4 ANALIZA COST BENEFICIU4.aIdentificarea investitiei si
![Page 2: 4 Analiza Cost Beneficiu](https://reader038.vdocuments.net/reader038/viewer/2022100421/55cf97b3550346d033931449/html5/thumbnails/2.jpg)
definirea obiectivelor Costul total cu investitia pentru proiectul de investitiiTARGET-CENTRU DE CERCETARE
![Page 3: 4 Analiza Cost Beneficiu](https://reader038.vdocuments.net/reader038/viewer/2022100421/55cf97b3550346d033931449/html5/thumbnails/3.jpg)
SI TRATAMENT IN GASTROENTEROLOGIE BAZAT PE METODE IMAGISTICE SI STUDII MOLECULARE cuprinde cheltuieli aferente realizarii unei
![Page 4: 4 Analiza Cost Beneficiu](https://reader038.vdocuments.net/reader038/viewer/2022100421/55cf97b3550346d033931449/html5/thumbnails/4.jpg)
constructii, realizarii de amenajari siachizitionarii de echipamente necesare infrastructurii
![Page 5: 4 Analiza Cost Beneficiu](https://reader038.vdocuments.net/reader038/viewer/2022100421/55cf97b3550346d033931449/html5/thumbnails/5.jpg)
de cercetare-dezvoltare.Activitatea de construire si dotare la cheie a Cladirii de Imagistica se va desfasura
![Page 6: 4 Analiza Cost Beneficiu](https://reader038.vdocuments.net/reader038/viewer/2022100421/55cf97b3550346d033931449/html5/thumbnails/6.jpg)
pe parcursul a21 luni calendaristice si amenajarea spatiilor existente se va realiza pe parcursul a 12
![Page 7: 4 Analiza Cost Beneficiu](https://reader038.vdocuments.net/reader038/viewer/2022100421/55cf97b3550346d033931449/html5/thumbnails/7.jpg)
lunicalendaristice.In continuare, sunt prezentate in tabelul alaturat principalele elemente ale
![Page 8: 4 Analiza Cost Beneficiu](https://reader038.vdocuments.net/reader038/viewer/2022100421/55cf97b3550346d033931449/html5/thumbnails/8.jpg)
costurilor de capitalaferente investitiei:Componentele de capitalValoare MiiRON faraTVAValoare
![Page 9: 4 Analiza Cost Beneficiu](https://reader038.vdocuments.net/reader038/viewer/2022100421/55cf97b3550346d033931449/html5/thumbnails/9.jpg)
MiiEURO faraTVAConstructie Cladirea Cnerului de Imagistica 14,299 3,971.98Amenajare module1,511
![Page 10: 4 Analiza Cost Beneficiu](https://reader038.vdocuments.net/reader038/viewer/2022100421/55cf97b3550346d033931449/html5/thumbnails/10.jpg)
419.75Achizitie echipamente 36,502 10,139.50Achizitie sisteme de calcul 1,386.36 385.10Achizitie aplicatii software 227.70
![Page 11: 4 Analiza Cost Beneficiu](https://reader038.vdocuments.net/reader038/viewer/2022100421/55cf97b3550346d033931449/html5/thumbnails/11.jpg)
63.25Achizitie mobilier 321.30 89.25Achizitie dotari intarirea capacitatiiadministrative 190.80 53.00
![Page 12: 4 Analiza Cost Beneficiu](https://reader038.vdocuments.net/reader038/viewer/2022100421/55cf97b3550346d033931449/html5/thumbnails/12.jpg)
TOTAL 54,438.60 15,121.83Pentru a avea o imagine de ansamblu asupra viabilitatii
![Page 13: 4 Analiza Cost Beneficiu](https://reader038.vdocuments.net/reader038/viewer/2022100421/55cf97b3550346d033931449/html5/thumbnails/13.jpg)
proiectului de investitii este necesaraprevizionarea evolutiei intrarilor si iesirilor aferente
![Page 14: 4 Analiza Cost Beneficiu](https://reader038.vdocuments.net/reader038/viewer/2022100421/55cf97b3550346d033931449/html5/thumbnails/14.jpg)
acestuia pe termen mediu si lung. Astfel, avand invedere natura proiectului de infrastructura s-a considerat un
![Page 15: 4 Analiza Cost Beneficiu](https://reader038.vdocuments.net/reader038/viewer/2022100421/55cf97b3550346d033931449/html5/thumbnails/15.jpg)
orizont de timp pentru perioada deanaliza de 15 ani.In ceea ce priveste perioada de referinta, anul
![Page 16: 4 Analiza Cost Beneficiu](https://reader038.vdocuments.net/reader038/viewer/2022100421/55cf97b3550346d033931449/html5/thumbnails/16.jpg)
2007 este considerat anul de referinta al proiectului,iar analiza economico - financiara are ca punct de
![Page 17: 4 Analiza Cost Beneficiu](https://reader038.vdocuments.net/reader038/viewer/2022100421/55cf97b3550346d033931449/html5/thumbnails/17.jpg)
referinta anul 2007.
![Page 18: 4 Analiza Cost Beneficiu](https://reader038.vdocuments.net/reader038/viewer/2022100421/55cf97b3550346d033931449/html5/thumbnails/18.jpg)
![Page 19: 4 Analiza Cost Beneficiu](https://reader038.vdocuments.net/reader038/viewer/2022100421/55cf97b3550346d033931449/html5/thumbnails/19.jpg)