District Irrigation Plan, South West Garo Hills district
1 | P a g e
DISTRICT IRRIGATION PLAN
SOUTH WEST GARO HILLS, MEGHALAYA
District Irrigation Plan, South West Garo Hills district
2 | P a g e
District Irrigation Plan, 2016-2020
South West Garo Hills, Meghalaya
NABARD CONSULTANCY SERVICES PVT. LTD.
Corporate Office : 24, Rajendra Place, NABARD Building, New Delhi – 110125
Reg. Office : Plot No. C24, G Taluka, 3rd Floor, NABARD Building
Bandra Kurla Complex, Bandra East, Mumbai-400051
District Irrigation Plan, South West Garo Hills district
3 | P a g e
FOREWORD
Pradhan Mantri Krishi Sinchai Yojana (PMKSY) is a national mission to improve farm
productivity and ensure better utilization of the resources in the country. The primary
objectives of PMKSY are to attract investment in irrigation system at field level, develop and
expand cultivable land in the country enhance rain water use in order to minimize wastage of
water, enhance crop per drop by implementing water – saving technologies and precision
irrigation. The plan additionally calls for bringing ministries, offices, organizations, research
and financial institutions occupied with creation and recycling of water under one platform so
that an exhaustive and holistic outlook of the whole water cycle is considered. The goal is to
open the doors for optimal water budgeting in all the sectors.
In order to achieve the objectives, the District Irrigation Plan of South West Garo Hills
district, Meghalaya is prepared by District level Implementation Committee consisting of
various Departments and NABCONS after thoroughly studying the scenario of the district. I
wish to thank all the members of DLIC, NABCONS and all other officers/ officials of all the
line departments for preparation of District Irrigation Plan and wish them good luck for its
better implementation.
Place: South West Garo Hills Deputy Commissioner,
Date: South West Garo Hills
District Irrigation Plan, South West Garo Hills district
4 | P a g e
ACKNOWLEDGEMENT
It is my sincere privilege to express my deep sense of gratitude and heartfelt thanks to the
Ministry of Agriculture and Farmers’ Welfare and other concerned departments of
Government of India for providing an opportunity to prepare an exhaustive irrigation plan
covering all the components of PMKSY for the benefit of major farming community in the
district.
I am also highly thankful to the Deputy Commissioner, South West Garo Hills who is also
the Chairman of this District Level Implementation Committee (DLIC) for his extensive
support and guidance towards the preparation of this District Irrigation Plan and making it
possible to present the same in an implementable manner. I also thank all the members of the
DLIC for providing the desired data/ programme to be taken up in the Plan.
District Agriculture Officer
South West Garo Hills
District Irrigation Plan, South West Garo Hills district
5 | P a g e
DISTRICT LEVEL IMPLEMENTING COMMITTEE
1 Deputy Commissioner Chairman
2 Project Director DRDA Member
3 District Agriculture Officer Member Secretary
4 District Horticulture Officer Member
5 Divisional Soil and Water Conservation Officer Member
6 Executive Engineer PHE Member
7 Executive Engineer Water Resources Member
8 Project Director ATMA Member
9 Lead Band Officer Member
10 Leading NGO (to be nominated by DC) Member
11 Two Representing Farmers (to be nominated by DC for one
year at a time) Member
12 Representative from ICAR/KVK Member
District Irrigation Plan, South West Garo Hills district
6 | P a g e
Table of Contents List of Tables ........................................................................................................................................... 8
List of Figures .......................................................................................................................................... 8
List of Maps ............................................................................................................................................. 8
Executive Summary ................................................................................................................................. 9
Introduction .......................................................................................................................................... 13
Background ....................................................................................................................................... 13
Vision ................................................................................................................................................. 19
Objective ........................................................................................................................................... 19
Strategy/approach ............................................................................................................................ 20
Programme Components .................................................................................................................. 20
Rationale/ Justification ..................................................................................................................... 22
Methodology ..................................................................................................................................... 23
Chapter 1 : General Information of the District .................................................................................... 24
1.1 District Profile ............................................................................................................................. 24
Administrative Set-up of South West Garo Hills ........................................................................... 25
1.2 District Demography ................................................................................................................... 25
1.3 Biomass and Livestock ................................................................................................................ 26
1.4 Agro-Ecology, Climate, Hydrology and Topography ................................................................... 26
1.5 Soil Profile ................................................................................................................................... 27
1.6 Land Use pattern ......................................................................................................................... 28
Chapter 2 : District Water Profile .......................................................................................................... 29
2.1 Area wise, Crop wise, irrigation Status ....................................................................................... 29
2.2 Production and Productivity of Major crops ............................................................................... 30
2.3 Irrigation based classification ..................................................................................................... 32
Chapter 3 : Water Availability in South West Garo Hills ....................................................................... 33
3.1 Status of Water Availability......................................................................................................... 33
3.2 Status of Ground Water Availability ........................................................................................... 34
3.3 Status of Command Area ............................................................................................................ 34
3.4 Existing type of Irrigation ............................................................................................................ 35
Chapter 4 : Water Requirement/Demand ............................................................................................ 36
4.1 Domestic Water Demand ............................................................................................................ 36
4.2 Crop water demand .................................................................................................................... 37
4.3 Livestock water demand ............................................................................................................. 38
District Irrigation Plan, South West Garo Hills district
7 | P a g e
4.4 Industrial water demand ............................................................................................................. 38
4.5 Water demand for Power Generation ........................................................................................ 39
4.6 Total water demand of the district for various sectors .............................................................. 39
4.7 Water Budget .............................................................................................................................. 40
Chapter 5 : Strategic Action Plan for Irrigation in District under PMKSY .............................................. 41
5.1 Department wise, year wise plan ............................................................................................... 41
5.2 Component wise, year wise plan ................................................................................................ 42
5.3 Block wise, year wise plan .......................................................................................................... 43
5.4 Suggestions ................................................................................................................................. 43
5.5 Period of Implementation ........................................................................................................... 44
5.6 Monitoring and Evaluation ......................................................................................................... 44
5.7 Expected Outcome and Output .................................................................................................. 45
5.8 Conclusion ................................................................................................................................... 45
Annexure I : Strategic Action Plan by Water Resources Department ................................................. 47
Betasing Block ................................................................................................................................... 47
Zikzak Block ....................................................................................................................................... 86
Dalu Block ....................................................................................................................................... 114
Annexure II : Strategic Action Plan by Soil Conservation Department ............................................. 117
Betasing Block ................................................................................................................................. 117
Zikzak Block ..................................................................................................................................... 123
Annexure III : Strategic Action Plan by Agriculture Department ........................................................ 129
Annexure IV : Strategic Action Plan by Horticulture Department ...................................................... 144
District Irrigation Plan, South West Garo Hills district
8 | P a g e
List of Tables Table 1-1: District Profile ...................................................................................................................... 24
Table 1-2: Demography of South West Garo Hills ................................................................................ 26
Table 1-3: Population of Small and Milch or Meat Animals in South West Garo Hills ......................... 26
Table 1-4: Population of Large and Draft Animals in South West Garo Hills ........................................ 26
Table 1-5: Agro-ecology and Topography of South West Garo Hills district ........................................ 27
Table 1-6: Climate and Elevation of South West Garo Hills district ...................................................... 27
Table 1-7: Soil Type and Land slope classification of South West Garo Hills district ............................ 28
Table 1-8: Land use pattern in South West Garo Hills district .............................................................. 28
Table 2-1: Area wise, Crop wise, irrigation Status ................................................................................ 29
Table 2-2: Production and productivity of major crops in South West Garo Hills district.................... 31
Table 2-3: Block-wise irrigation based classification ............................................................................ 32
Table 3-1: Water availability in South West Garo Hills district (in MCM) ............................................. 33
Table 3-2: Status of Ground Water Availability (in MCM) in South West Garo Hills district ................ 34
Table 3-3: Status of command area in South West Garo Hills district .................................................. 34
Table 3-4: Existing types of Irrigation in South West Garo Hills district ............................................... 35
Table 4-1: Domestic water demand (MCM) ......................................................................................... 36
Table 4-2: Crop water requirement (MCM) .......................................................................................... 37
Table 4-3: Livestock water demand (MCM) .......................................................................................... 38
Table 4-4: Industrial Water Demand (MCM) ........................................................................................ 38
Table 4-5: Water Demand for Power Generation (MCM) .................................................................... 39
Table 4-6: Present Water Demand of the district for various sectors .................................................. 39
Table 4-7: Total Water Demand of the district for various sectors (Projected for 2020) ..................... 39
Table 4-8: Water Budget (Volume in MCM) ......................................................................................... 40
Table 5-1: Department wise plan .......................................................................................................... 41
Table 5-2: Component wise plan .......................................................................................................... 42
Table 5-3: Block wise plan ..................................................................................................................... 43
Table 5-4: Department wise proposed command area (in Ha.) ........................................................... 45
List of Figures Figure 5-1: Department wise plan ........................................................................................................ 41
Figure 5-2: Component wise plan ......................................................................................................... 42
Figure 5-3: Block wise plan ................................................................................................................... 43
List of Maps Map 1-1: Location of South West Garo Hills district in Meghalaya ...................................................... 24
District Irrigation Plan, South West Garo Hills district
9 | P a g e
Executive Summary
In an agrarian economy like India, agriculture utilizes the major share of country’s
exploitable water resources. Though the sector utilizes the maximum share of exploitable
water resources, availability of the same at different locations to different extent makes it
vital to adopt effective utilization of water through storage, channelizing and judicial use. At
some places like Punjab and Haryana, the environmental and socio-economic rationale for
this capture by the sector is now being questioned. Accordingly, it is needed to challenge and
change the fundamentals of the prevailing view of water resources exploitation. A new and
more suitable approach to water resources allocation is necessary if the population is to be
adequately fed, without further degradation and destruction of the critical ecosystem services.
Water productivity needs to be enhanced considerably, and economic cost-benefit analysis
and pricing regimes can play a significant role in such a process. However, these economic
measures will not be sufficient on their own. They will need to be buttressed by technological
innovation and institutional changes in order to encourage a more equitable distribution of
resources and to mitigate potential international conflicts across 'shared' water basins.
Water has unique characteristics that determine both its allocation and use as a resource by
agriculture. Agricultural use of water for irrigation is itself contingent on land resources. In a
situation of growing water scarcity and rising demands for non-agricultural (household and
industrial) use of water, reassessment of sectoral allocations of water are inevitable. In
developing countries, irrigated agriculture plays a vital role in contributing towards domestic
food security and poverty alleviation. Therefore, achievement of these objectives is
dependent on adequate allocations of water to agriculture. Justification of such allocations
requires that irrigated agriculture be a cost-effective means of achieving stated political or
social objectives, such as food security or poverty alleviation, and that all externalities be
taken into account in the pricing mechanism. Improved allocation of irrigation water is
required within the agriculture sectors in order to achieve greater efficiency in the use of
irrigation water and existing irrigation infrastructure. Reallocation is also required in order to
reduce waterlogging and salinization of irrigated land, to decrease the negative environmental
impacts and other externalities of irrigation (caused by over extraction of groundwater and
depletion and pollution of surface water).
Government of India launched Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) to
address the constraints in providing assured irrigation as well as increasing efficiency and
District Irrigation Plan, South West Garo Hills district
10 | P a g e
productivity of current water use to bring more prosperity to the rural areas. Priorities of
Government of India were reflected in the Hon’ble President’s address to the joint Session of
the Parliament of 16th Lok Sabha where he indicated that “Each drop of water is precious.
Government is committed to giving high priority to water security. It will complete the long
pending irrigation projects on priority and launch the ‘Pradhan Mantri Krishi Sinchayee
Yojana’ with the motto of ‘Har Khet Ko Pani’. There is a need for seriously considering all
options including linking of rivers, where feasible; for ensuring optimal use of our water
resources to prevent the recurrence of floods and drought. By harnessing rain water through
‘Jal Sanchay’ and ‘Jal Sinchan’, we will nurture water conservation and ground water
recharge. Micro irrigation will be popularised to ensure ‘Per drop-More crop”.
PMKSY has been approved with an indicative outlay of Rs.50,000 crore over a period of five
years from 2015-16 to 2019-20. The programme is an amalgamation of on-going schemes of
Ministry of Water Resources, River Development and Ganga Rejuvenation, Ministry of
Agriculture & Cooperation and Ministry of Rural Development. The existing schemes AIBP,
CADWM, MI, SWMA, Watershed & Convergence with MGNREGA were brought together
under the umbrella program of PMKSY. Further the scheme seeks convergence with scheme
like Mahatma Gandhi National Rural Employment Guarantee Scheme (MGNRES), Rashtriya
Krishi Vikas Yojana (RKVY), Jawaharlal Nehru National Solar Mission and Rural
Electrification programmes (JLNNSM & REP), Rural Infrastructure Development Fund
(RIDF), Members of Parliament Local Area Development Scheme (MPLAD), Members of
Legislative Assembly Local Area Development Fund (MLALAD), Local Body Funds (LBF),
Working Plan of State Forest Department (WPSFD) etc. The PMKSY will be implemented in
an area development mode only by adopting a decentralized state level planning and
projectised execution structure that will allow the state to draw up their own irrigation
development plans based on DIPs and SIPs with a horizon of 5-7 years. The program will be
supervised and coordinated utilizing the existing mechanism and structure available under
Rashtriya Krishi Vikas Yojana (RKVY) program with state agriculture department acting as
the State Nodal Agency for implementation of PMKSY. However, the implementing
departments for the four components like AIBP, PMKSY HKKP (Har Khet Ko Pani),
PMKSY PDMC (Per drop more crop) and PMKSY (watershed development) will be decided
by the respective program ministry/department.
The five chapters along with introduction chapter, explains the profile of district, its water
requirement for agriculture and allied sector, water availability, assessment of water
District Irrigation Plan, South West Garo Hills district
11 | P a g e
requirement for various sectors and strategic action plan for augmentation and effective
management of available water resources.
District Demography:
As per 2011 census, the population of the district is 1,72,495 which is 5.81% of the state’s
population. With a population density of 209 person per square kilometer, South West Garo
Hills is relatively denser compared to the population density of the state (132 person per
square kilometer). The number of males and females in the district are 87,135 and 85,360
respectively forming a sex ratio of 980 female per 1000 male. There are 33,863 households in
the district. The literacy rate of the District is 56.7% as per 2011 Census.
Agriculture in South West Garo Hills:
92.5% of the total population of this district are hilly tribal and they practice agriculture along
with poultry and piggery mostly for subsistence level. Total geographical area of the district
is 82200 Ha and of which 27076 Ha is only cultivable land. Gross irrigated area 9381 Ha.
Out of total gross irrigated area, rice is the most dominant crop which enjoys enough
irrigation through surface mode. The soils are acidic and prone to erosion but very rich in
organic matter indicating potential to go for organic farming under proper management
practices. Other than rice and maize, horticultural crops like ginger and turmeric, Arcenaut,
Pine apple and other seasonal vegetables have tremendous production potentials and their
qualities can compete with world class standards. As those are grown mostly on the hill
slopes, they need irrigation support during the critical stages to ensure optimum quality and
productivity to meet the demand locally as well as outside the state.
Demand for water and the gap:
The water budget of the district for is prepared for the district for 2015-16 to 2020-21. The
present water availability/demand and also for 2020-21 are worked out and the water gap is
found out. The water budget clearly shows the water gap of -559.69 MCM in present and of -
529.17 MCM in future between the water availability and requirement. The negative gap
indicates that there is sufficient water resources for irrigation, domestic and the industrial
uses without creating any deficit in our water potential.
District Irrigation Plan, South West Garo Hills district
12 | P a g e
PMKSY Financial Proposal:
Total plan of South West Garo Hills district for four years works out to be Rs. 259990.26
lakh. Maximum share of Rs. 245264.33 lakhs is for Water Resources department followed by
Soil Conservation department, Agriculture department & Horticulture department with Rs.
8359.25 lakhs, Rs. 4190.68 lakhs & Rs. 2176 lakhs respectively. The total plan of four years
is divided in to 4 years i.e. 2016-17, 2017-18, 2018-19 and 2019-20.
District Irrigation Plan, South West Garo Hills district
13 | P a g e
Introduction
Background
Preparation of decentralized area specific district planning process visualized in various plans
took concrete shape through the years and initiatives like specific guidelines on
methodologies and processes for preparation of district plans; framework for preparation of
perspective plan, medium term and annual plans by then planning commission in 1969 and
the 73rd and 74th constitutional amendments conferring constitutional status to Panchayats at
district and sub district level; local self-government in urban areas; constitution of district
planning committee to consolidate the plans prepared at Panchayats and municipalities and
prepare a draft development plan for the whole district.
The decentralized planning process was further strengthened through emphasis by planning
commission on preparation of district level plans and making it an integral part of the process
of preparation of the states 11th five year plan. The Planning commission issued guidelines in
August 2006 for preparation of the district plans. The guidelines define the District Planning
as ‘the process of preparing an integrated plan for the local government sector in a district
taking into account the resources (natural, human and financial) available and covering the
sectoral activities and schemes assigned to the district level and below and those
implemented through local governments in a state. The document that embodies this
statement of resources and their allocation for various purposes is known as the District
Plan”.
Government of India through a resolution in National Development Council on 29th May
2007 conceived a special Additional Central Assistance Scheme (ACAS) to address the slow
growth of agriculture and allied sectors by incentivizing states to draw up plans for their
agriculture sectors more comprehensively. The NDC resolution states "GoI will introduce a
new Additional Central Assistance Scheme to incentivize states to draw up plans for their
agriculture sector more comprehensively, taking agro-climatic conditions, natural resource
issues and technology into account, and integrating livestock, poultry and fisheries, etc. This
will involve a new scheme for Additional Central Assistance (ACA) to State Plans,
administered by the Union Ministry of Agriculture over and above its existing Centrally
Sponsored Schemes, to supplement the State-specific strategies including special schemes for
beneficiaries of land reforms. The newly created National Rainfed Area Authority will, on
District Irrigation Plan, South West Garo Hills district
14 | P a g e
request, assist States in planning for rainfed areas".
The NDC in its resolution advised the states to prepare a comprehensive district agriculture
plans (C-DAP) that will fully utilize available resources and will include allied agriculture
sectors. Further, GOI issued a manual on preparation of comprehensive district agriculture
plans to help the states prepare C-DAP. As per these guidelines, the objective of district
planning is ‘to design an integrated and participatory action plan for the development of local
area in general and agriculture and allied sectors in particular’. The objectives of
Comprehensive District Agriculture Plan (C-DAP) are:
To prepare a Comprehensive District Agriculture Plan (C-DAP) through participatory
process involving various organizations and stakeholders.
To enable optimum utilization of scarce natural, physical & financial resources.
To assess and plan for the infrastructure required to support the agriculture
development.
To establish linkages with the required institutional support services, like credit,
technology transfer, ICT, research etc.
To evolve an action plan for achieving sustainable agricultural growth with food
security and cropping system that will improve farmers’ income.
The guidelines required the state/district authorities to (i) ensure that the agricultural plans are
prepared for the district and then integrated into the agricultural plans of the State based on
the agro-climatic conditions, availability of technology, trained manpower and natural
resources; (ii) local needs / crops / feed and fodder / animal husbandry / dairying / fisheries /
priorities are reflected in the plan; (iii) productivity gaps for important crops and livestock
and fisheries are reduced; and (iv) the returns to the farmers from these are maximized.
The latest move in the process of strengthening of decentralized planning process was the
Government of India guidelines issued in 2015 in the form of a template for the preparation
of District Irrigation Plan (DIP) and State Irrigation Plan (SIP) as part of the Pradhan Mantri
Krishi Sinchayee Yojana (PMKSY) program and made the preparation of DIP and SIP
mandatory for the states to receive funds from the program. The present report is a product of
these long drawn efforts of Government of India to strengthen the decentralized planning
process in the country focusing on the vital resource i.e., water.
Water is of vital importance for human & animal life, maintenance of ecological balance and
promotion of developmental activities. Considering its vital importance and ever increasing
District Irrigation Plan, South West Garo Hills district
15 | P a g e
demand for water, in the face of population growth, urbanization & industrialization and
considerations of climatic change, making water, an increasingly a scarce resource, available
to multiple uses, planning and management of this vital resources, utilization of water
economically, optimally and equitably assumes greater importance.
According to the 12th Five year Plan the water budget estimates of India by Ministry of Water
Resources suggests an availability of 1123 billion cubic meters (BCM) against a current
estimated demand of 710 BCM. The Standing Committee of the Ministry of Water Resources
estimates that this water demand will rise to 1093 BCM by 2025. Though the existing water
availability in the immediate future seems to be adequate, with the near constant supply of
water resources in the face of increasing demand on account of population growth,
urbanization and industrialization will strain the water supply-demand balance.
The per capita water availability which stood at 5,177 cubic meters in 1951 was reduced to
1820 cubic meters in 2001 while the international prescribed limit is 1800 cubic meters. The
projected per capita availability of water is 1341 cubic meters in 2025 and 1140 cubic meters
in 2050 suggesting shortage of water in the medium term1. Further, the all India water
balance estimates does not reflect the variations in water balance across time and space-
certain areas having a positive water balance and the others facing acute shortage. The
problem is further accentuated by water quality related issues.
With the abundant surface and ground water supply in the first five decades since
independence, more than 80 percent of the total available water resources were allocated for
irrigation purposes and the rest meeting the domestic and industrial demands. In a recent
study2on the demand for water from agriculture, domestic and industrial uses in 2000, 2025
and 2050 seems to suggest that domestic demand (34 BCM in 2000, 66 BCM in 2025 and
101 BCM in 2050) and industrial demand (42 BCM in 2000, 92 BCM in 2025 and 161 BCM
in 2050) for water will utilize the total balance water available while agriculture demand for
water will be (605 BCM in 2000, 675 BCM in 2025 and 637 BCM in 2050). This change is
partly because of the changing sectoral contributions of India’s GDP and also partly because
of dynamics of irrigation development in the country where the initial expansion in area
under irrigation is propelled by the availability of abundant water resources and availability
1Ministry of Water Resources (2011), Strategic Plan for Ministry of Water Resources, GoI, New Delhi 2Amarasinghe, U.A., Shah T., Turral, H. and Anand, B.K. 2007. India’s water future to 2025-
2050:Business-as-usual scenario and deviations. Research Report 123, International Water
Management Institute, Colombo.
District Irrigation Plan, South West Garo Hills district
16 | P a g e
of good quality land. This is no longer the case in many of the states where the availability of
land and water are serious constraints for further expansion of irrigation. Further, as per the
erstwhile planning commission up to March 2012 out of 141 million hectares of net sown
area in the country 114 (or 81%) million hectares is Irrigation Potential Created (IPC) and 88
(or 62%) million hectares is Irrigation Potential Utilized (IPU) leaving almost 20% of
irrigated potential unutilized. This leaves 40 percent of the net sown area in the country
dependent on rainfall which makes farming a high risk and less productive.
The competing demands for water resources and the emerging issues and concerns were to be
addressed through certain basic principles and commonality in approaches in dealing with
planning, development and management of water resources3 under an Integrated Water
Resource Management framework. The main objectives of water resource management as
delineated in National Water Policy 2012 are:
a) Planning, development and management of water resources need to be governed by
common integrated perspective considering local, regional, State and national context,
having an environmentally sound basis, keeping in view the human, social and
economic needs.
b) Principle of equity and social justice must inform use and allocation of water.
c) Good governance through transparent informed decision making is crucial to the
objectives of equity, social justice and sustainability. Meaningful intensive
participation, transparency and accountability should guide decision making and
regulation of water resources.
d) Water needs to be managed as a common pool community resource held, by the state,
under public trust doctrine to achieve food security, support livelihood, and ensure
equitable and sustainable development for all.
e) Water is essential for sustenance of eco-system, and therefore, minimum ecological
needs should be given due consideration.
f) Safe Water for drinking and sanitation should be considered as pre-emptive needs,
followed by high priority allocation for other basic domestic needs (including needs
of animals), achieving food security, supporting sustenance agriculture and minimum
eco-system needs. Available water, after meeting the above needs, should be allocated
in a manner to promote its conservation and efficient use.
3Ministry of Water Resources, National Water Policy, 2012, GoI, New Delhi.
District Irrigation Plan, South West Garo Hills district
17 | P a g e
g) All the elements of the water cycle, i.e., evapo-transpiration, precipitation, runoff,
river, lakes, soil moisture, and ground water, sea, etc., are interdependent and the
basic hydrological unit is the river basin, which should be considered as the basic
hydrological unit for planning.
h) Given the limits on enhancing the availability of utilizable water resources and
increased variability in supplies due to climate change, meeting the future needs will
depend more on demand management, and hence, this needs to be given priority,
especially through (a) evolving an agricultural system which economizes on water use
and maximizes value from water, and (b) bringing in maximum efficiency in use of
water and avoiding wastages.
i) Water quality and quantity are interlinked and need to be managed in an integrated
manner, consistent with broader environmental management approaches inter-alia
including the use of economic incentives and penalties to reduce pollution and
wastage.
j) The impact of climate change on water resources availability must be factored into
water management related decisions. Water using activities need to be regulated
keeping in mind the local geo climatic and hydrological situation.
Government of India launched Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) to
address the constraints in providing assured irrigation as well as increasing efficiency and
productivity of current water use to bring more prosperity to the rural areas. Priorities of
Government of India were reflected in the Hon’ble President’s address to the joint Session of
the Parliament of 16th Lok Sabha where he indicated that “Each drop of water is precious.
Government is committed to giving high priority to water security. It will complete the long
pending irrigation projects on priority and launch the ‘Pradhan Mantri Krishi Sinchayee
Yojana’ with the motto of ‘Har Khet Ko Pani’. There is a need for seriously considering all
options including linking of rivers, where feasible; for ensuring optimal use of our water
resources to prevent the recurrence of floods and drought. By harnessing rain water
through ‘Jal Sanchay’ and ‘Jal Sinchan’, we will nurture water conservation and ground
water recharge. Micro irrigation will be popularised to ensure ‘Per drop-More crop”.
PMKSY has been approved with an indicative outlay of Rs.50,000 crore over a period of five
years from 2015-16 to 2019-20. The programme is an amalgamation of on-going schemes of
Ministry of Water Resources, River Development and Ganga Rejuvenation, Ministry of
District Irrigation Plan, South West Garo Hills district
18 | P a g e
Agriculture & Cooperation and Ministry of Rural Development. The existing schemes AIBP,
CADWM, MI, SWMA, Watershed and Convergence with MGNREGA were brought
together under the umbrella program of PMKSY. Further the scheme seeks convergence with
scheme likeMahatma Gandhi National Rural Employment Guarantee Scheme (MGNRES),
Rashtriya Krishi Vikas Yojana (RKVY), Jawaharlal Nehru National Solar Mission and Rural
Electrification programmes (JLNNSM & REP), Rural Infrastructure Development Fund
(RIDF), Members of Parliament Local Area Development Scheme (MPLAD), Members of
Legislative Assembly Local Area Development Fund (MLALAD), Local Body Funds (LBF),
Working Plan of State Forest Department (WPSFD) etc. The PMKSY will be implemented in
an area development mode only by adopting a decentralized state level planning and
projectised execution structure that will allow the state to draw up their own irrigation
development plans based on DIPs and SIPs with a horizon of 5-7 years. The program will be
implemented as part of Rashtriya Krishi Vikas Yojana (RKVY) with state agriculture
department acting as the State Nodal Agency. However, the implementing departments for
the four components like AIBP, PMKSY (Har Khet Ko Pani), PMKSY (Per drop more crop)
and PMKSY (watershed development) will be decided by the respective program
ministry/department.
The funds under this program would be provided to the states as per the pattern of assistance
of Centrally Sponsored Schemes (CSS) decided by the Ministry of Finance and NITI Aayog.
During 2015-16 the existing pattern of assistance of ongoing scheme was continued. An
outlay of Rs. 50,000 crore has been approved for 2015-20. The financial assistance provided
to the state governments from this centrally sponsored scheme is subject to fulfilment of
certain conditions. Firstly, a state will become eligible to access PMKSY fund only if it has
prepared the District Irrigation Plans (DIP) and State Irrigation Plan (SIP), excepting for the
initial year, and the expenditure in water resource development for agriculture sector in the
year under consideration is not less than the baseline expenditure, which is defined as the
average of the expenditure in irrigation sector irrespective of the department in the state plan
in three years prior to the year under consideration. Secondly, States will be given additional
weightage for levying charges on water and electricity for irrigation purposes, so as to ensure
sustainability of the programme. Thirdly, interstate allocation of PMKSY fund will be
decided based on
District Irrigation Plan, South West Garo Hills district
19 | P a g e
Share of percentage of unirrigated area in the state vis-à-vis national average
including prominence of areas classified under Desert Development Programme
(DDP) and Drought Prone Area Development Programme (DPAP)
Increase in percentage share of expenditure on water resource development for
agriculture sector in State Plan expenditure in the previous year over three years prior
to it and
Improvement in irrigation efficiency in the state.
Vision
The overreaching vision of Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) will be to
ensure access to some means of protective irrigation to all agricultural farms in the country,
to produce ‘per drop more crop’, thus bringing much desired rural prosperity.
Objective
The objectives of the PMKSY are to:
a) Achieve convergence of investments in irrigation at the field level (preparation of
district level and, if required, sub district level water use plans).
b) Enhance the physical access of water on the farm and expand cultivable area under
assured irrigation (Har Khet ko Pani),
c) Integration of water source, distribution and its efficient use, to make best use of
water through appropriate technologies and practices.
d) Improve on-farm water use efficiency to reduce wastage and increase availability both
in duration and extent,
e) Enhance the adoption of precision-irrigation and other water saving technologies
(More crop per drop).
f) Enhance recharge of aquifers and introduce sustainable water conservation practices
g) Ensure the integrated development of rainfed areas using the watershed approach
towards soil and water conservation, regeneration of ground water, arresting runoff,
providing livelihood options and other NRM activities.
h) Promote extension activities relating to water harvesting, water management and crop
alignment for farmers and grass root level field functionaries.
District Irrigation Plan, South West Garo Hills district
20 | P a g e
i) Explore the feasibility of reusing treated municipal waste water for peri-urban
agriculture, and
j) Attract greater private investments in irrigation.
Strategy/approach
To achieve these objectives PMKSY adopted strategies that include
a) Creation of new water sources; repair, restoration and renovation of defunct water
sources; construction of water harvesting structures, secondary & micro storage,
groundwater development, enhancing potentials of traditional water bodies at village
level like Jal Mandir (Gujarat); Khatri, Kuhl (H.P.); Zabo (Nagaland); Eri, Ooranis
(T.N.); Dongs (Assam); Katas, Bandhas (Odisha and M.P.) etc.
b) Developing/augmenting distribution network where irrigation sources (both assured
and protective) are available or created;
c) Promotion of scientific moisture conservation and run off control measures to
improve ground water recharge so as to create opportunities for farmers to access
recharged water through shallow tube/dug wells;
d) Promoting efficient water conveyance and field application devices within the farm
viz, underground piping system, Drip & Sprinklers, pivots, rain-guns and other
application devices etc.;
e) Encouraging community irrigation through registered user groups/farmer producers’
organizations/NGOs; and
f) Farmer oriented activities like capacity building, training and exposure visits,
demonstrations, farm schools, skill development in efficient water and crop
management practices (crop alignment) including large scale awareness on more crop
per drop of water through mass media campaign, exhibitions, field days, and
extension activities through short animation films etc.
Programme Components
PMKSY has following four components:
1. Accelerated Irrigation Benefit Programme (AIBP) to focus on faster completion of
ongoing Major and Medium Irrigation including National Projects.
2. PMKSY (Har Khet ko Pani): This component focuses on-
District Irrigation Plan, South West Garo Hills district
21 | P a g e
a) Creation of new water sources through Minor Irrigation (both surface and ground
water)
b) Repair, restoration and renovation of water bodies; strengthening carrying capacity of
traditional water sources, construction rain water harvesting structures (Jal Sanchay);
c) Command area development, strengthening and creation of distribution network from
source to the farm;
d) Ground water development in the areas where it is abundant, so that sink is created to
store runoff/ flood water during peak rainy season.
e) Improvement in water management and distribution system for water bodies to take
advantage of the available source which is not tapped to its fullest capacity (deriving
benefits from low hanging fruits). At least 10% of the command area to be covered
under micro/precision irrigation.
f) Diversion of water from source of different location where it is plenty to nearby water
scarce areas, lift irrigation from water bodies/rivers at lower elevation to supplement
requirements beyond IWMP and MGNREGS irrespective of irrigation command.
g) Creating and rejuvenating traditional water storage systems like Khatri, Kuhl etc. at
feasible locations.
3. PMKSY (Per Drop More Crop)
a) Programme management, preparation of State/District Irrigation Plan, approval of
annual action plan, Monitoring etc.
b) Promoting efficient water conveyance and precision water application devices like
drips, sprinklers, pivots, rain-guns in the farm (Jal Sinchan);
c) Topping up of input cost particularly under civil construction beyond permissible
limit (40%), under MGNREGS for activities like lining inlet, outlet, silt traps,
distribution system etc.
d) Construction of micro irrigation structures to supplement source creation activities
including tube wells and dug wells (in areas where ground water is available and not
under semi critical/ critical/ over exploited category of development) which are not
supported under AIBP, PMKSY (Har Khet ko Pani), PMKSY (Watershed) and
MGNREGS as per Taluka/district irrigation plan.
District Irrigation Plan, South West Garo Hills district
22 | P a g e
e) Secondary storage structures at tail end of canal system to store water when available
in abundance (rainy season) or from perennial sources like streams for use during dry
periods through effective on-farm water management;
f) Water lifting devices like diesel/ electric/ solar pump sets including water carriage
pipes, underground piping system.
g) Extension activities for promotion of scientific moisture conservation and agronomic
measures including cropping alignment to maximize use of available water including
rainfall and minimize irrigation requirement (Jal Sarankchan);
h) Capacity building, training and awareness campaign including low cost publications,
use of pico projectors and low cost films for encouraging potential use water source
through technological, agronomic and management practices including community
irrigation.
i) The extension workers will be empowered to disseminate relevant technologies under
PMKSY only after requisite training is provided to them especially in the area of
promotion of scientific moisture conservation and agronomic measures, improved/
innovative distribution system like pipe and box outlet system, etc. Appropriate
Domain Experts will act as Master Trainers.
j) Information Communication Technology (ICT) interventions through NeGP-A to be
made use in the field of water use efficiency, precision irrigation technologies, on
farm water management, crop alignment etc. and also to do intensive monitoring of
the Scheme.
4. PMKSY (Watershed Development)
a) Effective management of runoff water and improved soil & moisture conservation
activities such as ridge area treatment, drainage line treatment, rain water harvesting,
in-situ moisture conservation and other allied activities on watershed basis.
b) Converging with MGNREGS for creation of water source to full potential in
identified backward rainfed Talukas including renovation of traditional water bodies
Rationale/ Justification
In reference to the status and need of irrigation, the water resource management including
irrigation related priorities was identified for South West Garo Hills district by the peoples’
representatives of district with support from administration and technical experts. For
District Irrigation Plan, South West Garo Hills district
23 | P a g e
instance the reports of Strategic Research and Extension Plan (SREP) prepared under ATMA
program, Comprehensive District Agriculture Plan (C-DAP) prepared as part of Rashtriya
Krishi Vikas Yojana (RKVY), Potential Linked Credit Plans (PLP) of NABARD and the
Integrated District Development Plan etc. identified number of irrigation related issues for
South West Garo Hills district including (i) creating irrigation potential through water
harvesting structure, Nalla and Check Bundh, Percolation and Recharge tanks (ii) promoting
water use efficiency through sprinkler and drip irrigation; (iii) promoting protected polyhouse
cultivation to minimize risk factors and enhance quality and productivity; (iv) Improvement
of on-farm water delivery and efficiency of existing irrigation systems; (v) promotion of soil
conservation of arable & non-arable land through engineering measures; (vi) increase the
forest cover in the district and (vii) land improvement measures.
Methodology
During the course of preparation of District Irrigation Plan (DIP) the team visited South West
Garo Hills district to collect data and have interaction with all the stakeholders. Methodology
adopted to prepare DIP is outlined in brief as under:
a) Collection of primary and secondary data from field from various sources including
published documents and websites.
b) Various meetings were held to obtain ground level realities and data from key
personnel/stakeholders through structured, unstructured interviews, focused group
discussions etc.
c) Meetings with various State Government departments and related institutions were held
d) Meeting was also held with State Level authorities.
e) GIS maps of the areas/clusters were studied to understand the land morphology,
topography of the district.
f) Focused group discussions and interaction with agriculture officers, horticulture officers,
soil conservation officers, extension officers, rural development department, animal
husbandry department, irrigation officers both at Talukas and district level for identifying
the key issues and focus areas of the region.
g) Discussion with NABARD officer of the district was also held during the visit.
On the basis of detailed discussion and analysis of data, the team arrived at the projections of
various components of PMKSY and Department wise plan for four years from 2016-17 to
2019-20 as detailed in the plan.
District Irrigation Plan, South West Garo Hills district
24 | P a g e
Chapter 1 : General Information of the District
1.1 District Profile
Meghalaya Chief Minister Dr Mukul Sangma In the interest of general public inaugurated the
South West Garo Hills on 7th of August 2012 at its headquarters, Ampati. With the
inaguration of South West Garo Hills District the number of districts in the state has gone up
to 11(eleven). It is located at the Latitude of 25º27.505 and Longitude of 89º56.456 and is 52
km away from the district headquarter Tura of West Garo Hills District. South-West Garo
Hills is carved out of the present West Garo Hills district.
Map 1-1: Location of South West Garo Hills district in Meghalaya
Table 1-1: District Profile
Name of the District District Code Latitude Longitude
South West Garo Hills 293 25º27.505 North 89º56.456 East
Source: Census of India 2011, West Garo Hills
The District is bounded on the north by Selsella and Rongram Community & Rural
Development Block; on the south by Sherpur and Jamalpur District of Bangladesh and Dalu
and Gambegre Community & Rural Development Blocks, on the east by Dalu and Gambegre
Community & Rural Development Blocks and on the west by Dhubri and Kurigram District
District Irrigation Plan, South West Garo Hills district
25 | P a g e
of Assam and Bangladesh respectively. As a natural boundary the District has the river Kalu
(also known as Ganol) on the north and providing a long demarcation line to Dhubri district
and Selsella while the river Jinjiram flows along the Western boundary of the District.
Physically the area of the District extends upto the 11 kilometers short of Tura on the east;
Mankachar on the north. The District has approximately 35 kilometers of international
boundary with Bangladesh on the south and western side. Nearly one third of the total
number of villages of the sub-division is declared as border villages by the Border Area
Development Department.
Administrative Set-up of South West Garo Hills
South West Garo Hills District comprises all the villages falling under the two Community
and Rural Development Blocks, viz. Betasing and Zikzak Community and Rural
Development Blocks, including 33 (thirty-three) villages under Mukdangra Gram Sevak (GS)
Circle and Garobadha Gram Sevak Circle of Selsella Community & Rural Development
Block, 24 (twenty-four) villages under Okkapara Songma Gram Sevak Circle and
Chengkuregre Gram Sevak Circle of Gambeggre Community & Rural Development Block,
13 (thirteen) villages under Jarangkona Gram Sevak Circle of Dalu Community & Rural
Development Block and Anggalgre village of Rongkhongre Gram Sevak Circle of Rongram
Community & Rural Development Block.
Reorganized Gram Sevak Circle
After the reorganization of the Gram Sevak Circle all the villages annexed from other
Community and Rural Development Blocks falls under Betasing Community and Rural
Development Block, except for Jarangkona Gram Sevak Circle of Dalu Community & Rural
Development Block which falls under Zikzak Community and Rural Development Block.
1.2 District Demography
As per 2011 census, the population of the district is 1,72,495 which is 5.81% of the state’s
population. With a population density of 209 person per square kilometer, South West Garo
Hills is relatively denser compared to the population density of the state (132 person per
square kilometer). The number of males and females in the district are 87,135 and 85,360
respectively forming a sex ratio of 980 female per 1000 male. There are 33,863 households in
the district. The literacy rate of the District is 56.7% as per 2011 Census.
District Irrigation Plan, South West Garo Hills district
26 | P a g e
Table 1-2: Demography of South West Garo Hills
Name of the
blocks
Population SC ST Total
M* F CH SC
NHH
SC
NM
ST
NHH
ST
NM NHH NM
ZikZak 39339 38138 12918 377 1703 9586 49862 15621 77477
Betasing 47796 47222 12486 55 305 12468 65776 18242 95018
Total 87135 85360 25404 432 2008 22054 115638 33863 172495
Source: Census of India 2011, West Garo Hills
*M- Male, F- Female, CH- Children 0-14 years, NHH- No. of households, NM- No. of members, T-
Total, R-Rural, U-Urban
1.3 Biomass and Livestock
Next to Agriculture and Horticulture, Livestock rearing is an important enterprise of the
district. Cows, buffaloes, draft animals, goats, pigs, poultry are main commodities of
livestock enterprise. Cross breed cows, improved breed buffaloes and upgraded pigs in small
numbers are also reared in almost all the blocks of the district. Mostly the local breeds are
common. The population of the Large, Small, Milch or meat animals including the draft
animals (Buffalos/yak/bulls etc) are given in Table no. 1-3 and 1-4.
Table 1-3: Population of Small and Milch or Meat Animals in South West Garo Hills
Blocks
Small Animals Any other Milch or
Meat Animal (Nos.) Poultry
(Nos.)
Ducks
(Nos.)
Pigs
(Nos.)
Goats
(Nos.)
Sheeps
(Nos.)
ZikZak 30077 - 9337 38437 1162 -
Betasing 78120 - 10175 11141 199 -
Total 108197 - 19512 49578 1361 -
Source: District Veterinary Officer, South West Garo Hills
Table 1-4: Population of Large and Draft Animals in South West Garo Hills
Blocks
Large Animals
Draft Animal
(Buffalo/yak/bulls/any other (Nos.)
Indigenous
Cow
(Nos.)
Hybrid
Cow
(Nos.)
In
descriptive
Buffalo
(Nos.)
Hybrid
Buffalo
(Nos.)
ZikZak 23374 - 2703 - 2
Betasing 47672 - 2132 - 1
Total 71046 - 4835 - 3
Source: District Veterinary Officer, South West Garo Hills
1.4 Agro-Ecology, Climate, Hydrology and Topography
In general, the district has a mildly tropical climate. The climate of the district is largely
controlled by southwest monsoon and seasonal winds. The average rainfall is 3400 mm, of
which more than two-thirds occur during the monsoon, with winter being practically dry. The
district has mostly dense tropical mixed forest. There are four seasons in the district namely
summer, monsoon or rainy, autumn and winter. The summer season extends from the end of
March to mid-May, which is characterized by relatively high temperature. Rainy season
District Irrigation Plan, South West Garo Hills district
27 | P a g e
commences with the onset of southwest monsoon in April and lasts up to October. This is
followed by short autumn from mid-October to November. This season indicates the slow
retreating of monsoon with clear and sunny sky. Winter season extends from December to the
end of March. This is the coldest season of the year with sharp decline in the temperature.
Winter is basically dry with lower diurnal range of temperature in the northern and southern
foothills, whereas central upland portion experiences temperate climate and the places of
medium altitude of the northern, southern and western part of the district experiences sub-
tropical climate. The district receives a fairly high rainfall throughout the year. Most of the
precipitation occurs during the rainy season i.e. between April and October due to southwest
monsoon.
Table 1-5: Agro-ecology and Topography of South West Garo Hills district
Agro
Ecological
Zone
Type
Type of
Terrain
Area
(Ha)
Normal
Annual
Rainfall
(mm)
Average
Monthly
Rainfall
(mm)
No of
Rainy
Days
Maximum Rainfall
Intensity (mm)
Up to
15 min
Beyond
15 but
upto 30
min
Beyond
30 but
upto 60
min
ACZ V Partly Hilly 82200 3400 283 112 25 20 8
Source: KVK Tura, Department of Agriculture, Ampati
Table 1-6: Climate and Elevation of South West Garo Hills district
Average Weekly Temperature (0C) Elevation (m)
Period
Min Max Mean Summer (Apr-May) Winter (Oct- Mar) Rainy (Jun-Sep)
Min Max Mean Min Max Mean Min Max Mean
19.5 35.9 27.7 8.04 35.92 21.98 22.56 36.81 29.69 14 288 151
Source: KVK Tura, Department of Agriculture, Ampati
1.5 Soil Profile
Nearly one third of the total area is said to be covered with hills. While the rest is, literally a
plain region dotted with small hillocks here and there. A large and continuous strip of plain
land stretches from Garobadha towards Mankachar extending upto Mahendraganj and
Gopinath Killa along the border of Dhubri District of Assam and Bangladesh. The hill
regions, on the other hand, begin from 11 kilometer short of Tura on the east and cover
Damalgiri, Okkapara, Mellim and Salmanpara areas on the south. These hills and hills ranges
occur in the east and southern parts of the District and gradually slope down towards north
and west and ultimately converge with the bigger plain region. Major soil class in the district
is Sandy Loam Clay Loam for which area and land slope is given in the table below.
District Irrigation Plan, South West Garo Hills district
28 | P a g e
Table 1-7: Soil Type and Land slope classification of South West Garo Hills district
Soil Type Land Slope
Major Soil Class Area (Ha) 0-3% (ha) 3-8 % (ha) 8-25 % (ha) >25 % (ha)
Sandy Loam Clay Loam 70600 0 15532 48714 6354
Source: Divisional Soil & Water Conservation Department, Ampati, South West Garo Hills
1.6 Land Use pattern
Agriculture and forests are the two important units of land utilization and they occupy about
50231 hectares (61.10% of total geographical area of the district). The gross cropped area in
the district is 27076 ha (33%). The net area sown is 20412 ha, which is 24.5% of total
geographical area of the district. Land put to non-agricultural use is 30821 ha which is
37.49% and area sown more than once is very low i.e. 6664 ha while Barren & un-cultivable
land occupy 1148 ha (0.80%) and cultivable wasteland is about 1050 ha (0.23%). While
permanent pastures and other grazing land under miscellaneous, tree, crops and grooves are
not included in net area sown of the total geographical area of the district. The following
table gives the block wise information on land use pattern.
Table 1-8: Land use pattern in South West Garo Hills district
Blocks TGA*
Area Under Agriculture Area
under
Forest
(Ha)
Area
under
Wasteland
(Ha)
Area
under
other use
(Ha)
GCA NSA AST CI (%)
ZikZak 45526 14493 11139 3354 130.11 13395 688 16950
Betasing 36674 12583 9273 3310 135.70 9760 460 13871
Total 82200 27076 20412 6664 132.65 23155 1148 30821
Source: Department of Agriculture & Horticulture, Ampati
*TGA- Total Geographical Area, GCA- Gross Cropped Area, NSA- Net Sown Area, AST- Area
Sown more than once, CI- Cropping Intensity
District Irrigation Plan, South West Garo Hills district
29 | P a g e
Chapter 2 : District Water Profile
Water is vital for survival of both plants and animals. It is the central component of the planet
Earth controlling the weather, climate, plant and animal kingdom. It supports agriculture,
forestry, navigation, industries and hydroelectricity generation and other uses such as for
recreation, water sports activities etc. The importance of water has been recognized all over
the world. Water resource development and management practices are given top priorities all
over the world to avoid the water crisis in future. This chapter outlines the different type of
crops, productivity and irrigation status of the South West Garo Hills district.
2.1 Area wise, Crop wise, irrigation Status
The economy of the district centres on agriculture and piggery and paddy is the predominant
commodity that is cultivated. The district receives around 3400 mm rainfall annually, with a
major share during the four months of monsoon (June-September). Total potential
harvestable rainwater in the district is 0.111779 BCM, annually. However, due to lack of
proper and sufficient water harvesting structures, the crops grown under different seasons has
to rely on the mercy of rain to realize a good harvest. The crop wise irrigated and rainfed area
sown in different seasons like Kharif, Rabi and Summer in the district for each block is given
in the table below.
Table 2-1: Area wise, Crop wise, irrigation Status
Name of the district: South West Garo Hills
Name of the Block : Zikzak Development Block
Crop Type
Kharif
(Area in ha)
Rabi
(Area in ha)
Summer Crop
(Area in ha)
Total
(Area in ha)
I R T I R T I R T I R T
A. Cereal (Rice) --- 2948 2948 893 --- 893 1740 --- 1740 2633 2948 5581
B. Coarse cereal
(Rice) --- --- --- --- --- --- --- --- --- --- --- ---
C. Pulses (Pea &
Cowpea) --- --- --- 152 --- 152 --- --- --- 152 --- 152
D. Oil seed
(Soyabeans, Rape
Mustard, Castor)
---
1028 --- 1028 --- --- --- 1028 --- 1028
E. Fibre (Jute) --- 515 515 --- --- --- --- --- --- --- 515 515
F. Fibre (Cotton) --- 125 125 --- --- --- --- --- --- --- 125 125
G. Maize --- 768 768 --- --- --- --- --- --- --- 768 768
H. Lentil --- --- --- 37 --- 37 --- --- --- 37 --- 37
I. Any other crop * --- --- --- --- --- --- --- --- --- --- --- ---
Name of the Block : Betasing Development Block
Crop Type
Kharif
(Area in ha)
Rabi
(Area in ha)
Summer Crop
(Area in ha)
Total
(Area in ha)
I R T I R T I R T I R T
A. Cereal (Rice) --- 4400 4400 1442 --- 1442 2900 --- 2900 4342 4400 8742
B. Coarse cereal
(Rice) --- --- --- --- --- --- --- --- --- --- --- ---
District Irrigation Plan, South West Garo Hills district
30 | P a g e
C. Pulses (Pea &
Cowpea) --- --- --- 147 --- 147 --- --- --- 147 --- 147
D. Oil seed
(Soyabeans, Rape
Mustard, Castor)
--- 37 37 1007 --- 1007 --- --- --- 1007 37 1044
E. Fibre (Jute) --- 510 510 --- --- --- --- --- --- --- 510 510
F. Fibre (Cotton) --- 210 210 --- --- --- --- --- --- --- 210 210
G. Maize --- 648 648 --- --- --- --- --- --- --- 648 648
H. Lentil --- --- --- 35 --- 35 --- --- --- 35 --- 35
I. Any other crop * --- --- --- --- --- --- --- --- --- --- --- ---
Source: Department of Agriculture & Horticulture, Ampati
I: Irrigated Area (Ha), R: Rainfed Area (Ha) and T: Total Area (Ha)
2.2 Production and Productivity of Major crops
92.5% of the total population of this district are hilly tribal and they practice agriculture along
with poultry and piggery mostly for subsistence level. Total geographical area of the district
is 82200 Ha and of which 27076 Ha is only cultivable land. Gross irrigated area 9381 Ha.
