ABOUT BLACK SEA GROUP

BLACK SEA GROUP is formed of:

1. BLACK SEA TECHNOCHIM CO. S.R.L., having its head office in Bucharest, Romania, registered at the Register of Commerce under no. J40/18522/1994 with C.U.I. no. 6286263 and the fiscal attribute R; Black Sea Technochim Co. is liable for Romania and European markets.

2. BLACK SEA ENERGY GENERATING EQUIPMENT TRADING (L.L.C.)having its head office in Dubai, U.A.E., registered at the Department of Economic Development with license no. 515004 and Commercial Register no. 53617/1999; Black Sea Energy Generating Equipment Trading L.L.C. is liable for the United Arab Emirates markets.

3. SUN ORBIT FOR GENERAL TRADING CO., having its head office in Baghdad-IRAQ, registered at Commercial Register no. 13116/2004; Sun Orbit for General Trading Co. is liable for Iraqi markets.

4. BLACK SEA POWER GENERATING FZCO, having its head office in Jebel Ali Free Zone - Dubai, U.A.E., License no.40146 Government of Dubai. Black Sea Power Generating FZCO is liable for International, Middle East and Africa markets.

The main markets for our activities are in the Middle East and Africa countries. Since its formation, as an international trade company, Black Sea Group has been dealing in the field of power generation, representing and collaborating with famous Romanian companies, for supplying of equipments and spare parts and performing of overhaul for all types of steam power stations with power up to 330MW and boilers with capacity up to 1035t/h. Due to an extensive experience, we offer to our clients high-quality products, short time delivery, competitive prices and a transparent collaboration. Highly-qualified personnel work hard so that all the products, works and services to be completed according to our clients requirements and in time. Quality Management Black Sea Technochim Co. is certified by TÜV Thüringen e.V. for the implementation and the application of the quality system according to DIN EN ISO 9001:2000.

Page 3: electrical power substationsblackseagroup.com/catalog/substations.pdf · for all types of Relay protection and substation Control. The ISPE Company is certified by Suddeutschland

BLACK SEA GROUP - ELECTRIC POWER SUBSTATIONS

3

From the beginning, Black Sea Group was focused intensively on quality, technical development and marketing. Black Sea Group’s main competencies include:

• Thigh contacts with old and possible future clients; • Thorough market studies and discover new possible tenders to take part to; • Looks for the best designers and manufacturers for each possible future job; • Black Sea Group buys the tender documents; • The best offer issued on the name of one BSG member is sent to the client; • Black Sea Group participates to the negotiations and signs the contracts as

Main Contractor; • Black Sea Group is responsible for the necessary finances required for each

offer/contract as follows: bid bonds and performance bonds, opens L/C or makes advance payments for the manufacturers;

• During the development of each contract, in order to assure the best conditions in accomplishing the job, Black Sea Group is responsible for the delivery of goods from manufacturers to the client in short time, for the transportation and accommodation of the employed personnel during the rehabilitations and/or service period, insurances for the goods during the shipment and during the erection works;

• Black Sea Group as Main Contractor is responsible in front of the client during the warranty period of each job performed.

Page 4: electrical power substationsblackseagroup.com/catalog/substations.pdf · for all types of Relay protection and substation Control. The ISPE Company is certified by Suddeutschland

BLACK SEA GROUP - ELECTRIC POWER SUBSTATIONS

4

BLACK SEA GROUP - CONTACT ROMANIA

Black Sea Technochim Co. Contact person: Mrs. Aurelia Neacsu - Commercial Manager Phone: +40-21-3373951 FAX: +40-21-3366112

E-mail: [email protected]

UNITED ARAB EMIRATES Black Sea Energy Generating Power Equipment Trading L.L.C. Contact person: Mr. Saud Thuny – Commercial Manager Mr. Tawfeeq Majeed Phone: +971-4-2727806 Mobile: +050-6587708 FAX: +971-4-2728553 E-mail: [email protected] Black Sea Power Generating FZCO Contact person: Mr. Mohanad Ahmed – Commercial Manager Phone: +971-4-2727806 Mobile: +050-2589854 FAX: +971-4-2728553

E-mail: [email protected]

IRAQ Sun Orbit for General Trading Co. Contact person: Mr. Ossama M. Hussein Mobile: +964 7901379203 Ms. Sherin Bassam Mobile: +964 7901399163 Mr. Raed Yakub Mobile: +964 7901157503 E-mail: [email protected]

Page 5: electrical power substationsblackseagroup.com/catalog/substations.pdf · for all types of Relay protection and substation Control. The ISPE Company is certified by Suddeutschland

BLACK SEA GROUP - ELECTRIC POWER SUBSTATIONS

5

DESIGN,

DELIVERY, COMMISSIONING& START-UP,

SERVICES.

BLACK SEA GROUP offers: ◘Turn key projects:

-AIS and GIS High Voltage up to 400kV Power Substations; -Power Transformers up to 420kV, 400 MVA ; -High Voltage up to 400kV Power Lines: overhead & underground; -Protection equipments in Transmission Substations and

SCADA; BLACK SEA GROUP offers:

◘Compete range of Transformers: - Electrical Network Interconnecting Transformers; -Three Phase Power Transformers for internal Services; -Three Phase Power Transformers with Off-Load Tap Changer; -Three Phase Power Transformers with On-Load Tap Changer; -Three Phase Power Transformers with On Load Voltage Control; -Double Wounded, Three Phase Power Transformers with On-Load Tap Changer; ►Procurement and Delivery on site; ►Erection ,Commissioning and Start-up; ►Acceptance and Performance Testing; ►Training on site or in manufacture place; ►Engineering services (inspection, power system studies, etc.)►Maintenance services; BLACK SEA GROUP is certified by TUV Thuringen e.V. for application of the quality system according with EN ISO 9001:2000.

