Page 1: DOM MB Status October 14, 2003

DOM MB StatusOctober 14, 2003

Gerald Przybylski

Lawerence Berkeley National Laboratory

GTPrzybylski 20/14/03 LBNL

Page 2: DOM MB Status October 14, 2003

A Rev 2 board

IceCube ReviewGTPrzybylski 20/14/03 LBNL

Page 3: DOM MB Status October 14, 2003

Rev 3 Changes

• EPXA4 Baseline; EPC16 Config. Memory

• Memory Power Options (1.8V, 2.5V, 3.3V)

• Memory ‘Snubbing’ resistors

• Define ALL Memory Input Levels More

• Low impedance Power Distribution to SDRAM and SDRAM controller

• Primary Oscillator; Corning (Hi-Rel 2560A-0009)

• Alternate Oscillator; ToyocomIceCube Review

GTPrzybylski 20/14/03 LBNL

Page 4: DOM MB Status October 14, 2003

More Rev 3 Changes• Major Problem Component:

- Al Electrolytic -> Polypropylene Film• Power Filter Network Refinements• Noise Related Layout Changes• High-Rel DC-DC Converter by

Power-One brand

• DC-DC Converter Footprint Options 4W or 7W dual footprint

• Simplify Input Power Protection• HV Power Supply Connector Pin-out

GTPrzybylski 20/14/03 LBNL

Page 5: DOM MB Status October 14, 2003

and More Rev 3 Changes

• Q/A Tests Added to Plan; Coupons on PCB

• 2 x 12 Channel ADCs vs. 1 x 8 Channel for housekeeping

• Hi-Rel Part Substitutions

• Test Connector (Main Cable and LC)

• Bill-of-Materials Consolidation

IceCube ReviewGTPrzybylski 20/14/03 LBNL

Page 6: DOM MB Status October 14, 2003

Fabrication Changes

• Layout for Convenient Integration

• Restrict Layer Repairs during PCB Fab

• Temperature Cycling of Bare Boards

• Improve Process Control in PCB Fab

• Near Class-III Fab/Medical PCB Standards

• Tin – Awareness

IceCube ReviewGTPrzybylski 20/14/03 LBNL

Page 7: DOM MB Status October 14, 2003

Tuning for Physics Performance

• On-Board Flasher Performance Tuning- UV LED gives < 10ns FWHM pulse- Blue LED gives ~13 ns FWHM pulse

• x0.25 x 2 x 8 gain for ATWD PMT inputs

• Extend Input Clipping Range [+2.4..-3.0]

• Stronger ATWD Drivers

• Optimize ATWD Driver Output Impedance to minimize ringing

• fADC channel gain adjustment for 12 bitsGTPrzybylski 20/14/03 LBNL

Page 8: DOM MB Status October 14, 2003

Deletions

• SRAM ‘lookback-memory’ not needed since FPGA writes directly to SDRAM

• Test connector footprints not needed• Alternate communications line receiver• Lumped Delay Line… (space, performance)

GTPrzybylski 20/14/03 LBNL

Page 9: DOM MB Status October 14, 2003

The End

GTPrzybylski 20/14/03 LBNL

Page 10: DOM MB Status October 14, 2003

Memory Issues• Improve Layout

- Trace length matching- Bypassing- Low impedance power distribution (island)

• Match Output levels to Signal threshold • Set-up Time Tuning (SD_CLKn -> SD_DQS0)

Back

GTPrzybylski 20/14/03 LBNL