![Page 1: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January](https://reader033.vdocuments.net/reader033/viewer/2022052008/601c925398ccca21b81fb784/html5/thumbnails/1.jpg)
Edwards Concrete blends art and concrete to achieve award-winning results that are as visually stunning as they are eco-friendly and sustainable. Since 1982 we have completed hundreds of decorative concrete designs including polished interior floors, to exterior concrete walkways, curbs and poolside hardscapes for retail stores, commercial builders and architects throughout the state of Florida and the US South Eastern regions. Since 1982 we have completed hundreds of decorative concrete designs for retail, commercial and theme park projects.
BUILDING GREEN SINCE 1982
![Page 2: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January](https://reader033.vdocuments.net/reader033/viewer/2022052008/601c925398ccca21b81fb784/html5/thumbnails/2.jpg)
UPTOWN ALTAMONTE
ALTAMONTE SPRINGS, FLORIDA
Over 100,000sf of stamped road, integral color concrete walkway.
Article in Florida Concrete Magazine, March 2008 “The Beauty of Concrete”.
GC: Wharton-Smith
![Page 3: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January](https://reader033.vdocuments.net/reader033/viewer/2022052008/601c925398ccca21b81fb784/html5/thumbnails/3.jpg)
Uptown Altamonte
Stamped concrete road
![Page 4: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January](https://reader033.vdocuments.net/reader033/viewer/2022052008/601c925398ccca21b81fb784/html5/thumbnails/4.jpg)
Uptown Altamonte
Spring beige Integral color placed, and band recesses with brick pavers
![Page 5: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January](https://reader033.vdocuments.net/reader033/viewer/2022052008/601c925398ccca21b81fb784/html5/thumbnails/5.jpg)
Uptown Altamonte
Walkway area at the Amphitheater .
![Page 6: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January](https://reader033.vdocuments.net/reader033/viewer/2022052008/601c925398ccca21b81fb784/html5/thumbnails/6.jpg)
Uptown Altamonte
Styles of stamp patterns : Slate gray Cobblestone and Ashlar Slate
![Page 7: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January](https://reader033.vdocuments.net/reader033/viewer/2022052008/601c925398ccca21b81fb784/html5/thumbnails/7.jpg)
Uptown Altamonte
Cobblestone and Ashlar Slate
![Page 8: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January](https://reader033.vdocuments.net/reader033/viewer/2022052008/601c925398ccca21b81fb784/html5/thumbnails/8.jpg)
A stencil was used to display the crane, which resulted in a two tone color effect of white concrete. With a sandblasted finish for the outer band, and a
French gray colored inner field with a sponge finish.
Uptown Altamonte
![Page 9: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January](https://reader033.vdocuments.net/reader033/viewer/2022052008/601c925398ccca21b81fb784/html5/thumbnails/9.jpg)
Fields Land Rover Dealership
Over 5,000 sf placed, used regular gray concrete with Bisque Tan color hardener and Silver Gray release powder.
![Page 10: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January](https://reader033.vdocuments.net/reader033/viewer/2022052008/601c925398ccca21b81fb784/html5/thumbnails/10.jpg)
Ashlar Slate design pattern
![Page 11: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January](https://reader033.vdocuments.net/reader033/viewer/2022052008/601c925398ccca21b81fb784/html5/thumbnails/11.jpg)
West Volusia Town CenterOrange City, Florida
28,000sf, placed with integral color.
GC: J Raymond Construction
![Page 12: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January](https://reader033.vdocuments.net/reader033/viewer/2022052008/601c925398ccca21b81fb784/html5/thumbnails/12.jpg)
Placed the bands first and then placed the fields with integral color
![Page 13: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January](https://reader033.vdocuments.net/reader033/viewer/2022052008/601c925398ccca21b81fb784/html5/thumbnails/13.jpg)
Cobblestone bands
![Page 14: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January](https://reader033.vdocuments.net/reader033/viewer/2022052008/601c925398ccca21b81fb784/html5/thumbnails/14.jpg)
The Caribbean Beach ResortWalt Disney World
32,000sf placed, used mesa beige integral colored concrete with beige cream color hardener, and pecan tan release.