Page 6: electrical power substationsblackseagroup.com/catalog/substations.pdf · for all types of Relay protection and substation Control. The ISPE Company is certified by Suddeutschland

BLACK SEA GROUP - ELECTRIC POWER SUBSTATIONS

6

BLACK SEA GROUP PARTNERS : 1. -ISPE -

Design and Research Institute for Energy -Romania. Internet:www.ispe.ro Consulting and Technical Design.

2. –EMON ELECTRIC- Electric Erection -Romania.

Internet:www.emon.ro Constructions and Installations in Energetic and Telecommunication Field. Manufacturing.

3. –ELECTROMONTAJ-

Electroenergetic Erection -Romania. Internet:www.electromontaj.ro

Constructions and Installations in Energetic Field.

4. –ELECTROPUTERE CRAIOVA-

Power Transformers, Instrument Transformers, Electrical Motors, Switching Apparatus

Factory-Romania. Internet:www.electroputere.ro Transformers, Motors, Apparatus Manufacturer.

5. -ETRA 33- Power Transformers. Internet:www.etra33.sl Transformers, Chokes, Autotransformers.

6. -BEZ and ETD-

Power Transformers. Internet:www.bez.sk and www.bez-etd.cz Transformers, Chokes, Autotransformers..

Page 7: electrical power substationsblackseagroup.com/catalog/substations.pdf · for all types of Relay protection and substation Control. The ISPE Company is certified by Suddeutschland

BLACK SEA GROUP - ELECTRIC POWER SUBSTATIONS

7

7. -SEL- Schweitzer Engineering Laboratories, INC-USA. Internet:www.selinc.com Consulting and Relay Protections Delivery.

8. -ABB – Calor-Emag -Germany.

Internet:www.abb.com Switching Apparatus for Substations. 9. -SIEMENS AG- Erlangen -Germany.

Internet:www.siemens.com Power Transmision and Distribution. Medium voltage Division.

10. -FEA- Automation Elements Factory –Romania. Internet:www.fea.ro

Electrical Assemblies. 11. -ICEMENERG Service-

Rehabilitation and Research Institute for National Energy System –Romania. Internet:www.icemenerg.ro

Consulting, Implementation and Testing works on site. 12. –GENERAL TURBO-Romania.

Internet:www.generalturbo.ro Generators and Steam Turbine manufacture.

Page 8: electrical power substationsblackseagroup.com/catalog/substations.pdf · for all types of Relay protection and substation Control. The ISPE Company is certified by Suddeutschland

BLACK SEA GROUP - ELECTRIC POWER SUBSTATIONS

8

MAIN WORKS AND COMPONENTS IN OUR PROJECTS BLACK SEA GROUP is constantly in the development and improvement of the offered products and services.

Our aim is to satisfy customer’s high demand for a safe Electrical Power Generation.

The equipments are carried out with the best quality components based on tested beyond standard margins. The quality in the erection field is constantly maintained and monitored by our company and our partners as the Energy to be safe for entire satisfaction of our customers entire. OUR PARTNERS are the world known companies which care perform the routine and performance tests on factory and the results are proven with the best Mean Time Between Failure. EMON ELECTRIC(Romania) for energetic constructions:

◘ Production of the MV Power Station; ◘ Installation & Commissioning from LV to HV substations; ◘ Service;

ELECTROMONTAJ(Romania) for energetic constructions:

◘ Construction overhead & underground Lines; ◘ Installation & Commissioning from LV to HV substations; ◘ Service;

Page 9: electrical power substationsblackseagroup.com/catalog/substations.pdf · for all types of Relay protection and substation Control. The ISPE Company is certified by Suddeutschland

BLACK SEA GROUP - ELECTRIC POWER SUBSTATIONS

9

ISPE (Romania) for electric network studies and designs:

◘ Power Transmission and Distribution systems; ◘ Power and Heat generation; ◘ Civil and industrial works;

ELECTROPUTERE CRAIOVA factory (Romania):

◘ Power transformers; ◘ Electric Motors; ◘ Current and Voltage transformers; ◘ Services;

SEL (USA) for Distribution Digital Protection Relays :

◘ Generator Digital Protection Relays; ◘ Motor Digital Protection Relays; ◘ Communication Processors; ◘ Fiber-optic Transceivers;

ABB (Germany) for HV Switching apparatus; MV Switchgears; Instrument Transformers; Control products.

◘ MV and HV circuit breakers; ◘ MV and HV load switches; ◘ Surge Arresters;

Page 10: electrical power substationsblackseagroup.com/catalog/substations.pdf · for all types of Relay protection and substation Control. The ISPE Company is certified by Suddeutschland

BLACK SEA GROUP - ELECTRIC POWER SUBSTATIONS

10

◘ Current and Voltage Transformers: ◘ MV and HV Switchgear; ◘ Industrial control process systems;

SIEMENS (Germany) for HV Switching apparatus; MV Switchgears; Control products.

◘ MV and HV circuit breakers; ◘ Surge Arresters;

◘ MV and HV Switchgear;

◘ Industrial control process systems;

FEA (Romania) for LV assemblies constructions: ◘ Panels; Cabinets; Boxes- complete equipped for ◘ LV installations(electrical protections; LV distribution; ◘ DC distribution; ICEMENERG (Romania)-consulting and services concerning with:

◘ Distribution network analyze; ◘ Electric protection coordination; ◘ Testing on site;

Page 11: electrical power substationsblackseagroup.com/catalog/substations.pdf · for all types of Relay protection and substation Control. The ISPE Company is certified by Suddeutschland

BLACK SEA GROUP - ELECTRIC POWER SUBSTATIONS

11

ELECTRIC POWER SUBSTATIONS.

