Page 1: DIRT GRAVEL AND LOW VOLUME ROAD MAINTENANCE PROGRAM · DIRT AND GRAVEL ROADS •BITTLE ROAD PHASE 2 – GERMANY TOWNSHIP •DITCH WORK ALONG STEEP SLOPE •DITCHES DIRECTED TO FACILITY

DIRT GRAVEL AND LOW VOLUME ROAD

MAINTENANCE PROGRAM

A WATER QUALITY PROGRAM

Page 2: DIRT GRAVEL AND LOW VOLUME ROAD MAINTENANCE PROGRAM · DIRT AND GRAVEL ROADS •BITTLE ROAD PHASE 2 – GERMANY TOWNSHIP •DITCH WORK ALONG STEEP SLOPE •DITCHES DIRECTED TO FACILITY

ENVIRONMENTALLY SENSITIVE MAINTENANCE (ESM) FOR LOW-

VOLUME ROADS

• REDUCE CONCENTRATED DRAINAGE.

• REDUCE SEDIMENT POLLUTION.

• REDUCE IMPACT OF ROAD ON THE LAND.

• REDUCE LONG-TERM ROAD MAINTENANCE COSTS.

Page 3: DIRT GRAVEL AND LOW VOLUME ROAD MAINTENANCE PROGRAM · DIRT AND GRAVEL ROADS •BITTLE ROAD PHASE 2 – GERMANY TOWNSHIP •DITCH WORK ALONG STEEP SLOPE •DITCHES DIRECTED TO FACILITY

CONSERVATION DISTRICT ROLE

• ADMINISTER PROGRAM ON COUNTY LEVEL.

• OUTREACH AND EDUCATION

• ASSESSMENT OF SITES

• WORK WITH APPLICANTS ON PROJECTS AND PERMITTING.

• CONDUCT INSPECTIONS DURING AND AFTER WORK IS COMPLETED.

Page 4: DIRT GRAVEL AND LOW VOLUME ROAD MAINTENANCE PROGRAM · DIRT AND GRAVEL ROADS •BITTLE ROAD PHASE 2 – GERMANY TOWNSHIP •DITCH WORK ALONG STEEP SLOPE •DITCHES DIRECTED TO FACILITY

ELIGIBLE APPLICANTS

• PUBLIC ENTITIES THAT OWN ROADS

• MUNICIPALITIES

• STATE ENTITIES SUCH AS:

• PENNDOT, GAME COMMISSION, FISH & BOAT

• COUNTY AND OTHER GOVERNMENT ENTITIES

• FEDERAL ROADS AND PRIVATE ROADS ARE NOT ELIGIBLE

• PERSON IN CHARGE OF THE PROJECT MUST BE ESM CERTIFIED

• CERTIFICATION TRAINING BEING HELD IN DAUPHIN COUNTY JULY 12 AND

13, 2017

Page 5: DIRT GRAVEL AND LOW VOLUME ROAD MAINTENANCE PROGRAM · DIRT AND GRAVEL ROADS •BITTLE ROAD PHASE 2 – GERMANY TOWNSHIP •DITCH WORK ALONG STEEP SLOPE •DITCHES DIRECTED TO FACILITY

CERTIFIED MUNICIPALITIES IN ADAMS COUNTY

TOWNSHIPS

FRANKLIN

HAMILTONBAN

CUMBERLAND

TYRONE

GERMANY

CONEWAGO

HAMILTON

UNION

MOUNT JOY

READING

STRABAN

MENALLEN

LIBERTY

HUNTINGTON

BOROUGH

EAST BERLIN

Page 6: DIRT GRAVEL AND LOW VOLUME ROAD MAINTENANCE PROGRAM · DIRT AND GRAVEL ROADS •BITTLE ROAD PHASE 2 – GERMANY TOWNSHIP •DITCH WORK ALONG STEEP SLOPE •DITCHES DIRECTED TO FACILITY

ELIGIBLE PROJECTS

• ENVIRONMENTAL AND ROAD IMPROVEMENT FOCUS

• USE OF ENVIRONMENTALLY SENSITIVE MAINTENANCE PRACTICES

• REDUCE SEDIMENT

• REDUCE CONCENTRATED DRAINAGE

• FOCUS ON LONG TERM IMPROVEMENTS

• NOT FOR ROUTINE MAINTENANCE SUCH AS CLEANING INLETS, STREET

SWEEPING, ETC.

