DEWATERING PIT ALAM 1 - 3
By : Engineering Dept.PT Ulimanitra – Site Muara Alam Sejahtera
MONTHLY PRODUCTION PLAN&
MINING SEQUENCESite MAS -LahatSEPTEMBER 2016
Data Curah Hujan & Durasi Jam Hujan
Tahun Januari Februari Maret April Mei Juni Juli Agustus September Oktober November Desember TOTAL Rata2 Max2003 268.00 463.00 398.00 283.50 96.00 10.00 165.00 83.00 151.00 279.00 251.00 506.00 2,953.50 246.13 506.00 2004 404.00 488.00 136.00 420.00 61.00 102.00 124.00 58.00 156.00 266.00 308.00 630.00 3,153.00 262.75 630.00 2005 524.00 399.00 497.00 443.00 259.00 215.00 145.00 160.00 218.00 305.00 329.00 89.00 3,583.00 298.58 524.00 2006 365.00 518.00 192.00 435.00 251.00 116.00 80.00 24.00 37.00 90.00 249.00 374.00 2,731.00 227.58 518.00 2007 466.00 152.50 51.00 269.00 80.00 85.50 41.00 23.80 150.50 261.50 229.00 438.00 2,247.80 187.32 466.00 2008 709.00 92.50 246.00 498.50 143.00 72.00 35.00 260.00 106.00 277.00 212.00 384.00 3,035.00 252.92 709.00 2009 405.00 339.00 293.00 317.00 37.00 144.00 69.00 137.00 155.00 248.00 276.00 472.00 2,892.00 241.00 472.00 2010 568.00 705.00 356.00 340.00 298.00 195.00 113.00 353.00 215.00 328.00 564.00 274.00 4,309.00 359.08 705.00 2011 175.30 319.90 200.90 180.60 374.80 327.40 57.60 21.30 114.50 300.10 265.20 660.70 2,998.30 249.86 660.70 2012 384.10 553.20 92.10 201.80 366.30 98.60 133.80 62.00 140.50 352.00 315.70 512.40 3,212.50 267.71 553.20 2013 572.60 324.40 472.15 300.00 425.20 161.20 283.80 111.30 168.30 371.00 275.60 509.70 3,975.25 331.27 572.60 2014 324.80 310.40 259.00 242.60 257.00 141.00 196.60 325.00 42.20 90.10 300.50 458.30 2,947.50 245.63 458.30 2015 245.10 382.90 203.30 251.20 127.50 81.00 9.50 102.20 3.30 8.20 359.50 448.30 2,222.00 185.17 448.30 2016 716.50 239.50 532.50 536.50 267.70 71.00 125.20 41.00 - - - - 2,529.90 210.83 716.50
Tahun Januari Februari Maret April Mei Juni Juli Agustus September Oktober November Desember TOTAL Rata2 Max2008 116.32 24.19 64.71 49.34 20.56 17.50 6.02 16.97 26.97 43.88 50.15 79.35 515.96 43.00 116.32 2009 65.24 51.96 55.62 48.67 9.94 19.75 15.35 11.61 16.51 20.09 33.21 67.66 415.61 34.63 67.66 2010 85.22 115.45 64.71 68.27 33.32 20.06 14.89 36.02 68.72 69.15 69.75 26.80 672.36 56.03 115.45 2011 44.00 85.00 36.50 32.50 43.30 72.00 25.00 13.90 34.20 47.10 64.82 143.80 642.12 53.51 143.80 2012 28.90 84.70 22.02 35.08 43.27 29.68 18.30 5.80 13.80 46.55 78.60 132.00 538.70 44.89 132.00 2013 108.30 116.97 61.83 79.38 72.77 9.03 67.22 14.23 47.27 44.52 73.37 110.65 805.53 67.13 116.97 2014 228.08 90.60 91.20 77.65 62.87 39.42 48.90 37.62 27.80 20.67 133.98 149.88 1,008.68 84.06 228.08 2015 83.10 132.10 95.30 98.65 35.95 25.43 25.82 51.30 18.40 19.20 100.36 275.15 960.76 80.06 275.15 2016 190.43 174.22 213.81 158.68 82.84 23.15 54.74 14.35 - - - - 912.22 76.02 213.81
Rata-rata 9 Thn + Up 20% (Digunakan untuk acuan 2017)Plan 2017 Januari Februari Maret April Mei Juni Juli Agustus September Oktober November Desember AVERAGE
