Generated by Jive on 2014-03-29+01:00 1 Batch Derivation in Production Batch Derivation : Transferring batch characteristics values or batch master fields from the sender batch to the receiving batch is called “Batch Derivation”. The component batches can pass on their Field values/characteristics values to the manufactured batch. Scenario : Minimum value of Manufacturing date and Expiry Date (SLED) of the component materials batches are to be transferred to header material batch during process order release automatically Process Flow: Create BOM and Recipe for Header material - CS01 Create condition records for sender receiver materials - DVCO Create Process Order - COR1 Do the batch determination for components - COR2 Release the process order - COR2 Check for the batch derivation - MSC3N Detailed Flow: Create BOM for header material as shown below....and also create master recipe for the header material.... Now go to transaction DVCO

Upload: spsubbu

Post on 24-May-2017

259 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: DOC 51594 Batch Derivation

Generated by Jive on 2014-03-29+01:001

Batch Derivation in Production

Batch Derivation :

Transferring batch characteristics values or batch master fields from the sender batch to thereceiving batch is called “Batch Derivation”.The component batches can pass on their Field values/characteristics values to the manufactured batch.

Scenario :

Minimum value of Manufacturing date and Expiry Date (SLED) of the component materials batches are to be

transferred to header material batch during process order release automatically

Process Flow:• Create BOM and Recipe for Header material - CS01• Create condition records for sender receiver materials - DVCO• Create Process Order - COR1• Do the batch determination for components - COR2• Release the process order - COR2• Check for the batch derivation - MSC3N

Detailed Flow:

Create BOM for header material as shown below....and also create master recipe for the header material....

Now go to transaction DVCO

Page 2: DOC 51594 Batch Derivation

Batch Derivation in Production

Generated by Jive on 2014-03-29+01:002

Enter the relevant details Material, Plant, usage as shown below and select the derivation event as during

Release of process/production order

Page 3: DOC 51594 Batch Derivation

Batch Derivation in Production

Generated by Jive on 2014-03-29+01:003

then click on execute

Now click on create button

Page 4: DOC 51594 Batch Derivation

Batch Derivation in Production

Generated by Jive on 2014-03-29+01:004

add two fields SLED and Date of manufacture as shown below

Drag and Drop these two to Left side materials to create sender and Receivercondition records….

Page 5: DOC 51594 Batch Derivation

Batch Derivation in Production

Generated by Jive on 2014-03-29+01:005

select the comarative as minimum as shown below for value selection during derivation...

Page 6: DOC 51594 Batch Derivation

Batch Derivation in Production

Generated by Jive on 2014-03-29+01:006

Page 7: DOC 51594 Batch Derivation

Batch Derivation in Production

Generated by Jive on 2014-03-29+01:007

Then Save

Now check the batches of the two component materials and values of their Manufacturing date and SLED....

First component is 2160

Page 8: DOC 51594 Batch Derivation

Batch Derivation in Production

Generated by Jive on 2014-03-29+01:008

Batch S1 with MFG date as 14.08.2013 and SLED as 31.12.2014

Page 9: DOC 51594 Batch Derivation

Batch Derivation in Production

Generated by Jive on 2014-03-29+01:009

Now check for second component is T-RJ200

Page 10: DOC 51594 Batch Derivation

Batch Derivation in Production

Generated by Jive on 2014-03-29+01:0010

Batch 1234 with MFG date as 01.07.2013 and SLED as 31.07.2014

Page 11: DOC 51594 Batch Derivation

Batch Derivation in Production

Generated by Jive on 2014-03-29+01:0011

Now create process order for header material as shown below...

Page 12: DOC 51594 Batch Derivation

Batch Derivation in Production

Generated by Jive on 2014-03-29+01:0012

Create batch for header material as shown below...

Page 13: DOC 51594 Batch Derivation

Batch Derivation in Production

Generated by Jive on 2014-03-29+01:0013

save the order

go to change mode

Page 14: DOC 51594 Batch Derivation

Batch Derivation in Production

Generated by Jive on 2014-03-29+01:0014

Assign the batches to the components manually or through batch determination as shown below.....

Now Release the process order

Page 15: DOC 51594 Batch Derivation

Batch Derivation in Production

Generated by Jive on 2014-03-29+01:0015

Now save the process order

Now during process order release batch derivation gets triggered and values gets transferred to header batch

automatically...

Now check in the Batch of the header material whether MFG date and SLED are updated as per the

requirement...

MFG date: 01.07.2013 is the minimum of 14.08.2013 (Batch S1 material 2160) and 01.07.2013 (Batch 1234

material T-RJ200)

Shelf Life Exp. Date: 31.07.2013 is the minimum of 31.12.2014 (Batch S1 material 2160) and 31.07.2013

(Batch 1234 material T-RJ200)

Page 16: DOC 51594 Batch Derivation

Batch Derivation in Production

Generated by Jive on 2014-03-29+01:0016

Thanks