Out of total gross irrigated area, rice is the most dominant crop which enjoys enough
irrigation through surface mode. The soils are acidic and prone to erosion but very rich in
organic matter indicating potential to go for organic farming under proper management
practices. Other than rice and maize, horticultural crops like ginger and turmeric, Arcenaut,
Pine apple and other seasonal vegetables have tremendous production potentials and their
qualities can compete with world class standards. As those are grown mostly on the hill
slopes, they need irrigation support during the critical stages to ensure optimum quality and
productivity to meet the demand locally as well as outside the state. The crop-wise
production and productivity of different types of crops are given in the table below.
District Irrigation Plan, South West Garo Hills district
31 | P a g e
Table 2-2: Production and productivity of major crops in South West Garo Hills district
Name of the district: South West Garo Hills
Name of the Block : Betasing Development Block
Season
Crop Swon Rainfed Irrigated Total
Cereals Coarse
Cereal Pulses Oil seeds
Fibre
crops
Any
other
crop
P Y C P Y C P Y C
Kharif
Rice (Sali) --- --- --- --- --- 10072 2.289 --- --- --- --- 10072 2289 ---
Rice
(Boro) --- --- --- --- --- ---
--- 12992 4.48 --- 12992 4480 ---
Rice
(autumn) --- --- --- --- --- ---
--- 2567 1.78 --- 2567 1780 ---
--- Maize --- --- --- --- 1050 1.62 --- --- --- --- 1050 1620 ---
--- --- --- Soyabeans --- --- 14 0.778 --- --- --- --- 14 778 ---
--- --- ---
Jute --- 4788 1.69 --- --- --- --- 4788 1690 ---
--- --- ---
Cotton --- 80 0.129 --- --- --- --- 80 129 ---
Rabi
--- --- Lentil
--- --- --- --- --- 29 0.835 --- 29 835 ---
--- --- --- Rape &
mustard --- --- --- --- --- 692 0.687 --- 692 687 ---
Total 16004 6.506 --- 16280 7.782 --- 32284 14288 ---
Name of the Block : Zikzak Development Block
Season
Crop Swon Rainfed Irrigated Total
Cereals Coarse
Cereal Pulses Oil seeds
Fibre
crops
Any
other
crop
P Y C P Y C P Y C
Kharif
Rice (Sali) --- --- --- --- --- 5483 1.86 --- --- --- --- 5483 1860 ---
Rice
(Boro) --- --- --- --- --- ---
--- 7341 4.219 --- 7341 4219 ---
Rice
(autumn) --- --- --- --- --- ---
--- 1544 1.725 --- 1544 1725 ---
--- Maize --- --- --- --- 1229 1.6 --- --- --- --- 1229 1600 ---
--- --- --- Soyabeans --- --- 14 0.7778 --- --- --- --- 14 778 ---
--- --- ---
Jute --- 4933 1.724 --- --- --- --- 4933 1724 ---
--- --- ---
Cotton --- 101 0.138 --- --- --- --- 101 138 ---
Rabi
--- --- Lentil
--- --- --- --- --- 25 0.832 --- 25 832 ---
--- --- --- Rape &
mustard --- --- --- --- --- 692 0.687 --- 692 687 ---
Total 11760 6.0998 --- 9602 7.463 --- 21362 13563 ---
Source: Department of Agriculture & Horticulture, Ampati
P: Production (MT/Yr), Y: Productivity or yield (MT/Ha) and C: Cost of cultivation (Rs/Ha.)
District Irrigation Plan, South West Garo Hills district
32 | P a g e
2.3 Irrigation based classification
As shown in the table below, the Gross Irrigated area and Net Irrigated Area in South West
Garo Hills district is 9381 hectares (34.64% of the gross cropped area) and 5010 hectares
(53.40% of the gross irrigated area) respectively while un-irrigated or Totally Rainfed area in
the district is 17695 hectares (65.36% of the gross cropped area).
Table 2-3: Block-wise irrigation based classification
Blocks
Irrigated (Area in Ha) Rainfed (Area in Ha)
Gross Irrigated
Area
Net Irrigated
Area
Partially
Irrigated/Protective
Irrigation
Un-Irrigated or
Totally Rainfed
ZikZak 3850 2110 - 10643
Betasing 5531 2900 - 7052
Total 9381 5010 - 17695
Source: Department of Agriculture & Horticulture, Ampati
District Irrigation Plan, South West Garo Hills district
33 | P a g e
Chapter 3 : Water Availability in South West Garo Hills
Water availability is an important issue for ascertaining the demand of water for domestic,
livestock, irrigation, industrial and power generation projects. The water availability depends
on topography, climatic conditions, rainfall, soil profile, infiltration rate, run off and human
activities over the catchment area. The changes in the water levels of the surface source are
mainly because of the variations in the inflow from the upper catchments. The fluctuations
constitute a sensitive indicator of past and present climate and human activities at a local and
regional scale. In the hydrological point of view, the entire South West Garo Hills district
falls under the Brahmaputra basin.
3.1 Status of Water Availability
For creating access to water source either assured or protective to each farmer will require a
demand and supply assessment of crop water requirements, effective rainfall and potential
source of existing and new water sources considering the geo-hydrological and agro
ecological scenario of the block. The master plan will include information on all sources of
available water, distribution network, defunct water bodies, new potential water sources both
surface and sub surface system, application to conveyance provisions, crops and cropping
system aligned to available/designed quantity of water and suitability to local agro ecology.
All activities pertaining to water harvesting, water augmentation from surface ad sub surface
sources, distribution and application of water including repair, renovation and restoration of
water bodies, major, medium and minor irrigation works, command area development etc. are
to be taken up within the frame work of this muster plan. Emphasis is to be given for deriving
the potential benefit from low hanging fruits like extending the reach/coverage of water
source through effective distribution and application mechanism, reducing the gap between
potential created and utilized through more focus on command area development and
precision irrigation. Proper integration of creation of diversion head work and water
harvesting structures, distribution system like canals and command area development works
and precision farming is to be made for best possible use of water resources.
Table 3-1: Water availability in South West Garo Hills district (in MCM)
Sl. No. Sources Kharif Rabi Summer Total
1 Surface Irrigation
(i) Canal (Major & medium irrigation) - - - -
(ii) Minor Irrigation tanks 132.09 - - 132.09
(iii) Lift Irrigation/ Diversion - - - -
(iv) Various water bodies including Rain Water
Harvesting 101.61 - - 101.61
District Irrigation Plan, South West Garo Hills district
34 | P a g e
(v) Treated Effluent Received from STP - - - -
(vi) Untreated Effluent - - - -
(vii) Perennial sources of water 111.77 - - 111.77
2 Ground Water
(i) Open Well
508.09
- -
508.09 (ii) Deep Tube Well - -
(iii) Medium Tube Well - -
(iv) Shallow Tube Wells - -
Total 853.57 - - 853.57
Source: Department of Water Resources, Ampati
3.2 Status of Ground Water Availability
India has largest irrigated agriculture with 65 million ha Net irrigated area (21 million ha
through surface and 44 million ha through ground water). Methodology adopted for ground
water resource estimation of the district is as per GEC 1997 Report, i.e. Ground Water Level
Fluctuation and Rainfall infiltration factor Method. Assessment unit can be categorized into 4
categories as SAFE, SEMI-CRITICAL, CRITICAL, and OVER-EXPLOITED. As long-term
water level trend does not show any major change so the whole district may be considered as
SAFE. The detailed status of ground water, draft, recharge and gaps for the district is given
separately in table below.
Table 3-2: Status of Ground Water Availability (in MCM) in South West Garo Hills district
Name of the district Critical Semi-
Critical Safe Draft Recharge Gap
South West Garo Hills - - 0.59 % Safe
Category 0.0015 2.88 2.88
Source: Technical Report Series D No. 46/2011 – 12 CGWB
3.3 Status of Command Area
Information regarding the other services command area which are based on minor irrigation
scheme is given in the table below while the information regarding canal command area for
major and medium irrigation is not available. For total area of 3745.95 hectares, total
developed area is 550 hectares while total undeveloped area is 3195.95 hectares.
Table 3-3: Status of command area in South West Garo Hills district
Name of the
Block
Information of Canal
Command (Major &
Medium Irrigation)
Information on the other
Services Command (Minor
Irrigation Scheme)
Total Area
TA DA UA TA DA UA DA UA
Total -- -- -- 3745.95 550 3195.95 550 3195.95
Source: Department of Water Resources, Ampati
*TA: Total Area, DA: Developed Area and UA: Undeveloped Area Area in Ha.
District Irrigation Plan, South West Garo Hills district
35 | P a g e
3.4 Existing type of Irrigation
As shown in the table below, in the district, for surface water, total of 3616 hectares of area is
covered under government canals and 249 hectares is covered by 34 number of
tanks/ponds/dams while for ground water, 109.95 hectares is covered by government
tubewells and 600 hectares is covered by private tubewells. 35 hectares is covered by other
traditional water harvesting structures. There are 400 diesel pumps available in the district.
Table 3-4: Existing types of Irrigation in South West Garo Hills district
Source of
irrigation
Surface
Irrigation Ground Water
Other
Sources
including
Traditional
WHS
Water Extraction
Devices/ Lift Total
Govt.
Canal
Tanks/
Ponds/
dams
Govt.
Tube
Wells
Pvt.
Tube
Wells
Bore
Wells Diesel Pump
Irrigation
Sources
Water
Extracting
units
No. - 34 - - - - 400 34 434
Command
Area (Ha) 3616 249 109.95 600 - 35 - 4609.95 -
Source: Department of Water Resources, Ampati
District Irrigation Plan, South West Garo Hills district
36 | P a g e
Chapter 4 : Water Requirement/Demand
Whenever an engineer is given the duty to design a water supply scheme for a particular use
of the community, it becomes imperative upon him, to first of all, evaluate the amount of
water available and the amount of water required/ demanded by the public. In fact, the first
study is to consider the demand, and then the second requirement is to find sources to fulfil
that demand. Many a times a compromise is sought between the two. It is very difficult to
precisely assess the quantity of water demanded by the public since there are many variable
factors affecting water consumption. The various type of water demands for a district may be
as follows.
4.1 Domestic Water Demand
This includes the water requirement in private buildings for drinking, cooking, bathing, lawn
sprinkling, gardening, sanitary purposes etc. The amount of domestic water consumption per
person shall vary according to the living conditions of the consumers. On an average, this
domestic consumption under normal conditions in Indian city is expected to be around 135
litres/day/person as per IS: 1172-1971. In a developed and an effluent country like USA, this
figure goes as high as 340 litres/day/person. This is because more water is consumed in rich
living, air cooling/conditioning, automatic household appliances, car washing etc. The total
domestic consumption generally amounts to 55% to 60% of the total water consumption.
The total domestic water demand shall be equal to the total design population multiplied by
the per capita domestic consumption i.e. 140 litre/day. As the last population census was
made in 2011, the actual population of the district in 2015 is not readily available.
Considering the population of the South West Garo Hills district as per Census, 2011 the
projected population in 2020 is worked out assuming the last decadal growth of 26.8% and
annual exponential growth rate of 2.68% to apply for the period 2011-2020 (9 years). The
domestic water demand is given in the table below.
Table 4-1: Domestic water demand (MCM)
Blocks
Population
as per 2011
census
Population in
2015
Water
demand
(MCM)
Projected
Population in
2020
Gross Water
Demand
(MCM)
ZikZak 77477 85783 4.38 87859 4.49
Betasing 95018 105204 5.38 107750 5.51
Total 172495 190986 9.76 195609 10.00
District Irrigation Plan, South West Garo Hills district
37 | P a g e
4.2 Crop water demand
Water requirement of a crop means the total quantity and the way in which a crop requires
water, from the time it is sawn to the time it is harvested (crop period). Different crops will
have different water requirements and the same crop may have different water requirements
at different places of the same country depending upon the climate, type of soil, method of
cultivation and useful rainfall etc. The total quantity of water required by the crop for its full
growth may be expressed in Hectare-m or in Million Cubic meter or simply as a depth to
which the total supplied irrigation water would stand above the surface without percolation or
evaporation. This depth is known as delta for the crop. On the other hand duty is defined as
the area irrigated per cumec of discharge running for the base period. The duty helps us in
designing the efficient canal irrigation system. If we know the crops area required to be
irrigated and their duties, we can work out the discharge required for designing the canal.
Consumptive use for a particular crop may be defined as the total amount of water used by
the plant in transpiration (building of plant tissues etc.) and evaporation from adjacent soils or
from plant leaves, in any specified time. Therefore, crop water requirements are defined as
“the depth of water needed to meet the water loss through evapo-transpiration of a disease
free crop, growing in large fields under non restricting soil conditions including soil water
and fertility and achieving full production under the given growing environment.
Consumptive use for a particular crop may be defined as the total amount of water used by
the plant in transpiration (building of plant tissues etc.) and evaporation from adjacent soils or
from plant leaves, in any specified time. Thus crop water requirement is nothing but the
consumptive use itself, but exclusive of effective precipitation, stored soil moisture or ground
water. Consumptive use or evapotranspiration depends upon all those factors on which
evaporation and transpiration depend such as, temperature, sunlight, wind movement etc. The
crop water requirement of different bocks in the South West Garo Hills district has been
worked out and a statement is prepared as shown in table below which outlines the required
and available water potential in the district.
Table 4-2: Crop water requirement (MCM)
Block
Area
sown
(ha)
Irrigated
area (ha)
Crop
Water
Demand
(MCM)
Water
potential
required
(MCM)
Existing
Water
potential
(MCM)
Water
potential to
be created
(MCM)
ZikZak 14493 3850 144.93 144.93 38.5 106.43
Betasing 12583 5531 125.83 125.83 55.31 70.52
Total 27076 9381 270.76 270.76 93.81 176.95
District Irrigation Plan, South West Garo Hills district
38 | P a g e
4.3 Livestock water demand
The livestock water demand of the district is determined by multiplying the total livestock
population in the district by the per capita water requirement (litres/day/No) for each category
of the population. As per livestock census of 2003 & 2007, there was a population growth of
24% in four years. With the existing population recorded for a base year, the total projected
livestock population in 2020 may be worked out and accordingly the livestock water demand
is worked out. The livestock water demand is given in the table below.
Table 4-3: Livestock water demand (MCM)
Block
Total
number of
livestock
Present
Water
demand
(MCM)
Water
demand in
2020
(MCM)
Existing
Water
potential
(MCM)
Water
potential to
be created
(MCM)
ZikZak 105092 1.53 1.99 1.53 0.46
Betasing 149440 2.18 2.84 2.18 0.65
Total 254532 3.72 4.83 3.72 1.11
4.4 Industrial water demand
This includes the quantity of water required to be supplied to offices, factories, different
industries, hostels, hospitals etc. This quantity will vary considerably with the nature of city
and with the type of industries and commercial establishments present in it. On an average, a
provision of 20-25% of the total water consumption is generally made in the design for these
uses. In small residential communities, the industrial use may be as low as 45 /litre/day, but
in industrial cities, it may be as high as 450 litres/day. Some of the industries may develop
their own supplies and may place little or no demand on municipal system. Zoning of the city
affects the location of the industries and may help in estimating future industrial demands.
The industrial water demand for South West Garo Hills district is given in table below.
Table 4-4: Industrial Water Demand (MCM)
Name of the
Blocks
Name of the
industry
Present
Water
Demand
(MCM)
Water
Demand in
2020
(MCM)
Existing
Water
Potential
(MCM)
Water
Potential to
be created
(MCM)
ZikZak &
Betasing
Textile 3.15 3.30 3.15 0.16
Food processing 1.61 1.69 1.61 0.08
Bottled water 1.41 1.48 1.41 0.07
Paper 1.81 1.90 1.81 0.09
Hotel industry 1.62 1.70 1.62 0.08
Micro steel industry 0.06 0.06 0.06 0.00
Total 9.64 10.12 9.64 0.48
Source: District Commerce & Industry Centre, Ampati
District Irrigation Plan, South West Garo Hills district
39 | P a g e
4.5 Water demand for Power Generation
Presently there is no any power plant in the South West Garo Hills district; however in the
years to come i.e. up to the year 2020, there are plans to tap water resources for power
generation. Hence water demand for power generation is taken as nil for present but the same
for 2020 is as shown in the table below.
Table 4-5: Water Demand for Power Generation (MCM)
Name of
the district
Power
Requirement
(MW)
15% of the
requirement
is proposed
to be
produced in
the district
(Micro
Hydel)
Water
Demand
(MCM)
Water
Demand in
2020
(MCM)
Existing
Water
Potential
(MCM)
Water
Potential
to be
created
(MCM)
South West
Garo Hills 1.609 MW 0.241 MW 0 28.69 0 28.69
Source: Department of Water Resources, Ampati Ref: Hydraulic & Fluid Mechanic by E. H. Lewitt
4.6 Total water demand of the district for various sectors
The total water demand of the district for all the sectors described in 4.1 to 4.5 are given in
the are assessed by summing up all the values of water demand for domestic uses, livestock,
power and industrial/commercial uses etc. The current water demand has been indicated in
Table 4-5 and the projected water demand has been depicted in Table 4-6. Total present water
requirement for the district is 293.88 MCM while the total future water requirement for the
district is 324.40 MCM. In present, water demand for Zikzak block is 160.49 MCM while the
same for Betasing block which is 133.39 MCM. For future, water demand for Zikzak block is
190.23 MCM while the same for Betasing block which is 134.17 MCM.
Table 4-6: Present Water Demand of the district for various sectors
Block
Demand from Components (MCM) Total
MCM Domestic Crop Livestock Industrial Power
generation
ZikZak 4.38 144.93 1.53 9.64 0
160.49
Betasing 5.38 125.83 2.18 133.39
Total 9.76 270.76 3.72 9.64 0 293.88
Table 4-7: Total Water Demand of the district for various sectors (Projected for 2020)
Block
Demand from Components (MCM) Total
MCM Domestic Crop Livestock Industrial Power
generation
ZikZak 4.49 144.93 1.99 10.12 28.69
190.23
Betasing 5.51 125.83 2.84 134.17
Total 10.00 270.76 4.83 10.12 28.69 324.40
District Irrigation Plan, South West Garo Hills district
40 | P a g e
4.7 Water Budget
The water budget of the district for the base year 2015-16 and 2020-21 as per water
availability and demand is given in the table below. The present water availability/demand
and also for 2020 are worked out as explained above and the water gap is found out. The
water budget clearly shows the water gap of -559.69 MCM in present and of -529.17 MCM
in future between the water availability and requirement. The negative gap indicates that
there is sufficient water resources for irrigation, domestic and the industrial uses without
creating any deficit in our water potential.
Table 4-8: Water Budget (Volume in MCM)
District
Existing Water
Availability (MCM) Total
(MCM)
Water Demand
(MCM) Water Gap (MCM)
Surface
water
Ground
water Present
Projected
(2020) Present
Projected
(2020)
South West
Garo Hills 345.47 508.09 853.57 293.88 324.40 -559.69 -529.17
District Irrigation Plan, South West Garo Hills district
41 | P a g e
Chapter 5 : Strategic Action Plan for Irrigation in District under
PMKSY
The present DIP for South West Garo Hills District is prepared duly considering all the data
collected from the line department and converging data of all departments in each block and
thus a realistic Action Plan is assured as prevented in the format for the years. The total
required of this comprehensive DIP is coming for Rs. 259990.26 lakhs for 4 years.
5.1 Department wise, year wise plan
Total plan of South West Garo Hills district for four years works out to be Rs. 259990.26
lakh (Table 5-1). Maximum share of Rs. 245264.33 lakhs is for Water Resources department
followed by Soil Conservation department, Agriculture department & Horticulture
department with Rs. 8359.25 lakhs, Rs. 4190.68 lakhs & Rs. 2176 lakhs respectively. The
total plan of four years is divided in to 4 years i.e. 2016-17, 2017-18, 2018-19 and 2019-20.
Table 5-1: Department wise plan
Departments Years Estimated Cost
(in Rs. Lacs) 2016-17 2017-18 2018-19 2019-20
Soil Conservation 1978.43 2812.63 2197.85 1370.34 8359.25
Water Resources 6836.00 57299.21 110026.72 60940.43 245264.33
Agriculture 1086.68 1055.00 1055.00 994.00 4190.68
Horticulture 544.00 544.00 544.00 544.00 2176.00
Total 10445.12 61710.84 113823.57 63848.77 259990.26
Figure 5-1: Department wise plan
Soil Conservation
3%
Water Resources
94%
Agriculture2%
Horticulture1%
District Irrigation Plan, South West Garo Hills district
42 | P a g e
5.2 Component wise, year wise plan
As discussed above about various components of PMKSY, the plan is prepared accordingly.
Table 5-2 shows component wise plan for 4 years starting from 2016-17 to 2019-20. AIBP
component has a total proposal of Rs. 26100 lakhs. This component will be mainly executed
by Water Resources department. Har Khet Ko Pani (HKKP) component is of Rs. 194028.13
lakhs, which will be executed mainly by Water Resources and Soil Conservation
departments. Per Drop More Crop (PDMC) components is of Rs. 23500.46 lakhs, which will
be executed mainly by Agriculture, Horticulture and Water Resources departments.
Watershed component has a total proposal of Rs. 3509.48 lakhs which will be implemented
by Soil Conservation department. Convergence with MGNREGA is proposed for Rs.
12660.54 lakhs by Water Resources department. All the stakeholders need to have
coordination among themselves to have the maximum irrigation efficiency and to avoid
duplicity.
Table 5-2: Component wise plan
Components Years Total Estimated Cost (in
Rs. Lacs.) 2016-17 2017-18 2018-19 2019-20
AIBP 0.00 7830.00 7830.00 10440.00 26100.00
HKKP 8446.45 46541.21 89416.05 43088.86 194028.13
PDMC 1277.87 5085.59 11036.56 5980.77 23500.46
Watershed 196.44 636.00 1342.15 1334.89 3509.48
Convergence 39.90 78.60 37.70 35.45 12660.54
Total 10445.12 61710.84 113823.57 63848.77 259990.26
Figure 5-2: Component wise plan
AIBP10%
Har Khet ko Pani75%
PDMC9%
Watershed1%
Convergence with MGNREGA
5%
District Irrigation Plan, South West Garo Hills district
43 | P a g e
5.3 Block wise, year wise plan
Block wise, year wise plan is shown in the table below. The amount proposed for Betasing
block is Rs. 172930.31 lakhs while the amount proposed for Zikzak block is Rs. 79614.74
lakhs. Water Resources department has proposed Rs. 7445.21 lakhs for the villages which
were in Dalu block before the creation of South West Garo Hills district. As of now, these
villages come under South West Garo Hills district.
Table 5-3: Block wise plan
Blocks Years Total Estimated
Cost (in Rs. lakhs) 2016-17 2017-18 2018-19 2019-20
Betasing 6238.52 41364.70 74860.38 42822.71 172930.31
Dalu 286.00 1201.73 2996.10 2649.28 7445.21
Zikzak 3920.60 19144.41 35967.09 18376.78 79614.74
Grand Total 10445.12 61710.84 113823.57 63848.77 259990.26
Figure 5-3: Block wise plan
5.4 Suggestions
For successful implementation of PMKSY plan it is suggested that:
All the stakeholders should convene meeting of concerned Gram Panchayat and then
finalize the village plan and prepare DPR.
All the structures planned should be geo tagged and marked on map, so that social
auditing of the projects can be conducted. This will also avoid duplicity and wastage of
resources.
The Departments should supplement each other so that the maximum irrigation efficiency
is achieved.
Betasing66%
Dalu3%
Zikzak31%
District Irrigation Plan, South West Garo Hills district
44 | P a g e
Priority should be given to projects to minimize the gap in potential created and potential
utilized.
Execution of the schemes should be properly planned to avoid time and cost overrun.
There should be smooth fund flow for timely completion of the project and to avoid cost
escalation.
5.5 Period of Implementation
It is proposed that the planned activities and outlay will be spent in a period of 4 years. Some
of the activities relating to extension, small irrigation works etc., are recurring and hence will
have a period of implementation less than a year. Through these activities PMKSY program
is expected to increase the water availability meeting the water demand from multiple
sources. A total of Rs. 259990.26 Lakhs will be spent during the next 4 years covering
55791.55 hectares.
5.6 Monitoring and Evaluation
The Strategic Action Plan of PMKSY will be monitored by the respective departments
through the regular reporting system and component wise progress will be monitored by the
District Level Irrigation Committee. Further, the activities, outputs and outcomes will be
reported in web based MIS of PMKSY for review at state and national level. Some of the key
indicators that will be used to monitor and evaluate the progress of PMKSY include:
1. Annual irrigation water supply per unit irrigated area measured as the ratio of total
volume of irrigation water supplied at intake divided by total area irrigated in all seasons
2. Potential created and utilized measured as the ratio of total potential utilized (measured
crop area) to irrigation potential created
3. Output (agricultural production) per unit irrigated area measured as the ratio of total value
of agriculture production divided by the total irrigated area
4. Output (agricultural production) per unit irrigation water supply measured as the ratio of
total value of agriculture production divided by the total volume of irrigated water
supplied
5. Total Operations & Maintenance (O&M) cost per unit irrigated area measured as the total
Management, Operation and Maintenance (MOM) costs for the system divided by total
area irrigated (potential utilized)
District Irrigation Plan, South West Garo Hills district
45 | P a g e
6. Total Operations & Maintenance (O&M) cost per unit volume of water supplied
measured as total Management, Operation and Maintenance (MOM) costs for the system
divided Total volume of water supplied (all uses)
7. Equity performance measured as actual area irrigated in head, middle and tail divided by
Command area in head, middle and tail
5.7 Expected Outcome and Output
Table below represents the department wise target proposed by various department to bring
additional land under irrigated cultivation through PMKSY. Total of 55791.55 hectares area
will be brought under irrigation.
Table 5-4: Department wise proposed command area (in Ha.)
Departments Command Area (Ha.)
Soil Conservation Department 5630.14
Water Resources Department 47301.41
Agriculture Department 1892.00
Horticulture Department 968.00
Total 55791.55
5.8 Conclusion
The PMKYS District Irrigation Plan was prepared at Block level & District level. The total
cropped area of South West Garo Hills district is 47706 ha. Though, this whole area was
under agriculture most of the area 60% was utilized for Kharif crops. Through PMKSY, DIP
is envisaging to increase irrigation potential in the district. Under AIBP, 299 Minor irrigation
projects are proposed in the plan which shall increase the irrigation potential in 3005 ha. The
model irrigation plan envisages educating the farmers to adhere to the scientific practices in
the command area .This will increase the crop production per unit area of agriculture land.
Under Har Khet Ko Pani, Minor and Lift irrigation projects proposed shall enable to provide
irrigation access to the hill district favouring second cropping during the Rabi season. As
such majority of the agriculture in South West Garo Hills is rainfed and the aforementioned
minor irrigation projects will facilitate better availability of water. A lot of Water Harvesting
and conservation structures, like Farm Ponds Check Dams, Nalah bunds are proposed which
shall enhance the Net Irrigated Area. This shall be undertaken in convergence with
MGNREGS and Integrated Watershed Management Programme. On the other hand, no
ground water is used in South West Garo Hills district. The ground water potential is yet to
be estimated for the use of drinking and irrigation to the non-command areas. This shall
favour micro irrigation activities in the region mainly drip and sprinkler irrigation. This will
District Irrigation Plan, South West Garo Hills district
46 | P a g e
also spur a change in cropping patterns and farmers will show interests towards vegetable and
other horticultural crops. This can be boost commercial precision agriculture fostering local
economy. There is high potential for micro irrigation in South West Garo Hills and the plan
has been proposed for maximum utilization of the same. Nearly 15% of the total cropped area
can be brought under micro-irrigation system. Target of “More Crop per Drop” will be
achieved. New Structures shall provide more surface water opportunities and shall act as
support for the livestock. This is one of the major water needs that go unnoticed. The plan
aims for cattle troughs and village ponds that favour cattle and other livestock. Increased
Water Availability shall spur many Agro-based industries in the region providing
employment generation. The holistic irrigation plan was prepared at Block level & District
level. PMKSY DIP will fulfil the resource gap in the irrigation chain. Irrigation to every farm
will be achieved through completion of surface minor projects proposed under AIBP. Under
Per Drop More crop, we will achieve enhance cropping & productivity which leads to rural
prosperity. The cost of the DIP is about Rs. 259990.26 lakhs. This will enhance total use
efficiency management for higher yield in the district.
District Irrigation Plan, South West Garo Hills district
47 | P a g e
Annexure I : Strategic Action Plan by Water Resources Department
Betasing Block
Sl.
No
.
Name
of
Block
Name of
village
Concerened
Ministry/
Department
Component Activity
Total in Nos.
/Capacity (in
Cum)
Total
comman
d area
(in Ha.)
Total
fund (in
Rs.
Lakhs)
16 -
17
Are
a
16 -
17
Cost
17 -
18
Are
a
17 - 18
Cost
18 -
19
Area
18 - 19
Cost
19 -
20
Area
19 - 20
Cost
1 Betasin
g Damalgre MoWR AIBP Medium irrigation 1 No 0.00350 2400 Ha
Rs.2610
0
-----
- ------
-----
-
Rs.783
0
960
Ha
Rs.783
0
1440
Ha
Rs.1044
0
2 Betasin
g Kokilla MoWR HKKP Surface minor irrigation 1 No 0.00239 182 Ha
Rs.228.0
0
228
Ha Rs.46
-----
- ------ ------ ------ ------ ------
3 Betasin
g
Daru
Anangpara MoWR HKKP Surface minor irrigation 1 No 0.00405 1400 Ha Rs.3500
-----
-
Rs.70
0
560
Ha
Rs.140
0
560
Ha
Rs.140
0 ------ ------
4 Betasin
g Jiljil MoWR HKKP Surface minor irrigation 1 No 0.00236 85 Ha Rs.159
-----
- Rs.32
68
Ha
Rs.53.0
0 ------ ------ ------ ------
5 Betasin
g Bainapara MoWR HKKP Surface minor irrigation 1 No 0.00262 115 Ha
Rs.287.5
0
-----
- ------
-----
- Rs.58
115
Ha
Rs.229.
5 ------ ------
6 Betasin
g Bando Raja MoWR HKKP Surface minor irrigation 1 No 0.00381 840 Ha Rs.2010
-----
-
Rs.40
2
336
Ha Rs.804
504
Ha Rs.804 ------ ------
7 Betasin
g Bolchugre MoWR HKKP Surface minor irrigation 1 No 0.00407 80 Ha
Rs.375.0
0
-----
- ------
-----
- Rs.75 80 Ha Rs.300 ------ ------
8 Betasin
g Domdoma MoWR HKKP Surface minor irrigation 1 No 0.00425 90 Ha
Rs.400.0
0
-----
- ------
-----
- Rs.120 90 Ha Rs.280 ------ ------
9 Betasin
g Dalbotpara MoWR HKKP Surface minor irrigation 1 No 0.00252 50 Ha
Rs.187.5
0
-----
- ------
-----
- Rs.56 50 Ha Rs.132 ------ ------
10 Betasin
g Balladingre MoWR HKKP Surface minor irrigation 1 No 0.00363 60 Ha
Rs.225.0
0
-----
- ------
-----
- Rs.68 60 Ha Rs.157 ------ ------
11 Betasin
g Chiringpara MoWR HKKP Surface minor irrigation 1 No 0.00238 80 Ha
Rs.275.0
0
-----
- ------
-----
- Rs.83 80 Ha Rs.192 ------ ------
12 Betasin
g Sonamitte MoWR HKKP Surface minor irrigation 1 No 0.00288 75 Ha
Rs.300.0
0
-----
- ------
-----
- ------ ------ ------ ------ Rs.90
13 Betasin
g Bokmagre MoWR HKKP Surface minor irrigation 1 No 0.00264 60 Ha
Rs.275.0
0
-----
- ------
-----
- ------ ------ Rs.55 60 Ha Rs.220
14 Betasin
g Anteka MoWR HKKP Surface minor irrigation 1 No 0.00210 70 Ha
Rs.387.5
0
-----
- ------
-----
- ------ ------ Rs.116 70 Ha Rs.272
15 Betasin
g Samati MoWR HKKP Surface minor irrigation 1 No 0.00216 65 Ha
Rs.250.0
0
-----
- ------
-----
- Rs.75 65 Ha Rs.175 ------ ------
16 Betasin
g Sawbhanga MoWR HKKP Surface minor irrigation 1 No 0.00191 50 Ha
Rs.225.0
0
-----
- ------
-----
- ------ ------ Rs.68 50 Ha Rs.157
17 Betasin
g Tokonchi MoWR HKKP Surface minor irrigation 1 No 0.00202 45 Ha
Rs.175.0
0
-----
- Rs.35
28
Ha Rs.140 42 Ha ------ ------ ------
District Irrigation Plan, South West Garo Hills district
48 | P a g e
18 Betasin
g Chidipa MoWR HKKP Surface minor irrigation 1 No 0.00256 35 Ha
Rs.162.5
0
-----
- ------
-----
- Rs.49 65 Ha Rs.114 ------ ------
19 Betasin
g Kentrikona MoWR HKKP Surface minor irrigation 1 No 0.00132 112 Ha
Rs.280.0
0
-----
- Rs.84
34
Ha Rs.196 78 Ha ------ ------ ------
20 Betasin
g Tangabari MoWR HKKP Surface minor irrigation 1 No 0.00233 200 Ha
Rs.500.0
0
-----
-
Rs.15
0
60
Ha Rs.350
140
Ha ------ ------ ------
21 Betasin
g Makbil Chring MoWR HKKP Surface minor irrigation 1 No 0.00197 90 Ha
Rs.225.0
0
-----
- ------
-----
- ------ ------ ------ ------ Rs.68
22 Betasin
g A.palgre MoWR HKKP Surface minor irrigation 1 No 0.00239 110 Ha
Rs.275.0
0
-----
- ------
-----
- Rs.83
110
Ha Rs.192 ------ ------
23 Betasin
g Dak MoWR HKKP Surface minor irrigation 1 No 0.00196 200 Ha
Rs.500.0
0
-----
- ------
-----
- ------ ------ Rs.150
200
Ha Rs.350
24 Betasin
g Skagre MoWR HKKP Surface minor irrigation 1 No 0.00173 80 Ha
Rs.200.0
0
-----
- ------
-----
- Rs.60 80 Ha Rs.140 ------ ------
25 Betasin
g Garobadha MoWR HKKP Surface minor irrigation 1 No 0.00160 125 Ha
Rs.312.5
0
-----
- ------
-----
- ------ ------ ------ ------ Rs.94
26 Betasin
g Kalaichar MoWR HKKP Surface minor irrigation 1 No 0.00246 150 Ha
Rs.375.0
0
-----
- ------
-----
- ------ ------ ------ ------ Rs.113
27 Betasin
g Malchapara MoWR HKKP Surface minor irrigation 1 No 0.00256 125 Ha
Rs.500.0
0
-----
- ------
-----
- Rs.150
125
Ha Rs.350 ------ ------
28 Betasin
g Bangkapara MoWR HKKP Surface minor irrigation 1 No 0.00224 110 Ha
Rs.275.0
0
-----
- Rs.55
44
Ha Rs.220 66 Ha ------ ------ ------
29 Betasin
g Chisegre MoWR HKKP Surface minor irrigation 1 No 0.00238 45 Ha Rs.225
-----
- ------
-----
- ------ ------ Rs.68 90 Ha Rs.157
30 Betasin
g Bagidela MoWR HKKP Surface minor irrigation 1 No 0.00258 85 Ha Rs.213
-----
- ------
-----
- ------ ------ Rs.64 85 Ha Rs.149
31 Betasin
g Darugre MoWR HKKP Surface minor irrigation 1 No 0.00170 90 Ha Rs.275
-----
- ------
-----
- ------ ------ Rs.83
110
Ha Rs.192
32 Betasin
g Nagraskhet MoWR HKKP Surface minor irrigation 1 No 0.00202 50 Ha Rs.375
-----
- ------
-----
- Rs.113 50 Ha Rs.262 ------ ------
33 Betasin
g Chisimokgre MoWR HKKP Surface minor irrigation 1 No 0.00181 60 Ha Rs.1250
-----
- ------
-----
- Rs.375 60 Ha Rs.875 ------ ------
34 Betasin
g Josipara MoWR HKKP Surface minor irrigation 1 No 0.00209 45 Ha Rs.225
-----
- ------
-----
- Rs.68 90 Ha Rs.157 ------ ------
35 Betasin
g Jongdikgre MoWR HKKP Surface minor irrigation 1 No 0.00315 50 Ha Rs.275
-----
- ------
-----
- ------ ------ Rs.83
110
Ha Rs.192
36 Betasin
g Betasing MoWR HKKP Surface minor irrigation 1 No 0.00184 75 Ha Rs.375
-----
- ------
-----
- ------ ------ ------ ------ Rs.113
37 Betasin
g Koidol MoWR HKKP Surface minor irrigation 1 No 0.00233 90 Ha Rs.142
-----
- Rs.28
56
Ha Rs.114 84 Ha ------ ------ ------
38 Betasin
g Kokatola MoWR HKKP Surface minor irrigation 1 No 0.00353 100 Ha Rs.338
-----
- ------
-----
- Rs.101
100
Ha Rs.237 ------ ------
39 Betasin Hajongpara MoWR HKKP Surface minor irrigation 1 No 0.00239 200 Ha Rs.2000 ----- ------ ----- Rs.600 200 Rs.140 ------ ------
District Irrigation Plan, South West Garo Hills district
49 | P a g e
g (Dilni) - - Ha 0
40 Betasin
g Matalagre MoWR HKKP Surface minor irrigation 2 No 0.00198 90 Ha Rs.490
-----
- Rs.98
36
Ha Rs.392 54 Ha ------ ------ ------
41 Betasin
g Belbari MoWR HKKP Surface minor irrigation 3 No 0.00227 80 Ha Rs.250
-----
- Rs.50
32
Ha Rs.200 48 Ha ------ ------ ------
42 Betasin
g Garobaha MoWR HKKP Lift irrigation
150
Nos 0.0002 75 Ha Rs.135
-----
- ------
23
Ha
Rs.40.5
0 23 Ha
Rs.41.0
0 29 Ha
Rs.53.5
0
43 Betasin
g Betasing MoWR HKKP Lift irrigation
150
Nos 0.0002 75 Ha Rs.135
-----
- ------
23
Ha
Rs.40.5
0 23 Ha
Rs.41.0
0 29 Ha
Rs.53.5
0
44 Betasin
g Ampati MoWR HKKP Lift irrigation
150
Nos 0.0002 75 Ha Rs.135
-----
- ------
23
Ha
Rs.40.5
0 23 Ha
Rs.41.0
0 29 Ha
Rs.53.5
0
45 Betasin
g Rangsakona MoWR HKKP Lift irrigation
150
Nos 0.0002 75 Ha Rs.99
-----
- ------
23
Ha
Rs.29.7
0 23 Ha
Rs.30.0
0 29 Ha
Rs.39.3
0
46 Betasin
g Damalgre MoWR HKKP Lift irrigation
150
Nos 0.0002 75 Ha Rs.68
-----
- ------
23
Ha
Rs.20.4
0 23 Ha
Rs.20.0
0 29 Ha
Rs.27.6
0
47 Betasin
g Garodobha MoWR HKKP Lift irrigation
150
Nos 0.0002 75 Ha Rs.113
-----
- ------
23
Ha
Rs.33.9
0 23 Ha
Rs.34.0
0 29 Ha
Rs.45.1
0
48 Betasin
g Monabari MoWR HKKP Lift irrigation
75
Nos 0.0002 38 Ha Rs.45
-----
- ------
11
Ha
Rs.13.5
0 11 Ha
Rs.14.0
0 16 Ha
Rs.17.5
0
49 Betasin
g Bandalkona MoWR HKKP Lift irrigation
75
Nos 0.0002 38 Ha Rs.34
-----
- ------
11
Ha
Rs.10.2
0 11 Ha
Rs.10.0
0 16 Ha
Rs.13.8
0
50 Betasin
g Hathisi MoWR HKKP Lift irrigation
75
Nos 0.0002 38 Ha Rs.34
-----
- ------
11
Ha
Rs.10.2
0 11 Ha
Rs.10.0
0 16 Ha
Rs.13.8
0
51 Betasin
g Samati MoWR HKKP Lift irrigation
50
Nos 0.0002 25 Ha Rs.23
-----
- ------
8
Ha Rs.6.90 8 Ha Rs.7.00 9 Ha Rs.9.10
52 Betasin
g Melim MoWR HKKP Lift irrigation
50
Nos 0.0002 25 Ha Rs.27
-----
- ------
8
Ha Rs.8.10 8 Ha Rs.8.00 9 Ha
Rs.10.9
0
53 Betasin
g Grenggandhi MoWR HKKP Lift irrigation
50
Nos 0.0002 25 Ha Rs.23
-----
- ------
8
Ha Rs.6.90 8 Ha Rs.7.00 9 Ha Rs.9.10
54 Betasin
g Jelbongpara MoWR HKKP Lift irrigation
25
Nos 0.0002 13 Ha Rs.18
-----
- ------
4
Ha Rs.5.40 4 Ha Rs.5.00 5 Ha Rs.7.60
55 Betasin
g Jolgaon MoWR HKKP Lift irrigation
25
Nos 0.0002 13 Ha Rs.23
-----
- ------
4
Ha Rs.6.90 4 Ha Rs.7.00 5 Ha Rs.9.10
56 Betasin
g Borkona MoWR HKKP Lift irrigation
25
Nos 0.0002 13 Ha Rs.23
-----
- ------
4
Ha Rs.6.90 4 Ha Rs.7.00 5 Ha Rs.9.10
57 Betasin
g Ichaguri MoWR HKKP Lift irrigation
25
Nos 0.0002 13 Ha Rs.18
-----
- ------
4
Ha Rs.5.40 4 Ha Rs.5.00 5 Ha Rs.7.60
58 Betasin
g Jewilgre MoWR HKKP Lift irrigation
25
Nos 0.0002 13 Ha Rs.14
-----
- ------
4
Ha Rs.4.20 4 Ha Rs.4.00 5 Ha Rs.5.80
59 Betasin
g Mukdangra MoWR HKKP Lift irrigation
100
Nos 0.0002 50 Ha Rs.54
-----
- ------
15
Ha
Rs.16.2
0 15 Ha
Rs.16.0
0 20 Ha
Rs.21.8
0
60 Betasin
g Dorambok MoWR HKKP Lift irrigation
100
Nos 0.0002 50 Ha Rs.68
-----
- ------
15
Ha
Rs.20.4
0 15 Ha
Rs.20.0
0 20 Ha
Rs.27.6
0
District Irrigation Plan, South West Garo Hills district
50 | P a g e
61 Betasin
g Chisigre MoWR HKKP Lift irrigation
25
Nos 0.0002 13 Ha Rs.23
-----
- ------
4
Ha Rs.6.90 4 Ha Rs.7.00 5 Ha Rs.9.10
62 Betasin
g Nogapara MoWR HKKP Lift irrigation
50
Nos 0.0002 25 Ha Rs.45
-----
- ------
8
Ha
Rs.13.5
0 8 Ha
Rs.14.0
0 9 Ha
Rs.17.5
0
63 Betasin
g Aderkhona MoWR HKKP Lift irrigation
50
Nos 0.0002 25 Ha Rs.23.00
-----
- ------
8
Ha Rs.6.90 8 Ha Rs.7.00 9 Ha Rs.9.10
64 Betasin
g Baghmara MoWR HKKP Lift irrigation
50
Nos 0.0002 25 Ha Rs.23.00
-----
- ------
8
Ha Rs.6.90 8 Ha Rs.7.00 9 Ha Rs.9.10
65 Betasin
g
Rongchadengg
re MoWR HKKP Lift irrigation
35
Nos 0.0002 18 Ha Rs.16.00
-----
- ------
5
Ha Rs.4.80 5 Ha Rs.5.00 8 Ha Rs.6.20
66 Betasin
g
Rongsang
A.bagre MoWR HKKP Lift irrigation
25
Nos 0.0002 13 Ha Rs.11.00
-----
- ------
4
Ha Rs.3.30 4 Ha Rs.3.00 5 Ha Rs.4.70
67 Betasin
g Naragre MoWR HKKP Lift irrigation
20
Nos 0.0002 10 Ha Rs.9.00
-----
- ------
3
Ha Rs.2.70 3 Ha Rs.3.00 4 Ha Rs.3.30
68 Betasin
g Melim MoWR HKKP Lift irrigation
50
Nos 0.0002 25 Ha Rs.45.00
-----
- ------
8
Ha
Rs.13.5
0 8 Ha
Rs.14.0
0 9 Ha
Rs.17.5
0
69 Betasin
g Dengnakpara MoWR HKKP Lift irrigation
50
Nos 0.0002 25 Ha Rs.32.00
-----
- ------
8
Ha Rs.9.60 8 Ha
Rs.10.0
0 9 Ha
Rs.12.4
0
70 Betasin
g Goragre' MoWR HKKP Lift irrigation
25
Nos 0.0002 13 Ha Rs.23.00
-----
- ------
4
Ha Rs.6.90 4 Ha Rs.7.00 5 Ha Rs.9.10
71 Betasin
g Matchallang MoWR HKKP Lift irrigation
25
Nos 0.0002 13 Ha Rs.23.00
-----
- ------
4
Ha Rs.6.90 4 Ha Rs.7.00 5 Ha Rs.9.10
72 Betasin
g Rongsong MoWR HKKP Lift irrigation
25
Nos 0.0002 13 Ha Rs.14.00
-----
- ------
4
Ha Rs.4.20 4 Ha Rs.4.00 5 Ha Rs.5.80
73 Betasin
g Rangatary MoWR HKKP Lift irrigation
25
Nos 0.0002 13 Ha Rs.14.00
-----
- ------
4
Ha Rs.4.20 4 Ha Rs.4.00 5 Ha Rs.5.80
74 Betasin
g Skagre MoWR HKKP Lift irrigation
20
Nos 0.0002 10 Ha Rs.9.00
-----
- ------
3
Ha Rs.2.70 3 Ha Rs.3.00 4 Ha Rs.3.30
75 Betasin
g Bashbari MoWR HKKP Lift irrigation
25
Nos 0.0002 13 Ha Rs.54.00
-----
- ------
4
Ha
Rs.16.2
0 4 Ha
Rs.16.0
0 5 Ha
Rs.21.8
0
76 Betasin
g Chondonpara MoWR HKKP Lift irrigation
25
Nos 0.0002 13 Ha Rs.14.00
-----
- ------
4
Ha Rs.4.20 4 Ha Rs.4.00 5 Ha Rs.5.80
77 Betasin
g
Chondon
Nokat MoWR HKKP Lift irrigation
25
Nos 0.0002 13 Ha Rs.23.00
-----
- ------
4
Ha Rs.6.90 4 Ha Rs.7.00 5 Ha Rs.9.10
78 Betasin
g Rongramgre MoWR HKKP Lift irrigation
25
Nos 0.0002 13 Ha Rs.45.00
-----
- ------
4
Ha
Rs.13.5
0 4 Ha
Rs.14.0
0 5 Ha
Rs.17.5
0
79 Betasin
g Belbari MoWR HKKP Lift irrigation
25
Nos 0.0002 13 Ha Rs.23.00
-----
- ------
4
Ha Rs.6.90 4 Ha Rs.7.00 5 Ha Rs.9.10
80 Betasin
g Kasra MoWR HKKP Lift irrigation
25
Nos 0.0002 13 Ha Rs.45.00
-----
- ------
4
Ha
Rs.13.5
0 4 Ha
Rs.14.0
0 5 Ha
Rs.17.5
0
81 Betasin
g
Betasing
Bazaar MoWR HKKP Lift irrigation
25
Nos 0.0002 13 Ha Rs.23.00
-----
- ------
4
Ha Rs.6.90 4 Ha Rs.7.00 5 Ha Rs.9.10
82 Betasin Bainapara MoWR HKKP Lift irrigation 25 0.0002 13 Ha Rs.68.00 ----- ------ 4 Rs.20.4 4 Ha Rs.20.0 5 Ha Rs.27.6
District Irrigation Plan, South West Garo Hills district
51 | P a g e
g Nos - Ha 0 0 0
83 Betasin
g Chringpara MoWR HKKP Lift irrigation
25
Nos 0.0002 13 Ha Rs.45.00
-----
- ------
4
Ha
Rs.13.5
0 4 Ha
Rs.14.0
0 5 Ha
Rs.17.5
0
84 Betasin
g Borkona MoWR HKKP
Ground water
development 2 Nos 0.0006 60 Ha
Rs.243.0
0
-----
- ------
-----
-
Rs.72.9
0 60 Ha Rs.146 ------ ------
85 Betasin
g Kasra MoWR HKKP
Ground water
development 3 Nos 0.0006 90 Ha
Rs.297.0
0
-----
- ------
-----
-
Rs.89.1
0 90 Ha Rs.178 ------ ------
86 Betasin
g Jolgaon MoWR HKKP
Ground water
development 5 Nos 0.0006 150 Ha
Rs.486.0
0
-----
- ------
-----
-
Rs.145.
8
150
Ha Rs.292 ------ ------
87 Betasin
g Batazor MoWR HKKP
Ground water
development 2 Nos 0.0006 60 Ha
Rs.216.0
0
-----
- ------
-----
-
Rs.64.8
0 60 Ha Rs.130 ------ ------
88 Betasin
g Ichaguri MoWR HKKP
Ground water
development 2 Nos 0.0006 60 Ha
Rs.189.0
0
-----
- ------
-----
-
Rs.56.7
0 60 Ha Rs.113 ------ ------
89 Betasin
g Rangatary MoWR HKKP
Ground water
development 2 Nos 0.0006 60 Ha
Rs.256.5
0
-----
- ------
-----
-
Rs.76.9
5 60 Ha Rs.154 ------ ------
90 Betasin
g Kumligaon MoWR HKKP
Ground water
development 3 Nos 0.0006 90 Ha
Rs.351.0
0
-----
- ------
-----
-
Rs.105.