Curah Hujan/Month 547.97 410.32 324.71 376.46 285.18 165.20 127.74 172.39 131.44 268.31 335.70 498.89 303.69 Curah Hujan/Hari 18.27 13.68 10.82 12.55 9.51 5.51 4.26 5.75 4.38 8.94 11.19 16.63 10.12 Durasi Hujan/Month 126.61 116.69 94.09 86.43 53.98 34.14 36.83 26.91 38.05 46.67 90.64 147.79 74.90 Durasi Hujan/Hari 4.22 3.89 3.14 2.88 1.80 1.14 1.23 0.90 1.27 1.56 3.02 4.93 2.50
DIS
HU
T M
ERA
PI
BA
RA
T P
T.M
AS
ACTUAL CURAH HUJAN AREA SITE PT.MUARA ALAM SEJAHTERASUMBER
DIN
AS
KEH
UTA
NA
N
MER
API
BA
RA
T K
AB
LA
HA
T
ACTUAL JAM HUJAN AREA SITE PT.MUARA ALAM SEJAHTERASUMBER
PT.M
AS
habibie_w:Jan s.d Mar 2014 Data IMWKApril s.d Des 2014 Data PSGTahun 2015 Data PSGTahun 2016 Data PSG
habibie_w:Jan s.d Mar 2014 Data IMWKApril s.d Des 2014 Data PSGTahun 2015 Data PSGTahun 2016 Data PSG
EXTREME FALL
ACTUAL FIELD CONDITION
Area RL Water Volume Water Area
Water Surface Pipe Outlet (m3) (m2)Block 2-3 Pit Alam 1-3 18 65 43,000.0 41,760.0
TOTAL HEAD 55
Elev. +65 m
Elev. +18 m
KeteranganElevasi Suction Elevasi Pompa ke air 16
Elevasi Discharge Ketinggian Permukaan air 18Panjang Suction Panjang tiap pompa 6
Panjang Discharge Panjang semua pipe 220Friction Rubber Hose gesekan 0.025
Friction HDPE gesekan tiap hdpe 0.0905Head Loss Fitting 1
Total Head : Head Static + Head DinamikHead Statik : Elevasi Suction (Q) + Elevasi Discharge (B)
Head Dinamik : Head LossRubber Suction + Head Loss HDPE + Head Loss FittingHead Loss Rubber Suction : Friction Rubber Hosek x Panjang Suction (P)
Head Loss HDPE Pipe : Friction HDPE x Panjang Discharge (A)
Head static 34Head Loss rubber Suction 0.15
Head Loss HDPE Pipe 19.91Head Loss Fitting 1
Head Dinamik 21.06Total Head 55.06
KeteranganElevasi Suction Elevasi Pompa ke air 16
Elevasi Discharge Ketinggian Permukaan air 18Panjang Suction Panjang tiap pompa 6
Panjang Discharge Panjang semua pipe 220Friction Rubber Hose gesekan 0.025
Friction HDPE gesekan tiap hdpe 0.0905Head Loss Fitting 1
Total Head : Head Static + Head DinamikHead Statik : Elevasi Suction (Q) + Elevasi Discharge (B)
Head Dinamik : Head LossRubber Suction + Head Loss HDPE + Head Loss FittingHead Loss Rubber Suction : Friction Rubber Hosek x Panjang Suction (P)
Head Loss HDPE Pipe : Friction HDPE x Panjang Discharge (A)
Head static 34Head Loss rubber Suction 0.15
Head Loss HDPE Pipe 19.91Head Loss Fitting 1
Head Dinamik 21.06Total Head 55.06
Section Sump UN - East EOM
160901
Plan Q4 PT MAS
Gradien 60 %
RL + 18Permukaan
Air
RL + 65
TOTAL HEAD MULTIFLO CF48
Section Sump UN – PSG - West EOM
160901
Plan Q4 PT MAS
Gradien 60 %
RL + 80
TOTAL HEAD MULTIFLO MultiFlo MF100
RL + 10Permukaan
Air
KeteranganElevasi Suction Elevasi Pompa ke air 10
Elevasi Discharge Ketinggian Permukaan air 35Panjang Suction Panjang tiap pompa 6
Panjang Discharge Panjang semua pipe 325Friction Rubber Hose gesekan 0.025
Friction HDPE gesekan tiap hdpe 0.0905Head Loss Fitting 1
Total Head : Head Static + Head DinamikHead Statik : Elevasi Suction (Q) + Elevasi Discharge (B)
