Budget
Planning 2012 Done by: Lam Zhi Yuan Ng Jia XinOoi Ren YiTeo Xin HuiWang Jiale (Daryl)
![Page 2: Budget Plans 2012](https://reader033.vdocuments.net/reader033/viewer/2022051213/55ae50a81a28abf1738b47db/html5/thumbnails/2.jpg)
Section 1: Problems with Singapore's Transport System
![Page 3: Budget Plans 2012](https://reader033.vdocuments.net/reader033/viewer/2022051213/55ae50a81a28abf1738b47db/html5/thumbnails/3.jpg)
Problems with the transport system?
Crowded Trains
Frustrated Unpleasant
Noisy Avoid taking trains
![Page 4: Budget Plans 2012](https://reader033.vdocuments.net/reader033/viewer/2022051213/55ae50a81a28abf1738b47db/html5/thumbnails/4.jpg)
Problems with the transport system?
Failing Trains
People in danger Frustrated
Lose trust in MoT Chaos
![Page 5: Budget Plans 2012](https://reader033.vdocuments.net/reader033/viewer/2022051213/55ae50a81a28abf1738b47db/html5/thumbnails/5.jpg)
Problems with the transport system?
Especially long bus waiting times
![Page 6: Budget Plans 2012](https://reader033.vdocuments.net/reader033/viewer/2022051213/55ae50a81a28abf1738b47db/html5/thumbnails/6.jpg)
Problems with the transport system?
Bus drivers speed past bus stops
without even checking whether there
are any passenger at the bus stops
![Page 7: Budget Plans 2012](https://reader033.vdocuments.net/reader033/viewer/2022051213/55ae50a81a28abf1738b47db/html5/thumbnails/7.jpg)
Problems with the transport system?
Bus breakdowns
Passengers have to alight
Road obstacle
Late for school/work
Crowded bus stops
Traffic Jam
Chaos
![Page 8: Budget Plans 2012](https://reader033.vdocuments.net/reader033/viewer/2022051213/55ae50a81a28abf1738b47db/html5/thumbnails/8.jpg)
Problems with the transport system?No comprehensive
system of rail at Bukit
Timah
![Page 9: Budget Plans 2012](https://reader033.vdocuments.net/reader033/viewer/2022051213/55ae50a81a28abf1738b47db/html5/thumbnails/9.jpg)
Section 2: Solutions
![Page 10: Budget Plans 2012](https://reader033.vdocuments.net/reader033/viewer/2022051213/55ae50a81a28abf1738b47db/html5/thumbnails/10.jpg)
Solutions
•Increase the rolling stock on North South and East West lines.
•Install back up batteries that would last one station
•Increase number of buses.
•Hasten the construction of downtown line 2, to 2013, together with downtown line 1.
![Page 11: Budget Plans 2012](https://reader033.vdocuments.net/reader033/viewer/2022051213/55ae50a81a28abf1738b47db/html5/thumbnails/11.jpg)
Section 3: Budget Allocation
![Page 12: Budget Plans 2012](https://reader033.vdocuments.net/reader033/viewer/2022051213/55ae50a81a28abf1738b47db/html5/thumbnails/12.jpg)
Spending
•5 new Kawasaki Heavy Industries & CSR Qingdao Sifang C151A trains costing 85 million dollars.
•100 new Mercedes citaro busses costing total of 50 million
•10 trains will be a tested first using regenerative braking technology on the wheels of the train, and be pushed out slowly to the rest of the rolling stock. Cost of which would be 65 million.
•Speeding up of Downtown line construction to cost 300 million.
![Page 13: Budget Plans 2012](https://reader033.vdocuments.net/reader033/viewer/2022051213/55ae50a81a28abf1738b47db/html5/thumbnails/13.jpg)
Expenditure
17%
13%
10%60%
Cost
5 C151A Trains
Retrofitting 10 trains with regenerative batteries
100 Citaro Busses
Speeding up of Downtown line construction
![Page 14: Budget Plans 2012](https://reader033.vdocuments.net/reader033/viewer/2022051213/55ae50a81a28abf1738b47db/html5/thumbnails/14.jpg)
5 new Kawasaki Heavy Industries & CSR Qingdao Sifang C151A trains
• less congested trains during morning peak hours.
• increases frequency of trains from five minutes, to four minutes.
![Page 15: Budget Plans 2012](https://reader033.vdocuments.net/reader033/viewer/2022051213/55ae50a81a28abf1738b47db/html5/thumbnails/15.jpg)
100 new Mercedes citarobusses• Reduce significantly the
amount of time spent waiting for busses.
• From 20 minutes, to 13 minutes.
• Will be used in services that operate near schools.
• Citaro busses are comfortable and fuel-efficient.
![Page 16: Budget Plans 2012](https://reader033.vdocuments.net/reader033/viewer/2022051213/55ae50a81a28abf1738b47db/html5/thumbnails/16.jpg)
Regenerative braking technology
• Converts the train’s kinetic energy to another form of energy, to be stored.
• back-up power supply, should there be a power failure.
• Prevents of stalling if trains.
![Page 17: Budget Plans 2012](https://reader033.vdocuments.net/reader033/viewer/2022051213/55ae50a81a28abf1738b47db/html5/thumbnails/17.jpg)
Regenerative braking technology
![Page 18: Budget Plans 2012](https://reader033.vdocuments.net/reader033/viewer/2022051213/55ae50a81a28abf1738b47db/html5/thumbnails/18.jpg)
Speeding up of Downtown line 2 construction
• Provides rail network for citizens living in Bukit Timah, and Bukit Panjangstretch.
• Ease of travel
![Page 19: Budget Plans 2012](https://reader033.vdocuments.net/reader033/viewer/2022051213/55ae50a81a28abf1738b47db/html5/thumbnails/19.jpg)
Speeding up of Downtown line 2 construction
• Students from schools will benefit from two stations, Stevens, and Tan Kah Kee.
• Improves education sector as well.
![Page 20: Budget Plans 2012](https://reader033.vdocuments.net/reader033/viewer/2022051213/55ae50a81a28abf1738b47db/html5/thumbnails/20.jpg)
Section 4: Bibliography
![Page 21: Budget Plans 2012](https://reader033.vdocuments.net/reader033/viewer/2022051213/55ae50a81a28abf1738b47db/html5/thumbnails/21.jpg)
Images• http://www.carrentaltoday.com/wp-
content/uploads/2011/02/hyundai-matrix-rear-view.jpg• http://2.bp.blogspot.com/-
xRyaiqQIdxM/Tc9cdxQZlPI/AAAAAAAAAO0/bFmo6yIVins/s1600/walking-away.gif
• http://2.bp.blogspot.com/-XEfCLPohzss/TuGVLCCFgDI/AAAAAAAABOM/srWiYILL7xE/s1600/explosion.png
• http://www.singapore.la/img/Beautiful-Roads-.jpg• http://media.photobucket.com/image/singapore%20bus%20forwar
d%20facing/TIB838H/IMG_8182.jpg• http://upload.wikimedia.org/wikipedia/commons/e/ec/SG_bus_st
op_2.JPG• http://www.bombardier.com/files/en/supporting_docs/image_and
_media/products/BT-4115-Metro-Singapore_Downtown_Line-HR.jpg
• http://upload.wikimedia.org/wikipedia/commons/thumb/f/f1/2_C830_in_KCD.JPG/300px-2_C830_in_KCD.JPG
• http://research.phillipmartin.info/la_bibliography.gif• http://thelongnwindingroad.files.wordpress.com/2010/10/img_50
75.jpg?w=510&h=340
Bibliography