2009-10 Capital Improvement Project

PROJECT GOALS -Health and Safety

Energy Performance Infrastructure Improvements

Page 4: 2009-10 Capital Improvement Project

• The focus of the project will be on health and safety infrastructure improvements and reducing the district’s utility bills.– Roofs (replace and insulate 101,414 ft²)– Boilers (2–1958, 2–1976, 1–1986, and 1–1990)– Asbestos abatement (approx. 60 classrooms)– High school entrance – revamp guidance and

principal’s offices– Concrete sidewalks, stairs, and doorways– Card swipes

Page 5: 2009-10 Capital Improvement Project

Rockwell Roof – 27,370 ft²

Page 6: 2009-10 Capital Improvement Project

Rockwell Roof - new

Page 7: 2009-10 Capital Improvement Project

Rockwell Roof – Separate Voter Referendum

• Purpose– To replace approximately 5,100 ft² of the worst

areas this school year.

• Cost– $87,800 – architect’s estimate– ($76,737) – state aid payable next school year– $11,063 – net cost (budgeted in 2009-10)

Page 8: 2009-10 Capital Improvement Project

Wheeler Hot Water Boilers - 1958

Page 9: 2009-10 Capital Improvement Project

Rockwell Steam Boilers – 1986 & 1990

Page 10: 2009-10 Capital Improvement Project

Rockwell – Asbestos Floor Tile,30 classrooms

Page 11: 2009-10 Capital Improvement Project

Wheeler Gym Lighting - old

Page 12: 2009-10 Capital Improvement Project

Wheeler Gym Lighting - new

Page 13: 2009-10 Capital Improvement Project

Jr/Sr High School Entrance

Page 14: 2009-10 Capital Improvement Project

Jr/Sr High School Sidewalks

Page 15: 2009-10 Capital Improvement Project

Upgraded Science Room - 2008

Page 16: 2009-10 Capital Improvement Project

Industrial Arts Building

Page 17: 2009-10 Capital Improvement Project

Drainage Improvements - 1990

Page 18: 2009-10 Capital Improvement Project

Expanding the District Office by 1,250 ft² will:Create a Technology Office at Rockwell for 5 IT Technicians (PRIMARY OBJECTIVE) Create a conference room for professional developmentAdd District Office for Asst. Superintendent Curriculum, Instruction and Special Education

Page 19: 2009-10 Capital Improvement Project

Project Schedule

Architectural RFP September 29, 2009

Architectural selection October 20, 2009

Public Forum – Rockwell January 14, 2010

Public Forum – High School

January 21, 2010

Voter Referendum February 9, 2010

Final design complete June, 2010

NYSED approval January, 2011

Contractor/project award

April, 2011

Project completion August, 2012

Page 20: 2009-10 Capital Improvement Project

Financing

• Parameters for the district’s financial consultant (Fiscal Advisors)– Goal is to MAINTAIN THE CURRENT TAX RATE– 95% or more of the project is eligible for building aid

reimbursement at a rate of 87.4%.– Use available fund balance per voter referendum.– Existing serial bond retires June 15, 2010.

• Result ~ $10,655,000 Project

Page 21: 2009-10 Capital Improvement Project

In Conclusion…

• Health and safety of students, staff, and community members.

• Ongoing energy efficiency improvements to reduce utility use and cost.

• Control project costs to maintain the current tax rate.

Page 22: 2009-10 Capital Improvement Project

Questions or Comments

• Please refer questions and comments to either –– Joseph Rotella, Superintendent of Schools,

(315) 552-5000 or [email protected]– Steven Smith, Business Administrator,

(315) 552-5001 or [email protected]