DISTANCE TO PARK INFRASTRUCTURE - WATER ………………..…………………................ - SEWER ………………….…………………………. - TELPHONE LINES …..……………………….... - ENERGY ………..……………………………………. - NATURAL GAS …………………………………….. P a r k L o c a t i o n Guard House & Controlled Access T e l e p h o n e (+52) (81) 8356-7978 w w w . v y n m s a . c o m 04481-1555-5151) Contact us Ernesto Lopez ( (PARK) (PARK) (TELMEX) (CFE) (GNM) ADVANTAGES - Ramos Arizpe, Coahuila México LOCATION L a S i l l a A p o d a c a I n d r I a l P a r k SPEC III – Vynmsa Ramos Arizpe Industrial Park Inventory Building / For Lease or Sale - P OCKET PARK FLEXIBILITY : Accommodates 6 to 8 projects with a variety of building sizes. - A IRPORT : Ramos Arizpe / Saltillo = Less than 10 Min. Drive Monterrey Int’l. Airport = Less than 90 minutes. - H IGHWAYS TO: Torreón, Zacatecas (Derramadero), Monclova, Monterrey, Laredo and Reynosa, - L ABOR FORCE : WALKING DISTANCE. - C ONTROLLED ACCESS : FENCED AND GATED. - U SE : MANUFACTURING, ASSEMBLY or DISTRIBUTION - T RANSPORTATION : AVAILABLE - I NFRASTRUCTURE : WORLD CLASS MONTERREY INTERNATIONAL AIRPORT ……………………………… SALTILLO INTERNATIONAL AIRPORT …………………….………. LAREDO, TX…………………………… MONTERREY DOWNTOWN…..……. MEXICO CITY…………………………. REYNOSA CITY…….………..………. SALTILLO DOWNTOWN …………… 110 KM 9 KM 310 KM 80 KM 1030 KM 350 KM 10 KM Monterrey / San Luis Potosí / Ciudad Victoria / Saltillo - Ramos Arizpe / Irapuato The location of the VRAIP “ The location of the VRAIP “A ” is next to the ” is next to the Libramiento Poniente Saltillo “ Libramiento Poniente Saltillo “C” with easy ” with easy connection to Zacatecas or Monterrey and connection to Zacatecas or Monterrey and Monclova Hwys “ Monclova Hwys “B”., right behind the GM ”., right behind the GM Plant. Plant.

Upload: jaylan-mall

Post on 30-Mar-2015

221 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: DISTANCE TO PARK INFRASTRUCTURE - WATER ………………..…………………................ - SEWER ………………….…………………………. - TELPHONE LINES …..………………………

DISTANCE TO

PARK INFRASTRUCTURE

- WATER ………………..…………………................- SEWER ………………….………………………….- TELPHONE LINES …..………………………....- ENERGY ………..…………………………………….- NATURAL GAS ……………………………………..

P a r k L o c a t i o n

Guard House & Controlled Access

T e l e p h o n e (+52) (81) 8356-7978 w w w . v y n m s a . c o m

Ruben Calderon (04481-1555-5151) Contact us Ernesto Lopez (04481-8010-7290) [email protected] [email protected]

(PARK)(PARK)

(TELMEX)(CFE)

(GNM)

ADVANTAGES

- Ramos Arizpe, Coahuila México

LOCATION

L a S i l l a A p o d a c a I n d u s t r I a l P a r k SPEC III – Vynmsa Ramos Arizpe Industrial Park

Inventory Building / For Lease or Sale

- POCKET PARK FLEXIBILITY: Accommodates 6 to 8

projects with a variety of building sizes.

- AIRPORT : Ramos Arizpe / Saltillo = Less than 10 Min. Drive

Monterrey Int’l. Airport = Less than 90 minutes.

- HIGHWAYS TO: Torreón, Zacatecas (Derramadero),

Monclova, Monterrey, Laredo and Reynosa,

- LABOR FORCE: WALKING DISTANCE.

- CONTROLLED ACCESS: FENCED AND GATED.

- USE: MANUFACTURING, ASSEMBLY or DISTRIBUTION

- TRANSPORTATION: AVAILABLE

- INFRASTRUCTURE: WORLD CLASS

MONTERREY INTERNATIONAL AIRPORT ………………………………

SALTILLO INTERNATIONAL AIRPORT …………………….……….

LAREDO, TX……………………………

MONTERREY DOWNTOWN…..…….

MEXICO CITY………………………….

REYNOSA CITY…….………..……….