• NOT FOR NEGLECTED MAINTENANCE WITH NO ROAD IMPROVEMENTS

Page 7: DIRT GRAVEL AND LOW VOLUME ROAD MAINTENANCE PROGRAM · DIRT AND GRAVEL ROADS •BITTLE ROAD PHASE 2 – GERMANY TOWNSHIP •DITCH WORK ALONG STEEP SLOPE •DITCHES DIRECTED TO FACILITY

COMPLETED WORKSITES LOW-VOLUME PAVED

SURFACES

ROCK VALLEY ROAD

Page 8: DIRT GRAVEL AND LOW VOLUME ROAD MAINTENANCE PROGRAM · DIRT AND GRAVEL ROADS •BITTLE ROAD PHASE 2 – GERMANY TOWNSHIP •DITCH WORK ALONG STEEP SLOPE •DITCHES DIRECTED TO FACILITY

ROCK VALLEY ROAD TYRONE TOWNSHIP

SUMMER TO FALL 2016

Page 9: DIRT GRAVEL AND LOW VOLUME ROAD MAINTENANCE PROGRAM · DIRT AND GRAVEL ROADS •BITTLE ROAD PHASE 2 – GERMANY TOWNSHIP •DITCH WORK ALONG STEEP SLOPE •DITCHES DIRECTED TO FACILITY

ROCK VALLEY ROAD – SITE 4

• WORK ON ROADSIDE DITCHES

• STORMWATER INLETS AND PIPING

• PREVENT DIRECT DISCHARGE OF DITCHES TO THE STREAM

Page 10: DIRT GRAVEL AND LOW VOLUME ROAD MAINTENANCE PROGRAM · DIRT AND GRAVEL ROADS •BITTLE ROAD PHASE 2 – GERMANY TOWNSHIP •DITCH WORK ALONG STEEP SLOPE •DITCHES DIRECTED TO FACILITY

ROCK VALLEY ROAD

BEFORE AFTER

Page 11: DIRT GRAVEL AND LOW VOLUME ROAD MAINTENANCE PROGRAM · DIRT AND GRAVEL ROADS •BITTLE ROAD PHASE 2 – GERMANY TOWNSHIP •DITCH WORK ALONG STEEP SLOPE •DITCHES DIRECTED TO FACILITY

BEFORE

Page 12: DIRT GRAVEL AND LOW VOLUME ROAD MAINTENANCE PROGRAM · DIRT AND GRAVEL ROADS •BITTLE ROAD PHASE 2 – GERMANY TOWNSHIP •DITCH WORK ALONG STEEP SLOPE •DITCHES DIRECTED TO FACILITY

AFTER

Page 13: DIRT GRAVEL AND LOW VOLUME ROAD MAINTENANCE PROGRAM · DIRT AND GRAVEL ROADS •BITTLE ROAD PHASE 2 – GERMANY TOWNSHIP •DITCH WORK ALONG STEEP SLOPE •DITCHES DIRECTED TO FACILITY

AFTER

Page 14: DIRT GRAVEL AND LOW VOLUME ROAD MAINTENANCE PROGRAM · DIRT AND GRAVEL ROADS •BITTLE ROAD PHASE 2 – GERMANY TOWNSHIP •DITCH WORK ALONG STEEP SLOPE •DITCHES DIRECTED TO FACILITY

ROCK VALLEY ROAD

BEFORE AFTER

Page 15: DIRT GRAVEL AND LOW VOLUME ROAD MAINTENANCE PROGRAM · DIRT AND GRAVEL ROADS •BITTLE ROAD PHASE 2 – GERMANY TOWNSHIP •DITCH WORK ALONG STEEP SLOPE •DITCHES DIRECTED TO FACILITY

STORM SYSTEM

Page 16: DIRT GRAVEL AND LOW VOLUME ROAD MAINTENANCE PROGRAM · DIRT AND GRAVEL ROADS •BITTLE ROAD PHASE 2 – GERMANY TOWNSHIP •DITCH WORK ALONG STEEP SLOPE •DITCHES DIRECTED TO FACILITY

