Page 1: District heating seminar 08-10-2015- Roeselare. 2 BW2E vzw  14 members = installations which energetically valorize household and comparable industrial

District heating seminar

08-10-2015- Roeselare

Page 2: District heating seminar 08-10-2015- Roeselare. 2 BW2E vzw  14 members = installations which energetically valorize household and comparable industrial

2

BW2E vzw

14 members = installations which energetically valorize household and comparable industrial waste Data 2014:

2 642 659 tonnes incinerated 1 448 011 MWh electricity 1 265 702 MWh heat

Founded in 2009 as an unincorporated association – converted into an NPO in 2015

Page 3: District heating seminar 08-10-2015- Roeselare. 2 BW2E vzw  14 members = installations which energetically valorize household and comparable industrial

3

Mirom Roeselare

District heating since 1986• Circuit city: 5 km (X 2)• Circuit greenhouses: 2,5 km (X 2)• 110°C – 65 °C• 21 customers• First 20 years: district heating unprofitable – in competition with GSC (electricity)• Power:

Current district heating: 14 MW Future: 45 MW

Page 4: District heating seminar 08-10-2015- Roeselare. 2 BW2E vzw  14 members = installations which energetically valorize household and comparable industrial

4

Mirom Roeselare

New connections and/or expansions:

• 2010: first new connection: 74 apartments

• 2012: Light and space: apartments and several homes (94) Autonomous district heating in plastics with dedicated gas boiler backup Support of the Flemish Authorities

• 2013: Gediflora (floriculture) Expansion district heating to second greenhouse (1,2 ha) 4 MW net – 4,2 MW natural gas boilers Remote interruptible customer

• KMO-zone Roeselare West (Schiervelde): Expansion circuit greenhouses: heat distribution to a.o.

– New 18 ha SME Zone– Site Schiervelde (sports complex, new swimming pool, …)– Eandis expands district heating for 1 000 homes, school complex, …

Support of the Flemish Authorities Operational: June 2016

Page 5: District heating seminar 08-10-2015- Roeselare. 2 BW2E vzw  14 members = installations which energetically valorize household and comparable industrial

5

Mirom Roeselare

• De Ronde Kom: expansion New branch to city circuit (> 4 km) for heat distribution to hospital, OCMW buildings, schools,

provincial government building, apartments, commercial spaces, … Investment of 5 million euros Support of the Flemish Authorities Savings of 1 500 000 liters of heating fuel. Operational: 2017

• Greenhouse project: new district heating 20 ha of greenhouses 40 °C flow temperature – 14 MW 40-60 GWh Includes heat buffer to balance out production with all heating users Support of the Flemish Authorities Operational 2017

Page 6: District heating seminar 08-10-2015- Roeselare. 2 BW2E vzw  14 members = installations which energetically valorize household and comparable industrial

6

IVBO-Brugge

District heating since 1984

• Length of 11 km (X2) Heat distribution to a.o. hospital, OCMW buildings, apartments, Aquafin, …

• 125 °C – 80 °C

• Potential heat distribution with 3 furnace lines: 20 MWth (15 MWth with 2 furnace lines)

• Average annual power used by customers: 4,8 MWth

• Large maintenance cost due to isolation leaks

• The search for new customers is hard: Competition with gas (group purchasing) Too expensive

Page 7: District heating seminar 08-10-2015- Roeselare. 2 BW2E vzw  14 members = installations which energetically valorize household and comparable industrial

7

IVBO-Brugge

New connections and/or expansions:• 2005: hospital cooling• 2012: connection to apartment building (88 apartments)• Further expansion is impossible without a heat buffer to absorb peaks

Study initiated with respect to complete or partial renovation of district heating

Page 8: District heating seminar 08-10-2015- Roeselare. 2 BW2E vzw  14 members = installations which energetically valorize household and comparable industrial

8

Net Brussels (Brussel Energie)

Building of the first district heating has started in August 2015• Maximum capacity: 20 MW• 110°C - 10 bars • length +/- 1 km • First phase: biggest customer = commercial centre, additionally truck depot

and wood workshop• Operational: January 2016• No subsidies

Page 9: District heating seminar 08-10-2015- Roeselare. 2 BW2E vzw  14 members = installations which energetically valorize household and comparable industrial

9

IVOO - Ostend

Presently no heat distribution yet• Various projects have been studied, but deemed unprofitable

Feasibility study (POM West-Vlaanderen) of district heating for Ostend is ongoing:• Different scenarios with a variety of heat suppliers are under consideration

including district heating network with IVOO as heat supplier:

– 12,6 km long

Page 10: District heating seminar 08-10-2015- Roeselare. 2 BW2E vzw  14 members = installations which energetically valorize household and comparable industrial