3 90 Ha Rs.211 ------ ------
91 Betasin
g Kuligaon MoWR HKKP
Ground water
development 3 Nos 0.0006 90 Ha
Rs.270.0
0
-----
- ------
-----
-
Rs.81.0
0 90 Ha Rs.162 ------ ------
92 Betasin
g Katuligaon MoWR HKKP
Ground water
development 2 Nos 0.0006 60 Ha
Rs.243.0
0
-----
- ------
-----
- ------ ------ Rs.73 60 Ha Rs.170
93 Betasin
g Jewilgre MoWR HKKP
Ground water
development 2 Nos 0.0006 60 Ha
Rs.256.5
0
-----
- ------
-----
- ------ ------ Rs.77 60 Ha Rs.180
94 Betasin
g Bandalkona MoWR HKKP
Ground water
development 3 Nos 0.0006 90 Ha
Rs.270.0
0
-----
- ------
-----
- ------ ------ Rs.81 90 Ha Rs.189
95 Betasin
g Samati MoWR HKKP
Ground water
development 3 Nos 0.0006 90 Ha
Rs.275.4
0
-----
- ------
-----
- ------ ------ Rs.83 90 Ha Rs.192
96 Betasin
g Gasura MoWR HKKP
Ground water
development 3 Nos 0.0006 90 Ha
Rs.286.2
0
-----
- ------
-----
- ------ ------ Rs.86 90 Ha Rs.200
97 Betasin
g Monabari MoWR HKKP
Ground water
development 4 Nos 0.0006 120 Ha
Rs.432.0
0
-----
- ------
-----
- ------ ------ Rs.130
120
Ha Rs.302
98 Betasin
g Bansali MoWR HKKP
Ground water
development 3 Nos 0.0006 90 Ha
Rs.351.0
0
-----
- ------
-----
- ------ ------ Rs.105 90 Ha Rs.246
99 Betasin
g Gandhipara MoWR HKKP R.R.R of water bodies 1 No 0.0054 300 Ha
Rs.129.6
9
30
Ha
Rs.
130 ----- ------ ------ ------ ------ ------
10
0
Betasin
g Sonamitte MoWR HKKP R.R.R of water bodies 1 No 0.0068 60 Ha
Rs.493.5
0
-----
- ------
-----
- ------ ------ Rs.197
235
Ha Rs.297
10
1
Betasin
g Damalgre MoWR HKKP R.R.R of water bodies 1 No 0.002 75 Ha
Rs.241.5
0
-----
- ------
-----
- Rs.72.5 75 Ha Rs.145 ------ ------
10
2
Betasin
g Dolbari MoWR HKKP R.R.R of water bodies 1 No 0.0007 70 Ha
Rs.150.0
0
-----
- Rs.15
7
Ha Rs.55 63 Ha ------ ------ ------
10
3
Betasin
g Dengnakpara MoWR HKKP R.R.R of water bodies 1 No 0.0126 100 Ha
Rs.850.0
0
-----
- ------
-----
- Rs.70.0
100
Ha Rs.510 ------ ------
District Irrigation Plan, South West Garo Hills district
52 | P a g e
10
4
Betasin
g Muji A.galgre MoWR HKKP R.R.R of water bodies 1 No 0.0047 150 Ha
Rs.600.0
0
-----
- ------
-----
- ------ ------ Rs.360
150
Ha Rs.240
10
5
Betasin
g Nogorpara MoWR HKKP R.R.R of water bodies 1 No 0.0039 60 Ha
Rs.315.0
0
-----
- ------
-----
- ------ ------ Rs.189 60 Ha Rs.126
10
6
Betasin
g Masudi MoWR HKKP R.R.R of water bodies 1 No 0.0008 45 Ha
Rs.180.0
0
-----
- ------
-----
- Rs.54.0 45 Ha Rs.108 ------ ------
10
7
Betasin
g Matchallang MoWR HKKP R.R.R of water bodies 1 No 0.0008 60 Ha
Rs.262.5
0
-----
- ------
-----
- Rs.78.8 60 Ha Rs.158 ------ ------
10
8
Betasin
g Grenggandhi MoWR HKKP R.R.R of water bodies 1 No 0.0008 80 Ha
Rs.115.0
0
-----
- Rs.23
32
Ha Rs.92
-12
Ha ------ ------ ------
10
9
Betasin
g Baghmara MoWR HKKP R.R.R of water bodies 1 No 0.0012 75 Ha
Rs.525.0
0
-----
- ------
-----
- ------ ------ Rs.210 75 Ha Rs.315
11
0
Betasin
g Andherkona MoWR HKKP R.R.R of water bodies 1 No 0.0018 70 Ha
Rs.375.0
0
-----
- ------
-----
-
Rs.112.
5 70 Ha Rs.225 ------ ------
11
1
Betasin
g Tallangre MoWR HKKP R.R.R of water bodies 1 No 0.0018 97 Ha
Rs.255.0
0
-----
- ------
-----
- Rs.76.5 97 Ha Rs.153 ------ ------
11
2
Betasin
g
Daru
Ananagpara MoWR HKKP R.R.R of water bodies 1 No 0.0054 150 Ha Rs.1960
-----
- ------
-----
- ------ ------ ------ ------ Rs.588
11
3
Betasin
g Jiljil MoWR HKKP R.R.R of water bodies 1 No 0.0016 80 Ha
Rs.172.5
0
-----
- ------
-----
- ------ ------ ------ ------ Rs.52
11
4
Betasin
g Gopijhora MoWR HKKP R.R.R of water bodies 1 No 0.0008 100 Ha
Rs.225.0
0
-----
- ------
-----
- Rs.67.5
100
Ha Rs.135 ------ ------
11
5
Betasin
g Kokilla MoWR HKKP R.R.R of water bodies 1 No 0.0036 80 Ha
Rs.255.0
0
-----
- ------
-----
- ------ ------ Rs.102 80 Ha Rs.153
11
6
Betasin
g Bashbari MoWR HKKP R.R.R of water bodies 1 No 0.0072 150 Ha
Rs.825.0
0
-----
- ------
-----
-
Rs.247.
5
150
Ha Rs.495 ------ ------
11
7
Betasin
g Rongsong MoWR HKKP R.R.R of water bodies 1 No 0.0020 50 Ha
Rs.142.5
0
-----
- ------
-----
- ------ ------ Rs.86 50 Ha Rs.57
11
8
Betasin
g Ringdee MoWR HKKP R.R.R of water bodies 1 No 0.0084 150 Ha
Rs.450.0
0
-----
- ------
-----
- ------ ------ Rs.270
150
Ha Rs.180
11
9
Betasin
g Naragre MoWR HKKP Lined field channel 1 No 0.0006 50 Ha
Rs.127.5
0
-----
- ------
-----
- Rs.38.3 50 Ha Rs.77 ------ ------
12
0
Betasin
g Dolbari MoWR HKKP Lined field channel 1 No 0.0017 90 Ha Rs.340
-----
- ------
-----
-
Rs.102.
0 90 Ha Rs.204 ------ ------
12
1
Betasin
g Grenggandhi MoWR HKKP Lined field channel 1 No 0.000 75 Ha Rs.238
-----
- Rs.48
30
Ha Rs.190 45 Ha ------ ------ ------
12
2
Betasin
g Masudi MoWR HKKP Lined field channel 1 No 0.0010 50 Ha Rs.170
-----
- Rs.34
20
Ha Rs.136 30 Ha ------ ------ ------
12
3
Betasin
g Matchallang MoWR HKKP Lined field channel 1 No 0.0007 45 Ha Rs.190
-----
- Rs.38
18
Ha Rs.152 27 Ha ------ ------ ------
12
4
Betasin
g Rongsong MoWR HKKP Lined field channel 1 No 0.0007 45 Ha Rs.200
-----
- ------
-----
- Rs.60.0 45 Ha Rs.120 ------ ------
12 Betasin Dabella MoWR HKKP Lined field channel 1 No 0.0008 40 Ha Rs.127.5 ----- ------ ----- Rs.38.3 40 Ha Rs.77 ------ ------
District Irrigation Plan, South West Garo Hills district
53 | P a g e
5 g 0 - -
12
6
Betasin
g Badupara MoWR HKKP Lined field channel 1 No 0.001 50 Ha
Rs.127.5
0
-----
- ------
-----
- Rs.38.3 50 Ha Rs.77 ------ ------
12
7
Betasin
g Dengnakpara MoWR HKKP Lined field channel 1 No 0.0033 75 Ha
Rs.510.0
0
-----
- ------
-----
-
Rs.153.
0 75 Ha Rs.306 ------ ------
12
8
Betasin
g Goragre MoWR HKKP Lined field channel 1 No 0.0024 50 Ha Rs.93.50
-----
- ------
-----
- ------ 20 Ha Rs.28 30 Ha Rs.66
12
9
Betasin
g Bashbari MoWR HKKP Lined field channel 1 No 0.0029 75 Ha
Rs.510.0
0
-----
- ------
-----
- ------ 30 Ha Rs.153 45 Ha Rs.357
13
0
Betasin
g Thallang MoWR HKKP Lined field channel 1 No 0.0027 90 Ha
Rs.193.0
0
-----
- Rs.39
36
Ha Rs.154 54 Ha ------ ------ ------
13
1
Betasin
g Muji A.gal MoWR HKKP Lined field channel 1 No 0.002 70 Ha
Rs.160.0
0
-----
- Rs.32
28
Ha Rs.128 42 Ha ------ ------ ------
13
2
Betasin
g Kokilla MoWR HKKP Lined field channel 1 No 0.0020 80 Ha
Rs.255.0
0
-----
- ------
-----
- ------ 32 Ha Rs.77 48 Ha Rs.178
13
3
Betasin
g Gopijhora MoWR HKKP Lined field channel 1 No 0.0021 90 Ha
Rs.259.0
0
-----
- ------
-----
- Rs.77.7 90 Ha Rs.155 ------ ------
13
4
Betasin
g Marakapara MoWR HKKP Lined field channel 1 No 0.0023 80 Ha
Rs.510.0
0
-----
- ------
-----
- ------ ------ ------ ------ Rs.153
13
5
Betasin
g Chisrigre MoWR HKKP Lined field channel 1 No 0.0005 38 Ha Rs.68.00
-----
- ------
-----
- ------ 15 Ha Rs.20 23 Ha Rs.48
13
6
Betasin
g Sangkarigre MoWR HKKP Lined field channel 1 No 0.000 43 Ha Rs.76.50
-----
- ------
-----
- ------ 17 Ha Rs.23 26 Ha Rs.54
13
7
Betasin
g Baghmara MoWR HKKP Lined field channel 1 No 0.0009 90 Ha
Rs.340.0
0
-----
- ------
-----
-
Rs.102.
0 90 Ha Rs.204 ------ ------
13
8
Betasin
g Andherkona MoWR HKKP Lined field channel 1 No 0.0013 100 Ha
Rs.425.0
0
-----
- ------
-----
-
Rs.127.
5
100
Ha Rs.255 ------ ------
13
9
Betasin
g Gandhipara MoWR HKKP Lined field channel 1 No 0.0020 90 Ha
Rs.255.0
0
-----
- ------
-----
- ------ 36 Ha Rs.77 54 Ha Rs.178
14
0
Betasin
g Daru MoWR HKKP Lined field channel 1 No 0.0028 65 Ha
Rs.680.0
0
-----
- ------
-----
- ------ ------ ------ ------ Rs.204
14
1
Betasin
g Jiljil MoWR HKKP Lined field channel 1 No 0.001 50 Ha
Rs.127.5
0
-----
- ------
-----
- ------ 20 Ha Rs.38 30 Ha Rs.90
14
2
Betasin
g Tangabari MoWR HKKP Lined field channel 1 No 0.0017 45 Ha
Rs.212.5
0
-----
- ------
-----
- ------ ------ ------ ------ Rs.64
14
3
Betasin
g Kentrikona MoWR HKKP Lined field channel 1 No 0.0015 50 Ha
Rs.178.5
0
-----
- ------
-----
- ------ ------ ------ ------ Rs.54
14
4
Betasin
g Jolgaon MoWR HKKP Lined field channel 1 No 0.0016 45 Ha
Rs.212.5
0
-----
- ------
-----
- ------ ------ ------ ------ Rs.64
14
5
Betasin
g Adugre 1 MoWR HKKP Unlined field channel 1 No 0.0001 4.7 Ha Rs.9.45
-----
- ------
-----
- ------ 1 Ha Rs.3.00 3 Ha Rs.6.45
14
6
Betasin
g Adugre 2 MoWR HKKP Unlined field channel 1 No 0.0002 5.4 Ha Rs.10.80
-----
- ------
-----
- ------ 2 Ha Rs.3.00 4 Ha Rs.7.80
District Irrigation Plan, South West Garo Hills district
54 | P a g e
14
7
Betasin
g Bollanggre 1 MoWR HKKP Unlined field channel 1 No 0.0003 3.4 Ha Rs.6.75
-----
- ------
-----
- ------ 1 Ha Rs.2.00 2 Ha Rs.4.75
14
8
Betasin
g Bollanggre 2 MoWR HKKP Unlined field channel 1 No 0.0001 4.1 Ha Rs.8.10
-----
- ------
-----
- ------ 1 Ha Rs.2.00 3 Ha Rs.6.10
14
9
Betasin
g Chibongbong MoWR HKKP Unlined field channel 1 No 0.0001 6.5 Ha Rs.12.96
-----
- ------
-----
- ------ 2 Ha Rs.4.00 5 Ha Rs.8.96
15
0
Betasin
g Chiringpara 1 MoWR HKKP Unlined field channel 1 No 0.0002 4.1 Ha Rs.8.10
-----
- ------
-----
- ------ 1 Ha Rs.2.00 3 Ha Rs.6.10
15
1
Betasin
g Dorombok MoWR HKKP Unlined field channel 1 No 0.0001 4.2 Ha Rs.8.37
-----
- ------
-----
- ------ 1 Ha Rs.3.00 3 Ha Rs.5.37
15
2
Betasin
g Apalgre MoWR HKKP Unlined field channel 1 No 0.0001 4.1 Ha Rs.8.10
-----
- ------
-----
- ------ 1 Ha Rs.2.00 3 Ha Rs.6.10
15
3
Betasin
g Grenggandhi MoWR HKKP Unlined field channel 1 No 0.0002 4.7 Ha Rs.9.45
-----
- ------
-----
- ------ 1 Ha Rs.3.00 3 Ha Rs.6.45
15
4
Betasin
g Jongdikgre MoWR HKKP Unlined field channel 1 No 0.0001 4.1 Ha Rs.8.10
-----
- ------
-----
- ------ 1 Ha Rs.2.00 3 Ha Rs.6.10
15
5
Betasin
g Masal MoWR HKKP Unlined field channel 1 No 0.0001 3.8 Ha Rs.7.56
-----
- ------
-----
- ------ 1 Ha Rs.2.00 3 Ha Rs.5.56
15
6
Betasin
g Sonamite MoWR HKKP Unlined field channel 1 No 0.0001 3.5 Ha Rs.7.02
-----
- ------
-----
- ------ 1 Ha Rs.2.00 2 Ha Rs.5.02
15
7
Betasin
g Batajol MoWR HKKP Unlined field channel 1 No 0.0001 4.7 Ha Rs.9.45
-----
- ------
-----
- ------ 1 Ha Rs.3.00 3 Ha Rs.6.45
15
8
Betasin
g Latri MoWR HKKP Unlined field channel 1 No 0.0002 6.1 Ha Rs.12.15
-----
- ------
-----
- ------ 2 Ha Rs.4.00 4 Ha Rs.8.15
15
9
Betasin
g Chiringpara 2 MoWR HKKP Unlined field channel 1 No 0.0002 4.7 Ha Rs.9.45
-----
- ------
-----
- ------ 1 Ha Rs.3.00 3 Ha Rs.6.45
16
0
Betasin
g Abagre MoWR HKKP Unlined field channel 1 No 0.0001 4.1 Ha Rs.8.10
-----
- ------
-----
- ------ 1 Ha Rs.2.00 3 Ha Rs.6.10
16
1
Betasin
g Agigre MoWR HKKP Unlined field channel 1 No 0.0002 4.2 Ha Rs.8.37
-----
- ------
-----
- ------ 1 Ha Rs.3.00 3 Ha Rs.5.37
16
2
Betasin
g Malchapara MoWR HKKP Unlined field channel 1 No 0.0010 70.0 Ha Rs.90.00
-----
- ------
28
Ha
Rs.27.0
0 42 Ha
Rs.63.0
0 ------ ------
16
3
Betasin
g Gopa MoWR HKKP Unlined field channel 1 No 0.0004 4.3 Ha Rs.8.64
-----
- ------
2
Ha Rs.3.00 2 Ha Rs.5.64 ------ ------
16
4
Betasin
g Skagre MoWR HKKP Unlined field channel 1 No 0.0005 25.0 Ha Rs.75.00
-----
- ------
10
Ha
Rs.23.0
0 15 Ha
Rs.52.0
0 ------ ------
16
5
Betasin
g Belbari MoWR HKKP Unlined field channel 1 No 0.0012 40.0 Ha
Rs.222.0
0
-----
- ------
16
Ha
Rs.67.0
0 24 Ha
Rs.155.
0 ------ ------
16
6
Betasin
g
Chondon
Nokat MoWR HKKP Unlined field channel 1 No 0.0009 35.0 Ha Rs.74.00
-----
- ------
14
Ha
Rs.22.0
0 21 Ha
Rs.52.0
0 ------ ------
16
7
Betasin
g Rangsagre MoWR HKKP Unlined field channel 1 No 0.0001 7.0 Ha Rs.27.00
-----
- ------
3
Ha Rs.8.00 4 Ha
Rs.19.0
0 ------ ------
16 Betasin Moulcheng MoWR HKKP Unlined field channel 1 No 0.0001 5.0 Ha Rs.5.40 ----- ------ 2 Rs.2.00 3 Ha Rs.3.40 ------ ------
District Irrigation Plan, South West Garo Hills district
55 | P a g e
8 g - Ha
16
9
Betasin
g Chamaguri' MoWR HKKP Unlined field channel 1 No 0.0002 8.0 Ha Rs.9.45
-----
- ------
3
Ha Rs.3.00 5 Ha Rs.6.45 ------ ------
17
0
Betasin
g Bolslagre MoWR HKKP Unlined field channel 1 No 0.0003 6.0 Ha Rs.10.80
-----
- ------
2
Ha Rs.3.00 4 Ha Rs.7.80 ------ ------
17
1
Betasin
g Berupra MoWR HKKP Unlined field channel 1 No 0.0001 9.0 Ha Rs.10.26
-----
- ------
4
Ha Rs.3.00 5 Ha Rs.7.26 ------ ------
17
2
Betasin
g Benabazar MoWR HKKP Unlined field channel 1 No 0.0001 8.0 Ha Rs.8.10
-----
- ------
-----
- ------
3.1
Ha Rs.2.00
4.9
Ha Rs.6.10
17
3
Betasin
g Dipkaipara MoWR HKKP Unlined field channel 1 No 0.0002 8.0 Ha Rs.10.80
-----
- ------
-----
- ------
3.2
Ha Rs.3.00
4.9
Ha Rs.7.80
17
4
Betasin
g Dapguri MoWR HKKP Unlined field channel 1 No 0.0001 7.0 Ha Rs.7.56
-----
- ------
-----
- ------
3.2
Ha Rs.2.00
3.8
Ha Rs.5.56
17
5
Betasin
g Chengjhora MoWR HKKP Unlined field channel 1 No 0.0001 11.5 Ha Rs.6.75
-----
- ------
-----
- ------
3.5
Ha Rs.2.00
8.1
Ha Rs.4.75
17
6
Betasin
g Nogapara MoWR HKKP Unlined field channel 1 No 0.0001 12.3 Ha Rs.10.80
-----
- ------
4
Ha Rs.3
8.6
Ha Rs.7.80 ------ ------
17
7
Betasin
g Chokonggre MoWR HKKP Unlined field channel 1 No 0.0001 9.5 Ha Rs.12.15
-----
- ------
3
Ha Rs.4
6.7
Ha Rs.8.15 ------ ------
17
8
Betasin
g Gonglangre MoWR HKKP Unlined field channel 1 No 0.0001 9.8 Ha Rs.10.80
-----
- ------
3
Ha Rs.3
6.9
Ha Rs.7.80 ------ ------
17
9
Betasin
g Modupara MoWR HKKP Unlined field channel 1 No 0.0001 10.9 Ha Rs.12.15
-----
- ------
3
Ha Rs.4.00 8 Ha Rs.8.15 ------ ------
18
0
Betasin
g Garobdha MoWR HKKP Unlined field channel 1 No 0.0001 10.4 Ha Rs.13.50
-----
- ------
3
Ha Rs.4.00 7 Ha Rs.9.50 ------ ------
18
1
Betasin
g Sangkaregre MoWR HKKP Unlined field channel 1 No 0.0002 10.3 Ha Rs.13.50
-----
- ------
3
Ha Rs.4.00 7 Ha Rs.9.50 ------ ------
18
2
Betasin
g Nunmati MoWR HKKP Unlined field channel 1 No 0.0002 11.0 Ha Rs.10.80
-----
- ------
3
Ha Rs.3.00 8 Ha Rs.7.80 ------ ------
18
3
Betasin
g Koritola MoWR HKKP Unlined field channel 1 No 0.0001 11.2 Ha Rs.12.96
-----
- ------
3
Ha Rs.4.00 8 Ha Rs.8.96 ------ ------
18
4
Betasin
g Rongrekgre MoWR HKKP Unlined field channel 1 No 0.0002 10.1 Ha Rs.13.50
-----
- ------
3
Ha Rs.4.00 7 Ha Rs.9.50 ------ ------
18
5
Betasin
g Baghmara MoWR HKKP Unlined field channel 1 No 0.0001 10.1 Ha Rs.13.50
-----
- ------
3
Ha Rs.4.00 7 Ha Rs.9.50 ------ ------
18
6
Betasin
g Kanchikona MoWR HKKP Unlined field channel 1 No 0.0001 11.2 Ha Rs.13.50
-----
- ------
3
Ha Rs.4.00 8 Ha Rs.9.50 ------ ------
18
7
Betasin
g Sisimokgre MoWR HKKP Unlined field channel 1 No 0.0002 12.1 Ha Rs.13.50
-----
- ------
4
Ha Rs.4.00 8 Ha Rs.9.50 ------ ------
18
8
Betasin
g Dopatchigre MoWR HKKP Unlined field channel 1 No 0.0001 10.3 Ha Rs.13.50
-----
- ------
3
Ha Rs.4.00 7 Ha Rs.9.50 ------ ------
18
9
Betasin
g Andherkona MoWR HKKP Unlined field channel 1 No 0.0001 11.6 Ha Rs.13.50
-----
- ------
-----
- ------ 3 Ha Rs.4.00 8 Ha Rs.9.50
District Irrigation Plan, South West Garo Hills district
56 | P a g e
19
0
Betasin
g Harigon MoWR HKKP Unlined field channel 1 No 0.0002 9.8 Ha Rs.13.50
-----
- ------
-----
- ------ 3 Ha Rs.4.00 7 Ha Rs.9.50
19
1
Betasin
g Nokatgre MoWR HKKP Unlined field channel 1 No 0.0001 8.9 Ha Rs.13.50
-----
- ------
-----
- ------ 3 Ha Rs.4.00 6 Ha Rs.9.50
19
2
Betasin
g Mukdangra MoWR HKKP Unlined field channel 1 No 0.0001 8.0 Ha Rs.12.15
-----
- ------
-----
- ------ 2 Ha Rs.4.00 6 Ha Rs.8.15
19
3
Betasin
g Dengasi MoWR HKKP Unlined field channel 1 No 0.0001 9.0 Ha Rs.15.66
-----
- ------
3
Ha Rs.5.00 6 Ha
Rs.10.6
6 ------ ------
19
4
Betasin
g Apalgre MoWR HKKP Unlined field channel 1 No 0.0001 8.6 Ha Rs.16.20
-----
- ------
3
Ha Rs.5.00 6 Ha
Rs.11.2
0 ------ ------
19
5
Betasin
g Asimgre MoWR HKKP Unlined field channel 1 No 0.0001 12.5 Ha Rs.12.15
-----
- ------
4
Ha Rs.4.00 9 Ha Rs.8.15 ------ ------
19
6
Betasin
g Bansali MoWR HKKP Unlined field channel 1 No 0.0001 8.8 Ha Rs.13.50
-----
- ------
-----
- ------ 3 Ha Rs.4.00 6 Ha Rs.9.50
19
7
Betasin
g
Chondon
Nokat MoWR HKKP Unlined field channel 1 No 0.0002 11.2 Ha Rs.11.34
-----
- ------
-----
- ------ 3 Ha Rs.3.00 8 Ha Rs.8.34
19
8
Betasin
g Borkona MoWR HKKP Unlined field channel 1 No 0.0002 9.7 Ha Rs.14.04
-----
- ------
-----
- ------ 3 Ha Rs.4.00 7 Ha
Rs.10.0
4
19
9
Betasin
g Joyfar MoWR HKKP Unlined field channel 1 No 0.0001 13.0 Ha Rs.13.50
-----
- ------
-----
- ------ 4 Ha Rs.4.00 9 Ha Rs.9.50
20
0
Betasin
g Kasra MoWR HKKP Unlined field channel 1 No 0.0002 8.8 Ha Rs.12.42
-----
- ------
-----
- ------ 3 Ha Rs.4.00 6 Ha Rs.8.42
20
1
Betasin
g Kasra Hajong MoWR HKKP Unlined field channel 1 No 0.0001 8.8 Ha Rs.13.50
-----
- ------
-----
- ------ 3 Ha Rs.4.00 6 Ha Rs.9.50
20
2
Betasin
g Belbari MoWR HKKP Unlined field channel 1 No 0.0002 9.5 Ha Rs.12.15
-----
- ------
-----
- ------ 3 Ha Rs.4.00 7 Ha Rs.8.15
20
3
Betasin
g Badagre MoWR HKKP Unlined field channel 1 No 0.0001 6.9 Ha Rs.13.50
-----
- ------
-----
- ------ 2 Ha Rs.4.00 5 Ha Rs.9.50
20
4
Betasin
g Brojopara MoWR HKKP Unlined field channel 1 No 0.0001 11.0 Ha Rs.12.42
-----
- ------
-----
- ------ 3 Ha Rs.4.00 8 Ha Rs.8.42
20
5
Betasin
g Hajonggre MoWR HKKP Unlined field channel 1 No 0.0002 8.0 Ha Rs.13.50
-----
- ------
-----
- ------ 2 Ha Rs.4.00 6 Ha Rs.9.50
20
6
Betasin
g Monabari MoWR HKKP Unlined field channel 1 No 0.0001 7.0 Ha Rs.14.85
-----
- ------
-----
- ------ 2 Ha Rs.4.00 5 Ha
Rs.10.8
5
20
7
Betasin
g Talbari MoWR HKKP Unlined field channel 1 No 0.0001 8.0 Ha Rs.14.04
-----
- ------
-----
- ------ 2 Ha Rs.4.00 6 Ha
Rs.10.0
4
20
8
Betasin
g Galmara MoWR HKKP Unlined field channel 1 No 0.0001 11.1 Ha Rs.14.85
-----
- ------
3
Ha Rs.4.00 8 Ha
Rs.10.8
5 ------ ------
20
9
Betasin
g Rongramgre MoWR HKKP Unlined field channel 1 No 0.0001 8.5 Ha Rs.13.50
-----
- ------
3
Ha Rs.4.00 6 Ha Rs.9.50 ------ ------
21
0
Betasin
g Rangapani MoWR HKKP Unlined field channel 1 No 0.0001 9.5 Ha Rs.12.42
-----
- ------
3
Ha Rs.4.00 7 Ha Rs.8.42 ------ ------
21 Betasin Ishaguri MoWR HKKP Unlined field channel 1 No 0.0002 11.6 Ha Rs.13.77 ----- ------ 3 Rs.4.00 8 Ha Rs.9.77 ------ ------
District Irrigation Plan, South West Garo Hills district
57 | P a g e
1 g - Ha
21
2
Betasin
g Takunbari MoWR HKKP Unlined field channel 1 No 0.0001 8.0 Ha Rs.13.50
-----
- ------
2
Ha Rs.4.00 6 Ha Rs.9.50 ------ ------
21
3
Betasin
g Teporpara MoWR HKKP Unlined field channel 1 No 0.0001 11.3 Ha Rs.14.85
-----
- ------
3
Ha Rs.4.00 8 Ha
Rs.10.8
5 ------ ------
21
4
Betasin
g
Upper
Teporpara MoWR HKKP Unlined field channel 1 No 0.0002 7.0 Ha Rs.16.20
-----
- ------
2
Ha Rs.5.00 5 Ha
Rs.11.2
0 ------ ------
21
5
Betasin
g Jongdikgre MoWR HKKP Unlined field channel 1 No 0.0001 8.1 Ha Rs.12.42
-----
- ------
2
Ha Rs.4.00 6 Ha Rs.8.42 ------ ------
21
6
Betasin
g Tangabari MoWR HKKP Unlined field channel 1 No 0.0001 9.3 Ha Rs.12.96
-----
- ------
3
Ha Rs.4.00 7 Ha Rs.8.96 ------ ------
21
7
Betasin
g Masal MoWR HKKP Unlined field channel 1 No 0.0001 8.8 Ha Rs.14.85
-----
- ------
3
Ha Rs.4.00 6 Ha
Rs.10.8
5 ------ ------
21
8
Betasin
g Gandipara MoWR HKKP Unlined field channel 1 No 0.0002 8.0 Ha Rs.16.20
-----
- ------
2
Ha Rs.5.00 6 Ha
Rs.11.2
0 ------ ------
21
9
Betasin
g Boiragipara MoWR HKKP Unlined field channel 1 No 0.0001 11.5 Ha Rs.17.55
-----
- ------
3
Ha Rs.5.00 8 Ha
Rs.12.5
5 ------ ------
22
0
Betasin
g Ambari MoWR HKKP Unlined field channel 1 No 0.0001 7.7 Ha Rs.14.85
-----
- ------
2
Ha Rs.4.00 5 Ha
Rs.10.8
5 ------ ------
22
1
Betasin
g
Gandipara
Hajong MoWR HKKP Unlined field channel 1 No 0.0001 6.8 Ha Rs.13.23
-----
- ------
2
Ha Rs.4.00 5 Ha Rs.9.23 ------ ------
22
2
Betasin
g Putimari MoWR HKKP Unlined field channel 1 No 0.0001 9.5 Ha Rs.12.96
-----
- ------
3
Ha Rs.4.00 7 Ha Rs.8.96 ------ ------
22
3
Betasin
g Tiksali MoWR HKKP Unlined field channel 1 No 0.0001 11.1 Ha Rs.14.85
-----
- ------
-----
- ------ 3 Ha Rs.4.00 8 Ha
Rs.10.8
5
22
4
Betasin
g
Gandipara
Garo MoWR HKKP Unlined field channel 1 No 0.0002 7.7 Ha Rs.12.42
-----
- ------
-----
- ------ 2 Ha Rs.4.00 5 Ha Rs.8.42
22
5
Betasin
g Rangatari MoWR HKKP Unlined field channel 1 No 0.0001 8.0 Ha Rs.14.85
-----
- ------
-----
- ------ 2 Ha Rs.4.00 6 Ha
Rs.10.8
5
22
6
Betasin
g Balapara MoWR HKKP Unlined field channel 1 No 0.0001 7.0 Ha Rs.14.04
-----
- ------
-----
- ------ 2 Ha Rs.4.00 5 Ha
Rs.10.0
4
22
7
Betasin
g Garodoba MoWR HKKP Unlined field channel 1 No 0.0002 8.0 Ha Rs.10.80
-----
- ------
-----
- ------ 2 Ha Rs.3.00 6 Ha Rs.7.80
22
8
Betasin
g Baishpara MoWR HKKP Unlined field channel 1 No 0.0001 8.7 Ha Rs.13.77
-----
- ------
-----
- ------ 3 Ha Rs.4.00 6 Ha Rs.9.77
22
9
Betasin
g Dunnigaon MoWR HKKP Unlined field channel 1 No 0.0001 8.5 Ha Rs.13.77
-----
- ------
-----
- ------ 3 Ha Rs.4.00 6 Ha Rs.9.77
23
0
Betasin
g Golagre MoWR HKKP Unlined field channel 1 No 0.0001 9.5 Ha Rs.15.12
-----
- ------
-----
- ------ 3 Ha Rs.5.00 7 Ha
Rs.10.1
2
23
1
Betasin
g Grenggandi MoWR HKKP Unlined field channel 1 No 0.0002 7.0 Ha Rs.13.50
-----
- ------
-----
- ------ 2 Ha Rs.4.00 5 Ha Rs.9.50
23
2
Betasin
g Ransakona MoWR HKKP Unlined field channel 1 No 0.0001 8.0 Ha Rs.16.20
-----
- ------
-----
- ------ 2 Ha Rs.5.00 6 Ha
Rs.11.2
0
District Irrigation Plan, South West Garo Hills district
58 | P a g e
23
3
Betasin
g Rangsagre MoWR HKKP Unlined field channel 1 No 0.0001 6.3 Ha Rs.17.55
-----
- ------
-----
- ------ 2 Ha Rs.5.00 4 Ha
Rs.12.5
5
23
4
Betasin
g Anchengge MoWR HKKP Unlined field channel 1 No 0.0001 7.7 Ha Rs.16.47
-----
- ------
-----
- ------ 2 Ha Rs.5.00 5 Ha
Rs.11.4
7
23
5
Betasin
g Matchokpara MoWR HKKP Unlined field channel 1 No 0.0002 6.8 Ha Rs.16.20
-----
- ------
2
Ha Rs.5.00 5 Ha
Rs.11.2
0 ------ ------
23
6
Betasin
g Akinpara MoWR HKKP Unlined field channel 1 No 0.0001 9.5 Ha Rs.13.50
-----
- ------
3
Ha Rs.4.00 7 Ha Rs.9.50 ------ ------
23
7
Betasin
g Jaluagre MoWR HKKP Unlined field channel 1 No 0.0001 6.9 Ha Rs.13.77
-----
- ------
2
Ha Rs.4.00 5 Ha Rs.9.77 ------ ------
23
8
Betasin
g Tallangre MoWR HKKP Unlined field channel 1 No 0.0002 7.7 Ha Rs.14.85
-----
- ------
2
Ha Rs.4.00 5 Ha
Rs.10.8
5 ------ ------
23
9
Betasin
g Manggagre MoWR HKKP Unlined field channel 1 No 0.0001 8.0 Ha Rs.15.12
-----
- ------
2
Ha Rs.5.00 6 Ha
Rs.10.1
2 ------ ------
24
0
Betasin
g Bisindagre MoWR HKKP Unlined field channel 1 No 0.0001 7.0 Ha Rs.14.04
-----
- ------
-----
- ------ 2 Ha Rs.4.00 5 Ha
Rs.10.0
4
24
1
Betasin
g Hajonpara MoWR HKKP Unlined field channel 1 No 0.0001 8.0 Ha Rs.13.77
-----
- ------
-----
- ------ 2 Ha Rs.4.00 6 Ha Rs.9.77
24
2
Betasin
g Gondugre MoWR HKKP Unlined field channel 1 No 0.0001 6.9 Ha Rs.13.50
-----
- ------
-----
- ------ 2 Ha Rs.4.00 5 Ha Rs.9.50
24
3
Betasin
g Chigitchakgre MoWR HKKP Unlined field channel 1 No 0.0002 8.5 Ha Rs.13.50
-----
- ------
-----
- ------ 3 Ha Rs.4.00 6 Ha Rs.9.50
24
4
Betasin
g Dolbari MoWR HKKP Unlined field channel 1 No 0.0001 9.5 Ha Rs.13.77
-----
- ------
-----
- ------ 3 Ha Rs.4.00 7 Ha Rs.9.77
24
5
Betasin
g Melim MoWR HKKP Unlined field channel 1 No 0.0001 7.0 Ha Rs.13.77
-----
- ------
-----
- ------ 2 Ha Rs.4.00 5 Ha Rs.9.77
24
6
Betasin
g Goragre MoWR HKKP Unlined field channel 1 No 0.0001 8.9 Ha Rs.13.50
-----
- ------
-----
- ------ 3 Ha Rs.4.00 6 Ha Rs.9.50
24
7
Betasin
g
Rongchadengg
re MoWR HKKP Unlined field channel 1 No 0.0001 9.3 Ha Rs.15.12
-----
- ------
3
Ha Rs.5.00 7 Ha
Rs.10.1
2 ------ ------
24
8
Betasin
g Rangsakona MoWR HKKP Unlined field channel 1 No 0.0001 9.2 Ha Rs.14.85
-----
- ------
3
Ha Rs.4.00 6 Ha
Rs.10.8
5 ------ ------
24
9
Betasin
g Rongsanggre MoWR HKKP Unlined field channel 1 No 0.0002 10.2 Ha Rs.14.85
-----
- ------
3
Ha Rs.4.00 7 Ha
Rs.10.8
5 ------ ------
25
0
Betasin
g Rongramgre MoWR HKKP Unlined field channel 1 No 0.0001 11.2 Ha Rs.15.12
-----
- ------
3
Ha Rs.5.00 8 Ha
Rs.10.1
2 ------ ------
25
1
Betasin
g Chidekgre MoWR HKKP Unlined field channel 1 No 0.0001 9.6 Ha Rs.14.85
-----
- ------
3
Ha Rs.4.00 7 Ha
Rs.10.8
5 ------ ------
25
2
Betasin
g Doreng Jasi MoWR HKKP Unlined field channel 1 No 0.0002 9.4 Ha Rs.14.85
-----
- ------
3
Ha Rs.4.00 7 Ha
Rs.10.8
5 ------ ------
25
3
Betasin
g Lutubari MoWR HKKP Unlined field channel 1 No 0.0001 10.6 Ha Rs.13.50
-----
- ------
3
Ha Rs.4.00 7 Ha Rs.9.50 ------ ------
25 Betasin rangatary MoWR HKKP Unlined field channel 1 No 0.0001 9.4 Ha Rs.13.50 ----- ------ 3 Rs.4.00 7 Ha Rs.9.50 ------ ------
District Irrigation Plan, South West Garo Hills district
59 | P a g e
4 g - Ha
25
5
Betasin
g galmara MoWR HKKP Unlined field channel 1 No 0.0001 12.3 Ha Rs.15.66
-----
- ------
4
Ha Rs.5.00 9 Ha
Rs.10.6
6 ------ ------
25
6
Betasin
g Mukdangra MoWR HKKP Unlined field channel 1 No 0.0002 9.8 Ha Rs.14.85
-----
- ------
3
Ha Rs.4.00 7 Ha
Rs.10.8
5 ------ ------
25
7
Betasin
g Se.el MoWR HKKP Unlined field channel 1 No 0.0001 10.5 Ha Rs.16.20
-----
- ------
3
Ha Rs.5.00 7 Ha
Rs.11.2
0 ------ ------
25
8
Betasin
g Skagre MoWR HKKP Unlined field channel 1 No 0.0001 11.2 Ha Rs.15.66
-----
- ------
3
Ha Rs.5.00 8 Ha
Rs.10.6
6 ------ ------
25
9
Betasin
g Rangsakona MoWR HKKP Unlined field channel 1 No 0.0001 9.8 Ha Rs.14.85
-----
- ------
3
Ha Rs.4.00 7 Ha
Rs.10.8
5 ------ ------
26
0
Betasin
g Garodoba MoWR HKKP Unlined field channel 1 No 0.0002 8.9 Ha Rs.15.66
-----
- ------
3
Ha Rs.5.00 6 Ha
Rs.10.6
6 ------ ------
26
1
Betasin
g Malchapara MoWR HKKP Unlined field channel 1 No 0.0001 9.3 Ha Rs.15.39
-----
- ------
3
Ha Rs.5.00 7 Ha
Rs.10.3
9 ------ ------
26
2
Betasin
g Chiringpara MoWR HKKP Unlined field channel 1 No 0.0001 7.2 Ha Rs.16.20
-----
- ------
2
Ha Rs.5.00 5 Ha
Rs.11.2
0 ------ ------
26
3
Betasin
g
Chondon
Nokat MoWR HKKP Unlined field channel 1 No 0.0002 8.6 Ha Rs.15.66
-----
- ------
3
Ha Rs.5.00 6 Ha
Rs.10.6
6 ------ ------
26
4
Betasin
g Nagrakhet MoWR HKKP Unlined field channel 1 No 0.0001 7.6 Ha Rs.16.20
-----
- ------
2
Ha Rs.5.00 5 Ha
Rs.11.2
0 ------ ------
26
5
Betasin
g Ampatigre MoWR HKKP Unlined field channel 1 No 0.0001 8.8 Ha Rs.23.76
-----
- ------
3
Ha Rs.7.00 6 Ha
Rs.16.7
6 ------ ------
26
6
Betasin
g Nirghini MoWR HKKP Unlined field channel 1 No 0.0002 12.2 Ha Rs.14.04
-----
- ------
4
Ha Rs.4.00 9 Ha
Rs.10.0
4 ------ ------
26
7
Betasin
g Moulcheng MoWR HKKP Micro irrigation 1 No 0.0001 9.00 Ha Rs.28.60
-----
- ------
11
Ha
Rs.28.6
0 ------ ------ ------ ------
26
8
Betasin
g Chamaguri' MoWR HKKP Micro irrigation 1 No 0.0002 7.00 Ha Rs.28.60
-----
- ------
11
Ha
Rs.28.6
0 ------ ------ ------ ------
26
9
Betasin
g Bolslagre MoWR HKKP Micro irrigation 1 No 0.0003 6.00 Ha Rs.31.46
-----
- ------
12
Ha
Rs.31.4
6 ------ ------ ------ ------
27
0
Betasin
g Berupra MoWR HKKP Micro irrigation 1 No 0.0001 7.00 Ha Rs.29.12
-----
- ------
11
Ha
Rs.29.1
2 ------ ------ ------ ------
27
1
Betasin
g benabazar MoWR HKKP Micro irrigation 1 No 0.0001 8.00 Ha Rs.26.52
-----
- ------
10
Ha
Rs.26.5
2 ------ ------ ------ ------
27
2
Betasin
g Dipkaipara MoWR HKKP Micro irrigation 1 No 0.0002 5.00 Ha Rs.27.30
-----
- ------
11
Ha
Rs.27.3
0 ------ ------ ------ ------
27
3
Betasin
g Dapguri MoWR HKKP Micro irrigation 1 No 0.0001 4.00 Ha Rs.27.56
-----
- ------
11
Ha
Rs.27.5
6 ------ ------ ------ ------
27
4
Betasin
g Chengjhora MoWR HKKP Micro irrigation 1 No 0.0001 7.00 Ha Rs.29.90
-----
- ------
12
Ha
Rs.29.9
0 ------ ------ ------ ------
27
5
Betasin
g Nogapara MoWR HKKP Micro irrigation 1 No 0.0001 6.00 Ha Rs.31.98
-----
- ------
12
Ha
Rs.31.9
8 ------ ------ ------ ------
District Irrigation Plan, South West Garo Hills district
60 | P a g e
27
6
Betasin
g Chokonggre MoWR HKKP Micro irrigation 1 No 0.0001 5.00 Ha Rs.24.70
-----
- ------
10
Ha
Rs.24.7
0 ------ ------ ------ ------
27
7
Betasin
g Gonglangre MoWR HKKP Micro irrigation 1 No 0.0001 7.00 Ha Rs.25.48
-----
- ------
10
Ha
Rs.25.4
8 ------ ------ ------ ------
27
8
Betasin
g Modupara MoWR HKKP Micro irrigation 1 No 0.0001 6.00 Ha Rs.28.34
-----
- ------
11
Ha
Rs.28.3
4 ------ ------ ------ ------
27
9
Betasin
g Garobdha MoWR HKKP Micro irrigation 1 No 0.0001 5.00 Ha Rs.27.04
-----
- ------
10
Ha
Rs.27.0
4 ------ ------ ------ ------
28
0
Betasin
g Sangkaregre MoWR HKKP Micro irrigation 1 No 0.0002 4.00 Ha Rs.26.78
-----
- ------
10
Ha
Rs.26.7
8 ------ ------ ------ ------
28
1
Betasin
g Nunmati MoWR HKKP Micro irrigation 1 No 0.0002 3.00 Ha Rs.28.60
-----
- ------
11
Ha
Rs.28.6
0 ------ ------ ------ ------
28
2
Betasin
g Koritola MoWR HKKP Micro irrigation 1 No 0.0001 7.00 Ha Rs.29.12
-----
- ------
11
Ha
Rs.29.1
2 ------ ------ ------ ------
28
3
Betasin
g Rongrekgre MoWR HKKP Micro irrigation 1 No 0.0002 6.00 Ha Rs.26.33
-----
- ------
10
Ha
Rs.26.3
3 ------ ------ ------ ------
28
4
Betasin
g Baghmara MoWR HKKP Micro irrigation 1 No 0.0001 5.00 Ha Rs.26.14
-----
- ------
10
Ha
Rs.26.1
4 ------ ------ ------ ------
28
5
Betasin
g Kanchikona MoWR HKKP Micro irrigation 1 No 0.0001 7.00 Ha Rs.29.12
-----
- ------
11
Ha
Rs.29.1
2 ------ ------ ------ ------
28
6
Betasin
g Sisimokgre MoWR HKKP Micro irrigation 1 No 0.0002 6.00 Ha Rs.31.46
-----
- ------
12
Ha
Rs.31.4
6 ------ ------ ------ ------
28
7
Betasin
g Dopatchigre MoWR HKKP Micro irrigation 1 No 0.0001 5.00 Ha Rs.26.78
-----
- ------
10
Ha
Rs.26.7
8 ------ ------ ------ ------
28
8
Betasin
g Andherkona MoWR HKKP Micro irrigation 1 No 0.0001 4.00 Ha Rs.30.16
-----
- ------
12
Ha
Rs.30.1
6 ------ ------ ------ ------
28
9
Betasin
g Harigon MoWR HKKP Micro irrigation 1 No 0.0002 7.00 Ha Rs.25.48
-----
- ------
10
Ha
Rs.25.4
8 ------ ------ ------ ------
29
0
Betasin
g Nokatgre MoWR HKKP Micro irrigation 1 No 0.0001 6.00 Ha Rs.23.14
-----
- ------
9
Ha
Rs.23.1
4 ------ ------ ------ ------
29
1
Betasin
g Mukdangra MoWR HKKP Micro irrigation 1 No 0.0001 4.00 Ha Rs.20.80
-----
- ------
8
Ha
Rs.20.8
0 ------ ------ ------ ------
29
2
Betasin
g Dengasi MoWR HKKP Micro irrigation 1 No 0.0001 6.00 Ha Rs.23.40
-----
- ------
9
Ha
Rs.23.4
0 ------ ------ ------ ------
29
3
Betasin
g Apalgre MoWR HKKP Micro irrigation 1 No 0.0001 7.00 Ha Rs.22.36
-----
- ------
9
Ha
Rs.22.3
6 ------ ------ ------ ------
29
4
Betasin
g Asimgre MoWR HKKP Micro irrigation 1 No 0.0001 6.00 Ha Rs.32.50
-----
- ------
13
Ha
Rs.32.5
0 ------ ------ ------ ------
29
5
Betasin
g Bansali MoWR HKKP Micro irrigation 1 No 0.0001 5.00 Ha Rs.22.88
-----
- ------
9
Ha
Rs.22.8
8 ------ ------ ------ ------
29
6
Betasin
g
Chondon
Nokat MoWR HKKP Micro irrigation 1 No 0.0002 4.00 Ha Rs.29.12
-----
- ------
11
Ha
Rs.29.1
2 ------ ------ ------ ------
29 Betasin Borkona MoWR HKKP Micro irrigation 1 No 0.0002 5.00 Ha Rs.25.22 ----- ------ 10 Rs.25.2 ------ ------ ------ ------
District Irrigation Plan, South West Garo Hills district
61 | P a g e
7 g - Ha 2
29
8
Betasin
g Joyfar MoWR HKKP Micro irrigation 1 No 0.0001 6.00 Ha Rs.33.80
-----
- ------
13
Ha
Rs.33.8
0 ------ ------ ------ ------
29
9
Betasin
g Kasra MoWR HKKP Micro irrigation 1 No 0.0002 4.00 Ha Rs.22.88
-----
- ------
9
Ha
Rs.22.8
8 ------ ------ ------ ------
30
0
Betasin
g Kasra Hajong MoWR HKKP Micro irrigation 1 No 0.0001 5.00 Ha Rs.22.88
-----
- ------
9
Ha
Rs.22.8
8 ------ ------ ------ ------
30
1
Betasin
g Belbari MoWR HKKP Micro irrigation 1 No 0.0002 6.00 Ha Rs.24.70
-----
- ------
-----
- ------ 10 Ha
Rs.24.7
0 ------ ------
30
2
Betasin
g Badagre MoWR HKKP Micro irrigation 1 No 0.0001 5.00 Ha Rs.17.94
-----
- ------
-----
- ------ 7 Ha
Rs.17.9
4 ------ ------
30
3
Betasin
g Brojopara MoWR HKKP Micro irrigation 1 No 0.0001 4.00 Ha Rs.28.60
-----
- ------
-----
- ------ 11 Ha
Rs.28.6
0 ------ ------
30
4
Betasin
g Hajonggre MoWR HKKP Micro irrigation 1 No 0.0002 5.00 Ha Rs.20.80
-----
- ------
-----
- ------ 8 Ha
Rs.20.8
0 ------ ------
30
5
Betasin
g Monabari MoWR HKKP Micro irrigation 1 No 0.0001 4.00 Ha Rs.18.20
-----
- ------
-----
- ------ 7 Ha
Rs.18.2
0 ------ ------
30
6
Betasin
g Talbari MoWR HKKP Micro irrigation 1 No 0.0001 7.00 Ha Rs.20.80
-----
- ------
-----
- ------ 8 Ha
Rs.20.8
0 ------ ------
30
7
Betasin
g Galmara MoWR HKKP Micro irrigation 1 No 0.0001 6.00 Ha Rs.28.86
-----
- ------
-----
- ------ 11 Ha
Rs.28.8
6 ------ ------
30
8
Betasin
g Rongramgre MoWR HKKP Micro irrigation 1 No 0.0001 5.00 Ha Rs.22.10
-----
- ------
-----
- ------ 9 Ha
Rs.22.1
0 ------ ------
30
9
Betasin
g Rangapani MoWR HKKP Micro irrigation 1 No 0.0001 4.50 Ha Rs.24.70
-----
- ------
-----
- ------ 10 Ha
Rs.24.7
0 ------ ------
31
0
Betasin
g Ishaguri MoWR HKKP Micro irrigation 1 No 0.0002 5.00 Ha Rs.30.16
-----
- ------
-----
- ------ 12 Ha
Rs.30.1
6 ------ ------
31
1
Betasin
g Takunbari MoWR HKKP Micro irrigation 1 No 0.0001 6.00 Ha Rs.20.80
-----
- ------
-----
- ------ 8 Ha
Rs.20.8
0 ------ ------
31
2
Betasin
g Teporpara MoWR HKKP Micro irrigation 1 No 0.0001 5.00 Ha Rs.29.38
-----
- ------
-----
- ------ 11 Ha
Rs.29.3
8 ------ ------
31
3
Betasin
g
Upper
Teporpara MoWR HKKP Micro irrigation 1 No 0.0002 5.50 Ha Rs.18.20
-----
- ------
-----
- ------ 7 Ha
Rs.18.2
0 ------ ------
31
4
Betasin
g Jongdikgre MoWR HKKP Micro irrigation 1 No 0.0001 6.00 Ha Rs.21.06
-----
- ------
-----
- ------ 8 Ha
Rs.21.0
6 ------ ------
31
5
Betasin
g Tangabari MoWR HKKP Micro irrigation 1 No 0.0001 4.00 Ha Rs.24.18
-----
- ------
-----
- ------ 9 Ha
Rs.24.1
8 ------ ------
31
6
Betasin
g Masal MoWR HKKP Micro irrigation 1 No 0.0001 6.00 Ha Rs.22.88
-----
- ------
-----
- ------ 9 Ha
Rs.22.8
8 ------ ------
31
7
Betasin
g Gandipara MoWR HKKP Micro irrigation 1 No 0.0002 8.00 Ha Rs.20.80
-----
- ------
-----
- ------ 8 Ha
Rs.20.8
0 ------ ------
31
8
Betasin
g Boiragipara MoWR HKKP Micro irrigation 1 No 0.0001 5.00 Ha Rs.29.90
-----
- ------
-----
- ------ 12 Ha
Rs.29.9
0 ------ ------
District Irrigation Plan, South West Garo Hills district
62 | P a g e
31
9
Betasin
g Ambari MoWR HKKP Micro irrigation 1 No 0.0001 4.00 Ha Rs.20.02
-----
- ------
-----
- ------ 8 Ha
Rs.20.0
2 ------ ------
32
0
Betasin
g
Gandipara
Hajong MoWR HKKP Micro irrigation 1 No 0.0001 6.00 Ha Rs.17.68
-----
- ------
-----
- ------ 7 Ha
Rs.17.6
8 ------ ------
32
1
Betasin
g Putimari MoWR HKKP Micro irrigation 1 No 0.0001 7.00 Ha Rs.24.70
-----
- ------
-----
- ------ 10 Ha
Rs.24.7
0 ------ ------
32
2
Betasin
g Tiksali MoWR HKKP Micro irrigation 1 No 0.0001 5.00 Ha Rs.28.86
-----
- ------
-----
- ------ 11 Ha
Rs.28.8
6 ------ ------
32
3
Betasin
g
Gandipara
Garo MoWR HKKP Micro irrigation 1 No 0.0002 4.00 Ha Rs.20.02
-----
- ------
-----
- ------ 8 Ha
Rs.20.0
2 ------ ------
32
4
Betasin
g Rangatari MoWR HKKP Micro irrigation 1 No 0.0001 4.00 Ha Rs.20.80
-----
- ------
-----
- ------ 8 Ha
Rs.20.8
0 ------ ------
32
5
Betasin
g Balapara MoWR HKKP Micro irrigation 1 No 0.0001 3.00 Ha Rs.18.20
-----
- ------
-----
- ------ 7 Ha
Rs.18.2
0 ------ ------
32
6
Betasin
g Garodoba MoWR HKKP Micro irrigation 1 No 0.0002 5.00 Ha Rs.20.80
-----
- ------
-----
- ------ 8 Ha
Rs.20.8
0 ------ ------
32
7
Betasin
g Baishpara MoWR HKKP Micro irrigation 1 No 0.0001 6.00 Ha Rs.22.62
-----
- ------
-----
- ------ 9 Ha
Rs.22.6
2 ------ ------
32
8
Betasin
g Dunnigaon MoWR HKKP Micro irrigation 1 No 0.0001 4.00 Ha Rs.22.10
-----
- ------
-----
- ------ 9 Ha
Rs.22.1
0 ------ ------
32
9
Betasin
g Golagre MoWR HKKP Micro irrigation 1 No 0.0001 7.00 Ha Rs.24.70
-----
- ------
-----
- ------ 10 Ha
Rs.24.7
0 ------ ------
33
0
Betasin
g Grenggandi MoWR HKKP Micro irrigation 1 No 0.0002 5.00 Ha Rs.18.20
-----
- ------
-----
- ------ 7 Ha
Rs.18.2
0 ------ ------
33
1
Betasin
g Ransakona MoWR HKKP Micro irrigation 1 No 0.0001 4.00 Ha Rs.20.80
-----
- ------
-----
- ------ 8 Ha
Rs.20.8
0 ------ ------
33
2
Betasin
g Rangsagre MoWR HKKP Micro irrigation 1 No 0.0001 3.00 Ha Rs.16.38
-----
- ------
-----
- ------ 6 Ha
Rs.16.3
8 ------ ------
33
3
Betasin
g Anchengge MoWR HKKP Micro irrigation 1 No 0.0001 6.00 Ha Rs.20.02
-----
- ------
-----
- ------ 8 Ha
Rs.20.0
2 ------ ------
33
4
Betasin
g Matchokpara MoWR HKKP Micro irrigation 1 No 0.0002 5.00 Ha Rs.17.68
-----
- ------
-----
- ------ ------ ------ 7 Ha
Rs.17.6
8
33
5
Betasin
g Akinpara MoWR HKKP Micro irrigation 1 No 0.0001 4.00 Ha Rs.24.70
-----
- ------
-----
- ------ ------ ------ 10 Ha
Rs.24.7
0
33
6
Betasin
g Jaluagre MoWR HKKP Micro irrigation 1 No 0.0001 7.00 Ha Rs.17.94
-----
- ------
-----
- ------ ------ ------ 7 Ha
Rs.17.9
4
33
7
Betasin
g Tallangre MoWR HKKP Micro irrigation 1 No 0.0002 6.00 Ha Rs.20.02
-----
- ------
-----
- ------ ------ ------ 8 Ha
Rs.20.0
2
33
8
Betasin
g Manggagre MoWR HKKP Micro irrigation 1 No 0.0001 5.00 Ha Rs.20.80
-----
- ------
-----
- ------ ------ ------ 8 Ha
Rs.20.8
0
33
9
Betasin
g Bisindagre MoWR HKKP Micro irrigation 1 No 0.0001 4.00 Ha Rs.18.20
-----
- ------
-----
- ------ ------ ------ 7 Ha
Rs.18.2
0
34 Betasin Hajonpara MoWR HKKP Micro irrigation 1 No 0.0001 3.00 Ha Rs.20.80 ----- ------ ----- ------ ------ ------ 8 Ha Rs.20.8
District Irrigation Plan, South West Garo Hills district
63 | P a g e
0 g - - 0
34
1
Betasin
g Gondugre MoWR HKKP Micro irrigation 1 No 0.0001 6.00 Ha Rs.17.94
-----
- ------
-----
- ------ ------ ------ 7 Ha
Rs.17.9
4
34
2
Betasin
g Chigitchakgre MoWR HKKP Micro irrigation 1 No 0.0002 7.00 Ha Rs.22.10
-----
- ------
-----
- ------ ------ ------ 9 Ha
Rs.22.1
0
34
3
Betasin
g Dolbari MoWR HKKP Micro irrigation 1 No 0.0001 5.00 Ha Rs.24.70
-----
- ------
-----
- ------ ------ ------ 10 Ha
Rs.24.7
0
34
4
Betasin
g Melim MoWR HKKP Micro irrigation 1 No 0.0001 4.00 Ha Rs.18.20
-----
- ------
-----
- ------ ------ ------ 7 Ha
Rs.18.2
0
34
5
Betasin
g Goragre MoWR HKKP Micro irrigation 1 No 0.0001 7.00 Ha Rs.23.14
-----
- ------
-----
- ------ ------ ------ 9 Ha
Rs.23.1
4
34
6
Betasin
g
Rongchadengg
re MoWR HKKP Micro irrigation 1 No 0.0001 4.00 Ha Rs.22.87
-----
- ------
-----
- ------ ------ ------ 9 Ha
Rs.22.8
7
34
7
Betasin
g Rangsakona MoWR HKKP Micro irrigation 1 No 0.0001 5.00 Ha Rs.22.58
-----
- ------
-----
- ------ ------ ------ 9 Ha
Rs.22.5
8
34
8
Betasin
g Rongsanggre MoWR HKKP Micro irrigation 1 No 0.0002 4.00 Ha Rs.25.00
-----
- ------
-----
- ------ ------ ------ 10 Ha
Rs.25.0
0
34
9
Betasin
g Rongramgre MoWR HKKP Micro irrigation 1 No 0.0001 6.00 Ha Rs.27.43
-----
- ------
-----
- ------ ------ ------ 11 Ha
Rs.27.4
3
35
0
Betasin
g Chidekgre MoWR HKKP Micro irrigation 1 No 0.0001 5.00 Ha Rs.23.51
-----
- ------
-----
- ------ ------ ------ 10 Ha
Rs.23.5
1
35
1
Betasin
g Doreng Jasi MoWR HKKP Micro irrigation 1 No 0.0002 3.00 Ha Rs.22.90
-----
- ------
-----
- ------ ------ ------ 9 Ha
Rs.22.9
0
35
2
Betasin
g Lutubari MoWR HKKP Micro irrigation 1 No 0.0001 4.00 Ha Rs.25.96
-----
- ------
-----
- ------ ------ ------ 11 Ha
Rs.25.9
6
35
3
Betasin
g Rangatary MoWR HKKP Micro irrigation 1 No 0.0001 5.00 Ha Rs.22.90
-----
- ------
-----
- ------ ------ ------ 9 Ha
Rs.22.9
0
35
4
Betasin
g Galmara MoWR HKKP Micro irrigation 1 No 0.0001 6.00 Ha Rs.30.20
-----
- ------
-----
- ------ ------ ------ 12 Ha
Rs.30.2
0
35
5
Betasin
g Mukdangra MoWR HKKP Micro irrigation 1 No 0.0002 4.00 Ha Rs.23.93
-----
- ------
-----
- ------ ------ ------ 10 Ha
Rs.23.9
3
35
6
Betasin
g Se.el MoWR HKKP Micro irrigation 1 No 0.0001 7.00 Ha Rs.25.74
-----
- ------
-----
- ------ ------ ------ 11 Ha
Rs.25.7
4
35
7
Betasin
g Skagre MoWR HKKP Micro irrigation 1 No 0.0001 4.00 Ha Rs.27.43
-----
- ------
-----
- ------ ------ ------ 11 Ha
Rs.27.4
3
35
8
Betasin
g Rangsakona MoWR HKKP Micro irrigation 1 No 0.0001 3.00 Ha Rs.24.00
-----
- ------
-----
- ------ ------ ------ 10 Ha
Rs.24.0
0
35
9
Betasin
g Garodoba MoWR HKKP Micro irrigation 1 No 0.0002 7.00 Ha Rs.21.80
-----
- ------
-----
- ------ ------ ------ 9 Ha
Rs.21.8
0
36
0
Betasin
g Malchapara MoWR HKKP Micro irrigation 1 No 0.0001 6.00 Ha Rs.22.78
-----
- ------
-----
- ------ ------ ------ 9 Ha
Rs.22.7
8
36
1
Betasin
g Chiringpara MoWR HKKP Micro irrigation 1 No 0.0001 4.00 Ha Rs.17.63
-----
- ------
-----
- ------ ------ ------ 7 Ha
Rs.17.6
3
District Irrigation Plan, South West Garo Hills district
64 | P a g e
36
2
Betasin
g
Chondon
Nokat MoWR HKKP Micro irrigation 1 No 0.0002 4.00 Ha Rs.21.06
-----
- ------
-----
- ------ ------ ------ 9 Ha
Rs.21.0
6
36
3
Betasin
g Nagrakhet MoWR HKKP Micro irrigation 1 No 0.0001 3.00 Ha Rs.18.49
-----
- ------
-----
- ------ ------ ------ 8 Ha
Rs.18.4
9
36
4
Betasin
g Ampatigre MoWR HKKP Micro irrigation 1 No 0.0001 5.00 Ha Rs.21.55
-----
- ------
-----
- ------ ------ ------ 9 Ha
Rs.21.5
5
36
5
Betasin
g Nirghini MoWR HKKP Micro irrigation 1 No 0.0002 7.00 Ha Rs.29.88
-----
- ------
-----
- ------ ------ ------ 12 Ha
Rs.29.8
8
36
6
Betasin
g Darugre
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 1 No 0.0040 80 Ha
Rs.724.5
0
-----
- ------
-----
- ------ ------
Rs.217.