ROCK VALLEY ROAD - SITE 3

• WORK ON ROADSIDE DITCHES

• DRIVEWAY CULVERTS

• PREVENT DIRECT DISCHARGE OF DITCHES TO THE STREAM

Page 17: DIRT GRAVEL AND LOW VOLUME ROAD MAINTENANCE PROGRAM · DIRT AND GRAVEL ROADS •BITTLE ROAD PHASE 2 – GERMANY TOWNSHIP •DITCH WORK ALONG STEEP SLOPE •DITCHES DIRECTED TO FACILITY

ROCK VALLEY ROAD DITCHES- BEFORE

Page 18: DIRT GRAVEL AND LOW VOLUME ROAD MAINTENANCE PROGRAM · DIRT AND GRAVEL ROADS •BITTLE ROAD PHASE 2 – GERMANY TOWNSHIP •DITCH WORK ALONG STEEP SLOPE •DITCHES DIRECTED TO FACILITY

BEFORE

Page 19: DIRT GRAVEL AND LOW VOLUME ROAD MAINTENANCE PROGRAM · DIRT AND GRAVEL ROADS •BITTLE ROAD PHASE 2 – GERMANY TOWNSHIP •DITCH WORK ALONG STEEP SLOPE •DITCHES DIRECTED TO FACILITY

AFTER

Page 20: DIRT GRAVEL AND LOW VOLUME ROAD MAINTENANCE PROGRAM · DIRT AND GRAVEL ROADS •BITTLE ROAD PHASE 2 – GERMANY TOWNSHIP •DITCH WORK ALONG STEEP SLOPE •DITCHES DIRECTED TO FACILITY

AFTER

Page 21: DIRT GRAVEL AND LOW VOLUME ROAD MAINTENANCE PROGRAM · DIRT AND GRAVEL ROADS •BITTLE ROAD PHASE 2 – GERMANY TOWNSHIP •DITCH WORK ALONG STEEP SLOPE •DITCHES DIRECTED TO FACILITY

DITCHES AFTER

Page 22: DIRT GRAVEL AND LOW VOLUME ROAD MAINTENANCE PROGRAM · DIRT AND GRAVEL ROADS •BITTLE ROAD PHASE 2 – GERMANY TOWNSHIP •DITCH WORK ALONG STEEP SLOPE •DITCHES DIRECTED TO FACILITY

BEFORE

Page 23: DIRT GRAVEL AND LOW VOLUME ROAD MAINTENANCE PROGRAM · DIRT AND GRAVEL ROADS •BITTLE ROAD PHASE 2 – GERMANY TOWNSHIP •DITCH WORK ALONG STEEP SLOPE •DITCHES DIRECTED TO FACILITY

AFTER

Page 24: DIRT GRAVEL AND LOW VOLUME ROAD MAINTENANCE PROGRAM · DIRT AND GRAVEL ROADS •BITTLE ROAD PHASE 2 – GERMANY TOWNSHIP •DITCH WORK ALONG STEEP SLOPE •DITCHES DIRECTED TO FACILITY

DIRT AND GRAVEL ROAD –COMPLETED

BITTLE ROAD

Page 25: DIRT GRAVEL AND LOW VOLUME ROAD MAINTENANCE PROGRAM · DIRT AND GRAVEL ROADS •BITTLE ROAD PHASE 2 – GERMANY TOWNSHIP •DITCH WORK ALONG STEEP SLOPE •DITCHES DIRECTED TO FACILITY

BITTLE ROAD PHASE 1 CULVERT REPLACEMENT

A 24” ROUND PIPE WAS REPLACED WITH A CONCRETE BOX CULVERT

• THE 6 FOOT WIDE BOX CULVERT WAS PLACED THE END OF JANUARY

2017.