10

Indaver - Doel

Heat distribution to neighbouring company• Process heat for chemical processes• Supply of steam at 400 °C and 40 bar• Condensate: +/- 125 °C

New district heating• Ecluse = collaboration between IVEG/INFRAX, Maatschappij LinkerSchelde

Oever, Indaver/SLECO and FINEG• Heat source: grate incinerators Indaver and waste incinerator Sleco (availability

of 200-250 MW of energy – processing of over 1 000 000 tonnes waste/year)• Heat customers: 6 chemical companies, opportunity for other companies to join

in later• Superheated steam at 400 °C and 40 bar• Return of condensed steam -> used as feed water for the boiler• Length 5-6 km (own sites, third-arty sites, rail and road crossings, ..)

Page 11: District heating seminar 08-10-2015- Roeselare. 2 BW2E vzw  14 members = installations which energetically valorize household and comparable industrial

11

Indaver - Doel

• Capacity 110 MW• Base power: 420 GWh/year• CO2 reduction Ecluse = CO2 reduction by 50 wind turbines of 2,3 MWe• Investment of about 30 million euros, with strategic ecological support of the

Flemish Government• Operational: 1st half of 2017

Page 12: District heating seminar 08-10-2015- Roeselare. 2 BW2E vzw  14 members = installations which energetically valorize household and comparable industrial

Indaver – Antwerp (rotary kiln incinerators hazardous waste)

• After several feasibility studies the City of Antwerp has plans for a large-scale district heating network in Antwerpen Noord (investment decisions still under review!)

Page 13: District heating seminar 08-10-2015- Roeselare. 2 BW2E vzw  14 members = installations which energetically valorize household and comparable industrial

Indaver - Antwerp (rotary kiln incinerators hazardous waste)

Minimum scenario 80 GWh: Amoras, LPS, Rozemaai and Luchtbal

Maximum scenario 105 GWh: Minimum + Luithagen + De Schinde

Page 14: District heating seminar 08-10-2015- Roeselare. 2 BW2E vzw  14 members = installations which energetically valorize household and comparable industrial

14

Bionerga – Houthalen-Helchteren

Houthalen –Helchteren (existing installation – 100 000 tonnes/year): district heating since 2002• Steam supply to Aquafin• 260 °C and 26 bar• Length < 1 km• 25 000 to 30 000 MWhth/year delivered to Aquafin

Beringen (planned new installation– 200.000 ton/year): district heating (research on going)• Steam supply to Borealis• 400°C and 40 bar• Length < 1 km• Consumption circa 200 000 MWhth/year + 90 000 MWhe/year• Research into other consumers (steam and/or hot water) – Ravenshout

industrial area (free plots left).

Page 15: District heating seminar 08-10-2015- Roeselare. 2 BW2E vzw  14 members = installations which energetically valorize household and comparable industrial

15

IVAGO - Ghent

District heating since 2007• Steam supply to academic hospital of Ghent

Heating, sterilisation, kitchen Covers about 85 % of heating needs

• Steam supply at 208 °C and 10 bar• Length 1400 + 200 m (2 boiler rooms)• Duct underneath E17• 40 000 – 45 000 MWhth per year

Expansion• Steam supply to neighbouring company Eastman• Steam supply at 205 °C and 16 bar• 15 000 MWhth per year

Page 16: District heating seminar 08-10-2015- Roeselare. 2 BW2E vzw  14 members = installations which energetically valorize household and comparable industrial

(Residual) heat at Imog in Harelbeke:

I. Electricity generation

II. Residual heat.a. Thermal oil (oil temperature ca 180°C)b. From condensation of the steam from the turbine (steam ca. 55°C)c. Steam net 3,5 bar (steam ca. 140 °C)d. Flue gas in the chimney (flue gas ca. 147 °C)e. Flue gas at the entry of the Quench (flue gas ca. 195 °C)f. Bio-WKK project.

16

Imog - Harelbeke

Page 17: District heating seminar 08-10-2015- Roeselare. 2 BW2E vzw  14 members = installations which energetically valorize household and comparable industrial

Imog - Harelbeke

17

Page 18: District heating seminar 08-10-2015- Roeselare. 2 BW2E vzw  14 members = installations which energetically valorize household and comparable industrial

18

IMOG - Harelbeke

Heat distribution to neighbouring company Nerva (producer concrete vaults)• Floor heating, drying, casting of vaults• Replaces fuel oil consumption of 130 000 l/year• Expandable to double capacity (now 8 lines, 10 lines output per outday)• Design on 500 kW (current oil boiler 810 à 1.000 kWth)

Possibly requires further measurements regarding peak power Related to heat buffering or not?