4 80 Ha Rs.507
36
7
Betasin
g Jongchetpara
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 1 No 0.0048 85 Ha Rs.1575
-----
- ------
-----
-
Rs.472.
5 85 Ha
Rs.110
3 ------ ------
36
8
Betasin
g Bandalkona
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 1 No 0.0052 50 Ha
Rs.945.0
0
-----
- ------
-----
- ------ ------
Rs.283.
5 50 Ha Rs.662
36
9
Betasin
g Kolkatola
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 1 No 0.0051 70 Ha
Rs.976.5
0
-----
- ------
-----
- ------ ------
Rs.293.
0 70 Ha Rs.684
37
0
Betasin
g Latri
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 1 No 0.0056 90 Ha
Rs.630.0
0
-----
- ------
-----
-
Rs.189.
0 90 Ha Rs.441 ------ ------
37
1
Betasin
g Muri Kati
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 1 No 0.0053 80 Ha
Rs.976.5
0
-----
- ------
-----
-
Rs.293.
0 80 Ha Rs.684 ------ ------
37
2
Betasin
g Baladinggre
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 1 No 0.0053 65 Ha
Rs.630.0
0
-----
- ------
-----
- ------
Rs.18
9 65 Ha
Rs.44
1 ------
37
3
Betasin
g Chgitchakgre
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 1 No 0.0050 75 Ha
Rs.834.7
5
-----
- ------
-----
-
Rs.250.
4 75 Ha Rs.584 ------ ------
37
4
Betasin
g Mukdangra
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 5 No 0.0062 60 Ha Rs.2520
-----
- ------
-----
-
Rs.756.
0 60 Ha
Rs.176
4 ------ ------
37
5
Betasin
g Teporpara
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 1 No 0.0058 50 Ha
Rs.976.5
0
-----
- ------
-----
-
Rs.293.
0 50 Ha Rs.684 ------ ------
37
6
Betasin
g Rongkhon
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 1 No 0.0062 75 Ha
Rs.819.0
0
-----
- ------
-----
- ------ ------
Rs.245.
7 75 Ha Rs.573
37
7
Betasin
g Okapara
MoA & FW
DAC -& PDMC
Secondry storage
structure 1 No 0.0058 60 Ha Rs.1103
-----
- ------
-----
- ------ ------
Rs.330.
8 60 Ha Rs.772
District Irrigation Plan, South West Garo Hills district
65 | P a g e
FW
37
8
Betasin
g Dolbari
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 1 No 0.0057 75 Ha Rs.1166
-----
- ------
-----
- ------ ------
Rs.349.
7 75 Ha Rs.816
37
9
Betasin
g Jebongpara
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 1 No 0.0052 50 Ha
Rs.540.0
0
-----
- ------
-----
-
Rs.162.
0 50 Ha Rs.378 ------ ------
38
0
Betasin
g Rangsagre
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 1 No 0.0001 8 Ha Rs.19.50
8
Ha Rs.19
-----
- ------ ------ ------ ------ ------
38
1
Betasin
g Rongramgre
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 1 No 0.0001 9 Ha Rs.13.76
9
Ha Rs.14
-----
- ------ ------ ------ ------ ------
38
2
Betasin
g
Jebongpara
Songma
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 1 No 0.0001 7 Ha Rs.30.51
7
Ha Rs.31
-----
- ------ ------ ------ ------ ------
38
3
Betasin
g Rangsakona
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 1 No 0.0001 5 Ha Rs.30.51
5
Ha Rs.31
-----
- ------ ------ ------ ------ ------
38
4
Betasin
g Rongsanggre
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 1 No 0.0002 8 Ha Rs.30.51
8
Ha Rs.31
-----
- ------ ------ ------ ------ ------
38
5
Betasin
g Adugre
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 3 No 0.0001 7 Ha Rs.91.53
-----
- ------
7
Ha
Rs.91.5
3 ------ ------ ------ ------
38
6
Betasin
g Mukdangra
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 1 No 0.0001 8 Ha Rs.29.70
-----
- ------
8
Ha
Rs.29.7
0 ------ ------ ------ ------
38
7
Betasin
g Okapara
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 1 No 0.0001 9 Ha Rs.35.10
-----
- ------
9
Ha
Rs.35.1
0 ------ ------ ------ ------
38
8
Betasin
g Rangatari
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 1 No 0.0001 5 Ha Rs.32.40
-----
- ------
5
Ha
Rs.32.4
0 ------ ------ ------ ------
38
9
Betasin
g Monabari
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 1 No 0.0001 4 Ha Rs.29.70
-----
- ------
4
Ha
Rs.29.7
0 ------ ------ ------ ------
39
0
Betasin
g Kasra
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 1 No 0.0001 9 Ha Rs.37.80
-----
- ------
9
Ha
Rs.37.8
0 ------ ------ ------ ------
39
1
Betasin
g Chondonpara
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 1 No 0.0001 7 Ha Rs.35.10
-----
- ------
7
Ha
Rs.35.1
0 ------ ------ ------ ------
District Irrigation Plan, South West Garo Hills district
66 | P a g e
39
2
Betasin
g Salbari
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 1 No 0.0001 9 Ha Rs.32.40
9
Ha Rs.32
-----
- ------ ------ ------ ------ ------
39
3
Betasin
g Garobadha
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 1 No 0.0001 7 Ha Rs.35.10
-----
- ------
7
Ha
Rs.35.1
0 ------ ------ ------ ------
39
4
Betasin
g Tangabari
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 1 No 0.0002 8 Ha Rs.27.00
-----
- ------
8
Ha
Rs.27.0
0 ------ ------ ------ ------
39
5
Betasin
g Mujai Agal
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 1 No 0.0002 8 Ha Rs.29.70
8
Ha Rs.30
-----
- ------ ------ ------ ------ ------
39
6
Betasin
g
Monabari
Songma
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 1 No 0.0001 9 Ha Rs.37.80
9
Ha Rs.38
-----
- ------ ------ ------ ------ ------
39
7
Betasin
g Balonggre
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 1 No 0.0002 6 Ha Rs.35.10
6
Ha Rs.35
-----
- ------ ------ ------ ------ ------
39
8
Betasin
g Rongsanggre
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 1 No 0.0054 9 Ha Rs.37.80
9
Ha Rs.38
-----
- ------ ------ ------ ------ ------
39
9
Betasin
g Nagarsket
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 1 No 0.0054 8 Ha Rs.44.10
8
Ha Rs.44
-----
- ------ ------ ------ ------ ------
40
0
Betasin
g Gingbang
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 1 No 0.0054 7 Ha Rs.40.95
7
Ha Rs.41
-----
- ------ ------ ------ ------ ------
40
1
Betasin
g
Jebongpara
Nokat
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 1 No 0.0054 6 Ha Rs.36.23
6
Ha Rs.36
-----
- ------ ------ ------ ------ ------
40
2
Betasin
g Malchapara
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 5 No 0.0054 45 Ha
Rs.177.9
8
-----
- ------
45
Ha
Rs.91.5
3 ------ ------ ------ ------
40
3
Betasin
g Chringpara
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 1 No 0.0054 9 Ha Rs.34.65
-----
- ------
9
Ha Rs.34.7 ------ ------ ------ ------
40
4
Betasin
g Jongdikgre
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 1 No 0.0054 8 Ha Rs.40.95
-----
- ------
8
Ha Rs.41.0 ------ ------ ------ ------
40
5
Betasin
g Masalgre
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 1 No 0.0054 7 Ha Rs.37.80
-----
- ------
7
Ha Rs.37.8 ------ ------ ------ ------
40 Betasin Jamanggre MoA & FW PDMC Secondry storage 1 No 0.0054 6 Ha Rs.31.50 ----- ------ 6 Rs.31.5 ------ ------ ------ ------
District Irrigation Plan, South West Garo Hills district
67 | P a g e
6 g DAC -&
FW
structure - Ha
40
7
Betasin
g Dorambok
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 3 No 0.0054 8 Ha
Rs.105.8
4
-----
- ------
8
Ha
Rs.105.
8 ------ ------ ------ ------
40
8
Betasin
g Sisimokgre
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 4 No 0.0054 7 Ha
Rs.142.3
8
-----
- ------
-----
- ------ ------ ------ 7 Ha Rs.142
40
9
Betasin
g Dolbari
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 3 No 0.0054 5 Ha
Rs.106.7
9
-----
- ------
-----
- ------ ------ ------ 5 Ha Rs.107
41
0
Betasin
g Harigaon
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 2 No 0.0054 7 Ha Rs.71.19
-----
- ------
-----
- ------ ------ ------ 7 Ha Rs.71
41
1
Betasin
g Gengendhi
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 4 No 0.0054 6 Ha
Rs.142.3
8
-----
- ------
-----
- ------ ------ ------ 6 Ha Rs.142
41
2
Betasin
g Matchalang
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 1 No 0.0054 5 Ha Rs.40.95
-----
- ------
-----
- ------ ------ ------ 5 Ha Rs.41
41
3
Betasin
g Masudi
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 2 No 0.0054 8 Ha Rs.71.19
-----
- ------
-----
- ------ ------ ------ 8 Ha Rs.71
41
4
Betasin
g Anteka
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 1 No 0.0054 6 Ha Rs.31.50
-----
- ------
-----
- ------ 10 Ha Rs.31.5 ------ ------
41
5
Betasin
g Godalgre
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 1 No 0.0054 8 Ha Rs.35.60
-----
- ------
-----
- ------ 11 Ha Rs.35.6 ------ ------
41
6
Betasin
g Bashbari
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 4 No 0.0054 7 Ha
Rs.142.3
8
-----
- ------
-----
- ------ 45 Ha
Rs.142.
4 ------ ------
41
7
Betasin
g Watregre
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 4 No 0.0054 16 Ha
Rs.142.3
8
-----
- ------
-----
- ------ 45 Ha
Rs.142.
4 ------ ------
41
8
Betasin
g Dengnakpara
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 3 No 0.0054 22 Ha
Rs.106.7
9
-----
- ------
-----
- ------ 34 Ha
Rs.106.
8 ------ ------
41
9
Betasin
g Golagre
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 3 No 0.0054 20 Ha
Rs.106.7
9
-----
- ------
-----
- ------ 34 Ha
Rs.106.
8 ------ ------
42
0
Betasin
g Abegre
MoA & FW
DAC -& PDMC
Secondry storage
structure 1 No 0.0054 12 Ha Rs.37.80
-----
- ------
12
Ha Rs.37.8 ------ ------ ------ ------
District Irrigation Plan, South West Garo Hills district
68 | P a g e
FW
42
1
Betasin
g Dak
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 2 No 0.0054 20 Ha Rs.71.19
-----
- ------
20
Ha Rs.71.2 ------ ------ ------ ------
42
2
Betasin
g Andherkona
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 3 No 0.0054 15 Ha
Rs.106.7
9
-----
- ------
15
Ha
Rs.106.
8 ------ ------ ------ ------
42
3
Betasin
g Baghmara
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 4 No 0.0054 35 Ha
Rs.142.3
8
-----
- ------
14
Ha
Rs.142.
4 21 Ha
Rs.142.
4 ------ ------
42
4
Betasin
g Betasing
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 10 No 0.0054 40 Ha
Rs.391.5
5
-----
- ------
-----
- ------ 40 Ha
Rs.391.
6 ------ ------
42
5
Betasin
g Thalanggre
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 3 No 0.0054 25 Ha
Rs.106.7
9
-----
- ------
25
Ha
Rs.106.
8 ------ ------ ------ ------
42
6
Betasin
g Chiringpara
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 5 No 0.0054 40 Ha
Rs.177.9
8
-----
- ------
16
Ha
Rs.178.
0 24 Ha
Rs.178.
0 ------ ------
42
7
Betasin
g Chondonpara
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 4 No 0.0054 36 Ha
Rs.142.3
8
-----
- ------
36
Ha
Rs.142.
4 ------ ------ ------ ------
42
8
Betasin
g
Chondon
Nokat
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 4 No 0.0054 30 Ha
Rs.142.3
8
-----
- ------
-----
- ------ 45 Ha
Rs.142.
4 ------ ------
42
9
Betasin
g Joyfar
MoA & FW
DAC -&
FW
PDMC Secondry storage
structure 3 No 0.0054 20 Ha
Rs.106.7
9
-----
- ------
-----
- ------ ------ ------ 20 Ha Rs.107
43
0
Betasin
g Damalgre
DoLR -
MoRD
Convergenc
e Land Development 1 No ------ 20 Ha Rs.1500
-----
- ------
-----
- ------ 10 Ha Rs.750 10 Ha Rs.750
43
1
Betasin
g Kokilla
DoLR -
MoRD
Convergenc
e Land Development 1 No ------ 15 Ha
Rs.131.2
5
-----
- ------
15
Ha Rs.131 ------ ------ ------ ------
43
2
Betasin
g
Daru
Anangpara
DoLR -
MoRD
Convergenc
e Land Development 1 No ------ 10 Ha
Rs.375.0
0
-----
- ------
5
Ha Rs.188 5 Ha Rs.187 ------ ------
43
3
Betasin
g Bainapara
DoLR -
MoRD
Convergenc
e Land Development 1 No ------ 9 Ha Rs.56.25
-----
- ------
-----
- ------ 9 Ha Rs.56.3 ------ ------
43
4
Betasin
g Bando Raja
DoLR -
MoRD
Convergenc
e Land Development 1 No ------ 15 Ha
Rs.225.0
0
-----
- ------
-----
- ------ ------ ------ 15 Ha Rs.225
43
5
Betasin
g Bolchugre
DoLR -
MoRD
Convergenc
e Land Development 1 No ------ 10 Ha Rs.37.50
-----
- ------
-----
- ------ ------ ------ 10 Ha Rs.38
43
6
Betasin
g Domdoma
DoLR -
MoRD
Convergenc
e Land Development 1 No ------ 5 Ha Rs.22.50
-----
- ------
-----
- ------ 5 Ha Rs.22.5 ------ ------
43 Betasin Dalbotpara DoLR - Convergenc Land Development 1 No ------ 6 Ha Rs.11.25 ----- ------ ----- ------ 6 Ha Rs.11.3 ------ ------
District Irrigation Plan, South West Garo Hills district
69 | P a g e
7 g MoRD e - -
43
8
Betasin
g Balladingre
DoLR -
MoRD
Convergenc
e Land Development 1 No ------ 7 Ha Rs.20.25
-----
- ------
-----
- ------ ------ ------ 7 Ha Rs.20
43
9
Betasin
g Chiringpara
DoLR -
MoRD
Convergenc
e Land Development 1 No ------ 9 Ha Rs.36.75
-----
- ------
-----
- ------ ------ ------ 9 Ha Rs.37
44
0
Betasin
g Sonamitte
DoLR -
MoRD
Convergenc
e Land Development 1 No ------ 7 Ha Rs.35.25
-----
- ------
-----
- ------ ------ ------ 7 Ha Rs.35
44
1
Betasin
g Bokmagre
DoLR -
MoRD
Convergenc
e Land Development 1 No ------ 8 Ha Rs.43.50
-----
- ------
-----
- ------ ------ ------ 8 Ha Rs.44
44
2
Betasin
g Anteka
DoLR -
MoRD
Convergenc
e Land Development 1 No ------ 5 Ha Rs.36.00
-----
- ------
-----
- ------ 5 Ha Rs.36.0 ------ ------
44
3
Betasin
g Samati
DoLR -
MoRD
Convergenc
e Land Development 1 No ------ 3 Ha Rs.26.25
-----
- ------
-----
- ------ 3 Ha Rs.26.3 ------ ------
44
4
Betasin
g Sawbhanga
DoLR -
MoRD
Convergenc
e Land Development 1 No ------ 4 Ha Rs.27.75
-----
- ------
4
Ha Rs.28 ------ ------ ------ ------
44
5
Betasin
g Tkonchi
DoLR -
MoRD
Convergenc
e Land Development 1 No ------ 7 Ha Rs.50.25
-----
- ------
-----
- ------ 7 Ha Rs.50.3 ------ ------
44
6
Betasin
g Chidipa
DoLR -
MoRD
Convergenc
e Land Development 1 No ------ 6 Ha Rs.31.50
-----
- ------
6
Ha Rs.32 ------ ------ ------ ------
44
7
Betasin
g Anchenggre
DoLR -
MoRD
Convergenc
e Land Development 1 No ------ 8 Ha Rs.42.75
-----
- ------
8
Ha Rs.43 ------ ------ ------ ------
44
8
Betasin
g Kentrikona
DoLR -
MoRD
Convergenc
e Land Development 1 No ------ 7 Ha Rs.84.00
-----
- ------
7
Ha Rs.84 ------ ------ ------ ------
44
9
Betasin
g Tangabari
DoLR -
MoRD
Convergenc
e Land Development 1 No ------ 5 Ha Rs.90.00
-----
- ------
-----
- ------ 60 Ha Rs.90.0 ------ ------
45
0
Betasin
g Makbil Chring
DoLR -
MoRD
Convergenc
e Land Development 1 No ------ 6 Ha Rs.29.25
-----
- ------
6
Ha Rs.29 ------ ------ ------ ------
45
1
Betasin
g A.palgre
DoLR -
MoRD
Convergenc
e Land Development 1 No ------ 7 Ha Rs.67.50
-----
- ------
7
Ha Rs.68 ------ ------ ------ ------
45
2
Betasin
g Dak
DoLR -
MoRD
Convergenc
e Land Development 1 No ------ 8 Ha Rs.75.00
-----
- ------
-----
- ------ 8 Ha Rs.75.0 ------ ------
45
3
Betasin
g Jewilgre
DoLR -
MoRD
Convergenc
e Land Development 1 No ------ 7 Ha Rs.33.75
-----
- ------
7
Ha Rs.34 ------ ------ ------ ------
45
4
Betasin
g Skagre
DoLR -
MoRD
Convergenc
e Land Development 1 No ------ 5 Ha Rs.44.25
-----
- ------
-----
- ------ 5 Ha Rs.44.3 ------ ------
45
5
Betasin
g Jongdikgre
DoLR -
MoRD
Convergenc
e Land Development 1 No ------ 7 Ha Rs.45.75
-----
- ------
-----
- ------ 7 Ha Rs.45.8 ------ ------
45
6
Betasin
g Betasing
DoLR -
MoRD
Convergenc
e Land Development 1 No ------ 6 Ha Rs.86.25
-----
- ------
-----
- ------ 6 Ha Rs.86.3 ------ ------
45
7
Betasin
g Chisimokgre
DoLR -
MoRD
Convergenc
e Land Development 1 No ------ 9 Ha
Rs.112.5
0
-----
- ------
-----
- ------ 9 Ha
Rs.112.
5 ------ ------
45
8
Betasin
g Josipara
DoLR -
MoRD
Convergenc
e Land Development 1 No ------ 6 Ha Rs.26.25
-----
- ------
-----
- ------ 6 Ha Rs.26.3 ------ ------
District Irrigation Plan, South West Garo Hills district
70 | P a g e
45
9
Betasin
g Garobadha
DoLR -
MoRD
Convergenc
e Land Development 1 No ------ 9 Ha
Rs.225.0
0
-----
- ------
5
Ha
Rs.112.
5
-104
Ha
Rs.112.
5 ------ ------
46
0
Betasin
g Kalaichar
DoLR -
MoRD
Convergenc
e Land Development 1 No ------ 8 Ha
Rs.112.5
0
-----
- ------
4
Ha Rs.56.3
-48
Ha Rs.56.3 ------ ------
46
1
Betasin
g Chisegre
DoLR -
MoRD
Convergenc
e Land Development 1 No ------ 7 Ha Rs.51.75
-----
- ------
-7
Ha Rs.52 ------ ------ ------ ------
46
2
Betasin
g Bagidela
DoLR -
MoRD
Convergenc
e Land Development 1 No ------ 9 Ha Rs.56.25
-----
- ------
-----
- ------ 9 Ha Rs.56.3 ------ ------
46
3
Betasin
g Darugre
DoLR -
MoRD
Convergenc
e Land Development 1 No ------ 6 Ha Rs.68.25
-----
- ------
-----
- ------ 6 Ha Rs.68.3 ------ ------
46
4
Betasin
g Nagraskhet
DoLR -
MoRD
Convergenc
e Land Development 1 No ------ 6 Ha Rs.82.50
-----
- ------
6
Ha Rs.83 ------ ------ ------ ------
46
5
Betasin
g Naragre
DoLR -
MoRD
Convergenc
e
Renovation of &
maintaince of irrigation
canals & drains
1 No ------ 30 Ha Rs.48.00 8
Ha
Rs.12.
0
8
Ha Rs.9.60 8 Ha Rs.7.7 6 Ha Rs.6.14
46
6
Betasin
g Baghama
DoLR -
MoRD
Convergenc
e
Renovation of &
maintaince of irrigation
canals & drains
1 No ------ 50 Ha Rs.132.0
0
13
Ha
Rs.33.
0
13
Ha
Rs.26.4
0 13 Ha Rs.21.1 11 Ha
Rs.16.9
0
46
7
Betasin
g Goragre
DoLR -
MoRD
Convergenc
e
Renovation of &
maintaince of irrigation
canals & drains
1 No ------ 45 Ha Rs.48.00 11
Ha
Rs.12.
0
11
Ha Rs.9.60 11 Ha Rs.7.7 12 Ha Rs.6.14
46
8
Betasin
g Matchallang
DoLR -
MoRD
Convergenc
e
Renovation of &
maintaince of irrigation
canals & drains
1 No ------ 30 Ha Rs.24.00 8
Ha Rs.6.0
8
Ha Rs.4.80 8 Ha Rs.3.8 6 Ha Rs.3.07
46
9
Betasin
g Masudi
DoLR -
MoRD
Convergenc
e
Renovation of &
maintaince of irrigation
canals & drains
1 No ------ 25 Ha Rs.26.00 6
Ha Rs.6.5
6
Ha Rs.5.20 6 Ha Rs.4.2 7 Ha Rs.3.33
47
0
Betasin
g Rongsong
DoLR -
MoRD
Convergenc
e
Renovation of &
maintaince of irrigation
canals & drains
1 No ------ 30 Ha Rs.24.00 8
Ha Rs.6.0
8
Ha Rs.4.80 8 Ha Rs.3.8 6 Ha Rs.3.07
47
1
Betasin
g Badupara
DoLR -
MoRD
Convergenc
e
Renovation of &
maintaince of irrigation
canals & drains
1 No ------ 25 Ha Rs.44.00 6
Ha
Rs.11.
0
6
Ha Rs.8.80 6 Ha Rs.7.0 7 Ha Rs.5.63
47
2
Betasin
g Chondonpara
DoLR -
MoRD
Convergenc
e
Renovation of &
maintaince of irrigation
canals & drains
1 No ------ 30 Ha Rs.18.00 8
Ha Rs.4.5
8
Ha Rs.3.60 8 Ha Rs.2.9 6 Ha Rs.2.30
47
3
Betasin
g Mokpara
DoLR -
MoRD
Convergenc
e
Renovation of &
maintaince of irrigation
canals & drains
1 No ------ 35 Ha Rs.16.00 9
Ha Rs.4.0
9
Ha Rs.3.20 9 Ha Rs.2.6 8 Ha Rs.2.05
47
4
Betasin
g Marakapara
DoLR -
MoRD
Convergenc
e
Renovation of &
maintaince of irrigation
canals & drains
1 No ------ 70 Ha Rs.128.0
0
18
Ha
Rs.32.
0
18
Ha
Rs.25.6
0 18 Ha Rs.20.5 16 Ha
Rs.16.3
8
47 Betasin Dolbari DoLR - Convergenc Renovation of & 1 No ------ 45 Ha Rs.120.0 11 Rs.30. 11 Rs.24.0 11 Ha Rs.19.2 12 Ha Rs.15.3
District Irrigation Plan, South West Garo Hills district
71 | P a g e
5 g MoRD e maintaince of irrigation
canals & drains
0 Ha 0 Ha 0 6
47
6
Betasin
g Sangkaregre
DoLR -
MoRD
Convergenc
e
Renovation of &
maintaince of irrigation
canals & drains
1 No ------ 35 Ha Rs.48.00 9
Ha
Rs.12.
0
9
Ha Rs.9.60 9 Ha Rs.7.7 8 Ha Rs.6.14
47
7
Betasin
g Andherkona
DoLR -
MoRD
Convergenc
e
Renovation of &
maintaince of irrigation
canals & drains
1 No ------ 40 Ha Rs.124.0
0
10
Ha
Rs.31.
0
10
Ha
Rs.24.8
0 10 Ha Rs.19.8 10 Ha
Rs.15.8
7
47
8
Betasin
g Bashbari
DoLR -
MoRD
Convergenc
e
Renovation of &
maintaince of irrigation
canals & drains
1 No ------ 45 Ha Rs.140.0
0
11
Ha
Rs.35.
0
11
Ha
Rs.28.0
0 11 Ha Rs.22.4 12 Ha
Rs.17.9
2
47
9
Betasin
g Muji A.galgre
DoLR -
MoRD
Convergenc
e
Renovation of &
maintaince of irrigation
canals & drains
1 No ------ 70 Ha Rs.80.00 18
Ha
Rs.20.
0
18
Ha
Rs.16.0
0 18 Ha Rs.12.8 16 Ha
Rs.10.2
4
48
0
Betasin
g Gopijhora
DoLR -
MoRD
Convergenc
e
Renovation of &
maintaince of irrigation
canals & drains
1 No ------ 50 Ha Rs.72.00 13
Ha
Rs.18.
0
13
Ha
Rs.14.4
0 13 Ha Rs.11.5 11 Ha Rs.9.22
48
1
Betasin
g Kokilla
DoLR -
MoRD
Convergenc
e
Renovation of &
maintaince of irrigation
canals & drains
1 No ------ 50 Ha Rs.68.00 13
Ha
Rs.17.
0
13
Ha
Rs.13.6
0 13 Ha Rs.10.9 11 Ha Rs.8.70
48
2
Betasin
g Grenggandhi
DoLR -
MoRD
Convergenc
e
Renovation of &
maintaince of irrigation
canals & drains
1 No ------ 45 Ha Rs.56.00 11
Ha
Rs.14.
0
11
Ha
Rs.11.2
0 11 Ha Rs.9.0 12 Ha Rs.7.17
48
3
Betasin
g Dengnakpara
DoLR -
MoRD
Convergenc
e
Renovation of &
maintaince of irrigation
canals & drains
1 No ------ 45 Ha Rs.200.0
0
11
Ha
Rs.50.
0
11
Ha
Rs.40.0
0 11 Ha Rs.32.0 12 Ha
Rs.25.6
0
48
4
Betasin
g Chelipara
State
Irrigation
Department
HKKP Surface Minor Irrigation 1 No 0.0002 16 Ha Rs.26.50 -----
- Rs.15
16
Ha
Rs.11.5
0 ------ ------ ------ ------
48
5
Betasin
g Chondonpara
State
Irrigation
Department
HKKP Surface Minor Irrigation 1 No 0.0004 18 Ha Rs.40.00 -----
- Rs.25
18
Ha
Rs.15.0
0 ------ ------ ------ ------
48
6
Betasin
g Mokpara
State
Irrigation
Department
HKKP Surface Minor Irrigation 1 No 0.0004 17 Ha Rs.39.00 -----
- Rs.20
17
Ha
Rs.19.0
0 ------ ------ ------ ------
48
7
Betasin
g Bollonggre
State
Irrigation
Department
HKKP Surface Minor Irrigation 1 No 0.0003 13 Ha Rs.22.00 -----
- Rs.17
13
Ha Rs.5.00 ------ ------ ------ ------
48
8
Betasin
g
Ronsang
Abagre
State
Irrigation
Department
HKKP Surface Minor Irrigation 1 No 0.0005 17 Ha Rs.42.00 -----
- Rs.20
17
Ha
Rs.22.0
0 ------ ------ ------ ------
48
9
Betasin
g Dailaga
State
Irrigation HKKP Surface Minor Irrigation 1 No 0.0003 16 Ha Rs.39.84
-----
- Rs.16
16
Ha
Rs.23.8
4 ------ ------ ------ ------
District Irrigation Plan, South West Garo Hills district
72 | P a g e
Department
49
0
Betasin
g Dalbotpara
State
Irrigation
Department
HKKP Surface Minor Irrigation 1 No 0.0003 15 Ha Rs.38.10 -----
- ------
-----
-
Rs.25.0
0 15 Ha Rs.13.1 ------ ------
49
1
Betasin
g Arengre
State
Irrigation
Department
HKKP Surface Minor Irrigation 1 No 0.0003 25 Ha Rs.62.25 -----
- Rs.25
25
Ha
Rs.37.2
5 ------ ------ ------ ------
49
2
Betasin
g Bakwe
State
Irrigation
Department
HKKP Surface Minor Irrigation 1 No 0.0003 17 Ha Rs.42.33 -----
- ------
-----
-
Rs.17.0
0 17 Ha Rs.25.3 ------ ------
49
3
Betasin
g Ampatigre
State
Irrigation
Department
HKKP Surface Minor Irrigation 1 No 0.0002 15 Ha Rs.37.35 -----
- ------
-----
- ------ ------ Rs.15.0 15 Ha
Rs.22.3
5
49
4
Betasin
g
Chengkompar
a
State
Irrigation
Department
HKKP Surface Minor Irrigation 1 No 0.0002 13 Ha Rs.32.37 -----
- ------
-----
- ------ ------ Rs.13.0 13 Ha
Rs.19.3
7
49
5
Betasin
g Rangatari
State
Irrigation
Department
HKKP Surface Minor Irrigation 1 No 0.0002 17 Ha Rs.42.33 -----
- ------
-----
- ------ ------ Rs.17.0 17 Ha
Rs.25.3
3
49
6
Betasin
g Chringpara
State
Irrigation
Department
HKKP Surface Minor Irrigation 1 No 0.0003 17 Ha Rs.42.33 -----
- ------
-----
-
Rs.17.0
0 17 Ha Rs.25.3 ------ ------
49
7
Betasin
g Malchapara
State
Irrigation
Department
HKKP Surface Minor Irrigation 1 No 0.0003 16 Ha Rs.39.84 -----
- Rs.16
16
Ha
Rs.23.8
4 ------ ------ ------ ------
49
8
Betasin
g Jongdikgre
State
Irrigation
Department
HKKP Surface Minor Irrigation 1 No 0.0003 16 Ha Rs.39.84 -----
- ------
-----
-
Rs.16.0
0 16 Ha Rs.23.8 ------ ------
49
9
Betasin
g Muji Agalgre
State
Irrigation
Department
HKKP
Improvement &
moderization of existing
schemes
1 No 0.0014 173 Ha Rs.91.00 -----
-
Rs.30.
3
173
Ha
Rs.60.6
7 ------ ------ ------ ------
50
0
Betasin
g Thalang
State
Irrigation
Department
HKKP
Improvement &
moderization of existing
schemes
1 No 0.0009 80 Ha Rs.90.00 -----
- ------
-----
- Rs.36.0 80 Ha Rs.54 ------ ------
50
1
Betasin
g Grenggandhi
State
Irrigation
Department
HKKP
Improvement &
moderization of existing
schemes
1 No 0.0010 55 Ha Rs.56.00 -----
-
Rs.14.
0
55
Ha
Rs.42.0
0 ------ ------ ------ ------
50
2
Betasin
g Sangkaregre
State
Irrigation
Department
HKKP
Improvement &
moderization of existing
schemes
1 No 0.0008 45 Ha Rs.108.0
0
-----
- ------
-----
- Rs.43 45 Ha Rs.65 ------ ------
50
3
Betasin
g Chisegre
State
Irrigation
Department
HKKP
Improvement &
moderization of existing
schemes
1 No 0.0007 60 Ha Rs.70.20 -----
- ------
-----
- Rs.28 60 Ha Rs.42 ------ ------
District Irrigation Plan, South West Garo Hills district
73 | P a g e
50
4
Betasin
g Andherkona
State
Irrigation
Department
HKKP
Improvement &
moderization of existing
schemes
1 No 0.0014 200 Ha Rs.315.0
0
-----
- ------
-----
- Rs.126
200
Ha Rs.189 ------ ------
50
5
Betasin
g Jewilgre
State
Irrigation
Department
HKKP
Improvement &
moderization of existing
schemes
1 No 0.0004 60 Ha Rs.54.00 -----
- ------
-----
- Rs.22 60 Ha Rs.32 ------ ------
50
6
Betasin
g Kokilla
State
Irrigation
Department
HKKP
Improvement &
moderization of existing
schemes
1 No 0.0011 150 Ha Rs.283.5
0
-----
- ------
-----
- ------ 60 Ha Rs.113 90 Ha Rs.171
50
7
Betasin
g Goragre
State
Irrigation
Department
HKKP
Improvement &
moderization of existing
schemes
1 No 0.0008 97 Ha Rs.189.0
0
-----
- ------
-----
- ------ 39 Ha Rs.76 58 Ha Rs.113
50
8
Betasin
g Marakapara
State
Irrigation
Department
HKKP
Improvement &
moderization of existing
schemes
1 No 0.0011 100 Ha Rs.360.0
0
-----
- ------
-----
- Rs.144 40 Ha Rs.216 ------ ------
50
9
Betasin
g Bashbari
State
Irrigation
Department
HKKP
Improvement &
moderization of existing
schemes
1 No 0.0019 140 Ha Rs.165.0
0
-----
- ------
-----
- ------ 56 Ha Rs.66 84 Ha Rs.99
51
0
Betasin
g Dolbari
State
Irrigation
Department
HKKP
Improvement &
moderization of existing
schemes
1 No 0.0009 60 Ha Rs.162.0
0
-----
-
Rs.40.
5
180
Ha Rs.122 ------ ------ ------ ------
51
1
Betasin
g Chidekgre
State
Irrigation
Department
HKKP SMR 1 No 0.0019 80 Ha Rs.250 -----
-
Rs.12
5
280
Ha Rs.125 ------ ------ ------ ------
51
2
Betasin
g Doldigre
State
Irrigation
Department
HKKP SMR 1 No 0.0020 70 Ha Rs.220 -----
-
Rs.11
0
120
Ha Rs.110 ------ ------ ------ ------
51
3
Betasin
g Bolchugre
State
Irrigation
Department
HKKP SMR 1 No 0.0020 75 Ha Rs.797.5
0
-----
- ------
-----
- Rs.319 75 Ha Rs.479 ------ ------
51
4
Betasin
g Danak
State
Irrigation
Department
HKKP SMR 1 No 0.0030 60 Ha Rs.870.0
0
-----
- ------
-----
- Rs.348 60 Ha Rs.522 ------ ------
51
5
Betasin
g Bandalkona
State
Irrigation
Department
HKKP SMR 1 No 0.0011 80 Ha Rs.1058.
5
-----
- ------
-----
- Rs.212 80 Ha Rs.847 ------ ------
51
6
Betasin
g Dalbotpara
State
Irrigation
Department
HKKP SMR 1 No 0.0011 70 Ha Rs.1058.
5
-----
- ------
-----
- Rs.212 70 Ha Rs.847 ------ ------
51
7
Betasin
g Darugre
State
Irrigation
Department
HKKP SMR 1 No 0.0014 60 Ha Rs.1189.
