132/11kV GIS sub-stations.

Customer satisfaction:

© C

opyr

ight

200

5 A

BB

. All

right

s re

serv

ed.

For more information please refer to the responsible ABB sales engineer for your country or to the address mentioned below.

Project Reference 5-3 Substat ion Automation

Protection, Substat ion Automation & Network Control

ABB Switzerland LtdPower Technology SystemsBrown Boveri Strasse 6CH-5400 Baden/Switzerland

Phone +41 -58-585 77 44Fax +41 -58-585 55 77e.Mail [email protected] www.abb.com/substationautomation

ConclusionIt is a great honor for ABB to support its valued customer DEWA in this impor-tant and ambitious grid expansion project. The frame contract is a sign of the trust DEWA has in our solutions and service competence. The fully IEC 61850-compliant systems ensure that highest quality, safety and environmental standards are being met for reliable energy

© C

opyr

ight

200

5 A

BB

. All

right

s re

serv

ed.

For more information please refer to the responsible ABB sales engineer for your country or to the address mentioned below.

met for reliable energy delivery.

DEWA’s benefits at a glance

On-time energization of one to two

substations per month during the

winter season

Reliable, competent project

execution

Adequate resources to handle bulk

contracts

Long-term partnership, continuity

Excellent project management and

highly efficient, tool-supported

engineering,testing and commiss-

ioning

Maximum operational safety

with proven automation functions

homogeneous and well-integrated

control concept throughout all

substations

uniform high-quality operator

interface

Smooth transition to new technology

enabled by proven capabilities in

IEC 61850

Expert know how in IEC 61850

from direct involvement in its

elaboration and verification

Verified implementation of IEC 61850

Full system integration capabilities

Safeguarded investment and optimized

life cycle management through future-

proof systems with IEC 61850 inter-

operability

to realize fully integrated substation

automation systems

to ensure easy integration of various

parts/stages of the project handled by

various suppliers

to be open for extensions and up-

grades with reuse of engineering data

Strong local competence and support

Easily accessible, excellent local

services

Strong involvement of ABB Dubai

throughout the contract

Local IEC 61850 competence

Low risks

Page 2: DEWA* awards the largest frame con- tract for IEC 61850 ... · PDF fileDEWA* awards the largest frame con-tract for IEC 61850-based Substation Automation Systems to ABB The Dubai Electricity

��������� ������� ��� ������

������������

��

��� �� �� �� ���

��

������������

��

��������

���������� ����

����������

��� ������� ��������������� ����

������ ���

��� ������� ����

������ ���

��� ������� ����

������ ���

��� ������� ����

������ ���

������ ���

������ ���

������ ���

������

����������������

���������

������������

�������������

����� �������� �������

������ ��� ������������� ���������� ������

�����������������������������

������������

������� �����������

����������� �����

� � ��� �� ��������� ����

����� ����� �������

� � ������ �������������

������

� � �������� �������

� � �� ����� �������

�� � ������������ ������

� � ������ ��������� ������

� � ��������� ����� ����

������ ������ ��������� ���������������� �������� ���� ��������� �������� ����

������ ������ ������

����������������������

�������������������������

��� ������� ����������� ����

��� ������� ����������� ����

��� ������� ����������� ����

Dubai is one of the largest

of the seven emirates

forming the federation of the

United Arab Emirates. It is

enjoying strong economic

growth based on a diversi-

fication programme with

manufacturing and tourism

as the centrepieces out-

pacing the traditional oil

and gas export business.

This modern state has a

population of approx. 0.86

million. Overall responsibility

for the electricity supply

industry rests with the

Dubai Electricity and Water

Authority. DEWA avails of

a generating capacity of

3’833 MW from combined

cycle and gas turbine power

plants, operates the country’s

400/132/33/11kV grid and

supplies electricity to four

other emirates as well. To

meet the continuous growth

in demand for electrical

energy with an expected

15% p.a. until 2010, DEWA

is continuously adding

generation and transmission

capacity to its grid. Within

a massive grid extension

program, approx. 10-12

new substations are being

built each year.