BLACK SEA GROUP is an active companies group on Energy Market in Middle East area. BLACK SEA GROUP provides turn-on-key Solutions and Services consisting of: ◘ Technical Expertise and Consulting,

◘ Design and on-site Elevation Design,

◘ Procurement and Delivery- Systems and Equipments,

◘ Acceptance Tests in Factory, ◘ Erection on site, ◘ Commissioning and Start-up, ◘ Performance Tests on site, ◘ Staff Personnel Training,

The Our Main Partners for manufacturer of switching, apparatus, control devices and systems, are:

- ABB-Germany; - SIEMENS-Germany; - SEL-USA

-ISPE-Romania as professional designer; -EMON Electric-Romania and ELECTROMONTAJ-Romania as erection companies on site;

Page 12: electrical power substationsblackseagroup.com/catalog/substations.pdf · for all types of Relay protection and substation Control. The ISPE Company is certified by Suddeutschland

BLACK SEA GROUP - ELECTRIC POWER SUBSTATIONS

12

A short presentation of our Deliveries and Services with short profile description of our partners is presented below. (1) ISPE--DESIGN AND RESEARCH INSTITUTE FOR ENERGY -Romania ISPE Design Institute has a large experience in Romanian Grid Substations and Primary / Secondary Electrical Distribution Substations with Projects development in Romania and Overseas for all types of Relay protection and substation Control. The ISPE Company is certified by Suddeutschland for the application of the quality system according to ISO 9001:2000. Business Areas: -Power Transmission and Distribution -Power and Heat Generation; -Environmental Protection; -Civil and Industrial Works Reference in Romania: The entire Romanian National Power System was practically developed based on ISPE projects. Reference Abroad Power Transmission and Distribution -22xMV and HVsubstations in Morocco,Turkey,Egypt,Bangladesh, Nigeria,Pakistan,croatia,Syria,Iraq,India -7000 km lines(150kV,220 kV,400kV)in Egypt,Iran,Jordan,Cyprus,Yemen Republic,Peru,Algeria,Malayasia,Syria, Lebanon,Iraq, Philippines Power and Heat Generation Thermal Power Plant summing up about 800km installed in:China; Syria; India; Turkey; Egypt The ISPE company HV Substations Dept. and Overhead transmission Lines Dept. and the recent Projects are presented in following sheets.

Page 13: electrical power substationsblackseagroup.com/catalog/substations.pdf · for all types of Relay protection and substation Control. The ISPE Company is certified by Suddeutschland

BLACK SEA GROUP - ELECTRIC POWER SUBSTATIONS

13

HIGH VOLTAGE SUBSTATION DEPARTMENT • Fields of activity: ▫ power transmission and distribution system; ▫ industry; ▫ industrial, administrative, social cultural buildings; ▫ urban and rural infrastructure; Particularly: - medium, high and extreme high voltage transformation and connecting electrical substations of the NPS (National Power System); - connecting electrical substations of hidro-themal and clear power plants to NPS at 110 KV and even higher voltage; - reactive power compensation equipment; - system and individual relay protections equipment for substations; and power plants, voltage level 6-750 KV power 0,25-800 MVA; - system automation; - control system and installations (control, signaling, interlocking, synchronizing, measuring, metering) at 6-750 KV; - telecommunication system in NPS; - system control and data acquisition for substations, local control and remote control system of the power substations; - direct current and alternating current auxiliary installation: auxiliary services, emergency lighting, indoor and outdoor lighting; - fire detecting and signaling, fire fighting installations; - cable yard; • Business area: - Power and heat generation; - Power transmission and distribution; - Environmental protection; - Infrastructure system. Public services; - Civil and industrial works; - Industry; • Scope of services of capabilities:

▫ technical consulting, expert appraisal and assistance; ▫ profile consulting, expert appraisal and assistance; ▫ profile and location studies for power substations; ▫ all stage design (pre-feasibility and feasibility studies, basic and detail engineering, bid documents etc.) ▫ technical standards regarding power design, operation and maintenance; ▫ documents for issuing the necessary agreements and/or approvals to perform the projects; ▫ environmental impact studies environmental balance and environmental authorization documents; ▫ other's engineering companies projects approvals; Certifying: - design expert appraisal and surveys by authorized technical experts of MLPTL in compliance with Law 10/1990 regulations concerning civil engineering quality; - technical agreements for power equipment and installations according to the Ministry of Industry and Resources; Our experts are authorized by the National Society for Power Distribution ELECTRICA, for Power Transmission TRANSELECTRICA and for Hidro & Thermo Power Generation -HIDROELECTRICA and TERMOELECTRICA, in order to develop projects, operation and maintenance of the above -listed power plants and installations. • Recent projects, local & abroad: In Romania: - feasibility studies and detail design for upgrading, rehabilitation and retrofitting of NPS electrical Substations; - design for power substations in order to improve the safety operation of the NPS; - design for power substations in order to supply private industries; - design for transformer installations and deep connecting electrical substations for different clients.