0
-----
- ------
-----
- Rs.238 60 Ha Rs.951 ------ ------
51 Betasin Rangsang State HKKP SMR 1 No 0.0015 50 Ha Rs.1125. ----- ------ ----- Rs.225 50 Ha Rs.900 ------ ------
District Irrigation Plan, South West Garo Hills district
74 | P a g e
8 g Ajigre Irrigation
Department
2 - -
51
9
Betasin
g Arichengre
State
Irrigation
Department
HKKP SMR 1 No 0.0024 45 Ha Rs.1102 -----
- ------
-----
- Rs.441 45 Ha Rs.661 ------ ------
52
0
Betasin
g Asangre
State
Irrigation
Department
HKKP SMR 1 No 0.0024 60 Ha Rs.1253 -----
- ------
-----
- Rs.501 60 Ha Rs.752 ------ ------
52
1
Betasin
g Doldigre
State
Irrigation
Department
HKKP SMR 1 No 0.0018 75 Ha Rs.1264 -----
- ------
-----
- Rs.379 75 Ha Rs.885 ------ ------
52
2
Betasin
g Rongkon
State
Irrigation
Department
HKKP SMR 1 No 0.0029 60 Ha Rs.2030 -----
- ------
-----
- Rs.609 60 Ha
Rs.142
1 ------ ------
52
3
Betasin
g Malchpara
State
Irrigation
Department
HKKP SMR 1 No 0.0029 65 Ha Rs.805 -----
- ------
-----
- Rs.242 65 Ha Rs.563 ------ ------
52
4
Betasin
g Bolsal Dokgre
State
Irrigation
Department
HKKP SMR 1 No 0.0024 60 Ha Rs.725 -----
- ------
-----
- Rs.218 60 Ha Rs.507 ------ ------
52
5
Betasin
g Ajonggre
State
Irrigation
Department
HKKP SMR 1 No 0.0019 75 Ha Rs.750 -----
- ------
-----
- Rs.225 75 Ha Rs.525 ------ ------
52
6
Betasin
g
Gara
Bokmangre
State
Irrigation
Department
HKKP SMR 1 No 0.0016 70 Ha Rs.700 -----
- ------
-----
- Rs.210 70 Ha Rs.490 ------ ------
52
7
Betasin
g Kebolpara
State
Irrigation
Department
HKKP SMR 1 No 0.0017 80 Ha Rs.800 -----
- ------
-----
- Rs.240 80 Ha Rs.560 ------ ------
52
8
Betasin
g Grenggandhi
State
Irrigation
Department
HKKP SMR 1 No 0.0027 60 Ha Rs.725 -----
- ------
-----
- Rs.218 60 Ha Rs.507 ------ ------
52
9
Betasin
g Mawapara
State
Irrigation
Department
HKKP SMR 1 No 0.0018 75 Ha Rs.928 -----
- ------
-----
- Rs.278 75 Ha Rs.650 ------ ------
53
0
Betasin
g Mankingre
State
Irrigation
Department
HKKP SMR 1 No 0.0019 60 Ha Rs.754 -----
- ------
-----
- Rs.226 60 Ha Rs.528 ------ ------
53
1
Betasin
g Bando Raja
State
Irrigation
Department
HKKP SMR 1 No 0.0019 55 Ha Rs.1740 -----
- ------
-----
- Rs.522 55 Ha
Rs.121
8 ------ ------
53
2
Betasin
g
Rongsang
Songma
State
Irrigation HKKP SMR 1 No 0.0029 80 Ha Rs.725
-----
- ------
-----
- Rs.218 80 Ha Rs.507 ------ ------
District Irrigation Plan, South West Garo Hills district
75 | P a g e
Department
53
3
Betasin
g Bolchugre
State
Irrigation
Department
HKKP SMR 1 No 0.0023 75 Ha Rs.870 -----
- ------
-----
- Rs.261 75 Ha Rs.609 ------ ------
53
4
Betasin
g Jelbongpara
State
Irrigation
Department
HKKP SMR 1 No 0.0028 85 Ha Rs.450 -----
-
Rs.11
3
85
Ha Rs.338 ------ ------ ------ ------
53
5
Betasin
g Jongchetpara
State
Irrigation
Department
HKKP SMR 1 No 0.0020 90 Ha Rs.667 -----
- ------
-----
- Rs.200 90 Ha Rs.467 ------ ------
53
6
Betasin
g Bandalkona
State
Irrigation
Department
HKKP SMR 1 No 0.0019 80 Ha Rs.986 -----
- ------
-----
- Rs.296 80 Ha Rs.690 ------ ------
53
7
Betasin
g Jangnapara
State
Irrigation
Department
HKKP SMR 1 No 0.0019 60 Ha Rs.551 -----
- ------
-----
- Rs.165 60 Ha Rs.386 ------ ------
53
8
Betasin
g Darugre
State
Irrigation
Department
HKKP SMR 1 No 0.0020 70 Ha Rs.609 -----
- ------
-----
- Rs.183 70 Ha Rs.426 ------ ------
53
9
Betasin
g
Rongsang
Songma
State
Irrigation
Department
HKKP SMR 1 No 0.0018 65 Ha Rs.638 -----
- ------
-----
- Rs.191 65 Ha Rs.447 ------ ------
54
0
Betasin
g
Rongsang
A.jrigre
State
Irrigation
Department
HKKP SMR 1 No 0.0027 80 Ha Rs.682 -----
- ------
-----
- Rs.204 80 Ha Rs.478 ------ ------
54
1
Betasin
g Maltagre
State
Irrigation
Department
HKKP SMR 1 No 0.0024 85 Ha Rs.754 -----
- ------
-----
- ------ 34 Ha Rs.226 51 Ha Rs.528
54
2
Betasin
g Golmangre
State
Irrigation
Department
HKKP SMR 1 No 0.0027 75 Ha Rs.899 -----
- ------
-----
- ------ 30 Ha Rs.279 45 Ha Rs.620
54
3
Betasin
g Baladinggre
State
Irrigation
Department
HKKP SMR 1 No 0.0026 60 Ha Rs.945 -----
- ------
-----
- ------ 24 Ha Rs.303 36 Ha Rs.642
54
4
Betasin
g Goldagre
State
Irrigation
Department
HKKP SMR 1 No 0.0027 55 Ha Rs.911 -----
- ------
-----
- ------ 22 Ha Rs.300 33 Ha Rs.611
54
5
Betasin
g
Simsang
Bokmangre
State
Irrigation
Department
HKKP SMR 1 No 0.0024 75 Ha Rs.609 -----
- ------
-----
- ------ 30 Ha Rs.207 45 Ha Rs.402
54
6
Betasin
g Kebolpara
State
Irrigation
Department
HKKP SMR 1 No 0.0026 60 Ha Rs.609 -----
- ------
-----
- ------ 24 Ha Rs.213 36 Ha Rs.396
District Irrigation Plan, South West Garo Hills district
76 | P a g e
54
7
Betasin
g
Gara
Bokmangre
State
Irrigation
Department
HKKP SMR 1 No 0.0025 70 Ha Rs.626 -----
- ------
-----
- ------ 28 Ha Rs.226 42 Ha Rs.400
54
8
Betasin
g Bandoraja
State
Irrigation
Department
HKKP SMR 1 No 0.0031 60 Ha Rs.667 -----
- ------
-----
- ------ 24 Ha Rs.247 36 Ha Rs.420
54
9
Betasin
g Asanggre
State
Irrigation
Department
HKKP SMR 1 No 0.0022 50 Ha Rs.667 -----
- ------
-----
- ------ 20 Ha Rs.253 30 Ha Rs.414
55
0
Betasin
g A.jonggre
State
Irrigation
Department
HKKP SMR 1 No 0.0031 55 Ha Rs.870 -----
- ------
-----
- ------ 22 Ha Rs.339 33 Ha Rs.531
55
1
Betasin
g
Bolsal
Dobokgre
State
Irrigation
Department
HKKP SMR 1 No 0.0018 70 Ha Rs.899 -----
- ------
-----
- ------ 28 Ha Rs.360 42 Ha Rs.539
55
2
Betasin
g Malchapara
State
Irrigation
Department
HKKP SMR 1 No 0.0029 50 Ha Rs.894 -----
- ------
-----
- ------ 20 Ha Rs.367 30 Ha Rs.527
55
3
Betasin
g Arenggre
State
Irrigation
Department
HKKP SMR 1 No 0.0024 65 Ha Rs.910 -----
- ------
-----
- ------ 26 Ha Rs.382 39 Ha Rs.528
55
4
Betasin
g Masangpani
State
Irrigation
Department
HKKP SMR 1 No 0.0019 60 Ha Rs.650 -----
- ------
-----
- ------ 24 Ha Rs.280 36 Ha Rs.370
55
5
Betasin
g Gimbilgre
State
Irrigation
Department
HKKP SMR 1 No 0.0016 75 Ha Rs.546 -----
- ------
-----
- ------ 30 Ha Rs.240 45 Ha Rs.306
55
6
Betasin
g Sasatbolgre
State
Irrigation
Department
HKKP SMR 1 No 0.0017 80 Ha Rs.728 -----
- ------
-----
- Rs.218
280
Ha Rs.80 ------ ------
55
7
Betasin
g
Hatisil
Bollongre
State
Irrigation
Department
HKKP SMR 1 No 0.0027 60 Ha Rs.520 -----
- ------
-----
- Rs.156
200
Ha Rs.60 ------ ------
55
8
Betasin
g Boro Latri
State
Irrigation
Department
HKKP SMR 1 No 0.0018 85 Ha Rs.676 -----
- ------
-----
- Rs.203
260
Ha Rs.85 ------ ------
55
9
Betasin
g Murchani
State
Irrigation
Department
HKKP SMR 1 No 0.0019 55 Ha Rs.806 -----
- ------
-----
- Rs.242
310
Ha Rs.55 ------ ------
56
0
Betasin
g Bangkapara
State
Irrigation
Department
HKKP SMR 1 No 0.0019 60 Ha Rs.728 -----
- ------
-----
- ------ 24 Ha Rs.291 36 Ha Rs.437
56 Betasin Jolgaon State HKKP SMR 1 No 0.0029 55 Ha Rs.692 ----- ------ ----- ------ 22 Ha Rs.284 33 Ha Rs.408
District Irrigation Plan, South West Garo Hills district
77 | P a g e
1 g Irrigation
Department
- -
56
2
Betasin
g Taskunbari
State
Irrigation
Department
HKKP SMR 1 No 0.0023 70 Ha Rs.780 -----
- ------
-----
- ------ 28 Ha Rs.328 42 Ha Rs.452
56
3
Betasin
g Monabari
State
Irrigation
Department
HKKP SMR 1 No 0.0028 55 Ha Rs.806 -----
- ------
-----
- ------ 22 Ha Rs.347 33 Ha Rs.459
56
4
Betasin
g Perengpara
State
Irrigation
Department
HKKP SMR 1 No 0.0022 60 Ha Rs.754 -----
- ------
-----
- ------ 24 Ha Rs.332 36 Ha Rs.422
56
5
Betasin
g Bashbari
State
Irrigation
Department
HKKP Protection & Rejuvination
of springs 1 No
0.00000
4 5 Ha Rs.20.00
5
Ha Rs.5.0
-----
- ------ ------ ------ ------ ------
56
6
Betasin
g Chondonpara
State
Irrigation
Department
HKKP Protection & Rejuvination
of springs 1 No
0.00000
1 6 Ha Rs.17.50
6
Ha Rs.4.4
-----
- ------ ------ ------ ------ ------
56
7
Betasin
g
Chondonpara
Songgitcham
State
Irrigation
Department
HKKP Protection & Rejuvination
of springs 1 No
0.00000
2 4 Ha Rs.15.00
4
Ha Rs.3.8
-----
- ------ ------ ------ ------ ------
56
8
Betasin
g
Lotubari
Hajong
State
Irrigation
Department
HKKP Protection & Rejuvination
of springs 1 No
0.00000
1 5 Ha Rs.18.00
5
Ha Rs.4.5
-----
- ------ ------ ------ ------ ------
56
9
Betasin
g lotubari Koch
State
Irrigation
Department
HKKP Protection & Rejuvination
of springs 1 No
0.00000
1 4 Ha Rs.15.75
4
Ha Rs.3.9
-----
- ------ ------ ------ ------ ------
57
0
Betasin
g Monabari
State
Irrigation
Department
HKKP Protection & Rejuvination
of springs 1 No
0.00000
1 6 Ha Rs.13.00
6
Ha Rs.3.3
-----
- ------ ------ ------ ------ ------
57
1
Betasin
g Damalgre
State
Irrigation
Department
HKKP Protection & Rejuvination
of springs 1 No
0.00000
4 7 Ha Rs.27.75
7
Ha Rs.6.9
-----
- ------ ------ ------ ------ ------
57
2
Betasin
g Jewilgre
State
Irrigation
Department
HKKP Protection & Rejuvination
of springs 1 No
0.00000
2 5 Ha Rs.22.25
5
Ha Rs.5.6
-----
- ------ ------ ------ ------ ------
57
3
Betasin
g Masudi
State
Irrigation
Department
HKKP Protection & Rejuvination
of springs 1 No
0.00000
4 4 Ha Rs.19.00
4
Ha Rs.4.8
-----
- ------ ------ ------ ------ ------
57
4
Betasin
g Rongsong
State
Irrigation
Department
HKKP Protection & Rejuvination
of springs 1 No
0.00000
1 5 Ha Rs.15.75
-----
- ------
5
Ha
Rs.15.7
5 ------ ------ ------ ------
57
5
Betasin
g Belbari
State
Irrigation HKKP
Protection & Rejuvination
of springs 1 No
0.00000
1 3 Ha Rs.18.00
-----
- ------
3
Ha
Rs.18.0
0 ------ ------ ------ ------
District Irrigation Plan, South West Garo Hills district
78 | P a g e
Department
57
6
Betasin
g Rongramgre
State
Irrigation
Department
HKKP Protection & Rejuvination
of springs 1 No
0.00000
1 5 Ha Rs.20.50
-----
- ------
5
Ha
Rs.20.5
0 ------ ------ ------ ------
57
7
Betasin
g Dengnakpara
State
Irrigation
Department
HKKP Protection & Rejuvination
of springs 1 No
0.00000
1 6 Ha Rs.23.25
-----
- ------
6
Ha
Rs.23.2
5 ------ ------ ------ ------
57
8
Betasin
g Adugre
State
Irrigation
Department
HKKP Protection & Rejuvination
of springs 1 No
0.00000
3 5 Ha Rs.17.00
-----
- ------
-----
- ------ 5 Ha Rs.17 ------ ------
57
9
Betasin
g Godalgre
State
Irrigation
Department
HKKP Protection & Rejuvination
of springs 1 No
0.00000
2 4 Ha Rs.18.00
-----
- ------
-----
- ------ 4 Ha Rs.18 ------ ------
58
0
Betasin
g Nirgini
State
Irrigation
Department
HKKP Protection & Rejuvination
of springs 1 No
0.00000
1 5 Ha Rs.15.25
-----
- ------
-----
- ------ 5 Ha Rs.15 ------ ------
58
1
Betasin
g Skagre
State
Irrigation
Department
HKKP Protection & Rejuvination
of springs 1 No
0.00000
2 4 Ha Rs.17.25
4
Ha Rs.4.3
-----
- ------ ------ ------ ------ ------
58
2
Betasin
g Grenggandi
State
Irrigation
Department
HKKP Protection & Rejuvination
of springs 1 No
0.00000
2 3 Ha Rs.18.25
-----
- ------
-----
- ------ 7 Ha Rs.18 ------ ------
58
3
Betasin
g
Chondon
Nokat
State
Irrigation
Department
HKKP Protection & Rejuvination
of springs 1 No
0.00000
2 4 Ha Rs.15.50
-----
- ------
-----
- ------ 7 Ha ------ 6 Ha
Rs.15.5
0
58
4
Betasin
g Nagrasket
State
Irrigation
Department
HKKP Protection & Rejuvination
of springs 1 No
0.00000
1 5 Ha Rs.20.75
-----
- ------
-----
- ------ ------ ------ 8 Ha
Rs.20.7
5
58
5
Betasin
g Hatisil
State
Irrigation
Department
HKKP Protection & Rejuvination
of springs 1 No
0.00000
1 4 Ha Rs.23.13
-----
- ------
-----
- ------ ------ ------ 9 Ha
Rs.23.1
3
58
6
Betasin
g
Chengkompar
a
State
Irrigation
Department
HKKP Protection & Rejuvination
of springs 1 No
0.00000
1 3 Ha Rs.21.50
-----
- ------
-----
- ------ ------ ------ 9 Ha
Rs.21.5
0
58
7
Betasin
g
Adugre
Songma
State
Irrigation
Department
HKKP Protection & Rejuvination
of springs 1 No
0.00000
1 5 Ha Rs.18.88
-----
- ------
-----
- ------ ------ ------ 8 Ha
Rs.18.8
8
58
8
Betasin
g Belbari
Externally
aided
projects
(NEC)
HKKP
Water Harvesting,
rejuvination of streams &
recharging of water table
1 No 0.0013 70 Ha Rs.350 -----
-
Rs.17
5
28
Ha Rs.175 42 Ha ------ ------ ------
58
9
Betasin
g Chodon Nokat
Externally
aided HKKP
Water Harvesting,
rejuvination of streams & 1 No 0.0018 90 Ha
Rs.220.0
0
-----
-
Rs.11
0
36
Ha Rs.110 54 Ha ------ ------ ------
District Irrigation Plan, South West Garo Hills district
79 | P a g e
projects
(NEC)
recharging of water table
59
0
Betasin
g Chandragre
Externally
aided
projects
(NEC)
HKKP
Water Harvesting,
rejuvination of streams &
recharging of water table
1 No 0.0018 75 Ha Rs.200.0
0
-----
-
Rs.10
0
30
Ha Rs.100 45 Ha ------ ------ ------
59
1
Betasin
g Solbi
Externally
aided
projects
(NEC)
HKKP
Water Harvesting,
rejuvination of streams &
recharging of water table
1 No 0.0017 55 Ha Rs.500.0
0
-----
- ------
-----
- Rs.200 55 Ha Rs.300 ------ ------
59
2
Betasin
g
Simsang
Bokmangre
Externally
aided
projects
(NEC)
HKKP
Water Harvesting,
rejuvination of streams &
recharging of water table
1 No 0.0013 55 Ha Rs.800.0
0
-----
- ------
-----
- Rs.320 55 Ha Rs.480 ------ ------
59
3
Betasin
g
Manwapara
(wadagre)
Externally
aided
projects
(NEC)
HKKP
Water Harvesting,
rejuvination of streams &
recharging of water table
1 No 0.0015 90 Ha Rs.825.0
0
-----
- ------
-----
- Rs.330 90 Ha Rs.495 ------ ------
59
4
Betasin
g Asangre
Externally
aided
projects
(NEC)
HKKP
Water Harvesting,
rejuvination of streams &
recharging of water table
1 No 0.0014 65 Ha Rs.650.0
0
-----
- ------
-----
- Rs.260 65 Ha Rs.390 ------ ------
59
5
Betasin
g Arengre
Externally
aided
projects
(NEC)
HKKP
Water Harvesting,
rejuvination of streams &
recharging of water table
1 No 0.0010 70 Ha Rs.775.0
0
-----
- ------
-----
- Rs.310 70 Ha Rs.465 ------ ------
59
6
Betasin
g Baladingre
Externally
aided
projects
(NEC)
HKKP
Water Harvesting,
rejuvination of streams &
recharging of water table
1 No 0.0011 90 Ha Rs.805.0
0
-----
- ------
-----
- Rs.322 90 Ha Rs.483 ------ ------
59
7
Betasin
g
Damalgre
(Dolis)
Externally
aided
projects
(NEC)
HKKP
Water Harvesting,
rejuvination of streams &
recharging of water table
1 No 0.0014 70 Ha Rs.825.0
0
-----
- ------
-----
- Rs.330 70 Ha Rs.495 ------ ------
59
8
Betasin
g Skagre
Externally
aided
projects
(NEC)
HKKP
Water Harvesting,
rejuvination of streams &
recharging of water table
1 No 0.0017 60 Ha Rs.720.0
0
-----
- ------
-----
- Rs.288 60 Ha Rs.432 ------ ------
59
9
Betasin
g Gambegre
Externally
aided
projects
(NEC)
HKKP
Water Harvesting,
rejuvination of streams &
recharging of water table
1 No 0.0023 95 Ha Rs.690.0
0
-----
- ------
-----
- Rs.276 95 Ha Rs.414 ------ ------
60
0
Betasin
g
Jebongpara
(Daru)
Externally
aided HKKP
Water Harvesting,
rejuvination of streams & 1 No 0.0014 80 Ha
Rs.742.5
0
-----
- ------
-----
- Rs.297 80 Ha Rs.446 ------ ------
District Irrigation Plan, South West Garo Hills district
80 | P a g e
projects
(NEC)
recharging of water table
60
1
Betasin
g Bolchugre
Externally
aided
projects
(NEC)
HKKP
Water Harvesting,
rejuvination of streams &
recharging of water table
1 No 0.0020 70 Ha Rs.775.0
0
-----
- ------
-----
- Rs.310 70 Ha Rs.465 ------ ------
60
2
Betasin
g Jongchetpara
Externally
aided
projects
(NEC)
HKKP
Water Harvesting,
rejuvination of streams &
recharging of water table
1 No 0.0014 90 Ha Rs.777.5
0
-----
- ------
-----
- Rs.311 90 Ha Rs.467 ------ ------
60
3
Betasin
g Watregre
Externally
aided
projects
(NEC)
HKKP
Water Harvesting,
rejuvination of streams &
recharging of water table
1 No 0.0014 65 Ha Rs.700.0
0
-----
- ------
-----
- ------ ------ Rs.280 65 Ha Rs.420
60
4
Betasin
g Jelbongpara
Externally
aided
projects
(NEC)
HKKP
Water Harvesting,
rejuvination of streams &
recharging of water table
1 No 0.0020 75 Ha Rs.775.0
0
-----
- ------
-----
- ------ ------ Rs.310 75 Ha Rs.465
60
5
Betasin
g Goldatgre
Externally
aided
projects
(NEC)
HKKP
Water Harvesting,
rejuvination of streams &
recharging of water table
1 No 0.0014 65 Ha Rs.650.0
0
-----
- ------
-----
- ------ ------ Rs.260 65 Ha Rs.390
60
6
Betasin
g
Ampati
Songma
Externally
aided
projects
(NEC)
HKKP
Water Harvesting,
rejuvination of streams &
recharging of water table
1 No 0.0013 80 Ha Rs.700.0
0
-----
- ------
-----
- ------ ------ Rs.280 80 Ha Rs.420
60
7
Betasin
g Chipra
Externally
aided
projects
(NEC)
HKKP
Water Harvesting,
rejuvination of streams &
recharging of water table
1 No 0.0012 75 Ha Rs.750.0
0
-----
- ------
-----
- ------ ------ Rs.300 75 Ha Rs.450
60
8
Betasin
g Chigitchakre
Externally
aided
projects
(NEC)
HKKP
Water Harvesting,
rejuvination of streams &
recharging of water table
1 No 0.0011 60 Ha Rs.700.0
0
-----
- ------
-----
- ------ ------ Rs.280 60 Ha Rs.420
60
9
Betasin
g A.galgre
Externally
aided
projects
(NEC)
HKKP
Water Harvesting,
rejuvination of streams &
recharging of water table
1 No 0.0011 70 Ha Rs.725.0
0
-----
- ------
-----
- ------ ------ Rs.290 70 Ha Rs.435
61
0
Betasin
g
Ampati
Bazaar
Externally
aided
projects
(NEC)
HKKP
Water Harvesting,
rejuvination of streams &
recharging of water table
1 No 0.0013 75 Ha Rs.775.0
0
-----
- ------
-----
- ------ ------ Rs.310 75 Ha Rs.465
61
1
Betasin
g Kasi Bill
Externally
aided HKKP
Water Harvesting,
rejuvination of streams & 1 No 0.0013 65 Ha
Rs.715.0
0
-----
- ------
-----
- ------ ------ Rs.286 65 Ha Rs.429
District Irrigation Plan, South West Garo Hills district
81 | P a g e
projects
(NEC)
recharging of water table
61
2
Betasin
g Bollonggitok
Externally
aided
projects
(NEC)
HKKP
Water Harvesting,
rejuvination of streams &
recharging of water table
1 No 0.0017 70 Ha Rs.625.0
0
-----
- ------
-----
- ------ ------ Rs.250 70 Ha Rs.375
61
3
Betasin
g Damdiloka
Externally
aided
projects
(NEC)
HKKP
Water Harvesting,
rejuvination of streams &
recharging of water table
1 No 0.0018 55 Ha Rs.675.0
0
-----
- ------
-----
- Rs.270 55 Ha Rs.405 ------ ------
61
4
Betasin
g Skagre
Externally
aided
projects
(NEC)
HKKP
Water Harvesting,
rejuvination of streams &
recharging of water table
1 No 0.0013 75 Ha Rs.740.0
0
-----
- ------
-----
- Rs.296 75 Ha Rs.444 ------ ------
61
5
Betasin
g Jaranggre
Externally
aided
projects
(NEC)
HKKP
Water Harvesting,
rejuvination of streams &
recharging of water table
1 No 0.0013 60 Ha Rs.775.0
0
-----
- ------
-----
- Rs.310 60 Ha Rs.465 ------ ------
61
6
Betasin
g Porasinga
Externally
aided
projects
(NEC)
HKKP
Water Harvesting,
rejuvination of streams &
recharging of water table
1 No 0.0014 70 Ha Rs.725.0
0
-----
- ------
-----
- Rs.290 70 Ha Rs.435 ------ ------
61
7
Betasin
g Bashbari
Other loan
projects like
NABARD
HKKP Renovation 1 No 0.0026 120 Ha Rs.762.0
0
-----
-
Rs.38
1
120
Ha Rs.381 ------ ------ ------ ------
61
8
Betasin
g Baghmara
Other loan
projects like
NABARD
HKKP Renovation 1 No 0.0018 90 Ha Rs.330.0
0
-----
-
Rs.16
5
90
Ha Rs.165 ------ ------ ------ ------
61
9
Betasin
g Gopijhaora
Other loan
projects like
NABARD
HKKP Renovation 1 No 0.0019 60 Ha Rs.150.0
0
-----
- Rs.75
60
Ha Rs.75 ------ ------ ------ ------
62
0
Betasin
g Ringdee
Other loan
projects like
NABARD
HKKP Renovation 1 No 0.0015 90 Ha Rs.450.0
0
-----
- ------
36
Ha Rs.180 54 Ha Rs.270 ------ ------
62
1
Betasin
g Sankagre
Other loan
projects like
NABARD
HKKP Renovation 1 No 0.0016 75 Ha Rs.840.0
0
-----
- ------
-----
- ------ 30 Ha Rs.420 45 Ha
Rs.420.
0
62
2
Betasin
g Chisegre
Other loan
projects like
NABARD
HKKP Renovation 1 No 0.0014 80 Ha Rs.800.0
0
-----
- ------
-----
- ------ 32 Ha Rs.400 48 Ha
Rs.400.
0
62
3
Betasin
g Kokilla
Other loan
projects like
NABARD
HKKP Renovation 1 No 0.0013 60 Ha Rs.825.0
0
-----
- ------
-----
- ------ 24 Ha Rs.413 36 Ha
Rs.412.
0
District Irrigation Plan, South West Garo Hills district
82 | P a g e
62
4
Betasin
g Muji Agal
Other loan
projects like
NABARD
HKKP Renovation 1 No 0.0016 173 Ha Rs.400.0
0
-----
- ------
-----
- ------ 69 Ha Rs.200
104
Ha
Rs.200.
0
62
5
Betasin
g Garobaha
Other loan
projects like
NABARD
HKKP Solar pumpsets 25
Nos ------ 13 Ha Rs.13.75
-----
- ------
8
No. Rs.4.00 8 No. Rs.4.00 9 No. Rs.5.75
62
6
Betasin
g Betasing
Other loan
projects like
NABARD
HKKP Solar pumpsets 25
Nos ------ 13 Ha Rs.13.75
-----
- ------
8
No. Rs.4.00 8 No. Rs.4.00 9 No. Rs.5.75
62
7
Betasin
g Ampati
Other loan
projects like
NABARD
HKKP Solar pumpsets 25
Nos ------ 13 Ha Rs.13.75
-----
- ------
8
No. Rs.4.00 8 No. Rs.4.00 9 No. Rs.5.75
62
8
Betasin
g Rangsakona
Other loan
projects like
NABARD
HKKP Solar pumpsets 25
Nos ------ 13 Ha Rs.13.75
-----
- ------
8
No. Rs.4.00 8 No. Rs.4.00 9 No. Rs.5.75
62
9
Betasin
g Damalgre
Other loan
projects like
NABARD
HKKP Solar pumpsets 25
Nos ------ 13 Ha Rs.13.75
-----
- ------
8
No. Rs.4.00 8 No. Rs.4.00 9 No. Rs.5.75
63
0
Betasin
g Garodobha
Other loan
projects like
NABARD
HKKP Solar pumpsets 25
Nos ------ 13 Ha Rs.13.75
-----
- ------
8
No. Rs.4.00 8 No. Rs.4.00 9 No. Rs.5.75
63
1
Betasin
g Monabari
Other loan
projects like
NABARD
HKKP Solar pumpsets 25
Nos ------ 13 Ha Rs.13.75
-----
- ------
8
No. Rs.4.00 8 No. Rs.4.00 9 No. Rs.5.75
63
2
Betasin
g Bandalkona
Other loan
projects like
NABARD
HKKP Solar pumpsets 20
Nos ------ 10 Ha Rs.11.00
-----
- ------
6
No. Rs.3.00 6 No. Rs.3.00 8 No. Rs.5.00
63
3
Betasin
g Hathisi
Other loan
projects like
NABARD
HKKP Solar pumpsets 20
Nos ------ 10 Ha Rs.11.00
-----
- ------
6
No. Rs.3.00 6 No. Rs.3.00 8 No. Rs.5.00
63
4
Betasin
g Samati
Other loan
projects like
NABARD
HKKP Solar pumpsets 25
Nos ------ 13 Ha Rs.13.75
-----
- ------
8
No. Rs.4.00 8 No. Rs.4.00 9 No. Rs.5.75
63
5
Betasin
g Melim
Other loan
projects like
NABARD
HKKP Solar pumpsets 10
Nos ------ 5 Ha Rs.5.50
-----
- ------
3
No. Rs.2.00 3 No. Rs.2.00 4 No. Rs.1.50
63
6
Betasin
g Grenggandhi
Other loan
projects like
NABARD
HKKP Solar pumpsets 10
Nos ------ 5 Ha Rs.5.50
-----
- ------
3
No. Rs.2.00 3 No. Rs.2.00 4 No. Rs.1.50
63
7
Betasin
g Jelbongpara
Other loan
projects like
NABARD
HKKP Solar pumpsets 25
Nos ------ 13 Ha Rs.13.75
-----
- ------
8
No. Rs.4.00 8 No. Rs.4.00 9 No. Rs.5.75
63 Betasin Jolgaon Other loan HKKP Solar pumpsets 20 ------ 10 Ha Rs.11.00 ----- ------ 6 Rs.3.00 6 No. Rs.3.00 8 No. Rs.5.00
District Irrigation Plan, South West Garo Hills district
83 | P a g e
8 g projects like
NABARD
Nos - No.
63
9
Betasin
g Borkona
Other loan
projects like
NABARD
HKKP Solar pumpsets 20
Nos ------ 10 Ha Rs.11.00
-----
- ------
6
No. Rs.3.00 6 No. Rs.3.00 8 No. Rs.5.00
64
0
Betasin
g Ichaguri
Other loan
projects like
NABARD
HKKP Solar pumpsets 20
Nos ------ 10 Ha Rs.11.00
-----
- ------
6
No. Rs.3.00 6 No. Rs.3.00 8 No. Rs.5.00
64
1
Betasin
g Jewilgre
Other loan
projects like
NABARD
HKKP Solar pumpsets 20
Nos ------ 10 Ha Rs.11.00
-----
- ------
6
No. Rs.3.00 6 No. Rs.3.00 8 No. Rs.5.00
64
2
Betasin
g Mukdangra
Other loan
projects like
NABARD
HKKP Solar pumpsets 20
Nos ------ 10 Ha Rs.11.00
-----
- ------
6
No. Rs.3.00 6 No. Rs.3.00 8 No. Rs.5.00
64
3
Betasin
g Dorambok
Other loan
projects like
NABARD
HKKP Solar pumpsets 20
Nos ------ 10 Ha Rs.11.00
-----
- ------
6
No. Rs.3.00 6 No. Rs.3.00 8 No. Rs.5.00
64
4
Betasin
g Chisigre
Other loan
projects like
NABARD
HKKP Solar pumpsets 20
Nos ------ 10 Ha Rs.11.00
-----
- ------
6
No. Rs.3.00 6 No. Rs.3.00 8 No. Rs.5.00
64
5
Betasin
g Nogapara
Other loan
projects like
NABARD
HKKP Solar pumpsets 20
Nos ------ 10 Ha Rs.11.00
-----
- ------
6
No. Rs.3.00 6 No. Rs.3.00 8 No. Rs.5.00
64
6
Betasin
g Aderkhona
Other loan
projects like
NABARD
HKKP Solar pumpsets 20
Nos ------ 10 Ha Rs.11.00
-----
- ------
6
No. Rs.3.00 6 No. Rs.3.00 8 No. Rs.5.00
64
7
Betasin
g Baghmara
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.8.25
-----
- ------
5
No. Rs.2.00 5 No. Rs.2.00 5 No. Rs.4.25
64
8
Betasin
g
Rongchadengg
re
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.8.25
-----
- ------
5
No. Rs.2.00 5 No. Rs.2.00 5 No. Rs.4.25
64
9
Betasin
g
Rongsang
A.bagre
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.8.25
-----
- ------
5
No. Rs.2.00 5 No. Rs.2.00 5 No. Rs.4.25
65
0
Betasin
g Naragre
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.8.25
-----
- ------
5
No. Rs.2.00 5 No. Rs.2.00 5 No. Rs.4.25
65
1
Betasin
g Melim
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.8.25
-----
- ------
5
No. Rs.2.00 5 No. Rs.2.00 5 No. Rs.4.25
65
2
Betasin
g Dengnakpara
Other loan
projects like HKKP Solar pumpsets
15
Nos ------ 8 Ha Rs.8.25
-----
- ------
5
No. Rs.2.00 5 No. Rs.2.00 5 No. Rs.4.25
District Irrigation Plan, South West Garo Hills district
84 | P a g e
NABARD
65
3
Betasin
g Goragre'
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.8.25
-----
- ------
5
No. Rs.2.00 5 No. Rs.2.00 5 No. Rs.4.25
65
4
Betasin
g Matchallang
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.8.25
-----
- ------
5
No. Rs.2.00 5 No. Rs.2.00 5 No. Rs.4.25
65
5
Betasin
g Masudi
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.8.25
-----
- ------
5
No. Rs.2.00 5 No. Rs.2.00 5 No. Rs.4.25
65
6
Betasin
g Rongsong
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.8.25
-----
- ------
5
No. Rs.2.00 5 No. Rs.2.00 5 No. Rs.4.25
65
7
Betasin
g Rangatary
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.8.25
-----
- ------
5
No. Rs.2.00 5 No. Rs.2.00 5 No. Rs.4.25
65
8
Betasin
g skagre
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.8.25
-----
- ------
5
No. Rs.2.00 5 No. Rs.2.00 5 No. Rs.4.25
65
9
Betasin
g Bashbari
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.8.25
-----
- ------
5
No. Rs.2.00 5 No. Rs.2.00 5 No. Rs.4.25
66
0
Betasin
g Chondonpara
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.8.25
-----
- ------
5
No. Rs.2.00 5 No. Rs.2.00 5 No. Rs.4.25
66
1
Betasin
g chondonnokat
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.8.25
-----
- ------
5
No. Rs.2.00 5 No. Rs.2.00 5 No. Rs.4.25
66
2
Betasin
g Rongramgre
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.8.25
-----
- ------
5
No. Rs.2.00 5 No. Rs.2.00 5 No. Rs.4.25
66
3
Betasin
g Belbari
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.8.25
-----
- ------
5
No. Rs.2.00 5 No. Rs.2.00 5 No. Rs.4.25
66
4
Betasin
g Kasra
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.8.25
-----
- ------
5
No. Rs.2.00 5 No. Rs.2.00 5 No. Rs.4.25
66
5
Betasin
g
Betasing
Bazaar
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.8.25
-----
- ------
5
No. Rs.2.00 5 No. Rs.2.00 5 No. Rs.4.25
66
6
Betasin
g Bainapara
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.8.25
-----
- ------
5
No. Rs.2.00 5 No. Rs.2.00 5 No. Rs.4.25
District Irrigation Plan, South West Garo Hills district
85 | P a g e
66
7
Betasin
g Chringpara
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.8.25
-----
- ------
5
No. Rs.2.00 5 No. Rs.2.00 5 No. Rs.4.25
District Irrigation Plan, South West Garo Hills district
86 | P a g e
Zikzak Block
Sl.
No.
Name
of
Block
Name of
village
Concerened
Ministry/
Department
Component Activity
Total in Nos.
/Capacity (in
Cum)
Total
comman
d area
(in Ha.)
Total
fund (in
Rs.
Lakhs)
16 -
17
Are
a
16 -
17
Cost
17 -
18
Are
a
17 - 18
Cost
18 -
19
Are
a
18 - 19
Cost
19 -
20
Are
a
19 - 20
Cost
1
Zikza
k Jhonjona MoWR HKKP Surface minor irrigation 1 No 0.00420 310 Ha
Rs.467.0
0
467
Ha
Rs.20
0
-----
- ------
-----
- ------
-----
- ------
2
Zikza
k Bokman MoWR HKKP Surface minor irrigation 1 No 0.00282 120 Ha
Rs.236.0
0
-----
- Rs.47
48
Ha Rs.94
48
Ha Rs.94
-----
- ------
3
Zikza
k Bongka MoWR HKKP Surface minor irrigation 1 No 0.00247 120 Ha
Rs.234.0
0
-----
- Rs.47
48
Ha Rs.94
48
Ha Rs.94
-----
- ------
4
Zikza
k Kongbangpara MoWR HKKP Surface minor irrigation 1 No 0.00167 90 Ha
Rs.128.0
0
-----
- Rs.26
36
Ha Rs.51
36
Ha Rs.51
-----
- ------
5
Zikza
k Tarapara MoWR HKKP Surface minor irrigation 1 No 0.00173 320 Ha
Rs.615.0
0
-----
-
Rs.12
3
128
Ha Rs.246
128
Ha Rs.246
-----
- ------
6
Zikza
k Rongkai MoWR HKKP Surface minor irrigation 1 No 0.00486 820 Ha
Rs.2050.
0
-----
-
Rs.20
5
-----
- Rs.820
820
Ha
Rs.102
5
-----
- ------
7
Zikza
k
Koligaon
Kajalgopi MoWR HKKP Surface minor irrigation 1 No 0.00218 130 Ha
Rs.325.0
0
-----
- ------
-----
- Rs.130
130
Ha Rs.195
-----
- ------
8
Zikza
k Balughat MoWR HKKP Surface minor irrigation 1 No 0.00195 70 Ha
Rs.175.0
0
-----
- ------
-----
- Rs.70
70
Ha Rs.105
-----
- ------
9
Zikza
k Bairagopi MoWR HKKP Surface minor irrigation 1 No 0.00179 100 Ha
Rs.400.0
0
-----
- ------
-----
- ------
-----
- Rs.160
100
Ha Rs.240
10
Zikza
k Bahadur Khatta MoWR HKKP Surface minor irrigation 1 No 0.00119 400 Ha Rs.2000
-----
- ------
-----
- Rs.800
400
Ha
Rs.120
0
-----
- ------
11
Zikza
k Phuljura MoWR HKKP Surface minor irrigation 1 No 0.00188 60 Ha
Rs.200.0
0
-----
- ------
-----
- Rs.80
60
Ha Rs.120
-----
- ------
12
Zikza
k Barmanpara MoWR HKKP Surface minor irrigation 1 No 0.00163 120 Ha
Rs.400.0
0
-----
- ------
-----
- Rs.160
120
Ha Rs.240
-----
- ------
13
Zikza
k Demdema MoWR HKKP Surface minor irrigation 1 No 0.00126 50 Ha
Rs.150.0
0
-----
- ------
-----
- ------
-----
- Rs.60
50
Ha Rs.90
14
Zikza
k Amtuli MoWR HKKP Surface minor irrigation 1 No 0.00158 100 Ha
Rs.450.0
0
-----
- ------
-----
- ------
-----
- Rs.180
100
Ha Rs.270
15
Zikza
k Pislajhora MoWR HKKP Surface minor irrigation 1 No 0.00232 120 Ha
Rs.537.5
0
-----
- ------
-----
- ------
-----
- Rs.215
120
Ha Rs.323
16
Zikza
k Chapahati MoWR HKKP Surface minor irrigation 1 No 0.00091 45 Ha
Rs.225.0
0
-----
- ------
-----
- ------
-----
- Rs.90
45
Ha Rs.135
17
Zikza
k Kebolpara MoWR HKKP Surface minor irrigation 1 No 0.00198 55 Ha
Rs.175.0
0
-----
- ------
-----
- Rs.70
55
Ha Rs.105
-----
- ------
18
Zikza
k Dinagre MoWR HKKP Surface minor irrigation 1 No 0.00132 90 Ha
Rs.300.0
0
-----
- ------
-----
- Rs.120
90
Ha Rs.180
-----
- ------
19
Zikza
k Dalamgre MoWR HKKP Surface minor irrigation 1 No 0.00203 75 Ha
Rs.212.5
0
-----
- ------
-----
- ------
-----
- Rs.85
75
Ha Rs.128
District Irrigation Plan, South West Garo Hills district
87 | P a g e
20
Zikza
k Salmanpara 1 MoWR HKKP Surface minor irrigation 1 No 0.00173 90 Ha
Rs.375.0
0
-----
- ------
-----
- Rs.150
90
Ha Rs.225
-----
- ------
21
Zikza
k
New
Salmanpara MoWR HKKP Surface minor irrigation 1 No 0.00211 100 Ha
Rs.337.5
0
-----
- ------
-----
- ------
-----
- Rs.135
100
Ha Rs.203
22
Zikza
k Grenggre MoWR HKKP Surface minor irrigation 1 No 0.00166 90 Ha
Rs.287.5
0
-----
- ------
-----
- ------
-----
- Rs.115
90
Ha Rs.173
23
Zikza
k
Lower
boldakgre MoWR HKKP Surface minor irrigation 1 No 0.00188 80 Ha
Rs.337.5
0
-----
- ------
-----
- Rs.135
80
Ha Rs.203
-----
- ------
24
Zikza
k
Upper
Boldakgre MoWR HKKP Surface minor irrigation 1 No 0.00131 70 Ha
Rs.375.0
0
-----
- ------
-----
- Rs.150
70
Ha Rs.225
-----
- ------
25
Zikza
k Samgong A.we MoWR HKKP Surface minor irrigation 1 No 0.00087 60 Ha
Rs.450.0
0
-----
- ------
-----
- ------
-----
- Rs.180
55
Ha Rs.270
26
Zikza
k Ronmilgre MoWR HKKP Surface minor irrigation 1 No 0.00158 55 Ha
Rs.300.0
0
-----
- ------
-----
- ------
-----
- Rs.120
60
Ha Rs.180
27
Zikza
k Bokgre MoWR HKKP Surface minor irrigation 1 No 0.00176 60 Ha
Rs.375.0
0
-----
- ------
-----
- ------
-----
- Rs.150
55
Ha Rs.225
28
Zikza
k Udalgre MoWR HKKP Surface minor irrigation 1 No 0.00112 55 Ha
Rs.250.0
0
-----
- ------
-----
- ------
-----
- Rs.100
40
Ha Rs.150
29
Zikza
k Satihari MoWR HKKP Surface minor irrigation 1 No 0.00125 40 Ha
Rs.225.0
0
-----
- Rs.23
-----
- Rs.90
40
Ha Rs.112
-----
- ------
30
Zikza
k Nachilpara MoWR HKKP Surface minor irrigation 1 No 0.00125 65 Ha
Rs.200.0
0
-----
- Rs.20
-----
- Rs.80
65
Ha Rs.100
-----
- ------
31
Zikza
k Jhorjora MoWR HKKP Surface minor irrigation 1 No 0.00420 170 Ha
Rs.280.0
0
280
Ha
Rs.10
0
-----
- ------
-----
- ------
-----
- ------
32
Zikza
k Gonchukol MoWR HKKP Surface minor irrigation 1 No 0.00066 75 Ha
Rs.230.0
0
-----
- Rs.23
-----
- Rs.92
75
Ha Rs.115
-----
- ------
33
Zikza
k Rokkalpara MoWR HKKP Surface minor irrigation 1 No 0.00063 92 Ha
Rs.175.0
0
-----
- Rs.18
-----
- Rs.70
92
Ha Rs.87
-----
- ------
34
Zikza
k Anangpara MoWR HKKP Surface minor irrigation 1 No 0.00073 120 Ha
Rs.174.0
0
-----
- Rs.17
-----
- Rs.70
120
Ha Rs.87
-----
- ------
35
Zikza
k Wadagre MoWR HKKP Surface minor irrigation 1 No 0.00063 160 Ha
Rs.242.0
0
-----
- Rs.24
-----
- Rs.97
160
Ha Rs.121
-----
- ------
36
Zikza
k Bakdagre MoWR HKKP Surface minor irrigation 1 No 0.00087 70 Ha
Rs.237.5
0
-----
- ------
-----
- ------
-----
- Rs.70
95
Ha Rs.143
37
Zikza
k Rapapaanggre MoWR HKKP Surface minor irrigation 1 No 0.00110 60 Ha
Rs.312.5
0
-----
- ------
-----
- ------
-----
- Rs.60
125
Ha Rs.188
38
Zikza
k Hulukona MoWR HKKP Surface minor irrigation 1 No 0.00109 50 Ha
Rs.222.5
0
-----
- ------
-----
- Rs.89
50
Ha Rs.134
-----
- ------
39
Zikza
k Domapara MoWR HKKP Surface minor irrigation 1 No 0.00087 70 Ha
Rs.300.0
0
-----
- ------
-----
- Rs.120
70
Ha Rs.180
-----
- ------
40
Zikza
k Kangknaggre MoWR HKKP Surface minor irrigation 1 No 0.00139 60 Ha
Rs.255.0
0
-----
- ------
-----
- ------
-----
- Rs.102
60
Ha Rs.153
41 Zikza Agonggittim MoWR HKKP Surface minor irrigation 1 No 0.00086 50 Ha Rs.240.0 ----- ------ ----- ------ ----- Rs.96 50 Rs.144
District Irrigation Plan, South West Garo Hills district
88 | P a g e
k 0 - - - Ha
42
Zikza
k Managre MoWR HKKP Surface minor irrigation 1 No 0.00133 60 Ha
Rs.250.0
0
-----
- ------
-----
- Rs.100
60
Ha Rs.150
-----
- ------
43
Zikza
k Rongsolgre MoWR HKKP Surface minor irrigation 1 No 0.00091 50 Ha
Rs.300.0
0
-----
- ------
-----
- ------
-----
- Rs.120
50
Ha Rs.180
44
Zikza
k Menggongpara MoWR HKKP Surface minor irrigation 1 No 0.00121 75 Ha
Rs.400.0
0
-----
- ------
-----
- Rs.160
75
Ha Rs.240
-----
- ------
45
Zikza
k Marengpara MoWR HKKP Surface minor irrigation 1 No 0.00129 60 Ha
Rs.257.5
0
-----
- ------
-----
- Rs.103
60
Ha Rs.155
-----
- ------
46
Zikza
k Damagre MoWR HKKP Surface minor irrigation 1 No 0.00102 70 Ha
Rs.375.0
0
-----
- ------
-----
- Rs.150
70
Ha Rs.225
-----
- ------
47
Zikza
k Wagepara MoWR HKKP Surface minor irrigation 1 No 0.00073 60 Ha
Rs.267.5
0
-----
- ------
-----
- ------
-----
- Rs.107
60
Ha Rs.161
48
Zikza
k Torangpara MoWR HKKP Surface minor irrigation 1 No 0.00089 65 Ha
Rs.247.5
0
-----
- ------
-----
- Rs.99
65
Ha Rs.149
-----
- ------
49
Zikza
k Zikzak MoWR HKKP Lift irrigation
15
Nos 0.0005
52.50
Ha Rs.8.25
-----
- ------
16
Ha Rs.2
16
Ha Rs.2
21
Ha Rs.3.30
50
Zikza
k Salmanpara 1 MoWR HKKP Lift irrigation
15
Nos 0.0006
52.50
Ha Rs.8.25
-----
- ------
16
Ha Rs.2
16
Ha Rs.2
21
Ha Rs.3.30
51
Zikza
k Mahendraganj MoWR HKKP Lift irrigation
15
Nos 0.0007
52.50
Ha Rs.8.25
-----
- ------
16
Ha Rs.2
16
Ha Rs.2
21
Ha Rs.3.30
52
Zikza
k Kalaichar MoWR HKKP Lift irrigation
15
Nos 0.0006
52.50
Ha Rs.8.25
-----
- ------
16
Ha Rs.2
16
Ha Rs.2
21
Ha Rs.3.30
53
Zikza
k Katuligre MoWR HKKP Lift irrigation
15
Nos 0.0006
52.50
Ha Rs.8.25
-----
- ------
16
Ha Rs.2
16
Ha Rs.2
21
Ha Rs.3.30
54
Zikza
k Lokaichar MoWR HKKP Lift irrigation
15
Nos 0.0004
52.50
Ha Rs.8.25
-----
- ------
16
Ha Rs.2
16
Ha Rs.2
21
Ha Rs.3.30
55
Zikza
k Wadagre MoWR HKKP Lift irrigation
15
Nos 0.0004
52.50
Ha Rs.8.25
-----
- ------
16
Ha Rs.2
16
Ha Rs.2
21
Ha Rs.3.30
56
Zikza
k Anangpara MoWR HKKP Lift irrigation
15
Nos 0.0003
52.50
Ha Rs.8.25
-----
- ------
16
Ha Rs.2
16
Ha Rs.2
21
Ha Rs.3.30
57
Zikza
k Mekdual MoWR HKKP Lift irrigation
15
Nos 0.0008
52.50
Ha Rs.8.25
-----
- ------
16
Ha Rs.2
16
Ha Rs.2
21
Ha Rs.3.30
58
Zikza
k Kodaldoa MoWR HKKP Lift irrigation
15
Nos 0.0006
52.50
Ha Rs.8.25
-----
- ------
16
Ha Rs.2
16
Ha Rs.2
21
Ha Rs.3.30
59
Zikza
k Gelajhuri MoWR HKKP Lift irrigation
15
Nos 0.0006
52.50
Ha Rs.8.25
-----
- ------
16
Ha Rs.2
16
Ha Rs.2
21
Ha Rs.3.30
60
Zikza
k Nogorpara MoWR HKKP Lift irrigation
15
Nos 0.0004
52.50
Ha Rs.8.25
-----
- ------
16
Ha Rs.2
16
Ha Rs.2
21
Ha Rs.3.30
61
Zikza
k Barmanpara MoWR HKKP Lift irrigation
15
Nos 0.0004
52.50
Ha Rs.8.25
-----
- ------
16
Ha Rs.2
16
Ha Rs.2
21
Ha Rs.3.30
62
Zikza
k Daspara MoWR HKKP Lift irrigation
15
Nos 0.0005
52.50
Ha Rs.8.25
-----
- ------
16
Ha Rs.2
16
Ha Rs.2
21
Ha Rs.3.30
District Irrigation Plan, South West Garo Hills district
89 | P a g e
63
Zikza
k Amtulli MoWR HKKP Lift irrigation
15
Nos 0.0003
52.50
Ha Rs.8.25
-----
- ------
16
Ha Rs.2
16
Ha Rs.2
21
Ha Rs.3.30
64
Zikza
k TunrurChar MoWR HKKP Lift irrigation
15
Nos 0.0005
52.50
Ha Rs.8.25
-----
- ------
16
Ha Rs.2
16
Ha Rs.2
21
Ha Rs.3.30
65
Zikza
k Nadirchar MoWR HKKP Lift irrigation
15
Nos 0.0007
52.50
Ha Rs.8.25
-----
- ------
16
Ha Rs.2
16
Ha Rs.2
21
Ha Rs.3.30
66
Zikza
k Tarapara MoWR HKKP Lift irrigation
15
Nos 0.0004
52.50
Ha Rs.8.25
-----
- ------
16
Ha Rs.2
16
Ha Rs.2
21
Ha Rs.3.30
67
Zikza
k Modakpara MoWR HKKP Lift irrigation
15
Nos 0.0003
52.50
Ha Rs.8.25
-----
- ------
16
Ha Rs.2.48
16
Ha Rs.2.48
21
Ha Rs.3.30
68
Zikza
k
Chelipara
Nokat MoWR HKKP Lift irrigation
15
Nos 0.0002
52.50
Ha Rs.8.25
-----
- ------
16
Ha Rs.2.48
16
Ha Rs.2.48
21
Ha Rs.3.30
69
Zikza
k Jangrapara MoWR HKKP Lift irrigation
15
Nos 0.0003
52.50
Ha Rs.8.25
-----
- ------
16
Ha Rs.2.48
16
Ha Rs.2.48
21
Ha Rs.3.30
70
Zikza
k Matkolgre MoWR HKKP Lift irrigation
15
Nos 0.0004
52.50
Ha Rs.8.25
-----
- ------
16
Ha Rs.2.48
16
Ha Rs.2.48
21
Ha Rs.3.30
71
Zikza
k Ponchapara MoWR HKKP Lift irrigation
15
Nos 0.0004
52.50
Ha Rs.8.25
-----
- ------
16
Ha Rs.2.48
16
Ha Rs.2.48
21
Ha Rs.3.30
72
Zikza
k Boldakgre MoWR HKKP Lift irrigation
15
Nos 0.0003
52.50
Ha Rs.8.25
-----
- ------
16
Ha Rs.2.48
16
Ha Rs.2.48
21
Ha Rs.3.30
73
Zikza
k Demdemakona MoWR HKKP Lift irrigation
15
Nos 0.0002
52.50
Ha Rs.8.25
-----
- ------
16
Ha Rs.2.48
16
Ha Rs.2.48
21
Ha Rs.3.30
74
Zikza
k Damagre MoWR HKKP Lift irrigation
15
Nos 0.0003
52.50
Ha Rs.8.25
-----
- ------
16
Ha Rs.2.48
16
Ha Rs.2.48
21
Ha Rs.3.30
75
Zikza
k Sanjangpara MoWR HKKP Lift irrigation
15
Nos 0.0003
52.50
Ha Rs.8.25
-----
- ------
16
Ha Rs.2.48
16
Ha Rs.2.48
21
Ha Rs.3.30
76
Zikza
k Jigatolpara MoWR HKKP Lift irrigation
15
Nos 0.0004
52.50
Ha Rs.8.25
-----
- ------
16
Ha Rs.2.48
16
Ha Rs.2.48
21
Ha Rs.3.30
77
Zikza
k Nachilgre MoWR HKKP Lift irrigation
15
Nos 0.0004
52.50
Ha Rs.8.25
-----
- ------
16
Ha Rs.2.48
16
Ha Rs.2.48
21
Ha Rs.3.30
78
Zikza
k Mondolpara MoWR HKKP Lift irrigation
15
Nos 0.0005
52.50
Ha Rs.8.25
-----
- ------
16
Ha Rs.2.48
16
Ha Rs.2.48
21
Ha Rs.3.30
79
Zikza
k Rokkolpara MoWR HKKP Lift irrigation
15
Nos 0.0004
52.50
Ha Rs.8.25
-----
- ------
16
Ha Rs.2.48
16
Ha Rs.2.48
21
Ha Rs.3.30
80
Zikza
k Nayapara MoWR HKKP Lift irrigation
15
Nos 0.0005
52.50
Ha Rs.8.25
-----
- ------
16
Ha Rs.2.48
16
Ha Rs.2.48
21
Ha Rs.3.30
81
Zikza
k Dollonggre MoWR HKKP Lift irrigation
15
Nos 0.0004
52.50
Ha Rs.8.25
-----
- ------
16
Ha Rs.2.48
16
Ha Rs.2.48
21
Ha Rs.3.30
82
Zikza
k Boldamgre MoWR HKKP Lift irrigation
15
Nos 0.0004
52.50
Ha Rs.8.25
-----
- ------
16
Ha Rs.2.48
16
Ha Rs.2.48
21
Ha Rs.3.30
83
Zikza
k Gopinath Killa MoWR HKKP Lift irrigation
15
Nos 0.0004
52.50
Ha Rs.8.25
-----
- ------
16
Ha Rs.2.48
16
Ha Rs.2.48
21
Ha Rs.3.30
84 Zikza Debajane MoWR HKKP Lift irrigation 15 0.0004 52.50 Rs.8.25 ----- ------ 16 Rs.2.48 16 Rs.2.48 21 Rs.3.30
District Irrigation Plan, South West Garo Hills district
90 | P a g e
k Nos Ha - Ha Ha Ha
85
Zikza
k Dangsapara MoWR HKKP Ground water development 3 Nos 0.0011 75 Ha
Rs.187.5
0
-----
- ------
-----
- Rs.75
75
Ha Rs.113
-----
- ------
86
Zikza
k Nandirchar MoWR HKKP Ground water development 2 Nos 0.0013 50 Ha
Rs.125.0
0
-----
- ------
-----
- Rs.50
50
Ha Rs.75
-----
- ------
87
Zikza
k Majherchar MoWR HKKP Ground water development 2 Nos 0.0016 50 Ha
Rs.125.0
0
-----
- ------
-----
- Rs.50
50
Ha Rs.75
-----
- ------
88
Zikza
k Salmanpara MoWR HKKP Ground water development 2 Nos 0.0017 50 Ha
Rs.125.0
0
-----
- ------
-----
- Rs.50
50
Ha Rs.75
-----
- ------
89
Zikza
k Jamgre MoWR HKKP Ground water development 2 Nos 0.0007 50 Ha
Rs.125.0
0
-----
- ------
-----
- Rs.50
50
Ha Rs.75
-----
- ------
90
Zikza
k Gandeigre MoWR HKKP Ground water development 2 Nos 0.0010 50 Ha
Rs.125.0
0
-----
- ------
-----
- Rs.50
50
Ha Rs.75
-----
- ------
91
Zikza
k Kalaicharpara MoWR HKKP Ground water development 2 Nos 0.0011 50 Ha
Rs.125.0
0
-----
- ------
-----
- Rs.50
50
Ha Rs.75
-----
- ------
92
Zikza
k Hatibelpara MoWR HKKP Ground water development 2 Nos 0.0013 50 Ha
Rs.125.0
0
-----
- ------
-----
- Rs.50
50
Ha Rs.75
-----
- ------
93
Zikza
k Nachipara MoWR HKKP Ground water development 2 Nos 0.0017 50 Ha
Rs.125.0
0
-----
- ------
-----
- ------
-----
- Rs.50
50
Ha Rs.75
94
Zikza
k Amtuli MoWR HKKP Ground water development 2 Nos 0.0011 50 Ha
Rs.125.0
0
-----
- ------
-----
- ------
-----
- Rs.50
50
Ha Rs.75
95
Zikza
k Gopinathkilla MoWR HKKP Ground water development 2 Nos 0.0012 50 Ha
Rs.125.0
0
-----
- ------
-----
- ------
-----
- Rs.50
50
Ha Rs.75
96
Zikza
k Jongsetpara MoWR HKKP Ground water development 2 Nos 0.0009 50 Ha
Rs.125.0
0
-----
- ------
-----
- ------
-----
- Rs.50
50
Ha Rs.75
97
Zikza
k Didoba MoWR HKKP Ground water development 2 Nos 0.0010 50 Ha
Rs.125.0
0
-----
- ------
-----
- ------
-----
- Rs.50
50
Ha Rs.75
98
Zikza
k Baksapara MoWR HKKP Ground water development 2 Nos 0.0011 50 Ha
Rs.125.0
0
-----
- ------
-----
- ------
-----
- Rs.50
50
Ha Rs.75
99
Zikza
k Katuli MoWR HKKP R.R.R of water bodies 1 No 0.0073 60 Ha
Rs.441.0
0
-----
- Rs.88
24
Ha Rs.353
36
Ha ------
-----
- ------
100
Zikza
k Kawahagra MoWR HKKP R.R.R of water bodies 1 No 0.0030 45 Ha
Rs.140.0
0
-----
- Rs.28
18
Ha Rs.112
27
Ha ------
-----
- ------
101
Zikza
k Kolaigaon MoWR HKKP R.R.R of water bodies 1 No 0.0026 80 Ha
Rs.592.2
0
-----
- ------
-----
-
Rs.177.
