MASONRY AND BRICK ARCH BRIDGES:
The problem:The problem: Masonry arch bridge construction long abandoned in the UKMasonry arch bridge construction long abandoned in the UK
UK transport network dependent on masonry and brick archesUK transport network dependent on masonry and brick arches
Subjected to ever increasing traffic levels, speeds and loadsSubjected to ever increasing traffic levels, speeds and loads
Frequently 100+ years old Frequently 100+ years old
Some are damaged or have simply deteriorated graduallySome are damaged or have simply deteriorated gradually
NEED FOR MAINTENANCE, REPAIR AND STRENGTHENING
NEED FOR BEST PRACTICE GUIDANCE
UK InfrastructureUK Infrastructure
Key elements of UK transport infrastructure:Key elements of UK transport infrastructure:
Network RailNetwork Rail
London Underground LimitedLondon Underground Limited
British WaterwaysBritish Waterways
Highways AgencyHighways Agency
British WaterwaysBritish Waterways
canals circa 1800'scanals circa 1800's
Network RailNetwork Rail
railways circa 1850'srailways circa 1850's
London London UndergroundUnderground
underground circa underground circa 1900's1900's
Highways AgencyHighways Agency
motorways and trunk motorways and trunk roads circa 1960's roads circa 1960's onwardsonwards
canals circa 1800'scanals circa 1800's
railways circa 1850'srailways circa 1850's
underground circa 1900'sunderground circa 1900's
motorways and trunk roads motorways and trunk roads circa 1960's onwardscirca 1960's onwards
UK infrastructureUK infrastructure
Magnitude of the problem:Magnitude of the problem:
Masonry and brick arches comprise:Masonry and brick arches comprise:
40% of UK bridge stock (largest single group)40% of UK bridge stock (largest single group)
40,000 arch highway bridges40,000 arch highway bridges
33,000 railway arch spans33,000 railway arch spans
Very high proportion of British Waterways’ assetsVery high proportion of British Waterways’ assets
To present To present best practice guidancebest practice guidance
To facilitate knowledge sharingTo facilitate knowledge sharing
To provide an enabling documentTo provide an enabling document
To have national applicationTo have national application
To recommend maintenance strategies To recommend maintenance strategies
representing best value for moneyrepresenting best value for money
To provide impartial assessment and adviceTo provide impartial assessment and advice
Purpose of the ProjectPurpose of the Project
Main User GroupsMain User Groups
The report should provide guidance for:The report should provide guidance for:
Clients (asset owners and operators) in railways, Clients (asset owners and operators) in railways,
road and canals infrastructuresroad and canals infrastructures
Engineers (consultants and contractors)Engineers (consultants and contractors)
Maintenance managersMaintenance managers
ApproachApproach
Asset ManagementAsset Management
Structural Structural BehaviourBehaviour of masonry and brick arch of masonry and brick arch bridgesbridges
Loss of bridge performanceLoss of bridge performance
Condition appraisal and assessment of capacityCondition appraisal and assessment of capacity
Preventative, remedial and strengthening measuresPreventative, remedial and strengthening measures
MonitoringMonitoring
Environmental and heritage considerationsEnvironmental and heritage considerations
Future researchFuture research
MethodMethod
Literature reviewLiterature review
ConsultationConsultation
Case historiesCase histories
Assessment of informationAssessment of information
Conclusions and reportingConclusions and reporting
The Consultation ProcessThe Consultation Process
Involve individuals and organisations with experience Involve individuals and organisations with experience and expertise in brick and masonry arch bridges.and expertise in brick and masonry arch bridges.
Contribution of knowledge, user’s perspective, views on Contribution of knowledge, user’s perspective, views on content and material for inclusion (e.g. case-studies).content and material for inclusion (e.g. case-studies).