Page 14: electrical power substationsblackseagroup.com/catalog/substations.pdf · for all types of Relay protection and substation Control. The ISPE Company is certified by Suddeutschland

BLACK SEA GROUP - ELECTRIC POWER SUBSTATIONS

14

OVERHEAD TRANSMISSION LINES DEPARTMENT

• Fields for activity: Power transmission lines

- Overhead distribution lines (20/110kV) - Overhead transmission lines (220/750kV) - Underground cable transmission lines (20-400kV) - 20-750kV rehabilitation/modernization

Transmission system rehabilitation by means of OPGW equipped conductors on the existing overhead transmission lines

Aerials for telecommunications Concrete structures rehabilitation (poles, electrical

substations frames etc.). • Business areas:

- Power and heat generation - Power transmission and distribution - Environmental protection - Infrastructure system. Public services - Civil and industrial works - Industry

• Services and capabilities:

Technical consulting and engineering Project management Testing documentation for poles prototype, insulators

chains and foundations Opportunity, pre-feasibility, feasibility studies, basic

engineering and bid documents, detail engineering for new projects/rehabilitation/modernization/retrofitting operations

Technical and geological expert appraisals for OHTL Technical offers for tenders in the OHTL field Standards, norms and power prescriptions for OHTL

performance and revision Assets evaluation for OHTL electrical equipment Documents for getting approvals Implementation of rehabilitation and refurbishing

programs Technical assistance during erection and

commissioning General Contractor

Personnel training and specialization in the above fields Certifying:

- our experts have been authorized by MTCT and ANDRE to carry out design, operation and maintenance works in the above fields of activity and installations according to Law 10/1990 regulations concerning civil engineering quality.

- ISPE services supplier approved by Transelectrica - ISPE services supplier approved by Electrica (all stages

OHTL engineering, research, consulting, studies, norms and technical prescriptions).

• Recent projects, local and abroad: In Romania:

- Designs for more than 4400 km transmission lines of 400 kV, 3600 km transmission lines of 220 kV and 157 km transmission lines of 750 kV during 1962-2000.

- Transmission system rehabilitation – replacement of the existing groundwire by OPGW and porcelain insulation replacement.

- Assessment of the electrical equipment existing within Electrica patrimony (PRICE WATER HOUSE COOPER cooperation)

- Design for 2 new OHTL: 400 kV OHTL Oradea – Bekescsaba 400 kV OHTL Arad – Nadab

Abroad: - designs and technical assistance for 7000 km overhead

transmission lines (33kV – 400kV) in Iran, Egypt, Jordan, Iraq, Peru, Algeria, Syria, Yemen, United Arab Emirates, Lebanon, Malaysia, Cyprus and Philippines.

- OHTL consulting in Syria, Iraq and Jordan.

• Memberships: - Electrical and I&C Installations Society of Romania

(SIEAR) - CIGRE Romanian National Committee (CNR-LST)

• Presence within recent international events: - CIGRE 2002 session, Paris – France - Under Voltage Work International Symposium – LST

2002, Sibiu-Romania - National Energy Conference – FOREN 2000 and 2002,

Neptun-Romania.

Page 15: electrical power substationsblackseagroup.com/catalog/substations.pdf · for all types of Relay protection and substation Control. The ISPE Company is certified by Suddeutschland

BLACK SEA GROUP - ELECTRIC POWER SUBSTATIONS

15

REFERENCE: 400/220/110 kV Brazi Vest Substation equiped with outdoor enclosed cells

• Short description:

400/220/110 kV Brazi Vest Substation is an important

branch point of the transmission network gathering several functions for each voltage in turn, as follows.

At 400 kV.

- power transit between the area Bucharest and Brasov and a supply reserve of each above mentioned areas within a network having at its end 400/110 kV substations;

- power injection in the network of 220 kV of the area, for supplying the local consumer and the consumer and the consumers in the areas Teleajen and Buzau, as well as for reserving the connections in the areas Bucharest East and Targoviste. This function will become more important further to the canceling of the local source the two large units (200 MW) of Brazi Vest CHPP.

At 220 kV - power injection in the area network of 110 kV; - supplying the deficit areas Teleajen and Buzau; Interconnection with the areas Bucharest East and Targoviste.

At 110 kV - supplying the local consumers; - reserving the supplying of deficit areas (Teleajen and

Buzau). Brazi Vest substation was commissioned in 1971, being equipped with equipment manufactured in Romania at the technological level of the sixties. The technical condition of these equipment is inadequate, their normal operating lifetime is exceeded and it is necessary to modernize this substation by providing high performance equipment and systems based on state-of-the-art technologies. 400/220/110 kV Brazi Vest substation has been modernized by replacing the existing air insulated electrical equipment with high performance modern equipment i.e. 400 and 220 kV SF6-GIS type insulated enclosed cells. These GIS equipment as well as the control-protection integrated system lead to the following advantages:

- getting free significant land surfaces as the surface occupied by GIS cells is very small (e.g. for 400 kV the ratio is 1:40)

- significant reduction of maintenance yearly expenses; - possibility of erecting new cells without taking out of

operation the existing systems;

- observance of labor protection norms and fire preventing norms by eliminating all risks of injuries, fires etc

- easy extension of substations with new cells for all voltages; - reduction of monitoring and maintenance personnel; - possibility of integral remote control of substation from all

dispatcher levels (area, territory and national) - significant reduction of materials consumption (conductors,

isolators, cables) considering the compact system performed by means of GIS;

- ensurance of monitoring and maintenance personnel protection;

- ensurance of environment and neighborhood protection according to international standards;

- the supply of industrial consumers under reliable conditions and at higher parameters is guaranteed.

• Estimated economic efficiency:

- Analysis time 22 years (of which 2 years construction time); - Operating time 20 years (about 170.000 hours); - Annual operating time 8.400 hours/year; - Internal Rate of Return (IRR) 17%; - Return of Investment (ROI) 21.5%; - Total investment value 45.0 mil USD; - Net Present Value (NPV) 53.8 mil USD; - Present return time about 7.5 years.

• Country/location: Romania – Brazi Vest locality, at about 60 km North from

Bucharest, Prahova county – intersection of the national road DN 1A with the county road towards Negoesti.

• Start date/Commissioning date/implementation stage:

September 2001/2005/start of technological buildings construction works

• Client: C.N. Transelectrica S.A., 33, Magheru Ave., Sector 1-Bucharest.