• Separate circuits!! IMOG||NERVA

Page 19: District heating seminar 08-10-2015- Roeselare. 2 BW2E vzw  14 members = installations which energetically valorize household and comparable industrial

19

IMOG - Harelbeke

Pilot project Imog-Eandis: Kuurne• Collaboration between IMOG, Eandis and project developers (Dumobil and

Huyzentruyt)• Local distribution network 350 family homes

Length 6,6 km Main: 1,6 km, +/- 100 °C – max 16 bar Distribution network: 5 km, +/- 75 °C - max 6 bar

• Later phase: +/- 400 additional homes• Flemish investment subsidies granted

Page 20: District heating seminar 08-10-2015- Roeselare. 2 BW2E vzw  14 members = installations which energetically valorize household and comparable industrial

20

IMOG - Harelbeke

Pilot project Imog-Infrax: Harelbeke• Collaboration between Imog and Infrax

2017: 1,85 MW2022: 5,94 MW

Page 21: District heating seminar 08-10-2015- Roeselare. 2 BW2E vzw  14 members = installations which energetically valorize household and comparable industrial

21

IMOG - Harelbeke

Pilot project: heat transport with energy containers• Storage of energy in transport medium (water or sodium acetate) in container

at +/- 95 °C• Containers: look like shipping containers, additional features such as

temperature display, grounding, leak proof valves, pressure relief, ..• Subsidies awarded by Flemish Government

Page 22: District heating seminar 08-10-2015- Roeselare. 2 BW2E vzw  14 members = installations which energetically valorize household and comparable industrial

22

IMOG - Harelbeke

• IMOG: heat buffer followed by collector which branches off to charging stations (min. 2)

• IMOG and consumer: pipes and facilities to transport heat from or to the container

Consumer’s interior installation is taken over in parallel: the existing heat production enters standby mode, external heat distribution gets priority

Page 23: District heating seminar 08-10-2015- Roeselare. 2 BW2E vzw  14 members = installations which energetically valorize household and comparable industrial

23

Imog – Moen (landfill)

Page 24: District heating seminar 08-10-2015- Roeselare. 2 BW2E vzw  14 members = installations which energetically valorize household and comparable industrial

24

IVM - Eeklo

Currently no district heating

Studies:• Late 90’s: study for greenhouse complex, stopped for spatial planning

reasons• Feasability study CORE (College Group T Leuven): first aproach in

collaboration with the city of Eeklo• EANDIS: additional study

conclusion: global district heating for the city of Eeklo (2 scenarios) is not profitable in the current context

• Permanent screening of opportunities for an ‘industrial large-scale consumer’ as starting point for the development of district heating

• New Provincial Spatial Implementation Programme Balgerhoeke as an opportunity for the development of district heating in a future industrial zone

Page 25: District heating seminar 08-10-2015- Roeselare. 2 BW2E vzw  14 members = installations which energetically valorize household and comparable industrial

25

Isvag - Antwerp

Feasibility Study (financial, economic and legal) to branch off waste heat to Terbekehofdreef (industrial estate -> process heat)• Short-term potential capacity ± 3 MW.• Technical impact of branching off heat on the functioning of the installation

currently under review

Page 26: District heating seminar 08-10-2015- Roeselare. 2 BW2E vzw  14 members = installations which energetically valorize household and comparable industrial

Ipalle Thumaide

• Energy Plant 2 x 13,2 T/h (10.600 kJ/kg) + 2 x 16,5 T/h garbages (8.800 kJ/kg)– 4x44 MWth

superheated steam2 steam turbine of 21 MVAHeat Exchanger 1 MWth (heating of buildings)

– 88 T/h condensates 130°C

• Thermal Projects (feasibility studies)Feeding superheated steam for industrial estate Polaris

– (FEDER fonds) – 88 MWth thermical Heat capacity (395°C, 42 Barg)– Length pipe < 2500 m

1

2

Page 27: District heating seminar 08-10-2015- Roeselare. 2 BW2E vzw  14 members = installations which energetically valorize household and comparable industrial

Ipalle Thumaide

Greenhouses – 37 MWth thermal Heat capacity – Low pressure steam (60°C, 0,1 Barg)– Length piping < 500 m

Page 28: District heating seminar 08-10-2015- Roeselare. 2 BW2E vzw  14 members = installations which energetically valorize household and comparable industrial

28

ICDI – Pont de Loup

• UVE 2 incineration linesCapacity 110 000 tonnes OM19 000 MWh electrical energy reinjected into the network (2014)Present situation:

– Oven nr 3: end of life– Oven nr 2: existing oven: life expectancy until 2035– Thermal power: 22 MWth

Future situation (2018)– Oven nr 2 – Oven nr 1: modernization project and replacement of Oven nr 3– Thermal power: 44 MWth