Page 26: DIRT GRAVEL AND LOW VOLUME ROAD MAINTENANCE PROGRAM · DIRT AND GRAVEL ROADS •BITTLE ROAD PHASE 2 – GERMANY TOWNSHIP •DITCH WORK ALONG STEEP SLOPE •DITCHES DIRECTED TO FACILITY

BITTLE ROAD – LOOKING UPSTREAM – BEFORE AND AFTER

Page 27: DIRT GRAVEL AND LOW VOLUME ROAD MAINTENANCE PROGRAM · DIRT AND GRAVEL ROADS •BITTLE ROAD PHASE 2 – GERMANY TOWNSHIP •DITCH WORK ALONG STEEP SLOPE •DITCHES DIRECTED TO FACILITY

STREAM CROSSING DISCHARGE – BEFORE AND AFTER

Page 28: DIRT GRAVEL AND LOW VOLUME ROAD MAINTENANCE PROGRAM · DIRT AND GRAVEL ROADS •BITTLE ROAD PHASE 2 – GERMANY TOWNSHIP •DITCH WORK ALONG STEEP SLOPE •DITCHES DIRECTED TO FACILITY

ENTERING CULVERT

Page 29: DIRT GRAVEL AND LOW VOLUME ROAD MAINTENANCE PROGRAM · DIRT AND GRAVEL ROADS •BITTLE ROAD PHASE 2 – GERMANY TOWNSHIP •DITCH WORK ALONG STEEP SLOPE •DITCHES DIRECTED TO FACILITY

DISCHARGE

Page 30: DIRT GRAVEL AND LOW VOLUME ROAD MAINTENANCE PROGRAM · DIRT AND GRAVEL ROADS •BITTLE ROAD PHASE 2 – GERMANY TOWNSHIP •DITCH WORK ALONG STEEP SLOPE •DITCHES DIRECTED TO FACILITY

CONTRACTED 2016 – TO BE COMPLETED IN 2017

• TOTAL CONTRACTED AMOUNT – OVER $239,000 IN THESE 4

CONTRACTED SITES

• ULRICKTOWN ROAD

• BITTLE ROAD PHASE 1 – FINAL STABILIZATION IN MAY

• JACK ROAD

• MILTENBERGER ROAD – WORK HAS BEGUN

Page 31: DIRT GRAVEL AND LOW VOLUME ROAD MAINTENANCE PROGRAM · DIRT AND GRAVEL ROADS •BITTLE ROAD PHASE 2 – GERMANY TOWNSHIP •DITCH WORK ALONG STEEP SLOPE •DITCHES DIRECTED TO FACILITY

LOW VOLUME PAVED ROADS

• ULRICKTOWN ROAD

• CULVERT REPLACEMENT

• REALIGNMENT OF STRUCTURE

Page 32: DIRT GRAVEL AND LOW VOLUME ROAD MAINTENANCE PROGRAM · DIRT AND GRAVEL ROADS •BITTLE ROAD PHASE 2 – GERMANY TOWNSHIP •DITCH WORK ALONG STEEP SLOPE •DITCHES DIRECTED TO FACILITY

STREAM ENTERING 24” PIPE

Page 33: DIRT GRAVEL AND LOW VOLUME ROAD MAINTENANCE PROGRAM · DIRT AND GRAVEL ROADS •BITTLE ROAD PHASE 2 – GERMANY TOWNSHIP •DITCH WORK ALONG STEEP SLOPE •DITCHES DIRECTED TO FACILITY

EROSION OF STREAM AT DISCHARGE

Page 34: DIRT GRAVEL AND LOW VOLUME ROAD MAINTENANCE PROGRAM · DIRT AND GRAVEL ROADS •BITTLE ROAD PHASE 2 – GERMANY TOWNSHIP •DITCH WORK ALONG STEEP SLOPE •DITCHES DIRECTED TO FACILITY

DIRT AND GRAVEL ROADS

• BITTLE ROAD PHASE 2 – GERMANY TOWNSHIP

• DITCH WORK ALONG STEEP SLOPE

• DITCHES DIRECTED TO FACILITY TO SPREAD OUT DISCHARGE

• STREAM CROSSING REPLACEMENT (BOX CULVERT)

• DRIVING SURFACE AGGREGATE (DSA) PLACEMENT

Page 35: DIRT GRAVEL AND LOW VOLUME ROAD MAINTENANCE PROGRAM · DIRT AND GRAVEL ROADS •BITTLE ROAD PHASE 2 – GERMANY TOWNSHIP •DITCH WORK ALONG STEEP SLOPE •DITCHES DIRECTED TO FACILITY