• Associated companies: Tecnoservice (Romania) Itochu (Japan) Energomontaj (Romania) Energoconstructia (Romania) Electromontaj (Romania)

Page 16: electrical power substationsblackseagroup.com/catalog/substations.pdf · for all types of Relay protection and substation Control. The ISPE Company is certified by Suddeutschland

BLACK SEA GROUP - ELECTRIC POWER SUBSTATIONS

16

REFERENCE:

Arad 400 kV Electrical Substation • Short description The switching substation Arad represents and important interconnection point of the Power System which will provide reliable power supply for the consumers of Arad, Timisoara, Resita, Iaz area as well as the power transit to Northern Transylvania deficita area, through OHTL 400 Kv Arad – Oradea. This substation is also an interconnection point with Hungary through OHTL 400 kV Arad – Sandorfalva. The substation diagram is a double bus system and transfer bus to which 10 cells are connected. From the structural point of view, this substation has been performed with 1 row disposed switches. The structural disposition is of half-high type provided with 3-voltage levels and 20 m cell step. One of the 2 collecting bus system has been performed with flexible conductors and the other system with the transfer bus have been performed under the rigid alternative, with 200 mm conductors, sustained by support insulators fixed on metallic support frames. This substation has high performance primary equipment of high electrical and mechanical endurance and equipped with surveillance and detection (diagnosis) systems allowing faults detection and elimination in due time and thus avoiding the planned non availabilities. By providing such equipment, we could implement a modern substation control system that could control the connection, disconnection or transfer of a cell from one system to another based on sequential controls.

Control and relay protection systems have been performed under and integrated control – protection system and with a decentralized, hierarchized and distributed architecture. The main components of the system are performed with digital equipment. • Services offered: - pre-feasibility study; - feasibility study; - documents for getting agreements and approvals; - bid documents for imported equipment procurement; - basic and detail engineering; - bid documents for construction – erection works; - fire risk assessment study; - as-built documentation; - consulting and technical assistance; - operating monitoring behavior. • Country/Location: Romania – Arad county • Start date/Commissioning: 1999-2000 • Associated companies: GEOTEC, ENERGOMONTAJ, Bucharest

Page 17: electrical power substationsblackseagroup.com/catalog/substations.pdf · for all types of Relay protection and substation Control. The ISPE Company is certified by Suddeutschland

BLACK SEA GROUP - ELECTRIC POWER SUBSTATIONS

17

(2) EMON Electric as erection company -Romania. EMON Electric has a large experience in Primary / Secondary Electrical Distribution Substations with Projects development in Romania and Overseas. EMON Electric Company is certified by Germanischer Lloyd Certification GmbH,20459 Hamburg for the application of the quality system according to DIN EN ISO 9001:2000. Business Areas: -Hitgh Voltage up to 400 kV Power Substation, -Hitgh Voltage up to 400 kV Power Lines, -Medium Voltage Power Substation and power Network

CLIENT PROJECT ELECTRICA MUNTENIA NORD SA –A SDFEE PLOIESTI – ACM 4

Deviation works of 20 kV electrical line – PT Pompe Azuga

SIEMENS AG – TRANSPORTATION SYSTEMS - in progress

ES Columbia HV outgoings and cable connection to Substation Ploiesti Vest

TRANSELECTRICA SA – AREVA – in progress 220/110/20kV Targoviste Substation Retrofit – 220-110Kv switchgears – primary switching equipment

ELECTROEXPERT CSI – V1, 20/0,4 KV, 2*630KVA concrete envelope substation, Busteni DUCATI hall electrical power supply.

ELECTRICA MUNTENIA NORD SA – SDFEE PLOIESTI CHIRESCU PENSION electrical power supply

ELECTICA SA – SISE MUNTENIA NORD 110/20kv Busteni station warning installation repair EUROELECTRIC SA BUCURESTI CSI- V0 concrete envelope substation

CD ELECTRIC SRL BRASOV CSI-V3 20/0,4 KV, 630KVA Fagaras concrete envelope substation

ELECON SA BRASOV CSI-V0, 20/0,4 KV, 160KVA concrete envelope substation

CN CFR SA – REGIONALA CFR BUCURESTI Aerial concrete envelope substation current repair and low voltage connector for VALEA CALUGAREASCA RAILWAY

TRANSELECTRICA SA – in progress 200 MVA Targoviste electrical station, AT3 current repair

DUCATTI ENERGIA ROMANIA SA BUSTENI 2*630KVA DUCATTI concrete envelope substation service

BEN ELECTRO SERV SRL BRAILA CSI-V2 20/0.4 KV 1000 KVA concrete envelope substation

ELECTRICA MUNTENIA NORD SA – SDFEE PLOIESTI – in progress

PLOIESTI VEST substation electrical power supply – 110 kv Columbia station works

ELCO BUCURESTI SA 1000Kva 10/0,4 Kv metallic envelope substation MULTIPROD ENERGO SRL BUZAU 6/0,4 KV 250 KVA concrete envelope substation

Page 18: electrical power substationsblackseagroup.com/catalog/substations.pdf · for all types of Relay protection and substation Control. The ISPE Company is certified by Suddeutschland

BLACK SEA GROUP - ELECTRIC POWER SUBSTATIONS

18

(3) SEL-SCHWEITZER ENGINEERING LABORATORIES, INC (USA). Digital Relay Protections Manufacturer.

SEL company has over 30 years experience in the field of industrial electric power systems worldwide.

