Booster Short Kicker TestingUpdate
• Testing short & Long Kicker modules using noker CX1168 Thyratron system• Two short modules look similar
in characteristic but not as expected.• Short Kicker rebuild in progress
to make to get third module with modifications.
Preliminary Finding is a 8-15 ns difference between ANU pulser and Operational Booster pulser(Slower)
Long BKED012 Magnet
Short BKEE002 Magnet