Head Dinamik : Head LossRubber Suction + Head Loss HDPE + Head Loss FittingHead Loss Rubber Suction : Friction Rubber Hosek x Panjang Suction (P)
Head Loss HDPE Pipe : Friction HDPE x Panjang Discharge (A)
Head static 45Head Loss rubber Suction 0.15
Head Loss HDPE Pipe 29.4125Head Loss Fitting 1
Head Dinamik 30.5625Total Head 75.5625
Monorobe equation :
R24 = Rainfall in 24 hourst = time (hour)m = rainfall coeficient, for Indonesia is 2/ 3
Statistic : GUMBELL DISTRIBUTION :Xavg = 10.123 ∑Ymi = 21.7448Standard deviation (S) = 4.655 Ym avg = 0.5436 ( Y40 avg)
Sy = 1.1559
Rainfall(mm/day)
1 18.272 13.683 10.824 12.555 9.516 5.517 4.268 5.759 4.38
10 8.9411 11.1912 16.63
Extrem Rainfall*
No Data
STDEV 4.66Avg 10.12
No. T YT XT (mm) IT (mm/hr)1 5 1.4999 13.9747 9.31652 10 2.2504 16.9971 11.33143 15 2.6738 18.7023 12.46824 20 2.9702 19.8962 13.26425 25 3.1985 20.8159 13.87736 30 3.3843 21.5641 14.37607 35 3.5409 22.1947 14.79658 40 3.6762 22.7399 15.15999 45 3.7954 23.2200 15.480010 50 3.9019 23.6489 15.765911 55 3.9982 24.0365 16.024312 60 4.0860 24.3900 16.260013 65 4.1666 24.7150 16.476714 70 4.2413 25.0157 16.677215 75 4.3108 25.2955 16.863716 80 4.3757 25.5572 17.038117 85 4.4367 25.8028 17.201918 90 4.4942 26.0344 17.356219 95 4.5486 26.2533 17.502220 100 4.6001 26.4610 17.6406
SOLUTION & ANALYSIS
ACTUAL FIELD CONDITION
Water Volume Water AreaWater Surface Pipe Outlet (m3) (m2)
Block 2 -3 18 65 43,000.0 41,760.0
Area RL
PUMP REQUIREMENTAssumptions : Pump hour = 18 hours/day
liter/sec cu.mtr/hourMultiFlo CF 48 62 225 78Slurry Pump 65 215 62Note : 1 liter/ sec = 3.6 cu.mtr/ hour * Obtained from pump curve
Estimate flowrate efficiency (%)*Pump
CA = 70,14 HaFlowrate Volume for 1 hour
( m2) (km2) (m3/sec) (m3)Block 2 - 3 701,400.00 0.70 3.10 11,144.74
Area Catchment Area
PROJECTED FLOWRATEExtrem Rain Times Plan 3 timesRun-off coefficient 0.9 Gradien > 15 %Projected Rainfall Int. 17.6 mm/hr
IF NO RAINS OCCURRED DURING PUMPINGWater Volume Pump Flowrate
(m3) (m3/hr) Hours DaysBlock 2 -3 43,000.0 225 191 11.94 MultiFlo CF 48
Area Time Required Actual Pump Type
IF RAINS OCCURRED WITH 1 HR PEAKSTORM 3 TIMES DURING PUMPINGWater Volume Rain Vol 1 hr Flowrate
(m3) 3 times (m3/hr) Hours DaysBlock 2-3 43,000 33,434 225 339.71 18.87 Multi Flo CF 48
33,000
Area Time Required Actual Pump Type
SOLUTION & ANALYSIS
4.844762985.8925656396.4837270456.8976431067.2164670777.4758393777.6944887397.8834856168.0499213388.1986127928.3329818678.4555470338.5682158128.67246769
8.7694733278.8601749448.9453421499.0256116869.10151636
9.173506498
Project Flow Rate Run Off - River
Project Flow RateCatchment
Plan Joint Sump UN - PSG
Note :- MultiFlo CF48 Recommended for Total Head 55 m ->
actual Field Condition Section Highwall to KPL UN = 2 Unit / 1 Unit CF48 & 1 Unit MF100
- MultiFlo MF100 Recommended for Total Head > 75 m = Joint Sump PSG – UN Case Project
- Gradient Dinamic & Static Total Head +- 60 % from Wall = Optimum Pump Graphic
- Pump HL 200 M Recommended but High Cost & Capacity KPL PT MAS ?