SEL provides solutions for the control, protection, automation by them digital relays, fault locating, event reporting, Self- checking ,remote communications. All design processes are controlled and certified under the ISO 9001:2000 Quality Systems Standards. All products have been verified for decades under demanding conditions by testing with margins well beyond the requirements in these areas: functional performance; Environmental Robustness; Electrostatic discharge; Electromagnetic compatibility ; Vibration/Shock Resistance; Power System Transients. Verification test Lab is accredited by TUV Rheiland of North America. SEL company has complete solutions span protection, metering, Integration, automation, communications, faulted circuits indicators, and more. SEL company invests heavily in compliance with industry standards ,trough design and testing, such as DNP3, IEC61 850. SEL company develops many solutions available to ease communications and integration where many protocols coexist. SEL microprocessor-based products protect, monitor ,control, automate and meter electric power systems in more than 100 countries.

SEL company systems and services include:

•SCADA •Protection and control panels •Protection and integrating system design. •Event analysis. •Integrated substation systems for protection, control, metering and monitoring of all substations.

Page 19: electrical power substationsblackseagroup.com/catalog/substations.pdf · for all types of Relay protection and substation Control. The ISPE Company is certified by Suddeutschland

BLACK SEA GROUP - ELECTRIC POWER SUBSTATIONS

19

Recent Industry Contracts : •Motor oil Hellas: -Complete Relay upgrade -Automation system -SCADA

•AEP Plaquemine Cogeneration Plant: -Substation and Automation Integration •Peters, Tschantz and Bandwen -City Hospital: -RTU -Dynamic Touch-Screen Annunciator •Oklahoma Gas& Electric: -Control House Design -Factory Acceptance Testing •BC Hydro: -Real time Digital Simulator Testing •Salt River Project: -Protection Panel for 500kV Substations

BLACK SEA GROUP has a fasten link with SEL our partner since the first stage of the project to analyze the client technical conditions for the optimum application of SEL.

Page 20: electrical power substationsblackseagroup.com/catalog/substations.pdf · for all types of Relay protection and substation Control. The ISPE Company is certified by Suddeutschland

BLACK SEA GROUP - ELECTRIC POWER SUBSTATIONS

20

(4) FEA-AUTOMATION ELEMENTS Factory (Romania). Manufacturer of the assembly construction equipment.

FEA S.A. – is a company with over 35 years experience in the field of industrial automation. The equipment and the instruments manufactured by FEA are used at present for the automation of some important industrial objectives throughout the world, such as: oil-refineries, power plants, cement plants, petrochemical processing plants, chemical fertilizers plants, metallurgical plants, oil and gas pipe-lines, railway and underground railway dispatching systems. FEA was also authorized to manufacture instruments and equipment for automation of nuclear power plants and some of the apparatus, which equip the Nuclear Power Plant of Cernavoda(Romania). FEA operates with worldwide-standardized Quality Management System, certified to ISO 9001/2000. From the apparatus deliveries, lately FEA concentrated its efforts on the deliveries of COMPLEX EQUIPMENT and AUTOMATION SYSTEMS and LOW VOLTAGE DISTRIBUTION and CONTROL EQUIPMENT realized with automation instruments manufactured by FEA or by well known companies in the field from Romania or abroad (GENERAL ELECTRIC, HONEYWELL, KLOCKNER MOELLER, MERLIN GERIN, SCHNEIDER, SIEMENS, A.B.B., FRAKO, TELEMECANIQUE, WEID MULLER).

Page 21: electrical power substationsblackseagroup.com/catalog/substations.pdf · for all types of Relay protection and substation Control. The ISPE Company is certified by Suddeutschland

BLACK SEA GROUP - ELECTRIC POWER SUBSTATIONS

21

ELECTRONICS & AUTOMATION

FOREIGN REFERENCES

OIL REFINERIES • Karachi – PAKISTAN • Banias – SIRIA • Kirikkale, Anatolia – TURKEY CEMENT FACTORIES • Al Quaim, Sinjar – IRAQ • Lukavac, Koromancno, Kakany, Nasice –

YUGOSLAVIA • Sin-Hori, Yu-San, Mam-Po – KOREA • Sheik-Said – SIRIA • Kohat – PAKISTAN • 5 factories of 9 lines – CSI • 6 factories of 12 lines – CHINA • 3 lines in ASSIUTT/EGYPT, in cooperation with other

firms • Also participation in VIETNAM, NIGERIA, SOMALIA,

CUBA, LEBANON and former GERMANY

CHEMICAL PLANTS • El-Mex soda ash factory – EGYPT • Hamrawein phosphates factory – EGYPT • Abu-Zaabal sulfuric acid factory – EGYPT • Soda ash in chlorine derivates plant – IRAN • Homs triple super phosphate factory – SIRIA • Sibetra chemical products storehouse-IRAQ HYDRO POWER PLANTS • Hydro Power Station Dicle – TURKEY • Nile Lock – Rayah El Monofy – EGYPT

CENTRAL HEATING PLANT • Berlin-Mitte, Berlin-Lichtenberg, Halle, Schwerin,

Rostock, Weissenbron, Neubrandenburg, Alt-Chemnitz, all in former Germany

THERMAL POWER PLANTS • Karachi refinery – PAKISTAN • Banias refinery – SIRIA • Anatolia refinery – TURKEY • El-Mex soda ash factory – EGYPT • Hamrawein phosphates factory – EGYPT • Cebu power plant – PHILIPPINES • Basrah refinery – IRAQ • T.V –sets factory – PYNOGYANG/KOREA • Pu Cheng power plant – CHINA

METALLURGICAL INDUSTRY • Ores pellet factory from the Eisenhuttenstadt steel

works, in former GERMANY • Sulfur roasting plant in OTZ-Works, Kardznaly-

BULGARIA • Ores pellet factory – KRIVOI ROG- UKRAINE • Non-ferrous ores factory – Las Cmariocas – CUBA • Ores factory – Mangalore – INDIA

OTHER INDUSTRIAL APPLICATIONS • Monitoring and Power Distribution Systems for GSM