• Consultation WorkshopConsultation Workshop
• Questionnaires (available on CIRIA website)Questionnaires (available on CIRIA website)
• Ongoing consultation (RP692 Steering Group, Ongoing consultation (RP692 Steering Group, correspondence and interviews with individuals)correspondence and interviews with individuals)
Today - the Consultation WorkshopToday - the Consultation Workshop
Your opportunity to contribute to the reportYour opportunity to contribute to the report
Aiming to explore relevant issues, discuss report Aiming to explore relevant issues, discuss report content and define industry best-practicecontent and define industry best-practice
Open-forum discussion based around topics:Open-forum discussion based around topics:
Asset managementAsset management
Bridge performance, appraisal and assessmentBridge performance, appraisal and assessment
Maintenance and repairMaintenance and repair
The future of masonry and brick arch bridgesThe future of masonry and brick arch bridges
Asset ManagementAsset Management
What are the performance requirements for masonry and What are the performance requirements for masonry and brick arch bridges?brick arch bridges?
Are they likely to change in future?Are they likely to change in future?
How are masonry and brick arch bridge assets currently How are masonry and brick arch bridge assets currently managed?managed?
What are the main issues of concern for owners/managers What are the main issues of concern for owners/managers of these structures?of these structures?
What are the key issues to be dealt with in the report?What are the key issues to be dealt with in the report?
What guidance should be given as to best practice in asset What guidance should be given as to best practice in asset management?management?
Condition Appraisal and AssessmentCondition Appraisal and Assessment How is bridge condition currently appraised?How is bridge condition currently appraised?
What are the requirements for routine and special What are the requirements for routine and special investigations?investigations?
What are the causes of loss of performance and how can What are the causes of loss of performance and how can their effects be assessed?their effects be assessed?
What are the principal structural assessment methods?What are the principal structural assessment methods?
What are the main considerations in their use?What are the main considerations in their use?
What key issues should be considered in the report?What key issues should be considered in the report?
What guidance should be given as to best practice?What guidance should be given as to best practice?
Maintenance and RepairMaintenance and Repair
What are the principal factors in the selection and design What are the principal factors in the selection and design of remedial works?of remedial works?
How can future maintenance requirements best be How can future maintenance requirements best be assessed?assessed?
Which strategies and techniques have proven effective, Which strategies and techniques have proven effective, and which ineffective, in the past?and which ineffective, in the past?
What key issues should be addressed in this report?What key issues should be addressed in this report?
What guidance should be given as to best practice in this What guidance should be given as to best practice in this area?area?
The FutureThe Future
What is the outlook for masonry and brick arch bridges in What is the outlook for masonry and brick arch bridges in the future?the future?
What areas would benefit from improved knowledge and What areas would benefit from improved knowledge and experience?experience?
Are there any promising new developments in the areas Are there any promising new developments in the areas discussed?discussed?
What lessons have been learned from our experience with What lessons have been learned from our experience with these structures to date?these structures to date?
How can we best ensure the long-term serviceability of How can we best ensure the long-term serviceability of these bridges as part of our transport infrastructure?these bridges as part of our transport infrastructure?
Producing the report: Producing the report: what happens now?what happens now?
Ongoing consultation processOngoing consultation process
Issue and return of Questionnaires Issue and return of Questionnaires
Direct consultation via correspondence and/or Direct consultation via correspondence and/or interviewsinterviews
All contributions gratefully receivedAll contributions gratefully received
Benefit of advice, knowledge, experienceBenefit of advice, knowledge, experience
Case-studies illustrating good or poor practiceCase-studies illustrating good or poor practice
Photographs, diagrams, illustrationsPhotographs, diagrams, illustrations
Closing PointsClosing Points
Thank you for your contribution today!Thank you for your contribution today!
Please visit the CIRIA website and complete and Please visit the CIRIA website and complete and return a Questionnairereturn a Questionnaire
Any further contributions to the report, ideas or Any further contributions to the report, ideas or discussion of its content, should be directed to discussion of its content, should be directed to Leo McKibbins (Mott MacDonald)Leo McKibbins (Mott MacDonald)