The substation automation solution chosen is based on the verified implementation

of IEC 61850. High availability is ensured by full redundancy on the station level. The

redundant embedded NCC gateways to the system and emergency control centres as

well as the hot standby station computers are working completely independent of each

other. For maximum performance and security, three physically separated communication

networks are implemented for 11kV, 132kV and the station level. The IEC 61850-compliant

bay level solutions feature functional integration of control and back-up protection for

132kV and 11kV. ABB Switzerland performs the system design and engineering, whilst

the entire cubicle assembly, installation and commissioning is carried out by ABB Dubai.

Dependable and competent project execution as well as close cooperation with main

contractors ensures on-time energization of the substations.

The Customer The Challenge

ABB’s solution

Several main contractors build the turnkey GIS sub-

stations. Their safe operation calls for future-proof

secondary systems based on state-of-the-art yet pro-

ven technologies, which shall allow easy maintenance

and future extensions. Redundancy concepts shall

meet stringent availability requirements. Adherence to

the tight time schedules is required with one to two

substations being energized every month in winter.

The short project lead-times necessitate efficient pro-

ject management and execution with adequate resour-

ces. Parts of the work shall be performed locally and

competent service and support be easily accessible.

Page 3: DEWA* awards the largest frame con- tract for IEC 61850 ... · PDF fileDEWA* awards the largest frame con-tract for IEC 61850-based Substation Automation Systems to ABB The Dubai Electricity

��������� ������� ��� ������

������������

��

��� �� �� �� ���

��

������������

��

��������

���������� ����

����������

��� ������� ��������������� ����

������ ���

��� ������� ����

������ ���

��� ������� ����

������ ���

��� ������� ����

������ ���

������ ���

������ ���

������ ���

������

����������������

���������

������������

�������������

����� �������� �������

������ ��� ������������� ���������� ������

�����������������������������

������������

������� �����������

����������� �����

� � ��� �� ��������� ����

����� ����� �������

� � ������ �������������

������

� � �������� �������

� � �� ����� �������

�� � ������������ ������

� � ������ ��������� ������

� � ��������� ����� ����

������ ������ ��������� ���������������� �������� ���� ��������� �������� ����

������ ������ ������

����������������������

�������������������������

��� ������� ����������� ����

��� ������� ����������� ����

��� ������� ����������� ����

Dubai is one of the largest

of the seven emirates

forming the federation of the

United Arab Emirates. It is

enjoying strong economic

growth based on a diversi-

fication programme with

manufacturing and tourism

as the centrepieces out-

pacing the traditional oil

and gas export business.

This modern state has a

population of approx. 0.86

million. Overall responsibility

for the electricity supply

industry rests with the

Dubai Electricity and Water

Authority. DEWA avails of

a generating capacity of

3’833 MW from combined

cycle and gas turbine power

plants, operates the country’s

400/132/33/11kV grid and

supplies electricity to four

other emirates as well. To

meet the continuous growth

in demand for electrical

energy with an expected

15% p.a. until 2010, DEWA

is continuously adding

generation and transmission

capacity to its grid. Within

a massive grid extension

program, approx. 10-12

new substations are being

built each year.

The substation automation solution chosen is based on the verified implementation

of IEC 61850. High availability is ensured by full redundancy on the station level. The

redundant embedded NCC gateways to the system and emergency control centres as

well as the hot standby station computers are working completely independent of each

other. For maximum performance and security, three physically separated communication

networks are implemented for 11kV, 132kV and the station level. The IEC 61850-compliant

bay level solutions feature functional integration of control and back-up protection for

132kV and 11kV. ABB Switzerland performs the system design and engineering, whilst

the entire cubicle assembly, installation and commissioning is carried out by ABB Dubai.