Sites – ITALY, TURKEY • Dispatching of KOGAN/CSI-BULGARIA and

ASHABAD- WEST EUROPE natural gas pipe-line • Water treatment plant in Dimitrovgrad BULGARIA • Water treatment plant in Trmice FEDERAL REPUBLIC

CZECH AND SLOVAK • Furniture factory – MONGOLIA • Glass factory – Kadoma –ZIMBABWE • El-Wasta repair wagon factory – Cairo EGYPT • Sugar factory – Kadoma – ZIMBABWE • El-Wasta repair wagon factory – Cairo-EGYPT • Sugar factory – Cairo – EGYPT • Oil and dyes factory – Tirana- ALBANIA

Water injection and land reclamation Kirkuk- IRAK

Page 22: electrical power substationsblackseagroup.com/catalog/substations.pdf · for all types of Relay protection and substation Control. The ISPE Company is certified by Suddeutschland

BLACK SEA GROUP - ELECTRIC POWER SUBSTATIONS

22

5)-ICEMENERG SA-Rehabilitation and Research Institute for National Energy System (Romania). ICEMENERG SA offers professional services, as: ◘ Services in Power Substations field for Apparatus andTransformers insulation and life duration assessment, ◘ Prophylactic and Routine Tests for electrical Eqiupment in Primary and Secondary substations, ◘ Strength assessment of the overhead and underground Lines, ◘ Tests and Measurements concerning switching overvoltages, overcurrents, Electric and Magnetic fields and their influence to the electric Networks. References:

Dielectric properties of power transformers insulation by dielectric loss (tgd) measurement in the automate mode.

Page 23: electrical power substationsblackseagroup.com/catalog/substations.pdf · for all types of Relay protection and substation Control. The ISPE Company is certified by Suddeutschland

BLACK SEA GROUP - ELECTRIC POWER SUBSTATIONS

23

System front panel.

Diagnose result. Equipment for quantity evaluation of moisture content of a Paper-Oil transformer insulation, based on the bias factor.

Three Phase RC group. Switching overvoltage protection for Generators and Motors.

Page 24: electrical power substationsblackseagroup.com/catalog/substations.pdf · for all types of Relay protection and substation Control. The ISPE Company is certified by Suddeutschland

BLACK SEA GROUP - ELECTRIC POWER SUBSTATIONS

24

TURN-KEY SOLUTION.

HIGH VOLTAGE POWER SUBSTATION

• Basic Design and Detail Design • Procurement and Delivery on site • Manufacturing of metallic structure

• Manufacturing of LV switch-boxes and panels • Assembling of Control & Protection panels

• Installation of the HV equipment • Commissioning of HV equipment

• Training of the staff • Engineering and technical supervision on site

• Maintenance and Service • After sales service

Page 25: electrical power substationsblackseagroup.com/catalog/substations.pdf · for all types of Relay protection and substation Control. The ISPE Company is certified by Suddeutschland

BLACK SEA GROUP - ELECTRIC POWER SUBSTATIONS

25

TURN-KEY SOLUTION.

HIGH VOLTAGE POWER SUBSTATION

400 kV REACTANCE WAS BEEN MOUNTED ON PLACE.

SWITCH MANNOEUVRES.

EARTH BLADE COURSE ADJUSTING.

Page 26: electrical power substationsblackseagroup.com/catalog/substations.pdf · for all types of Relay protection and substation Control. The ISPE Company is certified by Suddeutschland

BLACK SEA GROUP - ELECTRIC POWER SUBSTATIONS

26

TURN-KEY SOLUTION.

HIGH VOLTAGE POWER SUBSTATION

•Technical supervision on site

Page 27: electrical power substationsblackseagroup.com/catalog/substations.pdf · for all types of Relay protection and substation Control. The ISPE Company is certified by Suddeutschland

BLACK SEA GROUP - ELECTRIC POWER SUBSTATIONS

27

SOLUTION FOR A COMPLETE INDOOR/ OUTDOOR 110(132) /20(33)KV

UPGRADING OF THE EXISTING SUBSTATION.

• Basic and Detail Design • Procurement and Delivery on site

• Manufacturing of LV switch-boxes and panels • Assembling of Control & Protection panels

• Installation of the HV equipment • Commissioning of HV equipment

• Training of the staff • Engineering and technical supervision on site

• Maintenance and Service • After sales service

Reference project: Upgrading of the existing primary 110kV/6kV substation with a NEW 110kV outdoor cell and 20kV switchgear indoor cells. Monophase diagram as below.

Page 28: electrical power substationsblackseagroup.com/catalog/substations.pdf · for all types of Relay protection and substation Control. The ISPE Company is certified by Suddeutschland

BLACK SEA GROUP - ELECTRIC POWER SUBSTATIONS

28

Page 29: electrical power substationsblackseagroup.com/catalog/substations.pdf · for all types of Relay protection and substation Control. The ISPE Company is certified by Suddeutschland

BLACK SEA GROUP - ELECTRIC POWER SUBSTATIONS

29

GENERAL LAYOUT OF THE EXISTING SUBSTATION AND THE EXTENSION

WITH A NEW 110 Kv CELL.