7
80
Ha Rs.355
-----
- ------
102
Zikza
k Dengna FIP MoWR HKKP R.R.R of water bodies 1 No 0.0024 158 Ha Rs.46.44
158
Ha
Rs.46.
44
-----
- ------
-----
- ------
-----
- ------
103
Zikza
k Jhorjhora MoWR HKKP R.R.R of water bodies 1 No 0.0036 80 Ha
Rs.382.2
0
-----
- ------
-----
- ------
-----
- Rs.229
80
Ha Rs.153
104
Zikza
k Jonjhonagre MoWR HKKP R.R.R of water bodies 1 No 0.0027 80 Ha
Rs.651.0
0
-----
- ------
-----
- ------
-----
- Rs.391
80
Ha Rs.260
105
Zikza
k Tarapara MoWR HKKP R.R.R of water bodies 1 No 0.0028 120 Ha
Rs.672.0
0
-----
- ------
-----
- ------
-----
- Rs.403
120
Ha Rs.269
District Irrigation Plan, South West Garo Hills district
91 | P a g e
106
Zikza
k Bokman MoWR HKKP R.R.R of water bodies 1 No 0.0035 100 Ha
Rs.252.0
0
-----
- ------
-----
- ------
-----
- Rs.151
100
Ha Rs.101
107
Zikza
k Gopi FIP MoWR HKKP R.R.R of water bodies 1 No 0.0033 186 Ha Rs.67.09
186
Ha
Rs.67.
09
-----
- ------ -----
------ ----- ------
108
Zikza
k Jhojona MoWR HKKP Lined field channel 1 No 0.0023 90 Ha
Rs.270.0
0
-----
- ------
-----
- ------
36
Ha Rs.81
54
Ha Rs.189
109
Zikza
k Jhojhora MoWR HKKP Lined field channel 1 No 0.0025 65 Ha
Rs.162.0
0
-----
- ------
-----
- ------
26
Ha Rs.49
39
Ha Rs.113
110
Zikza
k Kuligaon MoWR HKKP Lined field channel 1 No 0.0040 55 Ha
Rs.153.0
0
-----
- ------
-----
- ------
22
Ha Rs.46
33
Ha Rs.107
111
Zikza
k Kolaigaon MoWR HKKP Lined field channel 1 No 0.0034 50 Ha
Rs.162.0
0
-----
- ------
-----
- ------
20
Ha Rs.49
30
Ha Rs.113
112
Zikza
k Tarapara MoWR HKKP Lined field channel 1 No 0.0028 45 Ha
Rs.180.0
0
-----
- ------
-----
- ------
18
Ha Rs.54
27
Ha Rs.126
113
Zikza
k Kongbangpara MoWR HKKP Lined field channel 1 No 0.0026 60 Ha
Rs.144.0
0
-----
- ------
-----
- ------
24
Ha Rs.43
36
Ha Rs.101
114
Zikza
k Bokman MoWR HKKP Lined field channel 1 No 0.0027 50 Ha
Rs.135.0
0
-----
- ------
-----
- ------
20
Ha Rs.41
30
Ha Rs.94
115
Zikza
k Bongka MoWR HKKP Lined field channel 1 No 0.0017 30 Ha
Rs.153.0
0
-----
- ------
-----
- ------
12
Ha Rs.46
18
Ha Rs.107
116
Zikza
k Rongkai MoWR HKKP Lined field channel 1 No 0.0025 100 Ha
Rs.400.0
0
-----
- ------
-----
- ------
40
Ha Rs.120
60
Ha Rs.280
117
Zikza
k Anangpara MoWR HKKP Lined field channel 1 No 0.0027 50 Ha
Rs.180.0
0
-----
- ------
-----
- ------
20
Ha Rs.54
30
Ha Rs.126
118
Zikza
k Wadagre MoWR HKKP Lined field channel 1 No 0.0030 126 Ha
Rs.252.0
0
-----
- ------
-----
- ------
50
Ha Rs.76
76
Ha Rs.176
119
Zikza
k Anagpara' MoWR HKKP Unlined field channel 1 No 0.0033 5 Ha Rs.2.70
-----
- ------
5
Ha Rs.2.70
-----
- ------
-----
- ------
120
Zikza
k Chatiarai MoWR HKKP Unlined field channel 1 No 0.0040 3 Ha Rs.2.40
-----
- ------
3
Ha Rs.2.40
-----
- ------
-----
- ------
121
Zikza
k Jonjonagre MoWR HKKP Unlined field channel 1 No 0.0039 2 Ha Rs.2.40
-----
- ------
2
Ha Rs.2.40
-----
- ------
-----
- ------
122
Zikza
k Kachigaon MoWR HKKP Unlined field channel 1 No 0.0050 4 Ha Rs.2.70
-----
- ------
4
Ha Rs.2.70
-----
- ------
-----
- ------
123
Zikza
k Kambakpara MoWR HKKP Unlined field channel 1 No 0.0027 3 Ha Rs.2.10
-----
- ------
3
Ha Rs.2.10
-----
- ------
-----
- ------
124
Zikza
k Kebolpara 1 MoWR HKKP Unlined field channel 1 No 0.0030 4 Ha Rs.2.10
-----
- ------
4
Ha Rs.2.10
-----
- ------
-----
- ------
125
Zikza
k Kebolpara 2 MoWR HKKP Unlined field channel 1 No 0.0024 5 Ha Rs.2.70
-----
- ------
5
Ha Rs.2.70
-----
- ------
-----
- ------
126
Zikza
k Janggre 1 MoWR HKKP Unlined field channel 1 No 0.0020 3 Ha Rs.2.79
-----
- ------
3
Ha Rs.2.79
-----
- ------
-----
- ------
127 Zikza Janggre 2 MoWR HKKP Unlined field channel 1 No 0.0027 2 Ha Rs.2.40 ----- ------ 2 Rs.2.40 ----- ------ ----- ------
District Irrigation Plan, South West Garo Hills district
92 | P a g e
k - Ha - -
128
Zikza
k Tewali MoWR HKKP Unlined field channel 1 No 0.0027 4 Ha Rs.2.10
-----
- ------
4
Ha Rs.2.10
-----
- ------
-----
- ------
129
Zikza
k Tewali 1 MoWR HKKP Unlined field channel 1 No 0.0026 3 Ha Rs.1.80
-----
- ------
3
Ha Rs.1.80
-----
- ------
-----
- ------
130
Zikza
k Tewali 2 MoWR HKKP Unlined field channel 1 No 0.0028 4 Ha Rs.2.70
-----
- ------
4
Ha Rs.2.70
-----
- ------
-----
- ------
131
Zikza
k Demdema MoWR HKKP Unlined field channel 1 No 0.0028 5 Ha Rs.2.40
-----
- ------
5
Ha Rs.2.40
-----
- ------
-----
- ------
132
Zikza
k Kuligaoon MoWR HKKP Unlined field channel 1 No 0.0027 4 Ha Rs.2.10
-----
- ------
4
Ha Rs.2.10
-----
- ------
-----
- ------
133
Zikza
k Boldamgre MoWR HKKP Micro irrigation 1 No 0.00003 5.00 Ha Rs.16.50
-----
- ------
5
Ha
Rs.16.5
0
-----
- ------
-----
- ------
134
Zikza
k
upper
Boldamgre MoWR HKKP Micro irrigation 1 No 0.00003 4.00 Ha Rs.20.00
-----
- ------
4
Ha
Rs.20.0
0
-----
- ------
-----
- ------
135
Zikza
k Katuligre MoWR HKKP Micro irrigation 1 No 0.00003 3.00 Ha Rs.17.50
-----
- ------
3
Ha
Rs.17.5
0
-----
- ------
-----
- ------
136
Zikza
k Katuligaon MoWR HKKP Micro irrigation 1 No 0.00004 7.00 Ha Rs.20.00
-----
- ------
7
Ha
Rs.20.0
0
-----
- ------
-----
- ------
137
Zikza
k Dufrigaon MoWR HKKP Micro irrigation 1 No 0.00004 6.00 Ha Rs.17.50
-----
- ------
6
Ha
Rs.17.5
0
-----
- ------
-----
- ------
138
Zikza
k
Dufrigaon
Koch MoWR HKKP Micro irrigation 1 No 0.00007 5.00 Ha Rs.12.50
-----
- ------
5
Ha
Rs.12.5
0
-----
- ------
-----
- ------
139
Zikza
k Chilapara MoWR HKKP Micro irrigation 1 No 0.00004 4.00 Ha Rs.14.75
-----
- ------
4
Ha
Rs.14.7
5
-----
- ------
-----
- ------
140
Zikza
k Kambakpara MoWR HKKP Micro irrigation 1 No 0.00003 7.00 Ha Rs.13.75
-----
- ------
7
Ha
Rs.13.7
5
-----
- ------
-----
- ------
141
Zikza
k
kambakpara
Sonngitcham MoWR HKKP Micro irrigation 1 No 0.00003 9.00 Ha Rs.20.00
-----
- ------
-----
- ------
-----
- ------
9
Ha
Rs.20.0
0
142
Zikza
k Demiligre MoWR HKKP Micro irrigation 1 No 0.00002 4.00 Ha Rs.17.50
-----
- ------
-----
- ------
-----
- ------
4
Ha
Rs.17.5
0
143
Zikza
k Ameshgittim MoWR HKKP Micro irrigation 1 No 0.00003 6.00 Ha Rs.23.00
-----
- ------
-----
- ------
-----
- ------
6
Ha
Rs.23.0
0
144
Zikza
k Chatihari MoWR HKKP Micro irrigation 1 No 0.00004 5.00 Ha Rs.23.25
-----
- ------
-----
- ------
-----
- ------
5
Ha
Rs.23.2
5
145
Zikza
k Dangsapara MoWR HKKP Micro irrigation 1 No 0.00003 4.00 Ha Rs.10.00
-----
- ------
-----
- ------
-----
- ------
4
Ha
Rs.10.0
0
146
Zikza
k
Kuligaon
hajong MoWR HKKP Micro irrigation 1 No 0.00003 7.00 Ha Rs.23.00
-----
- ------
7
Ha
Rs.23.0
0
-----
- ------
-----
- ------
147
Zikza
k Kuligaon Koch MoWR HKKP Micro irrigation 1 No 0.00004 6.00 Ha Rs.15.00
-----
- ------
6
Ha
Rs.15.0
0
-----
- ------
-----
- ------
148
Zikza
k
Boldam
A.kongggre MoWR HKKP Micro irrigation 1 No 0.00004 5.00 Ha Rs.22.50
-----
- ------
5
Ha
Rs.22.5
0
-----
- ------
-----
- ------
District Irrigation Plan, South West Garo Hills district
93 | P a g e
149
Zikza
k Janggre MoWR HKKP Micro irrigation 1 No 0.00007 4.00 Ha Rs.23.75
-----
- ------
-----
- ------
4
Ha
Rs.23.7
5
-----
- ------
150
Zikza
k Janggre Samar MoWR HKKP Micro irrigation 1 No 0.00004 6.00 Ha Rs.20.00
-----
- ------
-----
- ------
6
Ha
Rs.20.0
0
-----
- ------
151
Zikza
k gandigre Garo MoWR HKKP Micro irrigation 1 No 0.00003 5.00 Ha Rs.14.75
-----
- ------
-----
- ------
5
Ha
Rs.14.7
5
-----
- ------
152
Zikza
k
gandigreBuram
an MoWR HKKP Micro irrigation 1 No 0.00003 4.00 Ha Rs.15.75
-----
- ------
-----
- ------
4
Ha
Rs.15.7
5
-----
- ------
153
Zikza
k wadagre MoWR HKKP Micro irrigation 1 No 0.00002 6.00 Ha Rs.23.25
-----
- ------
-----
- ------
6
Ha
Rs.23.2
5
-----
- ------
154
Zikza
k Kalaicharpara MoWR HKKP Micro irrigation 1 No 0.00003 4.00 Ha Rs.17.50
-----
- ------
-----
- ------
4
Ha
Rs.17.5
0
-----
- ------
155
Zikza
k
Lower
kalaichar MoWR HKKP Micro irrigation 1 No 0.00003 3.00 Ha Rs.20.00
-----
- ------
-----
- ------
3
Ha
Rs.20.0
0
-----
- ------
156
Zikza
k Mondalpara MoWR HKKP Micro irrigation 1 No 0.00002 5.00 Ha Rs.22.50
-----
- ------
5
Ha
Rs.22.5
0
-----
- ------
-----
- ------
157
Zikza
k Wannaggre MoWR HKKP Micro irrigation 1 No 0.00003 3.00 Ha Rs.17.25
-----
- ------
3
Ha
Rs.17.2
5
-----
- ------
-----
- ------
158
Zikza
k
upper
wananggre MoWR HKKP Micro irrigation 1 No 0.00004 5.00 Ha Rs.20.25
-----
- ------
-----
- ------
5
Ha
Rs.20.2
5
-----
- ------
159
Zikza
k Sobokgre MoWR HKKP Micro irrigation 1 No 0.00003 5.00 Ha Rs.19.25
-----
- ------
-----
- ------
5
Ha
Rs.19.2
5
-----
- ------
160
Zikza
k
Boldam
Songgitalgre MoWR HKKP Micro irrigation 1 No 0.00003 5.50 Ha Rs.20.00
-----
- ------
-----
- ------
6
Ha
Rs.20.0
0
-----
- ------
161
Zikza
k Dinangpara MoWR HKKP Micro irrigation 1 No 0.00004 4.00 Ha Rs.17.50
-----
- ------
-----
- ------
4
Ha
Rs.17.5
0
-----
- ------
162
Zikza
k Jongnogre MoWR HKKP Micro irrigation 1 No 0.00004 5.00 Ha Rs.20.00
-----
- ------
-----
- ------
5
Ha
Rs.20.0
0
-----
- ------
163
Zikza
k Satbone MoWR HKKP Micro irrigation 1 No 0.00003 6.00 Ha Rs.17.25
-----
- ------
-----
- ------
6
Ha
Rs.17.2
5
-----
- ------
164
Zikza
k Dangsinpara MoWR HKKP Micro irrigation 1 No 0.00003 5.00 Ha Rs.21.25
-----
- ------
-----
- ------
5
Ha
Rs.21.2
5
-----
- ------
165
Zikza
k Kuligre MoWR HKKP Micro irrigation 1 No 0.00002 4.00 Ha Rs.23.75
-----
- ------
-----
- ------
4
Ha
Rs.23.7
5
-----
- ------
166
Zikza
k
Kolaigaon
Tillapara MoWR HKKP Micro irrigation 1 No 0.00004 3.00 Ha Rs.17.50
-----
- ------
-----
- ------
3
Ha
Rs.17.5
0
-----
- ------
167
Zikza
k
Kolaigaon
Momdolpara MoWR HKKP Micro irrigation 1 No 0.00004 5.00 Ha Rs.20.00
-----
- ------
-----
- ------
-----
- ------
5
Ha
Rs.20.0
0
168
Zikza
k Billipara MoWR HKKP Micro irrigation 1 No 0.00003 4.00 Ha Rs.15.75
-----
- ------
-----
- ------
-----
- ------
4
Ha
Rs.15.7
5
169
Zikza
k Nayapara MoWR HKKP Micro irrigation 1 No 0.00003 4.50 Ha Rs.19.25
-----
- ------
-----
- ------
-----
- ------
5
Ha
Rs.19.2
5
170 Zikza Katabaripara MoWR HKKP Micro irrigation 1 No 0.00002 4.00 Ha Rs.17.00 ----- ------ ----- ------ 4 Rs.17.0 ----- ------
District Irrigation Plan, South West Garo Hills district
94 | P a g e
k - - Ha 0 -
171
Zikza
k kashipara MoWR HKKP Micro irrigation 1 No 0.00003 3.80 Ha Rs.23.75
-----
- ------
-----
- ------
4
Ha
Rs.23.7
5
-----
- ------
172
Zikza
k
Upper
Kalaichar MoWR HKKP Micro irrigation 1 No 0.00004 4.00 Ha Rs.17.25
-----
- ------
-----
- ------
4
Ha
Rs.17.2
5
-----
- ------
173
Zikza
k Bollongre MoWR HKKP Micro irrigation 1 No 0.00003 5.00 Ha Rs.24.75
-----
- ------
-----
- ------
5
Ha
Rs.24.7
5
-----
- ------
174
Zikza
k
Upper
Bollongre MoWR HKKP Micro irrigation 1 No 0.00003 4.50 Ha Rs.20.00
-----
- ------
-----
- ------
5
Ha
Rs.20.0
0
-----
- ------
175
Zikza
k Bolddenggre MoWR HKKP Micro irrigation 1 No 0.00004 5.00 Ha Rs.17.50
-----
- ------
-----
- ------
-----
- ------
5
Ha
Rs.17.5
0
176
Zikza
k Tewaligre MoWR HKKP Micro irrigation 1 No 0.00004 6.00 Ha Rs.20.00
-----
- ------
-----
- ------
-----
- ------
6
Ha
Rs.20.0
0
177
Zikza
k Pagolpara MoWR HKKP Micro irrigation 1 No 0.00007 4.00 Ha Rs.17.25
-----
- ------
4
Ha
Rs.17.2
5
-----
- ------
-----
- ------
178
Zikza
k Paglapara MoWR HKKP Micro irrigation 1 No 0.00003 3.00 Ha Rs.21.25
-----
- ------
3
Ha
Rs.21.2
5
-----
- ------
-----
- ------
179
Zikza
k Dengnagre MoWR HKKP Micro irrigation 1 No 0.00003 4.00 Ha Rs.13.25
-----
- ------
4
Ha
Rs.13.2
5
-----
- ------
-----
- ------
180
Zikza
k Anangpara MoWR HKKP Micro irrigation 1 No 0.00004 5.00 Ha Rs.23.00
-----
- ------
5
Ha
Rs.23.0
0
-----
- ------
-----
- ------
181
Zikza
k Chelipara MoWR HKKP Micro irrigation 1 No 0.00004 3.00 Ha Rs.20.00
-----
- ------
3
Ha
Rs.20.0
0
-----
- ------
-----
- ------
182
Zikza
k Darugre MoWR HKKP Micro irrigation 1 No 0.00007 4.00 Ha Rs.23.00
-----
- ------
-----
- ------
-----
- ------
4
Ha
Rs.23.0
0
183
Zikza
k Bengdapara MoWR HKKP Micro irrigation 1 No 0.00004 3.00 Ha Rs.17.50
-----
- ------
-----
- ------
-----
- ------
3
Ha
Rs.17.5
0
184
Zikza
k Kimdegre MoWR HKKP Micro irrigation 1 No 0.00003 4.00 Ha Rs.15.00
-----
- ------
-----
- ------
-----
- ------
4
Ha
Rs.15.0
0
185
Zikza
k Okchokgre MoWR HKKP Micro irrigation 1 No 0.00003 4.50 Ha Rs.23.00
-----
- ------
-----
- ------
-----
- ------
4.5
Ha
Rs.23.0
0
186
Zikza
k Sindilgre MoWR HKKP Micro irrigation 1 No 0.00002 4.00 Ha Rs.19.25
-----
- ------
-----
- ------
4
Ha
Rs.19.2
5
-----
- ------
187
Zikza
k Kedapara MoWR HKKP Micro irrigation 1 No 0.00003 3.00 Ha Rs.20.00
-----
- ------
-----
- ------
3
Ha
Rs.20.0
0
-----
- ------
188
Zikza
k Kerupara MoWR HKKP Micro irrigation 1 No 0.00003 5.00 Ha Rs.17.50
-----
- ------
-----
- ------
5
Ha
Rs.17.5
0
-----
- ------
189
Zikza
k Dinapara MoWR HKKP Micro irrigation 1 No 0.00002 4.00 Ha Rs.20.00
-----
- ------
-----
- ------
4
Ha
Rs.20.0
0
-----
- ------
190
Zikza
k Nachipara MoWR HKKP Micro irrigation 1 No 0.00003 3.00 Ha Rs.18.25
-----
- ------
-----
- ------
3
Ha
Rs.18.2
5
-----
- ------
191
Zikza
k Chepagre MoWR HKKP Micro irrigation 1 No 0.00002 4.00 Ha Rs.21.25
-----
- ------
-----
- ------
4
Ha
Rs.21.2
5
-----
- ------
District Irrigation Plan, South West Garo Hills district
95 | P a g e
192
Zikza
k
New
Anangpara
Songgitcham
MoWR HKKP Micro irrigation 1 No 0.00003 4.00 Ha Rs.23.75 -----
- ------
-----
- ------
4
Ha
Rs.23.7
5
-----
- ------
193
Zikza
k Matkolgre MoWR HKKP Micro irrigation 1 No 0.00004 3.00 Ha Rs.17.50
-----
- ------
-----
- ------
3
Ha
Rs.17.5
0
-----
- ------
194
Zikza
k Mandalgre MoWR HKKP Micro irrigation 1 No 0.00003 5.00 Ha Rs.20.00
-----
- ------
-----
- ------
5
Ha
Rs.20.0
0
-----
- ------
195
Zikza
k Chipra MoWR HKKP Micro irrigation 1 No 0.00003 5.00 Ha Rs.23.25
-----
- ------
-----
- ------
5
Ha
Rs.23.2
5
-----
- ------
196
Zikza
k Tallimgre MoWR HKKP Micro irrigation 1 No 0.00004 4.00 Ha Rs.19.25
-----
- ------
4
Ha
Rs.19.2
5
-----
- ------
-----
- ------
197
Zikza
k Domapara MoWR HKKP Micro irrigation 1 No 0.00004 3.00 Ha Rs.17.00
-----
- ------
3
Ha
Rs.17.0
0
-----
- ------
-----
- ------
198
Zikza
k Puljhuri MoWR HKKP Micro irrigation 1 No 0.00007 4.00 Ha Rs.23.75
-----
- ------
4
Ha
Rs.23.7
5
-----
- ------
-----
- ------
199
Zikza
k Sentpara MoWR HKKP Micro irrigation 1 No 0.00003 3.50 Ha Rs.23.00
-----
- ------
4
Ha
Rs.23.0
0
-----
- ------
-----
- ------
200
Zikza
k Kawahgra MoWR HKKP Micro irrigation 1 No 0.00004 3.00 Ha Rs.19.25
-----
- ------
3
Ha
Rs.19.2
5
-----
- ------
-----
- ------
201
Zikza
k salmanpara MoWR HKKP Micro irrigation 1 No 0.00007 4.00 Ha Rs.20.00
-----
- ------
4
Ha
Rs.20.0
0
-----
- ------
-----
- ------
202
Zikza
k Nogorpara MoWR HKKP Micro irrigation 1 No 0.00003 3.50 Ha Rs.17.50
-----
- ------
4
Ha
Rs.17.5
0
-----
- ------
-----
- ------
203
Zikza
k Doromchas MoWR HKKP Micro irrigation 1 No 0.00003 4.00 Ha Rs.20.00
-----
- ------
4
Ha
Rs.20.0
0
-----
- ------
-----
- ------
204
Zikza
k Kolaigaon
MoA & FW
DAC -&
FW
PDMC Secondry storage structure 1 No 0.00378 80 Ha Rs.900 -----
- ------
-----
-
Rs.270.
0
80
Ha Rs.630
-----
- ------
205
Zikza
k Boldorenggre
MoA & FW
DAC -&
FW
PDMC Secondry storage structure 1 No 0.00277 90 Ha Rs.1050 -----
- ------
-----
-
Rs.315.
0
90
Ha Rs.735
-----
- ------
206
Zikza
k Marahalipara
MoA & FW
DAC -&
FW
PDMC Secondry storage structure 1 No 0.00353 80 Ha Rs.1200 -----
- ------
-----
- ------
-----
-
Rs.360.
0
80
Ha Rs.840
207
Zikza
k Debilla
MoA & FW
DAC -&
FW
PDMC Secondry storage structure 1 No 0.00026 7.00 Ha Rs.15.84 7
Ha Rs.46
-----
- ------
-----
- ------
-----
- ------
208
Zikza
k Bodakgre
MoA & FW
DAC -&
FW
PDMC Secondry storage structure 1 No 0.00052 8.00 Ha Rs.19.50 8
Ha Rs.46
-----
- ------
-----
- ------
-----
- ------
209
Zikza
k Kolmesal
MoA & FW
DAC -&
FW
PDMC Secondry storage structure 2 No 0.00044 9.00 Ha Rs.22.50 -----
- ------
9
Ha
Rs.22.5
0
-----
- ------
-----
- ------
District Irrigation Plan, South West Garo Hills district
96 | P a g e
210
Zikza
k Damgre
MoA & FW
DAC -&
FW
PDMC Secondry storage structure 2 No 0.00029 11.00
Ha Rs.27.50
-----
- ------
11
Ha
Rs.27.5
0
-----
- ------
-----
- ------
211
Zikza
k Asimgre
MoA & FW
DAC -&
FW
PDMC Secondry storage structure 1 No 0.00018 10.00
Ha Rs.25.00
-----
- ------
-----
- ------
10
Ha Rs.25
-----
- ------
212
Zikza
k Rongmu
MoA & FW
DAC -&
FW
PDMC Secondry storage structure 1 No 0.00020 6.00 Ha Rs.15.00 -----
- ------
6
Ha
Rs.15.0
0
-----
- ------
-----
- ------
213
Zikza
k Nachilgre
MoA & FW
DAC -&
FW
PDMC Secondry storage structure 3 No 0.00018 8.00 Ha Rs.20.00 -----
- ------
8
Ha
Rs.20.0
0
-----
- ------
-----
- ------
214
Zikza
k
Bolmoram
Awe
MoA & FW
DAC -&
FW
PDMC Secondry storage structure 1 No 0.00034 9.30 Ha Rs.23.25 -----
- ------
9
Ha
Rs.23.2
5
-----
- ------
-----
- ------
215
Zikza
k Gondu
MoA & FW
DAC -&
FW
PDMC Secondry storage structure 1 No 0.00023 8.00 Ha Rs.20.00 8
Ha Rs.46
-----
- ------
-----
- ------
-----
- ------
216
Zikza
k Dolsi
MoA & FW
DAC -&
FW
PDMC Secondry storage structure 1 No 0.00016 11.00
Ha Rs.27.50
11
Ha Rs.46
-----
- ------
-----
- ------
-----
- ------
217
Zikza
k Damgre
MoA & FW
DAC -&
FW
PDMC Secondry storage structure 1 No 0.00023 13.00
Ha Rs.32.50
13
Ha Rs.46
-----
- ------
-----
- ------
-----
- ------
218
Zikza
k Kilga
MoA & FW
DAC -&
FW
PDMC Secondry storage structure 1 No 0.00010 8.00 Ha Rs.20.00 8
Ha Rs.46
-----
- ------
-----
- ------
-----
- ------
219
Zikza
k Adokgre
MoA & FW
DAC -&
FW
PDMC Secondry storage structure 1 No 0.00016 13.00
Ha Rs.32.50
-----
- ------
13
Ha
Rs.32.5
0
-----
- ------
-----
- ------
220
Zikza
k
New
Salmapara
MoA & FW
DAC -&
FW
PDMC Secondry storage structure 5 No 0.00015 7.00 Ha Rs.17.50 7
Ha Rs.46
-----
- ------
-----
- ------
-----
- ------
221
Zikza
k
Old
Salmanpara
MoA & FW
DAC -&
FW
PDMC Secondry storage structure 5 No 0.00015 11.00
Ha Rs.27.50
11
Ha Rs.46
-----
- ------
-----
- ------
-----
- ------
222
Zikza
k Jogchetpara
MoA & FW
DAC -&
FW
PDMC Secondry storage structure 3 No 0.00020 9.30 Ha Rs.23.25 9
Ha Rs.46
-----
- ------
-----
- ------
-----
- ------
223
Zikza
k Golagre
MoA & FW
DAC -&
FW
PDMC Secondry storage structure 2 No 0.00016 7.20 Ha Rs.18.00 -----
- ------
7
Ha
Rs.18.0
0
-----
- ------
-----
- ------
224 Zikza Jhonjona MoA & FW Convergenc Land Development 1 No 0.00420 15 Ha Rs.93.0 ----- ------ 7.5 Rs.47 7.5 Rs.46 ----- ------
District Irrigation Plan, South West Garo Hills district
97 | P a g e
k DAC -&
FW
e - Ha Ha -
225
Zikza
k Jhorjora
MoA & FW
DAC -&
FW
Convergenc
e Land Development 1 No 0.00282 20 Ha Rs.36.0
-----
- ------
10.0
Ha Rs.18
10.0
Ha Rs.18
-----
- ------
226
Zikza
k Bokman
MoA & FW
DAC -&
FW
Convergenc
e Land Development 1 No 0.00282 15 Ha Rs.36.0
-----
- ------
7.5
Ha Rs.18
7.5
Ha Rs.18
-----
- ------
227
Zikza
k Bongka
MoA & FW
DAC -&
FW
Convergenc
e Land Development 1 No 0.00247 20 Ha Rs.36.0
-----
- ------
10.0
Ha Rs.18
10.0
Ha Rs.18
-----
- ------
228
Zikza
k Kongbangpara
MoA & FW
DAC -&
FW
Convergenc
e Land Development 1 No 0.00167 15 Ha Rs.27.0
-----
- ------
7.5
Ha Rs.14
7.5
Ha Rs.13
-----
- ------
229
Zikza
k Tarapara
MoA & FW
DAC -&
FW
Convergenc
e Land Development 1 No 0.00173 10 Ha Rs.96.0
-----
- ------
5.0
Ha Rs.48
5.0
Ha Rs.48
-----
- ------
230
Zikza
k Rongkai
MoA & FW
DAC -&
FW
Convergenc
e Land Development 1 No 0.00486 25 Ha Rs.246.0
-----
- ------
-----
- ------
25
Ha
Rs.246.
0
-----
- ------
231
Zikza
k
Koligaon
Kajalgopi
MoA & FW
DAC -&
FW
Convergenc
e Land Development 1 No 0.00218 20 Ha Rs.39.0
-----
- ------
-----
- ------
20
Ha Rs.39.0
-----
- ------
232
Zikza
k Balughat
MoA & FW
DAC -&
FW
Convergenc
e Land Development 1 No 0.00195 15 Ha Rs.21.0
-----
- ------
-----
- ------
15
Ha Rs.21.0
-----
- ------
233
Zikza
k Bairagopi
MoA & FW
DAC -&
FW
Convergenc
e Land Development 1 No 0.00179 10 Ha Rs.48.0
-----
- ------
-----
- ------
10
Ha Rs.48.0
-----
- ------
234
Zikza
k Bahadur Khatta
MoA & FW
DAC -&
FW
Convergenc
e Land Development 1 No 0.00119 20 Ha Rs.240.0
-----
- ------
-----
- ------
20
Ha
Rs.240.
0
-----
- ------
235
Zikza
k Phuljura
MoA & FW
DAC -&
FW
Convergenc
e Land Development 1 No 0.00188 15 Ha Rs.24.0
-----
- ------
-----
- ------
-----
- ------
15
Ha Rs.24
236
Zikza
k Barmanpara
MoA & FW
DAC -&
FW
Convergenc
e Land Development 1 No 0.00163 10 Ha Rs.48.0
-----
- ------
-----
- ------
-----
- ------
10
Ha Rs.48
237
Zikza
k Demdema
MoA & FW
DAC -&
FW
Convergenc
e Land Development 1 No 0.00126 12 Ha Rs.18.0
-----
- ------
-----
- ------
-----
- ------
12
Ha Rs.18
238
Zikza
k Amtuli
MoA & FW
DAC -&
Convergenc
e Land Development 1 No 0.00158 10 Ha Rs.54.0
-----
- ------
-----
- ------
-----
- ------
10
Ha Rs.54
District Irrigation Plan, South West Garo Hills district
98 | P a g e
FW
239
Zikza
k Pislajhora
DoLR -
MoRD
Convergenc
e Land Development 1 No 0.00232 12 Ha Rs.64.5
-----
- ------
-----
- ------
12
Ha Rs.64.5
-----
- ------
240
Zikza
k Chapahati
DoLR -
MoRD
Convergenc
e Land Development 1 No 0.00091 10 Ha Rs.27.0
-----
- ------
-----
- ------
10
Ha Rs.27.0
-----
- ------
241
Zikza
k Salmanpara 1
DoLR -
MoRD
Convergenc
e Land Development 1 No 0.00173 8 Ha Rs.45.00
-----
- ------
-----
- ------
8
Ha Rs.45.0
-----
- ------
242
Zikza
k
New
Salmanpara
DoLR -
MoRD
Convergenc
e Land Development 1 No 0.00211 7 Ha Rs.40.50
-----
- ------
-----
- ------
7
Ha Rs.40.5
-----
- ------
243
Zikza
k Grenggre
DoLR -
MoRD
Convergenc
e Land Development 1 No 0.00166 10 Ha Rs.34.50
-----
- ------
-----
- ------
10
Ha Rs.34.5
-----
- ------
244
Zikza
k
Lower
boldakgre
DoLR -
MoRD
Convergenc
e Land Development 1 No 0.00188 12 Ha Rs.40.50
-----
- ------
-----
- ------
12
Ha Rs.40.5
-----
- ------
245
Zikza
k
Upper
Boldakgre
DoLR -
MoRD
Convergenc
e Land Development 1 No 0.00131 9 Ha Rs.45.00
-----
- ------
-----
- ------
9
Ha Rs.45.0
-----
- ------
246
Zikza
k Samgong A.we
DoLR -
MoRD
Convergenc
e Land Development 1 No 0.00087 8 Ha Rs.54.00
-----
- ------
-----
- ------
8
Ha Rs.54.0
-----
- ------
247
Zikza
k Ronmilgre
DoLR -
MoRD
Convergenc
e Land Development 1 No 0.00158 7 Ha Rs.36.00
-----
- ------
-----
- ------
7
Ha Rs.36.0
-----
- ------
248
Zikza
k Bokgre
DoLR -
MoRD
Convergenc
e Land Development 1 No 0.00176 10 Ha Rs.45.00
-----
- ------
-----
- ------
10
Ha Rs.45.0
-----
- ------
249
Zikza
k Udalgre
DoLR -
MoRD
Convergenc
e Land Development 1 No 0.00112 12 Ha Rs.19.50
-----
- ------
-----
- ------
12
Ha Rs.19.5
-----
- ------
250
Zikza
k Satihari
DoLR -
MoRD
Convergenc
e Land Development 1 No 0.00125 12 Ha Rs.27.00
-----
- ------
-----
- ------
12
Ha Rs.27.0
-----
- ------
251
Zikza
k Nachilpara
DoLR -
MoRD
Convergenc
e Land Development 1 No 0.00224 10 Ha Rs.22.20
-----
- ------
-----
- ------
10
Ha Rs.22.2
-----
- ------
252
Zikza
k Babngkapara
DoLR -
MoRD
Convergenc
e Land Development 1 No 0.00224 13 Ha Rs.33.00
-----
- ------
-----
- ------
13
Ha Rs.33.0
-----
- ------
253
Zikza
k Gonchukol
DoLR -
MoRD
Convergenc
e Land Development 1 No 0.00066 15 Ha Rs.22.50
-----
- ------
-----
- ------
-----
- ------
15
Ha Rs.23
254
Zikza
k Rokkalpara
DoLR -
MoRD
Convergenc
e Land Development 1 No 0.00063 20 Ha Rs.19.20
-----
- ------
-----
- ------
-----
- ------
20
Ha Rs.19
255
Zikza
k Anangpara
DoLR -
MoRD
Convergenc
e Land Development 1 No 0.00073 15 Ha Rs.17.10
-----
- ------
-----
- ------
-----
- ------
15
Ha Rs.17
256
Zikza
k Wadagre
DoLR -
MoRD
Convergenc
e Land Development 1 No 0.00063 10 Ha Rs.27.90
-----
- ------
-----
- ------
-----
- ------
10
Ha Rs.28
257
Zikza
k Bakdagre
DoLR -
MoRD
Convergenc
e Land Development 1 No 0.00087 15 Ha Rs.28.50
-----
- ------
-----
- ------
15
Ha Rs.28.5
-----
- ------
258
Zikza
k Rapapaanggre
DoLR -
MoRD
Convergenc
e Land Development 1 No 0.00110 10 Ha Rs.27.30
-----
- ------
-----
- ------
10
Ha Rs.27.3
-----
- ------
259
Zikza
k Hulukona
DoLR -
MoRD
Convergenc
e Land Development 1 No 0.00109 10 Ha Rs.26.70
-----
- ------
-----
- ------
10
Ha Rs.26.7
-----
- ------
District Irrigation Plan, South West Garo Hills district
99 | P a g e
260
Zikza
k Domapara
DoLR -
MoRD
Convergenc
e Land Development 1 No 0.00087 10 Ha Rs.26.40
-----
- ------
-----
- ------
10
Ha Rs.26.4
-----
- ------
261
Zikza
k Kangknaggre
DoLR -
MoRD
Convergenc
e Land Development 1 No 0.00139 8 Ha Rs.30.60
-----
- ------
-----
- ------
8
Ha Rs.30.6
-----
- ------
262
Zikza
k Agonggittim
DoLR -
MoRD
Convergenc
e Land Development 1 No 0.00086 7 Ha Rs.28.80
-----
- ------
-----
- ------
7
Ha Rs.28.8
-----
- ------
263
Zikza
k Managre
DoLR -
MoRD
Convergenc
e Land Development 1 No 0.00133 9 Ha Rs.25.80
-----
- ------
-----
- ------
9
Ha Rs.25.8
-----
- ------
264
Zikza
k Rongsolgre
DoLR -
MoRD
Convergenc
e Land Development 1 No 0.00091 10 Ha Rs.24.60
-----
- ------
-----
- ------
10
Ha Rs.24.6
-----
- ------
265
Zikza
k Menggongpara
DoLR -
MoRD
Convergenc
e Land Development 1 No 0.00121 15 Ha Rs.27.00
-----
- ------
-----
- ------
15
Ha Rs.27.0
-----
- ------
266
Zikza
k Marengpara
DoLR -
MoRD
Convergenc
e Land Development 1 No 0.00129 11 Ha Rs.30.90
-----
- ------
-----
- ------
11
Ha Rs.30.9
-----
- ------
267
Zikza
k Damagre
DoLR -
MoRD
Convergenc
e Land Development 1 No 0.00102 15 Ha Rs.33.15
-----
- ------
-----
- ------
15
Ha Rs.33.2
-----
- ------
268
Zikza
k Wagepara
DoLR -
MoRD
Convergenc
e Land Development 1 No 0.00073 10 Ha Rs.32.10
-----
- ------
-----
- ------
-----
- ------
10
Ha Rs.32
269
Zikza
k Torangpara
DoLR -
MoRD
Convergenc
e Land Development 1 No 0.00089 11 Ha Rs.29.70
-----
- ------
-----
- ------
-----
- ------
11
Ha Rs.30
270
Zikza
k Kebolpara
DoLR -
MoRD
Convergenc
e Land Development 1 No 0.00198 12 Ha Rs.13.80
-----
- ------
-----
- ------
-----
- ------
12
Ha Rs.14
271
Zikza
k Dinagre
DoLR -
MoRD
Convergenc
e Land Development 1 No 0.00132 9 Ha Rs.36.00
-----
- ------
-----
- ------
-----
- ------
9
Ha Rs.36
272
Zikza
k Dalamgre
DoLR -
MoRD
Convergenc
e Land Development 1 No 0.00203 10 Ha Rs.25.50
-----
- ------
-----
- ------
-----
- ------
10
Ha Rs.26
273
Zikza
k Jhonjona
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00420 25 Ha
Rs.138.4
0
-----
- ------
8
Ha
Rs.46.1
3
8
Ha Rs.36.9
10
Ha
Rs.29.5
3
274
Zikza
k Bokman
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00282 30 Ha Rs.96.00
-----
- ------
-----
- ------
-----
- ------
30
Ha
Rs.24.0
0
275
Zikza
k Bongka
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00247 50 Ha Rs.96.00
-----
- ------
-----
- ------
-----
- ------
50
Ha
Rs.24.0
0
276
Zikza
k Kongbangpara
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00167 45 Ha Rs.52.00
-----
- ------
-----
- ------
-----
- ------
45
Ha
Rs.13.0
0
277
Zikza
k Tarapara
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00173 55 Ha
Rs.256.0
0
-----
- ------
-----
- ------
-----
- ------
55
Ha
Rs.64.0
0
278
Zikza
k Rongkai
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00486 100 Ha
Rs.656.0
0
-----
- ------
-----
- ------
-----
- ------
100
Ha Rs.164
279
Zikza
k
Koligaon
Kajalgopi
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00218 50 Ha Rs.88.00
-----
- ------
-----
- ------
-----
- ------
50
Ha
Rs.22.0
0
280
Zikza
k Balughat
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00195 40 Ha Rs.52.00
-----
- ------
-----
- ------
-----
- ------
40
Ha
Rs.13.0
0
281 Zikza Bairagopi DoLR - Convergenc Renovation of & maintaince 1 No 0.00179 75 Ha Rs.128.0 ----- ------ ----- ------ ----- ------ 75 Rs.32.0
District Irrigation Plan, South West Garo Hills district
100 | P a g e
k MoRD e of irrigation canals & drains 0 - - - Ha 0
282
Zikza
k Bahadur Khatta
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00119 100 Ha
Rs.640.0
0
-----
- ------
-----
- ------
-----
- ------
100
Ha Rs.160
283
Zikza
k Phuljura
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00188 40 Ha Rs.64.00
-----
- ------
-----
- ------
-----
- ------
40
Ha
Rs.16.0
0
284
Zikza
k Barmanpara
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00163 30 Ha Rs.52.00
-----
- ------
-----
- ------
-----
- ------
30
Ha
Rs.13.0
0
285
Zikza
k Dinangpara
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00126 20 Ha Rs.16.00
-----
- ------
-----
- ------
-----
- ------
20
Ha Rs.4.00
286
Zikza
k Dangsapara
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00158 31 Ha Rs.24.80
-----
- ------
-----
- ------
-----
- ------
31
Ha Rs.6.20
287
Zikza
k Sanjangpara
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00232 28 Ha Rs.22.40
-----
- ------
-----
- ------
-----
- ------
28
Ha Rs.5.60
288
Zikza
k Demdema
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00091 60 Ha Rs.48.00
-----
- ------
-----
- ------
-----
- ------
60
Ha
Rs.12.0
0
289
Zikza
k Chepagre 2
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00173 15 Ha Rs.12.00
-----
- ------
-----
- ------
-----
- ------
15
Ha Rs.3.00
290
Zikza
k Amtuli
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00211 90 Ha
Rs.144.0
0
-----
- ------
-----
- ------
-----
- ------
90
Ha
Rs.36.0
0
291
Zikza
k Pislajhora
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00166 80 Ha
Rs.172.0
0
20
Ha
Rs.16.
