eucnc 2017 concluding remarks and way forward · eucnc 2017 concluding remarks and way forward 15th...

17
EUCNC 2017 Concluding Remarks and Way Forward 15 th June 2017, Oulu Bernard BARANI European Commission DG CONNECT E1 Future Connectivity Systems

Upload: phamnguyet

Post on 10-Apr-2018

219 views

Category:

Documents


3 download

TRANSCRIPT

EUCNC 2017Concluding Remarks and Way

Forward

15th June 2017, Oulu

Bernard BARANIEuropean Commission

DG CONNECT E1Future Connectivity Systems

> 600 registered participants to conference includingexhibitors, from 32 countries

> 15% of registered participants originating fromoutside the EU

> 240 submitted papers,

> 25% papers fully originating from non EU authors

> 40 Exhibition booths

è EUCNC 17: a great international success!

EUCNC 2017 – some figures

Some take-aways from EUCNC175G Actions towards deployment started

• Proof of concepts and demos

• Testing facilities

• Industry readiness progressing fast, multi views?

• Standards, spectrum

But:• Still far away from full 5G promises

• 5G full mobility particularly challenging

• More attention needed beyond radio access

• New concepts to validate, e.g. micro operators

R&D and use case validations still very relevant !

• Next year EUCNC conference will be inLjubljana!

• 18 – 21 June

• Themes: TBD

• Target: continue increasing scientific qualityand international participation.

• è Stay tuned

EUCNC 2018

5G-PPP Phase 2

5G PPP Phase 2 objectives

• Leverage work and results of Phase 1 (WP 2014-15)

• Accelerate on proof of concepts anddemonstrators

• Where technological maturity permits, validateresearch results through use case from relevantvertical sectors (e.g. connected cars, eHealth etc.)

• Scalability and usability of mixed networktechnological approaches towards validation ofdeployment at scale (ICT-08-2017)

Phase 2 Projectsglobal5g.orgEuConNeCts3To-Euro-5G5G-PHOS5G-MEDIANGPaaSMATILDA5GCITY5GTANGO5G-CORALClear5G

5G ESSENCEIoRL5G-MoNArchMETRO-HAULBlueSpaceONE5G5G-PICTURE5GCAR5G-TRANSFORMER5G-XcastNRG-5SLICENETSaT5G

Coverage of sub areasNB: "not covered" may be partly addressed in a project with a different focus

PROPOSALS

TA1: 5GWirelessSystemDesign(RANarch,multirats)

TA2: AirInterface;

lowfrequency bands

TA3: AirInterface,mmwave

bands

TA4:Subsystem for 5Gplatform,HW/SWintegrati

on

TA 5:NovelRadio

syst.architecture,

cloudcore.

TA6:Integrati

on ofsatcom,

HAPS

TA7: 5Gfor

mMTC,URLL, allVerticals

TA8:CognitiveNetworkManage

ment

TA9:OpticalMetrofor 5G

backhaul

TA10:High

capacityoptical

core

TA11:converge

d 5Gflexhaul

TA12:Foundations/tools

for SWnetworks, NetOS

TA13:Security,privacy,

resilience,

availability

TA14:multi

domainmti

tenantsPluc &

play CP,slicing

ctrl

T17: 5Gaccess

integrating

opticaltechs

TA18:platform

s andtools forNetApps

TA19:Operatio

nalsupportto E2E

NVF/SDN

TA15:Open RIA

TA20/21:Open IA

Taiwan:ICT08 RIA

TA16:ICT-07

CSA

ONE 5G X X5G MONARCH X X5G ESSENCE X XSAT5G X5G CAR XSLICENET XMETRO-HAUL X5G TRANSFORMER X XBlue SPACE X X5GPICTURE XNRG-5 Venergy X5G-PHOS X5GCITY X5G-MEDIA X X5GTANGO X XMATILDA XNGPaaS X5G XCAST V X XIORL (vlc) X5G-CORAL X

Clear5G XTo-Euro-5G XEuConNeCts3 Xglobal5g.org X

Fund distribution by type of beneficiaries(retained)

SME RO HES PRC EU GrantPrivate 32,932,556 24,260,528 3,609,158 56,822,495 117,624,737

Public 0 7,126,815 23,729,755 0 30,856,570

Total 32,932,556

23%

31,387,343

21%

27,338,913

18%

56,822,495

38%

148,481,307

Tot industry:61%

%Phase

114.5% 15% 21% 49.5% 64%

Number of beneficiaries (retained)• In Phase 1: 172 (across 19 projects)• In Phase 2: 244 (across 24 projects)• In Phase 2 and not in Phase 1: 156 (of which

32 are new to H2020)

è64% of Phase 2 beneficiaries are new withrespect to Phase 1

Portfolio AssessmentVery strong portfolio:

• The inclusion of verticals has been achieved(automotive, healthcare, energy, media..)

• Holes of phase one have been addressed(satellite, optical)

• Strong move towards software networks andcloudified networks both at RAN and Core level;

• Basis for programme integration and phase 3preparation

• Industrial drive

5G-PPP Phase 3

Phase 3 a) VerificationDemo/Trial Platform- Integration radio+ network

Y2015 2016 2017 2018 2019 2020 2021 2022

Phase 2 - DemosPoC- Core TechsComponents

Phase 3 b) Integrated Verification Trial- radio+network+applications- Support to 5G action Plan Trial Roadmap

Early 5GintroductionLower frequencybands

Later 5GintroductionHigher frequencybands

Phase I Core Techologies

User needs, partnerships withvertical industries

Towards 5G PPP Phase 3(Work Programme 2018-20)

Planned adoption: October

5G Connected Cars inEU corridors

5G R&I for "Long Term Evolution"

Kick off at EUCNC14, 15 June

International cooperation, moving forwardR&D , 2018-20 Work-programme Policy

JAPAN - Applications and trials with 5G networks 3M€- Beyond 5G, applicability of spectrum >275GHz 3M€

- Spectrum, interop atdifferent bands

REPUBLICOF KOREA

- Application trials at mmwave bands 2 M€- Interworking across multiple radios 2 M€

- Standard, validation ofspecs

PEOPLE'sREPUBLICOF CHINA

- Trials at 3,5 Ghz and in the V2X context 6M€- Spectrum co-operation- Standards, preparing 5Gphase 2 through trialresults

TAIWAN - End to End Testbeds for specific applications:4 M€

USA - Coordination of EU-NSF projects relevant tothe Advanced Wireless Platform programme:2M€

BRAZIL- mMTC/URLLC Trials, 1 M€

- Spectrum co-operation- Standards trialling

What's Next?Short term: mid Term Review of cPPP's andH2020ü Very important exerciseü Impact, Impact, Impact. Key to demonstrateü Will be used as input towards next MFF (including FP9)

Longer Term: Next Multi Annual FinancialFramework, MFFü The budgetary period will include FP9 aspectsü Reflection already started in MS and in ECü EC intention is to make a proposal by mid 2018ü Important that you are engaged in the discussion with your

national administrationsü Options very open at this strage, but god ideas welcome!

See you@EuCnC2018!