- KPL PSG Capacity for 2 Pump Require PSG & UN = 581 bcm/hour PSG Pump + 225 & 981 bcm/hour UN Pump. (Block 6 -7 ) ?
- Target Slurry Pump Debit Capacity 200 – 225 bcm/hour for Slurry Area
- Slurry Sample 35 % Solid & 65 % Water- Time Schedulle Pump Multiflo MF100 Delivery is
December 2016- Joint Sump PSG – UN block 6 -7 by Overflow / Ground
Canal
PUMPING PLANParameters : Target Pumping (hours) and Estimate Flowrate
IF NO RAINS OCCURRED DURING PUMPINGWater Volume Pump Estimate Flowrate Pump
(m3) (days) (hours) Plan liter/sec cu.mtr/hour RequiredMultiFlo CF 48 62 225 3.9 Recommended
Multiflo MF100 255 918 1.0 Recommended
Block 6 - 7 33,000 2 36 Multiflo MF100 255 918 1.0 Recommended
HL 200 M 375 1,350 0.7 Recommended, High Cost
IF RAINS OCCURRED WITH 1 HR PEAKSTORM 3 TIMES DURING PUMPINGWater Volume Rain Vol 1 hr Pump Pump Remarks
(m3) 3 times (days) (hours) Plan liter/sec cu.mtr/hour RequiredMultiFlo CF 48 62 225 4.2 RecommendedMultiflo MF100 255 918 1.0 RecommendedMultiflo MF100 255 918 0.4 RecommendedHL 200 M 375 1,350 0.3 Recommended, High Cost
Estimate Flowrate Area Target Pumping
RemarksArea Target Pumping
Block 2-3 43,000 3 49
Block 2-3 43,000 33,434 5 81
Block 6 - 7 33,000 33,434 9 162
Slurry Pump Plan - Actual
Mine Schedulling Three Monthly Rolling Plan (End of Oktober 2016)
KPL PIT
Water Sump
Slurry Sump
Water Sump
Joint Sump PSG - UN
Water Flow
Seam B1
Slurry PumpMultiFlo CF48
Proposed Road
Note : - Proposed Road Side
Wall maximum Grade 6 %
- 1 Unit Pump MultiFlo CF48 Available
- Slurry Pump Continue to KPL Perusda Debit Range 250 – 300 bcm/hour with Percent Solid 50% - 50%
- Overhaul Distance Front Low Wall Status UN – MAS
- Water Flow Block 5 – 7 to Block PSG 8
- Joint Sump Elevation +5
Water Sump
Joint Sump PSG - UN
Seam B1
Slurry PumpMultiFlo CF48
Water Sump
Water Flow Slurry
Sump
KPL PIT
Road
Mine Schedulling Three Monthly Rolling Plan (End of November 2016)
Note : - 1 Unit Pump
MultiFlo CF48 Available to KPL PIT
- Slurry Pump Continue to KPL Perusda Debit Range 250 – 300 bcm/hour with Percent Solid 60% - 40%
- Overhaul Distance Front Low Wall Status UN – MAS
- Water Flow Block 5 – 7 to Block PSG 8
- Joint Sump Elevation +0
Joint Sump PSG - UN
Seam B1Water Flow
KPL PIT
MultiFlo MF100
To KPL PIT PSG
Mine Schedulling Three Monthly Rolling Plan (End of December 2016)
Note : - 1 Unit Pump
MultiFlo MF100 Available to Block 8 – 9 (4th Week Dec 2016)
- Water Flow & Joint Sump Blck PSG 8 - 9
- Coal Getting Seam A1, A2 & B1
- Water Flow Block 5 – 7 to Block PSG 8
- Joint Sump Elevation +0
- Request HDPE Quantity = 300 m (50 Pipe @ 6 m)
To KPL PIT PSG
Cảm ơn bạnधन्यवाद谢谢
СпасибоTerima Kasih
ขอบคณุ
Created By : Engineering Dept.
PT Ulimanitra Site Lahat
MONTHLY PRODUCTION PLAN&
MINING SEQUENCESite MAS -LahatSEPTEMBER 2016