Page 29: District heating seminar 08-10-2015- Roeselare. 2 BW2E vzw  14 members = installations which energetically valorize household and comparable industrial

29

ICDI – Pont de Loup

• Possibilities for district heating near the WtE-plantChatelet (in place but getting old in the tooth)

– The network is about 30 years old• In bad condition but still working

– Approximately 6 km of pipes, 12 manholes– It supplies 17 public buildings (city hall, a school, church of Châtelet)

and even some social housing

Farciennes (project)– Oven nr 2 to power district heating (+ technical adaptation)– Power supply in the range of 22 MWth– Backup boilers integrated in project

Page 30: District heating seminar 08-10-2015- Roeselare. 2 BW2E vzw  14 members = installations which energetically valorize household and comparable industrial

30

ICDI – Pont de Loup

– Consumers “Farciennes Nord & Est” Public buildings (23) for ~ 4 MWh

• Pool, ONE, library, CPAS, Sports hall, party room, … Residential buildings for ~ 5 MWh

• District Farciennes Nord: ~ 65 homes• District Farciennes Est: ~ 25 homes

Ecopole (ongoing project, 180 ha dedicated to economic activities)– 20 year project

New business park for 3 towns (Farciennes, Aiseau-Presles and Sambreville)

Industrial clients – Expected consumption of 22 MWth

Page 31: District heating seminar 08-10-2015- Roeselare. 2 BW2E vzw  14 members = installations which energetically valorize household and comparable industrial

31

ICDI – Pont de Loup

icdi

ECOPÔLE

FARCIENNES EST

Réseau DE CHÂTELET

FARCIENNES NORD

3km

Page 32: District heating seminar 08-10-2015- Roeselare. 2 BW2E vzw  14 members = installations which energetically valorize household and comparable industrial

32

Intradel/Uvelia - Herstal

• UVE:2 linesCommissioning: 2009 (replaced the factory was commissioned in 1990)Authorized thermal capacity: 67,8 MWth/ovenAuthorized capacity : 370 000 tonnes/year residual household and

comparable waste + 35 000 tonnes/year of sewage sludgeEnergy recovered in 2014

– Electric power injected into the grid: 225 468 Mwhel– Thermal energy (heating of buildings): 460,68 MWhth

Page 33: District heating seminar 08-10-2015- Roeselare. 2 BW2E vzw  14 members = installations which energetically valorize household and comparable industrial

33

Intradel/Uvelia - Herstal

• District heating project2008: preliminary studies

2011:– Outcome of the studies realized by Intradel– Foundation of GIE Valorical

Initial study by Valorical: district heating in Herstal and Liège (250 GWhth/an) to be realized in successive phases

May 2014: project submitted under the European FEDER (ERDF) programme

– Network of 9 km on the territory of the town of Herstal– Maximum power demand: 33 MWth– Thermal energy developed: 61 GWhth/year– Investment: +/- 23 M€

Page 34: District heating seminar 08-10-2015- Roeselare. 2 BW2E vzw  14 members = installations which energetically valorize household and comparable industrial

34

Intradel/Uvelia - Herstal

May 2015: firm promise of funding received from FEDER (ERDF) for the first phase of the network

– Network of +/- 3 km on the territory of the town of Herstal– Maximum power demand: 7,6 MWth– Thermal energy developed: 14,1 GWhth/an– v: 12,8 M€ (max intervention by FEDER: 90 %)– Types of buildings concerned:

» Public buildings» Housing» commercial premises» High-tech SME’s

Realization Planning:– The first phase of the network should be realized between 2016-2020 (cfr firm

promise of funding by FEDER)– Network extensions are planned at a later stage

Page 35: District heating seminar 08-10-2015- Roeselare. 2 BW2E vzw  14 members = installations which energetically valorize household and comparable industrial

35

IBW - Virginal

• Plant

Maximum capacity: 116 000 tonnes waste/year Line 1 (1998):

– 25 t/h steam 40 bars (8 t waste/h for 10450 kJ/kg)– Steam turbine 4,5 Mwe

Line 2 (2004): – 20 t/h steam 40 bars (6,6 t waste/h for 10450 kJ/kg)– Steam turbine 4 Mwe

Page 36: District heating seminar 08-10-2015- Roeselare. 2 BW2E vzw  14 members = installations which energetically valorize household and comparable industrial

36

IBW - Virginal

• Heat exchange project with Idem Papers (Paper mill)15MWth (steam 12 bars) for paper production (decrease gas consumption

at Idem). Similar project has been in existence for 20 years (UVE Thonon les Bain /

Leman Paper Mill).Distance: 2,3 kms. Double walled tube (buried)Pay-back: 4-5 yearsConstruction time: 16 monthsTechnical studies and quotation endedProject in stand-by: financial discussions….