Transcript
Page 1: DESIGN AUTOMATION CONFERENCE - JULY 20-22, 2020 · MOSCONE CENTER WEST - WEST HALL LEVEL 2 - SAN FRANCISCO, CA Disclaimer - Every effort has been made to ensure the accuracy of all

EXIT

EXIT

EXIT

EXIT

EXIT

EXIT

EXIT

EXIT

EXIT

EXIT

EXIT

EXIT

EXIT

EXIT

EXIT

EXIT

EXIT

EXIT

EXIT

EXIT

EXIT

EXIT

EXIT

EXIT

EXIT

EXIT

FPS

FPS

FPS

FPS

FPS

FPS

FPS

FPS

FPS

FPS

WFPHONE

WFPHONE

WFPHONE

WFPHONE

FPS

FHFPS

FH

FH FH

FPS

WF

WF

WF

RECYCLING

OVER

HEAD

ROLL

UP

DOOR

ESCALATORS LEVEL 2

CLOSETOPER. PART.

ELEVATORVESTIBULE

ROOMTELECOM.

OPER. PART.CLOSET

CLOSETJANITOR'S

ALCOVERESTROOM

CLOSETOPER. PART.

PANTRYSTORAGE

TELECOM.ROOM ROOM

ELECTRICAL

OPER. PART.CLOSET

CLOSETOPER. PART.

TELECOM.ROOM

ELEC.ROOM

CLOSETOPER. PART.

CLOSET

ELEVATORVESTIBULE

TELECOM.ROOM

ELEVATORVESTIBULE

OPER. PART.CLOSET

ELEVATORS

HALLWAY

OFFICEA/V ROOM

CORRIDOR

PANTRY

UNASSIGNED

UNASSIGNED

OPER. PART.CLOSET

OPER. PART.CLOSET

CLOSETOPER. PART.

OPER. PART.

ELEV. ELEV.

STAIR-15

ELEVATOR

ELEV. #7

ELEV #8

STAIR-8

STAIR-12

STAIR-11

STAIR-10

STAIR-9

STAIR-1

STAIR-2

STAIR-3

STAIR-4

STAIR-5

STAIR-6

STAIR-7

JANITOR'SCLOSET

STAIR-13

#4ELEVATOR

#3ELEV.

#2ELEV.

#1

UNASSIGNED

CLOSETOPER. PART.

CLOSETOPER. PART.

CLOSETOPER. PART.

CLOSETOPER. PART.

#6 #5

20,000 LB Cap.10'h x 9'w x 19' Deep

30,000 LB Cap.10'h x 11'w x 29' Deep

20,000 LB Cap.10'h x 9'8"w x 19' Deep

20,000 LB Cap.10'h x 9'8"w x 19' Deep

Nursing Pod

40'-10"

13'-9"

46'

44'-11"

32'-4"

30'-7"

(*) DENOTES LAST IN / FIRST OUT 20

SCALE IN FEET

0 10 4030 50 100 150

15'

10'

5'-11"

5'-11"

5'-11"

5'-11"11'-10"

11'-10"

23'-8"

5'-11"

5'-11"

5'-11"

5'-11"11'-10"

11'-10"

23'-8"

Line of Atrium From Level 3

TO / F

ROM

LEVE

L THR

EETO

/ FRO

MLE

VEL O

NE

TO / F

ROM

LEVE

L ONE

TO / F

ROM

LEVE

L THR

EE

HOW

ARD

STRE

ET

FOURTH STREET

MINN

A ST

REET

Room 2012

Room 2010

Entrance

Design

Track

Design

Track

Room 2008

IP Track

2200

ais

le

2300

ais

le

2400

ais

le

2500

ais

le

CS

CS

CS

CS

Suite O

nly A

ccess

Suite O

nly A

ccess

2528

2211

2217

2219

2221

2225

2231

2233

2235

2237

2239

2243

2245

2249

2255

2360

2311

2317

2318 2319

2321

2330 2331

2332

2335

2336

2338

2342 2343

2348 2349

2350

2355

2409

2413

2416 2417

2418

2423

2424

2426

2430

2434

2436

2439

2451

2454 2455

2459

2511

2512

2516

2521

2534

2537

2538

2548

2552

S2415 S2417

S2455

S2531

S2533

S2549

S2551

S2553S2554 S2555

S2508S2515

2508

2429

2460 2560

2325

2327

2337

25572457

S2518 2518

2520

2138

2140

2142

2144

2146

2148

2218

2220

2252

2110

2112

2114

2116

2118

2120

2124

2126

2128

2130

2132

2134

2117

2119

2121

2216

2100

ais

le

S2110

S2124

2238

2230

2224

2210

10' 10' 10' 10'

10'

10'

10'

30'

30'

20'20'

10'

10'

10'

10'

10'

10'

10'

10'

10'

10'

10'

10'

10'

10'

10'

10'

20'

30'

10'

Friday (07/17): 8AM - Noon

Friday (07/17): 1PM - 5PM

Contact Louis Travieso Director, Freight Operations for all target request changes.

T: 1-650-878-6076 E: [email protected]

NOTE: Your target time is when your driver should arrive at the convention center for

your freight to be offloaded.

Please do not order labor for this time.

Prod. Branch: SAN FRANCISCO | Project #: 497340 | File Path: C:\_Vault\Designs\_Projects\D\Design Automation Conf\DAC2007\Event\Floor Plans\DAC Lvl 2 0720.dwg | Tab Name: TARGET PLAN

CUSTOM

Revision Date:

Scale:Revised By:

Account Sales: Line Item:

#6067027

Drawing Started:

Started By: Account Management:

1/13/20201/13/2020 BLYTHE HESS

CHRIS CANNONNICK FALGIANO, WRDC Nick Falgiano, WRDC

DESIGN AUTOMATION CONFERENCE - JULY 20-22, 2020

MOSCONE CENTER WEST - WEST HALL LEVEL 2 - SAN FRANCISCO, CADisclaimer - Every effort has been made to ensure the accuracy of all information contained on this floor plan. However,

no warranties, either expressed of implied, are made with respect to this floor plan. If the location of building columns,

utilities or other architectural components of the facility is a consideration in the construction or usage of an exhibit, it is

the sole responsibility of the exhibitor to physically inspect the facility to verify all dimension and locations. © Copyright

2020, Freeman, all rights reserved.

Confidential and Proprietary - the information contained herein is the proprietary information of Freeman and by accessing the

information, the recipient agrees to keep the information confidential and not disclose it to any third party without the prior consent of

Freeman. Recipient also agrees to only use the information for its internal evaluation purposes and for no other purpose, without the

prior consent of Freeman.

®

Top Related