Page 30: electrical power substationsblackseagroup.com/catalog/substations.pdf · for all types of Relay protection and substation Control. The ISPE Company is certified by Suddeutschland

BLACK SEA GROUP - ELECTRIC POWER SUBSTATIONS

30

a)110kV apparatus: Three Phase Circuit Breaker; Three Phase Load Switch with earth blade;Surge Arrester;Current transformer;as in the photos below. The reference photos show the main parts of NEW 110kV cell after erection

and commissioning

Page 31: electrical power substationsblackseagroup.com/catalog/substations.pdf · for all types of Relay protection and substation Control. The ISPE Company is certified by Suddeutschland

BLACK SEA GROUP - ELECTRIC POWER SUBSTATIONS

31

Photo 1: [winter 2003] Complete 110kV line switch-disconnector in operation

Photo 2: [winter 2003] NEW 25MVA; 110/21kV transformer in operation

Page 32: electrical power substationsblackseagroup.com/catalog/substations.pdf · for all types of Relay protection and substation Control. The ISPE Company is certified by Suddeutschland

BLACK SEA GROUP - ELECTRIC POWER SUBSTATIONS

32

Photo 3 [winter 2003]: Complete 123kV Circuit Breaker in operation

Page 33: electrical power substationsblackseagroup.com/catalog/substations.pdf · for all types of Relay protection and substation Control. The ISPE Company is certified by Suddeutschland

BLACK SEA GROUP - ELECTRIC POWER SUBSTATIONS

33

Photo 4 [winter 2003]: Current transformers 75/150/1/1/1A; 123kV

Page 34: electrical power substationsblackseagroup.com/catalog/substations.pdf · for all types of Relay protection and substation Control. The ISPE Company is certified by Suddeutschland

BLACK SEA GROUP - ELECTRIC POWER SUBSTATIONS

34

(b)MV indoor components:

an upgrade of the existing 6 (11)kV substation to new level 20(33)kV, with respective 24(36)kV metal-clad switchgear.

A SET OF NEW 24kV SWITCHGEAR

A SET OF NEW 24 kV SWITCH- GEAR. FRONT VIEW.

A SET OF NEW 24kV SWITCH-GEAR. REAR VIEW.

Page 35: electrical power substationsblackseagroup.com/catalog/substations.pdf · for all types of Relay protection and substation Control. The ISPE Company is certified by Suddeutschland

BLACK SEA GROUP - ELECTRIC POWER SUBSTATIONS

35

(c)Control room -The existing control room is provided with a modern numerical Relay Protection of the Power Transformer and a Voltage Regulator cabinet for transformer tap changer automatic adjusting.

Page 36: electrical power substationsblackseagroup.com/catalog/substations.pdf · for all types of Relay protection and substation Control. The ISPE Company is certified by Suddeutschland

BLACK SEA GROUP - ELECTRIC POWER SUBSTATIONS

36

COMPLETE DELIVERY- SECONDARY UNIT SUBSTATION 20(11) KV

FOR SMALL BUILDING OR INDUSTRIAL FACILITY. A method to handle the distribution voltage is with a secondary unit substation.A typical Secondary Unit Substation consists of three sections wich are coordinated in design to form one uniform enclosure:

• incomming section • transformer section • outgoing section.

• Basic Design and Detail Design • Procurement and Delivery on site

• Manufacturing of LV switch-boxes and panels • Assembling of Control & Protection panels

• Installation of the HV equipment • Commissioning of HV equipment

• Engineering and technical supervision on site • Maintenance and Service

• Maintenance and Services • After sales services

Page 37: electrical power substationsblackseagroup.com/catalog/substations.pdf · for all types of Relay protection and substation Control. The ISPE Company is certified by Suddeutschland

BLACK SEA GROUP - ELECTRIC POWER SUBSTATIONS

37

a)The incoming section consists of two primary switches and automatic transfer between them by voltage control. The outgoing section consists of various switchboards and panel boards.

20kV connection utility substation 20kV secondary unit substation located into concrete Envelope. Incoming section of the building Room.

b) The transformer section consists with two transformer, cast- coil type. secondary unit substation secondary unit substation 20(10)/0,4kV; 800KVA power transformer 20(10)/0,4kV; 800KVA power transformer

LV SIDE CABLES HV SIDE CABLES

Page 38: electrical power substationsblackseagroup.com/catalog/substations.pdf · for all types of Relay protection and substation Control. The ISPE Company is certified by Suddeutschland

BLACK SEA GROUP - ELECTRIC POWER SUBSTATIONS

38

SUPPLY MOBILE SUBSTATION,

for emergency cases where have to solve the problem of power transformer failure :

10MVA;33/11 kV power transformer 20MVA;33/11 kV power transformer

The supply consists of:

-the power transformer loaded on the truck and well fitted -the low-bed semitrailler is dedicated to be hooked to a horseshoe-

shaped coupling device at a rear of the engine drive; 4 axles with air hydraulic suspension.

Accessories: ABS breaking system; 24 V electrical part. -the transformer and the truck are well earthed -the spare parts of the power transformer -the spare parts of the truck

General dimensions are: (a)total length:13 700…12 200 mm (b)width: 2500 mm (c)total height:4 800…4 500 mm (d) max. weight:58 000…45 500 kg

Mobile substation. 20MVA(10MVA); 33/11kV. Type SJ44 (SJ35)

4500

Page 39: electrical power substationsblackseagroup.com/catalog/substations.pdf · for all types of Relay protection and substation Control. The ISPE Company is certified by Suddeutschland

BLACK SEA GROUP - ELECTRIC POWER SUBSTATIONS

39

TECHNICAL DOCUMENTATION SERVICES.

• ANALYSE AND SOLUTIONS;

• TECHNICAL DESIGN AND FULL DETAILS

DRAWINGS;

• OPERATING AND MAINTENANCE INSTRUCTIONS;

ISPE Design Institute as BLACK SEA GROUP partner is a professional and activ partner for rehabilitation based on proven solutions set drawn from a constant effort of a variety substation rehabilitation in Romania for coming into UCTE European network. BLACK SEA GROUP and ISPE are able to offer a spread services concerning:

(a ) consulting and elevation drawings on site (b) technical conditions issue and full details to describe the technical

conditions (c) technical design for approval (d) detail design (e) operating, installation and maintenance instructions (f ) commissioning work and client training (g) presumed fault events and protection coordination (h) operation and events analyze (k) stability analyze and improvement proposals


Top Related