GC: Tatro Contracting
![Page 15: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January](https://reader033.vdocuments.net/reader033/viewer/2022052008/601c925398ccca21b81fb784/html5/thumbnails/15.jpg)
Stamped pool deck area, restrooms, and Children water play area
![Page 16: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January](https://reader033.vdocuments.net/reader033/viewer/2022052008/601c925398ccca21b81fb784/html5/thumbnails/16.jpg)
Caribbean Beach Resort pool Framed out the entire pool and placed the concrete for the pool
floor
![Page 17: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January](https://reader033.vdocuments.net/reader033/viewer/2022052008/601c925398ccca21b81fb784/html5/thumbnails/17.jpg)
Framed and poured the concrete for the staircase wall to the slide, framed & poured the Tower
![Page 18: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January](https://reader033.vdocuments.net/reader033/viewer/2022052008/601c925398ccca21b81fb784/html5/thumbnails/18.jpg)
Stetson UniversityDeland, Florida
Placed with integral color
![Page 19: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January](https://reader033.vdocuments.net/reader033/viewer/2022052008/601c925398ccca21b81fb784/html5/thumbnails/19.jpg)
Diamond Polishing
![Page 20: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January](https://reader033.vdocuments.net/reader033/viewer/2022052008/601c925398ccca21b81fb784/html5/thumbnails/20.jpg)
Stetson University
Finished Diamond Polished Floor
![Page 21: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January](https://reader033.vdocuments.net/reader033/viewer/2022052008/601c925398ccca21b81fb784/html5/thumbnails/21.jpg)
JK2 Homes
Concrete stained floor and a Diamond polished
![Page 22: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January](https://reader033.vdocuments.net/reader033/viewer/2022052008/601c925398ccca21b81fb784/html5/thumbnails/22.jpg)
JK2 Homes
Diamond Polished Hallway
![Page 23: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January](https://reader033.vdocuments.net/reader033/viewer/2022052008/601c925398ccca21b81fb784/html5/thumbnails/23.jpg)
Disney Epcot -Soarin AttractionOverlay Stained Concrete Topping and Polished
Preparation Overlay ToppingPreparation
![Page 24: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January](https://reader033.vdocuments.net/reader033/viewer/2022052008/601c925398ccca21b81fb784/html5/thumbnails/24.jpg)
Kennedy Space Center
![Page 25: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January](https://reader033.vdocuments.net/reader033/viewer/2022052008/601c925398ccca21b81fb784/html5/thumbnails/25.jpg)
Custom designed finish to resemble the moons surface.
![Page 26: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January](https://reader033.vdocuments.net/reader033/viewer/2022052008/601c925398ccca21b81fb784/html5/thumbnails/26.jpg)
Integral colored bands
![Page 27: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January](https://reader033.vdocuments.net/reader033/viewer/2022052008/601c925398ccca21b81fb784/html5/thumbnails/27.jpg)
Dress BarnEntrance Walkway
![Page 28: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January](https://reader033.vdocuments.net/reader033/viewer/2022052008/601c925398ccca21b81fb784/html5/thumbnails/28.jpg)
Conway Middle School
Orlando, FL
![Page 29: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January](https://reader033.vdocuments.net/reader033/viewer/2022052008/601c925398ccca21b81fb784/html5/thumbnails/29.jpg)
Sea World- AquaticaWaterstone Grill Restaurant
![Page 30: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January](https://reader033.vdocuments.net/reader033/viewer/2022052008/601c925398ccca21b81fb784/html5/thumbnails/30.jpg)
Sea World - Manta Rollercoaster AreaThroughout the park walkways, curbs, and drains are Exposed Aggregate
![Page 31: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January](https://reader033.vdocuments.net/reader033/viewer/2022052008/601c925398ccca21b81fb784/html5/thumbnails/31.jpg)
Close up look at the exposed aggregate walkway and curb
![Page 32: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January](https://reader033.vdocuments.net/reader033/viewer/2022052008/601c925398ccca21b81fb784/html5/thumbnails/32.jpg)
Sea WorldSeat walls which match the exposed Aggregate Walkways
![Page 33: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January](https://reader033.vdocuments.net/reader033/viewer/2022052008/601c925398ccca21b81fb784/html5/thumbnails/33.jpg)
A variety of colors used with color hardeners
Marriott Grande Vista Resort
![Page 34: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January](https://reader033.vdocuments.net/reader033/viewer/2022052008/601c925398ccca21b81fb784/html5/thumbnails/34.jpg)
Caribe Royale Resort
Placed with black integral concrete , with a black hardener and a black form release
![Page 35: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January](https://reader033.vdocuments.net/reader033/viewer/2022052008/601c925398ccca21b81fb784/html5/thumbnails/35.jpg)
The Church of Jesus Christ of Latter Day SaintsWindermere, Florida
The original walkway around the building was made of concrete pavers. Over time, the weight of the lift which was used to pressure wash the massive building destroyed the paver walkway.
This is where David Edwards, president and owner of Edwards Concrete Company, an official Bomanite Franchise Partner, was brought into the plans. With over 25 years of experience in the concrete business, and since Mr.
Edwards had done some work for LDS Temple in the past, he was the right man for the job.It was decided that a product made from a South Florida concrete mix composed of ground lime rock would be used for the 27,000 square feet of walkway surrounding the Temple. Edwards Concrete worked for two weeks
doing samples to make sure the right look and strength was achieved for this project.Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was
started on January 9, 2008, and over 750 cubic yards of concrete and 34 tons of steel were placed and installed.Edwards Concrete Company was presented the Eagle Award for this project by the Associated Builders and Contractors, Inc. in 2008. It is also featured on the cover of Florida Concrete Magazine, March 2008, and an
article in Concrete Décor, Feb. 2009.
BEFORE AFTER