STEEP SLOPE – ROAD MATERIAL DEPOSITED ALONG FARM FIELD

Page 36: DIRT GRAVEL AND LOW VOLUME ROAD MAINTENANCE PROGRAM · DIRT AND GRAVEL ROADS •BITTLE ROAD PHASE 2 – GERMANY TOWNSHIP •DITCH WORK ALONG STEEP SLOPE •DITCHES DIRECTED TO FACILITY

STREAM CROSSING

Page 37: DIRT GRAVEL AND LOW VOLUME ROAD MAINTENANCE PROGRAM · DIRT AND GRAVEL ROADS •BITTLE ROAD PHASE 2 – GERMANY TOWNSHIP •DITCH WORK ALONG STEEP SLOPE •DITCHES DIRECTED TO FACILITY

STREAM CROSSING – DISCHARGE

Page 38: DIRT GRAVEL AND LOW VOLUME ROAD MAINTENANCE PROGRAM · DIRT AND GRAVEL ROADS •BITTLE ROAD PHASE 2 – GERMANY TOWNSHIP •DITCH WORK ALONG STEEP SLOPE •DITCHES DIRECTED TO FACILITY

ADAMS COUNTY ALLOCATION

2016-2017

• DIRT AND GRAVEL ROADS - $100,000

• LOW-VOLUME PAVED ROADS – $121,803

Page 39: DIRT GRAVEL AND LOW VOLUME ROAD MAINTENANCE PROGRAM · DIRT AND GRAVEL ROADS •BITTLE ROAD PHASE 2 – GERMANY TOWNSHIP •DITCH WORK ALONG STEEP SLOPE •DITCHES DIRECTED TO FACILITY

ADAMS COUNTY

DIRT AND GRAVEL LOW VOLUME

• FUNDED SITE MILES: 1

• CONTRACTED SITES: 1

• COMPLETED SITES: 6

• TOTAL EXPENDITURES:

$240,121.53

• FUNDED SITE MILES: 13

• CONTRACTED SITES: 3

• COMPLETED SITES: 15

• TOTAL EXPENDITURES:

$457,934.68

Page 40: DIRT GRAVEL AND LOW VOLUME ROAD MAINTENANCE PROGRAM · DIRT AND GRAVEL ROADS •BITTLE ROAD PHASE 2 – GERMANY TOWNSHIP •DITCH WORK ALONG STEEP SLOPE •DITCHES DIRECTED TO FACILITY

APPLICATIONS - FEB. 1, 2017

• 4 APPLICATIONS (2 OF THESE ARE ON AGENDA TO APPROVE

CONTRACTS AT THE MAY MEETING)

• TOTALING OVER $160,000

Page 41: DIRT GRAVEL AND LOW VOLUME ROAD MAINTENANCE PROGRAM · DIRT AND GRAVEL ROADS •BITTLE ROAD PHASE 2 – GERMANY TOWNSHIP •DITCH WORK ALONG STEEP SLOPE •DITCHES DIRECTED TO FACILITY

APPLICATIONS – MAY 1, 2017

• I APPLICATION CAME IN REQUESTING FUNDING

Page 42: DIRT GRAVEL AND LOW VOLUME ROAD MAINTENANCE PROGRAM · DIRT AND GRAVEL ROADS •BITTLE ROAD PHASE 2 – GERMANY TOWNSHIP •DITCH WORK ALONG STEEP SLOPE •DITCHES DIRECTED TO FACILITY

NEXT APPLICATION DEADLINE IS SEPTEMBER 1, 2017

Page 43: DIRT GRAVEL AND LOW VOLUME ROAD MAINTENANCE PROGRAM · DIRT AND GRAVEL ROADS •BITTLE ROAD PHASE 2 – GERMANY TOWNSHIP •DITCH WORK ALONG STEEP SLOPE •DITCHES DIRECTED TO FACILITY

ADDITIONAL INFORMATION

• CENTER FOR DIRT AND GRAVEL ROAD STUDIES AT PENN STATE

HTTPS://WWW.DIRTANDGRAVEL.PSU.EDU/