Dependable and competent project execution as well as close cooperation with main

contractors ensures on-time energization of the substations.

The Customer The Challenge

ABB’s solution

Several main contractors build the turnkey GIS sub-

stations. Their safe operation calls for future-proof

secondary systems based on state-of-the-art yet pro-

ven technologies, which shall allow easy maintenance

and future extensions. Redundancy concepts shall

meet stringent availability requirements. Adherence to

the tight time schedules is required with one to two

substations being energized every month in winter.

The short project lead-times necessitate efficient pro-

ject management and execution with adequate resour-

ces. Parts of the work shall be performed locally and

competent service and support be easily accessible.

Page 4: DEWA* awards the largest frame con- tract for IEC 61850 ... · PDF fileDEWA* awards the largest frame con-tract for IEC 61850-based Substation Automation Systems to ABB The Dubai Electricity

DEWA* awards the largest frame con-tract for IEC 61850-based Substation Automation Systems to ABB

The Dubai Electricity and Water Authority (DEWA*) relies on ABB’s IEC 61850-compliant SA solutions: Optimal life cycle management and low life cycle cost through future-proof SA systems based on key features of IEC 61850 Use of established equipment with verified new communication interface Maximum operational safety with tried and tested automation functions Proven system integration capabilities and close cooperation with main contractors ensures primary and secondary equipment are well integrated

This is the second frame contract for substation auto-mation systems that DEWA has awarded to ABB. It marks the customers’ great satisfaction with the profes-sional solutions and services already provided under theprevious project, which was extended from originally 20 to 24 SA systems. In closecooperation, ABB Switzer-land and ABB Dubai will combine global experience with local presence to offer DEWA future-proof systems and competent support to ensure on-time energization of the 132/11kV GIS sub-stations.

Customer satisfaction:

© C

opyr

ight

200

5 A

BB

. All

right

s re

serv

ed.

For more information please refer to the responsible ABB sales engineer for your country or to the address mentioned below.

Project Reference 5-3 Substat ion Automation

Protection, Substat ion Automation & Network Control

ABB Switzerland LtdPower Technology SystemsBrown Boveri Strasse 6CH-5400 Baden/Switzerland

Phone +41 -58-585 77 44Fax +41 -58-585 55 77e.Mail [email protected] www.abb.com/substationautomation

ConclusionIt is a great honor for ABB to support its valued customer DEWA in this impor-tant and ambitious grid expansion project. The frame contract is a sign of the trust DEWA has in our solutions and service competence. The fully IEC 61850-compliant systems ensure that highest quality, safety and environmental standards are being met for reliable energy

© C

opyr

ight

200

5 A

BB

. All

right

s re

serv

ed.

For more information please refer to the responsible ABB sales engineer for your country or to the address mentioned below.

met for reliable energy delivery.

DEWA’s benefits at a glance

On-time energization of one to two

substations per month during the

winter season

Reliable, competent project

execution

Adequate resources to handle bulk

contracts

Long-term partnership, continuity

Excellent project management and

highly efficient, tool-supported

engineering,testing and commiss-

ioning

Maximum operational safety

with proven automation functions

homogeneous and well-integrated

control concept throughout all

substations

uniform high-quality operator

interface

Smooth transition to new technology

enabled by proven capabilities in

IEC 61850

Expert know how in IEC 61850

from direct involvement in its

elaboration and verification

Verified implementation of IEC 61850

Full system integration capabilities

Safeguarded investment and optimized

life cycle management through future-

proof systems with IEC 61850 inter-

operability

to realize fully integrated substation

automation systems

to ensure easy integration of various

parts/stages of the project handled by

various suppliers

to be open for extensions and up-

grades with reuse of engineering data

Strong local competence and support

Easily accessible, excellent local

services

Strong involvement of ABB Dubai

throughout the contract

Local IEC 61850 competence

Low risks