DG CONNECT E1Future Connectivity Systems

> 600 registered participants to conference includingexhibitors, from 32 countries

> 15% of registered participants originating fromoutside the EU

> 240 submitted papers,

> 25% papers fully originating from non EU authors

> 40 Exhibition booths

è EUCNC 17: a great international success!

EUCNC 2017 – some figures

Some take-aways from EUCNC175G Actions towards deployment started

• Proof of concepts and demos

• Testing facilities

• Industry readiness progressing fast, multi views?

• Standards, spectrum

But:• Still far away from full 5G promises

• 5G full mobility particularly challenging

• More attention needed beyond radio access

• New concepts to validate, e.g. micro operators

R&D and use case validations still very relevant !

• Next year EUCNC conference will be inLjubljana!

• 18 – 21 June

• Themes: TBD

• Target: continue increasing scientific qualityand international participation.

• è Stay tuned

EUCNC 2018

5G-PPP Phase 2

5G PPP Phase 2 objectives

• Leverage work and results of Phase 1 (WP 2014-15)

• Accelerate on proof of concepts anddemonstrators

• Where technological maturity permits, validateresearch results through use case from relevantvertical sectors (e.g. connected cars, eHealth etc.)

• Scalability and usability of mixed networktechnological approaches towards validation ofdeployment at scale (ICT-08-2017)

Phase 2 Projectsglobal5g.orgEuConNeCts3To-Euro-5G5G-PHOS5G-MEDIANGPaaSMATILDA5GCITY5GTANGO5G-CORALClear5G

5G ESSENCEIoRL5G-MoNArchMETRO-HAULBlueSpaceONE5G5G-PICTURE5GCAR5G-TRANSFORMER5G-XcastNRG-5SLICENETSaT5G

Coverage of sub areasNB: "not covered" may be partly addressed in a project with a different focus

PROPOSALS

TA1: 5GWirelessSystemDesign(RANarch,multirats)

TA2: AirInterface;

lowfrequency bands

TA3: AirInterface,mmwave

bands

TA4:Subsystem for 5Gplatform,HW/SWintegrati

on

TA 5:NovelRadio

syst.architecture,

cloudcore.

TA6:Integrati

on ofsatcom,

HAPS

TA7: 5Gfor

mMTC,URLL, allVerticals

TA8:CognitiveNetworkManage

ment

TA9:OpticalMetrofor 5G

backhaul

TA10:High

capacityoptical

core

TA11:converge

d 5Gflexhaul

TA12:Foundations/tools

for SWnetworks, NetOS

TA13:Security,privacy,

resilience,

availability

TA14:multi

domainmti

tenantsPluc &

play CP,slicing

ctrl

T17: 5Gaccess

integrating

opticaltechs

TA18:platform

s andtools forNetApps

TA19:Operatio

nalsupportto E2E

NVF/SDN

TA15:Open RIA

TA20/21:Open IA

Taiwan:ICT08 RIA

TA16:ICT-07

CSA

ONE 5G X X5G MONARCH X X5G ESSENCE X XSAT5G X5G CAR XSLICENET XMETRO-HAUL X5G TRANSFORMER X XBlue SPACE X X5GPICTURE XNRG-5 Venergy X5G-PHOS X5GCITY X5G-MEDIA X X5GTANGO X XMATILDA XNGPaaS X5G XCAST V X XIORL (vlc) X5G-CORAL X

Clear5G XTo-Euro-5G XEuConNeCts3 Xglobal5g.org X

Fund distribution by type of beneficiaries(retained)

SME RO HES PRC EU GrantPrivate 32,932,556 24,260,528 3,609,158 56,822,495 117,624,737

Public 0 7,126,815 23,729,755 0 30,856,570

Total 32,932,556

23%

31,387,343

21%

27,338,913

18%

56,822,495

38%

148,481,307

Tot industry:61%

%Phase

114.5% 15% 21% 49.5% 64%

Number of beneficiaries (retained)• In Phase 1: 172 (across 19 projects)• In Phase 2: 244 (across 24 projects)• In Phase 2 and not in Phase 1: 156 (of which

32 are new to H2020)

è64% of Phase 2 beneficiaries are new withrespect to Phase 1

Portfolio AssessmentVery strong portfolio:

• The inclusion of verticals has been achieved(automotive, healthcare, energy, media..)

• Holes of phase one have been addressed(satellite, optical)

• Strong move towards software networks andcloudified networks both at RAN and Core level;

• Basis for programme integration and phase 3preparation

• Industrial drive

5G-PPP Phase 3

Phase 3 a) VerificationDemo/Trial Platform- Integration radio+ network

Y2015 2016 2017 2018 2019 2020 2021 2022

Phase 2 - DemosPoC- Core TechsComponents

Phase 3 b) Integrated Verification Trial- radio+network+applications- Support to 5G action Plan Trial Roadmap

Early 5GintroductionLower frequencybands

Later 5GintroductionHigher frequencybands

Phase I Core Techologies

User needs, partnerships withvertical industries

Towards 5G PPP Phase 3(Work Programme 2018-20)

Planned adoption: October

5G Connected Cars inEU corridors

5G R&I for "Long Term Evolution"

Kick off at EUCNC14, 15 June

International cooperation, moving forwardR&D , 2018-20 Work-programme Policy

JAPAN - Applications and trials with 5G networks 3M€- Beyond 5G, applicability of spectrum >275GHz 3M€

- Spectrum, interop atdifferent bands

REPUBLICOF KOREA

- Application trials at mmwave bands 2 M€- Interworking across multiple radios 2 M€

- Standard, validation ofspecs

PEOPLE'sREPUBLICOF CHINA

- Trials at 3,5 Ghz and in the V2X context 6M€- Spectrum co-operation- Standards, preparing 5Gphase 2 through trialresults

TAIWAN - End to End Testbeds for specific applications:4 M€

USA - Coordination of EU-NSF projects relevant tothe Advanced Wireless Platform programme:2M€

BRAZIL- mMTC/URLLC Trials, 1 M€

- Spectrum co-operation- Standards trialling

What's Next?Short term: mid Term Review of cPPP's andH2020ü Very important exerciseü Impact, Impact, Impact. Key to demonstrateü Will be used as input towards next MFF (including FP9)

Longer Term: Next Multi Annual FinancialFramework, MFFü The budgetary period will include FP9 aspectsü Reflection already started in MS and in ECü EC intention is to make a proposal by mid 2018ü Important that you are engaged in the discussion with your