0
20
Ha
Rs.12.8
0
20
Ha Rs.10.2
20
Ha Rs.8.19
292
Zikza
k RangaJhora
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00188 15 Ha Rs.24.00
-----
- ------
-----
- ------
-----
- ------
15
Ha Rs.6.00
293
Zikza
k Chapahati
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00131 15 Ha Rs.60.00
-----
- ------
-----
- ------
-----
- ------
15
Ha
Rs.15.0
0
294
Zikza
k Durgapara
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00087 10 Ha Rs.24.00
-----
- ------
-----
- ------
-----
- ------
10
Ha Rs.6.00
295
Zikza
k Kuligaon
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00158 40 Ha Rs.64.00
10
Ha
Rs.16.
0
10
Ha
Rs.12.8
0
10
Ha Rs.10.2
10
Ha Rs.8.19
296
Zikza
k Kebolpara
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00176 35 Ha Rs.36.80
-----
- ------
-----
- ------
-----
- ------
46
Ha Rs.9.20
297
Zikza
k Chepa
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00112 50 Ha Rs.96.00
13
Ha
Rs.24.
0
13
Ha
Rs.19.2
0
13
Ha Rs.15.4
13
Ha
Rs.12.2
9
298
Zikza
k Dalamgre
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00125 50 Ha Rs.68.00
-----
- ------
-----
- ------
-----
- ------
50
Ha
Rs.17.0
0
299
Zikza
k Salmanpara 1
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00224 35 Ha Rs.90.00
9
Ha
Rs.20.
0
9
Ha
Rs.20.0
0
9
Ha Rs.20.0
9
Ha
Rs.12.2
9
300
Zikza
k
New
Salmanpara
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00112 40 Ha
Rs.108.0
0
-----
- ------
-----
- ------
-----
- ------
40
Ha
Rs.27.0
0
301
Zikza
k Grenggre
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00066 35 Ha Rs.92.00
-----
- ------
-----
- ------
-----
- ------
35
Ha
Rs.23.0
0
302
Zikza
k
Lower
boldakgre
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00063 40 Ha
Rs.108.0
0
-----
- ------
-----
- ------
-----
- ------
40
Ha
Rs.27.0
0
District Irrigation Plan, South West Garo Hills district
101 | P a g e
303
Zikza
k
Upper
Boldakgre
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00073 35 Ha
Rs.120.0
0
-----
- ------
-----
- ------
-----
- ------
35
Ha
Rs.30.0
0
304
Zikza
k Samgong A.we
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00063 30 Ha
Rs.144.0
0
-----
- ------
-----
- ------
-----
- ------
30
Ha
Rs.36.0
0
305
Zikza
k Ronmilgre
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00087 25 Ha Rs.96.00
-----
- ------
-----
- ------
-----
- ------
25
Ha
Rs.24.0
0
306
Zikza
k Bokgre
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00110 15 Ha
Rs.120.0
0
-----
- ------
-----
- ------
-----
- ------
15
Ha
Rs.30.0
0
307
Zikza
k Udalgre
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00109 45 Ha Rs.52.00
-----
- ------
-----
- ------
-----
- ------
11
Ha
Rs.13.0
0
308
Zikza
k Jangrapara
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00087 10 Ha Rs.21.60
-----
- ------
-----
- ------
-----
- ------
3
Ha Rs.5
309
Zikza
k
Chelipara
nokat
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00139 15 Ha Rs.23.20
-----
- ------
-----
- ------
-----
- ------
4
Ha Rs.5.80
310
Zikza
k Satihari
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00086 45 Ha Rs.72.00
-----
- ------
-----
- ------
-----
- ------
11
Ha
Rs.18.0
0
311
Zikza
k Nachilpara
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00133 30 Ha Rs.59.20
-----
- ------
-----
- ------
-----
- ------
8
Ha
Rs.14.8
0
312
Zikza
k Bangkapara
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00091 55 Ha Rs.88.00
-----
- ------
-----
- ------
-----
- ------
14
Ha
Rs.22.0
0
313
Zikza
k Gonchukol
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00121 40 Ha Rs.3.75
-----
- ------
-----
- ------
-----
- ------
10
Ha Rs.0.94
314
Zikza
k Rokkalpara
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00129 30 Ha Rs.3.20
-----
- ------
-----
- ------
-----
- ------
8
Ha Rs.0.80
315
Zikza
k Anangpara
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00102 25 Ha Rs.2.85
-----
- ------
-----
- ------
-----
- ------
6
Ha Rs.0.71
316
Zikza
k Wadagre
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00073 50 Ha Rs.4.65
-----
- ------
-----
- ------
-----
- ------
13
Ha Rs.1
317
Zikza
k Bakdagre
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00089 40 Ha Rs.4.75
-----
- ------
-----
- ------
-----
- ------
10
Ha Rs.1.19
318
Zikza
k Rapapaanggre
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00198 35 Ha Rs.4.55
-----
- ------
-----
- ------
-----
- ------
9
Ha Rs.1.14
319
Zikza
k Hulukona
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00132 30 Ha Rs.4.45
-----
- ------
-----
- ------
-----
- ------
8
Ha Rs.1.11
320
Zikza
k Domapara
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00203 25 Ha Rs.4.40
-----
- ------
-----
- ------
-----
- ------
6
Ha Rs.1.10
321
Zikza
k Kangknaggre
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00247 50 Ha Rs.5.10
-----
- ------
-----
- ------
-----
- ------
13
Ha Rs.1.28
322
Zikza
k Agonggittim
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00167 35 Ha Rs.4.80
-----
- ------
-----
- ------
-----
- ------
9
Ha Rs.1.20
323
Zikza
k Managre
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00173 30 Ha Rs.4.30
-----
- ------
-----
- ------
-----
- ------
8
Ha Rs.1.08
324 Zikza Rongsolgre DoLR - Convergenc Renovation of & maintaince 1 No 0.00486 40 Ha Rs.4.10 ----- ------ ----- ------ ----- ------ 10 Rs.1.03
District Irrigation Plan, South West Garo Hills district
102 | P a g e
k MoRD e of irrigation canals & drains - - - Ha
325
Zikza
k Menggongpara
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00218 35 Ha Rs.4.50
-----
- ------
-----
- ------
-----
- ------
9
Ha Rs.1.13
326
Zikza
k Marengpara
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00195 40 Ha Rs.5.15
-----
- ------
-----
- ------
-----
- ------
10
Ha Rs.1.29
327
Zikza
k Dengna
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00109 35 Ha Rs.53.04
9
Ha
Rs.13.
3
9
Ha
Rs.10.6
1
9
Ha Rs.8.5
9
Ha Rs.6.79
328
Zikza
k Gopi
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 1 No 0.00087 45 Ha Rs.85.60
11
Ha
Rs.21.
4
11
Ha
Rs.17.1
2
11
Ha Rs.13.7
11
Ha
Rs.10.9
6
329
Zikza
k Jhorjora
DoLR -
MoRD
Convergenc
e
Renovation of & maintaince
of irrigation canals & drains 2 No 0.00139 30 Ha Rs.79.20
8
Ha
Rs.19.
8
8
Ha
Rs.15.8
4
8
Ha Rs.12.7
8
Ha
Rs.10.1
4
330
Zikza
k Nachil Awe
State
Irrigation
Department
HKKP Surface Minor Irrigation 1 No. 0.0002 16 Ha Rs.39.84 -----
- ------
-----
-
Rs.18.0
0
16
Ha Rs.21.8
-----
- ------
331
Zikza
k Wadapgre
State
Irrigation
Department
HKKP Surface Minor Irrigation 1 No. 0.0003 18 Ha Rs.44.82 -----
- ------
-----
-
Rs.17.0
0
18
Ha Rs.27.8
-----
- ------
332
Zikza
k Salmanpara
State
Irrigation
Department
HKKP Surface Minor Irrigation 1 No. 0.0004 17 Ha Rs.42.33 -----
- ------
-----
-
Rs.13.0
0
17
Ha Rs.29.3
-----
- ------
333
Zikza
k
Upper
Samanpara
State
Irrigation
Department
HKKP Surface Minor Irrigation 1 No. 0.0004 13 Ha Rs.32.37 -----
- ------
-----
- ------
-----
- Rs.13.0
13
Ha
Rs.19.3
7
334
Zikza
k Bollonggre
State
Irrigation
Department
HKKP Surface Minor Irrigation 1 No. 0.0003 17 Ha Rs.22.00 17
Ha Rs.15
-----
- ------
-----
- ------
-----
- ------
335
Zikza
k Dudara
State
Irrigation
Department
HKKP Surface Minor Irrigation 1 No. 0.0003 16 Ha Rs.39.84 -----
- ------
-----
-
Rs.16.0
0
16
Ha Rs.23.8
-----
- ------
336
Zikza
k Denagpara
State
Irrigation
Department
HKKP Surface Minor Irrigation 1 No. 0.0003 15 Ha Rs.38.10 -----
- ------
-----
-
Rs.15.0
0
15
Ha Rs.23.1
-----
- ------
337
Zikza
k Dangsapara
State
Irrigation
Department
HKKP Surface Minor Irrigation 1 No. 0.0003 13 Ha Rs.33.12 -----
- ------
-----
-
Rs.13.0
0
13
Ha Rs.20.1
-----
- ------
338
Zikza
k Chelipara Apal
State
Irrigation
Department
HKKP Surface Minor Irrigation 1 No. 0.0002 17 Ha Rs.42.33 -----
- ------
-----
-
Rs.17.0
0
17
Ha Rs.25.3
-----
- ------
339
Zikza
k Hati Belpara
State
Irrigation
Department
HKKP Surface Minor Irrigation 1 No. 0.0003 15 Ha Rs.37.35 -----
- ------
-----
-
Rs.15.0
0
15
Ha Rs.22.4
-----
- ------
340
Zikza
k Dinangpara
State
Irrigation HKKP Surface Minor Irrigation 1 No. 0.0003 13 Ha Rs.32.37
-----
- ------
-----
-
Rs.13.0
0
13
Ha Rs.19.4
-----
- ------
District Irrigation Plan, South West Garo Hills district
103 | P a g e
Department
341
Zikza
k Dangsapara
State
Irrigation
Department
HKKP Surface Minor Irrigation 1 No. 0.0003 17 Ha Rs.42.33 -----
- ------
-----
- ------
-----
- Rs.17.0
17
Ha
Rs.25.3
3
342
Zikza
k Sanjangpara
State
Irrigation
Department
HKKP Surface Minor Irrigation 1 No. 0.0003 17 Ha Rs.42.33 -----
- ------
-----
- ------
-----
- Rs.17.0
17
Ha
Rs.25.3
3
343
Zikza
k Chepagre 2
State
Irrigation
Department
HKKP Surface Minor Irrigation 1 No. 0.0002 16 Ha Rs.39.84 -----
- ------
-----
- ------
-----
- Rs.17.0
16
Ha
Rs.22.8
4
344
Zikza
k RangaJhora
State
Irrigation
Department
HKKP Surface Minor Irrigation 1 No. 0.0002 17 Ha Rs.42.33 -----
- ------
-----
- ------
-----
- Rs.18.0
17
Ha
Rs.24.3
3
345
Zikza
k Durgapara
State
Irrigation
Department
HKKP Surface Minor Irrigation 1 No. 0.0004 18 Ha Rs.44.82 -----
- ------
-----
- ------
-----
- Rs.20.0
18
Ha
Rs.24.8
2
346
Zikza
k Kuligaon
State
Irrigation
Department
HKKP Surface Minor Irrigation 1 No. 0.0004 19 Ha Rs.47.31 -----
- ------
-----
- ------
-----
- Rs.21.0
19
Ha
Rs.26.3
1
347
Zikza
k Jangrapara
State
Irrigation
Department
HKKP Surface Minor Irrigation 1 No. 0.0004 20 Ha Rs.49.80 -----
- ------
-----
- ------
-----
- Rs.23.0
20
Ha
Rs.26.8
0
348
Zikza
k
Chelipara
nokat
State
Irrigation
Department
HKKP Surface Minor Irrigation 1 No. 0.0002 21 Ha Rs.52.29 -----
- ------
-----
- ------
-----
- Rs.25.0
21
Ha
Rs.27.2
9
349
Zikza
k Kawahagra
State
Irrigation
Department
HKKP Impv. & Mordz. 1 No. 0.0018 80 Ha Rs.165.0
0
-----
- ------
-----
-
Rs.66.0
0
80
Ha Rs.99.0
-----
- ------
350
Zikza
k Koligaon
State
Irrigation
Department
HKKP Impv. & Mordz. 1 No. 0.0021 70 Ha Rs.209.0
0
-----
- ------
-----
-
Rs.84.0
0
70
Ha
Rs.125.
0
-----
- ------
351
Zikza
k Kuligaon
State
Irrigation
Department
HKKP Impv. & Mordz. 1 No. 0.0024 65 Ha Rs.176.0
0
-----
- ------
-----
-
Rs.70.0
0
65
Ha
Rs.106.
0
-----
- ------
352
Zikza
k Chepagre
State
Irrigation
Department
HKKP Impv. & Mordz. 1 No. 0.0002 60 Ha Rs.66.00 -----
- ------
-----
-
Rs.26.0
0
60
Ha Rs.40.0
-----
- ------
353
Zikza
k Babelapara
State
Irrigation
Department
HKKP Impv. & Mordz. 1 No. 0.0012 90 Ha Rs.220.0
0
-----
- ------
-----
-
Rs.88.0
0
90
Ha
Rs.132.
0
-----
- ------
354
Zikza
k
Jebobgpara
Nokat
State
Irrigation
Department
HKKP Multipurpose reseviours 1 No. 0.0022 90 Ha Rs.735.0
0
-----
- ------
-----
- Rs.294
90
Ha
Rs.441.
0
-----
- ------
District Irrigation Plan, South West Garo Hills district
104 | P a g e
355
Zikza
k
Koligaon
Kajalgopi
State
Irrigation
Department
HKKP Multipurpose reseviours 1 No. 0.0030 120 Ha Rs.857.5
0
-----
- ------
-----
- Rs.343
120
Ha
Rs.514.
5
-----
- ------
356
Zikza
k Balughat
State
Irrigation
Department
HKKP Multipurpose reseviours 1 No. 0.0029 100 Ha Rs.686.0
0
-----
- ------
-----
- Rs.274
100
Ha
Rs.412.
0
-----
- ------
357
Zikza
k
Salmanpara
East
State
Irrigation
Department
HKKP Multipurpose reseviours 1 No. 0.0021 90 Ha Rs.759.5
0
-----
- ------
-----
- Rs.304
90
Ha
Rs.455.
5
-----
- ------
358
Zikza
k Wadagre
State
Irrigation
Department
HKKP Multipurpose reseviours 1 No. 0.0025 85 Ha Rs.894.2
5
-----
- ------
-----
- Rs.358
85
Ha
Rs.536.
3
-----
- ------
359
Zikza
k Jangrapara
State
Irrigation
Department
HKKP Multipurpose reseviours 1 No. 0.0040 80 Ha Rs.661.5
0
-----
- ------
-----
- Rs.265
80
Ha
Rs.396.
5
-----
- ------
360
Zikza
k Golmangre
State
Irrigation
Department
HKKP Multipurpose reseviours 1 No. 0.0026 75 Ha Rs.644.3
5
-----
- ------
-----
- Rs.258
75
Ha
Rs.386.
4
-----
- ------
361
Zikza
k Salmanapara 1
State
Irrigation
Department
HKKP Multipurpose reseviours 1 No. 0.0027 90 Ha Rs.624.7
5
-----
- ------
-----
- Rs.250
90
Ha
Rs.374.
8
-----
- ------
362
Zikza
k
Salmanpara
West
State
Irrigation
Department
HKKP Multipurpose reseviours 1 No. 0.0026 95 Ha Rs.661.5
0
-----
- ------
-----
- ------
-----
-
Rs.311.
0
95
Ha Rs.351
363
Zikza
k
Samapara
North
State
Irrigation
Department
HKKP Multipurpose reseviours 1 No. 0.0022 65 Ha Rs.705.6
0
-----
- ------
-----
- ------
-----
-
Rs.332.
0
65
Ha Rs.374
364
Zikza
k Sildegre
State
Irrigation
Department
HKKP Multipurpose reseviours 1 No. 0.0030 90 Ha Rs.595.3
5
-----
- ------
-----
- Rs.238
90
Ha
Rs.357.
4
-----
- ------
365
Zikza
k Boldakgre
State
Irrigation
Department
HKKP Multipurpose reseviours 1 No. 0.0029 85 Ha Rs.735.0
0
-----
- ------
-----
- ------
-----
-
Rs.345.
0
85
Ha Rs.390
366
Zikza
k Demasi
State
Irrigation
Department
HKKP Multipurpose reseviours 1 No. 0.0021 90 Ha Rs.705.6
0
-----
- ------
-----
- Rs.282
90
Ha
Rs.423.
6
-----
- ------
367
Zikza
k Hulokhona
State
Irrigation
Department
HKKP Multipurpose reseviours 1 No. 0.0025 75 Ha Rs.624.7
5
-----
- ------
-----
- Rs.250
75
Ha
Rs.374.
8
-----
- ------
368
Zikza
k Damdiloka
State
Irrigation
Department
HKKP Multipurpose reseviours 1 No. 0.0027 80 Ha Rs.661.5
0
-----
- ------
-----
- Rs.265
80
Ha
Rs.396.
5
-----
- ------
369 Zikza Debajani State HKKP Multipurpose reseviours 1 No. 0.0040 75 Ha Rs.686.0 ----- ------ ----- Rs.274 75 Rs.412. ----- ------
District Irrigation Plan, South West Garo Hills district
105 | P a g e
k Irrigation
Department
0 - - Ha 0 -
370
Zikza
k Turanpara
State
Irrigation
Department
HKKP Multipurpose reseviours 1 No. 0.0026 80 Ha Rs.759.5
0
-----
- ------
-----
- Rs.304
80
Ha
Rs.455.
5
-----
- ------
371
Zikza
k Ponchapara
State
Irrigation
Department
HKKP Multipurpose reseviours 1 No. 0.0027 75 Ha Rs.588.0
0
-----
- ------
-----
- Rs.235
75
Ha
Rs.353.
0
-----
- ------
372
Zikza
k Radanpara
State
Irrigation
Department
HKKP Multipurpose reseviours 1 No. 0.0025 90 Ha Rs.710.5
0
-----
- ------
-----
- Rs.284
90
Ha
Rs.426.
5
-----
- ------
373
Zikza
k Dansinpara
State
Irrigation
Department
HKKP Multipurpose reseviours 1 No. 0.0040 100 Ha Rs.759.5
0
-----
- ------
-----
- ------
-----
-
Rs.357.
0
40
Ha Rs.403
374
Zikza
k Anchenggre
State
Irrigation
Department
HKKP Multipurpose reseviours 1 No. 0.0026 60 Ha Rs.142.5
0
-----
- ------
-----
- ------
-----
- Rs.67.0
24
Ha Rs.76
375
Zikza
k Wagepara
State
Irrigation
Department
HKKP Multipurpose reseviours 1 No 0.0014 100 Ha Rs.1102 -----
- ------
-----
- ------
-----
-
Rs.518.
0
40
Ha Rs.584
376
Zikza
k Sangjangpara
State
Irrigation
Department
HKKP Multipurpose reseviours 1 No 0.0014 90 Ha Rs.754.0
0
-----
- ------
-----
- ------
-----
-
Rs.354.
0
36
Ha Rs.400
377
Zikza
k Gopinat Killa
State
Irrigation
Department
HKKP Multipurpose reseviours 1 No 0.0014 95 Ha Rs.783.0
0
-----
- ------
-----
- ------
-----
-
Rs.368.
0
38
Ha Rs.415
378
Zikza
k Tiwaligre
State
Irrigation
Department
HKKP Multipurpose reseviours 1 No 0.0011 70 Ha Rs.681.5
0
-----
- ------
-----
- ------
-----
-
Rs.320.
0
28
Ha Rs.362
379
Zikza
k Sokbokgre
State
Irrigation
Department
HKKP Multipurpose reseviours 1 No 0.0015 80 Ha Rs.638.0
0
-----
- ------
-----
- ------
-----
-
Rs.300.
0
32
Ha Rs.338
380
Zikza
k Salmapara
State
Irrigation
Department
HKKP Multipurpose reseviours 1 No 0.0015 25 Ha Rs.62.50 10
Ha Rs.25
15
Ha Rs.38
-----
-
381
Zikza
k Pislajhora
State
Irrigation
Department
HKKP Multipurpose reseviours 1 No 0.0015 200 Ha Rs.500.0
0
80
Ha
Rs.20
0
120
Ha Rs.300
-----
-
382
Zikza
k Matkolgre
Externally
aided
projects
(NEC)
HKKP Water Harvesting 1 No. 0.00323 90 Ha Rs.710.5
0
-----
- ------
-----
- Rs.284
90
Ha
Rs.426.
5
-----
- ------
383 Zikza Ponchapara Externally HKKP Water Harvesting 1 No. 0.00296 110 Ha Rs.759.5 ----- ------ ----- Rs.304 110 Rs.455. ----- ------
District Irrigation Plan, South West Garo Hills district
106 | P a g e
k aided
projects
(NEC)
0 - - Ha 5 -
384
Zikza
k Zikzak
Externally
aided
projects
(NEC)
HKKP Water Harvesting 1 No. 0.00312 100 Ha Rs.710.5
0
-----
- ------
-----
- Rs.284
100
Ha
Rs.426.
5
-----
- ------
385
Zikza
k Salmanpara
Externally
aided
projects
(NEC)
HKKP Water Harvesting 2 No. 0.00368 90 Ha Rs.2646.
0
-----
- ------
-----
-
Rs.132
3
36
Ha
Rs.132
3
54
Ha
Rs.132
3
386
Zikza
k Magdual
Externally
aided
projects
(NEC)
HKKP Water Harvesting 1 No. 0.00317 90 Ha Rs.686.0
0
-----
- ------
-----
- Rs.274
90
Ha
Rs.412.
0
-----
- ------
387
Zikza
k Garagre
Externally
aided
projects
(NEC)
HKKP Water Harvesting 1 No. 0.00386 95 Ha Rs.563.5
0
-----
- ------
-----
- Rs.225
95
Ha
Rs.338.
5
-----
- ------
388
Zikza
k Dembema
Externally
aided
projects
(NEC)
HKKP Water Harvesting 1 No. 0.00404 80 Ha Rs.710.5
0
-----
- ------
-----
- Rs.284
80
Ha
Rs.426.
5
-----
- ------
389
Zikza
k Sokbokgre
Externally
aided
projects
(NEC)
HKKP Water Harvesting 1 No. 0.00403 100 Ha Rs.624.7
5
-----
- ------
-----
- ------
-----
-
Rs.294.
0
40
Ha Rs.331
390
Zikza
k Megerngipara
Externally
aided
projects
(NEC)
HKKP Water Harvesting 1 No. 0.00244 120 Ha Rs.686.0
0
-----
- ------
-----
- ------
-----
-
Rs.329.
0
48
Ha Rs.357
391
Zikza
k Bagina
Externally
aided
projects
(NEC)
HKKP Water Harvesting 1 No. 0.00247 90 Ha Rs.710.5
0
-----
- ------
-----
- ------
-----
-
Rs.348.
0
36
Ha Rs.363
392
Zikza
k Kuligaon
Other loan
projects like
NABARD
HKKP Renovation 1 No. 0.0025 95 Ha Rs.500.0
0
-----
- ------
-----
- ------
48
Ha Rs.250
48
Ha Rs.250
393
Zikza
k Koligaon
Other loan
projects like
NABARD
HKKP Renovation 1 No. 0.0024 70 Ha Rs.450.0
0
-----
- ------
-----
- ------
35
Ha Rs.225
35
Ha Rs.225
394
Zikza
k Dengna
Other loan
projects like
NABARD
HKKP Renovation 1 No. 0.0027 75 Ha Rs.525.0
0
-----
- ------
30
Ha Rs.210
45
Ha Rs.315
-----
- ------
District Irrigation Plan, South West Garo Hills district
107 | P a g e
395
Zikza
k Gopi
Other loan
projects like
NABARD
HKKP Renovation 1 No. 0.0034 60 Ha Rs.540.0
0
-----
- ------
-----
- ------
24
Ha Rs.270
36
Ha Rs.270
396
Zikza
k Kawahagra
Other loan
projects like
NABARD
HKKP Renovation 1 No. 0.0022 85 Ha Rs.525.0
0
-----
- ------
34
Ha Rs.210
51
Ha Rs.315
-----
- ------
397
Zikza
k Chepa
Other loan
projects like
NABARD
HKKP Renovation 1 No. 0.0004 65 Ha Rs.175.0
0
-----
- ------
-----
- ------
26
Ha Rs.88
26
Ha Rs.87
398
Zikza
k Jhonjona
Other loan
projects like
NABARD
HKKP Renovation 1 No. 0.0021 90 Ha Rs.750.0
0
-----
- ------
-----
- ------
36
Ha Rs.375
36
Ha Rs.375
399
Zikza
k Jhorjora
Other loan
projects like
NABARD
HKKP Renovation 1 No. 0.0023 95 Ha Rs.775.0
0
-----
- ------
-----
- ------
38
Ha Rs.388
38
Ha Rs.387
400
Zikza
k Boldamgre
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
401
Zikza
k Katuligre
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
402
Zikza
k Katuligaon
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
403
Zikza
k Dufrigaon
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
404
Zikza
k
Dufrigaon
Koch
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
405
Zikza
k Chilapara
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
406
Zikza
k Kambakpara
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
407
Zikza
k
kambakpara
Sonngitcham
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
408
Zikza
k Demiligre
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
409 Zikza Ameshgittim Other loan HKKP Solar pumpsets 15 ------ 8 Ha Rs.7.50 ----- ------ 5 Rs.2.25 5 Rs.2.25 6 Rs.3.00
District Irrigation Plan, South West Garo Hills district
108 | P a g e
k projects like
NABARD
Nos - No. No. No.
410
Zikza
k Chatihari
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
411
Zikza
k Dangsapara
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
412
Zikza
k
Kuligaon
hajong
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
413
Zikza
k Kuligaon Koch
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
414
Zikza
k
Boldam
A.kongggre
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
415
Zikza
k Janggre
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
416
Zikza
k Janggre Samar
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
417
Zikza
k gandigre Garo
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
418
Zikza
k
gandigreBuram
an
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
419
Zikza
k wadagre
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
420
Zikza
k Kalaicharpara
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
421
Zikza
k
Lower
kalaichar
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
422
Zikza
k Mondalpara
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
423
Zikza
k Wannaggre
Other loan
projects like HKKP Solar pumpsets
15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
District Irrigation Plan, South West Garo Hills district
109 | P a g e
NABARD
424
Zikza
k
upper
wananggre
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
425
Zikza
k Sobokgre
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
426
Zikza
k
Boldam
Songgitalgre
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
427
Zikza
k Dinangpara
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
428
Zikza
k Jongnogre
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
429
Zikza
k Satbone
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
430
Zikza
k Dangsinpara
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
431
Zikza
k Kuligre
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
432
Zikza
k
Kolaigaon
Tillapara
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
433
Zikza
k
Kolaigaon
Momdolpara
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
434
Zikza
k Billipara
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
435
Zikza
k Nayapara
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
436
Zikza
k Katabaripara
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
437
Zikza
k kashipara
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
District Irrigation Plan, South West Garo Hills district
110 | P a g e
438
Zikza
k
Upper
Kalaichar
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
439
Zikza
k Bollongre
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
440
Zikza
k
Upper
Bollongre
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
441
Zikza
k Bolddenggre
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
442
Zikza
k Tewaligre
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
443
Zikza
k Pagolpara
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
444
Zikza
k Paglapara
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
445
Zikza
k Dengnagre
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
446
Zikza
k Anangpara
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
447
Zikza
k Chelipara
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
448
Zikza
k Darugre
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
449
Zikza
k Bengdapara
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
450
Zikza
k Kimdegre
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
451
Zikza
k Okchokgre
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
452 Zikza Sindilgre Other loan HKKP Solar pumpsets 15 ------ 8 Ha Rs.7.50 ----- ------ 5 Rs.2.25 5 Rs.2.25 6 Rs.3.00
District Irrigation Plan, South West Garo Hills district
111 | P a g e
k projects like
NABARD
Nos - No. No. No.
453
Zikza
k Kedapara
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
454
Zikza
k Kerupara
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
455
Zikza
k Dinapara
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
456
Zikza
k Nachipara
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
457
Zikza
k Chepagre
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
458
Zikza
k
New
Anangpara
Songgitcham
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
459
Zikza
k Matkolgre
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
460
Zikza
k Mandalgre
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
461
Zikza
k Chipra
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
462
Zikza
k Tallimgre
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
463
Zikza
k Domapara
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
464
Zikza
k Puljhuri
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
465
Zikza
k Sentpara
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
466
Zikza
k Kawahgra
Other loan
projects like HKKP Solar pumpsets
15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
District Irrigation Plan, South West Garo Hills district
112 | P a g e
NABARD
467
Zikza
k salmanpara
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
468
Zikza
k Nogorpara
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
469
Zikza
k Doromchas
Other loan
projects like
NABARD
HKKP Solar pumpsets 15
Nos ------ 8 Ha Rs.7.50
-----
- ------
5
No. Rs.2.25
5
No. Rs.2.25
6
No. Rs.3.00
470
Zikza
k
Damal
Songgitcham
State
Irrigation
Department
HKKP Protection & Rejuvination of
springs 1 No.
0.00002
8 8.00 Rs.20.00
8
Ha
Rs.20.
0
-----
- ------
-----
- ------
-----
- ------
471
Zikza
k Damagre
State
Irrigation
Department
HKKP Protection & Rejuvination of
springs 1 No.
0.00003
5 7.00 Rs.17.50
7
Ha
Rs.17.
5
-----
- ------
-----
- ------
-----
- ------
472
Zikza
k Boldak songma
State
Irrigation
Department
HKKP Protection & Rejuvination of
springs 1 No.
0.00005
6 6.00 Rs.15.00
6
Ha
Rs.15.
0
-----
- ------
-----
- ------
-----
- ------
473
Zikza
k Anagre
State
Irrigation
Department
HKKP Protection & Rejuvination of
springs 1 No.
0.00005
4 7.20 Rs.18.00
-----
- ------
7
Ha
Rs.18.0
0
-----
- ------
-----
- ------
474
Zikza
k Kilma Gittim
State
Irrigation
Department
HKKP Protection & Rejuvination of
springs 1 No.
0.00005
9 6.30 Rs.15.75
6
Ha
Rs.15.
8
-----
- ------
-----
- ------
-----
- ------
475
Zikza
k Asigre
State
Irrigation
Department
HKKP Protection & Rejuvination of
springs 1 No.
0.00004
3 5.20 Rs.13.00
-----
- ------
5
Ha
Rs.13.0
0
-----
- ------
-----
- ------
476
Zikza
k Tapsi
State
Irrigation
Department
HKKP Protection & Rejuvination of
springs 1 No.
0.00004
0 6.20 Rs.15.50
-----
- ------
6
Ha
Rs.15.5
0
-----
- ------
-----
- ------
477
Zikza
k Salangre
State
Irrigation
Department
HKKP Protection & Rejuvination of
springs 1 No.
0.00005
7 7.20 Rs.18.00
-----
- ------
7
Ha
Rs.18.0
0
-----
- ------
-----
- ------
478
Zikza
k Purakasia
State
Irrigation
Department
HKKP Protection & Rejuvination of
springs 1 No.
0.00004
7 8.20 Rs.20.50
8
Ha
Rs.20.
5
-----
- ------
-----
- ------
-----
- ------
479
Zikza
k Salmanpara
State
Irrigation
Department
HKKP Protection & Rejuvination of
springs 1 No.
0.00005
4 9.20 Rs.23.00
-----
- ------
-----
- ------
9
Ha Rs.23
-----
- ------
480
Zikza
k Debajani
State
Irrigation
Department
HKKP Protection & Rejuvination of
springs 1 No.
0.00005
9 8.00 Rs.25.50
-----
- ------
-----
- ------
10
Ha Rs.26
-----
- ------
District Irrigation Plan, South West Garo Hills district
113 | P a g e
481
Zikza
k Mahendraganj
State
Irrigation
Department
HKKP Protection & Rejuvination of
springs 1 No.
0.00004
3 7.00 Rs.28.00
11
Ha
Rs.28.
0
-----
- ------
-----
- ------
-----
- ------
482
Zikza
k Babelapara
State
Irrigation
Department
HKKP Protection & Rejuvination of
springs 1 No.
0.00004
0 6.00 Rs.30.50
-----
- ------
-----
- ------
-----
- ------
12
Ha
Rs.30.5
0
483
Zikza
k Chepagre
State
Irrigation
Department
HKKP Protection & Rejuvination of
springs 1 No.
0.00004
3 5.00 Rs.33.00
-----
- ------
-----
- ------
-----
- ------
13
Ha
Rs.33.0
0
484
Zikza
k Chelipara
State
Irrigation
Department
HKKP Protection & Rejuvination of
springs 1 No.
0.00004
0 7.00 Rs.35.50
-----
- ------
14
Ha
Rs.35.5
0
-----
- ------
-----
- ------
485
Zikza
k Jangrapara
State
Irrigation
Department
HKKP Protection & Rejuvination of
springs 1 No.
0.00005
7 8.00 Rs.38.00
-----
- ------
15
Ha
Rs.38.0
0
-----
- ------
-----
- ------
486
Zikza
k Kawahagra
State
Irrigation
Department
HKKP Protection & Rejuvination of
springs 1 No.
0.00004
7 4.00 Rs.40.50
-----
- ------
-----
- ------
16
Ha Rs.41
-----
- ------
487
Zikza
k Patijhora
State
Irrigation
Department
HKKP Protection & Rejuvination of
springs 1 No.
0.00005
4 6.00 Rs.43.00
-----
- ------
-----
- ------
17
Ha Rs.43
-----
- ------
488
Zikza
k Magurmari
State
Irrigation
Department
HKKP Protection & Rejuvination of
springs 1 No.
0.00004
3 5.00 Rs.45.50
-----
- ------
18
Ha
Rs.45.5
0
-----
- ------
-----
- ------
489
Zikza
k Damagre
State
Irrigation
Department
HKKP Protection & Rejuvination of
springs 1 No.
0.00004
0 7.00 Rs.48.00
19
Ha
Rs.48.
0
-----
- ------
-----
- ------
-----
- ------
490
Zikza
k Boldakgre
State
Irrigation
Department
HKKP Protection & Rejuvination of
springs 1 No.
0.00004
0 6.00 Rs.48.00
19
Ha
Rs.48.
0
-----
- ------
-----
- ------
-----
- ------
District Irrigation Plan, South West Garo Hills district
114 | P a g e
Dalu Block
Sl.
No.
Nam
e of
Bloc
k
Name of
village
Concerened
Ministry/
Department
Component Activity
Total in Nos.
/Capacity (in
Cum)
Total
comman
d area
(in Ha.)
Total
fund (in
Rs.
Lakhs)
16 -
17
Are
a
16 -
17
Cost
17 -
18
Are
a
17 - 18
Cost
18 -
19
Are
a
18 - 19
Cost
19 -
20
Are
a
19 - 20
Cost
1 Dalu Sanda MoWR HKKP Surface minor irrigation 1 No 0.00578 285 Ha Rs.730
-----
-
Rs.14
6
228
Ha Rs.139
-----
- ------
-----
- ------
2 Dalu Sanda Adu MoWR HKKP Surface minor irrigation 1 No 0.00473 120 Ha Rs.700
-----
- ------
-----
- Rs.210
48
Ha Rs.210
72
Ha Rs.280
3 Dalu Genapara MoWR HKKP Surface minor irrigation 1 No 0.00519 100 Ha
Rs.700.0
0
-----
-
Rs.14
0
40
Ha Rs.280
60
Ha Rs.280
-----
- ------
4 Dalu Puran Bazaar MoWR HKKP Surface minor irrigation 1 No 0.00367 50 Ha
Rs.475.0
0
-----
- ------
-----
- ------
-----
- Rs.95
20
Ha Rs.380
5 Dalu Purakhasia MoWR HKKP Surface minor irrigation 1 No 0.00436 60 Ha
Rs.400.0
0
-----
- ------
-----
- ------
-----
- Rs.80
24
Ha Rs.320
6 Dalu Jarangkona MoWR HKKP Surface minor irrigation 1 No 0.00341 60 Ha
Rs.450.0
0
-----
- ------
-----
- ------
-----
- Rs.90
24
Ha Rs.360
7 Dalu Chongnapara MoWR HKKP Surface minor irrigation 1 No 0.00326 70 Ha
Rs.225.0
0
-----
- ------
-----
- ------
-----
- Rs.45
28
Ha Rs.180
8 Dalu Purakhasia MoWR HKKP Lift irrigation
20
Nos 0.00150 70 Ha Rs.10.00
-----
- ------
18
Ha Rs.2.50
18
Ha
Rs.2.5
0
35
Ha Rs.5.00
9 Dalu Babellapara MoWR HKKP Lift irrigation
20
Nos 0.00108 70 Ha Rs.10.00
-----
- ------
18
Ha Rs.2.50
18
Ha
Rs.2.5
0
35
Ha Rs.5.00
10 Dalu Genapara MoWR HKKP Lift irrigation
20
Nos 0.00075 70 Ha Rs.10.00
-----
- ------
18
Ha Rs.2.50
18
Ha
Rs.2.5
0
35
Ha Rs.5.00
11 Dalu Sandagre MoWR HKKP G/water 5 Nos 0.00075 35 Ha
Rs.540.0
0
-----
- ------
-----
- Rs.162
35
Ha Rs.540
-----
- ------
12 Dalu Sanda MoWR HKKP Lined F/C 1 No
0.00578
0 60 Ha
Rs.127.5
0
-----
- ------
-----
- ------
24
Ha Rs.51
36
Ha Rs.77
13 Dalu Babelapara MoWR HKKP Lined F/C 1 No
0.00108
0 50 Ha Rs.340
-----
- ------
-----
- ------
20
Ha Rs.136
30
Ha Rs.204
14 Dalu Genapara MoWR HKKP Lined F/C 1 No
0.00075
0 70 Ha Rs.238
-----
- ------
-----
- ------
28
Ha Rs.95
42
Ha Rs.143
15 Dalu Darong Adu MoWR HKKP unlined F/C 1 No 0.0001 50 Ha Rs.12.00
-----
- ------
-----
- ------
20
Ha Rs.5
30
Ha Rs.7
16 Dalu Sanda
DoLR -
MoRD
Convergenc
e Land Development 1 No ------ 10 Ha Rs.99.75
-----
- ------
-----
- ------
10
Ha
Rs.99.
8
-----
- ------
17 Dalu Sanda Adu
DoLR -
MoRD
Convergenc
e Land Development 1 No ------ 9 Ha Rs.98.00
-----
- ------
-----
- ------
9
Ha
Rs.98.
0
-----
- ------
18 Dalu Genapara DoLR - Convergenc Land Development 1 No ------ 8 Ha Rs.98.00 ----- ------ ----- ------ 8 Rs.98. ----- ------
District Irrigation Plan, South West Garo Hills district
115 | P a g e
MoRD e - - Ha 0 -
19 Dalu Puran Bazaar
DoLR -
MoRD
Convergenc
e Land Development 1 No ------ 6 Ha Rs.66.50
-----
- ------
-----
- ------
-----
- ------
6
Ha Rs.67
20 Dalu Purakhasia
DoLR -
MoRD
Convergenc
e Land Development 1 No ------ 10 Ha Rs.56.00
-----
- ------
-----
- ------
-----
- ------
10
Ha Rs.56
21 Dalu Jarangkona
DoLR -
MoRD
Convergenc
e Land Development 1 No ------ 7 Ha Rs.63.00
-----
- ------
-----
- ------
-----
- ------
7
Ha Rs.63
22 Dalu Chongnapara
DoLR -
MoRD
Convergenc
e Land Development 1 No ------ 6 Ha Rs.31.50
-----
- ------
-----
- ------
-----
- ------
6
Ha Rs.32
23
Dalu Wagepara
State
Irrigation
Department
HKKP Surface Minor Irrigation 1 No 0.0002 25 Ha Rs.249.0
0
-----
- ------
-----
- Rs.75
25
Ha Rs.174
-----
- ------
24
Dalu Madra
State
Irrigation
Department
HKKP Surface Minor Irrigation 1 No 0.0004 45 Ha Rs.298.8
0
-----
- ------
-----
- Rs.90
45
Ha Rs.209
-----
- ------
25
Dalu Naronggre
State
Irrigation
Department
HKKP Surface Minor Irrigation 1 No 0.0004 20 Ha Rs.224.1
0
-----
- ------
-----
- Rs.67
20
Ha Rs.157
-----
- ------
26
Dalu Jarangkona
State
Irrigation
Department
HKKP Surface Minor Irrigation 1 No 0.0003 21 Ha Rs.52.29 -----
- ------
-----
- Rs.16
21
Ha Rs.36
-----
- ------
27
Dalu Wakmedamgr
e
State
Irrigation
Department
HKKP Surface Minor Irrigation 1 No 0.0005 28 Ha Rs.69.72 -----
- ------
-----
- Rs.21
28
Ha Rs.49
-----
- ------
28
Dalu Chengapara
State
Irrigation
Department
HKKP Surface Minor Irrigation 1 No 0.0003 20 Ha Rs.79.68 -----
- ------
-----
- ------
8
Ha Rs.32
12
Ha Rs.48
29
Dalu Jewilgre
State
Irrigation
Department
HKKP Surface Minor Irrigation 1 No 0.0003 22 Ha Rs.89.64 -----
- ------
-----
- ------
9
Ha Rs.36
13
Ha Rs.54
30
Dalu Purakasi
State
Irrigation
Department
HKKP Surface Minor Irrigation 1 No 0.0003 26 Ha Rs.249.0
0
-----
- ------
-----
- ------
10
Ha Rs.100
16
Ha Rs.149
31
Dalu Genapara
State
Irrigation
Department
HKKP Surface Minor Irrigation 1 No 0.0003 18 Ha Rs.44.82 -----
- ------
-----
- ------
7
Ha Rs.18
11
Ha Rs.27
32
Dalu Babelpara
State
Irrigation
Department
HKKP Surface Minor Irrigation 1 No 0.0002 22 Ha Rs.54.78 -----
- ------
-----
- Rs.13
13
Ha Rs.42
-----
- ------
33
Dalu Bolanggre
State
Irrigation
Department
HKKP Surface Minor Irrigation 1 No 0.0001 13 Ha Rs.32.37 -----
- ------
-----
- Rs.15
15
Ha Rs.17
-----
- ------
34 Dalu Chongnapara State HKKP Surface Minor Irrigation 1 No 0.0003 15 Ha Rs.37.35 ----- ------ ----- Rs.18 18 Rs.19 ----- ------
District Irrigation Plan, South West Garo Hills district
116 | P a g e
Irrigation
Department
- - Ha -
35
Dalu Santang
Nokatgre
State
Irrigation
Department
HKKP Surface Minor Irrigation 1 No 0.0004 18 Ha Rs.44.82 -----
- ------
-----
- Rs.21
21
Ha Rs.24
-----
- ------
36
Dalu Gopinath
Killa
State
Irrigation
Department
HKKP Surface Minor Irrigation 1 No 0.0002 21 Ha Rs.52.29 -----
- ------
-----
- ------
-----
- Rs.21
21
Ha Rs.31
37
Dalu Kotchu Adok
State
Irrigation
Department
HKKP Surface Minor Irrigation 1 No 0.0006 15 Ha Rs.199.2
0
-----
- ------
-----
- ------
-----
- Rs.80
15
Ha Rs.120
38
Dalu Doreng Jasi
State
Irrigation
Department
HKKP Protection & Rejuvination
of springs 1 No 0.0021 7 Ha Rs.26.1
-----
- ------
7
Ha
Rs.20.0
0
-----
- ------
-----
- ------
39
Dalu Narongkolgre
State
Irrigation
Department
HKKP Protection & Rejuvination
of springs 1 No.
0.00002
8 5 Ha Rs.20.00
-----
- ------
5
Ha Rs.18
-----
- ------
-----
- ------
40
Dalu Darong Adu
State
Irrigation
Department
HKKP Protection & Rejuvination
of springs 1 No.
0.00003
5 5 Ha Rs.17.50
-----
- ------
5
Ha Rs.15
-----
- ------
-----
- ------
41
Dalu Babelapara
State
Irrigation
Department
HKKP Protection & Rejuvination
of springs 1 No.
0.00005
6 4 Ha Rs.15.00
-----
- ------
4
Ha Rs.15
-----
- ------
-----
- ------
42
Dalu Purakasi
State
Irrigation
Department
HKKP Protection & Rejuvination
of springs 1 No.
0.00005
4 7 Ha Rs.18.00
-----
- ------
-----
- ------
-----
- ------
-----
- ------
43
Dalu Babelapara
State
Irrigation
Department
HKKP Protection & Rejuvination
of springs 1 No.
0.00002
8 4 Ha Rs.20.00
-----
- ------
-----
- ------
4
Ha Rs.20
-----
- ------
44
Dalu Sanda Adugre
State
Irrigation
Department
HKKP Protection & Rejuvination
of springs 1 No.
0.00003
5 7 Ha Rs.17.50
-----
- ------
-----
- ------
7
Ha Rs.18
-----
- ------
45
Dalu Gopinath
Killa
State
Irrigation
Department
HKKP Protection & Rejuvination
of springs 1 No.
0.00005
6 5 Ha Rs.15.00
-----
- ------
-----
- ------
5
Ha Rs.15
-----
- ------
46
Dalu Salmanpara
East
State
Irrigation
Department
HKKP Protection & Rejuvination
of springs 1 No.
0.00005
4 7 Ha Rs.18.00
-----
- ------
-----
- ------
-----
- ------
7
Ha
Rs.18.0
0
47
Dalu Salmanpara
West
State
Irrigation
Department
HKKP Protection & Rejuvination
of springs 1 No.
0.00002
8 6 Ha Rs.20.00
-----
- ------
-----
- ------
-----
- ------
6
Ha
Rs.20.0
0
District Irrigation Plan, South West Garo Hills district
117 | P a g e
Annexure II : Strategic Action Plan by Soil Conservation Department
Betasing Block Name of the Block: BETASING
2016-17 2017-18 2018-19 2019-20
S.
No
.
Name of the
Village
Concerne
d
Ministry/
Departme
nt
Compone
nt Activity
Total
Number/Capac
ity (cum)
TotalComma
nd Area
(hac.)
Total
Funds
(in Rs.
Lacs.)
Comma
nd Area
(hac.)
Fund
(lacs.)
Comma
nd Area
(hac.)
Fund
(lacs.)
Comma
nd Area
(hac.)
Fun
d
(lacs
.)
Comma
nd Area
(hac.)
Fun
d
(lacs
.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
A
MUJI PRJ
(ONGOING)
MoWR HKKP
Bolchugre Weir 5 Nos/660 cum 459.84 337.94 459.84 337.94 --- --- --- --- --- ---
Chigitchakgre channel 8 Nos --- 498.325 --- 498.32
5 --- --- --- --- --- ---
Hatisil WHS 3 Nos/562 cum --- 51.704 --- 51.704 --- --- --- --- --- ---
Masangpani Aquaduct 2 Nos --- 6.241 --- 6.241 --- --- --- --- --- ---
Murchapani,
Sasatbolgre Disposal Dam 2 Nos/172 cum --- 25.31 --- 25.31 --- --- --- --- --- ---
B
MALCHAPA
RA PRJ
MoWR HKKP
Malchapara
RCC Weir 2 Nos/478 cum 106 92.437 106 92.437 --- --- --- --- --- ---
Channel 3 Nos 0 150.399 --- 28.535
121.86
4 --- --- --- ---
Aquaduct 1 No 0 6.755 --- ---
6.755 --- --- --- ---
Disposal Dam 2 Nos/120 cum 0 15.409 --- ---
15.409 --- --- --- ---
C
Jelbongpara,
Rongsang
Abagre,
Marakkapara,
Skagre
MoWR HKKP
R.R.R for water
Bodies
Water harvesting
strucure
13 Nos/3900
cum 336.8 842 --- --- 204.96 512.4 131.84
329.
6
Grand Total 41 Nos/5892
cum 902.64 2026.52 565.84
1040.4
92 204.96
656.42
8 131.84
329.
6 0 0
District Irrigation Plan, South West Garo Hills district
118 | P a g e
Name of the Block: BETASING
S.
No
.
Name of the
Village
Concerned
Ministry/
Departmen
t
Compone
nt Activity
Total
Number/Capac
ity (cum)
Total
Command
Area (hac.)
(9+11+13+1
5)
Total Funds
(Lacs)
(10+12+14+1
6)
2016-17 2017-18 2018-19 2019-20
Comman
d Area
(hac.)
Fund
(lacs.
)
Comman
d Area
(hac.)
Fund
(lacs.)
Comman
d Area
(hac.)
Fund
(lacs.)
Comman
d Area
(hac.)
