2009-10 Capital Improvement Project. PROJECT GOALS - Health and Safety Energy Performance Infrastructure Improvements. The focus of the project will be on health and safety infrastructure improvements and reducing the district’s utility bills. Roofs (replace and insulate 101,414 ft²) - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: 2009-10 Capital Improvement Project
Page 2: 2009-10 Capital Improvement Project
Page 3: 2009-10 Capital Improvement Project

2009-10 Capital Improvement Project

PROJECT GOALS -Health and Safety

Energy Performance Infrastructure Improvements

Page 4: 2009-10 Capital Improvement Project

• The focus of the project will be on health and safety infrastructure improvements and reducing the district’s utility bills.– Roofs (replace and insulate 101,414 ft²)– Boilers (2–1958, 2–1976, 1–1986, and 1–1990)– Asbestos abatement (approx. 60 classrooms)– High school entrance – revamp guidance and

principal’s offices– Concrete sidewalks, stairs, and doorways– Card swipes

Page 5: 2009-10 Capital Improvement Project

Rockwell Roof – 27,370 ft²

Page 6: 2009-10 Capital Improvement Project

Rockwell Roof - new

Page 7: 2009-10 Capital Improvement Project

Rockwell Roof – Separate Voter Referendum

• Purpose– To replace approximately 5,100 ft² of the worst

areas this school year.

• Cost– $87,800 – architect’s estimate– ($76,737) – state aid payable next school year– $11,063 – net cost (budgeted in 2009-10)

Page 8: 2009-10 Capital Improvement Project

Wheeler Hot Water Boilers - 1958

Page 9: 2009-10 Capital Improvement Project

Rockwell Steam Boilers – 1986 & 1990

Page 10: 2009-10 Capital Improvement Project

Rockwell – Asbestos Floor Tile,30 classrooms

Page 11: 2009-10 Capital Improvement Project

Wheeler Gym Lighting - old

Page 12: 2009-10 Capital Improvement Project

Wheeler Gym Lighting - new

Page 13: 2009-10 Capital Improvement Project

Jr/Sr High School Entrance

Page 14: 2009-10 Capital Improvement Project

Jr/Sr High School Sidewalks

Page 15: 2009-10 Capital Improvement Project

Upgraded Science Room - 2008

Page 16: 2009-10 Capital Improvement Project

Industrial Arts Building

Page 17: 2009-10 Capital Improvement Project

Drainage Improvements - 1990

Page 18: 2009-10 Capital Improvement Project

Expanding the District Office by 1,250 ft² will:Create a Technology Office at Rockwell for 5 IT Technicians (PRIMARY OBJECTIVE) Create a conference room for professional developmentAdd District Office for Asst. Superintendent Curriculum, Instruction and Special Education

Page 19: 2009-10 Capital Improvement Project

Project Schedule

Architectural RFP September 29, 2009

Architectural selection October 20, 2009

Public Forum – Rockwell January 14, 2010

Public Forum – High School

January 21, 2010

Voter Referendum February 9, 2010

Final design complete June, 2010

NYSED approval January, 2011

Contractor/project award

April, 2011

Project completion August, 2012

Page 20: 2009-10 Capital Improvement Project

Financing

• Parameters for the district’s financial consultant (Fiscal Advisors)– Goal is to MAINTAIN THE CURRENT TAX RATE– 95% or more of the project is eligible for building aid

reimbursement at a rate of 87.4%.– Use available fund balance per voter referendum.– Existing serial bond retires June 15, 2010.

• Result ~ $10,655,000 Project

Page 21: 2009-10 Capital Improvement Project

In Conclusion…

• Health and safety of students, staff, and community members.

• Ongoing energy efficiency improvements to reduce utility use and cost.

• Control project costs to maintain the current tax rate.

Page 22: 2009-10 Capital Improvement Project

Questions or Comments

• Please refer questions and comments to either –– Joseph Rotella, Superintendent of Schools,

(315) 552-5000 or [email protected]– Steven Smith, Business Administrator,

(315) 552-5001 or [email protected]

Onondaga Central School District4466 South Onondaga Road

Nedrow, NY 13120