dimitra riga cv 2015

4
DIMITRA RIGA 10 VAS. KOLLIA STR., 19200, ELEFSINA, GREECE +30 6946129550 [email protected] Objectives My target is to find a position where I can fully utilize my experience with security construction, construction management, value engineering, quality control and SED specifications. Experience Deputy Project engineer - ECCI on the NEW Office Building (NOB) Bishkek, Kyrgyzstan 2012 - Present - Evaluated submittals and other documents for compliance with IFC documents, both drawings and specifications, as well as the SED specs, OBO specific codes, RIPS (Requirements Integration Package) and referenced standards, for example, ASTM, NFPA, etc. Prepared ordinary OBO submittals and complicated substitution requests for non-US standard materials. - Developed and submitted RFI’s to the Designers of Record and OBO in all disciplines, civil, architectural, MEP and TSS. - Managed distribution of all technical information (drawings, specs, submittals, RFI’s, bulletins, schedules, etc.) for the project team based in Kyrgyzstan. This included coordinating information distribution with the ECCI stateside team and numerous stateside consultants. - Documented construction progress through generating coordination meeting minutes, taking and distributing photographs, conducting field surveys especially at problem areas. - Worked in the technical office and my responsibilities were including the followings: Monitored the progress of the construction to attain the highest construction and design quality within the limits of the contract documents. Evaluated submittals and issued RFIs for final resolution. Reported directly to the Project Manager and Project Engineer. Assisted in the distribution and timely return of submittals to subcontractors and construction managers. Worked closely with design manager to assure adherence to drawings and specifications as well as the extensive related codes, OBO standards and industry construction standards. Worked very closely with OBO's representatives on site experts in evaluating the project and making valuable corrections. Provided effort in coordination of construction during concrete placement to minimize its negative impact on the NEC till architectural finishes. Participation in presentations for Project Progress Part of LEED process and IAQ plan Structural Engineer – AICI-SP on the NEW Embassy Compound (NEC) Bucharest, Romania 2010 - 2011 - Prepared civil, structural and architectural coordination drawings and installation shop drawings - Performed take-offs for civil and architectural materials to be ordered - Prepared purchase requisitions for US procurements - Prepared material submittals for the approval of the Client and following up the approval process - Prepared civil, structural and architectural as-built drawings as part of the close-out procedures - Prepared Operation & Maintenance Manuals (O&M) for the Client as part of the close-out procedures - Prepared the spreadsheets for civil, architectural, electrical and mechanical spare parts for handing over to the Client as part of the close-out procedures in close coordination with the respective disciplines - Worked on contractual warranty requirements and ensured that the required warranty letters were submitted to the Client in a timely manner Site Survey and Quantity Engineering – Sofikitis Terra & Aqua 2005 – 2010

Upload: dimitra-riga

Post on 06-Aug-2015

71 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: Dimitra Riga CV 2015

DIMITRA RIGA

10 VAS. KOLLIA STR., 19200, ELEFSINA, GREECE +30 6946129550 ▪ [email protected]

Objectives My target is to find a position where I can fully utilize my experience with security construction, construction management, value engineering, quality control and SED specifications.

Experience Deputy Project engineer - ECCI on the NEW Office Building (NOB) Bishkek, Kyrgyzstan

▪ 2012 - Present - Evaluated submittals and other documents for compliance with IFC documents, both drawings and

specifications, as well as the SED specs, OBO specific codes, RIPS (Requirements Integration Package) and referenced standards, for example, ASTM, NFPA, etc. Prepared ordinary OBO submittals and complicated substitution requests for non-US standard materials.

- Developed and submitted RFI’s to the Designers of Record and OBO in all disciplines, civil, architectural, MEP and TSS.

- Managed distribution of all technical information (drawings, specs, submittals, RFI’s, bulletins, schedules, etc.) for the project team based in Kyrgyzstan. This included coordinating information distribution with the ECCI stateside team and numerous stateside consultants.

- Documented construction progress through generating coordination meeting minutes, taking and distributing photographs, conducting field surveys especially at problem areas.

- Worked in the technical office and my responsibilities were including the followings: Monitored the progress of the construction to attain the highest construction and design quality within the

limits of the contract documents. Evaluated submittals and issued RFIs for final resolution. Reported directly to the Project Manager and Project Engineer. Assisted in the distribution and timely return of submittals to subcontractors and construction managers. Worked closely with design manager to assure adherence to drawings and specifications as well as the

extensive related codes, OBO standards and industry construction standards. Worked very closely with OBO's representatives on site experts in evaluating the project and making

valuable corrections. Provided effort in coordination of construction during concrete placement to minimize its negative impact on the NEC till architectural finishes.

Participation in presentations for Project Progress Part of LEED process and IAQ plan

Structural Engineer – AICI-SP on the NEW Embassy Compound (NEC) Bucharest, Romania

▪ 2010 - 2011 - Prepared civil, structural and architectural coordination drawings and installation shop drawings - Performed take-offs for civil and architectural materials to be ordered - Prepared purchase requisitions for US procurements - Prepared material submittals for the approval of the Client and following up the approval process - Prepared civil, structural and architectural as-built drawings as part of the close-out procedures - Prepared Operation & Maintenance Manuals (O&M) for the Client as part of the close-out procedures - Prepared the spreadsheets for civil, architectural, electrical and mechanical spare parts for handing over to

the Client as part of the close-out procedures in close coordination with the respective disciplines - Worked on contractual warranty requirements and ensured that the required warranty letters were submitted

to the Client in a timely manner Site Survey and Quantity Engineering – Sofikitis Terra & Aqua

▪ 2005 – 2010

Page 2: Dimitra Riga CV 2015

DIMITRA Riga Page 2

- Coordinating the details with site construction manager and providing solutions for any deviations in the construction

- As-Built of big size swimming pools and surrounding pavement surfaces for marble installation by using special topographic equipment.

- Design and coordination of landscape for small projects / Preparing the coordination and installation shop drawings

Skills AutoCAD 2D/3D 3D Studio Max Microsoft Office LEED Certification Certified OSHA 30

Education Technical University of Athens Department of Structural Engineering (B.Sc.) ▪

Languages Greek (native) English (proficient level in written & spoken English, Holder of First Certificate of Cambridge University) French (intermediate level in written and spoken French, Holder of DELF 1, French Institute)

References: Deyanira Desouza (OBO Construction Manager – NEC Bishkek – Kyrgyzstan) e-mail: [email protected] John S. Alam (OBO Civil Engineer – NEC Bishkek – Kyrgyzstan) e-mail: [email protected] Adel Ekdawi (OBO Senior Project Engineer – NEC Bucharest – Romania) e-mail: [email protected]

Page 3: Dimitra Riga CV 2015
Page 4: Dimitra Riga CV 2015