SALTILLO DOWNTOWN ……………

110 KM

9 KM

310 KM

80 KM

1030 KM

350 KM

10 KM

Monterrey / San Luis Potosí / Ciudad Victoria / Saltillo - Ramos Arizpe / Irapuato

The location of the VRAIP “The location of the VRAIP “AA” is next to the Libramiento ” is next to the Libramiento

Poniente Saltillo “Poniente Saltillo “CC” with easy connection to Zacatecas or ” with easy connection to Zacatecas or

Monterrey and Monclova Hwys “Monterrey and Monclova Hwys “BB”., right behind the GM ”., right behind the GM

Plant.Plant.

Page 2: DISTANCE TO PARK INFRASTRUCTURE - WATER ………………..…………………................ - SEWER ………………….…………………………. - TELPHONE LINES …..………………………

COMPANIES IN THE PARK

T e l e p h o n e (+52) (81) 8356-7978 w w w . v y n m s a . c o m

Ruben Calderon (04481-1555-5151) Contact us Ernesto Lopez (04481-8010-7290) [email protected] [email protected]

Monterrey / San Luis Potosí / Ciudad Victoria / Saltillo - Ramos Arizpe / Irapuato

P a r k G e n e r a l L a y o u t

SPEC III – Vynmsa Ramos Arizpe Industrial Park

Inventory Building / For Lease or Sale

Park concrete Blvds: 21 meters = 68.9 feet wide

Park concrete Blvds: 21 meters = 68.9 feet wide

Park concrete Blvds: 21 meters = 68.9 feet wide

The GM PlantAs seen from the

SPEC III site

Abundant Labor surrounding the Vynmsa Ramos Arizpe Industrial Park, The GM Plant adjacent, hospital and airport nearby.

Page 3: DISTANCE TO PARK INFRASTRUCTURE - WATER ………………..…………………................ - SEWER ………………….…………………………. - TELPHONE LINES …..………………………

L a S i l l a A p o d a c a I n d u s t r I a l P a r k

T e l e p h o n e (+52) (81) 8356-7978 w w w . v y n m s a . c o m

Ruben Calderon (04481-1555-5151) Contact us Ernesto Lopez (04481-8010-7290) [email protected] [email protected]

Monterrey / San Luis Potosí / Ciudad Victoria / Saltillo - Ramos Arizpe / Irapuato

P a r k A r c h i t e c t u r a l L a y o u t

SPEC III – Vynmsa Ramos Arizpe Industrial Park

Inventory Building / BTS For Lease or Sale

LOT - A

715,500 ft2

16.5 acre

66,500 m2 LOT - B

401,350 ft2

9.21 acre

37,300 m2

LOT - C

250,00 ft25.75 acre

23,300 m2

LOT - D

361,500 ft2

8.29 are

33,600 m2

LOT - E

258,250 ft2

5.92 acre

24,000 m2

BUILT AREA: 44,913.02 Ft² May grow up to: 53,789.36 Ft²

LAND AREA: 7,307.50 M2

STRUCTURE: Pre Enginered Rigid Frame

ROOF SYSTEM: SSR, 4% Skyligths

4 in. Thermoacoustic

Insulation

WALL SYSTEM: Thick precast concrete

panels with polystyrene,

windows at the top for

natural lighting.

FLOOR SYSTEM: 4 In.

CLEAR HEIGHT: 30 Ft. (at the lowest point)

DOCKS & RAMPS (2) & (1) (room for more)

CAR PARKING: 25 spaces

OFFICE: To be built (according to client

needs)

MAIN SPECS:

May grow up to: 53,789.36

Page 4: DISTANCE TO PARK INFRASTRUCTURE - WATER ………………..…………………................ - SEWER ………………….…………………………. - TELPHONE LINES …..………………………

L a S i l l a A p o d a c a I n d u s t r I a l P a r k

T e l e p h o n e (+52) (81) 8356-7978 w w w . v y n m s a . c o m

Ruben Calderon (04481-1555-5151) Contact us Ernesto Lopez (04481-8010-7290) [email protected] [email protected]

Monterrey / San Luis Potosí / Ciudad Victoria / Saltillo - Ramos Arizpe / Irapuato

P a r k G e n e r a l I n f o r m a t i o n

SPEC III – Vynmsa Ramos Arizpe Industrial Park

Inventory Building / BTS For Lease or Sale

LOT - J

29,000 ft2

0.66 acre

2,700 m2

LOT - K

82,900 ft2

1.90 acre

7,700 m2LOT - L

59,200 ft2

1.35 acre

5,500 m2LOT - M

49,500 ft2

1.13 acre

4,600 m2

21 meters = 68.9 feet wide