Fund
(lacs.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
A
BATCH-VI
MoRD/DoL
R Watershed
Banggre
Bolchugre
Bongpara
Goragre
Grenggandi
Harigaon
Jaluagre
Jamanggre
Matchokpara
Rangsagre
Rangsakona
Rongchadengg
re
Sangkarigre
Wakantagre
A)
Watershed
Works
Check Dam 67 Nos/3216
cum 106.7 53.35 0 0 7.5 3.75 67.2 33.6 32 16
Irrigation
Dam 7 Nos/378 cum 141.13 77.62 0 0 25.24 13.88 89.22 49.07 26.67 14.67
Contour
Trenches 3010 Nos 66.89 30.1 0 0 7.78 3.5 46.67 21 12.44 5.6
Gabion
structure 71 Nos 47.33 35.5 0 0 3.33 2.5 37.33 28 6.67 5
Land
Development 109.2 Ha 36.4 16.38 0 0 6.07 2.73 23.33 10.5 7 3.15
Afforestation 72.8 Ha 0 10.92 0 0 0 2.52 0 6.3 0 2.1
Horticulture 154 Ha 0 23.1 0 0 0 4.2 0 14.7 0 4.2
B)
Livelihood
activities
0 0 39.69 0 0 0 4.41 0 13.23 0 22.05
C)
Production
System
0 0 44.1 0 0 0 4.41 0 13.23 0 26.46
D) DPR
preparation 0 0 4.41 0 4.41 0 0 0 0 0 0
E) Entry
point activity 0 0 17.64 0 17.64 0 0 0 0 0 0
F) Capacity
Building 0 0 22.05 0 4.41 0 8.82 0 4.41 0 4.41
G)
Administrati
ve Cost
0 0 44.1 0 0 0 8.82 0 22.05 0 13.23
H)
Monitoring 0 0 4.41 0 0 0 0.88 0 2.21 0 1.32
I) Evaluation 0 0 4.41 0 0 0 1.32 0 2.21 0 0.88
District Irrigation Plan, South West Garo Hills district
119 | P a g e
J)
Consolidatio
n Phase
0 0 13.23 0 0 0 0 0 0 0 13.23
SUB-TOTAL OF A 74 Nos/ 3594
cum 398.45 441.01 0 26.46 49.92 61.74 263.75 220.51 84.78 132.3
B
BATCH-VII
MoRD/DoL
R Watershed
Amjana
Korkora
Arenggre
Bainapara
Bainapara
Koch
Bandalkona
Chigitchakgre
Chigitchakgre
Chiringpara
Dengnakpara
Dolbari
Dombagre
Dumnigaon
Gasura
Golmangre
Gondugre
Jelbongpara
Jelbongpara
Nokat
Jewilgre
Kasibil
Kolkatola
Lower
Damalgre
Lutubari
Malchapara
Mangsanggre
Mohesbatanpa
ra
Murchapani
Murchapani
Koch
Rongsang
Abagre
Rongsang
Abrenggre
Rongsang
A)
Watershed
Works
Check Dam 290 Nos/ 14616
cum 459.8 229.9 0 0 63 31.5 297.6 148.8 99.2 49.6
Irrigation
Dam
28 Nos/1680
cum 603.48 331.91 0 0 55.11 30.31 409.32
225.12
5 139.05 76.475
Contour
Trenches 3984 Nos 81.47 39.84 0 0 19.2 8.64 51.67 23.25 10.6 7.95
Gabion
structure 84 Nos 61.33 42 0 0 6.67 5 41.33 31 13.33 6
Land
Development 341 Ha 80.6 51.15 0 0 15.5 6.975 49.6 37.2 15.5 6.975
Afforestation 217 Ha 0 32.55 0 0 0 9.3 0 18.6 0 4.65
Horticulture 527 Ha 0 79.05 0 0 0 16.27
5 0 48.825 0 13.95
B)
Livelihood
activities
0 0 129.6 0 0 0 14.4 0 43.2 0 72
C)
Production
System
0 0 144 0 0 0 14.4 0 43.2 0 86.4
D) DPR
preparation 0 0 14.4 0 14.4 0 0 0 0 0 0
E) Entry
point activity 0 0 57.6 0 57.6 0 0 0 0 0 0
F) Capacity
Building 0 0 72 0 14.4 0 28.8 0 14.4 0 14.4
G)
Administrati
ve Cost
0 0 144 0 0 0 28.8 0 72 0 43.2
H)
Monitoring 0 0 14.4 0 0 0 2.88 0 7.2 0 4.32
I) Evaluation 0 0 14.4 0 0 0 4.32 0 7.2 0 2.88
J)
Consolidatio
n Phase
0 0 43.2 0 0 0 0 0 0 0 43.2
District Irrigation Plan, South West Garo Hills district
120 | P a g e
Songma
Salbari
Sasatbolgre
Skagre
Taktaki
Uppar
Damalgre
Wadagre
SUB-TOTAL OF B 318 Nos/ 16296
cum 1286.68 1440 0 86.4 159.48 201.6 849.52 720 277.68 432
C
BATCH-IX
MoRD/DoL
R Watershed
Adugre
Agalgre
Asinagre
Bangkapara
Bisindagre
Bolgangre
Bollonggre
Bolsalgre
Bongpara
Borolatri
Chidekgre
Chimisenggre
Chisregre
Damdama
Dilnigre
Dorambokgre
Gambagre
Gimbilgre
Jenggichakgre
Latrigre
Marakkapara
Naragre
Wakagre
Wakka
Akongre
Wakka Kama
Watregre
A)
Watershed
Works
Check Dam 16 Nos/752 cum 27.05 13.525 0 0 0 0 0 0 27.05 13.525
Irrigation
Dam 2 Nos/192 cum 46.03 25.315 0 0 0 0 0 0 46.03 25.315
Contour
Trenches 420 Nos 9.33 4.2 0 0 0 0 0 0 9.33 4.2
Gabion
structure 15 Nos 10 7.5 0 0 0 0 0 0 10 7.5
Land
Development 21 Ha 4.2 3.15 0 0 0 0 0 0 4.2 3.15
Afforestation 10.5 Ha 0 1.575 0 0 0 0 0 0 0 1.575
Horticulture 44.1 Ha 0 6.615 0 0 0 0 0 0 0 6.615
B)
Livelihood
activities
0 0 8.25 0 0 0 0 0 0 0 8.25
C)
Production
System
0 0 8.25 0 0 0 0 0 0 0 8.25
D) DPR
preparation 0 0 8.25 0 0 0 0 0 8.25 0 0
E) Entry
point activity 0 0 33 0 0 0 0 0 33 0 0
F) Capacity
Building 0 0 24.75 0 0 0 0 0 8.25 0 16.5
G)
Administrati
ve Cost
0 0 16.5 0 0 0 0 0 0 0 16.5
H)
Monitoring 0 0 1.65 0 0 0 0 0 0 0 1.65
I) Evaluation 0 0 2.48 0 0 0 0 0 0 0 2.48
District Irrigation Plan, South West Garo Hills district
121 | P a g e
J)
Consolidatio
n Phase
0 0 0 0 0 0 0 0 0 0 0
SUB-TOTAL OF C 18 Nos/944 cum 96.61 165.01 0 0 0 0 0 49.5 96.61 115.51
D
BATCH-X
MoRD/DoL
R Watershed
Chelipara
Nokat
Chelipara
Songma
Gara
Bokmangre
Goldatgre
Rongchadengg
re
Simsang
Bokmangre
A)
Watershed
Works
Check Dam 0 0 0 0 0 0 0 0 0 0 0
Irrigation
Dam 0 0 0 0 0 0 0 0 0 0 0
Contour
Trenches 0 0 0 0 0 0 0 0 0 0 0
Gabion
structure 0 0 0 0 0 0 0 0 0 0 0
Land
Development 0 0 0 0 0 0 0 0 0 0 0
Afforestation 0 0 0 0 0 0 0 0 0 0 0
Horticulture 0 0 0 0 0 0 0 0 0 0 0
B)
Livelihood
activities
0 0 0 0 0 0 0 0 0 0 0
C)
Production
System
0 0 0 0 0 0 0 0 0 0 0
D) DPR
preparation 0 0 0 0 0 0 0 0 0 0 1.854
E) Entry
point activity 0 0 0 0 0 0 0 0 0 0 7.416
F) Capacity
Building 0 0 0 0 0 0 0 0 0 0 1.854
G)
Administrati
ve Cost
0 0 0 0 0 0 0 0 0 0 0
H)
Monitoring 0 0 0 0 0 0 0 0 0 0 0
I) Evaluation 0 0 0 0 0 0 0 0 0 0 0
J)
Consolidatio
n Phase
0 0 0 0 0 0 0 0 0 0 0
SUB-TOTAL OF D
0 0 0 0 0 0 0 0 0 11.124
GRAND TOTAL 410 Nos/ 20834
cum 1781.74 2046.02 0
112.8
6 209.4
263.3
4 1113.27 990.01 459.07
690.93
4
District Irrigation Plan, South West Garo Hills district
122 | P a g e
Name of the Block: BETASING
s.n
o village
Concerne
d
Ministry/
Departme
nt
Component Activity
Total
Number/Cap
acity (cum)
Total
Command
Area
(hac.)
(9+11+13+
15)
Total
Funds
(Lacs)
(10+12+14
+16)
2016-17 2017-18 2018-19 2019-20
Comman
d Area
(hac.)
Fun
d
(lac
s.)
Comma
nd Area
(hac.)
Fun
d
(lacs
.)
Comma
nd Area
(hac.)
Fun
d
(lacs
.)
Comma
nd Area
(hac.)
Fun
d
(lac
s.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1
Bainapara
Banggre
Bisindagre
Bolsalgre
Chidekgre
Chigitchakgr
e
Dolbari
Dumnigaon
Jaluagre
Jelbongpara
Jenggichakg
re
Kasibil
Malchapara
Marakkapara
Matchokpara
Naragre
Rangsagre
Rangsakona
Rongsang
Abagre
Sasatbolgre
Skagre
Watregre
MoRD/Do
LR
Convergence with
MGNREGA
Waer harvesting
structure
15 Nos/
1369 cum 174 78.25 39 17.5 78 35 22 10 35
15.7
5
2 MoRD/Do
LR
Convergence with
MGNREGA Land Development 66 Ha 66 26.4 11 4.4 19 7.6 23 9.2 13 5.2
Grand Total
12 Nos/
1296 cum 240 104.65 50 21.9 97 42.6 45 19.2 48
20.9
5
District Irrigation Plan, South West Garo Hills district
123 | P a g e
Zikzak Block Name of the Block: ZIKZAK
2016-17 2017-18 2018-19 2019-20
S.
No
.
Name of the
Village
Concerned
Ministry/
Departmen
t
Componen
t Activity
Total
Number/Capacit
y (cum)
TotalComman
d Area (hac.)
Total Funds
(in Rs.
Lacs.)
Comman
d Area
(hac.)
Fund
(lacs.)
Comman
d Area
(hac.)
Fund
(lacs.)
Comman
d Area
(hac.)
Fund
(lacs.
)
Comman
d Area
(hac.)
Fund
(lacs.
)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
A
BONBANGA
PRJ
MoWR HKKP
Bonbanga
RCC Weir 3 Nos/409 cum 98 107.812 98 107.81
2 --- --- --- --- --- ---
Channel 5 Nos 0 123.678 ---
--- 123.67
8 --- --- --- ---
Aquaduct 2 Nos 0 13.51 ---
--- 13.51 --- --- --- ---
B
DEMDEMA
PRJ
MoWR HKKP
Kalaipara,
Noomati
RCC Weir 1 No/300 cum 144 157.282 144 86.102 --- 71.18 --- --- --- ---
Channel 6 Nos 0 180.419 --- 38.023 --- 142.39
6 --- --- --- ---
Aquaduct 1 No 0 22.299 --- 22.299 ---
--- --- --- ---
C
DIMLI PROJ
MoWR HKKP
Dangsapara RCC Weir 4 Nos/638 cum 142 217.167 57.09 113.03
8 84.91
104.12
9 --- --- --- ---
Dinangpara Channel 5 Nos 0 131.078 --- 22.936 --- 108.14
2 --- --- --- ---
Katuli Aquaduct 1 No 0 6.755 --- 6.755 --- 0 --- --- --- ---
D
GARUGHAT
PRJ
MoWR HKKP
Chatihari,
Chengkompar
a
RCC Weir 3 Nos/396 cum 74 97.21 30.06 56.744 43.94 40.466 --- --- --- ---
Disposal
Dam 2 Nos/124 cum 0 18.404 --- 18.404 --- 0 --- --- --- ---
Channel 3 Nos 0 69.386 --- 0 --- 69.386 --- --- --- ---
E
KULI PRJ
MoWR HKKP
Kalaichar
RCC Weir 3 Nos/831 cum 226 263.876 91.79 203.43
9 134.21 60.437 --- --- --- ---
Distributio
n Dam 2 Nos/96 cum 0 26.048 --- 26.048 --- 0 --- --- --- ---
Disposal
Dam 3 Nos/316 cum 0 27.606 --- 0 --- 27.606 --- --- --- ---
Channel 9 Nos 0 247.47 --- 0 --- 247.47 --- --- --- ---
F Salmanpara, MoWR HKKP RRR for Water Bodies
District Irrigation Plan, South West Garo Hills district
124 | P a g e
Chopapara,
Nachilpara,
Rongkaigre,
Bangdapara
Water
Harvesting
structure
12 Nos/4860 cum 368.64 921.6 --- --- 173.28 433.2 195.36 488.4 --- ---
Grand Total 65 Nos/7973
cum 1052.64 2631.6 420.94 701.6 436.34 1441.6 195.36 488.4 0 0
Name of the Block:ZIKZAK
S.
No
.
Name of the
Village
Concerned
Ministry/
Departmen
t
Compone
nt Activity
Total
Number/Capaci
ty (cum)
Total
Comman
d Area
(hac.)
Total
Funds
(Lacs)
2016-17 2017-18 2018-19 2019-20
Comman
d Area
(hac.)
Fund
(lacs.)
Comman
d Area
(hac.)
Fund
(lacs.)
Comman
d Area
(hac.)
Fund
(lacs.)
Comman
d Area
(hac.)
Fund
(lacs.
)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
A
BATCH-V (ON-
GOING)
MoRD/DoL
R Watershed
Aningpara
Chopapara
Dangsapara
Dimligre
Dinangpara
Domapara Apalgre
Dosagre
Ganggekona
Jangnapara
Kambakpara
Amesgittim
Kerupara
Matkolgre
Megapgre
Okchokgre
Santogre
Sindilgre
Tochapara
A)
Watershed
Works
Irrigation
Dam
7 Nos/
630 cum 175.16
87.5830
1 11.7 5.85076 163.46
81.7322
5 0 0 0 0
Water
harvesting
structure
13 Nos/
936 cum 124.19
68.3016
8 20.82
11.4486
2 63.64 35 39.73 21.85306 0 0
Dug out
Pond
23 Nos/
1030 cum 41 34.856 16.05 13.646 11.64 9.898 13.31 11.312 0 0
Irrigation
Channel 12 Nos 9.91 7.43457 1.02 0.765 6.61 4.95802 2.28 1.71155 0 0
Protection
wall 11 Nos 26.67 20 0 0 18.67 14 8 6 0 0
Embankment 1 No 6.22 2.8 0 0 6.22 2.8 0 0 0 0
Check Dam 9 Nos/
518 cum 94.03 51.7163 0 0 69.73
38.3525
5 24.3 13.36375 0 0
Land
Developmen
t
170.895 Ha 46.86 21.0857
7 11.41 5.13612 19.73 8.877 15.72 7.07265 0 0
Afforestation 330.43 Ha 0 12.5454
8 0 0 0
11.4654
8 0 1.08 0 0
Horticulture 277.2 Ha 0 27.9972 0 7.9285 0 13.8067 0 6.262 0 0
B)
Livelihood
activities
0 0 53.73 0 5.97 0 17.91 0 29.85 0 0
C) 0 0 59.7 0 5.97 0 17.91 0 35.82 0 0
District Irrigation Plan, South West Garo Hills district
125 | P a g e
Production
System
D) DPR
preparation 0 0 0 0 0 0 0 0 0 0 0
E) Entry
point activity 0 0 0 0 0 0 0 0 0 0 0
F) Capacity
Building 0 0 23.88 0 11.94 0 5.97 0 5.97 0 0
G)
Administrati
ve Cost
0 0 59.7 0 11.94 0 29.85 0 17.91 0 0
H)
Monitoring 0 0 5.97 0 1.194 0 2.985 0 1.791 0 0
I) Evaluation 0 0 5.97 0 1.791 0 2.985 0 1.194 0 0
J)
Consolidatio
n Phase
0 0 17.91 0 0 0 0 0 17.91 0 0
SUB-TOTAL OF A 52 Nos/ 3114
cum 524.04 561.18 61 83.58 359.7 298.5 103.34
179.1000
1 0 0
B
BATCH-VIII
MoRD/DoL
R Watershed
Aragittim
Bahadurkutta
Baksapara
Bettola
Bildoba
Bonbanga
Chibonggre
Damdilaka
Danganatong
Dathbanga ( Garo )
Dathbanga ( Koch
)
Debajani
Demdemakona
Dhola Agia
Dhoromchas
Dinapara
Dingampara
Gofraigaon
Gongrapara
Gopinathkilla
Gujangpara
Hullukona
A)
Watershed
Works
Check Dam 234 Nos/ 12355
cum 375.04 187.52 0 0 0 0 30.4 15.2 344.64
172.3
2
Irrigation
Dam
18 Nos/
1944 cum 409.39 225.165 0 0 0 0 66.66 36.665 342.73 188.5
Contour
Trenches 2365 Nos 52.55 23.65 0 0 0 0 19.11 8.6 33.44 15.05
Gabion
structure 30 Nos 20 15 0 0 0 0 6 4.5 14 10.5
Land
Developmen
t
219.3 Ha 73.1 32.895 0 0 0 0 15.77 7.095 57.33 25.8
Afforestation 137.6 Ha 0 20.64 0 0 0 0 0 7.74 0 12.9
Horticulture 301 Ha 0 45.15 0 0 0 0 0 12.9 0 32.25
B)
Livelihood
activities
0 0 49.44 0 0 0 0 0 12.36 0 37.08
C)
Production
System
0 0 49.44 0 0 0 0 0 12.36 0 37.08
D) DPR 0 0 12.36 0 0 0 12.36 0 0 0 0
District Irrigation Plan, South West Garo Hills district
126 | P a g e
Josipara
Kawahagra
Kentrikona
Kongbangpara
Malmua
Marengpara
Nachilpara
Nogorpara
Rapangpanggiri
Rimtangpara
Ritekpara
Rongkaigre
Salampara
Salmanpara
Santangpara
Silghaguri
Songmagiri
Tarapara
Tongnapara
Torangpara
Tungrurchar
preparation
E) Entry
point activity 0 0 49.44 0 0 0 49.44 0 0 0 0
F) Capacity
Building 0 0 49.44 0 0 0 12.36 0 24.72 0 12.36
G)
Administrati
ve Cost
0 0 86.52 0 0 0 0 0 24.72 0 61.8
H)
Monitoring 0 0 8.65 0 0 0 0 0 2.47 0 6.18
I) Evaluation 0 0 9.89 0 0 0 0 0 3.71 0 6.18
J)
Consolidatio
n Phase
0 0 0 0 0 0 0 0 0 0 0
SUB-TOTAL OF B 252 Nos/ 14299
cum 930.08 865.2 0 0 0 74.16 137.94 173.04 792.14 618
C
BATCH-X
MoRD/DoL
R Watershed
Banangpara
Bhoirakupi
Bhoirakupi(Beltuli
)
Bhoirakupi(Marah
ali)
Bhoirakupi(Nolbar
i)
Bhorikupi
(Lutubari)
Bollonggiri A (
Diglakona )
Bollonggiri B
Bollonggiri I
Bollonggiri-II
Chelapara
Dufrigaon
Dufrigaon Koch
Matrongkolgre
A)
Watershed
Works
Check Dam 0 0 0 0 0 0 0 0 0 0 0
Irrigation
Dam 0 0 0 0 0 0 0 0 0 0 0
Contour
Trenches 0 0 0 0 0 0 0 0 0 0 0
Gabion
structure 0 0 0 0 0 0 0 0 0 0 0
Land
Developmen
t
0 0 0 0 0 0 0 0 0 0 0
Afforestation 0 0 0 0 0 0 0 0 0 0 0
Horticulture 0 0 0 0 0 0 0 0 0 0 0
B)
Livelihood
activities
0 0 0 0 0 0 0 0 0 0 0
C) 0 0 0 0 0 0 0 0 0 0 0
District Irrigation Plan, South West Garo Hills district
127 | P a g e
Satboni
Sokbokgre
Wagepara
Production
System
D) DPR
preparation 0 0 4.326 0 0 0 0 0 0 0 4.326
E) Entry
point activity 0 0 17.304 0 0 0 0 0 0 0
17.30
4
F) Capacity
Building 0 0 4.326 0 0 0 0 0 0 0 4.326
G)
Administrati
ve Cost
0 0 0 0 0 0 0 0 0 0 0
H)
Monitoring 0 0 0 0 0 0 0 0 0 0 0
I) Evaluation 0 0 0 0 0 0 0 0 0 0 0
J)
Consolidatio
n Phase
0 0 0 0 0 0 0 0 0 0 0
SUB-TOTAL OF C
0 25.956 0 0 0 0 0 0 0 25.95
6
GRAND TOTAL 304 Nos/ 17413
cum 1454.12 1452.34 61.00 83.58 359.70 372.66 241.28 352.14 792.14
643.9
6
District Irrigation Plan, South West Garo Hills district
128 | P a g e
Name of the Block: ZIKZAK
s.n
o village
Concerne
d
Ministry/
Departme
nt
Component Activity
Total
Number/Capa
city (cum)
Total
Command
Area
(hac.)
(9+11+13+
15)
Total
Funds
(Lacs)
(10+12+14+
16)
2016-17 2017-18 2018-19 2019-20
Comma
nd Area
(hac.)
Fun
d
(lacs
.)
Comma
nd Area
(hac.)
Fun
d
(lacs
.)
Comma
nd Area
(hac.)
Fun
d
(lacs
.)
Comma
nd Area
(hac.)
Fun
d
(lacs
.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1
Aningpara
Banangpara
Bhoirakupi
Chelapara
Chopapara
Damdilaka
Danganaton
g
Demdemak
ona
Dimligre
Dinangpara
Dinapara
Dufrigaon
Gopinathkil
la
Hullukona
Jangnapara
Kawahagra
Kentrikona
Nachilpara
Rongkaigre
Salmanpara
Satboni
Sokbokgre
Songmagiri
Tochapara
MoRD/Do
LR
Convergence with
MGNREGA
Waer harvesting
structure
12 Nos/
1296 cum 139 63 31 14 62 28 23 10.5 23 10.5
2 MoRD/Do
LR
Convergence with
MGNREGA Land Development 60 Ha 60 24 10 4 20 8 20 8 10 4
Grand Total
12 Nos/
1296 cum 199 87 41 18 82 36 43 18.5 33 14.5
District Irrigation Plan, South West Garo Hills district
129 | P a g e
Annexure III : Strategic Action Plan by Agriculture Department
Sl.
No
Name of
the Village Block
Concerned
Ministry/
Departmen
t
Compone
nt Activity
Total 2016-17 2017-18 2018-19 2019-20
Total
Num
ber/
Capa
city
(Cu
m)
Comm
ands
Area
(ha.)
Fun
d
(lacs
)
Total
Num
ber/
Capa
city
(Cu
m)
Comm
ands
Area
(ha.)
Fun
d
(lacs
)
Total
Num
ber/
Capa
city
(Cu
m)
Com
mand
Area
(ha.)
Fun
d
(lacs
)
Total
Num
ber/
Capa
city
(Cu
m)
Com
mand
Area
(ha.)
Fun
d
(lacs
)
Total
Num
ber/
Capa
city
(Cu
m)
Com
mand
Area
(ha.)
Fun
d
(lac
s)
1 Babelapara Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 12.00 36.0
0 1.00 12.00
36.0
0 --- --- --- --- --- --- --- --- ---
2 Genapara Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 8.00 35.0
0 1.00 8.00
35.0
0 --- --- --- --- --- --- --- --- ---
3 Lower
Babelapara Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 10.00 35.0
0 1.00 10.00
35.0
0 --- --- --- --- --- --- --- --- ---
4 Hatimara Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 6.00 28.0
0 1.00 6.00
28.0
0 --- --- --- --- --- --- --- --- ---
5 Pokasindig
ri Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 5.00 32.0
0 1.00 5.00
32.0
0 --- --- --- --- --- --- --- --- ---
6 Gopramgre Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 5.00 30.0
0 1.00 5.00
30.0
0 --- --- --- --- --- --- --- --- ---
7 Agalgre Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 4.00 30.0
0 1.00 4.00
30.0
0 --- --- --- --- --- --- --- --- ---
8 Bakdakgri Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
1.00 8.00 35.0
0 1.00 8.00
35.0
0 --- --- --- --- --- --- --- --- ---
District Irrigation Plan, South West Garo Hills district
130 | P a g e
channel
9 Rapangpan
ggri Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 6.00 28.0
0 1.00 6.00
28.0
0 --- --- --- --- --- --- --- --- ---
10 Dingampar
a Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 5.00 31.0
0 1.00 5.00
31.0
0 --- --- --- --- --- --- --- --- ---
11 Wakmeda
mgre Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 4.00 31.0
0 1.00 4.00
31.0
0 --- --- --- --- --- --- --- --- ---
12 Gopinathki
lla Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 6.00 38.6
0 1.00 6.00
38.6
0 --- --- --- --- --- --- --- --- ---
13 Damdiloka Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 4.00 29.0
0 1.00 4.00
29.0
0 --- --- --- --- --- --- --- --- ---
14 Josipara Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 5.00 32.0
0 1.00 5.00
32.0
0 --- --- --- --- --- --- --- --- ---
15 Songmagre Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 4.00 26.5
0 1.00 4.00
26.5
0 --- --- --- --- --- --- --- --- ---
16 Anangpara Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 7.00 34.0
0 1.00 7.00
34.0
0 --- --- --- --- --- --- --- --- ---
17 Chipra Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 6.00 33.0
0 1.00 6.00
33.0
0 --- --- --- --- --- --- --- --- ---
18 Chepagre Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 5.00 30.0
0 1.00 5.00
30.0
0 --- --- --- --- --- --- --- --- ---
19 Kodaldow
a Zikzak
MoA &
FW-DAC &
Har Khet
Ko Pani
Check Dam
with 1.00 18.00
38.0
0 1.00 18.00
38.0
0 --- --- --- --- --- --- --- --- ---
District Irrigation Plan, South West Garo Hills district
131 | P a g e
FW irrigation
channel
20 Gandigre Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 8.00 4.73 1.00 8.00 4.73 --- --- --- --- --- --- --- --- ---
21 Wanangre Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 10.00 3.16 1.00 10.00 3.16 --- --- --- --- --- --- --- --- ---
22 Chapahati Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 15.00 6.31 1.00 15.00 6.31 --- --- --- --- --- --- --- --- ---
23 Lokaichar Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 10.00 6.31 1.00 10.00 6.31 --- --- --- --- --- --- --- --- ---
24 Mahendrag
anj Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 15.00 6.94 1.00 15.00 6.94 --- --- --- --- --- --- --- --- ---
25 Kalaichar Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 20.00 9.47 1.00 20.00 9.47 --- --- --- --- --- --- --- --- ---
26 Morahalip
ara Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 10.00 36.0
0 1.00 10.00
36.0
0 --- --- --- --- --- --- --- --- ---
27 Paglapara
M.Ganj Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 10.00 35.6
5 1.00 10.00
35.6
5 --- --- --- --- --- --- --- --- ---
28 Chellipara Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 15.00 25.0
0 1.00 15.00
25.0
0 --- --- --- --- --- --- --- --- ---
29 Chiprakam
a
Betasin
g
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 20.00 30.0
0 1.00 20.00
30.0
0 --- --- --- --- --- --- --- --- ---
30 Goldatgre Betasin MoA & Har Khet Check Dam 1.00 20.00 20.0 1.00 20.00 20.0 --- --- --- --- --- --- --- --- ---
District Irrigation Plan, South West Garo Hills district
132 | P a g e
g FW-DAC &
FW
Ko Pani with
irrigation
channel
0 0
31 Belbupara Betasin
g
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 15.00 18.0
0 1.00 15.00
18.0
0 --- --- --- --- --- --- --- --- ---
32
Gara
Bokmangr
e
Betasin
g
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 15.00 15.0
0 1.00 15.00
15.0
0 --- --- --- --- --- --- --- --- ---
33 Simsangbo
kmangre
Betasin
g
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 20.00 18.0
0 1.00 20.00
18.0
0 --- --- --- --- --- --- --- --- ---
34 Kebolpara Betasin
g
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 20.00 20.0
0 1.00 20.00
20.0
0 --- --- --- --- --- --- --- --- ---
35 Jangnapara Betasin
g
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 20.00 15.0
0 1.00 20.00
15.0
0 --- --- --- --- --- --- --- --- ---
36 Bangkapar
a
Betasin
g
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 15.00 15.0
0 1.00 15.00
15.0
0 --- --- --- --- --- --- --- --- ---
37 Jolgaon Betasin
g
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 20.00 30.0
0 1.00 20.00
30.0
0 --- --- --- --- --- --- --- --- ---
38 Jongchetpa
ra Songma
Betasin
g
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 15.00 25.0
0 1.00 15.00
25.0
0 --- --- --- --- --- --- --- --- ---
39
Jongchetpa
ra
Christian
Betasin
g
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 10.00 22.0
0 1.00 10.00
22.0
0 --- --- --- --- --- --- --- --- ---
40 Jelbongpar
a
Betasin
g
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 20.00 35.0
0 1.00 20.00
35.0
0 --- --- --- --- --- --- --- --- ---
District Irrigation Plan, South West Garo Hills district
133 | P a g e
41 Bandalkon
a
Betasin
g
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 15.00 40.0
0 1.00 15.00
40.0
0 --- --- --- --- --- --- --- --- ---
42 Korkatola Betasin
g
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 15.00 18.0
0 1.00 15.00
18.0
0 --- --- --- --- --- --- --- --- ---
43 Murchapan
i
Betasin
g
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 20.00 15.0
0 1.00 20.00
15.0
0 --- --- --- --- --- --- --- --- ---
44
Tour
Programm
e
Betasin
g
MoA &
FW-DAC &
FW
Per Drop
More
Crop
Exposure trip
of farmers to
different
Agricultural
important
places in
India
2
Nos.
(Tour
)
100
farmers 5.00
2
Nos.
(Tour
)
100
farmers 5.00 --- --- --- --- --- --- --- --- ---
45 Patijora Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 7.00 32.0
0 --- --- --- 1.00 7.00
32.0
0 --- --- --- --- --- ---
46 Dathbhang
a Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 7.00 37.0
0 --- --- --- 1.00 7.00
37.0
0 --- --- --- --- --- ---
47 Paglapara Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 8.00 28.0
0 --- --- --- 1.00 8.00
28.0
0 --- --- --- --- --- ---
48 Radanpara Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 5.00 40.0
0 --- --- --- 1.00 5.00
40.0
0 --- --- --- --- --- ---
49 Tarapara Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 13.00 41.0
0 --- --- --- 1.00 13.00
41.0
0 --- --- --- --- --- ---
50 Arakgittim Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 6.00 40.0
0 --- --- --- 1.00 6.00
40.0
0 --- --- --- --- --- ---
51 Kentrikona Zikzak MoA & Har Khet Check Dam 1.00 10.00 26.0 --- --- --- 1.00 10.00 26.0 --- --- --- --- --- ---
District Irrigation Plan, South West Garo Hills district
134 | P a g e
FW-DAC &
FW
Ko Pani with
irrigation
channel
0 0
52 Baksapara Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 6.00 36.0
0 --- --- --- 1.00 6.00
36.0
0 --- --- --- --- --- ---
53 Debajani Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 8.00 38.0
0 --- --- --- 1.00 8.00
38.0
0 --- --- --- --- --- ---
54 Jengrimpar
a Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 8.00 36.0
0 --- --- --- 1.00 8.00
36.0
0 --- --- --- --- --- ---
55 Wagepara Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 7.00 37.0
0 --- --- --- 1.00 7.00
37.0
0 --- --- --- --- --- ---
56 Dombagre Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 5.00 33.0
0 --- --- --- 1.00 5.00
33.0
0 --- --- --- --- --- ---
57 Hullukona Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 11.00 34.0
0 --- --- --- 1.00 11.00
34.0
0 --- --- --- --- --- ---
58 Dolsigre Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 6.00 29.0
0 --- --- --- 1.00 6.00
29.0
0 --- --- --- --- --- ---
59 Banangpar
a Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 5.00 29.0
0 --- --- --- 1.00 5.00
29.0
0 --- --- --- --- --- ---
60 Tewaligre Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 5.00 40.0
0 --- --- --- 1.00 5.00
40.0
0 --- --- --- --- --- ---
61 Pagalpara Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 5.00 36.0
0 --- --- --- 1.00 5.00
36.0
0 --- --- --- --- --- ---
District Irrigation Plan, South West Garo Hills district
135 | P a g e
62 Aningpara Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 5.00 30.0
0 --- --- --- 1.00 5.00
30.0
0 --- --- --- --- --- ---
63 Garagre Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 5.00 36.0
0 --- --- --- 1.00 5.00
36.0
0 --- --- --- --- --- ---
64 Gopinathki
lla Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 6.00 40.0
0 --- --- --- 1.00 6.00
40.0
0 --- --- --- --- --- ---
65 Mahendrag
anj Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 30.00 37.0
0 --- --- --- 1.00 30.00
37.0
0 --- --- --- --- --- ---
66 Baladinggr
e Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 10.00 15.0
0 --- --- --- 1.00 10.00
15.0
0 --- --- --- --- --- ---
67 Sasatbolgr
e Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 15.00 18.0
0 --- --- --- 1.00 15.00
18.0
0 --- --- --- --- --- ---
68 Dalbotpara Betasin
g
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 10.00 15.0
0 --- --- --- 1.00 10.00
15.0
0 --- --- --- --- --- ---
69 Abagre Betasin
g
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 15.00 18.0
0 --- --- --- 1.00 15.00
18.0
0 --- --- --- --- --- ---
70 Rongsengg
re
Betasin
g
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 20.00 35.0
0 --- --- --- 1.00 20.00
35.0
0 --- --- --- --- --- ---
71 Godalgre Betasin
g
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 15.00 20.0
0 --- --- --- 1.00 15.00
20.0
0 --- --- --- --- --- ---
72 Kasibil Betasin
g
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 10.00 18.0
0 --- --- --- 1.00 10.00
18.0
0 --- --- --- --- --- ---
District Irrigation Plan, South West Garo Hills district
136 | P a g e
73 Golmanggr
e
Betasin
g
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 10.00 15.0
0 --- --- --- 1.00 10.00
15.0
0 --- --- --- --- --- ---
74 Kashra Betasin
g
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 15.00 25.0
0 --- --- --- 1.00 15.00
25.0
0 --- --- --- --- --- ---
75 Kashra
Koch
Betasin
g
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 20.00 22.0
0 --- --- --- 1.00 20.00
22.0
0 --- --- --- --- --- ---
76 Kashra
Hajong
Betasin
g
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 15.00 22.0
0 --- --- --- 1.00 15.00
22.0
0 --- --- --- --- --- ---
77 Dakupara Betasin
g
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 10.00 24.0
0 --- --- --- 1.00 10.00
24.0
0 --- --- --- --- --- ---
78 Badagre Betasin
g
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 15.00 25.0
0 --- --- --- 1.00 15.00
25.0
0 --- --- --- --- --- ---
79 Rongramgr
e
Betasin
g
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 15.00 25.0
0 --- --- --- 1.00 15.00
25.0
0 --- --- --- --- --- ---
80 Chadonpar
a Nokat
Betasin
g
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 10.00 18.0
0 --- --- --- 1.00 10.00
18.0
0 --- --- --- --- --- ---
81
Tour
Programm
e
Betasin
g
MoA &
FW-DAC &
FW
Per Drop
More
Crop
Exposure trip
of farmers to
different
Agricultural
important
places in
India
2
Nos.
(Tour
)
100
farmers 5.00 --- --- ---
2
Nos.
(Tour
)
100
farmer
s
5.00 --- --- --- --- --- ---
82 Katuligaon Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 18.00 32.0
0 --- --- --- --- --- --- 1.00 18.00
32.0
0 --- --- ---
83 Katuli Zikzak MoA & Har Khet Check Dam 1.00 15.00 26.0 --- --- --- --- --- --- 1.00 15.00 26.0 --- --- ---
District Irrigation Plan, South West Garo Hills district
137 | P a g e
Garo FW-DAC &
FW
Ko Pani with
irrigation
channel
0 0
84 Chellapara Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 15.00 35.0
0 --- --- --- --- --- --- 1.00 15.00
35.0
0 --- --- ---
85 Kambakpa
ra Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 8.00 30.0
0 --- --- --- --- --- --- 1.00 8.00
30.0
0 --- --- ---
86 Dimiligre Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 15.00 35.0
0 --- --- --- --- --- --- 1.00 15.00
35.0
0 --- --- ---
87 Dangsapar
a Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 10.00 32.0
0 --- --- --- --- --- --- 1.00 10.00
32.0
0 --- --- ---
88 Dinangpar
a Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 6.00 33.0
0 --- --- --- --- --- --- 1.00 6.00
33.0
0 --- --- ---
89 Baldan
Akong Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 7.00 35.0
0 --- --- --- --- --- --- 1.00 7.00
35.0
0 --- --- ---
90 Satboni Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 6.00 26.0
0 --- --- --- --- --- --- 1.00 6.00
26.0
0 --- --- ---
91 Nogorpara Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 10.00 45.0
0 --- --- --- --- --- --- 1.00 10.00
45.0
0 --- --- ---
92 Demdema
kona Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 13.00 31.0
0 --- --- --- --- --- --- 1.00 13.00
31.0
0 --- --- ---
93 Tongnapar
a Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 15.00 28.0
0 --- --- --- --- --- --- 1.00 15.00
28.0
0 --- --- ---
District Irrigation Plan, South West Garo Hills district
138 | P a g e
94 Gopraigao
n Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 12.00 34.0
0 --- --- --- --- --- --- 1.00 12.00
34.0
0 --- --- ---
95 Kalaigaon Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 18.00 31.0
0 --- --- --- --- --- --- 1.00 18.00
31.0
0 --- --- ---
96 Kalaigaon
Nayapara Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 15.00 41.0
0 --- --- --- --- --- --- 1.00 15.00
41.0
0 --- --- ---
97 Mondolpar
a Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 12.00 37.0
0 --- --- --- --- --- --- 1.00 12.00
37.0
0 --- --- ---
98 Kuligre Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 10.00 36.0
0 --- --- --- --- --- --- 1.00 10.00
36.0
0 --- --- ---
99 Balughat Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 11.00 32.0
0 --- --- --- --- --- --- 1.00 11.00
32.0
0 --- --- ---
100 Bollonggre
A Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 12.00 33.0
0 --- --- --- --- --- --- 1.00 12.00
33.0
0 --- --- ---
101 Bildoba Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Lift irrigation
channel 15.00 8.00 4.73 --- --- --- --- --- --- 15.00 8.00 4.73 --- --- ---
102 Silgaguri Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Lift irrigation
channel 16.00 11.00 5.05 --- --- --- --- --- --- 16.00 11.00 5.05 --- --- ---
103 Bidukura Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Lift irrigation
channel 12.00 10.00 3.79 --- --- --- --- --- --- 12.00 10.00 3.79 --- --- ---
104 Bollonggre Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Lift irrigation
channel 15.00 8.00 4.73 --- --- --- --- --- --- 15.00 8.00 4.73 --- --- ---
105 Kalaicharp
ara Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Lift irrigation
channel 15.00 10.00 4.73 --- --- --- --- --- --- 15.00 10.00 4.73 --- --- ---
District Irrigation Plan, South West Garo Hills district
139 | P a g e
106 Mahendrag
anj Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Lift irrigation
channel 44.00 20.00
13.8
9 --- --- --- --- --- --- 44.00 20.00
13.8
9 --- --- ---
107 Wategre Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
15.00 10.00 18.0
0 --- --- --- --- --- --- 15.00 10.00
18.0
0 --- --- ---
108 Okkapara
Apalgre Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
25.00 30.00 42.0
0 --- --- --- --- --- --- 25.00 30.00
42.0
0 --- --- ---
109 Jongdikgre Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
1.00 15.00 25.0
0 --- --- --- --- --- --- 1.00 15.00
25.0
0 --- --- ---
110 Dengnakpa
ra Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
20.00 10.00 26.0
0 --- --- --- --- --- --- 20.00 10.00
26.0
0 --- --- ---
111 Noagre Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
18.00 25.00 27.0
0 --- --- --- --- --- --- 18.00 25.00
27.0
0 --- --- ---
112 Dombagre Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
15.00 10.00 15.0
0 --- --- --- --- --- --- 15.00 10.00
15.0
0 --- --- ---
113 Grenggand
i Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
25.00 25.00 34.0
0 --- --- --- --- --- --- 25.00 25.00
34.0
0 --- --- ---
114 Bolchugre Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
18.00 15.00 31.0
0 --- --- --- --- --- --- 18.00 15.00
31.0
0 --- --- ---
115 Chisegre Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
20.00 18.00 28.0
0 --- --- --- --- --- --- 20.00 18.00
28.0
0 --- --- ---
116 Jensilpara Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
15.00 20.00 32.0
0 --- --- --- --- --- --- 15.00 20.00
32.0
0 --- --- ---
District Irrigation Plan, South West Garo Hills district
140 | P a g e
117 Akinpara Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
12.00 15.00 20.0
0 --- --- --- --- --- --- 12.00 15.00
20.0
0 --- --- ---
118 Salbari Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
with
irrigation
channel
12.00 10.00 22.0
0 --- --- --- --- --- --- 12.00 10.00
22.0
0 --- --- ---
119 Bongpara
Nokat Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani Lift irrigation 15.00 15.00
25.0
0 --- --- --- --- --- --- 15.00 15.00
25.0
0 --- --- ---
120 Monabari Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani Lift irrigation 20.00 30.00 7.00 --- --- --- --- --- --- 20.00 30.00 7.00 --- --- ---
121 Skagre Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani Lift irrigation 50.00 10.00
29.0
7 --- --- --- --- --- --- 50.00 10.00
29.0
7 --- --- ---
122
Tour
Programm
e
Zikzak
MoA &
FW-DAC &
FW
Per Drop
More
Crop
Exposure trip
of farmers to
different
Agricultural
important
places in
India
2
Nos.
(Tour
)
100
farmers 5.00 --- --- --- --- --- ---
2
Nos.
(Tour
)
100
farmer
s
5.00 --- --- ---
123 Hatibelpar
a Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
With
Irrigation
channel
1.00 10.00 26.0
0 --- --- --- --- --- --- --- --- --- 1.00 10.00
26.0
0
124 PuljuriPara Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
With
Irrigation
channel
1.00 11.00 37.0
0 --- --- --- --- --- --- --- --- --- 1.00 11.00
37.0
0
125 Ganggikon
a Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
With
Irrigation
channel
1.00 8.00 28.0
0 --- --- --- --- --- --- --- --- --- 1.00 8.00
28.0
0
126 Boiragupip
ara Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
With
Irrigation
channel
1.00 13.00 32.0
0 --- --- --- --- --- --- --- --- --- 1.00 13.00
32.0
0
127 Rakhalduli Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
With
Irrigation
channel
1.00 5.00 30.0
0 --- --- --- --- --- --- --- --- --- 1.00 5.00
30.0
0
District Irrigation Plan, South West Garo Hills district
141 | P a g e
128 Paglipara Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
With
Irrigation
channel
1.00 5.00 28.0
0 --- --- --- --- --- --- --- --- --- 1.00 5.00
28.0
0
129 kisangpara Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
With
Irrigation
channel
1.00 5.00 27.0
0 --- --- --- --- --- --- --- --- --- 1.00 5.00
27.0
0
130 Gorbuipara Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
With
Irrigation
channel
1.00 5.00 30.0
0 --- --- --- --- --- --- --- --- --- 1.00 5.00
30.0
0
131 Noonmati Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
With
Irrigation
channel
1.00 11.00 28.0
0 --- --- --- --- --- --- --- --- --- 1.00 11.00
28.0
0
132 Koraitola Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
With
Irrigation
channel
1.00 13.00 36.0
0 --- --- --- --- --- --- --- --- --- 1.00 13.00
36.0
0
133 Anchengg
gre Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
With
Irrigation
channel
1.00 6.00 27.0
0 --- --- --- --- --- --- --- --- --- 1.00 6.00
27.0
0
134 Makdual Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
With
Irrigation
channel
1.00 8.00 26.0
0 --- --- --- --- --- --- --- --- --- 1.00 8.00
26.0
0
135 Damalgre Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
With
Irrigation
channel
1.00 7.00 30.0
0 --- --- --- --- --- --- --- --- --- 1.00 7.00
30.0
0
136 Salmanpar
a Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
With
Irrigation
channel
1.00 8.00 30.0
0 --- --- --- --- --- --- --- --- --- 1.00 8.00
30.0
0
137 Darugre Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
With
Irrigation
channel
1.00 6.00 25.0
0 --- --- --- --- --- --- --- --- --- 1.00 6.00
25.0
0
138 Bangdapar
a Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
With
Irrigation
channel
1.00 6.00 28.0
0 --- --- --- --- --- --- --- --- --- 1.00 6.00
28.0
0
District Irrigation Plan, South West Garo Hills district
142 | P a g e
139 Dinapara Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
With
Irrigation
channel
1.00 6.00 30.0
0 --- --- --- --- --- --- --- --- --- 1.00 6.00
30.0
0
140 Bakdagre Zikzak
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
With
Irrigation
channel
1.00 6.00 31.0
0 --- --- --- --- --- --- --- --- --- 1.00 6.00
31.0
0
141 Parengpara Betasin
g
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
With
Irrigation
channel
1.00 15.00 25.0
0 --- --- --- --- --- --- --- --- --- 1.00 15.00
25.0
0
142 Chiringpar
a
Betasin
g
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
With
Irrigation
channel
1.00 10.00 18.0
0 --- --- --- --- --- --- --- --- --- 1.00 10.00
18.0
0
143 Takuranba
ri
Betasin
g
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
With
Irrigation
channel
1.00 20.00 43.0
0 --- --- --- --- --- --- --- --- --- 1.00 20.00
43.0
0
144 Nepalgre Betasin
g
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
With
Irrigation
channel
1.00 15.00 18.0
0 --- --- --- --- --- --- --- --- --- 1.00 15.00
18.0
0
145 Jarangre Betasin
g
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
With
Irrigation
channel
1.00 10.00 18.0
0 --- --- --- --- --- --- --- --- --- 1.00 10.00
18.0
0
146 Malchapar
a
Betasin
g
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
With
Irrigation
channel
1.00 10.00 20.0
0 --- --- --- --- --- --- --- --- --- 1.00 10.00
20.0
0
147 Bainapara
Koch
Betasin
g
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
With
Irrigation
channel
1.00 15.00 22.0
0 --- --- --- --- --- --- --- --- --- 1.00 15.00
22.0
0
148 Bandoraja Betasin
g
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
With
Irrigation
channel
1.00 15.00 25.0
0 --- --- --- --- --- --- --- --- --- 1.00 15.00
25.0
0
149 Sonamite Betasin
g
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
With
Irrigation
channel
1.00 20.00 35.0
0 --- --- --- --- --- --- --- --- --- 1.00 20.00
35.0
0
District Irrigation Plan, South West Garo Hills district
143 | P a g e
150 Doguripara Betasin
g
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
With
Irrigation
channel
1.00 18.00 25.0
0 --- --- --- --- --- --- --- --- --- 1.00 18.00
25.0
0
151 Jaluagre Betasin
g
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
With
Irrigation
channel
1.00 38.00 40.0
0 --- --- --- --- --- --- --- --- --- 1.00 38.00
40.0
0
152 Bangre Betasin
g
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
With
Irrigation
channel
1.00 45.00 50.0
0 --- --- --- --- --- --- --- --- --- 1.00 45.00
50.0
0
153 Adugre Betasin
g
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
With
Irrigation
channel
1.00 30.00 38.0
0 --- --- --- --- --- --- --- --- --- 1.00 30.00
38.0
0
154 Joyfar Betasin
g
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
With
Irrigation
channel
1.00 30.00 38.0
0 --- --- --- --- --- --- --- --- --- 1.00 30.00
38.0
0
155 Rangsakon
a
Betasin
g
MoA &
FW-DAC &
FW
Har Khet
Ko Pani
Check Dam
With
Irrigation
channel
1.00 35.00 45.0
0 --- --- --- --- --- --- --- --- --- 1.00 35.00
45.0
0
156
Tour
Programm
e
Betasin
g
MoA &
FW-DAC &
FW
Per Drop
More
Crop
Exposure trip
of farmers to
different
Agricultural
important
places in
India
2
Nos.
(Tour
)
100
farmers 5.00 --- --- --- --- --- --- --- --- ---
2
Nos.
(Tour
)
100
farmer
s
5.00
Total 529.0
0
1892.0
0
4190
.68 43.00 501.00
1086
.68 36.00 373.00
1055
.00
417.0
0 553.00
1055
.00 33.00 465.00
994.
00
District Irrigation Plan, South West Garo Hills district
144 | P a g e
Annexure IV : Strategic Action Plan by Horticulture Department
Name of the Block : Betasing
Sl.
No
Concerned
Ministry/
Department
Component Activity
Total
Command
Area (Ha.)
Total Estimated
Cost (in Rs.
Lacs)
2016-17 2017-18 2018-19 2019-20
Commands
Area (ha.)
Fund
(lacs)
Command
Area (ha.)
Fund
(lacs)
Command
Area (ha.)
Fund
(lacs)
Command
Area (ha.)
Fund
(lacs)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 MoA&FW-
DAC&FW
Per Drop More
Crop
Water harvesting Structures 140 480 35 120 35 120 35 120 35 120
2 Community tanks 144 400 36 100 36 100 36 100 36 100
3 Har Khet Ko Pani Treadle Pumps 200 208 50 52 50 52 50 52 50 52
Sub Total 484 1088 121 272 121 272 121 272 121 272
Name of the Block : Zikzak
Sl.
No
Concerned
Ministry/
Department
Component Activity
Total
Command
Area (Ha.)
Total Estimated
Cost (in Rs.
Lacs)
2016-17 2017-18 2018-19 2019-20
Commands
Area (ha.)
Fund
(lacs)
Command
Area (ha.)
Fund
(lacs)
Command
Area (ha.)
Fund
(lacs)
Command
Area (ha.)
Fund
(lacs)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 MoA&FW-
DAC&FW
Per Drop More
Crop
Water harvesting Structures 140 480 35 120 35 120 35 120 35 120
2 Community tanks 144 400 36 100 36 100 36 100 36 100
3 Har Khet Ko Pani Treadle Pumps 200 208 50 52 50 52 50 52 50 52
Sub Total 484 1088 121 272 121 272 121 272 121 272
Grand Total 968 2176 242 544 242 544 242 544 242 544